2007/03/13 City Council Resolution 2007-36RESOLUTION NO. 2007-36
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ROHNERT PARK
APPROVING CONTRACT CHANGE ORDER NO. 10
FOR $120,500.00
WITH ASHLIN PACIFIC CONSTRUCTION, INC. FOR
COMMERCIAL WATER METER REPLACEMENT PROJECT - PHASE III
PROJECT NO. 2004-03
WHEREAS, the City approved a construction contract with AshLin Pacific
Construction, Inc. on October 11, 2005; and
WHEREAS, changes to the construction contract are needed to best implement
the goals of the project.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of
Rohnert Park that Contract Change Order No. 10 with AshLin Pacific Construction, Inc.
is approved for the amount of $120,500.00, and
BE IT FURTHER RESOLVED that the City Manager is authorized to execute
the Contract Change Order.
DULY AND REGULARLY ADOPTED this 13 "' day of March, 2007.
CITY OF ROHNERT PARK
May ro Tempore
ATTEST:
BREEZE: AYE MACKENZIE: AYE SMITH: AYE STAFFORD: AYE VIDAK- MARTINEZ: ABSENT
AYES: (4) NOES: (0) ABSENT: (1) ABSTAIN: (0)
X1,0 NI CITY OF ROHNERT PARK
6750 Commerce Boulevard
19 Rohnert Park, CA 94928
Telephone (707) 588 -2232 FAX (707) 588 -2274
Commercial Water Meter Replacement - Phase III
Project No. 2004 -03
Ashlin Pacific Construction, Inc.
CONTRACT CHANGE ORDER NO. 10
Item Description
1 - PCO 21 -Site #71- Lancaster Arms, 8282 Lancaster Dr. -Bid Item #14, 6" compound
meter w/ bypass for $16,500 and a temp_ service @ $600.
- PCO 22 -Site #72- Ramada Limited Inn, 6288 Redwood Dr. -Bid item #12, 3"
compound meter w/ bypass for $13,500 and a cut in 3" gate valve for $2,900 and a
temp. service @ $600.
- PCO 23 -Site #73 -5880 Commerce Blvd. -New 1 -1/2" disc meter w/ 2" isolation gate
valve for $9,000.
2 Bid Items Quantities
3 Liquidated Damages assessed: $200 /day for 34 days
Change Orders 1 -9 $24,299.44
CCO #10: $120,500.00
Recommended by:
Recommended by:
Approved by:
Approved as to Form:
Attest:
TOTAL of Contract Chanqe Order 10:
Original Contract Amount:
Revised Contract Amount:
Revised Contract Amount:
George Frostick, Public Works Inspector
Darrin Jenkins, Director of Public Works /City Engineer
Stephen R. Donley, City Manager
City Attorney
Date: 03/13/07
Amount
$43,100.00
$84,200.00
- $6,800.00
$120, 500.00
$1,198,900.00
$1,223,199.44
$1,343,699.44
Date
Date
Date
Date
City Clerk Date
We, the undersigned contractor, have given careful consideration to the change proposed and hereby
agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as
may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above.
Accepted by:
George Bernard, Ashlin Pacific Date
1 Project No. 2004 -03 - Contract Change Order 10