Loading...
2006/04/25 City Council Resolution (8)RESOLUTION NO. 2006- logy A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AMENDMENT NO.2 TO TASK ORDER 2004 -14 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR ENGINEERING SERVICES ASSOCIATED WITH THE DESIGN OF THE EASTSIDE TRUNK SEWER (CITY PROJECT NO. 2004-05) WHEREAS, Winzler & Kelly will provide supplemental engineering and environmental services for the Snyder Lane & Bridge Widening, from Southwest Boulevard to Jasmine Circle, as part of the City of Rohnert Park Eastside Trunk Sewer Project. BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Amendment No. 2 to Task Order No. 2004 -14 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation, for design services associated with the Eastside Trunk Sewer (City Project No. 2004 -05). BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this agreement in substantially similar form to the attached agreement for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 25th day of April, 2006. CITY OF ROHNERT PARK ._..._....._.. Mayor Tim nu A 9rgP QT- BREEZE: AYE FLORES: AYE MACKENZIE: AYE VI )AK- MARTINEZ: AYE SMITH: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) JH- S:05 -f AMENDMENT No. 2 to TASK ORDER NO. 2004-14 CITY OF ROHNERT PARK AND WINZLER & KELLY AUTHORIZATION OF PROFESSIONAL SERVICES TO PROVIDE DESIGN SERVICES ASSOCIATED WITH THE EASTSIDE TRUNK SEWER - SNYDER LANE & BRIDGE WIDENING (CITY PROJECT NO. 2004 -05) SECTION 1 —PURPOSE The purpose of this Task Order is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the AGREEMENT between the City ofRohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto dated August 9, 2005. SECTION 2 — SCOPE OF WORK The items authorized by this Task Order are presented in Attachment A — Scope of Services and consists of tasks necessary to complete the design and permitting of the Snyder Lane & Bridge Widening as part of the Eastside Sewer Trunk Project. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties heretofore referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charge. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 is anticipated to be complete by early summer 2006. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 25a' day of April, 2006. CITY OF ROHNERT PARK Stephen R. Donley, City Manager (Date) Per Resolution No. 2006 -107 adopted by the City Council on April 25, 2006 WINZLER & KELLY ENGINEERS Marc Solomon, Region Manager (Date) ATTACHMENT "A" Eastside Trunk Sewer Scope of Services — Amendment 2 C O N e V t T N 0 F N G I N E€ R e Snyder Lane & Bridge Widening CITY OF ROHNERT PARK EASTSIDE TRUNK SEWER SCOPE OF SERVICES — AMENDMENT 2 SNYDER LANE & BRIDGE WIDENING Winzler & Kelly will provide supplemental engineering and environmental services for the Snyder Lane & Bridge Widening, from Southwest Boulevard to Jasmine Circle, as a part of the City of Rohnert Park Eastside Trunk Sewer Project. The following outlines the additional services associated with the work: Task 1— CEQA Documents: Initial Study/MitigatedNegative Declaration Based on the proposed road and bridge widening features and impacts, Winzler & Kelly will append the proposed Initial Study/Mitigated Negative Declaration (IS /MND) for the Eastside Trunk Sewer Project to address these proposed elements. • The widening of Snyder Lane and Bridge between Southwest Boulevard and Jasmine Circle at the eastern extent of the project. Task 2 — Permitting: Environmental Permit Identification • Winter & Kelly will include the additional impacts of the bridge widening in the permit applications to the effected regulatory agencies. Task 3 — Geotechnical Investigation: Consultant will retain the services of DCM/Joyal Engineering to perform geotechnical investigations supplemental to the Trunk Sewer and Phase I geotechnical investigations performed previously for the original scope. The supplemental geotechnical investigation will include up to 4 additional soil borings and recommendations regarding liquefaction potential, differential settlement, values for bridge footing design, values for retaining wall design and R- values for pavement design. This effort will primarily focus on the area east of Snyder Lane adjacent to the Rancho Cotate Senior High School and the Copeland Creek Crossing where the bridge work will be required. 2. Consultant will review the finding of the geotechnical report and develop strategies for implementing the recommendations. Areas requiring significant effort are pavement design, slope retention and bridge footing design. I of 3 ATTACHMENT "A" Eastside Trunk Sewer Scope of Services —A mendonent 2 ' � 0 ... L I C A 8 C O ri S U L T t N O E N O t R E E R 8 Snyder Lane & Bridge Widening Task 4 -- Easement(s) — Temporary Construction Easement (TCE): Consultant will obtain Title Reports for the following parcel(s): • Rancho Cotate Senior High School Parcel 2. Consultant will perform field surveys to locate property boundary markers for the above property. 3. Consultant will prepare and submit draft TCE description for review by owner and City. Comments will be addressed by Consultant before submitting final TCE for signature by owner and distribution to City. 4. Consultant will provide TCE acquisition assistance. Assistance will include evaluating alternatives, preparing exhibits, assisting with negotiations with owner and attending a coordination meeting. If required, as an optional service, the Consultant will have the properties appraised, negotiate with the property owners, and provide services to obtain the TCE. 5. A permanent easement is not anticipated. Task S - Supplemental Surveys 1. Consultant will prepare supplemental field surveys to support preparation of the contract drawings. The proposed supplemental coverage area is a swath approximately 50 feet wide and generally beyond the existing right of way along the east side of Snyder Lane, from Rancho Cotate Senior High School to Rohnert Park Expressway. 2. Consultant will survey mark outs made by utility locator and utility potholes. Task 6 — Construction Documents: Task includes incremental additional effort related to the Snyder Lane and Bridge Widening project work associated with the following subtasks: 1. Consultant will prepare plans and specifications suitable for public bid. 2. Plans will detail the work to be completed including temporary facilities, abandonment and demolition of existing facilities, plan and profile drawings for new pipelines, tunnel design, utility relocation design, construction details and conceptual traffic control plans showing allowable lane closures, work area, and detours. Drawings will be prepared using AutoCAD Version 2006 software and formatted for 11" x 17" and 22" x 34" sheets. Consultant will utilize City standard details where applicable. Consultant will use its own drafting standards. 2 of 3 ATTACHWNT "A" Eastside Trunk Sewer Scope of Services — Amendment 2`t% ALLY Snyder Lane & Bridge Widening 3. Specifications will establish the minimum level of quality acceptable including relevant reference standards, allowable materials and construction methods, and testing procedures and acceptance requirements. Consultant will also provide editing of the City's standard bid and contract forms to meet funding agency requirements and the specifics of the project. Specifications and other documents will be prepared using Microsoft Word 2000 software in CSI format. 4. An estimate of probable construction cost will be provided with a detailed breakdown of material and labor costs organized by specification section, with a separate summary in the same format as the bid schedule. 5. Consultant shall develop the storm water pollution prevention plan as a base plan for the contractor's use during construction. A Notice of Intent will be prepared for the City's signature and, submittal to the Regional Board. 6, A Progress Submittal will be made at an approximate 35% level of completion. Formal design submittals will be provided at. the 90% and Final design levels. Review comments from the 90% submittal will be addressed and a Final design will be prepared for back -check review by the City. The City will receive six copies of the design submittals, with half -size (I I" x 17 ") drawings. 7. Consultant will provide quality assurance and quality control review of each design submittal before submitting to the City. 3 of 3