Loading...
2006/02/14 City Council Resolution (3)Resolution No. 2006- 50 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK RATIFYING AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE CITY OF ROHNERT PARK AND APPLIED PAVEMENT TECHNOLOGY FOR THE STREET MAINTENANCE MEASURES, PROJECT NO. 2005-04 WHEREAS, the City entered into an agreement with Consultant, dated June 14, 2005 for pavement design services for the Rohnert Park Expressway Rehabilitation, Project No. 2005 -02; and WHEREAS, the City has requested additional professional services from the Consultant to evaluate additional streets for the Street Maintenance Measures Project, Project No. 2005 -04, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that the attached Amendment No. 1 to the Agreement by and between the City of Rohnert Park and Applied Pavement Technology for the amount of $15,472 is approved, and the City Manager is authorized to execute Amendment No. 1 in substantially similar form to the attached amended agreement for and on behalf of the City of Rohnert Parr --°° ATTEST: Mle CITY OF $ONERT PARK Smith BREEZE: AYE FLORES: AYE MACKENZIE: AYE VIDAK- MARTINEZ: AYE SMITH: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) AMENDMENT NO. 1 TO THE AGREEMENT BETWEEN THE CITY OF ROHNERT PARK AND APPLIED PAVEMENT TECHNOLOGY FOR THE STREET MAINTENANCE MEASURES, PROJECT NO. 2005-04 THIS AMENDMENT is made and entered into as of the 14`b of February, 2006 by and between the City of Rohnert Park (hereinafter referred to as the "City ") and Applied Pavement Technology (hereinafter referred to as the "Consultant "). WHEREAS, the City Entered into an agreement with Consultant, dated June 14, 2005, for pavement design services for the Rohnert Park Expressway Rehabilitation, Project No. 2005 -02; and WHEREAS, the City has requested additional professional services from the Consultant to also evaluate additional streets for the Street Maintenance Measures, Project No. 2005 -04; and NOW THEREFORE, the City and the Consultant for considerations hereinafter set forth, mutually agree as follows: Section 1, Exhibit "A" is amended to add the following: Applied Pavement Technology will provide pavement evaluation and design for Commerce Boulevard, Redwood Drive, and Southwest Boulevard as set forth in the letter proposal, Proposed Budget for Evaluation and Design of Three Additional Street Segments, dated August 4, 2005. Section 3. Compensation, is amended to read as follows: The existing contract amount of $33,156 is increased by $15,472 to a total of $48,628 for additional work tasks described in Section I and shown in letter proposal, Proposed Budget for Evaluation and Design of Three Additional Street Segments, dated August 4, 2005. IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed as of the day and year first above written. CITY OF ROHNERT PARK: CONSULTANT: By: City Manager Stephen R. Donley By:_ (Date) Per Resolution No. 2006 -50 adopted by the City Council on February 14, 2006. rvmrcklis City Clerk APP VED AS TO FORM: g, A&A P, u q, ity httorney Sant By: Applied Pavement Technology; 775 345 1966; providing engineering solutiono to improve pavement performance August 4, 2005 Mr. Dwritt lenitins, P-E. City Fngis"eer City of Ruhnctfi. Part: 6750 Commerce Bhd Rohnert Pack, CA 94928 Jan -20 -06 2:40PM; CENTRAL iLLINOIS CHICAGO AREA NEVADA VERMON7 S?ibject: Proposed Budget for Evaluation and Design of Thrcc Additional Street Segments Dear Mr. Ienkins: Attached please find oar proposed budget to include three additional street segments, C:omunercc Blvd., P- edvrood Drive, and Suulhwest Bled, as part of our project to conduct a pavement ;;valuation and provide rehabilitation designs for the Rohnert Park Expressway (RPE). The scope of worm associated with the additional field sampling, nondestnrctive testing, dimcss surveys, and lab testing is consistent with the scope that will be usual on the 16'..PE. Ot:r findings and design recommendations will be provWcd within the bathe design report that documents t e reset S of the RPE investigatior-. The iucniased cost of this effort is $15,472, bringing Ilse total art7ount of our agreement to x;48,628, Tl1a tither terms and conditions of our agreement remain unchanged. l.f you have .Inv questions abut (Ysr proposal. plemc c=ontact me. Sincerely, Applied Pavernent'I'Mmology, iW. tcphert B. Seed.;, F.E. Program Din:ctor Attsachmcnts W. David PeAkin Sett C3ibson +9vada Office 1755 E Piumb Cant-, Salta 264 Reno, NV 89502 -3661 tai 775.345,1999 fex 7 f `,.323.1121 Page 2/3 sent 3y: Appilea HaVei7ienT tecnnoiogy; /l5 345 1966; Jan -20 -06 2:40PM; uvernc ?It _Evatt e tion and ,yi n 6? the C iz y o 'Rohnert Park Augttst 4, 2005 ATTACHMENT PROPOSED BUDGET Feremont Evefuetivo an6 Design for Appiiod Pavement Terhrwitvdy, Inc Commerve Blvd, Ndwood Dr., j;nd SW Shod Jul-I 28, 2005 City of R+sPoRei6 Pant !"°'•°� .� Wmated Labor mows Naet TW t'a8ic t Task Z Task3 TuW "'V141 Fc,,1 ri firircipal io-Ckargo 1e +4 3fi� 5tr+lrn eatit Dcsig * F:,, ,i n M cur (f;hsar� jeu A1,�ct 17 R I r' ? Name ' Title Usk 1 Twk 2 Task3 TO Hate PxhlQn 'Prtin ipel- SnZ°hAr�c S38U $3G 5MOM Se�da ySnniutPawDesig Eogt Sl.11O $t,l 32,32 5145.(]Q Gibm, 1=iYjcetAiettngar 51,440 $MO $1,92 $4,32 5120.00 A-1 Page 33