Loading...
2007/11/13 City Council Resolution 2007-185RESOLUTION NO. 2007 -185 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING TASK ORDER NO. 2007-09 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR PROFESSIONAL SERVICES FOR ENVIRONMENTAL CLEANUP OF CORPORATION YARD (600 Enterprise Drive): SOIL INVESTIGATION AND PERFORMANCE OF COMPLIANCE GROUNDWATER SAMPLING WHEREAS, on January 10, 2003, the City approved the letter proposal with Winzler & Kelly Consulting Engineers for the Corporation Yard Underground Storage Tank (UST) Investigation; WHEREAS, on October 28, 2003, the City Council approved Resolution No. 2003 -260 which approved Amendment #1 to the letter proposal and provided for the installation of two new monitoring wells in order to close the tank removal site in accordance with County of Sonoma requirements; WHEREAS, on September 14, 2004, the City Council approved Resolution No. 2004 -244 approving Winzler & Kelly Task Order No. 2004 -16 for the destruction of wells; groundwater monitoring, sampling and reporting; water characterization and disposal; and preparation of State Fund reimbursement package for submittal; WHEREAS, Resolution No. 2006 -87 was adopted by City Council on March 28, 2006, authorizing Task Order No. 2006 -04 with Winzler & Kelly to conduct soils investigations and prepare a Corrective Action Plan and Remedial Action Plan; WHEREAS, the City now requires additional professional services for environmental clean up of the Corporation Yard Underground Storage Tank, specifically soil investigation and performance of compliance groundwater sampling required by the Sonoma County Department of Health Services - Environmental Health Division and the North Coast Regional Water Quality Board; and WHEREAS, Winzler & Kelly Consulting Engineers is qualified to perform such work. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Task Order No. 2007 -09 by and between Winzler & Kelly, a California Corporation, and the City of Rohnert Park, a municipal corporation, for Environmental Cleanup of the Corporation Yard: Soil Investigation and Performance of Compliance Groundwater Sampling for an amount not to exceed $67,174. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this Task Order in substantially similar form to the attached Task Order for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 13`h day of November, 2007. ATTEST: it ' c CITY OF ROHNERT PARK Pro Tempore BREEZE: AYE MACKENZIE: AYE SMITH: AYE STAFFORD: AYE VIDAK- MARTINEZ: ABSENT AYES: 4) NOES: (0) ABSENT: (1) ABSTAIN: (0) TASK ORDER NO. 2007-09 CITY OF ROHNERT PARK AND WINZLER & KELLY AUTHORIZATION OY TASK ORDER 2007 -09 AGREEMENT TO PROVIDE PROFESSIONAL SERVICES FOR ENVIRONMENTAL CLEANUP OF CORPORATION YARD: SOIL INVESTIGATION AND PERFORMANCE OF COMPLIANCE GROUNDWATER SAMPLING SECTION 1— PURPOSE The purpose of Task Order No. 2007 -09 is to authorize and direct Winzler & Kelly to proceed with_ the work specified in Section 2 below in accordance with the provisions . of the AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto- dated July 25, 2606. SECTION 2 — SCOPE. OF WORK The items authorized by this Task Order are presented in Attachment A— Scope of Services. SECTION 3 - COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties hereto referenced in SECTION i above - Jhe total cost for services as set forth in SECTION '2 shall be actual costs (time and materials) based on Consultants' standard labor charge in accordance with the provisions of the AGREEMENT shown in Attachment B for an estimated_ fee of $67,174. SECTION 4 - TIME OF PERFORMANCE The work described in SECTION 2 shall be completed by December 2008 or as extended by the City Manager. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 13'h day of November, 2007. CITY OF ROHNERT PARK Stephen R. Donley, City Manager (Date) Per Reso. No. 2007 - adopted by the Rohnert Park City Council at its. meeting of November 13, 2007. . WINZLER & KELLY ENGINEERS PE Theodore B. Whiton, Managing Principal (Date) ATTACHMENT KA" TO TASK ORDER NO. 2007-09 SCOPE OF SERVICES ENVIRONMENTAL CLEANUP OF CORPORATION YARD: SOIL INVESTIGATION AND PERFORMANCE OF COMPLIANCE GROUNDWATER SAMPLING 1. General Description and Background The items authorized by this Task Order are to conduct required routine groundwater monitoring and sampling activities associated with the former underground storage tank (UST) that was located in the City's Corporation Yard located at 600 Enterprise Drive. This work is required by the Sonoma County Department of Health Services- Environmental Health Division's (SCDHS -EHD) and the North Coast Regional Water Quality Control Board (NCRWQCB) and an annual budget is required by the State UST Cleanup Fund, for which the City is being reimbursed for costs associated.with the environmental cleanup. The work performed for this Task Order will keep the City in compliance with the - SCDHS -EHD and the NCRWQCB while the Remedial Action Plan is being reviewed and pending approval by the SCDHS -EHD. The estimated cost for this work is $67,174 and is reimbursable from the State UST Cleanup Fund except for the claim preparation, which has a limit of $5,000 per site. 2. Project Tasks The Scope of Services to stay .in compliance and enabling the City to proceed with the environmental clean up of the Corporation Yard site is presented below. Task 1— Quarterly Groundwater Sampling Events Perform five (5) quarterly groundwater monitoring and sampling events (4t` quarter 2007 through 4t` quarter 2008) for six (6) monitoring wells (MW -4 through MW -9) and two proposed monitoring wells (MW -10 and MW -11) for a total of eight (8) monitoring wells. Task includes collecting field measurements for pH, temperature, conductivity, dissolved oxygen, and oxidation reduction potential prior to purging and sampling the wells for the purpose of evaluating aerobic degradation activity. Task also includes sampling and profiling the purge water for disposal from the site. Task 2 — Annual Reports Prepare two (2) annual monitoring and sampling reports to summarize groundwater monitoring for the hydrologic year completed. This will include potentiometric maps, iso- concentration maps, groundwater contaminant trend graphs, conclusions, recommendations, and planned site activities. Task 3 — Quarterly Monitoring Reports Prepare three (3) groundwater monitoring and sampling reports for the lst, 2nd, and 3rd Quarters of 2008. Reports will summarize the analytical data, include a contour map, a contaminant TPH- G/Benzene/MTBE concentration map, conclusions, and planned. site activities. Task 4 — Quarterly Groundwater (Purge Water) Disposal Profile and coordinate the disposal of the quarterly purge water generated from the five (5) monitoring and sampling events. Meet with the disposal company on -site during pickup. Task 5 — State UST Cleanup. Fund Reimbursement Numbers 7 a.d 8 Prepare and submit the State UST Cleanup Fund reimbursement numbers 7 and 8 for the corrective actions conducted at the site. Winzler & Kelly will need the assistance of the City of Rohnert Park in providing the necessary backup and cancelled checks that are required. Additional reimbursements will be prepared (if directed) for similar costs described below. ' Task 6 — Install, Develop, and Survey Two. Monitoring Welts Drill and install two monitoring wells to�complete the necessary monitoring well network to monitor the natural attenuation of the residual hydrocarbons in the groundwater. Soil samples will be collected every 5 feet as required and select samples submitted to the laboratory for analyses. A lithology log of the subsurface soils will be prepared. After installation activities, the two new wells will be properly developed. Development water and soils.generated from these activities will be contained in DOT drums pending disposal. Task 7 — Prepare a Well Installation Report Prepare a well installation report documenting the findings and analytical results from the installation of the two new wells. Include all necessary figures, tables, and attachments to fully document the installation activities as required. Task 8 — Prepare a Letter to Postpone the Implementation of the RAP and a Letter to the State UST Cleanup Fund for Pre - Approval Prepare a document to postpone the implementation of the approved RAP based on the current groundwater concentrations. Request concurrence or a directive to implement the RAP. If the SCDHS -EHD directs the implementation of the RAP, prepare and submit a letter to the State UST Cleanup Fund for pre- approval status. 3. Schedule The anticipated schedule is shown in the table below. This schedule is dependent upon receiving timely lead agency approval on environmental submittals: Task Start Complete Notice to Proceed September. 28, 2007 1 Quarterly Groundwater Sampling October 2007 November 2008 2 Quarterly Monitoring Reports January 2008 November 2008 3 Annual Reports October 2007 January 2009 4 Quarterly Groundwater Disposal November 2007 December 2008 5 State UST Fund Reimbursement October 2007 August 2008 6 Well Installation/Development November 2007 December 2007 7 Well Installation Report December 2007 January 2008 8 Prepare Agency Letters September 2007 October 2007 4. Fee The work described above will be completed on a time and materials basis for a not -to- exceed budget of $67, 174. Direct costs are to cover project expenses including office consumables and expenses. The estimated costs associated with performing each task are summarized in Attachment B. Any additional services not included in this Scope of Services will be performed only after receiving written authorization from the City and a corresponding budget augmentation. Please note that the rates for field surveys will be performed at Prevailing Wage rates according to California State Law. 2 Attachment "A" Task Order 2007 -09 SCOPE OF WORK Site: 600 Enterprise Drive Client: City of Rohnert Park Date: October 2, 2007. Project #: 02056 -07OXX Phase: Quarterly M &S for the 4th Qtr 2007 through 4th Qtr 2008 Claim #: 000062 . Task # Task Title and Description Quarterly Groundwater Monitoring and Sampling Events (4th Qtr 2007 -4th Qtr 2008, 5 Prepare and conduct five (5) quarterly groundwater monitoring and sampling events from the 4th quarter 2007 _through the 4th quarter 2008. Eight (8). monitoring wells will be monitored, purged, and sampled according to the W &K SOP and on the schedule presented in the 2007 RAP. Monitoring will include, but is not limited to, the collection of field measurements for DO, ORP, pH, temperature, and DTW to evaluate the aerobic degradation activity on site. This task will also include sampling the contained purge water for profiling and off -site disposal. 2 Annual Monitoring and Sampling Report for 2007 (4th Qtr 2007 and 2008 Events, 2 Prepare two (2) annual monitoring and sampling reports for the 4th Qtrs of 2007 and 2008. The report will summarize the groundwater monitoring for a complete hydrologic cycle (year). These reports will include the potentiometric map, iso- concentration map, groundwater contaminant trend graphs, conclusions, recommendations, and planned site activities. 3 Quarterly Monitoring Reports (Ist 3rd Qtr 2008,3 Reports) Prepare three (3) quarterly monitoring and groundwater sampling reports for 2008 (1st through 3rd Qtrs). Reports will summarize the analytical data, including a contour map, a contaminant distribution map, conclusions, and a planned activities section. 4 Purge Water Disposal (5 Events) Profile and coordinate the disposal of the purge water generated from the quarterly monitoring and sampling events; meet the disposal company at the site during pickup. 5 Prepare State UST Cleanup Fund Reimbursement Nos. 7 and 8 Prepare and submit two reimbursements (Numbers 7 and 8) to the State UST Cleanup Fund. Winzler & Kelly will need the assistance of the City of Rohnert Park in providing the necessary back -up and cancelled checks that are required. Additional reimbursements and follow -up to the State UST Cleanup Fund will be prepared (if directed) for similar costs described below. 6 Install, Develop, and Survey Two Monitoring Wells Drill and install two monitoring wells to a max depth of 30 feet to complete the groundwater monitoring network. Conduct a site visit to mark site for USA. Solicit bids and coordinate with a licensed drilling company to perform the work. During drilling activities, collect samples every 5 feet and at lithologic changes and document the lithology encountered, prepare boring logs, prepare soil samples collected, drummed drill cuttings and sample for disposal profiling. After installation, perform well development activities and contain purge water in drums. Survey each new well in accordance with the State requirements and forward data to the GeoTracker database. Attachment "A" Task Order 2007 -09 7 Prepare Well Installation Report Prepare a Well Installation_ Report documenting the installation and findings during the drilling of the two monitoring wells. The report will include a updated site map with the locations of the new wells, soil concentration map, and include all of the well installation and development field data sheets. g Prepare Letter to Postpone Implementation of the RAP and letter to State UST Fund for Prepare a document to postpone the implementation of the RAP based on the recent and continuing declining dissolve concentrations. Prepare and submit a historical table summarizing analytical data, graphical plots to illustrate the site declining trends, and a site map with the locations of two proposed monitoring wells to complete the monitoring well network. Discuss approach with client prior to document preparation and submittal. Based on the SCDHS -EHD response, prepare a letter to the State Fund for pre- approval of remedial system installation costs prior to implementation of the RAP. 9 Attachment "A" Task Order 2007 -09 Q1 O I n O O N x Cd N b O N E-H 0 iJ PQ C V W �I F �x �z F�1 w H O U 0 0 v W 0 0 N t` O O N to W O 00 O b O o Q O ° N O S. et a Rini T �bA a�-� C7 'O Q lzt 66 69 69 69 [� � ° U O N M Y 00 to �aa 40- N � 99 6r9 G o >, o O N > N � � o UO'o qO 0 69 � Q z� HQv cz � U a � a w p 69 is O a 0 0 v W 0 0 N t` O O N to O O 00 O (11 O O O O O O et M M M 00 t!) O\ lzt 66 69 69 69 [� M It 00 to N � 99 6r9 G M 6.9 � 0 69 69 69 a d 0 H O O O O O O O O O O� CD V) 110 69 6R 69 69 69 6 9 (� to V) O 00 69 .,j 69 69 N U (1) roq 6F3 69 N pWp� W to O o to o to o 0 0 0 0 o v� 00 r- 't � 69 69 69 Ge a l� M 00 � o � � � � � � s 6R x 3 N -d � w Y o w ci CIO �D 00 O a� N y+ O G7 O aCo O 00 ate+ b 0 o o a� _ 00 a Cl) o 0 0 w � a� C Y 3 o v .o ° a H v' a° o N Q o C7 T y o T a] a Q a� o ° bD S3� sl. a a O' ° r4 CY w a a. a. 220 LJ �-_, N M n I r. V'� V1 �O l 00 O� O N 0 0 v W 0 0 N t` O O N FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 1: Quarterly Groundwater Monitoring and Sampling Events (4th Qtr 2007 -4th Qtr 2008, 5 events) Prepare and conduct five (5) quarterly groundwater monitoring and sampling events from the 4th quarter 2007 through the 4th quarter 2008. Eight (8) monitoring wells will be monitored, purged, and sampled according to the W &K SOP and on the schedule presented in the 2007 RAP. Monitoring will include, but is not limited to, the collection of field measurements for DO, ORP, pH, temperature, and DTW to evaluate the aerobic degradation activity on site. This task will also include sampling the contained purge water for profiling and off -site disposal. ��3Tr _k YOU Q>�ANT' (}TG �aC+ v� ......................................................... ............................... Principal Geologist $145.00 HOUR NA 5 $0.00 Senior /Project Manager $120.00 HOUR 2 NA 5 $1,200.00 Associate / Project Consultant $105.00 HOUR 2 NA 5 $1,050.00 Sr. Staff Consultant $90.00 HOUR 16 NA 5 $7,200.00 Junior Consultant/Senior Technician $80.00 HOUR NA 5 $0.00 Junior Technician $75.00 HOUR NA 5 $0.00 Drafting $65.00 HOUR NA 5 $0.00 Technical Report Reviewer $65.00 HOUR 1 NA 5 $325.00 Clerical/Word Processing $55.00 HOUR NA 5 $0.00 SUBTOTAL EMPLOYEE LABOR 21 $9,775.00 Subcontractors Utility Clearance TASK l $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 1 $0.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) $2,007.00 TASK 1 $301.05 5 $11,540.25 Driller TASK 1 $0.00 1 $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/Landfill Fees I TASK I 1 1 $0.00 1 1 $0.00 Permits Well/Boring Permits $312 + $66 ea additional I TASK I 1 $0.001 1 $0.00 Discharge Permit TASK 1 1 $0.001 1 $0.00 Encroachment Permit TASK 1 1 $0.00 l 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY 5 NA 5 $625.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrile, Lined, Heavyweight $2.59 PAIR NA 1 $0.00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor Cartridge R51 A $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH 10 NA 5 $4007 Purge Pump 2" submersible $45.00 DAY t NA 5 $225.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 -(5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA 1 $0.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH 3 NA 5 $600:00 2" Weighted Surge Block $5.00 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH 1 NA 5 $100.00 Padlock $10.00 EACH NA 1 $0.00 Water Level/interface Indicator Probes $35.00 DAY I NA 5 $175.00 Photovac TIP Photo - Ion Detector $100.00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY I NA 5 $200.00 Field Nitrate/Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH/Cond/Temp Meter $40.00 DAY I NA 5 $200.00 Turbidity Meter $20.00 DAY I NA 5 $100.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0.00 Surveying Equipment $100.001 DAY NA 1 $0.00 Traffic Control Barricades $5.001 EACH 10 NA 5 $250.00 Mileage $0.501 MILE 1 50 1 NA 1 5 $125.00 SUBTOTAL EXPENSES $14,540.25 TASK #1 GRAND TOTAL= $24,315.25 2007 -2008 QMR Cost Estimate 10/2/2007 2 Attachment `B" Task Order 2007 -09 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 2:' Annual Monitoring and Sampling Report for 2007 (4th Qtr 2007 and 2008 Events, 2 Reports) Prepare two (2) annual monitoring and sampling reports for the 4th Qtrs of 2007 and 2008. The report will summarize the groundwater monitoring for a complete hydrologic cycle (year). These reports will include the potentiometric map, iso- concentration map, groundwater contaminant trend graphs, conclusions, recommendations, and planned site activities. x 4M" t t 2y�;T l�ilT� Q "N 1 iTX A%2KUP /j 3 TOT 11� yy � �%'. Y ., > t,n �: f ✓eX x ::5 Xf L` �1�,� e Principal Geologist $145.00 HOUR. 1 NA 2 $290.00 Senior / Project Manager $120.00 HOUR 4 NA 2 $960.00 Associate / Project Consultant $105.00 HOUR NA 1 1 Woo Sr. Staff Consultant $90.00 HOUR 18 NA 2 $3,240.00 Junior Consultant/Senior Technician $80.00 HOUR NA 1 $0.00 Junior Technician $75.00 HOUR NA 1 $0.00 Drafting $65.00 HOUR 5 NA 2 $650.00 Technical Report Reviewer $65.00 HOUR 16 NA 2 $2,080.00 Clerical/Word Processing $55.00 HOUR 1 NA 2 $110.00 SUBTOTAL EMPLOYEE LABOR 45 $7,330.00 EKPENSES:::::::::•:::::::::::•::•:•:•:•:•:::::• :::::::::::::::: ............................................................................................. ............... .... ....:....... Subcontractors Utility Clearance TASK 1 $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 1 $0.00 Traffic Control TASK 1 $0.00 1 WOO Laboratory (See Attached Breakdown) TASK 1 $0.00 1 $0.00 Driller TASK 1 $0.00 1 $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/Landfill Fees TASK I $0.001 1 $0.00 Permits Well/Boring Permits $312 + $66 ea additional I TASK I 1 1 $0.00 1 1 $0.00 Discharge Permit I TASK I 1 1 $0.00 1 1 $0.00 Encroachment Permit I TASK I 1 1 $0.06 1 1 $0.00 Equipment Costs Misc. Small items $25.00 DAY 2 NA 2 $100.00 Tyvek/Polyethylene Suits $7.59 SUIT NA l $0.00 Gloves - Nitrite, Lined, Heavyweight $2.59 PAIR NA 1 $0.00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor CartridgeR51A $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH NA 1 $0.00 Purge Pump 2" submersible $45.00 DAY NA I .$0.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 {5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA 1 $0.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH NA 1 $0.00 2" Weighted Surge Block $5.00 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH NA 1 $0.00 Padlock $10.00 EACH NA 1 $0.00 Water Level/Interface Indicator Probes $35.00 DAY NA 1 $0.00 Photovac TIP Photo -Ion Detector $100.00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY NA 1 $0.00 Field Nitrate /Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH/Cond/Temp Meter $40.00 DAY NA 1 $0.00 Turbidity Meter $20.00 DAY NA 1 $0.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0.00 Surveying Equipment $100.00 DAY NA 1 $0.00 Traffic Control Barricades $5.001 EACH I I NA 1 $0.00 Mileage $0.501 MILE I I NA I 1 1 $0.00 SUBTOTAL EXPENSES $100.00 TASK #2 GRAND TOTAL = $7,430.00 2007 -2008 QMR Cost Estimate 10/212007 3 Attachment B Task Order 200749 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 4: Purge Water Disposal (5 .Events) Profile and coordinate the disposal of the purge water generated from the quarterly monitoring and sampling events; meet the disposal company at the site during pickup. kf WE T 21,111". " 6� �.k4 ��3,'A'st.)t�54- �, ?a :Flo- �4en . .'§c` £.e�1, � 0 ... ...i~ f. ri t KEG, M..✓. .. F' a SY \ 'T '" ., ..., -,_ .�.. .,... v... �... ,.� Principal Geologist $145.00 HOUR NA 1 $0.00 Senior / Project Manager $120.00 HOUR 1 NA 5 $600.00 Associate / Project Consultant $105.00 HOUR I NA 5 $525.00 Sr. StafrConsultant $90.00 HOUR 3 NA 5 $1,350.00 Junior Consultant/Senior Technician $80.00 HOUR NA 1 $0.00 Junior Technician $75.00 HOUR NA 1 $0.00 Drafting $65.00 HOUR NA l $0.00 Technical Report Reviewer 1 $65.001 HOUR NA 1 $0.00 Clerical/Word Processing 1 $55.001 HOUR I I NA I 1 1 $0.00 SUBTOTAL EMPLOYEE LABOR 5 $2,475.00 EXPEAISES::::::::•::::::::::::• :.:.:.:.:::.:::::::.::::: .............................................................................................. ............................... Subcontractors Utility Clearance TASK 1 $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 t $0.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) TASK 1 $0.00 1 $0.00 Driller TASK 1 $0.00 f $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/Landfill Fees $350.00 TASK 1 1-$52.501--7 5 $2,012.50 Permits Well/Boring Permits $312 + $66 ea additional I TASK 1 $0.001 1 1 $0.00 Discharge Permit I TASK I 1 $0.00 t 1 $0.00 Encroachment Permit I TASK I 1 1 $0.00 1 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY NA 1 $0.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrile, Lined, Heavyweight. $2.59 PAIR NA 1 $0.00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor Cartridge R51 A $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH NA 1 $0.00 Purge Pump 2" submersible $45.00 DAY NA 1 $0.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 -(5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA f $0.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH NA 1 $0.00 2" Weighted Surge Block $5.00 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH NA 1 $0.00 Padlock $10.00 EACH NA 1 $0.00 Water Level/Interface Indicator Probes $35.00 DAY NA 1 $0.00 Photovac TIP Photo -Ion Detector $100.00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY NA 1 $0.00 Field Nitrate/Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH /Cond/Temp Meter $40.00 DAY NA 1 $0.00 Turbidity Meter $20.00 DAY NA 1 $0.00 Pipe Finder (metal detector) $20.001 DAY I I NA 1 1 $0.00 Surveying Equipment $100.00 DAY NA 1 $0.00 Traffic Control Barricades $5.001 EACH NA l $0.00 Mileage $0.501 MILE 1 20 1 NA 1 5 1 $50.00 SUBTOTAL EXPENSES $2,062.50 TASK 94 GRAND TOTAL = $4,537.50 2007 -2008 QMR Cost Estimate 10/2/2007 4 Attaclunent <B„ Task Order 2007 -09 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard. TASK 3: Quarterly Monitoring Reports (1st - 3rd Qtr 2008, 3 Reports) Prepare three (3) quarterly monitoring and groundwater sampling reports for 2008 (1st through 3rd Qtrs). Reports will summarize the analytical data, including a contour map, a contaminant distribution map, conclusions, and a planned activities section. I�lt F 3 ,.tom y t tj N'-h $C '•. u�.bym_Y E2 ffi.Q C ) ? Ci. {AY X13 Principal Geologist $145.00 HOUR I NA 3 $435.00 Senior /Project Manager $120.00 HOUR 2 NA 3 $720.00 Associate / Project Consultant $105.00 HOUR NA 3 $0.00 Sr. Staff Consultant $90.00 HOUR 12 NA 3 $3,240.00 Junior Consultant/Senior Technician $80.00 HOUR NA 3 $0.00 Junior Technician $75.00 HOUR NA 3 $0.00 Drafting 1 $65.001 HOUR 1 4 1 NA 1 3 $780.00 Technical Report Reviewer 1 $65.001 HOUR 1 12 1 NA 1 3 $2,340.00 Clerical/Word Processing 1 $55.001 HOUR I 1 I NA 1 3 1 $165.00 SUBTOTAL EMPLOYEE LABOR 32 $7,680.00 Subcontractors Utility Clearance TASK 1 $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 1 $0.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) TASK 1 $0.00 1 $0.00 Driller TASK 1 $0.00 1 $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 DisposaULandfill Fees I TASK I 1 1 $0.00 1 1 $0.00 Permits WellBoring Permits $312 + $66 ea additional I TASK I 1 $0.001 1 $0.00 Discharge Permit I TASK 1 $0.001 1 $0.00 Encroachment Permit TASK 1 $0.001 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY 2 NA 3 $150.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrile, Lined, Heavyweight $2.59 PAIR NA 1 $0.00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor Cartridge R5IA $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH NA 1 $0.00 Purge Pump 2" submersible $45.00 DAY NA 1 $0.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 {5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA 1 $0.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH NA 1 $0.00 2" Weighted Surge Block $5-001 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH NA 1 $0.00 Padlock $10.00 EACH NA 1 $0.00 Water Level /Interface Indicator Probes $35.00 DAY NA 1 $0.00 Photovac TIP Photo -Ion Detector $100.00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY NA 1 $0.00 Field Nitrate /Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH /Cond/Temp Meter $40.00 DAY NA 1 $0.00 Turbidity Meter $20.00 DAY NA 1 $0.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0.00 Surveying Equipment $100.00 DAY NA 1 $0.00 Traffic Control Barricades 1 $5.001 EACH I NA I 1 $0.00 Mileage 1 $0.501 MILE NA I 1 1 $0.00 SUBTOTAL EXPENSES $150.00 TASK #3 GRAND TOTAL= $7,830.00 2007 -2008 QMR Cost Estimate 5 10/2/2007 Attachment `B" Task Order 2007 -09 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 5: Prepare State UST Cleanup Fund Reimbursement Nos. 7 and 8 Prepare and submit two reimbursements (Numbers 7 and 8) to the State UST Cleanup Fund. Winzler & Kelly will need the assistance of the City of Rohnert Park in providing the necessary backup and cancelled checks that are required. Additional reimbursements and follow -up to the State UST Cleanup Fund will be prepared (if directed) for similar costs described below. r ,�, - '` a {' `'� ]�� 1"0 ITEM i R� lE 4, hNNTI ���c rt b TDTAl r ..,. ,.. <. ,.... ..: ., x-r .k? a � .., •:c <.���.., ., 5 .: � �.'�, v � �'YLa?; n���t9 � ;r:.,���fi zi� :,;�; � .1v.. �?? ����e�<,y*.'�.�., �"<�x..,k�r. W&K:LABOR : » ::::::::::::::::< :::::::::::: >:::.J::::< ::: »» >:::.........:, .:::< : >::::::::::•: :::::: » >:::::::::: » >:: <£ _.z,. ................................................................................................................ Principal Geologist $145:00 HOUR NA 2 $0.00 Senior / Project Manager $120.00 HOUR NA 2 $0.00 Associate / Project Consultant $105.00 HOUR 4 NA 2 $840.00 Sr. Staff Consultant $90.00 HOUR NA 2 $0,00 Junior Consultant/SeniorTechnician $80.00 HOUR NA 2 $0.00 Junior Technician $75.00 HOUR NA 2 $0.00 Drafting $65.001 HOUR I NA 2 .$6.00 TechnicalReport Reviewer $65.001 HOUR I 11 NA 2 $1,430.00 Clerical/Word Processing 1 $55.001 HOUR I I NA 2 $110.00 SUBTOTAL EMPLOYEE LABOR 16 $2,380.00 EXPENSES :::::::::::::.:::::::::::::.:.:.:::.:.::::.:.:.::.::::::::::::::::::::::::::::::::::::::•:::: :::::::::::::::::::::::::::•::: : Subcontractors Utility Clearance TASK 1 $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 1 $0.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) TASK 1 $0.00 1 $0.00 Driller TASK 1 $0.00 1 $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/Landfill Fees TASK 1 $0.00 1 1 $0.00 Permits Well/Boring Permits $312 + $66 ea additional TASK 1 $0.00 1 1 $0.00 Discharge Permit TASK 1 I wool 1 1 $000 Encroachment Permit TASK d $0.00 1 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY NA 1 $0.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrile, Lined, Heavyweight $2.59 PAIR NA 1 $0:00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor Cartridge R5IA $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH NA 1 $0.00 Purge Pump 2" submersible $45.00 DAY NA 1 $0.00 Pressurized Bailer with Filter $25.00 EACH NA `1 $0.00 Encore Sample Set (includes 3 -(5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA 1 $0.00 Hand Auger with Split Spoon and Hammer $30 -00 DAY NA 1 $0.00 Drums $40.00 EACH NA 1 $0.00 2" Weighted Surge Block $5.00 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH NA 1 $0.00 Padlock $10.00 EACH NA 1 $0.00 Water Level/interface Indicator Probes $35.00 DAY NA 1 $0.00 Photovac TIP Photo -Ion Detector $100 -00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY NA 1 $0.00 Field Nitrate/Phosphate Tests $200 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH/Cond/Temp Meter $40.00 DAY NA 1 $0.00 Turbidity Meter $20.00 DAY NA 1 $0.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0:00 Surveying Equipment $100.00 DAY NA 1 $0.00 Traffic Control Barricades $5.00 EACH NA 1 $0.00 Mileage $0.50 MILE NA 1 $0.00 SUBTOTAL EXPENSES $0,00 TASK #5 GRAND TOTAL .= $2,380.00 2007 -2008 QMR Cost Estimate 6 10/2/2007 Attachment "W' Task Order 2007 -09 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 6: Install, Develop, and Survey Two Monitoring Wells Drill and install two monitoring wells to a max depth of 30 feet to complete the groundwater monitoring network. Conduct a site visit to mark site for USA. Solicit bids and coordinate with a licensed drilling company to perform the work. During drilling activities, collect samples every 5 feet and at lithoiogic changes and document the lithology encountered, prepare boring logs, prepare soil samples collected, drummed drill cuttings and sample for disposal profiling. After_ installation, perform well development activities and contain purge water in drums. Survey each new well in accordance with the State requirements and forward data to the GeoTracker database. z t i; rr� a .� 1TL` �' r.f ��+n 1�:�' „ rrr dl's k ry�� ��,� I f r r t.._ ................ ......::... W &K EABOR: J ..... .............. ............................... ............................ .................... ....................... Principal Geologist $145.00 HOUR 2 NA 1 $290.00 Senior / Project Manager $120.00 HOUR 6 NA 1 $720.00 Associate / Project Consultant $105.00 HOUR NA 1 $0.00 Sr. Staff Consultant $90.00 HOUR 30 NA 1 $2,700.00 Junior Consultant/Senior Technician $80.00 HOUR NA 1 $0.00 Junior Technician $75.00 HOUR NA 1 $0.00 Drafting $65.00 HOUR NA 1 $0.00 Technical Report Reviewer $65.001 HOUR I 1 I NA I 1 $65.00 Clerical/Word Processing $55.001 HOUR I NA I 1 $0.00 SUBTOTAL EMPLOYEE LABOR 39 $3,775.00 EXPENSES' ::::::::::::::::::::::::::::::::::::::::::::::::::::::::......•:::::::::::::::::::::: •:•::::::::::::::::............ ............................................................................................ ............................... Subcontractors Utility Clearance $600.00 TASK 1 $90.00 1 $690.100 Concrete Corer $400.00 TASK 1 $60.00 1 $460.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) $1,400.00 TASK 1 $210.00 1 $1,610.00 Driller $3,500.00 TASK 1 $525.00 1 $4,025.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/Landfill Fees I TASK I i 1 $0.00 1 1 $0.00 Permits Well/Boring Permits $312 + $66 ea additional $378.001 TASK I 1 1 $56.70 1 $434.70 Discharge Permit I TASK I i 1 $0.00 1 1 $0.00 Encroachment Permit TASK 1 $0:00 I 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY 4 NA 1 $100.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrite, Lined, Heavyweight $2.59 PAIR NA 1 $0.00 Gloves - Nitrite, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor Cartridge R5IA $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH 4 NA 1 $32.00 Purge Pump 2" submersible $45.00 DAY 2 NA 1 $90.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 -(5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH 36 NA I $360.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH 6 NA 1 $240.00 2" Weighted Surge Block $5.00 EACH 2 NA 1 $10.00 Locking Well Caps $20.00 EACH 2 NA 1 $40.00 Padlock $10.00 EACH 2 NA t $20.00 Water Level /Interface Indicator Probes $35.00 DAY I NA 1 $35.00 Photovac TIP Photo -Ion Detector $100.00 DAY 1 NA 1 $100.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY I NA 1 $40.00 Field Nitrate/Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0:00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH/Cond/Temp Meter $40.00 DAY 1 NA 1 $40.00 Turbidity Meter $20.00 DAY 1 NA 1 $20.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0.00 Surveying Equipment I 100.00i DAY 15 NA 1 $1,500.00 Traffic Control Barricades 1 $5.001 EACH I NA 1 1 $0.00 Mileage 1 $0.501 MILE 1 30 1 NA 1 2 1 $30.00 SUBTOTAL EXPENSES $9,876.70 TASK 96 GRAND TOTAL = $13,651.70 2007 -2008 QMR Cost Estimate 10/2/2007 7 Attachment "B" Task Order 2007-09 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 7: Prepare Well Installation Report Prepare a Well Installation Report documenting the installation and findings during the drilling of the two monitoring wells. The report will include a updated site map with the locations of the new wells, soil concentration map, and include all of the well installation and development field data sheets. { ., Ti r s +.l� r Qi3T.1[T� ESF {r{rtftfi. 4i: �`��` ., ✓.,_nF,c' L?v._�... ,r .L >, aY.P'.r.''.,4 �A ....�`., e[i Z y,.,i , ... .. _ .,� , . ,i ,S <,_ i# ,.....,''.? ...�i .., .vim. -3 ., Hrt ..;;, ,.:',ui;? � ` .as?.g. \,... ...?. _. . j:::::•: :::.:.::.:::.:.::.:•::::.::::L: Principal Geologist $145.00 HOUR 2 NA 1 $290.00 Senior / Project Manager $120.00 HOUR 6 NA 1 $720.00 Associate /Project Consultant $105.00 HOUR 2 NA 1 $210.00 Sr. Staff Consultant $90.00 HOUR 26 NA 1 $2,340.00 Junior Consultant/Senior Technician $80.00 HOUR NA 1 $0.00 Junior Technician $75.00 HOUR NA 1 $0.00 Drafting $65.00 HOUR 3 NA 1 $195.00 Technical Report Reviewer $65.001 HOUR 8 NA 1 $520.00 Clerical/Word Processing $55.001 HOUR 1 3 NA 1 $165.00 SUBTOTAL EMPLOYEE LABOR 50 $4,440.00 Subcontractors Utility Clearance TASK 1 $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 1 $0.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) TASK 1 $0.00 1 $0.00 Driller TASK 1 $0.00 1 $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/ Landfill Fees I TASK I 1 1 $0.00 1 1 $0.00 Permits Well/Boring Permits $312 + $66 ea additional TASK 1 $0.00 1 1 $0.00 Discharge Permit TASK I 1 $0.00 1 1 $0.00 Encroachment Permit I TASK I 1 1 $0.00 1 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY 2 NA 1 $50.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrile, Lined, Heavyweight $2.59 PAIR NA 1 $0.00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor CartridgeR51A $10.08 PAIR NA 1 $0.00 2" Disposable Bailer with drain tube $8.00 EACH NA 1 $0.00 Purge Pump 2" submersible $45.00 DAY NA 1 $0.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 {5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA 1 $0.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH NA 1 $0.00 2" Weighted Surge Block $5.00 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH NA 1 $0.00 Padlock $10.00 EACH NA 1 $0.00 Water Level /Interface Indicator Probes $35.00 DAY NA 1 $0.00 Photovac TIP Photo -Ion Detector $100.00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY NA 1 $0.00 Field Nitrate/Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA t $0.00 pH/Cond/Temp Meter $40.00 DAY NA 1 $0.00 Turbidity Meter $20.00 DAY NA 1 $0.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0.00 Surveying Equipment $100.00 DAY NA 1 $0.00 Traffic Control Barricades $5.001 EACH I NA 1 $0.00 Mileage $0.501 MILE I NA 1 $0.00 SUBTOTAL EXPENSES $50.00 TASK #7 GRAND TOTAL= $4,490.00 2007 -2008 QMR Cost Estimate 10/2/2007 8 Attachment "B" Task Order 2007.09 FEE ESTIMATING SHEET PROJECT: City of Rohnert Park Corporation Yard TASK 8: Prepare Letter to Postpone Implementation of the RAP and letter to State UST Fund for Pre - Approval Prepare a document to postpone the implementation of the RAP based on the recent and continuing declining dissolve concentrations. Prepare and submit a historical table summarizing analytical data, graphical plots to illustrate the site declining trends, and a site map with the locations of two proposed monitoring wells to complete the monitoring well network. Discuss approach with client prior to document preparation and submittal. Based on the SCDHS -EHD response, prepare a letter to the State Fund for pre- approval of remedial system installation costs prior to implementation of the RAP. NN 5�t 4�Ski KITS YJ• hi^flt �� �i�E' 1n 4 i)r4 C TN #� Ems+ NTS' J OA� YY$c f f ABOR :::::::::.:::.:.::.:.:.:.:.:.::.:.:.::.:.::.:.:.:.:.:.::.:.:::::::.::::::::::::::::.:.:::.:.::::.::::::.::::::. ::.::::::::.:.::.:::::.::::::.. . Principal Geologist $145.00 HOUR NA 1 $07 Senior /Project Manager $120.00 HOUR 12 NA 1 $1,440.00 Associate / Project Consultant $105.00 HOUR NA 1 $0.00 Sr. Staff Consultant $90.00 HOUR 8 NA 1 $720.00 Junior Consultant/Senior Technician 180.00 HOUR NA 1 $0.00 Junior Technician $75.00 HOUR NA 1 $0.00 Drafting $65.001 HOUR I NA 1 1 $0.00 Technical Report Reviewer $65.001 HOUR 1 5 NA I 1 $325.00 Clerical/Word Processing $55.001 HOUR I 1 I NA I I I $55.00 SUBTOTAL EMPLOYEE LABOR 26 $2,540.00 EXPENSES::-: :::::::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::: ..... ....... ............................................................... ............................... Subcontractors Utility Clearance TASK 1 $0.00 1 $0.00 Concrete Corer TASK 1 $0.00 1 $0.00 Traffic Control TASK 1 $0.00 1 $0.00 Laboratory (See Attached Breakdown) TASK 1 $0.00 1 $0.00 Driller TASK 1 $0.00 1 $0.00 Equipment Rental TASK 1 $0.00 1 $0.00 Disposal/Landfill Fees I TASK I 1 1 $0.00 1 1 $0.00 Permits Well/Boring Permits $312 + $66 ea additional I TASK I 1 1 $0.00 1 1 $0.00 Discharge Permit I TASK I 1 1 $0.00 1 1 $0.00 Encroachment Permit I TASK I 1 1 $0.00 1 1 $0.00 Equipment Costs Misc. Small Items $25.00 DAY NA 1 $0.00 Tyvek/Polyethylene Suits $7.59 SUIT NA 1 $0.00 Gloves - Nitrile, Lined, Heavyweight $2.59 PAIR NA 1 $0.00 Gloves - Nitrile, Disposable, Unlined $0.50 PAIR NA 1 $0.00 Organic Vapor Cartridge R5 IA $10.08 PAIR NA l $0.00 2" Disposable Bailer with drain tube $8.00 EACH NA 1 $0.00 Purge Pump 2" submersible $45.00 DAY NA l $0.00 Pressurized Bailer with Filter $25.00 EACH NA 1 $0.00 Encore Sample Set (includes 3 -(5) gm. Samplers) $30.00 EACH NA 1 $0.00 Soil Tubes (stainless steel) $10.00 EACH NA t $0.00 Hand Auger with Split Spoon and Hammer $30.00 DAY NA 1 $0.00 Drums $40.00 EACH NA 1 $0.00 2" Weighted Surge Block $5.00 EACH NA 1 $0.00 Locking Well Caps $20.00 EACH NA l $0.00 Padlock $10.00 EACH NA 1 $0.00 Water Level /Interface indicator Probes $35.00 DAY NA 1 $0.00 Photovac TIP Photo -Ion Detector $100.00 DAY NA 1 $0.00 Dissolved Oxygen / ORP Multi -Meter $40.00 DAY NA 1 $0.00 Field Nitrate/Phosphate Tests $2.00 EACH NA 1 $0.00 Sensidyne Pump and Tubes $25.00 DAY NA 1 $0.00 Air Sampling Pump $50.00 DAY NA 1 $0.00 pH/Cond/Temp Meter $40.00 DAY NA 1 $0.00 Turbidity Meter $20.00 DAY NA 1 $0.00 Pipe Finder (metal detector) $20.00 DAY NA 1 $0.00 Surveying Equipment 1 $100.001 DAY NA I 1 1 $0.00 Traffic Control Barricades 1 $5.001 EACH I I NA I 1 1 $0.00 Mileage 1 $0.501 MILE I NA t 1 $0.00 SUBTOTAL EXPENSES $0.00 TASK #8 GRAND TOTAL = $2,540.00 2007 -2008 QMR Cost Estimate 10/2/2007 9. Attachment "B" Task Order 2007 -09