2007/10/09 City Council Resolution 2007-170RESOLUTION NO. 2007 -170 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING TASK ORDER NO. 2007-07 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR ENGINEERING SERVICES FOR THE EASTSIDE TRUNK SEWER PROJECT — PHASE II (CITY PROJECT NO. 2007-02) WHEREAS, the City is under construction with Phase I of the Eastside Trunk Sewer Project and desires to complete Phase II; and WHEREAS, the final design of Phase II of the Eastside Trunk Sewer Project remains to be completed; and WHEREAS, Winzler & Kelly provided services for the design, permitting and bidding of Phase I of the Eastside Trunk Sewer. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Task Order No. 2007 -07 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation, in the amount of $49,618 for design services for Phase II of the Eastside Trunk Sewer (City Project No. 2007 -02). BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this agreement in substantially similar form to the attached agreement for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 91h day of October, 2007. ATTEST: r ' T CITY OF ROHNERT PARK Mayor BREEZE: AYE MACKENZIE: ABSENT SMITH: AYE STAFFORD: AYE VIDAK- MARTINEZ: AYE AYES: (4) NOES: (0) ABSENT: (1) ABSTAIN: (0) I TASK ORDER NO. 2007-07 CITY OF ROHNERT PARK AND WINZLER & KELLY CONSULTING ENGINEERS AUTHORIZATION OF ENGINEERING SERVICES FOR EASTSIDE TRUNK SEWER -- PHASE lI CITY PROJECT NO. 2007-02 SECTION 1— PURPOSE The purpose of this Task Order is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the MASTER AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") dated July 25, 2006. SECTION 2 — SCOPE OF WORK The items authorized by this Task Order are presented.in Attachment "A" - Scope of Services. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties hereto referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charges in accordance with the provisions of the AGREEMENT and as shown in Attachment "B" for an amount not -to- exceed $49,618. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 shall be completed during Fiscal Year 2007/08 or as extended by the City Manager. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 9th day of October, 2007. CITY OF ROHNERT PARK Stephen.R. Donley, City Manager Per Resolution No. 2007- adopted by the Rohnert Park City Council at its meeting of 10/9/07. WINZLER & KELLY ENGINEERS Ted IVVhiton, Managing Principal Eastside Trunk Sewer Phase II -Scope of Services WINZLERI�LLY C O,N S U TT I N O E N O I N E E R 9 ATTACHMENT "A" CITY OF ROHNERT PARK EASTSIDE TRUNK SEWER: PROJECT - PRASE II CITY PROJECT NO. 2007-02 ENGINEERING SERVICES SCOPE OF SERVICES TASK ORDER 2007 -07 Background This Task Order for $49,618 addresses engineering services required to create separate Contract Documents for Phase II of the Eastside Trunk Sewer Project. Due to City prioritization to construct the westerly portion of the Eastside Trunk Sewer Project in the summer of 2007, phasing of the Project construction was required including separate Construction Documents for each phase. .Construct ion Documents for Phase I of the Project were completed in late spring and that Phase is now into construction. Separate Construction Documents for Phase Il of the Project have yet to be developed and are proposed to be completed under this Task Order. Construction of Phase II is not anticipated to start until summer 2008 or 2009 and therefore Bid Phase services have not been included in this scope. The task -based scope of services for Phase II is as follows: Task 1— Construction Documents: From the original 100% Contract Documents, Winzler & Kelly will prepare separate Contract Documents for Phase lI of the Eastside Trunk Sewer Project. Phase 1I encompasses the work from Commerce Blvd east of Highway 101, westerly along Santa Alicia Drive, southerly along Seed Farm Drive, westerly along Southwest Blvd, and to Snyder Lane between Rohnert Park Expressway and East Cotati Avenue. The Phase II documents will coordinate the transition between Phase I and Phase II and no major revisions are anticipated. Deliverables: Back -check Submittal Phase II Plans Phase II Spec Book Phase II Cost Estimate Phase II S WPPP Final Submittal Phase II Plans Phase lI Spec Book Phase II Cost Estimate Phase II S WPPP PS &E, SWPPP 4 sets, half size 4 copies 4 copies 2 copies 6 sets, half size 6 copies 6 copies 3 copies 1 CD (electronic copies) Page IofI Attachment "B" stside Trunk Sewer Project - Phase II Desi n Personnel Estimated Man -Hours by Project Item! ro" Staff Env Sr Env Env Survey LLS Staff CADD Acct WP Total DCM/ Utility Cousumables Other Total - t r E PM Plnr Bin Crew Survey JC PB MR I Jo yal Locate/ Costs Cost & EAJ KS I PC DD BB AA Pothole 65 $115 1 $170 $120 $115 $270 8145 $105 $115 5105 S75 WRA /SSU 0 36 8 44 1 130 $0 $0 $780 $500 $18,670 0 36 20 98 $0 $0 $588 $500 $13,958 3 16 4 1 i 32 I $0 $0 $192 $100 $4,672 3 10 2 10 2 8 _ 38 $0 $0 $228 $200 $5,308 6 14 42 $0 $0 $210 $200 $7,01 2 98 2 18 2 0 0 0 56 1 0 20 298 $011 $0 $i,998 $1,5001 $49,618 2 98 2 l8 2 - 0 0 0 56 i 0 20 2g :T $0 $0 $1998 $1 500 $49,618 I