2007/08/28 City Council Resolution 2007-139RESOLUTION NO. 2007 -139 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AMENDMENT NO.5 TO TASK ORDER 2004 -14 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR SUPPLEMENTAL ENGINEERING SERVICES FOR THE EASTSIDE TRUNK SEWER PROJECT — PHASE I (CITY PROJECT NO. 2004-05) WHEREAS, Winzler & Kelly provided services for the design, permitting and bidding of Phase I of the Eastside Trunk Sewer; and WHEREAS, the Design and Bid Phases of the Eastside Trunk Sewer Project required an unanticipated level of effort to complete; and WHEREAS, Winzler & Kelly assisted the City in achieving a fast - tracked Phase I project delivery and the project was awarded on schedule. BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Amendment No. 5 to Task Order No. 2004 -14 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation, for supplemental services, associated with the Eastside Trunk Sewer (City Project No. 2004 -05). BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this amendment in substantially similar form to the attached amendment for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this date of 28th day of August, 2007. ig CITY OF ROHNERT PARK LJFORIOa i Vidak- Martinez BREEZE: AYE MACKENZIE: AYE SMITH: ABSENT STAFFORD: AYE VIDAK- MARTINEZ: AYE AYES: (4) NOES: (0) ABSENT: (1) ABSTAIN: (0) AMENDMENT NO.5 TO TASK ORDER NO. 2004-14 CITY OF ROHNERT PARK AND WINZLER & KELLY AUTHORIZATION OF PROFESSIONAL SERVICES TO PROVIDE SUPPLEMENTAL SERVICES ASSOCIATED WITH THE EASTSIDE TRUNK SEWER PROJECT, PHASE I (CITY PROJECT NO. 2004 -05) SECTION 1— PURPOSE The purpose of this AMENDMENT is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto dated July 26, 2006. SECTION 2 — SCOPE OF WORK The unanticipated level of effort to complete the scope of services is described in Attachment A — Scope of Services and consists of tasks necessary to complete supplemental services for the Design and Bid Phases of the Eastside Trunk Sewer Project. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties heretofore referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 shall be actual costs (time and materials) not to exceed $129,800. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 is anticipated to be completed by Winter 2007. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 28th day of August, 2007. CITY OF ROHNERT PARK Stephen Donley, City Manager (Date) Per Resolution No. 2007- adopted by the City Council on August 28, 2007. WINZLER & KELLY ENGINEERS Ted Whiton, Managing Principal (Date) Attachment - Eastside Trunk Sewer Supplemental Services N� WINZLER�KELLY C O N S U L T I N G E N G I N E E R S — Amendment #5 CITY OF ROHNERT PARK EASTSIDE TRUNK SEWER - PHASE 1 SUPPLEMENTAL ENGINEERING SERVICES SCOPE OF SERVICES AMENDMENT NO.5 TO WINZLER &KELLY TASK ORDER NO. 2004-14 Background Amendment No.5 proposes to amend the project budget to match the level of effort required to complete all tasks required for the design phase of the Eastside Trunk Sewer, including the original scope and Phase 1. Amendment No. 5 amends the total project budget and to cover unanticipated efforts related to the following project elements: - Original Project Plans, Specs and Estimate ( "100 %" level of completion) - Material Pre - Purchase Plans, Specs. and Estimate - Material Pre - Purchase Bid Phase Services - Phase 1 Plans, Specs and Estimate - Phase 1 Bid Phase Services The project was complex, utilized new technologies (i.e. Studliner HDPE lining) and required an extensive array of disciplines and tasks, including: - CEQA /Environmental Compliance - Permitting/Regulatory Agency Approval - Geotechnical Investigation and Potholing - Topographic and Boundary Survey - Easements, Appraisal and Acquisition Assistance - Project Management and QAQC - Design - Bid Phase Assistance - Pipe Prepurchase Assistance - Public Outreach In general, the unanticipated project effort was not isolated to one task, instead, because the project required considerable coordination between disciplines, the tasks developed closely with one another and the overall effort extended beyond expected levels concurrently. There were various tasks active during the final stages of the project that required additional efforts. Some of the key factors that attributed to the extension of the task durations included: - Prolonged Easement Procurement Efforts - Unanticipated water and storm utility relocations on J Rogers Drive - Change from summer to winter construction added effort - dewatering, paving, coordination, etc - Subsurface electrically actuated sluice gate efforts - Congested utilities on the west side of redwood forced the crossing at Hinebaugh Creek to the East side at 50% level of completion - Sewer diversions requested late in the project along Snyder caused additional effort Page 1 of 2 AttachmentA - Eastside Trunk Sewer Supplemental ServicesNZzE�?SzI L� C O N S U L T I N G E N I N E E R S — Amendment #5 - Caltrans exclusions and claim of ownership of Redwood Drive - Pennitting with Caltrans, SCWA, USACE, USF &W - Additional paving evaluation for increased pavement replacement along Redwood Drive - Efforts associated with revised traffic striping - Additional Public Outreach to include RPX Widening Project Summary Amendment proposes to increase the total budget by $129,800. With this Amendment included, the total design phase contact budget for the Eastside Trunk Sewer Project, including Snyder Lane, is $1,434,874. At 7.5% of project construction cost, this total fee is well within industry averages for projects of this magnitude, diversity and construction complexity, considering a total potential estimated construction cost of approximately $19 million (Phase 1, 2 and Snyder Lane /Bridge). Page 2 of 2