2006/06/13 City Council Resolution 2006-165RESOLUTION NO. 2006- 165
A RESOLUTION OF THE CITY COUNCIL OF ROHNERT PARK
UPDATING THE PUBLIC FACILITIES FEE FOR ALL DEVELOPMENT
WITHIN THE CITY OF ROHNERT PARK AND
REPEALING RESOLUTION 2004 -167
WHEREAS, on May 25, 2004 the City Council of the City of Rohnert Park (City)
conducted a duly noticed Public Hearing to receive and consider public comments on its
Public Facilities Finance Plan (PFFP) and upon completion of that hearing the City
Council unanimously approved the PFFP; and
WHEREAS, on July 13, 2004, the City conducted a duly noticed Public Hearing and
adopted its proposed Public Facilities Financing Ordinance and initial Public Facilities
(PF) Fee Schedule under Resolution 2004 -167; and
WHEREAS, these actions were taken to conform with the General Plan policies
requiring that new development pay for the impacts it creates as substantiated by Planning
Commission Resolution 2004 -19; and
WHEREAS, since the adoption of the initial PF Fee Schedule (Resolution 2004 -167),
the City has made substantial progress on the design of a number of facilities in the PF Fee
program and documented increased construction costs for these facilities in its City of
Rohnert Park 2006 Update - Public Facilities Finance Plan (2006 Update); and
WHEREAS, it is to the benefit of all developing property that the PF Fee Program
reflect accurate and current cost estimates to assure that each development supports its fair
share of needed facilities; and
WHEREAS, the City Council finds and determines as follows:
A. The 2006 Update complies with California Government Code Section 66001 by
establishing the basis for imposition of fees on new development. In particular, the
2006 Update:
1. identifies the purpose of the fee;
2, identifies the use to which the fee will be put;
3. shows a reasonable relationship between the fee's use and the type of development
project on which the fee is imposed;
4. shows a reasonable relationship between the need for the public facility and the
type of development project on which the fee is imposed because the new facilities
are sized to accommodated the increased population and increased vehicle trips that
will be generated by each type of development; and
5. shows a reasonable relationship between the amount of the fee and the cost of the
public facility or portion of the public facility attributable to the development on
which the fee is imposed because the proposed fees are proportional to the new
population and new traffic generated by each type of development.
(Reso. No. 2006 -165)
B. The fees collected pursuant to this Resolution shall be used to finance the public
facilities described or identified in the 2006 Update or other public facility master
plans as may from time to time be adopted by the City Council.
C. After considering the specific project descriptions and cost estimates identified in the
2006 Update, the City Council approves such project descriptions and cost estimates,
and finds them reasonable as the basis for calculating and imposing an updated PF Fee.
D. The projects and fee methodology identified in the 2006 Update continue to be
consistent with the City's General Plan;
E. The 2006 Update categorically exempt from environmental review pursuant to the
California Environmental Quality Act guidelines section 15061(b)(3). The intent of the
PF Program, the 2006 Update and the proposed PF fees is to provide one means of
mitigating potential environmental impacts which have been identified in
environmental analyses of other planning efforts, including the General Plan EIR.
NOW, THEREFORE, it is hereby resolved by the City Council of the City of Rohnert
Park, that:
1. Amount of Fee. The PF Fee for various classes of land use and various benefiting
areas are set forth in Attachment 1. The land uses classes set forth are intended to
be generally consistent with the Land Use Framework outline in the General Plan
and this Land Use Framework should be consulted as necessary to support accurate
determination of fees.
2. Use of Fee. The fee shall be solely used: (a) for the purposes described in the 2006
Update; (b) for reimbursing the City for the development's fair share of those
capital improvements already constructed by the City; or (c) for reimbursing
developers who have constructed public facilities described in the 2006 Update or
other facility master plans adopted from time to time by the City Council where
those facilities were beyond that needed to mitigate the impacts of the developers'
project or projects.
3. Automatic Increase. The PF Fee will automatically increase on July 1 in each
year hereafter in accordance with any increases in the Engineering News Record
Construction Cost Index for the fiscal year ending on such July 1.
4. Fee Review. Annually, as part of the budget process, the City Manager shall
review the estimated cost of the described capital improvements, the continued
need for those improvements and the reasonable relationship between such need
and the impacts of the various types of development pending or anticipated and for
which this fee is charged. The City Manager shall report his or her findings to the
City Council at a noticed public hearing and recommend any adjustment to this fee
or other action as may be needed.
S. Judicial Action to Challenge this Resolution. Any judicial action or proceeding
to attack, review, set aside, void or annul this resolution shall be brought within 120
days of the date of adoption of this resolution.
6. Severability. If any provision or clause, or paragraph of this resolution or the
(Reso. No. 2006 -165)
imposition of a PF fee for any project with the 2006 Update or the application
thereof to any person or circumstance shall be held invalid, such invalidity shall not
affect the other provisions of this resolution or other fees levied by this resolution
which can be given effect without the invalid provisions or application of fees, and
to this end the provisions of the resolution are declared to be severable.
7. Repeal. Resolution Number 2004 -167 is hereby repealed.
8. Effective Date. This Resolution shall take effect thirty (30) days after its adoption.
DULY AND REGULARLY ADOPTED by the City Council of the City of Rohnert Park
this 13th day of June, 2006 by the following vote:
AYES: Five (5) Councilmembers Breeze, Flores, Mackenzie, Vidak- Martinez
and Mayor Smith
NOES: None (0)
ABSENT: None (0)
ABSTAIN: None (0)
CITY OF ROHNERT PARK.__. --
Maypr,� im Smite
ATTEST:
Approved as to Form:
r-
City Atoney
(for Reso. No. 2006 -165)
Attachmcnt 1
Table ES -2 {a}
Northeast SPA
Summary of Proposed Mitigation Fees
Total SPA Fee:
51$,194,200
I
A
8
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traffic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
3%
Admin.
Allowance
Total
Mitigation Fee
per Unit
Number of
Units in SPA
SPA Fee per
Land Use
Single Family Residential units
$ 8,486
$
2,761
$
7,315
$
18,562
$
557
$
19,119
763
$ 14,588,007
Multi-Family Residential units
$ 5,304
$
1,795
S
4,572
$
11,671
S
350
$
12,021
300
$ 3,606,193
Senior Housing units
$ 5,304
$
1,104
$
4,572
3 $
10,980
$
329
$
11,310
0
$ -
Assisted Living units
$ 2,652
$
1,104
S
2,286
1 $
5,042
$
181
$
6,224
0
$ -
General Office thousandsquare feet
$ 7,585
$
4,694
$
6,538
1 $
18,816
$
564
$
19,381
0
$
Hotel/Motel thousandsquare feet
$ 2,785
$
4,970
$
2,400
1 $
10,155
$
305
$
10,459
0
$
Retail thousandsquare feet
$ 4,827
$
11,044
$
4,160
1 $
20,031
$
601
$
20,632
0
$
Light Industrial thousandsquare feet
$ 1,750
$
1,933
$
1,509
$
5,192
$
156
$
5,348
0
$
Heavy Industrial thousandsquare feet
S 1,750
S
1,933
$
17509
$
5,192
$
156
$
5,348
0
$
Warehouse thousandsquare feet
$ 1,750
$
1,347
$
1,509
$
4,606
$
138
$
4,745
0
$
Education students
$
$
-
$
-
$
-
$
-
$
-
0
1 $
Park /Recreation acres
; $ -
$
-
$
-
$
-
$
-
$
ED
Agricultural/Rural acres
($
$
-
$
$
-
$
$
-
0
1 $ -
A = Includes components for: Maintenance, Training, City Hall, Corp, Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Eastside Fire Station, Water System Pipeline - Eastside, Eastside Sewer -Main and Eastside Sewer -North.
D = A +g +C
rh
O
M
7d
fD
W
O
z
O
N
O
O
O�
u
Table ES -2(b)
University SPA
Summary of Proposed Mitigation Fees
Total SPA Fee:
$30,758,042
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Eastside Fire Station, Water System Pipeline - Eastside, Eastside Sewer -Main and Eastside Sewer - North.
D = A +B +C
i
J
H
7d
t�
N
O
`r..
O
N
O
O
I
r
O�
v
A
B
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traffic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
,
3 /o
Admin.
Allowance
Total
Mitigation Fee
per Unit
Number of
Units in SPA
SPA Fee per
Land Use
Single Family Residential units
$
8,486
S
2,761
S 7,315
S
18,562
S
557
$
?9,119
880
$ 16,824,962
Multi-Family Residential units
$
5,304
$
1,795
S 4,572
1 S
11,671
1 $
350
$
12,021_
730
$ 8,775,070
Senior Housing units
$
5,304
$
1,104
$ 4,572
$
10,980
S
329
$
11,310
0
$ -
Assisted Living units
$
2,652
$
1,104
$ 2,286
$
6,042
S
181
$
6,224
0
$ -
General Office thousands uare feet
$
7,585
$
4,694
$ 6,538
$
18,816
S
564
$
19,381
0
$ -
Hotel /Motel thousandsquare feet
$
2,785
$
4,970
$ 2,400
$
10,155
S
305
$
10,459
01
$ -
Retaii thousandsquare feet
$
4,827
$
11,044
$ 4,160
$
20,031
S
601
$
20,632
250
S 5,158,010
Light Industrial thousandsquare feet
$
1,750
$
1,933
$ 1,509
$
5,192
$
156
$
5,348
0
Heavy Industrial thousandsquare feet
$
1,750
$
1,933
S 1,509
$
5,192
S
156
$
5,348
0
$
Warehouse thousandsquare feet
$
1,750
$
1,347
$ 1,509
$
4,606
$
138
$
4,745
0
$
Education students
$
-
$
-
$ -
$
$
-
$
0
$
Park/Recreation acres
$
-
$
$ -
$
$
$
-
0
S
Agricultural/Rural acres
$
-
$
$ -
J $
1
$
0
S
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Eastside Fire Station, Water System Pipeline - Eastside, Eastside Sewer -Main and Eastside Sewer - North.
D = A +B +C
i
J
H
7d
t�
N
O
`r..
O
N
O
O
I
r
O�
v
Table ES -2(c)
Southeast SPA
Summary of Proposed Mitigation Fees
Total SPA Fee:
$9,837,265
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Eastside Fire Station, Water System Pipeline - Eastside, Eastside Sewer -Main and Eastside Sewer - South.
D = A +B +C
�-h
O
M
O
N
O
O
N
O
O
O�
I
H
l!�
A
B
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traff ic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
o
3/o
Admin.
Allowance
Total
Mitigation Fee
per Unit
Number of
Units in SPA
I SPA Fee per
Land Use
Single Family Residential units
$
8,486
$ 2,761
$
7,637
$ 18,884
$
567
$ 19,451
463
$
9,005,608
Multi-Family Residential units
$
5,304
$ 1,795
$
4,773
$ 11,872
$
356
$ 11,872
36
$
427,376
Senior Housing units
$
5,304
$ 1,104
$
4,773
$ 11,181
$
335
$ 11,181
0
$
-
Assisted Living units
$
2,652
$ 1,104
$
2,386
$ 6,143
$
184
$ 6,143
0
$
General Office thousandsquare feet
$
7,585
$ 4,694
$
6,825
$ 19,104
$
573
$ 19,104
0
S
Hotel /Motel thousandsquare feet
$
2,785
$ 4,970
$
21506
$ 10,260
$
308
$ 10,260
0
$
-
Retai! thousandsquare feet
$
4,827
$ 11,044
$
4,343
$ 20,214
$
606
$ 20,214
20
$
404,281
Light Industrial thousandsquare feet
$
1,750
$ 1,933
$
1,575
$ 5,258
$
158
$ 5,258
0
$
-
Heavy Industrial thousandsquare feet
$
1,750
$ 1,933
$
1,575
$ 5,258
$
i58
$ 5,258
0
$
Warehouse thousandsquare feet)
$
1,750
$ 1,347
$
1,575
$ 4,673
$
140
$ 4,673
0
$
Education students
$
-
$ -
$
-
$ -
$
-
$ -
0
$
Park /Recreation acres
$
$
$
-
$
$
$
2
$
,Agri cultu ral/Ru ral acres
$
$
$
-
$
$
-
1 $
0
$
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Eastside Fire Station, Water System Pipeline - Eastside, Eastside Sewer -Main and Eastside Sewer - South.
D = A +B +C
�-h
O
M
O
N
O
O
N
O
O
O�
I
H
l!�
Table ES -2(d)
Wilfred Dowdell SPA
Summary of Proposed Mitigation Fees
Total SPA Fee:
$3,969,574
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Westside Fire Station, Water System Pipeline - Westside.
D = A +B +C
rh
O
H
7d
M
N
O
O
N
O
O
O�
I
O�
lti
v
A
B
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traffic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
o
3/o
Admin.
Allowance
Total
Mitigation Fee
per Unit
Number of
Units in SPA
SPA Fee per
Land Use
Single Family Residential units
$
8,486
$ 2176;
$
2,655
$ 13,902
$
417
$ 14,319
0
$
Multi-Family Residential units
$
5,304
$ 1,795
$
1,659
$ 8,758
S
263
$ 9.021
0
$
-
Senior Housing units
$
5,304
$ 1,104
$
1,659
$ 8,068
S
242
$ 8,310
0
S
Assisted Living units
$
2,652
$ 1,104
$
830
$ 4,586
$
138
$ 4,724
0
$
-
General Office thousandsquare feet
$
7,585
$ 4,694
$
2,373
$ 14,651
$
440
$ 15,091
0
$
-
HoteltMotei thousandsquare feet
$
2,785
$ 4,970
$
871
$ 8,625
$
259
$ 8,884
64
$
566,776
Retail thousandsquare feet
$
4,827
$ 11,044
$
1,510
S 17,381
$
521
$ 17,902
190
$
3,402,798
Li ht industrial thousandsquare feet
$
1,750
$ 1,933
$
548
$ 4,231
$
127
$ 4,357
0
$
-
Heavy Industrial thousandsquare feet
$
1,750
$ 1,933
S
548
$ 4,231
$
127
$ 4.357
0
$
Warehouse thousandsquare feet
$
1,750
$ 1,347
$
548
$ 3,645
S
109
$ 3,755
0
$
Education students
$
-
$
$
-
$ -
$
-
$ -
0
$
Park/Recreation acres
$
-
$ -
$
-
$ -
$
-
1 $ -
i
S
A riculturailRural acres
$
$ -
$
-
$
S
$
01
$
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Westside Fire Station, Water System Pipeline - Westside.
D = A +B +C
rh
O
H
7d
M
N
O
O
N
O
O
O�
I
O�
lti
v
Table ES -2(e)
Northwest SPA
Summary of Proposed Mitigation Fees
Total SPA Fee:
$21,911,033
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Westside Fire Station, Water System Pipeline - Westside.
D = A +B +C
rh
O
H
Pd
O
N
O
z
0
ry
0
0
a,
I
a,
A
B
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traffic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
3%
Admin.
Allowance
Total
Mitigation Fee
per Unit
Number of
Units in SPA
SPA
Fee per
Land Use
Single Family Residential units
$ 8,486
$
2,761
$
2,655
$
13,902
$
417
$
14,319
0
S
Multi-Family Residential units
$ 5,304
$
1,795
$
1,659
$
8,758
$
263
$
9,021
900
$
8,118,466
Senior Housing units
$ 5,304
$
1,104
$
1,659
$
8,068
$
242
$
8,310
0
$
-
Assisted Living units
$ 2,652
$
1,104
$
830
$
4,586
$
138
$
4,724
0
S
-
General Office thousandsquare feet
$ 7,585
$
4,694
$
2,373
$
14,651
$
440
$
15,091
230
S
3,470,821
Hotel /Motel thousandsquare feet
$ 2,785
$
4,970
$
871
$
8,625
$
259
$
8,884
0
S
-
Retail thousandsquare feet
$ 4,827
$
11,044
$
1,510
$
17,381
$
521
S
17,902
450
S
8,055.867
Light Industrial thousandsquare feet
$ 1,750
$
1,933
$
548
$
4,231
$
127
$
4,357
520
S
2,265,879
Heavy Industrial thousandsquare feet
$ 1,750
$
1,933
$
548
$
4,231
$
127
$
4,357
0
$
-
Warehouse thousandsquare feet
$ 1,750
$
1,347
$
548
$
3,645
$
109.
$
3,755
0
S
Education students
$ -
$
$
-
$
-
$
-
$
-
0
Park/Recreation acres
$
$
$
$
$
$
01
S
,Agricultural/Rural acres
$
$
$
$
$
j $
01
S
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = Includes components for: Westside Fire Station, Water System Pipeline - Westside.
D = A +B +C
rh
O
H
Pd
O
N
O
z
0
ry
0
0
a,
I
a,
Table ES -2(f)
Stadium Lands Development
Summary of Proposed Mitigation Fees
Total SPA Fee:
$4,012,697
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Commt:nity Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = includes components form: Westside Fire Station, Water System Pipeline - Westside,
D = A +B +C
.-.
rh
O
H
7y
tD
to
O
z
O
N
O
O
O�
I
r
to
A
B
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traffic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
,
3 /o
Admin.
Allowance
Total
Mitigation Fee
per Unit
Number of
Units in SPA
SPA Fee per
Land Use
{
Single Family Residential units
8,486
2,761
2,655
1 13,902
$ 417
$ 14,319
0
$0
Multi-Family Residential units
5,304
1,795
1,559
1 8,758
$ 263
$ 9,021
167
$1,506,427
Senior Housing units
5,304
1,104
1,659
8,068
$ 242
$ 8,310
0
$0
Assisted Living units
2,652
1,104
830
1 4,586
$ 138
$ 4,724
0
$0
General Office lthousand square feet
7,585
4,694
2,373
1 14,651
$ 440
$ 15,091
0
$0
Hotel /Motel thousandsquare feet
2.785
4,970
871
j 8,625
$ 259
$ 8,884.
0
$0
Retail thousandsquare feet
4,827
11,044
1,510
} 17,381
$ 521
$ 17,902
1401
$2,506.270
Light Industrial thousandsquare feet
1,750
1,933
548
! 4,231
$ 127
1 $ 4,357
0
$0
Heavy Industrial thousandsquare feet)
1,750
1,933
548
4,231
$ 127
$ 4,357
0
$0
Warehouse thousandsquare feet
1,750
1,347
548
3,645
$ 109
$ 3,755
0
$0
Education students
-
-
$ -
$ -
0
$0
Park /Recreation acres
$
S -
0
SO
,Agricultural/Rural acres
-
S -
$
0
$0
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Commt:nity Center, Interceptor Outfall Project, Recycled Water System Expansion,
Water Plan and Sewer Plan.
C = includes components form: Westside Fire Station, Water System Pipeline - Westside,
D = A +B +C
.-.
rh
O
H
7y
tD
to
O
z
O
N
O
O
O�
I
r
to
Table ES -2(g)
Canon Manor SPA
Summary of Proposed Mitigation Fees
Total SPA Fee:
$2,130,436
A = Includes components for: Recycled Water System Expansion and Interceptor Outfall Project.
C = Includes components for: Eastside Sewer -Main Reach and Eastside Sewer -South Reach.
D = A +B +C
O
H
N
O
x
O
N
O
O
O�
I
rr
to
A
B
C
D
E
F
G
H
Population
Based
Mitigation
Fees
Traffic
Mitigation Fee
Component
Specific
Subtotal
Mitigation
Fees
o
3/o
Admin.
Allowance
Total
Mitigation Fee
per unit
Number of
units in SPA
SPA Fee per
Land Use
Single Family Residential units
$ 3,988
$
$ 5,413
$ 91402
$ 282
$ 9,684
220
$ 2,130,436
Multi-Family Residential units
$ 2,493
$
$ 3,383
$ 5,876
$ 176
$ 6,052
0
$
Senior Housing units
$ 2,493
$
$ 3,383
$ 5,876
$ 176
$ 6,052
0
$
Assisted Living units
$ 1,246
$
$ 1,692
$ 2,938
$ 88
$ 3,026
0
$
General Office thousandsquare feet
$ 3,565
$
$ 4,838
$ 8,403
$ 252
$ 8,655
0
$
Hotel /Motel thousandsquare feet
$ 1,309
$
$ 1,776
$ 3,085
$ 93
$ 3,177
0
$ -
Retail thousand square feet
$ 2,268
$
$ 3.079
$ 5,347
$ 160
$ 5,508
0
$
Light Industrial thousandsquare feet
$ 823
$
$ 1,116
$ 1,939
$ 58
$ 11997
0
$
Heavy Industrial thousandsquare feet
$ 823
$
$ 1,116
$ 1,939
$ 58
$ 1,997
0
$
Warehouse thousandsquare feet
$ 823
$
$ 1,116
$ 1,939
$ 58
$ 1,997
0
$
Education students
j $
$
$ -
I $ -
$ -
$ -
0
$
ParklRecreation acres
$
$
$
$ -
$
$
0
$
A riculturai!Rural acres
$
$
$
$
$ -
$
0
$
A = Includes components for: Recycled Water System Expansion and Interceptor Outfall Project.
C = Includes components for: Eastside Sewer -Main Reach and Eastside Sewer -South Reach.
D = A +B +C
O
H
N
O
x
O
N
O
O
O�
I
rr
to
Table ES -2(h)
I nfi I l West
Summary of Proposed Mitigation Fees
A = Includes components for: Maintenance, Training, City Hall, Corp
Recycled Water System Expansion, Water Plan and Sewer Plan.
C = Includes fees from: Westside Fire Station.
D = A +i3 +C
Yard, Senior Center, Community Center, Interceptor Outfall Project,
rr,
0
H
00
M
0
z
0
N
0
0
a`
i
a,
v,
v
A
B
C
D
E
F
Population
Based
Mitigation
Fees
Traffic
Mitigation
Fee
Component
Specific
Subtotal
Mitigation
Fees
3%
Admin.
Allowance
Total
Mitigation
Fee per Unit
Single Family Residential units
$
8,486
$
2,761
$
2,585
$
13,833
$
415
$
14,248
Multi-Family Residential units
$
5,304
$
1,795
$
1,616
$
8,714
$
261
$
8,976
Senior Housing units
$
5,304
$
1,104
$
1,616
$
8,024
$
241
$
8,265
Assisted Living units
$
2,652
$
1,104
$
808
$
4,564
$
137
$
4,701
General Office thousandsquare feet
$
7,585
$
4,694
$
2,310
$
14,589
$
438
$
15,027
Hotel /Motel thousandsquare feet
$
2,785
$
4,970
$
848
$
8,603
$
258
$
8,861
Retail thousandsquare feet
$
4,827
$
11,044
$
1,470
$
17,341
$
520
$
17,861
Light Industrial thousandsquare feet
$
1,750
$
1,933
$
533
$
4,216
$
126
$
4,343
Heavy Industrial thousandsquare feet
$
1,750
$
1,933
$
533
$
4,216
$
126
$
4,343
Warehouse thousandsquare feet
$
1,750
$
1,347
$
533
$
3,631
$
109
$
3,740
Education students
$
-
$
-
$
-
$
-
$
-
$
-
Park/Recreation acres
$
-
$
-
$
-
$
-
$
-
$
-
A riculturalfRural acres
$
-
$
-
$
-
$
-
$
-
j $
-
A = Includes components for: Maintenance, Training, City Hall, Corp
Recycled Water System Expansion, Water Plan and Sewer Plan.
C = Includes fees from: Westside Fire Station.
D = A +i3 +C
Yard, Senior Center, Community Center, Interceptor Outfall Project,
rr,
0
H
00
M
0
z
0
N
0
0
a`
i
a,
v,
v
Table ES -2(i)
Infill East
Summary of Proposed Mitigation Fees
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, c`
Recycled Water System Expansion, Water Plan and Sewer Plan.
C = Includes fees from: Eastside Fire Station and Eastside Sewer- Infill.
D = A +B +C
0
0
N
O
O
C N
ON
Ul
v
A
8
C
D
E
F
Population
Based
Mitigation
Fees
Traffic
Mitigation
Fee
Component
Specific
Subtotal
Mitigation
Fees
a
3 /a
Admin.
Allowance
Total
Mitigation
Fee per Unit
Single Family Residential units
$
8,486
$
2,761
$
1,699
$
12,946
$
388
$
12,946
Multi-Family Residential units
$
5,304
$
1,795
$
1,062
$
8,160
$
245
$
8,160
Senior Housing units
$
5,304
$
1,104
S
1,062
$
7,470
$
224
$
7,470
Assisted Living units
$
2,652
$
1,104
S
531
$
4,287
$
129
S
4,287
General Office thousandsquare feet
$
7,585
$
4,694
S
1,518
$
13,797
$
414
$
13,797
Hotel /Motel thousandsquare feet
$
2,785
$
4,970
S
557
$
8,312
$
249
$
8,312
Retail thousandsquare feet
$
4,827
$
11,044
S
966
$
16,837
$
505
$
16,837
Light Industrial thousandsquare feet
$
1,750
$
1,933
$
350
$
4,033
$
121
$
4,033
Heavy Industrial thousandsquare feet
$
1,750
$
1,933
$
350
$
4,033
$
121
$
4,033
Warehouse thousandsquare feet
$
1,750
$
11347
$
350
$
3,448
$
103
$
3,448
Education students
$
-
$
-
S
-
$
-
$
-
$
-
Park/Recreation acres
$
-
$
-
$
-
$
-
$
$
A ricultural /Rural acres
$
-
$
-
S
-
$
-
$
-
$
-
A = Includes components for: Maintenance, Training, City Hall, Corp. Yard, Senior Center, Community Center, Interceptor Outfall Project, c`
Recycled Water System Expansion, Water Plan and Sewer Plan.
C = Includes fees from: Eastside Fire Station and Eastside Sewer- Infill.
D = A +B +C
0
0
N
O
O
C N
ON
Ul
v
Sequence number: 1
Author: ebeardsley
Subject: Note
Date: 9/25/2007 11:58:24 AM
Clerical math error - Total should be $13,334.