2012/09/11 City Council Resolution 2012-105RESOLUTION NO. 2012- 105
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
AMENDING BUILDING PLAN CHECK AND INSPECTION FEE SCHEDULE AND
PLANNING FEE SCHEDULE
WHEREAS, the City Council of the City of Rohnert Park adopted Resolution No. 2011-
26 on March 22, 2011 approving an updated Building Plan Check and Inspection Fee Schedule;
WHEREAS, the City Council of the City of Rohnert Park adopted Resolution No. 2010-
81 on July 27, 2010 approving an updated Planning Fee Schedule;
WHEREAS, Rohnert Park Municipal Code Chapter 3.32, "Cost- Recovery - Fee and
Service Charge System," provides for the "establishment of a fee system to recover costs of the
City in providing certain services, products and regulatory activities," including a regular review
of fees to assure that they "continue to recover the reasonable and proportional share of costs
from applicants requesting services," and providing authority for the Council "to establish such
fees by resolution to support the cost of providing the service or services" requested by
applicants;
WHEREAS, both fee schedules need to be updated for reasonable cost recovery,
including new fees for services that are performed for which no fees are currently on the fee
schedules, corrections to reflect cost recovery adjustments intended by the Council, and other
minor text changes to clarify fee schedule implementation;
WHEREAS, a cost of services study for new proposed fees was prepared;
WHEREAS, based on the findings of the cost of services study, new and modified fees
are recommended to achieve reasonable cost recovery;
WHEREAS, the cost of services study provides the necessary data to substantiate that
the proposed fees will not exceed the estimated reasonable cost of providing the services for
which the fees are to be levied;
WHEREAS, the new and amended fees are not a tax subject to the supermajority voting
provisions of Article XIII of the California Constitution as amended by Proposition 26, but are
an exception under Section 1(e)(3) of Article XIII C of the California Constitution as amended
by Proposition 26, to wit:
(e) As used in this article, "tax" means any levy, charge, or exaction of any kind imposed
by a local government, except the following:...
(3) A charge imposed for the reasonable regulatory costs to a local government
for issuing licenses and permits, performing investigations, inspections, and
audits, enforcing agricultural marketing orders, and the administrative
enforcement and adjudication thereof
WHEREAS, none of the fees outlined in the amended fee schedules are Development
Impact Fees (fees imposed as a condition of approval of development) subject to state law
requirements pertaining to those fees;
WHEREAS, no fees are amended in these updated fee schedules for the purpose of
acquiring funds for the construction of public improvements or the acquisition of equipment;
WHEREAS, on July 10, 2012, the City Council of the City of Rohnert Park reviewed the
draft modified fee schedule and supporting data during a scheduled public meeting and provided
further guidance on the development of the new and modified fees;
WHEREAS, in accordance with state law, the cost of services study was made available
for public review at least ten (10) days prior to the meeting at which the fee schedule
amendments are to be adopted;
WHEREAS, the City published notice for adoption of the fee schedule amendments in
accordance with state law;
WHEREAS, on September 11, 2012, the City Council of the City of Rohnert Park
reviewed the amended fee schedules and supporting data during a scheduled public hearing; at
which time interested persons had an opportunity to testify either in support of or opposition to
the proposed fees; and
WHEREAS, at the September 11, 2012 City Council meeting, upon hearing and
considering all testimony and arguments, if any, of all persons desiring to be heard, the Council
considered all the facts relating to the amended fee schedules.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT
PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. Recitals. That the above recitations are true and correct and material to
this Resolution.
Section 2. Environmental Clearance. The adoption of this Resolution is exempt from
the California Environmental Quality Act as this action is not considered a "project" as defined
in California Code of Regulations, Title 14, Chapter 3, Article 20, Section 15378(a):
(a) "Project" means the whole of an action, which has a potential for resulting in either a
direct physical change in the environment, or a reasonably foreseeable indirect physical
change in the environment,...
and is specifically excluded in Section 15378(b)(4), to wit:
(b) "Project" does not include:... (4) The creation ofgovernment funding mechanisms or
other government fiscal activities which do not involve any commitment to any specific
project which may result in a potentially significant physical impact on the environment.
Section 3. Adoption of Fees. The Building Plan Check and Inspection Fee Schedule and
Planning Fee Schedule are hereby amended as shown on Exhibit A, which is attached hereto and
incorporated by this reference, and shall be in full force and effect as of December 1, 2012.
Except as shown on Exhibit A, all fees for building permits and services shall continue to be in
effect and shall remain as provided for in Resolution Nos. 2011 -26 and 2010 -81.
Section 4. Constitutionality. If any action, subsection, sentence, clause or phrase of
this Resolution or the fees levied by this Resolution shall be held invalid or unconstitutional by a
court of competent jurisdiction, such invalidity shall not affect the validity of the remaining
portions of this Resolution or the fees levied by this Resolution that can be given effect without
the invalid provisions.
Section 5. Waiver of Fee. The City Council is hereby authorized to waive any of the
fees outlined in Exhibit A. If such a waiver occurs, the City Manager or his/her designee will
ensure that any fee category for which a waiver was granted does not exceed the estimated
reasonable cost of providing the service.
DULY AND REGULARLY ADOPTED this I Ith day of September, 2012.
ATTEST:
_ n k
City Clerk
CITY OF ROHNERT PARK
Mayor
AHANOTU: A`IE BELFORTE: NJE CALLINAN: N-jE STAFFORD: AyG- MACKENZIE: N*
AYES: ( ) NOES: ( 0 ) ABSENT: (p ) ABSTAIN: ( p )
3
EXHIBIT A to Resolution - Page 1
MECHANICAL, ELECTRICAL
AND PLUMBING FEES
I✓XHIBIT A to Resolution - Page 2
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES FEE
'MECHANICAL PERMIT FEES
Stand Alone Mechanical Plan Check (hourly rate)
$
99.00
UNIT FEES:
A/C, Residential (each) Plan Check
$
70.00
A/C, Residential (each) Inspection
$
118.00
Furnace, less than 100,000 Btu, residential, including wall heaters, gas inserts, etc.
Inspecton
$
86.45
Furnace, more than 100,000 Btu, residential, including wall heaters, gas inserts, etc.
$
124.60
Furnace, non -res, less than 100,000 Btu
$
133.00
Furnace, non -res, more than 100,000 Btu
$
148.00
Refrigeration Compressor
$
147.00
Boiler
$
254.00
Chiller
$
246.00
Heat Pump (Package Unit)
$
103.00
Air Handler
$
103.00
Duct Work (only)
$
103.00
Make -up Air System
--------------------...----------------- ..._--- ------------------ ___... _.._...--------
Moisture Exhaust Duct, non- residential (Clothes Dryer)
$
$
148.00
-
88.00
Vent Fan, Single Duct (each)
$
96.00
Exhaust Hood and Duct (Residential)
$
117.00
Exhaust Hood, Type I (Commercial Grease Hood)
$
321.00
Exhaust Hood, Type II (Commercial Steam Hood)
$
231.00
Refrigerator Condenser Remote
$
170.00
Walk -in Box/Refrigerator Coil
$
163.00
Install /Relocate suspended heater, recessed wall heater, or floor- mounted unit heater
(each)
$
103.00
Install /Relocate /Replace appliance vent installed and not included in an appliance permit
(each)
$
111.00
Repair /Alter /Add heating appliance, refrigeration unit, cooling unit, absorption unit, or
each heating, cooling, absorption, or evaporative cooling system, including installation of
controls (each) Plan Check
$
108.00
Repair /Alter /Add heating appliance, refrigeration unit, cooling unit, absorption unit, or
each heating, cooling, absorption, or evaporative cooling system, including installation of
controls (each) Inspection
$
118.00
City of Rohnert Park - Development Services
Adopted March 11, 2011,
Effective June 1, 2011
Revised J_/2012
EXHIBIT A to Resolution -Page 3
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
Install /Relocate boiler or compressor, up to and including 3HP, or absorption system up
to and including 100,000 Btu /h (each)
$ 126.00
Install /Relocate boiler or compressor, over 3HP and up to and including 15 HP, or
absorption system over 100,000 Btu /h and up to and including 500,000 Btu /h (each)
$ 174.00
Install /Relocate boiler or compressor, over 15 HP and up to and including 30 HP, or
absorption system over 500,000 Btu /h and up to and including 1,000,000 Btu /h (each)
$ 305.00
Install /Relocate boiler or compressor, over 30 HP and up to and including 50 HP, or
absorption system over 1,000,000 Btu /h and up to and including 1,750,000 Btu /h (each)
$ 332.00
Install /Relocate boiler or compressor, over 50 HP, or absorption system over 1,750,000
Btu /h (each)
$ 481.00
Air - handling unit, including attached ducts. (Note: this fee shall not apply to an air -
handling unit that is a portion of a factory- assembled appliance, cooling unit, evaporative
cooler, or absorption unit for which a permit is required elsewhere) (each)
$ 131.00
Air - handling unit over 10,000 CFM (each)
$ 117.00
Evaporative cooler other than portable type (each)
$ 88.00
Ventilation fan connected to a single duct (each)
Ventilation system that is not a portion of any heating or air - conditioning system
authorized by a permit (each)
$ 96.00
Hood installation that is served by mechanical exhaust, including the ducts for such hood
(each)
$ 103.00
Appliance or piece of equipment not classed in other appliance categories, or for which
no other fee is listed (each)
$ 162.00
OTHER FEES:
Other Mechanical Inspections (per hour)
$ 99.00
PLUMBING /GAS PERMIT FEES
Stand Alone Plumbing Plan Check (hourly rate)
$ 99.00
UNIT FEES:
Fixtures (each)
Gas System
$ 81.00
First Outlet
$ 104.00
Each Additional Outlet
$ 10.00
Building Sewer
is 103.00
Grease Trap (Inside Building, Each)
1 $ 138.00
City of Rohnert Park - Development Services
Adopted March 11, 2011
Effective June 1, 2011
Revised _/ _/2012
Plan Check and Inspection Fees EXHIBIT A to Resolution -Page 4
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
Backflow Preventer
First 5
$ 82.00
Each after the First 5
$ 16.00
Roof Drain— Rainwater System
$ 96.00
Shower Valves including associated plumbing
$ 118.00
Water Heater
$ 87.55
$ 103.00
Water Pipe Repair /Replacement, residential
Water Pipe Repair /Replacement, non - residential
$ 162.00
Water Service Supply Line, residential
$ 103.00
Water Service Supply Line, non - residential
$ 162.00
Drain -Vent Repair /Alterations, residential
$ 96.00
Drain -Vent Repair /Alterations, non - residential
$ 148.00
Drinking Fountain
$ 96.00
Solar Water System Fixtures (solar panels, tanks, water treatment equipment) residential
$ 363.00
Solar Water Heating, swimming pool, residential
$ 341.00
Solar Water Heating, swimming pool, non - residential
$ 375.00
Graywater Systems
$ 345.00
Medical Gas System (Each Outlet)
$ 151.00
Plumbing fixture or trap or set of fixtures on one trap, including water, drainage piping,
and backflow protection (each)
$ 96.00
Industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen -
type grease interceptors functioning as fixture traps (each)
$ 204.00
Install /Alter /Repair water piping and /or water treating equipment (each)
$ 81.00
Repair /Alter drainage or vent piping (each fixture)
$ 73.00
Lawn sprinkler system on any one meter, including backflow protection devices therefore
(each)
$ 103.00
Backflow devices not included in other fee services, e.g., building /trailer park sewer
(each)
$ 108.00
Atmospheric -type vacuum breakers not included in other fee services, e.g., building /trailer
park sewer (1 -5 units)
$ 103.00
Atmospheric -type vacuum breakers not included in other fee services, e.g., building /trailer
park sewer (each unit over 5 units)
$ 103.00
Canon Manor Sewer Lateral
$ 542.00
Residential Sewer Lateral
$ 229.00
OTHER FEES:
Other Plumbing and Gas Inspections (per hour)
$ 99.00
City of Rohnert Park - Development Services
Adopted March 11, 2011
Effective June 1, 2011
Revised _/_J2012
Plan Check and Inspection Fees EXHIBIT A to Resolution -Page 5
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
ELECTRICAL PERMIT FEES
Stand Alone Electrical Plan Check (hourly rate)
$ 99.00
SYSTEM FEES:
Single' - Family Dwelling (SFD) Residential Service, up to and including 400 amps
$ 140.00
Single - Family' Dwelling (SFD); Residential Service, greater than 400 amps
$ 223.00
Non - Residential (Multi- Farnily- Dwell ing (MFD) /.Corrimereial / Indtastrial). service up to 200
amps
$ 82.00
Non - Residential (Multi; = Family. Dwelling:(MFD) ! Gornmercial / Industrial)'service 225 -400
amps
$ 91.00
Non - Residential (Multi=Famdy Dwellmgi(MFD) /Commercial / Industrial) service 425 -600
....
amps
$ 115.00
Non - Residential (Multi, - Family Dwelling (MFD) / Gornme ndustnal)'service 625 -800
amps
$ 148.00
Non - Residential (Multi= Family Dweilmg',(MFD)LCommercal /)ndustnal)'service over 800
amps
$ 206.00
Subpanels'
Residential & multi family dwelling sutpari < 16,bam,ps.
$ 84.00
Residential. &;multi family dwelling ag panel >1D arrips
$ 110.25
-
Nonresidentiai subp n;el <_100amps
$ 84.00
Non - residential subpanel > 10Qamps:
$ 110.25
Non - Residential Circuits
15 or 20 amp, first 10 circuits (each)
$ 96.00
15 or 20 amp, next 90 circuits (each)
$ 126.00
15 or 20 amp, over 100 circuits (each)
$ 178.00
30 or 40 amp circuits (each)
$ 122.00
50 to 175 amp circuits (each)
$ 165.00
200 amp and larger circuits (each) Plan Check
$ 171.00
200 amp and larger circuits (each) Inspection
$ 141.00
Temporary Service (each)
$ 195.00
Temporary Pole (each)
$ 144.00
City of Rohnert Park - Development Services
Adopted March 11, 2011
Effective June 1, 2011
Revised _/_/2012
EXHIBIT A to Resolution - Page 6
Plan Check and Inspection Fees
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
Outdoor Events
Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable -type
rides, booths, displays, and attractions
$ 293.00
Electric generator and electrically- driven rides (each)
$ 189.00
Mechanically- driven rides and walk- through attractions or displays having electric lighting
(each)
$ 189.00
System of area and booth lighting (each)
$ 107.00
Temporary Power Service
Temporary distribution system and temporary lighting and receptacle outlets for
constructions sites, decorative light, Christmas tree sales lots, firework stands, etc.
$ 254.00
Pre - Inspection (per hour)_
$ 237.00
_
Generator Installation (per kW)
_
$ 111.00
UNIT FEES:
Receptacle, Switch, Lighting Outlets, and Lighting Fixtures - RESIDENTIAL
$0.06 /SF
(Includes receptacles, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters; lighting fixtures, sockets or other lamp -
holding devices)
Residential Appliances
Fixed residential appliances or receptacle outlets for same, including wall- mounted
electric ovens; counter mounted cooking tops; electric ranges; self- contained room
console or through -wall air conditioners; space heaters; food waste grinders;
dishwashers; washing machines; water heaters; clothes dryers; or other motor - operated
appliances (each) not exceeding one horsepower (HP) in rating (each)
$ 88.00
(For other types of air conditioners and other motor - driven appliances having larger
electrical ratings, see Power Apparatus)
City of Rohnert Park - Development Services
Adopted March 11, 2011
Effective June 1, 2011
Revised _/_/2012
Plan Check and Inspection Fees EXHIBIT A to Resolution - Page 7
Mechanical, Electrical and Plumbing Permits
Adopted March 11, 2011
Effective June 1, 2011
City of Rohnert Park - Development Services Revised _/_/2012
FEE TYPES FEE
Nonresidential Appliances
Nonresidential appliances and self- contained factory - wired, nonresidential appliances,
including medical and dental devices; food, beverage, and ice cream cabinets;
illuminated show cases; drinking fountains; vending machines; laundry machines; or
other similar types of equipment (each)
$ 148.00
Nonresidential appliances and self - contained factory- wired, nonresidential appliances not
exceeding one horsepower (HP), kilowatt (kW), or kilovolt- ampere (WA) in rating,
including medical and dental devices; food, beverage, and ice cream cabinets;
illuminated show cases; drinking fountains; vending machines; laundry machines; or
other similar types of equipment (each)
$ 148.00
(For other types of air conditioners and other motor - driven appliances having larger
electrical ratings, see Power Apparatus)
Power Apparatus
Motors, generators, transformers, rectifiers, synchronous converters, capacitors,
industrial heating, air conditioners and heat pumps, cooking or baking equipment, and
other apparatus. Rating in horsepower (HP), kilowatts (kW), or kilovolt- amperes (WA), or
kilovolt- amperes- reactive (WAR)
Up to and including 1 (each)
Over 1 and not over 10 (each)
Over 10 and not over 50 (each)
Over 50 and not over 100 (each)
Over 100 (each)
-- -- -- ..— ._... -- — -- ------ - - -
$ 122.00
$ 139.00
$ 208.00
$ 238.00
$ 258.00
- --
(For equipment or appliances having more than one motor, transformer, heater, etc., the
sum of the combined ratings may be used: These fees include all switches, circuit
breakers, contactors, thermostats, relays, and other directly related control equipment.)
Bus ways
Trolley and plug -in -type bus ways - each 100 feet or fraction thereof
$ 152.00
(An additional fee will be required for lighting fixtures, motors, and other appliances that
are connected to trolley and plug -in -type bus ways. No fee is required for portable tools.)
Signs, Outline Lighting, and Marquees
Signs, Outline Lighting, or Marquees uif (eacj
$ 103.00
New electric bran.ch circuit only for existing and future signs; outlme.;lighting;.and.
Marquees and. additional branch circuits within the same sign, outline lighting system, or
marquee (each)
$ 88.00
Adopted March 11, 2011
Effective June 1, 2011
City of Rohnert Park - Development Services Revised _/_/2012
Plan Check and Inspection Fees EXHIBIT A to Resolution - Page 8
Mechanical, Electrical and Plumbing Permits
FEE TYPES
FEE
Miscellaneous Apparatus, Conduits, Bus ways, and Conductors
Minimum charge - 2 hours, includes administrative and professional staff time
Electrical apparatus, conduits, and conductors for which a permit is required, but for
which no fee is herein set forth: Plan Check
$ 92.00
Electrical apparatus, conduits, and conductors for which a permit is required, but for
which no fee is herein set forth: Inspection
(This fee is not applicable when a. fee is paid for one or more services, outlets, fixtures,
appliances, power apparatus, bus ways, signs, or other equipment)
$ 94.00
Minimum charge (See Reinspection Fee in MISCELLANEOUS FEES table)
Each additional hour or portion thereof
$ 169.00
Inspections for which no fee is specifically indicated, per hour (See Supplemental
Inspection Fee in MISCELLANEOUS FEES table)
OTHER FEES:
Additional Plan Review required by changes, additions, or revisions to approved plans,
per hour (See Supplemental Plan Check Fee in MISCELLANEOUS FEES table)
Other Electrical Inspections (per hour)
$ 99.00
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours, 0 -2 hours (minimum charge)
Minimum charge - 2 hours, includes administrative and professional staff time
$ 269.00
Each additional hour or portion thereof
$ 169.00
Reinspections
Minimum charge (See Reinspection Fee in MISCELLANEOUS FEES table)
Each additional hour or portion thereof
$ 169.00
Inspections for which no fee is specifically indicated, per hour (See Supplemental
Inspection Fee in MISCELLANEOUS FEES table)
Additional Plan Review required by changes, additions, or revisions to approved plans,
per hour (See Supplemental Plan Check Fee in MISCELLANEOUS FEES table)
City of Rohnert Park - Development Services
Adopted March 11, 2011
Effective June 1, 2011
Revised _/_J2012
EXHIBIT A to Resolution - Page 9
MISCELLANEOUS PERMITS
FEES
Plan Check and Inspection Fees 1EXHIBIT A to Resolution -Page 10
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
Antenna — Telecom - - - - --,- - F"' a c"i-1-ity---
Cellular/Mobile free-standing new structure
each
.................
$1,727
Cellular/Mobile Phone, attached to existing structure
each
$941
Each addt'l co-located antenna
each addt'l antenna
$199
Application Meeting
First Hour
hourly rate
$99
Each additional 1/2 hour
.-- - - -----------
ArborfFrellis (R-3s only over 120ft, non R-3), Awning/Canopy
(supported by building) R-3
Balcony addition (R-3)
hourly rate
each
up to 200 SF
--
$49
---- - ----- --- .........
$147
$549
Balcony addition (R-3) over 200 SF
Business License Inspections
each additional 50 SF
or portion thereof
each
$131
$74
Carport (R-3) - Plan Check
Carport (R-3) - Inspection
each
each
each
$224
$436
$43
Change of Occupancy (over the counter)
Change of Occupancy
minimum fee, actual costs
thereafter
(1)
$137
Chimney (factory-built, masonry), Chimney Repair
each
$424
Covered Porch (R3), Deck (wood) >30" above grade
,Covered Porch (R3), over 200 SF ..........
Demolition
up to 200 SF
each additional 100 SF
or portion thereof
$147
$78
.Commercial - Inspection
Residential - Inspection
Disabled Access Compliance Inspection
Door
each
$249
$249
each
hourly rate
$99
New door (non structural)
each
$150
New door (structural shear wall/masonry)
each
$704
Duplicate/Replacement Job Card
each
$144
lExterior Renovation, Non-Residential
per 100 SF or portion
thereof
$621
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _J_/2012
!EXHIBIT A to Resolution - Page 11
Plan Check and Inspection Fees
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
Fence
Masonry any height
up to 100 L
$331
Non-masonry, over 6 feet in height-,
up to 100 LF
$231
n-masonry, over 6 feet in height; masonry any height, over
Each additional 100 LF
100 LF
or portion thereof
$199
Final Inspection Permit (non-residential only) to reactivate an
expired .perTit,_ ___ ...... ----------
each
(2)
$325
Fireplace
New Pre-Fabricated/Metal Fireplace - Plan Check
each
$212
New Pre-Fabricated/Metal Fireplace - Inspection
. ... . .....
each
$318
Fireplace Repairs / Demolition.
Plan. Check
$195
$183
each
each
Inspection
Flag pole (over 20 feet in height)
each
$481
Fire Repairs
I� sidential, more than 30% damaged - Use Residential
Addition Fee
Residential, less than 30% damaged - Plan Check
each
$4241
Residential, less than 30% damaged - Inspection
each
$560
Commercial, use New Construction Tenant Improvement
Foundation Only Residential
W10 New Construction Permit
each
$897
W/ New Construction Permit
each
each
$405
$754
Tou-n-da--ti-o–n—Re-p-air, R-3
Foundation Repair, non-R3
each
$904
Garage (detached)
frame ood up to 1,000 SF
each
$1,215
Wood frame over 1,000 SF.an*d;llesg than 2000 SF
Forpprtionof1000SF
$230
Garage Conversion, Residential.
----------- -
each
$350
Generator
each
$624
Insulation (bqtf;*,bI own in,winjection)
each
$1291
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _/_J2012
Plan Check and Inspection Fees EXHIBIT A to Resolution - Page 12
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
Master Plan - Revisions
(3 )
Deferred Submittal Processing Fee
'�(_no
each
each
(3)(4)
$364
$23 - 1
change in structure or
Mino re footage)
(3) (4)
Major (USE RESIDENTIAL NEW CONSTRUCTION -
MASTER PLAN)
(3)
Master Plan - Duplicate Set Processing Fee
-- ------
(3) (4)
$182
Oven (Commercial)
each
$735
Partition—Commercial, Interior (up to 30 LF)
up to 30 LF
$506
Partition over 30 LF -Plan Check
each additional 30 LF
------ ----- - -.----_or
portion thereof
$144
Partition over 30 LF - Inspection
each additional 30 LF
...... . ..... - - ----
or portion thereof
$137
Partition—Residential, Interior (up to 30 LF)
..... .... ...
up to 30 LF
$268
----- -
Partition over 30 LF
each additional 30 LF
---- -
or portion thereof
$169
Patio Cover (wood frame, metal frame, other)
up to 300 SF
$443
Patio, over 300 SF
each additional 300 SF
woo d fr ame, W et l f rame, other)
__
--
---- - - --
up to 300 sf
35
--
Enclosed patio over 300 SF - Plan Check
each additional 300 SF
. ...... .
or portion thereof
$268
Enclosed patio over 300 SF - Inspection
each additional 300 SF
or portion thereof
$62
. . .......
eaG14
---- - -----
EaGh Addt'l 2_1o.ogg
AG14ion"
Photovoltaic System
-1-
5---kilowatts - Plan Check
each
]$150
1 - 15 kilowatts - Inspection
1 461� vatts - Plan Check
each
__$156
5_5 - 0
0 16matE-iln—spection
each
$312
F'51 --Too kilowatts- Plan Check
each
$430
_
1.. 51 - 100 kilowatts - Inspection—
$529
each
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _J_J2012
Plan Check and Inspection Fees 1EXHIBIT A to Resolution - Page 13
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
101 - 200 kilowatts- Plan Check
each
$747
101 - 200 kilowatts - Inspection
each
$823
201 - 500 kilowatts - Plan Check
_
each
di - 500 kilowatts o%Aiaffs - Inspection
each
--$-1,679
$3,225
500 kilowatts - I megawatt
aif
each
$3,933
500 kilowatts - 1 megawatt - Inspection
each
$5,231
Plot Plan Revision
each
(5)
$137
Product Review
minimum fee, actual costs
thereafter
(1)
$118
Remodel—Residential
.... . . - - ----- ........
- Remodel up to 300 SF - Plan Check
...-
up to 300 SF
- - --
$293
Remodel up to 3-0-0-S-F- - Inspection
up to 300 SF
$311
each additional 10Q SF
----- -
Remodel, over 300 SF - Plan Check
or portion thereof
$68
each additional 100 SF
Remodel, over 300 SF - Inspection
or portion thereof
$93
Kitchen - Plan Check
each
$268
Kitchen - Inspection
each
$354
Bath - Plan Check
each
$175
th - Inspection
each -------
$236
Reinspection Fee / Final Inspection Feb,(SFD)
... ..... - -------- --- --------
minimum fee, actual costs
thereafter
(1),(3)
$137
. . . . ..... ....
Repairs
Repairs, non residential, n. s.tr.ucturat - Plan Check
each
$350
Rppai(s, non-residential,'hon-structural _ `Inspection
"Oh,
$365
Repairs, residential - Plan Check
each
$350
Repairs, residential - Inspection
each
$365
Re-roof
Single Family - Dwelli.ng, (5FID). Residential only (w/ new roof
sheathing) - Inspection
each
$306
Single Family. Dwelling (SFD) Residential only (w/o new roof
sheathing) - Inspection
each
eaeli 5,000 9F
$212
eF
Multi Family Dwelliqq RlaR QheGI
$561
Multi-Family Dwelling ;(Apartrhent's/Corldo . miniums) -
each 5,000 SF or
Inspection
portion thereof
$442
each 5,000 SF or
Commercial - Plan Check
portion thereof
$56
Commercial - Inspection
—
each 5,000 SF or
portion thereof
F 1
$404
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _J_J2012
Plan Check and Inspection Fees lEXHIBIT A to Resolution - Page f-4'1
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
Revisions to approved plans
Commercial - New
Tenant Improvement
Single Family Dwelling
Minimum fee
Minimum fee
Minimum fee
Minimum fee
Minimum fee
4)
(4)
(4)
(4)
(4)
$118
$118
$118
$118
$118
Ad-d7ffiio`n-'—
Roof Structure Replacement - Plan Check
up to 500 SF
$212
Roof Structure Replacement - Inspection
up to 500 SF
$329
Roof structure replacement, over 500 SF
each additional 100 SF
or portion thereof
$43
Sauna—steam . ...... ....
SCEIP projects for which permits not typically issued (use
Minimum Processing Fee)
each
$723
Siding
Stone and Brick Veneer (interior or exterior), up to 800 sf
up to 800 SF
—$461
Other Siding up to 800 SF - Plan Check (for commercial only)
up to 800 SF
$180
Other Siding up to 800 SF - Inspection ----
upto800SF
each additional 806 SF
or portion thereof
each
each
(6)
(6)
$230
$169
$306
- - ----
Additional siding
Signs, new. (:5 100 SF area)
Roof / Projecting Signs
(6)
$281
Pole (under 10')
each
(6)
$306
Wall /Awning Sign, Non-Electric
each
(6)
$262
Wall, Electric
each
(6)
$287
Other Sign - Plan Check
Other Sign - Inspection
each
each
each —..--
each
(6)
$212
(6)
(6)
(6)
(6)
$131
$499
$350
Signs,: new. (> 100 SF area)
Roof / Projecting Signs
r�onumen—t-----
Pole (over 10')
each
(6)
$449
Wall/Awning Sign, Non-Electric
each
(6)
$331
Wall, Electric 7
each
(6)
$405
Other Sign - Plan heck
C
each
(6)
$274
Other Sign - Inspection
each
(6)
$293
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. —/_/2012
Plan Check and Inspection Fees EXHIBIT A to Resolution -Page 15
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
Site Accessibility
per hour
each
$99
Skylight
Less than 10 SF
$212
Greater than 10 SF or structural
each
$468
Solar Panels (Thermal), residential or equal
each
$338
Storage Racks
-
-first 1-0-0 L-F*
each additional 100 LF
or portion thereof
Each
- 6--7--
----$4
$237
.... .....
$518
S tor a' g—e—r ack s- over —8' high , u p to -1 0 0- LF
Storage racks over 8' high, over 100 LF
Structural Repairs (Non-Residential) - Plan Check
Structural Repairs (Non-Residential) - Inspection
Each
Each .. ch
Each
----- .... .. . .
up to 400 SF
$927
$405
Structural Repairs (Residential) - Plan Check
Structural Repairs (Residential) - Inspection
$442
$455
Stucco Applications
Stucco Application, over 400 SF
each additional 406-§-r
or portion thereof
$280
Supplemental Plan Check Fee (after 3rd review)
First hour
each
_$137
Each Additional 1/2 hour or portion thereof
per 112 hour or portion
thereof
$68
Supplemental Inspection Fee
First 1/2 hour
each
per 1/2 hour or portion
thereof
each
each
$68
$68
$635
$6 . 35
Each Additional 1/2 hour or portion thereof
Swimming Pool/Spa
Vinyl-lined (up to 800 so
Fiberglass
Gunite (up to 800 so
each
$635
Additional pool (over 800 sf or portion thereof)
each
$374
Commercial pool (up to 800 so
each
$1,095
Commercial pool (over 800 sf or portion thereof)
each
$1,268
Spa or Hot Tub (Pre-fabricated)
each
$685
Temporary Occupancy Approval
minimum fee, actu_a, —costs
thereafter
—
(4)
$449
Trash Enclosure
each
$624
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _J_/2012
Plan Check and Inspection Fees 1EXHIBIT A to Resolution - Page 16
Miscellaneous Permits
FEE TYPES
Unit
Note
FEE
Window or Sliding Glass Door
New Window (change in opening size/location, non-structural)
each
each - -------
each
each
each
$112
$26-1
$162
$261
—$42--3-
New window (structural shear wall/masonry) - Plan Check
New window (structural shear wall/masonry) - Inspection
Bay Window (structural) - Plan Check
Bay Window (structural) - Inspection
,Minimum Processing Fee (Administrative - No Permit)
each
(7)
T37
Notes:
1. Minimum fee includes professional and minimum adminstrative staff time for service
2. Inspection fee for reactivation of residential permits is included in "Reinspection Fee."
2- 3. Refer to Master Plan Policy
3. 4. Processing fee only. Staff time and materials cost, or actual consultant fee + City administrative fee
may be in addition to processing fee.
4- 5. Refer to Plot. Plan and Production Phase Policy
New signs means the .replacement .ot ,:bh`px'! stz, i g.,,,
s�ign,wfth . ,a
new.one, or installation of iriew sign with
:6n,6xi ti ' 'ble !.-,,sdu
7. Use for SCEIP projects & other "non-permit" projects for intake and processing costs.
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. — / _J2012
EXHIBIT A to Resolution - Page 17
Plan Check Fees
Tenant Improvements
Occupancy Groups A, B, E, F, H, I, M, S and "other"
NOTES:
(1) Project size for Tenant Improvement plan check fee calculation purposes is total square footage from inside
wall to wall measurements.
(2) Plan check fee adjustments for Tenant Improvements (Tls):
• TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee +
• TI without plumbing / mechanical: 70% base cost fee + 70% incremental cost fee
• TI without electrical: 70% base cost fee + 70% incremental cost fee
• TI only adding walls: 70% base cost fee + 70% incremental cost fee
'orrected for 50% cost recovery
;orrected for 75% cost recovery
;orrected for 50°% cost recovery
(3) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB -IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _/_/2012
CONSTRUCTION TYPE
IIA, 116, IIIA, IIIB, IV
VA, VB
IBC
Class
IBC Occupancy Type
Project
Size
Threshold
Base Cost.
- @ _
Threshold.
Size
- .Costforeach -
Additional 100
SF or fractional
part thereof
Base Cost
@
Threshold
Size
Cost for each
Additional 100
sF or fractional
part thereof
F, H
F & H Occupancy Tenant Improvements
Factory
High Hazard
1,000
$1,761
$52.03
$1,409
$41.63
5,000
$3,842
$40.66
$3,074
$32.53
10,000
$5,875
$31.01
$4,700
$24.81
20,000
$8,976
$10.83
$7,181
$8.67
50,000
$12,226
$7.83
$9,781
$6.27
100,000
$16,143
$5.66
$12,914
$4.53
I
1 Occupancy Tenant Improvements
Institutional
1,000
$4,361
$50.33
$3,489
$40.25
5,000
$6,374
$19.28
$5,099
$15.42
10,000
$7,338
$38.48
$5,870
$30.79
20,000
$11,186
$13.42
$8,949
$10.73
50,0001
$15,211
$9.80
$12,169
$7.84
100,000
$20,110
$7.16
$16,088
1 $5.73
M
M Occupancy Tenant Improvements
Mercantile
2,000
$1,621
$38.91
$1,297
$31.13
10,000
$4,734
$724
$3,787
$5.79
20,000
$5,458
$1413
$4,366
$11.38
40,000
$8,303
$4.95
$6,642
$3.96
100,000
$11,273
$3.63
$9,018
$2.91
200,000
$14,904
$2.66
$11,923
$2.14
S
S Occupancy Tenant Improvements
Storage
150
$1,850
$138.83
$1,480
$111.00
750
$2,683
$56.00
$2,146
$44.80
1,500
$3,103
$107.33
$2,482
$85.87
3,000
$4,713
$37.67
$3,770
$30.13
7,500
$6,408
$27.48
$5,126
$21.99
15,000
$8,469
$20.05
$6,775
$16.05
Other Tenant Improvements
500
$2,948
$66.85
$2,358
$53.50
2,500 1
$4,285
$26.16
$3,428 1
$20.92
5,000
$4,939
$51.80
$3,951 1
$41.44
10,000
$7,529
$18.04
$6,023 1
$14.43
25,000
$10,235
$10.58
50,000
$13,540
_$13.22
$9.69
__$8,188
$10,832
_
$7.76
NOTES:
(1) Project size for Tenant Improvement plan check fee calculation purposes is total square footage from inside
wall to wall measurements.
(2) Plan check fee adjustments for Tenant Improvements (Tls):
• TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee +
• TI without plumbing / mechanical: 70% base cost fee + 70% incremental cost fee
• TI without electrical: 70% base cost fee + 70% incremental cost fee
• TI only adding walls: 70% base cost fee + 70% incremental cost fee
'orrected for 50% cost recovery
;orrected for 75% cost recovery
;orrected for 50°% cost recovery
(3) To calculate Construction Type IA and IB base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB -IIIA- IIIB -IV by 1.20 and Construction Type VA -VB by 1.50.
City of Rohnert Park - Development Services Eff. 6/1/2011, Rev. _/_/2012
Inspection Fees
Tenant Improvements
Occupancy Groups A, B, E, F, H, I, M, S and "other"
EXHIBIT A to Resolution - Page 18
NOTES:
(1) Project size for Tenant Improvement inspection fee calculation purposes is total square footage from inside wall
to wall measurements.
(2) Inspection fee adjustments for Tenant improvements (Tis):
• TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee+ 100% incremental
• TI without plumbing / mechanical: 70% base cost fee + 70% incremental cost fee
• TI without electrical: 85% base cost fee + 85% incremental cost fee
• TI only adding /moving walls: 70% base cost fee + 7091 incremental cost fee
(3) To calculate Construction Type lA and 18 base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -V13 by 1.50.
:orrected for 50% cost recovery
;orrected for 75% cost recovery
:orrected for 50% cost recovery
City of Rohnert Park- Development Services Eff. 6/1/2011, Rev. _J_/2012
CONSTRUCTION TYPE
IIA, IIB, IIIA, 1116, IV
VA, VB
IBC
Class
IBC Occupancy Type
Project -
Size
Threshold
Base Cost
@
Threshold
Size
Cost for each
Additional 100 SF or
fractional part
thereof
Base Cost
@
Threshold
Size
Cost for each
Additional 100SF-
or fractional part
thereof
F, H
F & H Occupancy Tenant Improvements
Factory
High Hazard
1,000
$1,093
$22.15
$875
$17.72
5,000
$1,979
$29.50
$1,583
$23.60
10,000
$3,454
$12.39
$2,763
$9.91
20,000
$4,693
$7.62
$3,754
$6.10
50,000
$6,980
$7.03
$5,584
$5.62
100,000
$10,494
$6.49
$8,395
$5.18
1
1 Occupancy Tenant Improvements
Institutional
1,000
$4,051
$20.05
$3,241
$16.03
5,000
$4,853
$32.32
$3,882
$25.86
10,000
$6,469
$22.02
$5,175
$17.62
20,000
$8,671
$14.36
$6,937
$11.48
50,000
$12,978
$13.39
1 $10,382
$10.72
100,000
$19,675
$12.49
$15,740
$10.01
M
M Occupancy Tenant Improvements
Mercantile
2,000
$1,264
$22.81
$1,011
$18.25
10,000
$3,089
$10.02
$2,471
$8.02
20,000
$4,091
$6.94
$3,273
$5.55
40,000
$5,479
$4.48
$4,383
$3.59
100,000
$8,169
$4.16
$6,535
$3.33
200,000
$12,328
$3.86
$9,862
$3.09
S
S Occupancy Tenant Improvements
Storage
150
$1,385
$50.83
$1,108
$40.67
750
$1,690
$72.53
$1,352
$58.00
1,500
$2,234
$51.40
$1,787
$41.13
3,000
$3,005
$32.84
$2,404
$26.27
7,500
$4,483
$29.97
$3,586
$23.99
15,000
$6,731
$27.35
$5,385
$21.91
Other Tenant Improvements
500
$1,706
$20.35
$1,365
$16.25
2,500
$2,113
$26.12
$1,690
$20.92
5,000
$2,766
$20.14
$2,213
$16.10
10,000
$3,773
$11.84
$3,018
$9.47
25,000
$5,549
$10.74
$4,439
$8.59
50,000
$8,233
$9.74
$6,586
$7.79
NOTES:
(1) Project size for Tenant Improvement inspection fee calculation purposes is total square footage from inside wall
to wall measurements.
(2) Inspection fee adjustments for Tenant improvements (Tis):
• TI with all systems (mechanical, electrical, plumbing, and structural): 100% base cost fee+ 100% incremental
• TI without plumbing / mechanical: 70% base cost fee + 70% incremental cost fee
• TI without electrical: 85% base cost fee + 85% incremental cost fee
• TI only adding /moving walls: 70% base cost fee + 7091 incremental cost fee
(3) To calculate Construction Type lA and 18 base cost and cost for each additional 100 SF: Multiply value for
Construction Type IIA- IIB- IIIA- IIIB -IV by 1.20 and Construction Type VA -V13 by 1.50.
:orrected for 50% cost recovery
;orrected for 75% cost recovery
:orrected for 50% cost recovery
City of Rohnert Park- Development Services Eff. 6/1/2011, Rev. _J_/2012
EXHIBIT A to Resolution - Page 19
Planning Fee Schedule
(Adopted on July 27, 2010 by Rohnert Park City Council, Resolution No. 2010 -81,
Effective September 25, 2010)
!1Annexation
Actual cost of time & materials charged against an
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
Residents: $281 plus the actual cost of publishing
/noticing
- -
2
Appeals to City Council
-- - — - - - - - - - --
Non- residents: $1,125 plus the actual cost of
publishing / noticing
Residents: $390 plus the actual cost of publishing
/ noticing
3
Appeals to Planning Commission
Non- residents: $1,560 plus the actual cost of
publishing / noticing
$88 - one address
$130 - 2 to 5 addresses
4
Assignment of Address
— - -- --- - - - - --
$218 - 6 to 20 addresses
$348 - 21 or more addresses
5
Assignment of Temporary Power Pole
$65
Address
6
Business License Research
$85
7
Certificate of Zoning Compliance
$520
8
Condition Modification/Waiver -
$283
Administrative
9
Condition Modification/Waiver - Planning
Actual cost of time & materials charged against an
Commission
Initial Deposit of $1,000
Development Agreement, Processing &
Actual cost of time & materials charged against an
10
Amendment
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
Actual cost of time & materials charged against an
11
Development Area Plan
Initial Deposit of $9,000. An approved
Reimbursement Agreement is required.
EXHIBIT A to Resolution - Page 20
PLANNING FEE SCHEDULE
(Adopted on July 27, 2010 by Rohnert Park City Council, Resolution No. 2010 -81,
Effective September 25, 2010)
(Rev. September 2012)
Page 2
$283 plus the actual cost of any outside agency
fees (such as County Filing Fee, State
12
Filing & Notice of Categorical Exemption
Clearinghouse Fee and Office of Planning &
Research) and tine- act-ual-cest-Gfpub4sh+ag-/
n0tiGinq.
Actual cost of time & materials charged against an
Initial Deposit as determined by staff. An
13
Environmental Impact Report Review
approved Reimbursement Agreement is required.
Applicant is also responsible for any other agency
fees (e.g. State Fish & Game fees, etc.)
Actual cost of time & materials charged against an
14
Final Development Plan
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
Actual cost of time & materials charged against an
15
Final Specific Plan
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
Actual cost of time & materials charged against an
16
General Plan Amendment
Initial Deposit of $5,000. An approved
Reimbursement Agreement may be required.
17
Home Occupation Permit
$85 p6s4he -avt- c- sst-ef- pubfishing4--ne#Ging.
18
Pre - Application Conference
$248
19
Pre - Application Conference -
$990
Concept Plan Review
20
Pre - Application Conference -
$175
Single - Family Dwelling, Owner - Occupied
21
Initial Study /Negative Declaration
Actual cost of time & materials charged against an
Initial Deposit of $2,000.
22
Letter of Public Necessity /Convenience
$435
$412 plus the actual cost of any outside agency
fees (such as County Filing Fee, State
23
Notice of Determination
Clearinghouse Fee and Office of Planning &
Research) and -tht- aGt -uaf- cost -Gf- publishing-/
not+Ginq.
Specific Plan /Planned Development:
Actual cost of time & materials charged against an
24
Amendment/Revision of Related Items -
Initial Deposit as determined by staff. An
Standard
approved Reimbursement Agreement is required.
(Rev. September 2012)
Page 2
EXHIBIT A to Resolution - Page 21
PLANNING FEE SCHEDULE
(Adopted on July 27, 2010 by Rohnert Park City Council, Resolution No. 2010 -81,
Effective September 25, 2010)
25
Sign Review (Single Sign)
$98
New - $520 pluJ - the - actual- EOSt- of- puL�l+shin-g--/
noticing.
26
Sign Program Review - New /Revised
Revised - $348 pltfs- tie- ac�Ual- ac- of-publislalpg -/
noticing-
Actual cost of time & materials charged against an
27
Preliminary Development Plan
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
28
Rezoning
$6,450 plus the actual cost of publishing / noticing
and reprinting of City zoning maps.
Within existing footprint - $1,480
Site Plan & Architectural Review:
Building Remodel (Commercial &
Expansion of footprint - Actual cost of time &
29
Industrial)
materials charged against an Initial Deposit as
determined by staff. An approved
Reimbursement Agreement is required.
30
Site Plan & Architectural Review:
Building Remodel (? 2 Residential Units)
$1,210 plus the actual cost of publishing / noticing
31
Site Plan & Architectural Review:
Actual cost of time & materials charged against an
New Structure (Commercial & Industrial)
Initial Deposit of $1,200
32
Site Plan & Architectural Review:
New Structure /Change -In -Use (? 2
Actual cost of time & materials charged against an
g g
Residential Units)
Initial Deposit of $1,200
Actual cost of time & materials charged against an
33
Specific Plan - Preliminary Plan
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
Actual cost of time & materials charged against an
34
Specific Plan Amendment
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
Actual cost of time & materials charged against an
35
Specific Plan Preparation
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
(Rev. September 2012)
Page 3
EXHIBIT A to Resolution -Page 22
PLANNING FEE SCHEDULE
(Adopted on July 27, 2010 by Rohnert Park City Council, Resolution No. 2010 -81,
Effective September 25, 2010)
36
Subdivision: Extension to Approved Minor
$695 plus the actual cost of publishing / noticing.
37
Subdivision: Revision to Approved Minor
Actual cost of time & materials charged against an
Initial Deposit of $1,200.
38
Subdivision:
Extension /Revision to Approved - Major
Actual cost of time & materials charged against an
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
39
Tentative Map - Major (? 5 Lots)
Actual cost of time & materials charged against an
Initial Deposit as determined by staff. An
approved Reimbursement Agreement is required.
40
Tentative Map - Minor (s 4 Lots)
Actual cost of time & materials charged against an
Initial Deposit of $4,000
41
Use Permit (Commercial /Industrial/
Mixed -Use)
Actual cost of time & materials charged against an
Initial Deposit of $1,000
42
Use Permit - Residential >_ 2 Units
Actual cost of time & materials charged against an
Initial Deposit of $1,000
43
Variance
Actual cost of time & materials charged against an
Initial Deposit of $2,500
46
Temporary Use Permit
Minor- $130
Major - Actual cost of time & materials charged
against an Initial Deposit of $1,000
47
Time Extension To Approved - Minor
$175 plus the actual cost of publishing /noticing
48
Time Extension To Approved - Major
$695 plus the actual cost of publishing /noticing
49
Administrative Permit
$650
(Rev. September 2012)
Page 4
EXHIBIT A to Resolution - Page 23
PLANNING FEE SCHEDULE
(Adopted on July 27, 2010 by Rohnert Park City Council, Resolution No. 2010 -81,
Effective September 25, 2010)
50
Violation Correction
$520
51
Planning review of building permits
Actual cost of time and materials to be collected
at building permit issuance.
52
Tree Permit Clearance (Exemption)
201
53
Approval for Tree Removal (Tree
Removal Permit)
Actual cost of time and materials to be billed
against an initial deposit of $512
Notes on Fees:
I. For all fees that are based on actual cost of time - and - materials: City staff time is based on fully- burdened
hourly rate as updated periodically
2. For all fees that are based on actual cost of time - and - materials: If outside consultant is used, the actual
cost for the consultant will be passed through to the applicant and will include a 7% administrative charge
to cover City overhead costs specific to the processing of the project.
3. For any services that are not included in this fee schedule, City staff's fully- burdened hourly rate will be
used to calculate charges due.
4. For any services that are not included in this fee schedule and are performed by a consultant, the actual
cost of the consultant will be passed through to the applicant and will include a 7% administrative charge
to cover City overhead costs specific to the processing of the project.
(Rev. September 2012)
Page 5