Loading...
2007/10/23 City Council Resolution 2007-173RESOLUTION NO. 2007-173 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING TASK ORDER NO. 2007-08 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR AN UPDATE OF THE CITY'S WATER CAPACITY CHARGE PROGRAM WHEREAS, the City of Rohnert Park (City) has prepared its 2000 General Plan which outlines land use and growth projections for the City and provides policy guidance requiring planned growth to provide the infrastructure it needs; WHEREAS, the City has prepared its 2005 Urban Water Management Plan which outlines planned investments in water conservation that will contribute to a reliable and sustainable water supply for the City through General Plan build -out; WHEREAS, the Sonoma County Water Agency (Agency), which provides wholesale water supply to the City, is working to implement its Water Project which will also contribute to a reliable and sustainable water supply for the City through General Plan build -out; WHEREAS, the City's Water Capacity Charges do not currently incorporate planned water demands and planned capital improvements to the water system; and WHEREAS, Winzler & Kelly is most familiar with both the City's planned land use and water demands and the City's established impact and capacity fees. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Task Order No. 2007 -08 with Winzler & Kelly Consulting Engineers to include an update to the Water Capacity Charge Program for an amount not to exceed $ 65,000. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 23rd day of October, 2007. ATTEST: City ig CITY OF ROHNERT PARK Mayor BREEZE: AYE MACKENZIE: AYE SMITH: AYE — '"STAFFORD: AYE VIDAK- MARTINEZ: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) TASK ORDER NO. 2607-08 CITY OF ROHNERT PARK AND WINZLER & KELLY CONSULTING ENGINEERS AUTHORIZATION OF ENGINEERING SERVICES TO UPDATE THE CITY'S WATER CAPACITY CHARGE SECTION 1— PURPOSE The purpose of this Task Order. is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the MASTER AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ("Consultant") dated and extended on July 23; 2007. SECTION 2 — SCOPE OF WORK The items authorized by this Task Order are presented in Attachment "X'— Scope of Services. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties hereto referenced in SECTION 1 above. The cost for the services as set forth in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charges in accordance with the provisions of the AGREEMENT and as shown in Attachment "B" for an amount not -to- exceed $ 65,000. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 shall be completed by April 30, 2008. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 23`d day of October, 2007. CITY OF ROHNERT PARK Stephen R. Donley, City Manager Per Resolution No. 2007 - adopted by the Rohnert Park City Council at its meeting of 10/23/07. WINZLER & KELLY ENGINEERS Theodore B. Whiton Regional Manager ATTACHMENT A TASK ORDER NO. 2007-08 SCOPE OF SERVICES Update the City's Water Capacity Charge I. General Description and Background The City of Rohnert Park's (City's) General Plan provides comprehensive long -term guidance for development within the City up through 2020. The General Plan identifies among other things, goals and policies for development and infrastructure necessary to serve development. The General Plan has also been used to inform long -term wastewater planning by the Santa Rosa Subregional Water Reuse System ( Subregional System) and long -term water supply planning by the Sonoma County Water Agency (Agency). The City's adopted public policy includes provisions that new development shall pay for the infrastructure necessary to serve it. In order to implement, this policy the City has adopted a Public Facilities Fee Program, which it updates regularly. In addition, the City has recently updated its Sewer Capacity Charge Program to incorporate its best current understanding of the Subregional System's Incremental Recycled Water Policy. At this time, the City wishes to update its Water System Capacity Charge to incorporate water conservation elements consistent with its 2005 Urban Water Management Plan and to incorporate capital improvement projects for the water system including the Agency's Water Project. 2. Project Tasks Task I City Kickoff Meeting and 1s' Stakeholder Meeting This task includes an initial kick -off meeting with City, followed by a meeting with stakeholders from the development community. The purpose of this initial meeting is to exchange data and build a clear understanding of the concerns of all parties. Winzler & Kelly will come prepared to suggest a general framework for the Water Capacity Charge update as a starting point for the discussions. Deliverable: Meeting Minutes Task 2 Review and Update Contributing Land Uses and Water Demands This task includes reviewing and synthesizing available data on current and future land uses, projected water demands and the status of partially paid water connection fees. Information will be drawn from City and County land use records, the water billing database, the 2005 Urban Water Management Plan and the City's existing water connection fee atlas. Winzler & Kelly will develop an updated land use and water demand database that will be the basis for the fee update process. Winzler & Kelly will prepare a Technical Memorandum summarizing this task and specifically outlining: • Water Demands per Land Use Class • Summary of Projected New Land Uses • Summary of Partially -Paid Water Connection Fees by Parcel. Winzler & Kelly will review the Technical Memorandum with City staff and finalize the TM based upon comments received. Deliverable: Technical Memorandum 1 Contributing Land Uses -and Water Demands Task 3 Assemble and Update Costs for the Water System CIP This task includes gathering, synthesizing and updating available data on projects, including water conservation projects and costs for the water system.Capital Improvement Program. Information will be drawn from: . The City's CIP, 2005 Urban Water Management Plan, Water Model Study and developing Green Building Ordinance; Maddaus Water Management's analysis of Tier 2 and New Development Conservation Measures; and +� The Agency's regional water conservation efforts and data related to its Water Project. Winzler & Kelly will develop a matrix of water system projects, costs and yields and prioritize these for implementation based on both cost - effectiveness and time required for implementation. Winzler & Kelly will prepare a Technical Memorandum summarizing this task and specifically outlining a multi-year CIP schedule and budget. If a specific project, such as the Agency's Water Project, includes bond financing, the multi-year cash flow analysis will include an interest component. Winzler & Kelly will review the Technical Memorandum with City staff and finalize the TM based upon comments received. Deliverable: Technical Memorandum 2 Water System CIP Task 4 Mandatory Conservation Measure Workshop Winzler & Kelly will facilitate a workshop with staff and the Water Issues Subcommittee to review the analysis developed in Task 3 and prioritize water conservation measures for implementation. The goal of this workshop is to create a list of conservation measures that are mandatory and a list of conservation measures that will be funded by the impact fee /on -site implementation program. The results of the workshop will be summarized in meeting minutes. Deliverable: Meeting Minutes Task 5 Prepare Draft Nexus Study & Implementing Ordinance This task includes developing the draft nexus study, compliant with Government Code 66000 et.seq., and fee structure based on contributing land uses and the proposed CIP. The task also includes drafting the revisions to the Municipal Code that are necessary to implement the proposed fee structure. Using the information developed in Tasks 2 and 3, Winzler & Kelly will calculate a capacity fee for contributing land uses based on the impacts contributed by that land use. Winzler & Kelly will outline at least two strategies for mitigating impacts: • 100% In -lieu Capacity Fee Payment • Combination of Capacity Fee and On -Site Water Conservation Measures. 2 Attachment "A" Task Order 2007- 08 The nexus study will include the land use projections, a description of the water demands associated with these land uses, a description, cost and schedule for proposed projects and the nexus or reasonable relationship findings between the proposed new development and the proposed projects. Winzler & Kelly will submit the draft nexus study and ordinance the City for review. Deliverable: Draft Nexus Study Draft Implementing Ordinance . Task 6 Water Issues Subcommittee Meetings Winzler & Kelly will attend up to two meetings of the City's Water Issues Subcommittee in order to brief the Subcommittee on the policy development process. Task 7Stakeholder Working Group Meetings Winzler & Kelly well facilitate up to three follow -up stakeholder meetings to discuss the Draft Implementation Strategies and receive comments. Deliverable. Meeting Minutes Task 8 Finalized Nexus Study and Implementing Ordinance Based on review and comments received on the Nexus Study and Implementing Ordinance, Winzler & Kelly will finalize the documents and develop a staff report to City Council. Deliverables: Nexus Study Implementing Ordinance Staff Report Outlining Final Implementation Plan and Ordinance Task 9 Council Presentation This task includes up to two formal presentations to the City Council on the proposed Water Capacity and its supporting documents. Deliverable: Powerpoint Presentation Optional Task 10 Prepare Water Conservation Standards for New Development Winzler & Kelly will update the City standards to include specifications and details for the water conservation program included as part of the Water Capacity Fee. Deliverable: Updated City Standards 3 Attachment "A" Task Order 2007- 08 3 . Milestone Schedule Milestone Task Dates City Kickoff 'Meeting and 1 st Stakeholder Meeting November'l, 2007 TM 1 Land Uses and Water Demands November 27, ` 2007 Stakeholder Meeting December 6, 2001 TM 2 Water System CIP 11, 2008 Water Issues Sub - committee Meeting —January January. 16, 2008 Stakeholder Meeting February 7, 2008 ,Mandatory Conservation Measures Workshop February 13, 2008 Draft Nexus Study and Draft Ordinance Modifications March 3, 2008 Water Issues Subcommittee March 5, 2008 Stakeholder Meeting March 6, 2008 Final Council Package for Implementation Plan and 1St Reading of Ordinance Modifications March 24, 2008 1St Reading of Ordinance Modifications April 8, 2008 2nd Reading and Adoption of Ordinance Modifications Aril 22, 2008 4. Responsibilities of the City a. Provide legal review of Nexus Study and Ordinance modifications. b. Notice and conduct any public hearings required by law. 4 Attachment "A" Task Order 2007- 08 ATTACHMENT B Estimated Fee - Task Order No. 2007- 08 Update Water Capacity Charge Project Project. Project Manager Engineer Analyst Des Task Description $ +175 $ 125 $ 1t5 $ Task 1 Kickoff Meeting and 1 at Stakeholder Meeting 4 8 Task 2 Review and Update Contributing Land Uses and Water Demands Task 2.1 Update Land Use Database 2 24 Task 2.2 Review Existing Data and Update Water Demand Projections 2 24 24 Task 2.3 Perform Comparative Analysis with UWMP 4 8 Task 2.4 Research and Identify Pre -paid properties in the Land Use Database 2 8 Task 2.5 Draft TM 1 Land Use and Water Demands 8 10 Task 2.6 Finalize TM 1 Based on Staff Comments 4 16 Subtotal 22 24 64 ' Task 3 Assemble and Update Costs for the Water System CIP 4 6 120 Task.31 Assemble Proposed Projects, Cost Estimates and Yields 4 40 24 Task 3.2 Prepare Comparative Matrix 2 12 Task 3.3 Draft TM 2 Water System CIP 8 16 Task 3.4 Finalize TM 2 Based on Staff Comments 4 6 Subtotal 18 40 36 Task 4 Mandatory Conservation Measure Workshop 8 126 Task 5 Prepare Draft Nexus Study and Implementing Ordinance a 8 98 Task 4.1 Prepare Draft Nexus Study 16 4 60 Task 4.2 Prepare Draft Implementing Ordinance 16 114 Subtotal 32 4 60 Task 6 Water Issues Subcommittee Meetings (2) 4 18 Task 7 Follow -up Stakeholder Meetings (3) 6 12 Task 8 Finalized Nexus Study and Implementing Ordinance 2 10 8.1 Finalize Nexus Study Based on Comments 24 4 8 8.2 Finalize Implementing Ordinance Based on Comments 8 66 8.3 Prepare Agenda Transmittal Reports 8 16 Subtotal 40 4 8 Task 9 Council Presentations (2) 8 Task 10 Prepare Water Conservation Standards for New Development (effort to be determined upon completion of task 4) Tech Total Editor Hours Consumables Totals 0 $ 88 12 $72 $ 1,692 26 $156 $ 3,266 50 $300 $ 6,410 12 $72 $ 1,692 10 $60 $ 1,330 4 4 16 $96 $ 2,198 2 6 $36 $ 908 4 6 120 $720 $15,800 68 $408 $ 8,868 14 $84 $ 1,814 4 4 16 $96 $ 2,196 2 6 $36 $ 906 4 6 104 $624 $13,784 4 126 $756 $ 2,496 a 8 98 $576 $12,176 2 18 $108 $.3,078 8 10 114 $684 $15,254 4 $24 $ 724 18 $108 $ 2,538 2 8 46 $276 $ 8,756 2 10 $60 $ 1,630 2 10 $60 $ 1,830 . 2 12 66 $396 $10,016 8 16 $96 $ 2,216 N:1WaterlWaterCapacity Charge \Water Capacity Charge Update W &KTaskOrder#2007- 08_AttchB 2007 -10-23 10/4/2007