2007/05/08 City Council Resolution 2007-74RESOLUTION NO. 2007 -74 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING DESIGN AMENDMENT NO.4 TO TASK ORDER NO. 2004 -14 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR THE EASTSIDE TRUNK SEWER PROJECT— PHASE I PROJECT NO. 2004 -05 WHEREAS, the City of Rohnert Park determined the need for an amended design of the Rohnert Park Eastside Trunk Sewer; and WHEREAS, the City of Rohnert Park has prioritized the construction of Phase 1 of the Rohnert Park Eastside Trunk Sewer; and WHEREAS, the City authorized the design and preparation of plans and specifications by Winzler & Kelly Consulting Engineers for the project. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Design Amendment No. 4 to Task Order No. 2004 -14 with Winzler & Kelly Consulting Engineers for the Rohnert Park Eastside Trunk Sewer Project - Phase I, Project No. 2004 -05 for an amount not to exceed $77,481. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this amendment in substantially similar form to the attached amendment for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this date of May 8, 2007. ATTEST: CITY OF ROHNERT PARK ERr r,9R& Mayor BREEZE: AYE MACKENZIE: AYE SMITH: AYE STAFFORD: AYE VIDAK- MARTINEZ: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) AMENDMENT NO. 4 TO TASK ORDER NO. 2004-14 CITY OF ROHNERT. PARK AND WINZLER & KELLY AUTHORIZATION OF PROFESSIONAL SERVICES TO PROVIDE SUPPLEMENTAL SERVICES ASSOCIATED WITH THE EASTSIDE TRUNK SEWER PROJECT (CITY PROJECT NO. 2004 -05) SECTION 1— PURPOSE The purpose of this Task Order is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto dated July 26, 2006. SECTION 2 — SCOPE OF WORK The items authorized by this Task Order are presented in Attachment A — Scope of Services and consists of tasks necessary to complete supplemental services for Phase I development as to the Trunk Sewer. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties heretofore referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 are presented in Attachment B and shall be actual costs (time and materials) not to exceed $77,481. SECTION 4 - TIME OF PERFORMANCE The work described in SECTION 2 is anticipated to be completed by fall 2007. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 8th day of May, 2007. CITY OF ROHNERT PARK WINZLER & KELLY ENGINEERS Stephen Donley, City Manager (Date) Per Resolution No. 200 adopted by the City Council on May 8, 2007 4-1 PE� tfiZ7 /o 7 -::72a( ) , Ted Whiton, Managing Princi al (Date) Eastside Trunk Server Scope of Services — ATTACIIMEATA to Amendment #4 Background WINZ1_E1:;_AS,7_I <ELLY CITY OF ROHNERT PARK EASTSIDE TRUNK SEWER — PHASE I SUPPLEMENTAL ENGINEERING SERVICES SCOPE OF SERVICES AMENDMENT No. 4 Winzler & Kelly prepared 100% PS &E for the complete Eastside Trunk Sewer Project. Due to City prioritization of the westerly portion of the Project, phasing of the Project construction is required. Because of this, the Project will be bid as separate phases and as such, requires additional services to create separate Construction Documents and Bid Phases for each Project Phase. In addition, due to timing constraints, it is required that the City pre - purchase 1400 linear feet of piping and associated sewer manholes to allow for construction of the pipeline on the most westerly end of Phase I. As part of this Amendment, Winzler & Kelly will provide supplemental services for preparation of construction documents to cover only Phase I (from Rohnert Park Sewer Lift Station to Commerce Blvd), provide bid phase services for Phase 1, and provide bid services and document preparation for the pre- purchase of the pipe and manhole materials. It is understood that Phase II of the Project will be completed under separate amendment. The task -based scope of services is as follows: Task 1 — Construction Documents: Winzler & Kelly will prepare separate Contract Documents for Phase I of the Eastside Trunk Sewer Project. Phase I encompasses the work from the Rohnert Park Sewage Lift Station, generally south along Redwood Drive, under Highway 101 to Commerce Boulevard, near Avram. Deliverables: Phase I Plans Phase I Specs Phase I Cost Estimate Phase I SWPPP PS &E, SWPPP `mask 2 — Bid Phase Services: 6 sets, full size 6 copies 6 copies 6 copies I CD (electronic copies) Wirizler & Kelly will provide Bid Phase services for construction of Phase I of the Eastside Trunk Sewer Project. Most of the required tasks for Bid Phase services were included in the original contract, however, we have identified a few that are proposed for inclusion. For clarity, the fee proposal illustrates all tasks and identifies those that were previously covered. The following are proposed additional Bid Phase services for Phase 1: Page I of 2 Eastside Trunk Sewer Scope of Services — ATTACHMENTA to Amendment #4 �� WiNLLEI��.I�:EL:L'Y C 0 0 5 V l i i O G E N G I N E E H 5 • Preparation and delivery of construction bid advertisement (standard City distribution list) • Print and distribution of (up to 40) Full Size Plans and Specifications to requested bidders • Distribute addendums Deliverables: Noted above and outlined in fee proposal. Task 3 — Pre - purchase of Pipe and Manhole Support Services: Winzler & Kelly will coordinate and manage the acquisition of 1,400 Linear Feet (LF) of 42- inch Reinforce Concrete Pipe with a liner. A final decision on the liner type (HDPE, PVC) has not been made; we will work closely with City Engineering and O &M staff to make this selection. This pipe procurement process will be coordinated with the City's Purchasing Agent. The following services will be provided: • Preparation of Bid Document (6 copies to City) • Preparation and delivery of construction bid advertisement (standard City distribution list) • Print and distribution of (up to 20) bid documents • Evaluate Bids Deliverables: Noted above and outlined in fee proposal. Page 2 of 2 Attachment B Ar 07 Eastside Trunk Server Project - - Position Fisk Description - Design phase PLC Pro" M r A/ C Pro" En r Staff En r Env PM Sr Env Plot Desi Env Bio -u Personnel Surve Crew Estimated LLS Sta[C Survey JC AB $135 $95 Man -Hours CAD CAD b Pro Acct "ect Items WP Total MH DCM/ Utility Consume. Other Jo al Locate/ Costs Total Cost MS $210 WS $165 TW $180 TM 9155 MR $115 PC $160 DD $125 $100 $225 PB $100 BB $95 AA $yp Pothole WRA/SSU 1 Construction Documents I pFfdSE ! - - - -- —_- - -- — _ -- _ 1 3 4 S ' 6 !Final Submitta1(Yhast 1. Rohner Park SLS to Couunerce Blvd S eci fications - -- — O inion of Probable Construction Cost -- -- SFVYPP _ -- ------- ._.__--- - - -- -- Pro ect Mana enient Subtotal 0 0 0 0 0 0 U -- p 0 p -- p- O p _.._ fi - - -.. - -. —_ -- 0 U I. �—... 0 6 3 2 40 11 8 0 0 2 10 16 24 6 4 2p 50 24 48 16 10 98 0 0 0 2 2 4 0 0 8 l6 12 0 0 0 2 2 0 0 0 0 0 0 0_ 0 0 0 0 0 0 0 48 0 4 8 60 0 0 0 16 100 94 $0 $0 $600 $600 $0 _ $0 $564 $600 $13,180 $12,514 0 0 0 0 0 16 29 3� 76 261 _. $0 $0 $674 _ $ 600 $0 $0 $228 $200 $0 $0 3380 $200 0 0 1566 1500 $3,939 $5,208 $12,280 $34,841 $0 2 _ -_ ._ _- _�_ __ - -__ 'Bid Ytrase Services - - -- —_. - -- 'PIfASE ! 1 jPrepare Photo -Ready Bid Rocs lnduded in original contract) -. 2rAdvertise 3 _ 3 Print and D_tstnbut Drawm�s ro Bidd rs (Assume 50 sets) - -- -- - 41Attend Pre Bid Meetm., luded in omal contract) r 5�esp d to 1 ethnical Questions (included in on ag l contract) - -- -- -- 6, re Addenda (u lud d m mtgmal ouuxct) 8 1 --bute Add nd - -.- --- Slt:vdluate Bids (tnchided m ort mdl wutra t) - -- 9IPrcl). e C.unlunncil Ducuilicnts (Lacluded m UI'igu l c'ot lt) SLLll to ldt - -- - -- 3 Pre- purlttdx• uC Pipe dud plunhofes - -- __. - -- )1Prcpawttouutbidducwuuus 3)AdV Ill C .. 7 + 4 Ptmt uud Ui�tnbutc Uucuuieuu t,� B i kis �jEsatudtcl3ids __. .. .. - - -- S ubtotal] I. ... "1'otalFee __ 8 - --� 4 �- -- t2__ 12 _� —( -- - __— - -�" 2 24 47 0 -r- 0 1 _..... -- f._ .. 12 - -- 0 8- - -.+_ -- 8 �� _ 16 -__ 12 �4 ..t -7 - - 38 '-- — I —0 12 ��— -- 8j — t _ +--- G 42 i j 0 -- —- U - 0_ _ - -}j- - -- 0 -- i -- — — - ._- - -- 0 --- -- � 0 — i — -._— - 0 0 - — — -- {.. 0 - O 0 - - - - - �--- U 0 __ —r --1 0 - -� +- O _ 0 - �- 0 _ - I - — - -__� 0 I - I _— - -� -- Z4 __ - -_ _ 0 24 ! -li- 1 ._ - -- 8. a0 � - -- - _ -- 0 _ .. 0 8 __ 24 - -- - --- -- 16 - 0 16 -- 0 -- 0 - 0 28 0 p_ _ _ _ 3W 8336 $10,000 $0 $0 $0 -- - --- $0 so - — - - - -$O — $ t68 $200 $p $O __ $p $p $p $p $0 '76 ,56 $3,388 __ $p $0 - J8 _ _ 8 8 -- -8 2 26 p — 100 -�. '8 66 — 10 _ $01 $U1 _ _ OO_ 810,5 -__— - __ ..... $0 ._._ —$0 $l90 $50' —_ 30 NO -- -- _ - -. —_ _ —__- 60 $300 -- -- - - - -- -- -$1_30 $1,000 - — — $0 $0 50 $25 0 - S21,320 $0 $5,820 $$ 580 $3,720 $1,460 tU4 - 140 I - —�-- 2 l2 2 0 I - --1- 0 -- U - - -�--- l04 -- -- �-- 0 --� -- ._- I $2,826 $13,700 -- 1 - -� - -- $77,481