Loading...
2006/01/24 City Council Resolution (10)RESOLUTION NO. 2006- 39 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AMENDING CERTAIN ENGINEERING FEES WHEREAS, the Municipal Code of the City of Rohnert Park, Chapter 3.32 "Cost - Recovery -- Fee and Service Charge System," provides for the establishment of a fee system to recover costs of the City in providing certain services, products and regulatory activities. WHEREAS, the City of Rohnert Park Engineering Department has retained Revenue and Cost Specialists to conduct a study of the current engineering fee schedule, the beneficiaries of engineering services provided by the City, and the revenues produced by those fees and charges. WHEREAS, new and amended fees are recommended by the study to achieve reasonable cost recovery. WHEREAS, no fee on the amended fee schedule shown in Exhibit A, Engineering Fee Schedule, exceeds the costs reasonably borne by the Engineering Department in providing the service or enforcement of applicable ordinances, codes and regulations for which the fee is charged. WHEREAS, no fees are included in this amended fee schedule for the purpose of acquiring funds for the construction of public improvements or the acquisition of equipment. WHEREAS, the amended fee schedule was processed in the time and manner prescribed by State and local law. WHEREAS, on January 24, 2006, the City Council of the City of Rohnert Park reviewed the amended fee scheduled and supporting data during a scheduled public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposed fees. WHEREAS, at the January 24, 2006, City Council meeting, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the Council considered all the facts relating to the amended fee schedule. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the above recitations are true and correct. 1 of 2 Section 2. Environmental Clearance. The adoption of this Resolution including the fees and charges provided herein, is statutorily exempt from the California Environmental Quality Act under Public Resources Code Section 21080(b)(8), as the establishment and modification of charges by a public agency to meet operating expenses. NOW THEREFORE BE IT RESOLVED, that the City Council approves the Engineering Fee Schedule set forth in Exhibit A, attached to and incorporated herein, and that the Fee Schedule set forth in Exhibit A shall be in full force and effective sixty (60) days after its adoption. DULY AND REGULARLY ADOPTED this date of January 24, 2006. ATTEST: I / wM P-1. 6 IV, M. / TIM, I ON 14 "am N CITY OF ROHNERT PARK t1014N E RT Mayor Tim Smith BREEZE: AYE FLORES: AYE MACKENZIE: AYE VIDAK- MARTINEZ: AYE SMITH: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) 2of2 EXHIBIT A Engineering Fees :Current Fee Structure, Proposed Fees, and Cost Recovery Notes: If outside consultant is used, this actual cost will be passed through in addition to any City staff time & materials, and a 7% administrative charge will be added " If time and material costs rise above 1.5% of City Engineers estimated cost of improvement, then the additional time will be billed at the applicable hourly rates. State- mandated limit * *" If outside consultant is used, this actual cost will be passed through in addition to any City staff time & materials, and a 7% administrative charge will be added_ Further, other City management costs may be applied as they are incurred for the City Manager, City Attorney, etc. Cost Recovery from Cost Recovery fron Current Fee Proposed Fee Engineering Services Current Fees Structure Proposed Fees Structure 1 Sign Review None. 0.00% $100 per plan 100% 2 Conditional Use Permit None. 0.00% $390 per permit 100% 3 Preliminary Site Plan None. 0.00% $580 per plan 100% Time and materials charged against a 4 Specific Plan None. 0.00% deposit of $15,000. "" 100% - — 5 Preliminary Landscape Plan Check — None. 0.00% $305 per plan 100 Time and materials charged against a 6 Tentative Parcel Map Review None. 0.00% deposit of $1,050. * ----100% Time and materials charged against a 7 Tentative Subdivision Map Review None. 0.00% - deposit of $2,200. *_ - — t00% — Time and materials charged against a Grading /Site Improvement Plan deposit of $3,000 or upon City 8 Check Engineers estimate. 53.54% No change. * 100 1.5% of City Engineers estimated 9 Grading /Site Improvement Inspection cost of improvement 98.43% No change. `* 100% Time and materials charged against a 10 Final Parcel Map Review $500 plus $25 / lot 33.70% deposit of $1,800 ' 100% Time and materials charged against a 11 Final Subdivision Map Review $500 plus $25 / lot 50.44 % - deposit of $3,500._ 100% Final Map Amendment / Revision 12 Review (Minor) Minor - $300 plus $25 / lot 92.23% $520 per map ` 100% Final Map Amendment / Revision Time and materials charged against a 13 Review (Major) Major- $500 plus $25 /lot 92.23% deposit of $1,000.' 100 14 Time Extension None. 0.00% $90 per application 100% Time and materials charged against a deposit of $3,000 or upon City 15 Public Improvement Plan Check Engineers estimate. 95.63%. No change.' 100% Time and materials charged against a 16 Subdivision Plan Check $500 plus $25 / lot 27.04% deposit of $2,200.' — 100% 1.5% of City Engineers estimated 17 Public Improvement inspection cost of improvement 87.49% No change_" 100% 1.5% of City Engineers estimated 18 Subdivision Inspection cost of improvement 92.94% No change_'* 100% $780 per application, plus actual 19 Lot Line Adjustment Review $200 25.59% consultant costs 100% 20 Street Blocking Permit None. 0.00% $160 per permit 50% Street Vacation / Abandonment Time and materials charged against a Time and materials charged against a 21 Request deposit of $350. 9238% deposit of $1,150. ' — 100% $270 minimum charge per permit or ` Minor Encroachment Permit / actual cost at City staff hourly fate, 22 Inspection None. 0.00% whichever is greater. 100% $1,125 minimum charge per permit or Major Encroachment Permit / actual cost at City staff hourly rate, 23 Inspection None. 0.00% whichever is greater. 100% 24 Annual Blanket Encroachment Permit None. 0 -00% $445 per permit 100% -- -- - - -- - - - -- ---- - - - - -- $16 for a single trip permit-, $90 for 25 Transportation Permit None. 0.00% annual permit ``* 100% 26 Reversion to Acreage / Lot Merger $100 per application 16.13% $620 per application ' 100% Notes: If outside consultant is used, this actual cost will be passed through in addition to any City staff time & materials, and a 7% administrative charge will be added " If time and material costs rise above 1.5% of City Engineers estimated cost of improvement, then the additional time will be billed at the applicable hourly rates. State- mandated limit * *" If outside consultant is used, this actual cost will be passed through in addition to any City staff time & materials, and a 7% administrative charge will be added_ Further, other City management costs may be applied as they are incurred for the City Manager, City Attorney, etc.