Loading...
2011/03/22 City Council Resolution 2011-26RESOLUTION NO. 2011- 26 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING THE MODIFIED BUILDING FEE SCHEDULE AND SUPERSEDING RESOLUTION NO. 2001-129 AND RESOLUTION NO. 2003-23 WHEREAS, Resolution No. 2001 -129 of the City Council of the City of Rohnert Park amending certain building permit fees was adopted on June 12, 2001; WHEREAS, Resolution No. 2003 -23 of the City Council of the City of Rohnert Park amending certain building department fees was adopted on February 11, 2003; WHEREAS, Rohnert Park Municipal Code Chapter 3.32, "Cost - Recovery Fee and Service Charge System," provides for the "establishment of a fee system to recover costs of the City in providing certain services, products and regulatory activities," including a regular review of fees to assure that they "continue to recover the reasonable and proportional share of costs from applicants requesting services," and providing authority for the Council "to establish such fees by resolution to support the cost of providing the service or services" requested by applicants; WHEREAS, the City of Rohnert Park Development Services Department retained Revenue and Cost Specialists LLC to conduct a cost of services study and analyze the current schedule of building fees adopted in 2001 and amended in 2003 in relation to the cost of providing building services; WHEREAS, based on the findings of the cost of services study, new and modified fees are recommended to achieve reasonable cost recovery; WHEREAS, the cost of services study provides the necessary data to substantiate that the proposed fees will not exceed the estimated reasonable cost of providing the services for which the fees are to be levied; WHEREAS, the new and modified fees are not a tax subject to the supermajority voting provisions of Article XIII of the California Constitution as amended by Proposition 26, but are an exception under Section 1(e)(3) of Article XIII C of the California Constitution as amended by Proposition 26, to wit: (e) As used in this article, "tax" means any levy, charge, or exaction of any kind imposed by a local government, except the following :... (3) A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof. WHEREAS, none of the fees outlined in the modified fee schedule are Development Impact Fees (fees imposed as a condition of approval of development) subject to state law requirements pertaining to those fees; WHEREAS, no fees are modified in this updated fee schedule for the purpose of acquiring funds for the construction of public improvements or the acquisition of equipment; WHEREAS, on January 25, 2011, the City Council of the City of Rohnert Park reviewed the draft modified fee schedule and supporting data during a scheduled public meeting and provided further guidance on the development of the new and modified fees; WHEREAS, in accordance with state law, the cost of services study was made available for public review at least ten days prior to the meeting at which the modified fee schedule is to be adopted; WHEREAS, the City published notice for adoption of the modified fee schedule in accordance with state law; WHEREAS, on March 22, 2011, the City Council of the City of Rohnert Park reviewed the modified fee schedule and supporting data during a scheduled public hearing; at which time interested persons had an opportunity to testify either in support of or opposition to the proposed fees; and WHEREAS, at the March 22, 2011 City Council meeting, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the Council considered all the facts relating to the modified fee schedule. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the above recitations are true and correct. Section 2. Environmental Clearance. The adoption of this Resolution is exempt from the California Environmental Quality Act as this action is not considered a "project" as defined in California Code of Regulations, Title 14, Chapter 3, Article 20, Section 15378(a): (a) "Project" means the whole of an action; which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment,... and is specifically excluded in Section 15378(b)(4), to wit: (b) "Project" does not include:... (4) The creation of government funding mechanisms or other government fiscal activities which do not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment. Section 3. Exhibit A establishes the fees which shall be collected for building permits and services, superseding Resolution No. 2001 -129 and Resolution No. 2003 723. , Section 4. If any action, subsection, sentence, clause or phrase of this Resolution or the fees levied by this Resolution shall be held invalid or unconstitutional by a court of competent jurisdiction, such invalidity shall not affect the validity of the remaining portions of this Resolution or the fees levied by this Resolution that can be given effect without the invalid provisions. Section 5. Waiver of Fee. The City Council is hereby authorized to waive any of the fees outlined in Exhibit A. If such a waiver occurs, the City Manager or his /her designee will. ensure that any fee category for which a waiver was granted does not exceed the estimated reasonable cost of providing the service. . BE IT FURTHER RESOLVED that the City Council approves the Building Fee Schedule set forth in Exhibit A, attached to and incorporated herein, and that such Fee Schedule shall be in full force and effective on June 1, 2011. DULY AND REGULARLY ADOPTED this 22nd day of March, 2011. ATTEST: City Cler CITY OF ROHNERT PARK LIPORIOP- AHANOTU: AYE CALLINAN: AYE MACKENZIE: AYE STAFFORD: AYE BELFORTE: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) City of Rohnert Park Development Services Building Plan Check, Inspection and Permit Fees March 2011 Page 2 of Exhibit A to Resolution No. 2011 -26 Building Plan Check, Inspection and Permit Fees Chapter 3.32 of the Rohnert Park Municipal Code provides the authority for the City to establish building plan check, inspection and permit fees by City resolution to recover the estimated costs of Building and Safety services provided by Rohnert Park Development Services. Chapter 15.04 also provides authority for the Building Official to establish and administer fees and penalties as allowed by the California Building Standards Code of the State of California. The following general provisions apply to fees for plan check, inspection and permitting of New Construction, Mechanical /Electrical /Plumbing and Miscellaneous building projects, as established in subsequent subsections of this Fee Schedule. A. Plan Check Fees Plan check fees for new construction are based on occupancy group, description, and project square footage. These plan check fees include review of structural, mechanical, plumbing, electrical plans and energy plans as typical for projects. Plan check fees assume an initial submittal for plan check review and 2 resubmittals. Upon the 3rd resubmittal, applicants may be charged additional plan checkfee(s) based on staff fully- burdened hourly rate or the actual cost of outside consultant, plus 7% administrative fee. B. Inspection Fees Inspection fees for new construction are based on occupancy group, description, and project square footage. These inspection fees include mechanical, plumbing, and electrical permits. C. Building Occupancy Type, Construction Type and Project Size Determination In cases in which building occupancy and construction type are not provided by the architect /designer on the submitted plans, the Building Official shall determine the construction type and building occupancy type based on the California Building Code. The project size for purposes of new construction fee calculation (both plan check and inspection) is determined by measuring outside to outside of exterior walls. The project size for purposes of tenant improvement fee calculation (both plan check and inspection) is determined by the inside measurements from wall to wall. D. Special Services When Development Services provides requested or necessary building services that are not included in this Fee Schedule, are for projects outside of the listed classifications /occupancies, or are for unusual projects or circumstances, the Building Official may assess and.collect such fees that are reasonably necessary to defray the cost of such services. Page 3 of Exhibit A to Resolution No. 2011 -26 E. Fees Based on Hourly Rates When the nature of work precludes assessment of fees based on the square footage method, plan check fees and /or inspections shall be charged on an hourly rate basis or the actual cost of outside consultant, plus 7% administrative fee. F. Fee Adjustments In instances where the strict application of fees from this schedule would constitute a substantial inequity to an applicant or to the City, the Building Official shall be authorized to adjust such fees on a case -by -case basis. Any such adjustments shall be recorded in writing and entered into the appropriate files. G. Investigation Fees for Work Prior to Issuance of Permit If work on a building project is found to have commenced without a permit, an investigation fee will be charged equal to the amount of inspection fees for that project. This penalty fee is in addition to the permit fees that will be required to bring the project into compliance. H. Expedited Plan Review The fee for expedited plan review is paid at the time of building permit application and shall be the normal plan review fee plus 15% of that fee, in addition to any consultant fee. The building official must grant approval for an expedited plan review before.the building permit application can be submitted. Page 4 of Exhibit A to Resolution No. 2011 -26 This page left intentionally blank. Page 5 of Exhibit A to Resolution No. 2011 -26 NEW CONSTRUCTION FEES Page 6 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees New Construction Occupancy Group R CONSTRUCTION TYPE IIA IIB, IIIA !11113 W : VA, VB ' IBC Class 13G Occupaticy Type PrOJeCt Size Threshold ]Threshold 'Base Cost @ Size Cost for each 'Additional 100 SF orfractiogal pa � :, .tFiereof BCost@ ase Threshold Size Cost for each Additional 100, SO or fractional. partthereof ` R -1 Residential - Hotels & Motels 5,0001 $7,061 $16.12 $5,649 $12.90 25,000 $10,285 $6.22 $8,228 $4.97 50,000 $11,839 $12.54 $9,471 $10.03 100,000 $18,109 $4.32 $14,487 $3.45 250,000 $24,586 $3.18 $19,669 $2.54 500,000 $32,526 $2.34 $26,021 $1.87 R -2 Apartments, Permanent 1,500 $5,571 $41.83 $4,457 $33.47 7,500 $8,081 $16.59 $6,465 $13.27 15,000 $9,325 $32.69 $7,460 $26.15 30,000 $14,228 $11.36 $11,382 $9.09 75,000 $19,340 $8.31 $15,472 $6.65 150,000 $25,573 $6.08 $20,458 $4.86 R -3 Dwellings - Custom Homes, Models, First Master Plan (See Note 3 below) 1,000 $3,354 $33.60 $2,683 $26.87 2,500 $3,858 $21.00 $3,086 $16.80 3,500 $4,068 $39.47 $3,254 $31.60 5,000 $4,660 $65.33 $3,728 $52.27 6,500 $5,640 $35.73 $4,512 $28.60 8,000 $6,176 $19.54 $4,941 $15.65 R -3 Dwellings - Plot Plan Check (Production Phase) (See Note 4 below) 1,000 $360 $0.00 $288 $0.00 2,500 $360 $0.00 $288 $0.00 3,500 $360 $0.00 $288 $0.00 5,000 $360 $0.00 $288 $0.00 6,500 $360 $0.00 $288 $0.00 8,000 $360 $0.00 $288 $0.00 R -3 R -3 Additions 50 $283 $170.00 $226 $136.08 250 $623 $156.80 $498 $125.44 500 $1,015 $170.80 $812 $136.64 1,000 $1,869 $88.13 $1,495 $70.52 2,500 $3,191 $96.92 $2,553 $77.52 5,000 $5,614 $106.59 $4,491 $85.21 NOTES: (1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. (3) Refer to current Master Plan Policy and Procedures for application of fees. (4) Refer to Plot Plan Check and Production Phase Inspections Policy for application of fees. City of Rohnert Park - Development Services March 2011 Page 7 of Exhibit A to Resolution No. 2011 -26 Inspection Fees New Construction Occupancy Group R CONSTRUCTION TYPE IIA, IIB, IIIA, -1116, IV ¢ VAsV6 IBC class IBC Occupancy Type Project Size Threshold Base cost @ Threshold Size' Cost for each Additional 100 SF,orfrac4onal Part thereof ? Baso Cost - @ Threshold Size Cost for each Additional 100 SF' Orfractional parE„ thereof R -1 Residential - Hotels & Motels 5,000 $11,181 $9.67 $8,945 $7.74 25,000 $13,115 $18.82 $10,492 $15.05 50,000 $17,819 $11.18 $14,255 $8.95 100,000 $23,410 $8.05 $18,728 $6.44 250,000 $35,484 $7.72 $28,387 $6.17 500,000 $54,778 $7.40 $43,822 $5.91 R -2 Apartments, Permanent 1,500 $4,421 $12.17 $3,537 $9.73 7,500 $5,151 $24.65 $4,121 $19.72 15,000 $7,000 $14.93 $5,600 $11.94 30,000 $9,239 $10.50 $7,391 $8.40 75,000 $13,964 $10.14 $11,171 $8.11 150,000 $21,570 $9.79 $17,256 $7.83 R -3 Dwellings - Custom Homes, Models, First Master Plan (See Note 2 below) 1,000 $3,225 $60.20 $2,580 $48.13 2,500 $4,128 $9.20 $3,302 $7.40 3,500 $4,220 $78.27 $3,376 $62.60 5,000 $5,394 $58.07 $4,315 $46.47 6,500 $6,265 $40.40 $5,012 $32.33 8,000 $6,871 $28.11 $5,497 $22.49 R -3 Dwellings - Production Phase Permitting and Inspections (See Note 3 below) 1,000 $2,666 1 $50.33 $2,133 $40.27 2,500 $3,421 $38.90 $2,737 $31.10 3,500 $3,810 $44.07 $3,048 $35.27 5,000 $4,471 $47.60 $3,577 $38.07 6,500 $5,185 $34.27 $4,148 $27.40 8,000 $5,699 $24.67 $4,559 $19.72 R -3 R -3 Additions 50 $302 $101.00 $241 $80.98 250 $504 $187.60 $403 $149.92 500 $973 $112.80 $778 $90.28 1,000 $1,537 $91.73 $1,229 $73.39 2,500 $2,913 $122.52 $2,330 $98.03 5,000 $5,976 $163.64 $4,781 $130.94 NOTES: (1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB - IIIA - IIIB -IV by 1.20 and Construction Type VA-V13 by 1.50. (3) Refer to current Master Plan Policy and Procedures for application of fees. (4) Refer to Plot Plan Check and Production Phase Inspections Policy for application of fees. City of Rohnert Park - Development Services March 2011 Page 8 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees New Construction Occupancy Groups A, B, & E NOTES: (1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA - IIB - IIIA - IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 CONSTRUCTION TYPE IIA, IIB, INA,1116, IV, NA, VB , IBC Class;' IBC: OccupancyTypt Project . Size Threshold Base Cost p� Threshold Size _ Cost for each Add .SForfractional partihereof Base Cost ;Threshold Size Cost;for each Additiona1100. SFor.frac6onal parfthereof A -1 All A Occupancy Types (Excluding restaurants, Assembly & TI's) 1,500 $6,503 $50.62 $5,202 $40.50 7,500 $9,540 $21.13 $7,632 $16.91 15,000 $11,125 $39.31 $8,900 $31.45 30,000 $17,021 $13.57 $13,617 $10.86 75,000 $23,128 $9.92 $18,502 $7.94 150,000 $30,570 $7.25 $24,456 $5.81 A -2 Assembly - food and drink Restaurants, night clubs, bar 250 $1,536 $179.40 $1,229 $143.50 1,250 $3,330 $143.60 $2,664 $114.88 2,500 $5,125 $108.56 $4,100 $86.84 5,000 $7,839 $37.33 $6,271 $29.87 12,500 $10,639 $27.43 $8,511 $21.94 25,000 $14,068 $20.16 $11,254 $16.12 A -3, A -4 Small assembly bldgs, indoor sport viewing arena, skating rink, tennis court 500 $2,869 $65.70 $2,295 $52.55 2,500 $4,183 $23.92 $3,346 $19.16 5,000 $4,781 $50.86 $3,825 $40.68 10,000 $7,324 $17.53 $5,859 $14.02 25,000 $9,953 $12.91 $7,962 $10.33 50,000 $13,180 $9.51 $10,544 $7.61 A -5 Outdoor activities, amusement park, skating rink, tennis court 1,500 $7,124 $53.73 $5,699 $42.98 7,500 $10,348 $20.71 $8,278 $16.57 15,000 $11,901 $42.00 $9,521 $33.60 30,000 $18,201 $14.46 $14,561 $11.57 75,000 $24,710 $10.67 $19,768 $8.54 150,000 $32,713 $7.87 $26,170 $6.30 B All B Occupancy Types (Buildings or spaces used for service type transactions, including storage of records and accounts; restaurants with less than 50 people. Not including office and TI's) 500 $3,724 $83.95 $2,979 $67.15 2,500 $5,403 $33.60 $4,322 $26.88 5,000 $6,243 $229.32 $4,994 $183.46 10,000 $17,709 $42.23 $14,167 $33.79 25,000 $24,044 $30.98 $19,235 $24.78 50,000 $31,788 $22.73 $25,430 $18.17 B Professional Office 500 $2,578 $62.10 $2,062 $49.70 2,500 $3,820 $24.80 $3,056 $19.84 5,000. $4,440 $49.90 $3,552 $39.92 10,000 $6,935 $17.17 $5,548 $13.74 25,000 $9,511 $11.80 $7,609 $9.44 50,000 $12,460 $8.11 $9,968 $6.49 E All E Occupancy Types (Excluding TI's) 750 $4,889 $75.37 $3,911 $60.30 3,750 $7,150 $28.21 $5,720 $22.56 7,500 $8,208 $57.93 $6,566 $46.35 15,000 $12,553 $20.09 $10,042 $16.08 37,5001 $17,074 $14.72 $13,659 $11.77 75,0001 $22,593 $10.79 $18,074 $8.62 NOTES: (1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA - IIB - IIIA - IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 Page 9 of Exhibit A to Resolution No. 2011 -26 Inspection Fees New Construction Occupancy Groups A, B, & E NOTES: (1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA - IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 co, NSTRUCTIONTYPE IIA, IIB, IIIA, IIIB,IN " VA; VB , IBC ..Class ::' . 'IBC Occupancy Type Project size' Thresholds Base Cost @� Threshold : Sk6e' Cost for each Additionat 100 SF orfractionalpart thereof Base Cost @ ',Threshold size - Cost for each Additional 106S orfractionalpart thereon A -1 All A Occupancy Types (Excluding restaurants, Assembly & TI's) 1,500 $5,693 $16.30 $4,554 $13.05 7,500 $6,671 $32.20 $5,337 $25.76 15,000 $9,086 $18.95 $7,269 $15.16 30,000 $11,929 $13.60 $9,543 $10.88 75,000 $18,048 $13.06 $14,438 $10.45 150,000 $27,841 $12.54 $22,273 $10.03 A -2 Assembly - food and drink Restaurants, night clubs, bar 250 $1,186 $90.70 $949 $72.63 1,250 $2,093 $137.36 $1,675 $109.86 2,500 $3,810 $47.84 $3,048 $38.28 5,000 $5,006 $34.00 $4,005 $27.20 12,500 $7,556 $32.66 $6,045 $26.12 25,000 $11,638 $31.37 $9,310 $25.08 A -3, A -4 Small assembly bldgs, indoor sport viewing arena, skating rink, tennis court 500 $2,294 $19.45 $1,835 $15.55 2,500 $2,683 $37.04 $2,146 $29.64 5,000 $3,609 $22.70 $2,887 $18.16 10,000 $4,744 $16.48 $3,795 $13.19 25,000 $7,216 $15.53 $5,773 $12.42 50,000 $11,098 $14.63 $8,878 $11.70 A -5 Outdoor activities, amusement park, skating rink, tennis court 1,500 $5,959 $17.23 $4,767 $13.78 7,500 $6,993 $33.23 $5,594 $26.59 15,000 $9,485 $19.89 $7,588 $15.91 30,000 $12,469 $14.38 $9,975 $11.50 75,000 $18,940 $13.66 $15,152 $10.93 150,000 $29,186 $12.98 $23,349 $10.38 B All B Occupancy Types (Buildings or spaces used for service type transactions, including storage of records and accounts; restaurants with less than 50 people. Not including office and TI's) 500 $1,656 $13.25 $1,325 $10.60 2,500 $1,921 $28.36 $1,537. $22.68 5,000 $2,630 $16.48 $2,104 $13.18 10,000 $3,454 $11.83 $2,763 $9.46 25,000 $5,228 $11.36 $4,182 $9.09 50,000 $8,068 $10.91 $6,454 $8.73 B Professional Office 500 $1,704 $14.45 $1,363 $11.55 2,500 $1,993 $27.40 $1,594 $21.92 5,000 $2,678 $16.34 $2,142 $13.08 10,000 $3,495 $12.01 $2,796 $9.61 25,000 $5,296 $12.67 $4,237 $10.13 50,000 $8,463 $13.37 $6,770 $10.69 E All E Occupancy Types (Excluding TI's) 750 $2,278 $12.93 $1,822 $10.37 3,750 $2,666 $25.55 $2,133 $20.43 7,500 $3,624 $15.12 $2,899 $12.09 15,000 $4,758 $10.92 $3,806 $8.74 37,5001 $7,215 $10.47 $5,772 $8.38 75,0001 $11,141 $10.04 $8,913 $8.03 NOTES: (1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA - IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 Page 10 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees New Construction Occupancy Groups F, H, M, S, U - CONSTRUCTION` TYPE na; uBj nlA;ulB; Iv ` VA, va ' IBC: Class -' IBC Occupancy Type PrOjeCt Size Thieshodd„ Base Cost ,p� Threshold. Size, aost for each , AddMonal100 orfractionaI parttnareof _,. Base Cost @ - < 'Threshold Size Cost for each Additiona1,100' SF.orfractional part thereof F -1 F -1 Woodworking 1,000 $4,424 $50.30 $3,539 $40.25 5,000 $6,436 $19.28 $5,149 $15.42 10,000 $7,400 $39.1b $5,920 $31.28 20,000 $11,310 $13.53 $9,048 $10.82 50,000 $15,368 $9.98 $12,294 $7.99 100,000 $20,359 $7,36 $16,287 $5.90 F -1 All F -1 Occupancy Types (excluding woodworking and industrial /manufacturing) 1,000 $2,638 $20.93 $2,110 $16.75 5,000 $3,475 $60.12 $2,780 $48.10 10,000 $6,481 $2.80 $5,185 $2.24 20,000 $6,761 $11.28 $5,409 $9.02 50,000 $10,145 $6.70 $8,116 $5.36 100,000 $13,496 $3.98 $10,797 $3.19 F -1, F -2 Industrial /Manufacturing and All F -2s 2,000 $4,888 $27.95 $3910 $22.36 10,000 $7,124 $10.65 $5,699 $8.52 20,000 $8,189 $21.68 $6,551 $17.35 40,000 $12,525 $7.48 $10,020 $5.99 100,000 $17,015 $5.46 $13,612 $4.37 200,000 $22,478 $3.99. $17,982 $3.19 H -2 H -4 High Hazard Group Pose health hazards 1,000 $4,049 $46.63 $3,239 $37.30 5,000 $5,914 $17.58 $4,731 $14.06 10,000 $6,793 $35.90 $5,434 $28.72 20,000 $10,383 $12.38 $8,306 $9.91 50,000 $14,098 $9.06 $11,278 $7.25 100,000 $18,629 $6.63 $14,903 $5.30 H -3 High Hazard Readily support combustion 100 $2,130 $247.00 $1,704 $197.50 500 $3,118 $96.40 $2,494 $77.20 1,000 $3,600 $188.90 $2,880 $151.10 2,000 $5,489 $65.80 $4,391 $52.63 5,000 $7,463 $48.06 $5,970 $38.46 10,000 $9,866 $35.10 $7,893 $28.11 H -5 High Hazard Semiconductor fabrication, R &D 1,500 $5,694 $43.50 $4,555 $34.80 7,500 $8,304 $16.27 $6,643 $13.01 15,000 $9,524 $33.66 $7,619 $26.93 30,000 $14,573 $11.57 $11,658 $9.25 75,000 $19,778 $8.52 $15,822 $6.82 150,000 $26,171 $6.27 $20,937 1 $5.03 M Mercantile - Market (retail or wholesale) 4,500 $4,686 $11.91 $3,749 $9.53 22,500 $6,830 $4.56 $5,464 $3.65 45,000 $7,856 $9.21 $6,285 $7.36 90,000 $11,999 $3.20 $9,599 $2.56 225,000 $16,320 $2.32 $13,056 $1.86 450,000 $21,549 $1.68 $17,2391 $1.35 City of Rohnert Park - Development Services March 2011 Page 11 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees New Construction Occupancy Groups F, H, M, S, U NOTES: (1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB- IIIA - IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 Page 12 of Exhibit A to Resolution No. 2011 -26 Inspection Fees New Construction Occupancy Groups F, H, M, S, U City of Rohnert Park - Development Services March 2011 `:CONSTRUCTION TYPE IIA, IIB, IIIA, IIIB, IV VA, VB IBC Class IBC Occupancy Type` PfOJ@Ct Stze,'! Threshold Base; Cost Threshold Size Cost_foreach Additional 100 soor.fractional parttnereof Base Cost Threshold, Size Cost for each Additional 100' s, or fractional part thereof i F -1 F -1 Woodworking 1,000 $3,249 $14.38 $2,599 $11.50 5,000 $3,824 $27.68 $3,059 $22.14 10,000 $5,208 $16.01 $4,166 $12.81 20,000 $6,809 $11.63 $5,447 $9.31 50,000 $10,299 $11.21 $8,239 $8.97 100,000 $15,903 $10.81 $12,722 $8.64 F -1 All F -1 Occupancy Types (excluding woodworking and industrial /manufacturing) 1,000 $1,953 $7.00 $1,562 $5.60 5,000 $2,233 $17.12 $1,786 $13.70 10,000 $3,089 $11.72 $2,471 $9.38 20,000 $4,261 $10.19 $3,409 $8.15 50,000 $7,318 $9.37 $5,854 $7.50 100,000 $12,005 $8.62 $9,604 $6.90 F -1, F -2 Industrial /Manufacturing and All F -2s 2,000 $3,605 $7.58 $2,884 $6.06 10,000 $4,211 $15.17 $3,369 $12.13 20,000 $5,728 $8.93 $4,582 $7.15 40,000 $7,514 $6.42 $6,011 $5.14 100,000 $11,366 $6.18 $9,093 $4.94 200,000 $17,545 $5.95 $14,036 $4.75 H -2 H -4 High Hazard Group Pose health hazards 11000 $4,250 $18.25 $3,400 $14.60 5,000 $4,980 $35.28 $3,984 $28.22 10,000 $6,744 $21.27 $5,395 $17.02 20,000 $8,871 $15.28 $7,097 $12.22 50,000 $13,455 $14.64 $10,764 $11.71 100,000 $20,775 $14.03 $16,620 $11.22 H -3 High Hazard Readily support combustion 100 $1,461 1 $66.25 $1,169 $53.00 500 $1,726 $119.80 $1,381 $95.80 1,000 $2,325 $71.60 $1,860 $57.30 2,000 $3,041 $52.60 $2,433 $42.07 5,000 $4,619 $50.10 $3,695 $40.08 10,000 $7,124 $47.72 $5,699 $38.18 H -5 High Hazard Semiconductor fabrication, R &D 1,500 $4,770 $13.73 $3,816 $10.98 7,500 $5,594 $26.72 $4,475 $21.37 15,000 $7,598 $15.85 $6,078 $12.68 30,000 $9,975 $11.48 $7,980 $9.18 75,000 $15,141 $10.95 $12,113 $8.76 150,000 $23,351 1 $10.44 $18,681 $8.36 M Mercantile - Market (retail or wholesale) 4,500 $3,419 $3.37 $2,735 $2.69 22,500 $4,025 $6.46 $3,220 $5.17 45,000 $5,479 $3.83 $4,383 $3.06 90,000 $7,203 $2.72 $5,762 $2.17 225,000 $10,870 $2.62 $8,696 $2.10 450,000 $16,776 $2.52 $13,421 $2.03 City of Rohnert Park - Development Services March 2011 Page 13 of Exhibit A to Resolution No. 2011 -26 Inspection Fees New Construction Occupancy Groups F, H, M, S, U NOTES: (1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- 116 -IIIA- 1116 -IV by 1.20 and Construction Type VA -VB by 1:50. City of Rohnert Park - Development Services March 2011 Page 14 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees New Construction Occupancy Groups I & L IBC Class IBC Occupancy .Type ; Project Size, Threshold.. Base Cost p� Threshold : Size. Costforeach Additional 100 SF or fractional parttrereof Base Cost Threshold Size Cost for each Additiona1100 SF or fractions part thereof 1 -1 Institutional - Health Care Centers 500 $3,506 $79.35 $2,805 $63.45 2,500 $5,093 $31.08 $4,074 $24.88 5,000 $5,870 $61.72 $4,696 $49.38 10,000 $8,956 $21.36 $7,165 $17.09 25,000 $12,160 $15.70 $9,728 $12.56 50,000 $16,085 $11.54 $12,868 $9.23 1 -2 Institutional - Nursing Home /Assisted Living /Convalescent Hospital 1,000 $6,224 $70.50 $4,979 1 $56.40 5,000 $9,044 $27.34 $7,235 $21.88 10,000 $10,411 $54.93 $8,329 $43.94 20,000 $15,904 $19.11 $12,723 $15.29 50,000 $21,638 $13.95 $17,310 $11.16 100,000 $28,615 $10.18 $22,892 $8.15 L Labs - California ONLY 1,000 $4,361 $50.33 $3,489 $40.25 5,000 $6,374 $19.28 $5,099 $15.42 10,000 $7,338 $38.48 $5,870 $30.79 20,000 $11,186 $13.42 $8,949 $10.73 50,000 $15,211 1 $9.80 $12,169 $7.84 100,000 $20,110 1 $7.16 $16,088 $5.73 NOTES: (1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. March 2011 City of Rohnert Park - Development Services Page 15 of Exhibit A to Resolution No. 2011 -26 Inspection Fees New Construction Occupancy Groups I & L 1 -1 Institutional - Health Care Centers 500 $2,495 $22.55 $1,996 $18.05 2,500 $2,946 $43.28 $2,357 $34.60 5,000 $4,028 $25.16 $3,222 $20.14 10,000 $5,286 $18.03 $4,229 $14.42 25,000 $7,990 $17.20 $6,392 $13.76 50,000 $12,290 $16.41 $9,832 1 $13.13 1 -2 Institutional - Nursing Home /Assisted Living /Convalescent Hospital 1,000 $5,290 $22.15 $4,232 $17.73 5,000 $6,176 $44.44 $4,941 $35.54 10,000 $8,398 $26.41 $6,718 $21.13 20,000 $11,039 $18.96 $8,831 $15.17 50,000 $16,726 $18.13 $13,381 $14.50 100,000 $25,791 $17.34 $20,633 1 $13.86 L Labs - California ONLY 1,000 $4,545 $19.08 $3,636 $15.25 5,000 $5,308 $38.20 $4,246 $30.56 10,000 $7,218 $22.70 $5,774 $18.16 20,000 $9,488 $16.37 $7,590 $13.09 50,000 $14,398 $15.58 $11,518 $12.47 100,000 $22,190 $14.83 $17,752 $11.88 NOTES: (1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 Page 16 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees New Construction All Shell Buildings NOTES: (1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- 116- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 Page 17 of Exhibit to Resolution No. 2011 -26 Inspection Fees New Construction All Shell Buildings NOTES: (1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of exterior walls. (2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB -IIIA- 1116 -IV by 1.20 and Construction Type VA -Vl3 by 1.50. City of Rohnert Park - Development Services March 2011 Page 18 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees Tenant Improvements Occupancy Groups A, B, E, F, H, I, M, S and "other" City of Rohnert Park - Development Services March 2011 . CONSTRUCTION TYPE . IIA, IIB, IIIA, IIIB, IV . VA, VB IBC ,; Class ; `', .. 1BCOccupancyType PI O1BCt Slze Threshold Base Cost @ Threshold Size,., ' Cost for each. Additional 100 SF orfractipnal part thereof. Base Cost @ Threshold Size .Cost for each Additional 100 SF or fractional part thereof A Assembly Occupancy Other than food and drink 500 $1,214 $71.45 $971 $57.16 2,500 $2,643 $55.481 $2,114 $44.39 5,000 $4,030 $42.62 $3,224 $34.10 10,000 $6,161 $14.79 $4,929 $11.83 25,000 $8,379 $10.80 $6,703 $8.64 50,000 $11,078 $7.89 $8,862 $6.31 A -2 Assembly Occupancy Food and drink establishment (Restaurant, night club, bar) 500 $1,214 $71.45 $971 $57.16 2,500 $2,643 $55.48 $2,114 $44.39 5,000 $4,030 $42.62 $3,224 $34.10 10,000 $6,161 $14.79 $4,929 $11.83 25,000 $8,379 $10.80 $6,703 $8.64 50,000 $11,078 $7.89 $8,862 $6.31 B Business Occupancy Services, except professional office, medical office, nail salon /hair salon, and restaurants with less than 50 occupants) 500 $1,073 $62.70 $859 $50.15 2,500 $2,327 $50.04 $1,862 $40.02 5,000 $3,578 $38.10 $2,862 $30.48 10,000 $5,483 $12.95 $4,386 $10.37 25,000 $7,426 $9.65 $5,941 $7.72 50,000 $9,838 $7.19 $7,870 $5.75 B Business Occupancy Professional Office 500 $953 $55.00 $762 $44.03 2,500 $2,053 $44.20 $1,643 $35.34 5,000 $3,158 $32.82 $2,526 $26.26 10,000 $4,799 $11.51 $3,839 $9.21 25,000 $6,525 $8.46 $5,220 $6.77 50,000 $8,641 $6.22 $6,913 $4.98 B Business Occupancy Medical Office / Exam 500 $1,073 $62.70 $859 $50.15 2,500 $2,327 $50.04 $1,862 $40.02 5,000 $3,578 $37.50 $2,862 $30.00 10,000 $5,453 $12.95 $4,362 $10.36 25,000 $7,395 $9.64 $5,916 $7.72 50,000 $9,806 1 $7.18 $7,845 $5.75 B Business Occupancy Nail / Hair Salon 250 $487 $36.00 $390 $28.78 1,250 $847 $44.88 $677 $35.90 2,500 $1,408 $23.32 $1,126 $18.68 5,000 $1,991 $5.19 $1,593 $4.15 12,500 $2,380 $19.04 $1,904 $15.23 B E Business Occupancy Restaurants under 50 person occupancy Educational Occupancy 250 $576 $42.70 $461 $34.20 1,250 $1,003 $49.04 $803 $39.24 2,500 $1,616 $15.00 $1,293 $12.00 5,000 $1,991 $5.19 $1,593 $4.15 12,500 500 $2,380 $762 $19.04 $45.85 $1,904 $15.23 $610 $36.69 2,500 $1,679 $35.48 $1,343 $28.39 5,000 $2,566 $26.94 $2,053 $21.54 10,000 $3,913 $9.32 $3,130 $7.46 25,000 $5,311 $6.81 $4,249 $5.45 50,000 $7,014 $4.981 $5,611 $3.98 City of Rohnert Park - Development Services March 2011 Page 19 of Exhibit A to Resolution No. 2011 -26 Plan Check Fees Tenant Improvements Occupancy Groups A, B, E, F, H, I, M, S and "other" CONSTRUCTION: TYPE IIA, IIB, IIlAoils, IV VX IBC. Glass IBC Occupancy3ype PrOjeFt Size Threshold, Base Cost Threshold, Size ost for.each AddiUona1100 SForfractional partthereof Base Cost:: @ Threshold, Slze Cost for each - AddWona1100 SF or fractional , :p ,rttherooF F, H F & H Occupancy Tenant Improvements Factory High Hazard 1,000 $3,521 $40.05 $2,817 $32.03 5,000 $5,123 $15.04 $4,098 $12.04 10,000 $5,875 $31.01 $4,700 $24.81 20,00.0 $8,976 $10.83 $7,181 $8.67 50,000 $12,226 $7.83 $9,781 $6.27 100,000 $16,143 $5.66 $12,914 $4.53 1 1 Occupancy Tenant Improvements Institutional 1,000 $4,361 $50.33 $3,489 $40.25 5,000 $6,374 $19.28 $5,099 $15.42 10,000 $7,338 $38.48 $5,870 $30.79 20,000 $11,186 $13.42 $8,949 $10.73 50,000 $15,211 $9.80 $12,169 $7.84 100,000 $20,110 $7.16 $16,088 $5.73 M M Occupancy Tenant Improvements Mercantile 2,000 $3,241 $18.66 $2,593 $14.93 10,000 $4,734 $7.24 $3,787 $5.79 20,000 $5,458 1 $1423 $4,366 $11.38 40,000 $8,303 $4.95 $6,642 $3.96 100,000 $11,273 $3.63 $9,018 $2.91 200,000 $14,904 $2.66 $11,923 $2.14 S S Occupancy Tenant Improvements Storage 150 $1,850 $138.83 $1,480 $111.00 750 $2,683 $56.00 $2,146 $44.80 1,500 $3,103 $107.33 $2,482 $85.87 3,000 $4,713 $37.67 $3,770 $30.13 7,500 $6,408 $27.48 $5,126 $21.99 15,000 $8,469 $20.05 $6,775 $16.05 Other Tenant Improvements 500 $2,948 $66.85 $2,358 $53.50 2,500 $4,285 $26.16 $3,428 $20.92 5,000 $4,939 $51.80 $3,951 $41.44 10,000 $7,529 $18.04 $6,023 $14.43 25,0001 $10,235 $13.22 $8,188 $10.58 50,0001 $13,540 $9.691 $10,832 $7.76 NOTES: (1) Project size for Tenant Improvement plan check fee calculation purposes is total square footage from inside wall to wall measurements. (2) Plan check fee adjustments for Tenant Improvements (TIs): • TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee • TI without plumbing/ mechanical: 70% base cost fee + 70% incremental cost fee • TI without electrical: 70% base cost fee + 70% incremental cost fee • TI only adding walls: 70% base cost fee + 70% incremental cost fee (3) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB -IIIA- IIIB -IV by 1.20 and Construction Type VA-V13 by 1.50. City of Rohnert Park - Development Services . March 2011 Page 20 of Exhibit A to Resolution No. 2011 -26 Inspection Fees Tenant Improvements Occupancy Groups A, B, E, F, H, 1, M, S and "other" City of Rohnert Park - Development Services March 2011 CONSTRUCTION'. TYPE IIA, IIB,iWX 11113; IV : VA, VB .. IBC Class , ., ! .. .: ! IBG Occupancy Type,: PrOJeCt . Size; . Thresholds Base Cost @ Threshold , = Size Cost for each Additiona1100SFor f ractionai part : thereof Base Cost @ Threshold Size? _... Cost forea'ch -Additional IWSF :. or fractional part: hereof ?_ A Assembly Occupancy (Other than food and drink) 500 $525 $31.40 $420 $25.13 2,500 $1,153 $31.88 $923 $25.50 5,000 $1,950 $15.30 $1,560 $12.24 10,000 $2,715 $8.37 $2,172 $6.70 25,000 $3,971 $7.45 $3,177 $5.96 50,000 $5,833 $6.63 $4,666 $5.30 A -2 Assembly Occupancy Food and drink (Restaurant, night club, bar) 500 $720 $30.25 $576 $24.19 2,500 $1,325 $49.80 $1,060 $39.85 5,000 $2,570 $19.06 $2,056 $15.24 10,000 $3,523 $11.27 $2,818 $9.01 25,000 $5,213 $10.17 $4,170 $8.14 50,000 $7,756 $9.18 $6,205 $7.35 B Business Occupancy Services, except professional office, medical office, nail salon /hair salon, and restaurants with less than 50 occupants) 500 $561 $24.30 $449 $19.46 2,500 $1,047 $30.48 $838 $24.37 5,000 $1,809 $13.88 $1,447 $11.10 10,000 $2,503 $7.58 $2,002 $6.07 25,000 $3,640 $7.16 $2,912 $5.73 50,000 $5,430 $6.76 $4,344 $5.41 B Business Occupancy Professional Office 1 500 $525 $25.20 $420 `$20.18 2,500 $1,029 $29.28 $824 $23.42 5,000 $1,761 $12.94 $1,409 $10.34 10,000 $2,408 $7.58 $1,926 $6.07 25,000 $3,545 $6.98 $2,836 $5.58 50,000 $5,289 $6.43 $4,231 $5.13 B Business Occupancy Medical Office / Exam 500 $634 $28.75 $507 $23.03 2,500 $1,209 $36.40 $968 $29.10 5,000 $2,119 $15.74 $1,695 $12.60 10,000 $2,906 $9.03 $2,325 $7.22 25,000 $4,260 $8.53 $3,408 $6.82 50,000 $6,393 $8.06 $5,114 $6.44 B Business Occupancy Nail / Hair Salon 250 $564 $42.20 $452 $33.75 1,250 $986 $33.76 $789 $26.96 2,500 $1,408 $17.12 $1,126 $13.72 5,000 $1,836 $7.25 $1,469 $5.80 12,500 $2,380 $19.04 $1,904 $15.23 ��e 250 $634 sX $53.20 y ....a... AMA, B Business Occupancy Restaurants under 50 person occupancy $507 $42.60 1,250 $1,166 $38.56 $933 $30.80 2,500 $1,648 $23.64 $1,318 $18.92 5,000 $2,239 $8.92 $1,791 $7.13 12,500 $2,908 $23.26 $2,326 $18.61 500 $525 $21.65 $420 E Educational Occupancy $17.33 2,500 $958 $28.32 $767 $22.66 5,000 $1,666 $12.00 $1,333 $9.60 10,000 $2,266 $7.27 $1,813 $5.81 25,000 $3,356 $6.69 $2,685 $5.35 50,000 $5,028 1 $6.161 $4,022 $4.93 City of Rohnert Park - Development Services March 2011 Page 21 of Exhibit A to Resolution No. 2011 -26 Inspection Fees Tenant Improvements Occupancy Groups A, B, E, F, H, I, M, S and "other NOTES: (1) Project size for Tenant Improvement inspection fee calculation purposes is total square footage from inside wall to wall measurements. (2) Inspection fee adjustments for Tenant Improvements (Tls): • TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee + 100% incremental • TI without plumbing / mechanical: 70% base cost fee + 70% incremental cost fee • TI without electrical: 85% base cost fee + 85% incremental cost fee • TI only adding /moving walls: 70% base cost fee + 70% incremental cost fee (3) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50. City of Rohnert Park - Development Services March 2011 Page 22 of Exhibit A to Resolution No. 2011 -26 This page left intentionally blank. Page 23 of Exhibit A to Resolution No. 2011 -26 MECHANICAL, ELECTRICAL AND PLUMBING FEES Page 24 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits FEE TYPES 'FEE:, MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (hourly rate) $ 99.00. UNIT FEES: A/C, Residential (each) Plan Check $ 70.00 A/C, Residential (each) Inspection $ 118.00 Furnace, less than 100,000 Btu, residential, including wall heaters, gas inserts, etc. Inspecton $ 86.45 Furnace, more than 100,000 Btu, residential, including wall heaters, gas inserts, etc. $ 124.60 Furnace, non -res, less than 100,000 Btu $ 133.00 Furnace, non -res, more than 100,000 Btu $ 148.00 Refrigeration Compressor $ 147.00 Boiler $ 254.00 Chiller $ 246.00 Heat Pump (Package Unit) $ 103.00 Air Handler $ 103.00 Duct Work (only) $ 103.00 Make -up Air System $ 148.00 Moisture Exhaust Duct, non - residential (Clothes Dryer) $ 88.00 Vent Fan, Single Duct (each) $ 96.00 Exhaust Hood and Duct (Residential) $ 117.00 Exhaust Hood, Type I (Commercial Grease Hood) $ 321.00 Exhaust Hood, Type II (Commercial Steam Hood) $ 231.00 Refrigerator Condenser Remote $ 170.00 Walk -in Box/Refrigerator Coil $ 163.00 Install /Relocate suspended heater, recessed wall heater, or floor- mounted unit heater (each) $ 103.00 Install /Relocate /Replace appliance vent installed and not included in an appliance permit (each) $ 111.00 Repair /Alter /Add heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls (each) Plan Check $ 108.00 Repair /Alter /Add heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls (each) Inspection $ 118.00 Install /Relocate boiler or compressor, up to and including 3HP, or absorption system up to and including 100,000 Btu /h (each) $ 126.00 City of Rohnert Park - Development Services March 2011 Page 25 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits FEE TYPES FEE Install /Relocate boiler or compressor, over 3HP and up to and including 15 HP, or absorption system over 100,000 Btu /h and up to and including 500,000 Btu /h (each) $ 174.00 Install /Relocate boiler or compressor, over 15 HP and up to and including 30 HP, or absorption system over 500,000 Btu /h and up to and including 1,000,000 Btu /h (each) $ 305.00 Install /Relocate boiler or compressor, over 30 HP and up to and including 50 HP, or absorption system over 1,000,000 Btu /h and up to and including 1,750,000 Btu /h (each) $ 332.00 Install /Relocate boiler or compressor, over 50 HP, or absorption system over 1,750,000 Btu /h (each) $ 481.00 Air - handling unit, including attached ducts. (Note: this fee shall not apply to an air - handling unit that is a portion of a factory- assembled appliance, cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere) (each) $ 131.00 Air - handling unit over 10,000 CFM (each) $ 117.00 Evaporative cooler other than portable type (each) $ 88.00 Ventilation fan connected to a single duct (each) $ 88.00 Ventilation system that is not a portion of any heating or air - conditioning system authorized by a permit (each) $ 96.00 Hood installation that is served by mechanical exhaust, including the ducts for such hood (each) $ 103.00 Appliance or piece of equipment not classed in other appliance categories, or for which no other fee is listed (each) $ 162.00 OTHER FEES: Other Mechanical Inspections (per hour) $ 99.00 PLUMBING /GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 99.00 UNIT FEES: Fixtures (each) $ 81.00 Gas System First Outlet $ 104.00 Each Additional Outlet $ 10.00 Building Sewer $ 103.00 Grease Trap (Inside Building, Each) $ 138.00 Backflow Preventer First 5 $ 82.00 Each after the First 5 $ 16.00 Roof Drain — Rainwater System $ 96.00 City of Rohnert Park - Development Services March 2011 Page 26 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits FEE TYPES FEE`;' Shower Valves including associated plumbing $ 118.00 Water Heater $ 87.55 Water Pipe Repair /Replacement, residential $ 103.00 Water Pipe Repair /Replacement, non - residential $ 162.00 Water Service Supply Line, residential $ 103.00 Water Service Supply Line, non - residential $ 162.00 Drain -Vent Repair /Alterations, residential $ 96.00 Drain -Vent Repair /Alterations, non - residential $ 148.00 Drinking Fountain $ 96.00 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) residential $ 363.00 Solar Water Heating, swimming pool, residential $ 341.00 Solar Water Heating, swimming pool, non - residential $ 375.00 Graywater Systems $ 345.00 Medical Gas System (Each Outlet) $ 151.00 Plumbing fixture or trap or set of fixtures on one trap, including water, drainage piping, and backflow protection (each) $ 96.00 Industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen -type grease interceptors functioning as fixture traps (each) $ 204.00 Install /Alter /Repair water piping and /or water treating equipment (each) $ 81.00 Repair /Alter drainage or vent piping (each fixture) $ 73.00 Lawn sprinkler system on any one meter, including backflow protection devices therefore (each) $ 103.00 Backflow devices not included in other fee services, e.g., building /trailer park sewer (each) $ 108.00 Atmospheric -type vacuum breakers not included in other fee services, e.g., building /trailer park sewer (1 -5 units) $ 103.00 Atmospheric -type vacuum breakers not included in other fee services, e.g., building /trailer park sewer (each unit over 5 units) $ 103.00 Canon Manor Sewer Lateral $ 542.00 Residential Sewer Lateral $ 229.00 OTHER FEES: Other Plumbing and Gas Inspections (per hour) $ 99.00 City of Rohnert Park - Development Services March 2011 Page 27 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits FEE TYPES FEE ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (hourly rate) $ 99.00 SYSTEM FEES: Residential Service, up to and including 400 amps $ 140.00 Residential Service, greater than 400 amps $ 223.00 Non - Residential service up to 200 amps $ 82.00 Non - Residential service 225 -400 amps $ 91.00 Non - Residential service 425 -600 amps $ 115.00 Non - Residential service 625 -800 amps $ 148.00 Non - Residential service over 800 amps $ 206.00 Non - Residential Circuits 15 or 20 amp, first 10 circuits (each) $ 96.00 15 or 20 amp, next 90 circuits (each) $ 126.00 15 or 20 amp, over 100 circuits (each) $ 178.00 30 or 40 amp circuits (each) $ 122.00 50 to 175 amp circuits (each) $ 165.00 200 amp and larger circuits (each) Plan Check $ 171.00 200 amp and larger circuits (each) Inspection $ 141.00 Temporary Service (each) $ 195.00 Temporary Pole (each) $ 144.00 Outdoor Events Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable - type rides, booths, displays, and attractions $ 293.00 Electric generator and electrically- driven rides (each) $ 189.00 Mechanically- driven rides and walk- through attractions or displays having electric lighting (each) $ 189.00 System of area and booth lighting (each) $ 107.00 City of Rohnert Park - Development Services March 2011 Page 28 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits FEE TYPES` FEE Temporary Power Service Temporary distribution system and temporary lighting and receptacle outlets for constructions sites, decorative light, Christmas tree sales lots, firework stands, etc. $ 254.00 Pre - Inspection (per hour) $ 237.00 Generator Installation (per kW) $ 111.00 UNIT FEES: Receptacle, Switch, Lighting Outlets, and Lighting Fixtures - RESIDENTIAL $0.06 /SF (Includes receptacles, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters; lighting fixtures, sockets or other lamp- holding devices) Residential Appliances Fixed residential appliances or receptacle outlets for same, including wall- mounted electric ovens; counter mounted cooking tops; electric ranges; self - contained room console or through -wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor - operated appliances (each) not exceeding one horsepower (HP) in rating (each) $ 88.00 (For other types of air conditioners and other motor - driven appliances having larger electrical ratings, see Power Apparatus) Nonresidential Appliances Nonresidential appliances and self - contained factory- wired, nonresidential appliances, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment (each) $ 148.00 Nonresidential appliances and self- contained factory- wired, nonresidential appliances not exceeding one horsepower (HP), kilowatt (kW), or kilovolt- ampere (kVA) in rating, including medical and dental devices; food, beverage; and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment (each) $ 148.00 (For other types of air conditioners and other motor - driven appliances having larger electrical ratings, see Power Apparatus) City of Rohnert Park - Development Services March 2011 Page 29 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits � FEE TYPES Power Apparatus Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus. Rating in horsepower (HP), kilowatts (kW), or kilovolt - amperes (WA), or kilovolt- amperes- reactive (WAR) Up to and including 1 (each) $ 122.00 Over 1 and not over 10 (each) $ 139.00 Over 10 and not over 50 (each) $ 208.00 Over 50 and not over 100 (each) $ 236.00 Over 100 (each) $ 258.00 (For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. These fees include all switches, circuit breakers, contactors, thermostats, relays, and other directly related control equipment.) Bus ways Trolley and plug -in -type bus ways - each 100 feet or fraction thereof $ 152.00 (An additional fee will be required for lighting fixtures, motors, and other appliances that are connected to trolley and plug -in -type bus ways. No fee is required for portable tools.) Signs, Outline Lighting, and Marquees Signs, Outline Lighting, or Marquees supplied from one branch circuit (each) $ 103.00 Additional branch circuits within the same sign, outline lighting system, or marquee (each) $ 88.00 Miscellaneous Apparatus, Conduits, Bus ways, and Conductors Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth: Plan Check $ 92.00 Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth: Inspection $ 94.00 (This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, bus ways, signs, or other equipment) OTHER FEES: Other Electrical Inspections (per hour) $ 99.00 City of Rohnert Park - Development Services March 2011 Page 30 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Mechanical, Electrical and Plumbing Permits BOTHER INSPECTIONS AND FEES Inspections outside of normal business hours, 0 -2 hours (minimum charge) Minimum charge - 2 hours, includes administrative and professional staff time $ 269.00 Each additional hour or portion thereof $ 169.00 Reinspections Minimum charge (See Reinspection Fee in MISCELLANEOUS FEES table) Each additional hour or portion thereof $ 169.00 Inspections for which no fee is specifically indicated, per hour (See Supplemental Inspection Fee in MISCELLANEOUS FEES table) Additional Plan Review required by changes, additions, or revisions to approved plans, per hour (See Supplemental Plan Check Fee in MISCELLANEOUS FEES City of Rohnert Park - Development Services March 2011 Page 31 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES, Unit. Note FEE Antenna = Telecom Facility Cellular /Mobile Phone, free - standing new structure each $1,727 Cellular /Mobile Phone, attached to existing structure each $941 Each addt'I co- located antenna each ad_d_VI antenna $199 Application Meeting .First Hour hourly rate $99 Each additional 1/2 hour hourly rate $49 Arbor/Trellis (R -3s only over 120ft, non R -3), Awning /Canopy (supported by building) R -3 each $147 Balcony addition (R -3) up to 200 SF $549 Balcony addition (R -3) over 200 SF each additional 50 SF or portion thereof $131 Business License Inspections each $74 Carport (R -3) - Plan Check each $224 Carport (R -3) - Inspection each $436 Change of Occupancy (over the counter) each $43 Change of Occupancy minimum fee, actual costs thereafter (1) $137 Chimney (factory- built, masonry), Chimney Repair each $424 Covered Porch (R3), Deck (wood) >30" above grade up to 200 SF $147 Covered Porch (R3), over 200 SF each additional 100 SF or portion thereof $78 Demolition Commercial - Inspection each $249 Residential - Inspection each $249 Disabled Access Compliance Inspection hourly rate $99 Door New door (non structural) each $150 New door (structural shear wall /masonry) each $704 Duplicate /Replacement Job Card each $144 Exterior Renovation, Non - Residential per 100 SF or portion thereof _ $62 Fence Masonry any height up to 100 LF $331 Non - masonry, over 6 feet in height; up to 100 LF $231 Non- masonry, over 6 feet in height; masonry any height, over 100 LF Each additional 100 LF or portion thereof $199 Final Inspection Permit each $325 City of Rohnert Park - Development Services March 2011 Page 32 of Exhibit A to Resolution No. 2011 -26 This page left intentionally blank. Page 33 of Exhibit A to Resolution No. 2011 -26 MISCELLANEOUS PERMITS FEES Page 34 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES , Unit Note . ` FEE. Fireplace $0 Pre- Fabricated /Metal Fireplace - Plan Check each $212 Pre - Fabricated /Metal Fireplace - Inspection each $318 Flag pole (over 20 feet in height) each $481 Fire Repairs Residential, more than 30% damaged - Use Residential Addition Fee Residential, less than 30% damaged - Plan Check each $424 Residential, less than 30% damaged - Inspection each $560 Commercial, use New Construction Tenant Improvement Foundation Only Residential W/O New Construction Permit each _ $897 W/ New Construction Permit each $405 Foundation Repair, R3 each $754 Foundation Repair, non -R3 each $904 Garage (detached) Wood frame up to 1,000 SF each $1,215 Wood frame, over 1,000 SF Each additional 1000 SF or portion thereof $230 Generator each $624 Master Plan - Revisions (2) Deferred Submittal Processing Fee each (2) (3) $364 Minor (no change in structure or square footage) each (2) (3) $231 Major (USE RESIDENTIAL NEW CONSTRUCTION - MASTER PLAN) (2) Master Plan - Duplicate Set Processing Fee each (2) (3) $182 Oven (Commercial) each $735 Partition — Commercial, Interior (up to 30 LF) up to 30 LF $506 Partition over 30 LF - Plan Check each additional 30 LF or portion thereof $144 Partition over 30 LF - Inspection each additional W LF or portion thereof $137 Partition— Residential, Interior (up to 30 LF) up to 30 LF $268 Partition over 30 LF each additional 30 LF or portion thereof $169 City of Rohnert Park - Development Services March 2011 Page 35 of Exhibit to Resolution No, 2011 -26 Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note,; FEE Patio Cover (wood frame, metal frame, other) up to 300 SF $443 Patio, over 300 SF each additional 300 SF or portion thereof $312 Enclosed (wood frame, metal frame, other) up to 300 sf $935 Enclosed patio over 300 SF - Plan Check each additional 300 SF or portion thereof $268 Enclosed patio over 300 SF - Inspection each additional 300 SF or portion thereof $62 Permission to Proceed (First $10,000) each $193 Each Addt'I $10,000 each additional $10,000 or portion thereof $144 Photovoltaic System $0 1 - 15 kilowatts - Plan Check each $150 1 - 15 kilowatts - Inspection each $156 16 - 50 kilowatts - Plan Check each $312 16 - 50 kilowatts - Inspection each $430 51 - 100 kilowatts- Plan Check each $529 51 - 100 kilowatts - Inspection each $648 101 - 200 kilowatts- Plan Check each $747 101 - 200 kilowatts - Inspection each $823 201 - 500 kilowatts - Plan Check each $1,679 201 - 500 kilowatts - Inspection each $3,225 500 kilowatts - 1 megawatt - Plan Check each $3,933 500 kilowatts - 1 megawatt - Inspection each $5,231 Plot Plan - Revision each (4) $137 Product Review minimum fee, actual costs thereafter (1) $118 Remodel — Residential Remodel up to 300 SF - Plan Check up to 300 SF $293 Remodel up to 300 SF - Inspection up to 300 SF $311 Remodel, over 300 SF - Plan Check each additional 100 SF or portion thereof $68 Remodel, over 300 SF - Inspection each additional 100 SF or portion thereof $93 Kitchen - Plan Check each $268 Kitchen - Inspection each $354 Bath - Plan Check each $175 Bath - Inspection each $236 City of Rohnert Park - Development Services March 2011 Plan Check and Inspection Fees Miscellaneous Permits Page 36 of Exhibit to Resolution No. 2011 -26 Unit Reinspection Fee minimum fee, actual costs thereafter (1),(3) $137 Repairs (residential) - Plan Check each $393 Repairs (residential) - Inspection each $367 Re -roof Residential (w/ new roof sheathing) - Inspection each $306 Residential (w /o new roof sheathing) - Inspection each $212 Multi - Family Dwelling - Plan Check each 5,000 SF or . portion thereof $56 Multi- Family Dwelling - Inspection each 5,000 SF or portion thereof $442 Commercial - Plan Check each 5,000 SF or portion thereof $56 Commercial - Inspection each 5,000 SF or portion thereof $404 Revisions to approved plans Commercial New Minimum fee (3) $118 Tenant Improvement Minimum fee (3) $118 Single Family Dwelling Minimum fee (3) $118 Addition Minimum fee (3) $118 Remodel Minimum fee (3) $118 Roof Structure Replacement - Plan Check up to 500 SF $212 Roof Structure Replacement - Inspection up to 500 SF $329 Roof structure replacement, over 500 SF each additional 100 SF or portion thereof $43 Sauna —steam each $723 SCEIP projects for which permits not typically issued (use Minimum Processing Fee) Siding Stone and Brick Veneer (interior or exterior), up to 800 sf up to 800 SF $461 Other Siding up to 800 SF - Plan Check (for commercial only) up to 800 SF $180 Other Siding up to 800 SF - Inspection up to 800 SF $230 Additional siding each additional 800 SF or portion thereof $169 Signs ( <_ 100 SF area) Roof / Projecting Signs each $306 Monument each $281 Pole (under 10) each $306 Wall /Awning Sign, Non - Electric each $262 Wall, Electric each $287 City of Rohnert Park - Development Services March 2011 Page 37 of Exhibit A to Resolution No. 2011 -26 Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Note FEE:, Other Sign - Plan Check each $212 Other Sign - Inspection each $131 Signs ( >100 SF area) Roof / Projecting Signs each $499 Monument each $350 Pole (over 10') each $449 Wall /Awning Sign, Non - Electric each $331 Wall, Electric each $405 Other Sign - Plan Check each $274 Other Sign - Inspection each $293 Site Accessibility per hour $99 Skylight Less than 10 SF each $212 Greater than 10 SF or structural each $468 Solar Panels (Thermal), residential or equal each $338 Storage Racks Storage racks over 8' high, up to 100 LF first 100 LF $674 Storage racks over 8' high, over 100 LF each additional 100 LF or portion thereof $237 Structural Repairs (Non - Residential) - Plan Check Each Structural Repairs (Non - Residential) - Inspection Each _ _$518 $927 Structural Repairs (Residential) - Plan Check Each $405 Structural Repairs (Residential) - Inspection Each $442 Stucco Applications up to 400 SF $455 Stucco Application, over 400 SF each additional 400 SF or portion thereof $280 Supplemental Plan Check Fee (after 3rd review) First hour each (1) $137 Each Additional 1/2 hour or. portion thereof per 1/2 hour or portion thereof (1) $68 Supplemental Inspection Fee $0 First 1/2 hour each (1) $68 Each Additional 1/2 hour or portion thereof per 1/2 hour or portion thereof (1) $68 Swimming Pool /Spa Vinyl -lined (up to 800 sf) each $635 Fiberglass each $635 Gunite (up to 800 sf) each $635 Additional pool (over 800 sf or portion thereof) each $374 Commercial pool (up to 800 sf) each $1,095 Commercial pool (over 800 sf or portion thereof) each $1,268 City of Rohnert Park - Development Services March 2011 Page 38 of Exhibit to Resolution No. 2011 -26 Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE,' . Spa or Hot Tub (Pre- fabricated) each $685 minimum fee, actual costs Temporary Occupancy Approval thereafter (3) $449 Trash Enclosure each $624 Window or Sliding Glass Door New Window (change in opening size /location, non - structural) each $112 New window (structural shear wall /masonry) - Plan Check each $261 New window (structural shear wall /masonry) - Inspection each $162 Bay Window (structural) - Plan Check each $261 Bay Window (structural) - Inspection each $423 Minimum Processing Fee (Administrative - No Permit) each (5) $37 Notes: 1. Minimum fee includes professional and minimum adminstrative staff time for service 2. Refer to Master Plan Policy 3. Processing fee only. Staff time and materials cost, or actual consultant fee + City administrative fee may be in addition to processing fee. 4. Refer to Plot Plan and Production Phase Policy 5, Use for SCEIP projects & other "non- permit" projects for intake and processing costs. City of Rohnert Park - Development Services March 2011