2011/03/22 City Council Resolution 2011-26RESOLUTION NO. 2011- 26
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
APPROVING THE MODIFIED BUILDING FEE SCHEDULE AND
SUPERSEDING RESOLUTION NO. 2001-129 AND RESOLUTION NO. 2003-23
WHEREAS, Resolution No. 2001 -129 of the City Council of the City of Rohnert Park
amending certain building permit fees was adopted on June 12, 2001;
WHEREAS, Resolution No. 2003 -23 of the City Council of the City of Rohnert Park
amending certain building department fees was adopted on February 11, 2003;
WHEREAS, Rohnert Park Municipal Code Chapter 3.32, "Cost - Recovery Fee and
Service Charge System," provides for the "establishment of a fee system to recover costs of the
City in providing certain services, products and regulatory activities," including a regular review
of fees to assure that they "continue to recover the reasonable and proportional share of costs
from applicants requesting services," and providing authority for the Council "to establish such
fees by resolution to support the cost of providing the service or services" requested by
applicants;
WHEREAS, the City of Rohnert Park Development Services Department retained
Revenue and Cost Specialists LLC to conduct a cost of services study and analyze the current
schedule of building fees adopted in 2001 and amended in 2003 in relation to the cost of
providing building services;
WHEREAS, based on the findings of the cost of services study, new and modified fees
are recommended to achieve reasonable cost recovery;
WHEREAS, the cost of services study provides the necessary data to substantiate that
the proposed fees will not exceed the estimated reasonable cost of providing the services for
which the fees are to be levied;
WHEREAS, the new and modified fees are not a tax subject to the supermajority voting
provisions of Article XIII of the California Constitution as amended by Proposition 26, but are
an exception under Section 1(e)(3) of Article XIII C of the California Constitution as amended
by Proposition 26, to wit:
(e) As used in this article, "tax" means any levy, charge, or exaction of any kind imposed
by a local government, except the following :...
(3) A charge imposed for the reasonable regulatory costs to a local government
for issuing licenses and permits, performing investigations, inspections, and
audits, enforcing agricultural marketing orders, and the administrative
enforcement and adjudication thereof.
WHEREAS, none of the fees outlined in the modified fee schedule are Development
Impact Fees (fees imposed as a condition of approval of development) subject to state law
requirements pertaining to those fees;
WHEREAS, no fees are modified in this updated fee schedule for the purpose of
acquiring funds for the construction of public improvements or the acquisition of equipment;
WHEREAS, on January 25, 2011, the City Council of the City of Rohnert Park reviewed
the draft modified fee schedule and supporting data during a scheduled public meeting and
provided further guidance on the development of the new and modified fees;
WHEREAS, in accordance with state law, the cost of services study was made available
for public review at least ten days prior to the meeting at which the modified fee schedule is to
be adopted;
WHEREAS, the City published notice for adoption of the modified fee schedule in
accordance with state law;
WHEREAS, on March 22, 2011, the City Council of the City of Rohnert Park reviewed
the modified fee schedule and supporting data during a scheduled public hearing; at which time
interested persons had an opportunity to testify either in support of or opposition to the proposed
fees; and
WHEREAS, at the March 22, 2011 City Council meeting, upon hearing and considering
all testimony and arguments, if any, of all persons desiring to be heard, the Council considered
all the facts relating to the modified fee schedule.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT
PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. That the above recitations are true and correct.
Section 2. Environmental Clearance. The adoption of this Resolution is exempt from
the California Environmental Quality Act as this action is not considered a "project" as defined
in California Code of Regulations, Title 14, Chapter 3, Article 20, Section 15378(a):
(a) "Project" means the whole of an action; which has a potential for resulting in either a
direct physical change in the environment, or a reasonably foreseeable indirect physical
change in the environment,...
and is specifically excluded in Section 15378(b)(4), to wit:
(b) "Project" does not include:... (4) The creation of government funding mechanisms or
other government fiscal activities which do not involve any commitment to any specific
project which may result in a potentially significant physical impact on the environment.
Section 3. Exhibit A establishes the fees which shall be collected for building permits
and services, superseding Resolution No. 2001 -129 and Resolution No. 2003 723. ,
Section 4. If any action, subsection, sentence, clause or phrase of this Resolution or
the fees levied by this Resolution shall be held invalid or unconstitutional by a court of
competent jurisdiction, such invalidity shall not affect the validity of the remaining portions of
this Resolution or the fees levied by this Resolution that can be given effect without the invalid
provisions.
Section 5. Waiver of Fee. The City Council is hereby authorized to waive any of the
fees outlined in Exhibit A. If such a waiver occurs, the City Manager or his /her designee will.
ensure that any fee category for which a waiver was granted does not exceed the estimated
reasonable cost of providing the service.
. BE IT FURTHER RESOLVED that the City Council approves the Building Fee
Schedule set forth in Exhibit A, attached to and incorporated herein, and that such Fee Schedule
shall be in full force and effective on June 1, 2011.
DULY AND REGULARLY ADOPTED this 22nd day of March, 2011.
ATTEST:
City Cler
CITY OF ROHNERT PARK
LIPORIOP-
AHANOTU: AYE CALLINAN: AYE MACKENZIE: AYE STAFFORD: AYE BELFORTE: AYE
AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0)
City of Rohnert Park
Development Services
Building Plan Check, Inspection
and Permit Fees
March 2011
Page 2 of Exhibit A to Resolution No. 2011 -26
Building Plan Check, Inspection and Permit Fees
Chapter 3.32 of the Rohnert Park Municipal Code provides the authority for the City to establish
building plan check, inspection and permit fees by City resolution to recover the estimated costs of
Building and Safety services provided by Rohnert Park Development Services. Chapter 15.04 also
provides authority for the Building Official to establish and administer fees and penalties as allowed by
the California Building Standards Code of the State of California.
The following general provisions apply to fees for plan check, inspection and permitting of New
Construction, Mechanical /Electrical /Plumbing and Miscellaneous building projects, as established in
subsequent subsections of this Fee Schedule.
A. Plan Check Fees
Plan check fees for new construction are based on occupancy group, description, and project square
footage. These plan check fees include review of structural, mechanical, plumbing, electrical plans and
energy plans as typical for projects. Plan check fees assume an initial submittal for plan check review
and 2 resubmittals. Upon the 3rd resubmittal, applicants may be charged additional plan checkfee(s)
based on staff fully- burdened hourly rate or the actual cost of outside consultant, plus 7% administrative
fee.
B. Inspection Fees
Inspection fees for new construction are based on occupancy group, description, and project square
footage. These inspection fees include mechanical, plumbing, and electrical permits.
C. Building Occupancy Type, Construction Type and Project Size Determination
In cases in which building occupancy and construction type are not provided by the
architect /designer on the submitted plans, the Building Official shall determine the construction type
and building occupancy type based on the California Building Code.
The project size for purposes of new construction fee calculation (both plan check and inspection) is
determined by measuring outside to outside of exterior walls. The project size for purposes of tenant
improvement fee calculation (both plan check and inspection) is determined by the inside
measurements from wall to wall.
D. Special Services
When Development Services provides requested or necessary building services that are not included
in this Fee Schedule, are for projects outside of the listed classifications /occupancies, or are for unusual
projects or circumstances, the Building Official may assess and.collect such fees that are reasonably
necessary to defray the cost of such services.
Page 3 of Exhibit A to Resolution No. 2011 -26
E. Fees Based on Hourly Rates
When the nature of work precludes assessment of fees based on the square footage method, plan
check fees and /or inspections shall be charged on an hourly rate basis or the actual cost of outside
consultant, plus 7% administrative fee.
F. Fee Adjustments
In instances where the strict application of fees from this schedule would constitute a substantial
inequity to an applicant or to the City, the Building Official shall be authorized to adjust such fees on a
case -by -case basis. Any such adjustments shall be recorded in writing and entered into the appropriate
files.
G. Investigation Fees for Work Prior to Issuance of Permit
If work on a building project is found to have commenced without a permit, an investigation fee will
be charged equal to the amount of inspection fees for that project. This penalty fee is in addition to the
permit fees that will be required to bring the project into compliance.
H. Expedited Plan Review
The fee for expedited plan review is paid at the time of building permit application and shall be the
normal plan review fee plus 15% of that fee, in addition to any consultant fee. The building official must
grant approval for an expedited plan review before.the building permit application can be submitted.
Page 4 of Exhibit A to Resolution No. 2011 -26
This page left intentionally blank.
Page 5 of Exhibit A to Resolution No. 2011 -26
NEW CONSTRUCTION
FEES
Page 6 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
New Construction
Occupancy Group R
CONSTRUCTION TYPE
IIA IIB, IIIA !11113 W : VA, VB '
IBC
Class
13G Occupaticy Type
PrOJeCt
Size
Threshold ]Threshold
'Base Cost @
Size
Cost for each
'Additional 100 SF
orfractiogal pa �
:, .tFiereof
BCost@
ase
Threshold Size
Cost for each
Additional 100,
SO or fractional.
partthereof `
R -1
Residential - Hotels & Motels
5,0001
$7,061
$16.12
$5,649
$12.90
25,000
$10,285
$6.22
$8,228
$4.97
50,000
$11,839
$12.54
$9,471
$10.03
100,000
$18,109
$4.32
$14,487
$3.45
250,000
$24,586
$3.18
$19,669
$2.54
500,000
$32,526
$2.34
$26,021
$1.87
R -2
Apartments, Permanent
1,500
$5,571
$41.83
$4,457
$33.47
7,500
$8,081
$16.59
$6,465
$13.27
15,000
$9,325
$32.69
$7,460
$26.15
30,000
$14,228
$11.36
$11,382
$9.09
75,000
$19,340
$8.31
$15,472
$6.65
150,000
$25,573
$6.08
$20,458
$4.86
R -3
Dwellings - Custom Homes, Models,
First Master Plan
(See Note 3 below)
1,000
$3,354
$33.60
$2,683
$26.87
2,500
$3,858
$21.00
$3,086
$16.80
3,500
$4,068
$39.47
$3,254
$31.60
5,000
$4,660
$65.33
$3,728
$52.27
6,500
$5,640
$35.73
$4,512
$28.60
8,000
$6,176
$19.54
$4,941
$15.65
R -3
Dwellings - Plot Plan Check
(Production Phase)
(See Note 4 below)
1,000
$360
$0.00
$288
$0.00
2,500
$360
$0.00
$288
$0.00
3,500
$360
$0.00
$288
$0.00
5,000
$360
$0.00
$288
$0.00
6,500
$360
$0.00
$288
$0.00
8,000
$360
$0.00
$288
$0.00
R -3
R -3 Additions
50
$283
$170.00
$226
$136.08
250
$623
$156.80
$498
$125.44
500
$1,015
$170.80
$812
$136.64
1,000
$1,869
$88.13
$1,495
$70.52
2,500
$3,191
$96.92
$2,553
$77.52
5,000
$5,614
$106.59
$4,491
$85.21
NOTES:
(1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside of
exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
(3) Refer to current Master Plan Policy and Procedures for application of fees.
(4) Refer to Plot Plan Check and Production Phase Inspections Policy for application of fees.
City of Rohnert Park - Development Services March 2011
Page 7 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
New Construction
Occupancy Group R
CONSTRUCTION TYPE
IIA, IIB, IIIA, -1116, IV ¢ VAsV6
IBC
class
IBC Occupancy Type
Project
Size
Threshold
Base cost
@
Threshold
Size'
Cost for each
Additional 100
SF,orfrac4onal
Part thereof ?
Baso Cost
- @
Threshold
Size
Cost for each
Additional 100 SF'
Orfractional parE„
thereof
R -1
Residential - Hotels & Motels
5,000
$11,181
$9.67
$8,945
$7.74
25,000
$13,115
$18.82
$10,492
$15.05
50,000
$17,819
$11.18
$14,255
$8.95
100,000
$23,410
$8.05
$18,728
$6.44
250,000
$35,484
$7.72
$28,387
$6.17
500,000
$54,778
$7.40
$43,822
$5.91
R -2
Apartments, Permanent
1,500
$4,421
$12.17
$3,537
$9.73
7,500
$5,151
$24.65
$4,121
$19.72
15,000
$7,000
$14.93
$5,600
$11.94
30,000
$9,239
$10.50
$7,391
$8.40
75,000
$13,964
$10.14
$11,171
$8.11
150,000
$21,570
$9.79
$17,256
$7.83
R -3
Dwellings - Custom Homes, Models,
First Master Plan
(See Note 2 below)
1,000
$3,225
$60.20
$2,580
$48.13
2,500
$4,128
$9.20
$3,302
$7.40
3,500
$4,220
$78.27
$3,376
$62.60
5,000
$5,394
$58.07
$4,315
$46.47
6,500
$6,265
$40.40
$5,012
$32.33
8,000
$6,871
$28.11
$5,497
$22.49
R -3
Dwellings - Production Phase
Permitting and Inspections
(See Note 3 below)
1,000
$2,666 1
$50.33
$2,133
$40.27
2,500
$3,421
$38.90
$2,737
$31.10
3,500
$3,810
$44.07
$3,048
$35.27
5,000
$4,471
$47.60
$3,577
$38.07
6,500
$5,185
$34.27
$4,148
$27.40
8,000
$5,699
$24.67
$4,559
$19.72
R -3
R -3 Additions
50
$302
$101.00
$241
$80.98
250
$504
$187.60
$403
$149.92
500
$973
$112.80
$778
$90.28
1,000
$1,537
$91.73
$1,229
$73.39
2,500
$2,913
$122.52
$2,330
$98.03
5,000
$5,976
$163.64
$4,781
$130.94
NOTES:
(1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside
of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB - IIIA - IIIB -IV by 1.20 and Construction Type VA-V13 by 1.50.
(3) Refer to current Master Plan Policy and Procedures for application of fees.
(4) Refer to Plot Plan Check and Production Phase Inspections Policy for application of fees.
City of Rohnert Park - Development Services March 2011
Page 8 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
New Construction
Occupancy Groups A, B, & E
NOTES:
(1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside
of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA - IIB - IIIA - IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
CONSTRUCTION
TYPE
IIA, IIB, INA,1116,
IV,
NA, VB ,
IBC
Class;'
IBC: OccupancyTypt
Project .
Size
Threshold
Base Cost
p�
Threshold
Size
_
Cost for each
Add
.SForfractional
partihereof
Base Cost
;Threshold
Size
Cost;for each
Additiona1100.
SFor.frac6onal
parfthereof
A -1
All A Occupancy Types (Excluding
restaurants, Assembly & TI's)
1,500
$6,503
$50.62
$5,202
$40.50
7,500
$9,540
$21.13
$7,632
$16.91
15,000
$11,125
$39.31
$8,900
$31.45
30,000
$17,021
$13.57
$13,617
$10.86
75,000
$23,128
$9.92
$18,502
$7.94
150,000
$30,570
$7.25
$24,456
$5.81
A -2
Assembly - food and drink
Restaurants, night clubs, bar
250
$1,536
$179.40
$1,229
$143.50
1,250
$3,330
$143.60
$2,664
$114.88
2,500
$5,125
$108.56
$4,100
$86.84
5,000
$7,839
$37.33
$6,271
$29.87
12,500
$10,639
$27.43
$8,511
$21.94
25,000
$14,068
$20.16
$11,254
$16.12
A -3, A -4
Small assembly bldgs, indoor sport viewing
arena, skating rink, tennis court
500
$2,869
$65.70
$2,295
$52.55
2,500
$4,183
$23.92
$3,346
$19.16
5,000
$4,781
$50.86
$3,825
$40.68
10,000
$7,324
$17.53
$5,859
$14.02
25,000
$9,953
$12.91
$7,962
$10.33
50,000
$13,180
$9.51
$10,544
$7.61
A -5
Outdoor activities, amusement park, skating
rink, tennis court
1,500
$7,124
$53.73
$5,699
$42.98
7,500
$10,348
$20.71
$8,278
$16.57
15,000
$11,901
$42.00
$9,521
$33.60
30,000
$18,201
$14.46
$14,561
$11.57
75,000
$24,710
$10.67
$19,768
$8.54
150,000
$32,713
$7.87
$26,170
$6.30
B
All B Occupancy Types (Buildings or spaces
used for service type transactions, including
storage of records and accounts; restaurants
with less than 50 people. Not including office
and TI's)
500
$3,724
$83.95
$2,979
$67.15
2,500
$5,403
$33.60
$4,322
$26.88
5,000
$6,243
$229.32
$4,994
$183.46
10,000
$17,709
$42.23
$14,167
$33.79
25,000
$24,044
$30.98
$19,235
$24.78
50,000
$31,788
$22.73
$25,430
$18.17
B
Professional Office
500
$2,578
$62.10
$2,062
$49.70
2,500
$3,820
$24.80
$3,056
$19.84
5,000.
$4,440
$49.90
$3,552
$39.92
10,000
$6,935
$17.17
$5,548
$13.74
25,000
$9,511
$11.80
$7,609
$9.44
50,000
$12,460
$8.11
$9,968
$6.49
E
All E Occupancy Types (Excluding TI's)
750
$4,889
$75.37
$3,911
$60.30
3,750
$7,150
$28.21
$5,720
$22.56
7,500
$8,208
$57.93
$6,566
$46.35
15,000
$12,553
$20.09
$10,042
$16.08
37,5001
$17,074
$14.72
$13,659
$11.77
75,0001
$22,593
$10.79
$18,074
$8.62
NOTES:
(1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside
of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA - IIB - IIIA - IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
Page 9 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
New Construction
Occupancy Groups A, B, & E
NOTES:
(1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of
exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA - IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
co, NSTRUCTIONTYPE
IIA, IIB, IIIA,
IIIB,IN
" VA; VB ,
IBC
..Class
::' . 'IBC Occupancy Type
Project
size'
Thresholds
Base Cost @�
Threshold
: Sk6e'
Cost for each
Additionat 100 SF
orfractionalpart
thereof
Base Cost @
',Threshold
size -
Cost for each
Additional 106S
orfractionalpart
thereon
A -1
All A Occupancy Types (Excluding
restaurants, Assembly & TI's)
1,500
$5,693
$16.30
$4,554
$13.05
7,500
$6,671
$32.20
$5,337
$25.76
15,000
$9,086
$18.95
$7,269
$15.16
30,000
$11,929
$13.60
$9,543
$10.88
75,000
$18,048
$13.06
$14,438
$10.45
150,000
$27,841
$12.54
$22,273
$10.03
A -2
Assembly - food and drink
Restaurants, night clubs, bar
250
$1,186
$90.70
$949
$72.63
1,250
$2,093
$137.36
$1,675
$109.86
2,500
$3,810
$47.84
$3,048
$38.28
5,000
$5,006
$34.00
$4,005
$27.20
12,500
$7,556
$32.66
$6,045
$26.12
25,000
$11,638
$31.37
$9,310
$25.08
A -3, A -4
Small assembly bldgs, indoor sport viewing
arena, skating rink, tennis court
500
$2,294
$19.45
$1,835
$15.55
2,500
$2,683
$37.04
$2,146
$29.64
5,000
$3,609
$22.70
$2,887
$18.16
10,000
$4,744
$16.48
$3,795
$13.19
25,000
$7,216
$15.53
$5,773
$12.42
50,000
$11,098
$14.63
$8,878
$11.70
A -5
Outdoor activities, amusement park, skating
rink, tennis court
1,500
$5,959
$17.23
$4,767
$13.78
7,500
$6,993
$33.23
$5,594
$26.59
15,000
$9,485
$19.89
$7,588
$15.91
30,000
$12,469
$14.38
$9,975
$11.50
75,000
$18,940
$13.66
$15,152
$10.93
150,000
$29,186
$12.98
$23,349
$10.38
B
All B Occupancy Types (Buildings or spaces
used for service type transactions, including
storage of records and accounts; restaurants
with less than 50 people. Not including office
and TI's)
500
$1,656
$13.25
$1,325
$10.60
2,500
$1,921
$28.36
$1,537.
$22.68
5,000
$2,630
$16.48
$2,104
$13.18
10,000
$3,454
$11.83
$2,763
$9.46
25,000
$5,228
$11.36
$4,182
$9.09
50,000
$8,068
$10.91
$6,454
$8.73
B
Professional Office
500
$1,704
$14.45
$1,363
$11.55
2,500
$1,993
$27.40
$1,594
$21.92
5,000
$2,678
$16.34
$2,142
$13.08
10,000
$3,495
$12.01
$2,796
$9.61
25,000
$5,296
$12.67
$4,237
$10.13
50,000
$8,463
$13.37
$6,770
$10.69
E
All E Occupancy Types (Excluding TI's)
750
$2,278
$12.93
$1,822
$10.37
3,750
$2,666
$25.55
$2,133
$20.43
7,500
$3,624
$15.12
$2,899
$12.09
15,000
$4,758
$10.92
$3,806
$8.74
37,5001
$7,215
$10.47
$5,772
$8.38
75,0001
$11,141
$10.04
$8,913
$8.03
NOTES:
(1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of
exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA - IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
Page 10 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
New Construction
Occupancy Groups F, H, M, S, U
- CONSTRUCTION` TYPE
na; uBj nlA;ulB; Iv ` VA, va '
IBC:
Class -'
IBC Occupancy Type
PrOjeCt
Size
Thieshodd„
Base Cost
,p�
Threshold.
Size,
aost for each ,
AddMonal100
orfractionaI
parttnareof
_,.
Base Cost
@ - <
'Threshold
Size
Cost for each
Additiona1,100'
SF.orfractional
part thereof
F -1
F -1 Woodworking
1,000
$4,424
$50.30
$3,539
$40.25
5,000
$6,436
$19.28
$5,149
$15.42
10,000
$7,400
$39.1b
$5,920
$31.28
20,000
$11,310
$13.53
$9,048
$10.82
50,000
$15,368
$9.98
$12,294
$7.99
100,000
$20,359
$7,36
$16,287
$5.90
F -1
All F -1 Occupancy Types (excluding
woodworking and industrial /manufacturing)
1,000
$2,638
$20.93
$2,110
$16.75
5,000
$3,475
$60.12
$2,780
$48.10
10,000
$6,481
$2.80
$5,185
$2.24
20,000
$6,761
$11.28
$5,409
$9.02
50,000
$10,145
$6.70
$8,116
$5.36
100,000
$13,496
$3.98
$10,797
$3.19
F -1, F -2
Industrial /Manufacturing and All F -2s
2,000
$4,888
$27.95
$3910
$22.36
10,000
$7,124
$10.65
$5,699
$8.52
20,000
$8,189
$21.68
$6,551
$17.35
40,000
$12,525
$7.48
$10,020
$5.99
100,000
$17,015
$5.46
$13,612
$4.37
200,000
$22,478
$3.99.
$17,982
$3.19
H -2
H -4
High Hazard Group
Pose health hazards
1,000
$4,049
$46.63
$3,239
$37.30
5,000
$5,914
$17.58
$4,731
$14.06
10,000
$6,793
$35.90
$5,434
$28.72
20,000
$10,383
$12.38
$8,306
$9.91
50,000
$14,098
$9.06
$11,278
$7.25
100,000
$18,629
$6.63
$14,903
$5.30
H -3
High Hazard
Readily support combustion
100
$2,130
$247.00
$1,704
$197.50
500
$3,118
$96.40
$2,494
$77.20
1,000
$3,600
$188.90
$2,880
$151.10
2,000
$5,489
$65.80
$4,391
$52.63
5,000
$7,463
$48.06
$5,970
$38.46
10,000
$9,866
$35.10
$7,893
$28.11
H -5
High Hazard
Semiconductor fabrication, R &D
1,500
$5,694
$43.50
$4,555
$34.80
7,500
$8,304
$16.27
$6,643
$13.01
15,000
$9,524
$33.66
$7,619
$26.93
30,000
$14,573
$11.57
$11,658
$9.25
75,000
$19,778
$8.52
$15,822
$6.82
150,000
$26,171
$6.27
$20,937 1
$5.03
M
Mercantile - Market (retail or wholesale)
4,500
$4,686
$11.91
$3,749
$9.53
22,500
$6,830
$4.56
$5,464
$3.65
45,000
$7,856
$9.21
$6,285
$7.36
90,000
$11,999
$3.20
$9,599
$2.56
225,000
$16,320
$2.32
$13,056
$1.86
450,000
$21,549
$1.68
$17,2391
$1.35
City of Rohnert Park - Development Services March 2011
Page 11 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
New Construction
Occupancy Groups F, H, M, S, U
NOTES:
(1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside
of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB- IIIA - IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
Page 12 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
New Construction
Occupancy Groups F, H, M, S, U
City of Rohnert Park - Development Services March 2011
`:CONSTRUCTION
TYPE
IIA, IIB, IIIA,
IIIB, IV
VA, VB
IBC
Class
IBC Occupancy Type`
PfOJ@Ct
Stze,'!
Threshold
Base; Cost
Threshold
Size
Cost_foreach
Additional 100
soor.fractional
parttnereof
Base Cost
Threshold,
Size
Cost for each
Additional 100'
s, or fractional
part thereof i
F -1
F -1 Woodworking
1,000
$3,249
$14.38
$2,599
$11.50
5,000
$3,824
$27.68
$3,059
$22.14
10,000
$5,208
$16.01
$4,166
$12.81
20,000
$6,809
$11.63
$5,447
$9.31
50,000
$10,299
$11.21
$8,239
$8.97
100,000
$15,903
$10.81
$12,722
$8.64
F -1
All F -1 Occupancy Types (excluding
woodworking and industrial /manufacturing)
1,000
$1,953
$7.00
$1,562
$5.60
5,000
$2,233
$17.12
$1,786
$13.70
10,000
$3,089
$11.72
$2,471
$9.38
20,000
$4,261
$10.19
$3,409
$8.15
50,000
$7,318
$9.37
$5,854
$7.50
100,000
$12,005
$8.62
$9,604
$6.90
F -1, F -2
Industrial /Manufacturing and All F -2s
2,000
$3,605
$7.58
$2,884
$6.06
10,000
$4,211
$15.17
$3,369
$12.13
20,000
$5,728
$8.93
$4,582
$7.15
40,000
$7,514
$6.42
$6,011
$5.14
100,000
$11,366
$6.18
$9,093
$4.94
200,000
$17,545
$5.95
$14,036
$4.75
H -2
H -4
High Hazard Group
Pose health hazards
11000
$4,250
$18.25
$3,400
$14.60
5,000
$4,980
$35.28
$3,984
$28.22
10,000
$6,744
$21.27
$5,395
$17.02
20,000
$8,871
$15.28
$7,097
$12.22
50,000
$13,455
$14.64
$10,764
$11.71
100,000
$20,775
$14.03
$16,620
$11.22
H -3
High Hazard
Readily support combustion
100
$1,461 1
$66.25
$1,169
$53.00
500
$1,726
$119.80
$1,381
$95.80
1,000
$2,325
$71.60
$1,860
$57.30
2,000
$3,041
$52.60
$2,433
$42.07
5,000
$4,619
$50.10
$3,695
$40.08
10,000
$7,124
$47.72
$5,699
$38.18
H -5
High Hazard
Semiconductor fabrication, R &D
1,500
$4,770
$13.73
$3,816
$10.98
7,500
$5,594
$26.72
$4,475
$21.37
15,000
$7,598
$15.85
$6,078
$12.68
30,000
$9,975
$11.48
$7,980
$9.18
75,000
$15,141
$10.95
$12,113
$8.76
150,000
$23,351 1
$10.44
$18,681
$8.36
M
Mercantile - Market (retail or wholesale)
4,500
$3,419
$3.37
$2,735
$2.69
22,500
$4,025
$6.46
$3,220
$5.17
45,000
$5,479
$3.83
$4,383
$3.06
90,000
$7,203
$2.72
$5,762
$2.17
225,000
$10,870
$2.62
$8,696
$2.10
450,000
$16,776
$2.52
$13,421
$2.03
City of Rohnert Park - Development Services March 2011
Page 13 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
New Construction
Occupancy Groups F, H, M, S, U
NOTES:
(1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside
of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- 116 -IIIA- 1116 -IV by 1.20 and Construction Type VA -VB by 1:50.
City of Rohnert Park - Development Services March 2011
Page 14 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
New Construction
Occupancy Groups I & L
IBC
Class
IBC Occupancy .Type ;
Project
Size,
Threshold..
Base Cost
p�
Threshold
: Size.
Costforeach
Additional 100
SF or fractional
parttrereof
Base Cost
Threshold
Size
Cost for each
Additiona1100
SF or fractions
part thereof
1 -1
Institutional - Health Care Centers
500
$3,506
$79.35
$2,805
$63.45
2,500
$5,093
$31.08
$4,074
$24.88
5,000
$5,870
$61.72
$4,696
$49.38
10,000
$8,956
$21.36
$7,165
$17.09
25,000
$12,160
$15.70
$9,728
$12.56
50,000
$16,085
$11.54
$12,868
$9.23
1 -2
Institutional - Nursing Home /Assisted
Living /Convalescent Hospital
1,000
$6,224
$70.50
$4,979
1 $56.40
5,000
$9,044
$27.34
$7,235
$21.88
10,000
$10,411
$54.93
$8,329
$43.94
20,000
$15,904
$19.11
$12,723
$15.29
50,000
$21,638
$13.95
$17,310
$11.16
100,000
$28,615
$10.18
$22,892
$8.15
L
Labs - California ONLY
1,000
$4,361
$50.33
$3,489
$40.25
5,000
$6,374
$19.28
$5,099
$15.42
10,000
$7,338
$38.48
$5,870
$30.79
20,000
$11,186
$13.42
$8,949
$10.73
50,000
$15,211 1
$9.80
$12,169
$7.84
100,000
$20,110 1
$7.16
$16,088
$5.73
NOTES:
(1) Project size for plan check fee calculation purposes is gross square footage as measured from the
outside of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value
for Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
March 2011
City of Rohnert Park - Development Services
Page 15 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
New Construction
Occupancy Groups I & L
1 -1
Institutional - Health Care Centers
500
$2,495
$22.55
$1,996
$18.05
2,500
$2,946
$43.28
$2,357
$34.60
5,000
$4,028
$25.16
$3,222
$20.14
10,000
$5,286
$18.03
$4,229
$14.42
25,000
$7,990
$17.20
$6,392
$13.76
50,000
$12,290
$16.41
$9,832
1 $13.13
1 -2
Institutional - Nursing Home /Assisted
Living /Convalescent Hospital
1,000
$5,290
$22.15
$4,232
$17.73
5,000
$6,176
$44.44
$4,941
$35.54
10,000
$8,398
$26.41
$6,718
$21.13
20,000
$11,039
$18.96
$8,831
$15.17
50,000
$16,726
$18.13
$13,381
$14.50
100,000
$25,791
$17.34
$20,633
1 $13.86
L
Labs - California ONLY
1,000
$4,545
$19.08
$3,636
$15.25
5,000
$5,308
$38.20
$4,246
$30.56
10,000
$7,218
$22.70
$5,774
$18.16
20,000
$9,488
$16.37
$7,590
$13.09
50,000
$14,398
$15.58
$11,518
$12.47
100,000
$22,190
$14.83
$17,752
$11.88
NOTES:
(1) Project size for inspection fee calculation purposes is gross square footage as measured from the
outside of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value
for Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
Page 16 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
New Construction
All Shell Buildings
NOTES:
(1) Project size for plan check fee calculation purposes is gross square footage as measured from the outside
of exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- 116- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
Page 17 of Exhibit to Resolution No. 2011 -26
Inspection Fees
New Construction
All Shell Buildings
NOTES:
(1) Project size for inspection fee calculation purposes is gross square footage as measured from the outside of
exterior walls.
(2) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB -IIIA- 1116 -IV by 1.20 and Construction Type VA -Vl3 by 1.50.
City of Rohnert Park - Development Services March 2011
Page 18 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
Tenant Improvements
Occupancy Groups A, B, E, F, H, I, M, S and "other"
City of Rohnert Park - Development Services March 2011
. CONSTRUCTION TYPE .
IIA, IIB, IIIA, IIIB, IV .
VA, VB
IBC ,;
Class
; `', ..
1BCOccupancyType
PI O1BCt
Slze
Threshold
Base Cost
@
Threshold
Size,.,
'
Cost for each.
Additional 100
SF orfractipnal
part thereof.
Base Cost
@
Threshold
Size
.Cost for each
Additional 100
SF or fractional
part thereof
A
Assembly Occupancy
Other than food and drink
500
$1,214
$71.45
$971
$57.16
2,500
$2,643
$55.481
$2,114
$44.39
5,000
$4,030
$42.62
$3,224
$34.10
10,000
$6,161
$14.79
$4,929
$11.83
25,000
$8,379
$10.80
$6,703
$8.64
50,000
$11,078
$7.89
$8,862
$6.31
A -2
Assembly Occupancy
Food and drink establishment
(Restaurant, night club, bar)
500
$1,214
$71.45
$971
$57.16
2,500
$2,643
$55.48
$2,114
$44.39
5,000
$4,030
$42.62
$3,224
$34.10
10,000
$6,161
$14.79
$4,929
$11.83
25,000
$8,379
$10.80
$6,703
$8.64
50,000
$11,078
$7.89
$8,862
$6.31
B
Business Occupancy
Services, except professional office, medical
office, nail salon /hair salon, and restaurants
with less than 50 occupants)
500
$1,073
$62.70
$859
$50.15
2,500
$2,327
$50.04
$1,862
$40.02
5,000
$3,578
$38.10
$2,862
$30.48
10,000
$5,483
$12.95
$4,386
$10.37
25,000
$7,426
$9.65
$5,941
$7.72
50,000
$9,838
$7.19
$7,870
$5.75
B
Business Occupancy
Professional Office
500
$953
$55.00
$762
$44.03
2,500
$2,053
$44.20
$1,643
$35.34
5,000
$3,158
$32.82
$2,526
$26.26
10,000
$4,799
$11.51
$3,839
$9.21
25,000
$6,525
$8.46
$5,220
$6.77
50,000
$8,641
$6.22
$6,913
$4.98
B
Business Occupancy
Medical Office / Exam
500
$1,073
$62.70
$859
$50.15
2,500
$2,327
$50.04
$1,862
$40.02
5,000
$3,578
$37.50
$2,862
$30.00
10,000
$5,453
$12.95
$4,362
$10.36
25,000
$7,395
$9.64
$5,916
$7.72
50,000
$9,806 1
$7.18
$7,845
$5.75
B
Business Occupancy
Nail / Hair Salon
250
$487
$36.00
$390
$28.78
1,250
$847
$44.88
$677
$35.90
2,500
$1,408
$23.32
$1,126
$18.68
5,000
$1,991
$5.19
$1,593
$4.15
12,500
$2,380
$19.04
$1,904
$15.23
B
E
Business Occupancy
Restaurants under 50 person occupancy
Educational Occupancy
250
$576
$42.70
$461
$34.20
1,250
$1,003
$49.04
$803
$39.24
2,500
$1,616
$15.00
$1,293
$12.00
5,000
$1,991
$5.19
$1,593
$4.15
12,500
500
$2,380
$762
$19.04
$45.85
$1,904
$15.23
$610
$36.69
2,500
$1,679
$35.48
$1,343
$28.39
5,000
$2,566
$26.94
$2,053
$21.54
10,000
$3,913
$9.32
$3,130
$7.46
25,000
$5,311
$6.81
$4,249
$5.45
50,000
$7,014
$4.981
$5,611
$3.98
City of Rohnert Park - Development Services March 2011
Page 19 of Exhibit A to Resolution No. 2011 -26
Plan Check Fees
Tenant Improvements
Occupancy Groups A, B, E, F, H, I, M, S and "other"
CONSTRUCTION: TYPE
IIA, IIB, IIlAoils, IV VX
IBC.
Glass
IBC Occupancy3ype
PrOjeFt
Size
Threshold,
Base Cost
Threshold,
Size
ost for.each
AddiUona1100
SForfractional
partthereof
Base Cost::
@
Threshold,
Slze
Cost for each -
AddWona1100
SF or fractional
, :p ,rttherooF
F, H
F & H Occupancy Tenant Improvements
Factory
High Hazard
1,000
$3,521
$40.05
$2,817
$32.03
5,000
$5,123
$15.04
$4,098
$12.04
10,000
$5,875
$31.01
$4,700
$24.81
20,00.0
$8,976
$10.83
$7,181
$8.67
50,000
$12,226
$7.83
$9,781
$6.27
100,000
$16,143
$5.66
$12,914
$4.53
1
1 Occupancy Tenant Improvements
Institutional
1,000
$4,361
$50.33
$3,489
$40.25
5,000
$6,374
$19.28
$5,099
$15.42
10,000
$7,338
$38.48
$5,870
$30.79
20,000
$11,186
$13.42
$8,949
$10.73
50,000
$15,211
$9.80
$12,169
$7.84
100,000
$20,110
$7.16
$16,088
$5.73
M
M Occupancy Tenant Improvements
Mercantile
2,000
$3,241
$18.66
$2,593
$14.93
10,000
$4,734
$7.24
$3,787
$5.79
20,000
$5,458
1 $1423
$4,366
$11.38
40,000
$8,303
$4.95
$6,642
$3.96
100,000
$11,273
$3.63
$9,018
$2.91
200,000
$14,904
$2.66
$11,923
$2.14
S
S Occupancy Tenant Improvements
Storage
150
$1,850
$138.83
$1,480
$111.00
750
$2,683
$56.00
$2,146
$44.80
1,500
$3,103
$107.33
$2,482
$85.87
3,000
$4,713
$37.67
$3,770
$30.13
7,500
$6,408
$27.48
$5,126
$21.99
15,000
$8,469
$20.05
$6,775
$16.05
Other Tenant Improvements
500
$2,948
$66.85
$2,358
$53.50
2,500
$4,285
$26.16
$3,428
$20.92
5,000
$4,939
$51.80
$3,951
$41.44
10,000
$7,529
$18.04
$6,023
$14.43
25,0001
$10,235
$13.22
$8,188
$10.58
50,0001
$13,540
$9.691
$10,832
$7.76
NOTES:
(1) Project size for Tenant Improvement plan check fee calculation purposes is total square footage from
inside wall to wall measurements.
(2) Plan check fee adjustments for Tenant Improvements (TIs):
• TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee
• TI without plumbing/ mechanical: 70% base cost fee + 70% incremental cost fee
• TI without electrical: 70% base cost fee + 70% incremental cost fee
• TI only adding walls: 70% base cost fee + 70% incremental cost fee
(3) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB -IIIA- IIIB -IV by 1.20 and Construction Type VA-V13 by 1.50.
City of Rohnert Park - Development Services . March 2011
Page 20 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
Tenant Improvements
Occupancy Groups A, B, E, F, H, 1, M, S and "other"
City of Rohnert Park - Development Services March 2011
CONSTRUCTION'. TYPE
IIA, IIB,iWX 11113; IV
: VA, VB ..
IBC
Class ,
., ! .. .:
! IBG Occupancy Type,:
PrOJeCt .
Size; .
Thresholds
Base Cost
@
Threshold
, = Size
Cost for each
Additiona1100SFor
f ractionai part :
thereof
Base Cost
@
Threshold
Size?
_...
Cost forea'ch
-Additional IWSF :.
or fractional part:
hereof ?_
A
Assembly Occupancy
(Other than food and drink)
500
$525
$31.40
$420
$25.13
2,500
$1,153
$31.88
$923
$25.50
5,000
$1,950
$15.30
$1,560
$12.24
10,000
$2,715
$8.37
$2,172
$6.70
25,000
$3,971
$7.45
$3,177
$5.96
50,000
$5,833
$6.63
$4,666
$5.30
A -2
Assembly Occupancy
Food and drink
(Restaurant, night club, bar)
500
$720
$30.25
$576
$24.19
2,500
$1,325
$49.80
$1,060
$39.85
5,000
$2,570
$19.06
$2,056
$15.24
10,000
$3,523
$11.27
$2,818
$9.01
25,000
$5,213
$10.17
$4,170
$8.14
50,000
$7,756
$9.18
$6,205
$7.35
B
Business Occupancy
Services, except professional office, medical
office, nail salon /hair salon, and restaurants
with less than 50 occupants)
500
$561
$24.30
$449
$19.46
2,500
$1,047
$30.48
$838
$24.37
5,000
$1,809
$13.88
$1,447
$11.10
10,000
$2,503
$7.58
$2,002
$6.07
25,000
$3,640
$7.16
$2,912
$5.73
50,000
$5,430
$6.76
$4,344
$5.41
B
Business Occupancy
Professional Office
1 500
$525
$25.20
$420
`$20.18
2,500
$1,029
$29.28
$824
$23.42
5,000
$1,761
$12.94
$1,409
$10.34
10,000
$2,408
$7.58
$1,926
$6.07
25,000
$3,545
$6.98
$2,836
$5.58
50,000
$5,289
$6.43
$4,231
$5.13
B
Business Occupancy
Medical Office / Exam
500
$634
$28.75
$507
$23.03
2,500
$1,209
$36.40
$968
$29.10
5,000
$2,119
$15.74
$1,695
$12.60
10,000
$2,906
$9.03
$2,325
$7.22
25,000
$4,260
$8.53
$3,408
$6.82
50,000
$6,393
$8.06
$5,114
$6.44
B
Business Occupancy
Nail / Hair Salon
250
$564
$42.20
$452
$33.75
1,250
$986
$33.76
$789
$26.96
2,500
$1,408
$17.12
$1,126
$13.72
5,000
$1,836
$7.25
$1,469
$5.80
12,500
$2,380
$19.04
$1,904
$15.23
��e
250
$634
sX
$53.20
y
....a... AMA,
B
Business Occupancy
Restaurants under 50 person occupancy
$507
$42.60
1,250
$1,166
$38.56
$933
$30.80
2,500
$1,648
$23.64
$1,318
$18.92
5,000
$2,239
$8.92
$1,791
$7.13
12,500
$2,908
$23.26
$2,326
$18.61
500
$525
$21.65
$420
E
Educational Occupancy
$17.33
2,500
$958
$28.32
$767
$22.66
5,000
$1,666
$12.00
$1,333
$9.60
10,000
$2,266
$7.27
$1,813
$5.81
25,000
$3,356
$6.69
$2,685
$5.35
50,000
$5,028 1
$6.161
$4,022
$4.93
City of Rohnert Park - Development Services March 2011
Page 21 of Exhibit A to Resolution No. 2011 -26
Inspection Fees
Tenant Improvements
Occupancy Groups A, B, E, F, H, I, M, S and "other
NOTES:
(1) Project size for Tenant Improvement inspection fee calculation purposes is total square footage from inside wall to
wall measurements.
(2) Inspection fee adjustments for Tenant Improvements (Tls):
• TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee + 100% incremental
• TI without plumbing / mechanical: 70% base cost fee + 70% incremental cost fee
• TI without electrical: 85% base cost fee + 85% incremental cost fee
• TI only adding /moving walls: 70% base cost fee + 70% incremental cost fee
(3) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services March 2011
Page 22 of Exhibit A to Resolution No. 2011 -26
This page left intentionally blank.
Page 23 of Exhibit A to Resolution No. 2011 -26
MECHANICAL, ELECTRICAL
AND PLUMBING FEES
Page 24 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES
'FEE:,
MECHANICAL PERMIT FEES
Stand Alone Mechanical Plan Check (hourly rate)
$
99.00.
UNIT FEES:
A/C, Residential (each) Plan Check
$
70.00
A/C, Residential (each) Inspection
$
118.00
Furnace, less than 100,000 Btu, residential, including wall heaters, gas inserts, etc.
Inspecton
$
86.45
Furnace, more than 100,000 Btu, residential, including wall heaters, gas inserts, etc.
$
124.60
Furnace, non -res, less than 100,000 Btu
$
133.00
Furnace, non -res, more than 100,000 Btu
$
148.00
Refrigeration Compressor
$
147.00
Boiler
$
254.00
Chiller
$
246.00
Heat Pump (Package Unit)
$
103.00
Air Handler
$
103.00
Duct Work (only)
$
103.00
Make -up Air System
$
148.00
Moisture Exhaust Duct, non - residential (Clothes Dryer)
$
88.00
Vent Fan, Single Duct (each)
$
96.00
Exhaust Hood and Duct (Residential)
$
117.00
Exhaust Hood, Type I (Commercial Grease Hood)
$
321.00
Exhaust Hood, Type II (Commercial Steam Hood)
$
231.00
Refrigerator Condenser Remote
$
170.00
Walk -in Box/Refrigerator Coil
$
163.00
Install /Relocate suspended heater, recessed wall heater, or floor- mounted unit heater
(each)
$
103.00
Install /Relocate /Replace appliance vent installed and not included in an appliance
permit (each)
$
111.00
Repair /Alter /Add heating appliance, refrigeration unit, cooling unit, absorption unit, or
each heating, cooling, absorption, or evaporative cooling system, including
installation of controls (each) Plan Check
$
108.00
Repair /Alter /Add heating appliance, refrigeration unit, cooling unit, absorption unit, or
each heating, cooling, absorption, or evaporative cooling system, including
installation of controls (each) Inspection
$
118.00
Install /Relocate boiler or compressor, up to and including 3HP, or absorption system
up to and including 100,000 Btu /h (each)
$
126.00
City of Rohnert Park - Development Services March 2011
Page 25 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
Install /Relocate boiler or compressor, over 3HP and up to and including 15 HP, or
absorption system over 100,000 Btu /h and up to and including 500,000 Btu /h (each)
$
174.00
Install /Relocate boiler or compressor, over 15 HP and up to and including 30 HP, or
absorption system over 500,000 Btu /h and up to and including 1,000,000 Btu /h (each)
$
305.00
Install /Relocate boiler or compressor, over 30 HP and up to and including 50 HP, or
absorption system over 1,000,000 Btu /h and up to and including 1,750,000 Btu /h
(each)
$
332.00
Install /Relocate boiler or compressor, over 50 HP, or absorption system over
1,750,000 Btu /h (each)
$
481.00
Air - handling unit, including attached ducts. (Note: this fee shall not apply to an air -
handling unit that is a portion of a factory- assembled appliance, cooling unit,
evaporative cooler, or absorption unit for which a permit is required elsewhere) (each)
$
131.00
Air - handling unit over 10,000 CFM (each)
$
117.00
Evaporative cooler other than portable type (each)
$
88.00
Ventilation fan connected to a single duct (each)
$
88.00
Ventilation system that is not a portion of any heating or air - conditioning system
authorized by a permit (each)
$
96.00
Hood installation that is served by mechanical exhaust, including the ducts for such
hood (each)
$
103.00
Appliance or piece of equipment not classed in other appliance categories, or for
which no other fee is listed (each)
$
162.00
OTHER FEES:
Other Mechanical Inspections (per hour)
$
99.00
PLUMBING /GAS PERMIT FEES
Stand Alone Plumbing Plan Check (hourly rate)
$
99.00
UNIT FEES:
Fixtures (each)
$
81.00
Gas System
First Outlet
$
104.00
Each Additional Outlet
$
10.00
Building Sewer
$
103.00
Grease Trap (Inside Building, Each)
$
138.00
Backflow Preventer
First 5
$
82.00
Each after the First 5
$
16.00
Roof Drain — Rainwater System
$
96.00
City of Rohnert Park - Development Services March 2011
Page 26 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE`;'
Shower Valves including associated plumbing
$
118.00
Water Heater
$
87.55
Water Pipe Repair /Replacement, residential
$
103.00
Water Pipe Repair /Replacement, non - residential
$
162.00
Water Service Supply Line, residential
$
103.00
Water Service Supply Line, non - residential
$
162.00
Drain -Vent Repair /Alterations, residential
$
96.00
Drain -Vent Repair /Alterations, non - residential
$
148.00
Drinking Fountain
$
96.00
Solar Water System Fixtures (solar panels, tanks, water treatment equipment)
residential
$
363.00
Solar Water Heating, swimming pool, residential
$
341.00
Solar Water Heating, swimming pool, non - residential
$
375.00
Graywater Systems
$
345.00
Medical Gas System (Each Outlet)
$
151.00
Plumbing fixture or trap or set of fixtures on one trap, including water, drainage
piping, and backflow protection (each)
$
96.00
Industrial waste pretreatment interceptor, including its trap and vent, excepting
kitchen -type grease interceptors functioning as fixture traps (each)
$
204.00
Install /Alter /Repair water piping and /or water treating equipment (each)
$
81.00
Repair /Alter drainage or vent piping (each fixture)
$
73.00
Lawn sprinkler system on any one meter, including backflow protection devices
therefore (each)
$
103.00
Backflow devices not included in other fee services, e.g., building /trailer park sewer
(each)
$
108.00
Atmospheric -type vacuum breakers not included in other fee services, e.g.,
building /trailer park sewer (1 -5 units)
$
103.00
Atmospheric -type vacuum breakers not included in other fee services, e.g.,
building /trailer park sewer (each unit over 5 units)
$
103.00
Canon Manor Sewer Lateral
$
542.00
Residential Sewer Lateral
$
229.00
OTHER FEES:
Other Plumbing and Gas Inspections (per hour)
$
99.00
City of Rohnert Park - Development Services March 2011
Page 27 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
ELECTRICAL PERMIT FEES
Stand Alone Electrical Plan Check (hourly rate)
$
99.00
SYSTEM FEES:
Residential Service, up to and including 400 amps
$
140.00
Residential Service, greater than 400 amps
$
223.00
Non - Residential service up to 200 amps
$
82.00
Non - Residential service 225 -400 amps
$
91.00
Non - Residential service 425 -600 amps
$
115.00
Non - Residential service 625 -800 amps
$
148.00
Non - Residential service over 800 amps
$
206.00
Non - Residential Circuits
15 or 20 amp, first 10 circuits (each)
$
96.00
15 or 20 amp, next 90 circuits (each)
$
126.00
15 or 20 amp, over 100 circuits (each)
$
178.00
30 or 40 amp circuits (each)
$
122.00
50 to 175 amp circuits (each)
$
165.00
200 amp and larger circuits (each) Plan Check
$
171.00
200 amp and larger circuits (each) Inspection
$
141.00
Temporary Service (each)
$
195.00
Temporary Pole (each)
$
144.00
Outdoor Events
Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable -
type rides, booths, displays, and attractions
$
293.00
Electric generator and electrically- driven rides (each)
$
189.00
Mechanically- driven rides and walk- through attractions or displays having electric
lighting (each)
$
189.00
System of area and booth lighting (each)
$
107.00
City of Rohnert Park - Development Services March 2011
Page 28 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES`
FEE
Temporary Power Service
Temporary distribution system and temporary lighting and receptacle outlets for
constructions sites, decorative light, Christmas tree sales lots, firework stands, etc.
$ 254.00
Pre - Inspection (per hour)
$ 237.00
Generator Installation (per kW)
$ 111.00
UNIT FEES:
Receptacle, Switch, Lighting Outlets, and Lighting Fixtures - RESIDENTIAL
$0.06 /SF
(Includes receptacles, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters; lighting fixtures, sockets or other
lamp- holding devices)
Residential Appliances
Fixed residential appliances or receptacle outlets for same, including wall- mounted
electric ovens; counter mounted cooking tops; electric ranges; self - contained room
console or through -wall air conditioners; space heaters; food waste grinders;
dishwashers; washing machines; water heaters; clothes dryers; or other motor -
operated appliances (each) not exceeding one horsepower (HP) in rating (each)
$ 88.00
(For other types of air conditioners and other motor - driven appliances having larger
electrical ratings, see Power Apparatus)
Nonresidential Appliances
Nonresidential appliances and self - contained factory- wired, nonresidential
appliances, including medical and dental devices; food, beverage, and ice cream
cabinets; illuminated show cases; drinking fountains; vending machines; laundry
machines; or other similar types of equipment (each)
$ 148.00
Nonresidential appliances and self- contained factory- wired, nonresidential
appliances not exceeding one horsepower (HP), kilowatt (kW), or kilovolt- ampere
(kVA) in rating, including medical and dental devices; food, beverage; and ice
cream cabinets; illuminated show cases; drinking fountains; vending machines;
laundry machines; or other similar types of equipment (each)
$ 148.00
(For other types of air conditioners and other motor - driven appliances having larger
electrical ratings, see Power Apparatus)
City of Rohnert Park - Development Services March 2011
Page 29 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
� FEE TYPES
Power Apparatus
Motors, generators, transformers, rectifiers, synchronous converters, capacitors,
industrial heating, air conditioners and heat pumps, cooking or baking equipment,
and other apparatus. Rating in horsepower (HP), kilowatts (kW), or kilovolt -
amperes (WA), or kilovolt- amperes- reactive (WAR)
Up to and including 1 (each)
$ 122.00
Over 1 and not over 10 (each)
$ 139.00
Over 10 and not over 50 (each)
$ 208.00
Over 50 and not over 100 (each)
$ 236.00
Over 100 (each)
$ 258.00
(For equipment or appliances having more than one motor, transformer, heater,
etc., the sum of the combined ratings may be used. These fees include all
switches, circuit breakers, contactors, thermostats, relays, and other directly related
control equipment.)
Bus ways
Trolley and plug -in -type bus ways - each 100 feet or fraction thereof
$ 152.00
(An additional fee will be required for lighting fixtures, motors, and other
appliances that are connected to trolley and plug -in -type bus ways. No fee is
required for portable tools.)
Signs, Outline Lighting, and Marquees
Signs, Outline Lighting, or Marquees supplied from one branch circuit (each)
$ 103.00
Additional branch circuits within the same sign, outline lighting system, or marquee
(each)
$ 88.00
Miscellaneous Apparatus, Conduits, Bus ways, and Conductors
Electrical apparatus, conduits, and conductors for which a permit is required, but for
which no fee is herein set forth: Plan Check
$ 92.00
Electrical apparatus, conduits, and conductors for which a permit is required, but for
which no fee is herein set forth: Inspection
$ 94.00
(This fee is not applicable when a fee is paid for one or more services, outlets,
fixtures, appliances, power apparatus, bus ways, signs, or other equipment)
OTHER FEES:
Other Electrical Inspections (per hour)
$ 99.00
City of Rohnert Park - Development Services March 2011
Page 30 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
BOTHER INSPECTIONS AND FEES
Inspections outside of normal business hours, 0 -2 hours (minimum charge)
Minimum charge - 2 hours, includes administrative and professional staff time $ 269.00
Each additional hour or portion thereof $ 169.00
Reinspections
Minimum charge (See Reinspection Fee in MISCELLANEOUS FEES table)
Each additional hour or portion thereof $ 169.00
Inspections for which no fee is specifically indicated, per hour (See Supplemental
Inspection Fee in MISCELLANEOUS FEES table)
Additional Plan Review required by changes, additions, or revisions to approved
plans, per hour (See Supplemental Plan Check Fee in MISCELLANEOUS FEES
City of Rohnert Park - Development Services March 2011
Page 31 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Miscellaneous Permits
FEE TYPES, Unit. Note FEE
Antenna = Telecom Facility
Cellular /Mobile Phone, free - standing new structure
each
$1,727
Cellular /Mobile Phone, attached to existing structure
each
$941
Each addt'I co- located antenna
each ad_d_VI antenna
$199
Application Meeting
.First Hour
hourly rate
$99
Each additional 1/2 hour
hourly rate
$49
Arbor/Trellis (R -3s only over 120ft, non R -3), Awning /Canopy
(supported by building) R -3
each
$147
Balcony addition (R -3)
up to 200 SF
$549
Balcony addition (R -3) over 200 SF
each additional 50 SF
or portion thereof
$131
Business License Inspections
each
$74
Carport (R -3) - Plan Check
each
$224
Carport (R -3) - Inspection
each
$436
Change of Occupancy (over the counter)
each
$43
Change of Occupancy
minimum fee, actual costs
thereafter
(1)
$137
Chimney (factory- built, masonry), Chimney Repair
each
$424
Covered Porch (R3), Deck (wood) >30" above grade
up to 200 SF
$147
Covered Porch (R3), over 200 SF
each additional 100 SF
or portion thereof
$78
Demolition
Commercial - Inspection
each
$249
Residential - Inspection
each
$249
Disabled Access Compliance Inspection
hourly rate
$99
Door
New door (non structural)
each
$150
New door (structural shear wall /masonry)
each
$704
Duplicate /Replacement Job Card
each
$144
Exterior Renovation, Non - Residential
per 100 SF or portion
thereof
_
$62
Fence
Masonry any height
up to 100 LF
$331
Non - masonry, over 6 feet in height;
up to 100 LF
$231
Non- masonry, over 6 feet in height; masonry any height, over
100 LF
Each additional 100 LF
or portion thereof
$199
Final Inspection Permit
each
$325
City of Rohnert Park - Development Services March 2011
Page 32 of Exhibit A to Resolution No. 2011 -26
This page left intentionally blank.
Page 33 of Exhibit A to Resolution No. 2011 -26
MISCELLANEOUS PERMITS
FEES
Page 34 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Miscellaneous Permits
FEE TYPES , Unit Note . ` FEE.
Fireplace
$0
Pre- Fabricated /Metal Fireplace - Plan Check
each
$212
Pre - Fabricated /Metal Fireplace - Inspection
each
$318
Flag pole (over 20 feet in height)
each
$481
Fire Repairs
Residential, more than 30% damaged - Use Residential
Addition Fee
Residential, less than 30% damaged - Plan Check
each
$424
Residential, less than 30% damaged - Inspection
each
$560
Commercial, use New Construction Tenant Improvement
Foundation Only Residential
W/O New Construction Permit
each
_
$897
W/ New Construction Permit
each
$405
Foundation Repair, R3
each
$754
Foundation Repair, non -R3
each
$904
Garage (detached)
Wood frame up to 1,000 SF
each
$1,215
Wood frame, over 1,000 SF
Each additional 1000
SF or portion thereof
$230
Generator
each
$624
Master Plan - Revisions
(2)
Deferred Submittal Processing Fee
each
(2) (3)
$364
Minor (no change in structure or square footage)
each
(2) (3)
$231
Major (USE RESIDENTIAL NEW CONSTRUCTION -
MASTER PLAN)
(2)
Master Plan - Duplicate Set Processing Fee
each
(2) (3)
$182
Oven (Commercial)
each
$735
Partition — Commercial, Interior (up to 30 LF)
up to 30 LF
$506
Partition over 30 LF - Plan Check
each additional 30 LF
or portion thereof
$144
Partition over 30 LF - Inspection
each additional W LF
or portion thereof
$137
Partition— Residential, Interior (up to 30 LF)
up to 30 LF
$268
Partition over 30 LF
each additional 30 LF
or portion thereof
$169
City of Rohnert Park - Development Services March 2011
Page 35 of Exhibit to Resolution No, 2011 -26
Plan Check and Inspection Fees
Miscellaneous Permits
FEE TYPES
Unit
Note,;
FEE
Patio Cover (wood frame, metal frame, other)
up to 300 SF
$443
Patio, over 300 SF
each additional 300 SF
or portion thereof
$312
Enclosed (wood frame, metal frame, other)
up to 300 sf
$935
Enclosed patio over 300 SF - Plan Check
each additional 300 SF
or portion thereof
$268
Enclosed patio over 300 SF - Inspection
each additional 300 SF
or portion thereof
$62
Permission to Proceed (First $10,000)
each
$193
Each Addt'I $10,000
each additional $10,000
or portion thereof
$144
Photovoltaic System
$0
1 - 15 kilowatts - Plan Check
each
$150
1 - 15 kilowatts - Inspection
each
$156
16 - 50 kilowatts - Plan Check
each
$312
16 - 50 kilowatts - Inspection
each
$430
51 - 100 kilowatts- Plan Check
each
$529
51 - 100 kilowatts - Inspection
each
$648
101 - 200 kilowatts- Plan Check
each
$747
101 - 200 kilowatts - Inspection
each
$823
201 - 500 kilowatts - Plan Check
each
$1,679
201 - 500 kilowatts - Inspection
each
$3,225
500 kilowatts - 1 megawatt - Plan Check
each
$3,933
500 kilowatts - 1 megawatt - Inspection
each
$5,231
Plot Plan - Revision
each
(4)
$137
Product Review
minimum fee, actual costs
thereafter
(1)
$118
Remodel — Residential
Remodel up to 300 SF - Plan Check
up to 300 SF
$293
Remodel up to 300 SF - Inspection
up to 300 SF
$311
Remodel, over 300 SF - Plan Check
each additional 100 SF
or portion thereof
$68
Remodel, over 300 SF - Inspection
each additional 100 SF
or portion thereof
$93
Kitchen - Plan Check
each
$268
Kitchen - Inspection
each
$354
Bath - Plan Check
each
$175
Bath - Inspection
each
$236
City of Rohnert Park - Development Services March 2011
Plan Check and Inspection Fees
Miscellaneous Permits
Page 36 of Exhibit to Resolution No. 2011 -26
Unit
Reinspection Fee
minimum fee, actual costs
thereafter
(1),(3)
$137
Repairs (residential) - Plan Check
each
$393
Repairs (residential) - Inspection
each
$367
Re -roof
Residential (w/ new roof sheathing) - Inspection
each
$306
Residential (w /o new roof sheathing) - Inspection
each
$212
Multi - Family Dwelling - Plan Check
each 5,000 SF or .
portion thereof
$56
Multi- Family Dwelling - Inspection
each 5,000 SF or
portion thereof
$442
Commercial - Plan Check
each 5,000 SF or
portion thereof
$56
Commercial - Inspection
each 5,000 SF or
portion thereof
$404
Revisions to approved plans
Commercial New
Minimum fee
(3)
$118
Tenant Improvement
Minimum fee
(3)
$118
Single Family Dwelling
Minimum fee
(3)
$118
Addition
Minimum fee
(3)
$118
Remodel
Minimum fee
(3)
$118
Roof Structure Replacement - Plan Check
up to 500 SF
$212
Roof Structure Replacement - Inspection
up to 500 SF
$329
Roof structure replacement, over 500 SF
each additional 100 SF
or portion thereof
$43
Sauna —steam
each
$723
SCEIP projects for which permits not typically issued (use
Minimum Processing Fee)
Siding
Stone and Brick Veneer (interior or exterior), up to 800 sf
up to 800 SF
$461
Other Siding up to 800 SF - Plan Check (for commercial only)
up to 800 SF
$180
Other Siding up to 800 SF - Inspection
up to 800 SF
$230
Additional siding
each additional 800 SF
or portion thereof
$169
Signs ( <_ 100 SF area)
Roof / Projecting Signs
each
$306
Monument
each
$281
Pole (under 10)
each
$306
Wall /Awning Sign, Non - Electric
each
$262
Wall, Electric
each
$287
City of Rohnert Park - Development Services March 2011
Page 37 of Exhibit A to Resolution No. 2011 -26
Plan Check and Inspection Fees
Miscellaneous Permits
FEE TYPES
Note
FEE:,
Other Sign - Plan Check
each
$212
Other Sign - Inspection
each
$131
Signs ( >100 SF area)
Roof / Projecting Signs
each
$499
Monument
each
$350
Pole (over 10')
each
$449
Wall /Awning Sign, Non - Electric
each
$331
Wall, Electric
each
$405
Other Sign - Plan Check
each
$274
Other Sign - Inspection
each
$293
Site Accessibility
per hour
$99
Skylight
Less than 10 SF
each
$212
Greater than 10 SF or structural
each
$468
Solar Panels (Thermal), residential or equal
each
$338
Storage Racks
Storage racks over 8' high, up to 100 LF
first 100 LF
$674
Storage racks over 8' high, over 100 LF
each additional 100 LF
or portion thereof
$237
Structural Repairs (Non - Residential) - Plan Check
Each
Structural Repairs (Non - Residential) - Inspection
Each
_ _$518
$927
Structural Repairs (Residential) - Plan Check
Each
$405
Structural Repairs (Residential) - Inspection
Each
$442
Stucco Applications
up to 400 SF
$455
Stucco Application, over 400 SF
each additional 400 SF
or portion thereof
$280
Supplemental Plan Check Fee (after 3rd review)
First hour
each
(1)
$137
Each Additional 1/2 hour or. portion thereof
per 1/2 hour or portion
thereof
(1)
$68
Supplemental Inspection Fee
$0
First 1/2 hour
each
(1)
$68
Each Additional 1/2 hour or portion thereof
per 1/2 hour or portion
thereof
(1)
$68
Swimming Pool /Spa
Vinyl -lined (up to 800 sf)
each
$635
Fiberglass
each
$635
Gunite (up to 800 sf)
each
$635
Additional pool (over 800 sf or portion thereof)
each
$374
Commercial pool (up to 800 sf)
each
$1,095
Commercial pool (over 800 sf or portion thereof)
each
$1,268
City of Rohnert Park - Development Services March 2011
Page 38 of Exhibit to Resolution No. 2011 -26
Plan Check and Inspection Fees
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE,' .
Spa or Hot Tub (Pre- fabricated)
each
$685
minimum fee, actual costs
Temporary Occupancy Approval
thereafter
(3)
$449
Trash Enclosure
each
$624
Window or Sliding Glass Door
New Window (change in opening size /location, non - structural)
each
$112
New window (structural shear wall /masonry) - Plan Check
each
$261
New window (structural shear wall /masonry) - Inspection
each
$162
Bay Window (structural) - Plan Check
each
$261
Bay Window (structural) - Inspection
each
$423
Minimum Processing Fee (Administrative - No Permit)
each
(5)
$37
Notes:
1. Minimum fee includes professional and minimum adminstrative staff time for service
2. Refer to Master Plan Policy
3. Processing fee only. Staff time and materials cost, or actual consultant fee + City administrative fee may
be in addition to processing fee.
4. Refer to Plot Plan and Production Phase Policy
5, Use for SCEIP projects & other "non- permit" projects for intake and processing costs.
City of Rohnert Park - Development Services March 2011