2007/02/27 City Council Resolution 2007-29RESOLUTION NO. 2007-29
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
APPROVING AND ADOPTING GREEN BUILDING STANDARDS AND RATING
SYSTEMS FOR CONSTRUCTION OF BUILDINGS OF CERTAIN COVERED
PROJECT TYPES
WHEREAS, on February 27, 2007, the City Council considered regulations for the use
of green building features in buildings and introduced Ordinance No. 782; and
WHEREAS, the Ordinance specifies that the green building guidelines, ratings systems,
and project checklists for certain building covered project types will be set forth by city council
resolution.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park
that it does hereby approve and adopt green building guidelines, rating systems, and project
checklists as set forth in Table 1, attached as Exhibit A to this Resolution.
BE IT FURTHER RESOLVED by the City Council of the City of Rohnert Park that the
applicable green building guidelines, rating systems, and project checklists are specified in
Exhibit B, attached to this resolution.
BE IT FURTHER RESOLVED by the City Council of the City of Rohnert Park that this
resolution shall take effect upon the effective date of Ordinance No. 782.
DULY AND REGULARLY ADOPTED this 27`h day of February, 2007.
ATTEST:
�g
QC,Ry Clerk
CITY OF ROHNERT PARK
¢RT
Mayor
BREEZE: ABSENT MACKENZIE: AYE SMITH: AYE STAFFORD: AYE VIDAK- MARTINEZ: AYE
AYES: (4) NOES: (0) ABSENT: (1) ABSTAIN: (0)
EXHIBIT "A"
Covered Project
Tier I
Tier 2
Tier 3
Type
SFD New
Build It Green's 2005 New Home Construction Green Building
Guidelines, Rating System and Checklist
SFD Addition
Alameda County Waste Management Authority's Home Remodeling
Green Building Guidelines, Rating System and Checklist
FD New
Alameda County Waste Management Authority's Home Multi family
Green Building Guidelines, Rating System, and Checklist
FD Remodel
Not Applicable
Commercial, New
U.S. Green Building Council LEED. for New Construction Version 2.2 or
LEED Core and Shell Version 2.0 Guidelines, Rating System and
Checklist
Commercial, TI
U.S. Green Building Council LEED for New Construction Version 2.2 or
LEED for Commercial Jnteriors Version 2.0 Guidelines, Rating System
and Checklist
City Sponsored
As per project type above
Table 1
EXHIBIT "B"
1. Standards of Compliance for Covered Projects.
a) Single - family residential new projects shall be constructed using the 2005 Edition of
the New Home Construction Green Building Guidelines published by Build It Green.
The green building project checklist shall be the New Homes GreenPoints Checklist
by Build It Green.
b) Single - family residential addition projects shall be constructed using the Alameda
County Waste Management Authority's Home Remodeling Green Building
Guidelines published January 2004. The green building project checklist shall be the
Green Points Rating System. for Remodeling Projects by Build It Green.
c) Multi- family residential new projects and remodel projects shall be constructed using
the Alameda County Waste Management Authority's Multi family Green Building
Guidelines. The green building project checklist shall be the Multifamily GreenPoint
Checklist by Build It Green
d) Commercial projects new shall be constructed using the U.S. Green Building Council
LEED -NC (New Construction) Version 2.2 rating system, or the U.S. Green Building
Council LEED -CS (Core and Shell) Version 2.0 rating system, whichever one the
U.S. Green Building Council determines is the most appropriate. In the absence of a
detennination by the U.S. Green Building Council for specifying the applicable green
rating system, the determination shall be made by the green building compliance
official. The green building project checklist shall be the corresponding Registered
Project Checklist published by the U.S. Green Building Council as required for the
respective rating system used for the covered project.
e) Commercial tenant improvement projects shall be constructed using the U.S. Green
Building Council LEED -NC Version 2.2 rating system, or LEED -CI (Commercial
Interiors) Version 2.0 rating system, whichever one the U.S. Green Building Council
detennines is the most appropriate. In the absence of a determination by the U.S.
Green Building Council for specifying the applicable green rating system, the
detennination shall be made by the green building compliance official. The green
building project checklist shall be the corresponding Registered Project Checklist
published by the U.S. Green Council as required for the respective rating system used
for the covered project.
f) Mixed -use projects shall meet the requirements in "a" through "e" above for both
residential and commercial projects, for their respective parts, as if they were
separate projects.
g) All city - sponsored projects shall use rating systems as specified in "a" through "f"
above.
h) All city - sponsored projects that are either residential projects or mixed -use projects
shall be constructed using the same green building rating system and green building
project checklist as specified for non -city Sponsored projects.
2. Green Building Project Checklist. The Applicant may request to use Innovation credits at
the time of pre - permitting documentation review. The green building compliance official
shall consider such requests and specify the additional points allowed if findings are made
that the request achieves one or more of the five goals specified in Section 14.50.010 of the
Rohnert Park Municipal Code.
3. Plan Review and Construction Compliance for Covered Projects.
a) For other than registered LEED projects, the green building compliance official shall
review the green building checklists, plans, and any other application documentation
for compliance with chapter 14.50 of the municipal code. The green building
compliance official shall also verify that the green building measures and provisions
indicated in the pre - permitting documentation are being implemented at foundation
inspection, framing inspection, any type of close -in inspection, and prior to approval
of a final inspection. The green building compliance official shall conduct other
inspections as needed to ensure compliance with chapter 14.50. The inspection and
verification activities shall be conducted by a Build It Green Certified GreenPoint
Rater or approved green building inspector. The rater or inspector may be an
employee of the city or a third party whom the green building compliance official
designates, provided she or he has a current Build It Green Certified GreenPoint
Rater certificate.
b) LEED projects that are registered shall follow the certifying and procedural
requirements of the U.S. Green Building Council for the green building rating system
used. Applicants of LEED registered projects shall submit proof of registration of
the project with the U.S. Green Building Council within thirty (30) days of permit
issuance. The applicant shall also provide the green building compliance official
with online access to the U.S. Green Building Council website in order for the green
building compliance official to monitor the submission of documents by the
applicant to the U.S. Green Building Council. If the green building compliance
official detennines the project is no longer in compliance with the approved plans or
approved pre - permitting documentation, the green building compliance official may
issue a stop order pursuant to Section 14.50.075.C.
4. Documentation for Final Determination of Compliance. Documentation shall be provided
as described below:
a) Prior to final building inspection and approval for any covered single - family
residential, multi - family residential, or mixed -use project, the applicant shall notify
the green building compliance official that their project is ready for final inspection
of green building features required by chapter 14.50 of the Rohnert Park Municipal
Code. Upon the green building compliance official's receipt and review of
documentation from the GreenPoint Rater demonstrating project compliance with the
applicable compliance threshold requirements, the green building compliance official
shall reach a final determination of compliance as specified in section 14.050.075.E.
b) Prior to approval of a final inspection for any covered, commercial, city- sponsored, or
mixed -use project, the applicant shall demonstrate substantial completion of the
LEED documentation for the project as evidenced by accessing the online
information of the project on the U.S. Green Building Council's website. Within one
year of granting occupancy by the city, the applicant shall submit proof of LEED
certification to the green building compliance officer. Failure to do so shall result in
enforcement actions as provided in Section 14.50.100.
5. Self- certifying for LEED Projects.
a) Self- certifying projects do not require LEED registration or certification. Applicants
are, however, encouraged to register their projects with the U.S. Green Building
Council. Self- certifying projects that become LEED registered and certified need
only attain a threshold level of green that is one level less than that required by city
council resolution specified in Section 14.050.070.
b) Project Documentation for self- certifying projects shall be substantially the same as
that which is required for LEED registered projects. The one exception is that
instead of filing documents with the U.S. Green Building Council, the architect or
engineer of record shall be the repository for all documentation related to the LEED
rating system being used for the project. The architect or engineer of record shall
make these documents available to the green building compliance official at her or
his request.
c) Building commissioning, specified as a prerequisite for LEED ratings is not required
under this chapter for self- certifying projects. Applicants are encouraged to verify
that fundamental building systems are designed, installed, and calibrated to operate
as intended. Documentation of building commissioning is required when
commissioning measures other the prerequisites are included as a part of the
designated points in the pre - permitting documentation.
d) Inspection of self - certifying projects shall be as specified in item 3.a of this
resolution.