Loading...
2006/01/24 City Council Resolution (5)RESOLUTION NO. 2006 -31 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING AMENDMENT NO. 1 TO TASK ORDER NO. 2005-06 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR THE WESTSIDE PUBLIC SAFETY BUILDING NEEDS ASSESSMENT AND PROGRAMMING PHASE H PROJECT #2004 -13 FOR AN ESTIMATED FEE OF $6,172.00 WHEREAS, Council authorized a Needs Assessment and Programming Phase II study C "Phase II Program ") be conducted for the proposed Westside Public Safety Building through Resolution No. 2005 -116; and WHEREAS, based on City staff review of the Phase II Program, additional changes are requested to be completed to the Program. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby approve attached Amendment No. 1 to Task Order No. 2005 -06 for the Westside Public Safety Building Needs Assessment and Programming Phase R Project #2004 -13 and authorizes the City Manager to execute said Amendment No. 1. DULY AND REGULARLY ADOPTED this date of January 24, 2006. CITY OF ROHNERT PARK ayor Tim Smith BREEZE: AYE FLORES: AYE MACKENZIE: AYE VIDAK- MARTINEZ: AYE SMITH: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) 7H- S!05 -d AMENDMENT NO.1 Task Order No. 2005 -16 CITY OF ROHNERT PARK AND WINZLER & KELLY CONSULTING ENGINEERS AUTHORIZATION FOR PROFESSIONAL SERVICES FOR THE WESTSIDE PUBLIC SAFETY BUILDING NEEDS ASSESSMENT AND PROGRAMMING PHASE II PROJECT #2004 -13 SECTION 1— PURPOSE The purpose of this Amendment No. 1 ('AMENDMENT') is to authorize extra work described in Section 2 below in accordance with the provisions of the master agreement between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto dated August 9, 2005 (AGREEMENT). SECTION 2 — SCOPE OF WORK The items authorized by this AMENDMENT are presented in Attachment A — Scope of Services. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties hereto referenced in SECTION 1, The cost of the services described in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charge in accordance with the provisions of the AGREEMENT for an estimated fee of $6,172.00 as shown in Attachment B. SECTION 4 -- TIME OF PERFORMANCE The estimated number of days to complete the work is thirty (30) days from the Notice to Proceed, excluding the final presentation to City Council and City review. SECTION 5 -- ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 24th day of January 2006. mm Steve R. Donley 961VAW'14o. 2006 -31 adopted by the 05- 2056 -013 City Council on 1/24/06. CONSULTANT: Marc S. Solomon Region Manager January 2006 Attachment A Scope of Services Amendment No. 1 - Task Order No. 2005 -06 Westside Public Safety Building Needs Assessment And Programming Phase H Project #2004 -13 Pornose The City of Rohnert Park Public Safety Department wishes to pursue changes to the program, based on City staff review of the programming conducted under the original TASK ORDER as well as the proposed site location. Scope of Work Summary 1.1 Program Summary A Program Addendum will be revised to include the City's 11. 10.05 input to the program that was presented 11.08.05. The program was based on interviews and information provided under DGA Project # 03167. 1.2 Goals and Objectives The goal of this addendum is to update the program for the Department of Public Safety and present the program to the Rohnert Park City Council in a Power Point Format. Changes to the Program include the following: • Relocate the Emergency Operation & Training Center in the Block Diagram • Amend the block diagram to reduce the scope and cost of the City's out - sourced ambulance service, American Medical Response Company, AMR. • Incorporate the block diagram into the proposed site plan under consideration by RPPS. • Adjust the Statement of Probable Cost • Develop a phasing plan for the program areas as a tool for the City to determine their priorities. • Add a project schedule in Microsoft Project Format • Include LEED Silver Certification into the Program 05- 2056 -013 January 2006 1.3 Project Budget Consultant will revise and issue the Statement of Probable Cost to Saylor Consulting for review. 1.4 Project Schedule The schedule assumes an April 2008 Occupancy, and the Program Addendum presentation date is targeted for a regular Council meeting in February/March 2006 1.5 Coordination Issues with City • City will provide Consultant with the proposed site plan files. • The schedule will be developed and issued to City and City will coordinate Council presentation date • Consultant will develop the City slides and engineering specific slides for the Power Point presentation and City will provide presentation introduction and discussion pertinent to response times and other Public Safety issues related to the project • Consultant will coordinate with City regarding civil and public access programming information. .ti Deliverables • Five (5) copies of Addendum to Program • Site Layout exhibit on large, 24 "06" foam core board for display • Slide presentation (electronic format) for Council meeting 05 -7056 -013 January 2006 Westside PS Building Winzler Kelly Needs Assessment /Programming 495 Tesconi Circle January 2006 Santa Rosa, CA 95401 -4696 Rohnert Park Westside Public Safety Building - Program Addendum Primary adjustments to meet your fee budget and -- address your core objectives for services, 1'Aside from the project site walk noted in the Work Total '. Plan, the City is requested to provide all relevant Clerical ... .Staff planning, zoning, and site documentation to the '- : Design Team. The Team can then best spend time S60 on the substance of the study, the analysis, with 0 minimal time allocated to conducting research. 0 2, The site and building field verification will be used to 0 confirm general conformance with the record 0 documents if available or obtain perimeter site and 0 perimeter building dimensions. The remaining n features will be diagrammatic only. 0 1 3, The design documents will be conceptual in nature n and annotated sufficiently to illustrate the concepts 0 and to support the statement of probable cost with 2 estimated costs per square foot and unit pricing. 0 i n 4 .. n 0 4 3n .5 =660 _ Attachment B - Services Fee Breakdown For Amendment No. 1 to Task Order 200.5 -1( Fee __.... Project _..__ Task Estimate - January 9, 20fr6 ... _...... ....._ _ .. .._ _ \\ estside R�hlic Safety Building ._..._..... ....... ......... .. .. _. _.. _ _ . Hourihr Hdhn, Roc, PIC _.. RD 5175 _ MKTG _ DIR TW 5115 SIR : DSGNR_ - S115 Design Personnel PRO ARCT.,.DSGNR: LF 5125 Estimated PRO _ A.1 .M5 Man ' .lO-B CPTN JP ';?5 -Hours 1NT DSGNR S00 by Project items SR DR AFT ER',, Ss'S DRAFTER. _ .S75 A Architectnral Services I Site investigation & Envelope Field Verification W/O Record Drawings 2 Proerammning interviews 3 Pro rannnvng Documentation 4 Code Review 5 Create Base Files 6 Space Tabulations 7 Existing Buildin¢ Evaluation 8 Organization, Site, R Floor Plan Diagrams 1 10 9 Massing & Elevation Studies for complete tear down option 10 S. VUP, & E envr',, coord, fnr rcnovation and tear down options 71— Estimating 2 12 Draft Feasibility Report 13 Feasibility Report Revisions Exec Suimnary ? 14 Final FeasibihN Report 15 Meetings ]6 Power Point Presentation 4 17 Cost Estimating Consultant 5500 Allowance Conlracled /n. IVK-K Task A- Architectural Services, Man -Hours 0 4 0 1 n 10 0 n n n Task A - Sub -Total Fees $0 5460 .$n .41,250 .SO50 .SO $0 50 $0 Tack A - Architectural Services. Fixed Fee $2,660 Winzler R Kelly Office Consumabies aM 00 per Man - Hour %120 Dowler- Gnunan Expenses - Travel & Reproduction Allowance 5500 Dowler- Gruman Subtotal Fee 53,280 Architects Subtotal Fee $3,280 Winzler &Kelly Mark Up 15 % $442 T .AL - Architectural 53,772 Engineering - prepare estimate for site development/ site develo ment /meetings Staff Eor - 8hrs (rDi $105 /hr $840 W &K Office Consunpables (u7 $5.00 per Hours $60 Cost Estimating Sul — resultant - Allowance Qncl. 15% marku) $1,500 TOTAL FEE- ENGINEERING /COST ESTIMATE $2.400 $6,1 Westside PS Building Winzler Kelly Needs Assessment /Programming 495 Tesconi Circle January 2006 Santa Rosa, CA 95401 -4696 Filename: AMEND 1- Task Order 2005 -06 and ATTACH A Directory: J: \05 \0205605013 \Task Order Amend 1 Template: V: \W &K Templates\Normal.dot Title: Amendment No Subject: Author: April Asbury Keywords: Comments: Creation Date: 1/4/200611:33:00 AM Change Number: 9 Last Saved On: 1/9/2006 9:16:00 AM Last Saved By: Toni Bertolero Total Editing Time: 29 Minutes Last Printed tan: 1/9/2006 9:16 :00 AM As of Last Complete Printing Number of Pages: 3 Number of Words: 610 (approx.) Number of Characters: 3,478 (approx.)