2007/05/22 City Council Resolution 2007-81RESOLUTION NO. 2007 -81 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AMENDMENT NO. 2 TO THE AGREEMENT WITH BRELJE & RACE ENGINEERS FOR CONSTRUCTION PHASE SERVICES FOR THE ROHNERT PARK BOOSTER PUMP STATION IMPROVEMENTS PROJECT PROJECT NO. 2003-12 WHEREAS, the City of Rohnert City entered into an agreement with Brelje & Race Engineers ( "Consultant'') for design and construction of improvements services dated November 8, 2005, through Resolution No. 2005 -329; and WHEREAS, the City identified desired changes to the project scope and authorized and approved Amendment No. I to the Agreement on November 14, 2006, through Resolution No. 2006 -260; and WHEREAS, the City now requires additional professional services from the Consultant to perform construction management and inspection services. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Amendment No. 2 to the agreement with Brelje & Race Engineers for construction phase services for the Booster Pump Station Improvements Project No. 2003 -12 for an amount not to exceed $63,330. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this amendment in substantially similar forn to the attached amendment for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this date of May 22, 2007. CITY OF ROHNERT PARK Ot - t r� N" N Mayor ATTEST: .r Deputy City Clerk cAtlPOaIW* BREEZE: AYE MACKENZIE: AYE SMITH: AYE STAFFORD: AYE VIDAK- MARTINEZ: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) AMENDMENT NO.2 TO THE AGREEMENT BETWEEN THE CITY OF ROHNERT PARK AND BRELJE & RACE ENGINEERS FOR CONSTRUCTION PHASE SERVICES FOR THE ROHNERT PARK BOOSTER PUMP STATION IMPROVEMENTS PROJECT, PROJECT NO. 2003-12 THIS AMENDMENT is made and entered into as of the 22nd of May, 2007, by and between the City of Rohnert Park (hereinafter referred to as the "City") and Brelje & Race Engineering (hereinafter referred to as the "Consultant "). WHEREAS, the City entered into an agreement with Consultant, dated November 8, 2005, for design and construction of improvements services; and WHEREAS, the City identified desired changes to the project scope and authorized and approved Amendment No. 1 to the Agreement on November 14, 2006; and WHEREAS, the City has requested additional professional services from the Consultant to perform construction management and inspection services. NOW THEREFORE, the City and the Consultant for the considerations hereinafter set forth, mutually agree as follows: Consultant shall perform those services as described in the Scope of Engineering Services for Construction Management, dated April 20, 2007, and attached as Exhibit "A" and the Preliminary Task and Work Hour Estimate, dated April 20, 2007, and attached as Exhibit "B" within the time frames stated therein and for an amount not -to- exceed $63,330. IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed as of the day and year first above written. CITY OF ROHNERT PARK: CONSULTANT: By: By: aGu� Date: Date: 4' ,6o Lo 7 ATTEST: APPROVED AS TO FORM: City Clerk City Attorney EXHIBIT "A" CITY OF ROHNERT PARK BOOSTER PUMP STATIONS IMPROVEMENT PROJECT PROJECT NO. 2003 -12 SCOPE ENGINEERING SERVICES FOR .CONSTRUCTION MANAGEMENT April 20, 2007 INTRODUCTION The City of Rohnert Park completed a Water Model Study Report in 2004 that recommended improvements to the City's seven (7) booster pumping stations which are located at the City's water storage tank facilities_ In November 2005, the City retained Brelje & Race to perform preliminary site reviews and need assessments at each site, inventory and identify existing facilities, recommend improvements, review findings and recommendations with City staff, and prepare the improvement plans and a contract book for the improvements that City staff determined should be implemented. The project will be advertised for bid soon and construction is expected to begin early this summer_ This Scope of Engineering Services is for Construction Management Services for the Booster Pump Stations Improvement Project and includes bidding assistance services, services during construction and post construction services_ Improvements will take place at all seven (7) booster pump station sites and at the central control computer at the City corporation yard. The contractor will be required to limit shut downs and improvement work to a maximum of two (2) booster pump station sites that are in different City water pressure zones at one time and to complete all work within 150 calendar days. I of 4 EXHIBIT rrAu SCOPE OF ENGINEERING SERVICES Brelje & Race would perform the following tasks for this project. Task 1 - Bidding Assistance Services I . Distribute bid documents 2. Review and respond to bidder questions and requests for information 3. _ Conduct pre - construction meeting and lead tour of sites '4. Prepare and distribute addenda, as needed 5. Attend bid opening and tabulate bids 6. . Review bids and check bidder references 7. Recommend award Task 2 — Services During Construction 8. Monitor and update construction schedule and progress 9. Attend construction meetings (assumed to be held b17 weekly) 10. Prepare daily construction reports 11. Log, review and process shop drawings 12.Observe construction (assumed to average 4 hours /day) 13. Log, review, process and respond to requests for information 14. Assist Contractor with programming issues 15. Log, review and process change order requests 16. Review and process progress payment requests 17. Observe start up and testing Task 3 — Post Construction Services 18. Assist with final acceptance and closeout of project 19. Prepare record drawings 20. Review Operation and Maintenance Manuals The performance and completion of all tasks would be subject to the review, direction and approval of City staff. 2 of 4 EXHIBIT PROJECT PERSONNEL PIDject construction management services will be led by Brelje & Race with assistance with .WHK Engineering. The team of Brelje & Race and WHK Engineering performed the preliminary site reviews and needs assessment, inventoried and identified. existing facilities, recommended improvements, reviewed findings and recommendations with City staff, and prepared the improvement plans and a contract book for the improvements that City staff determined should be implemented. The personnel who will be involved in construction management services are Tom Yoko( and Rich UlTommaso from Brelje & Race and Ray Wong from WHK Engineering, all of whom. have been involved in the development of the project and in the preparation. of the improvement plans_ Additionally, it is possible that Charlie Fisher; an engineer who has over 40 years .of construction experience, will also be.involved. Mr. Fisher has been with Brelje &Race for 30 years. More information regarding Mr_ Fisher's experience will be provided upon request_ ESTIMATED FEE The work within this scope of engineering services is proposed to be completed on a time and material basis in accordance with our current rate schedule, a copy of which is attached. For the construction management services included in this scope of services, a total amount of $63,000 has been estimated_ A preliminary task and work hour estimate, which is the basis for this estimate, is attached_ 3 of 4 SERVICES RATE SCHEDULE EFFECTIVE MARCH 1, -2007 PROFESSIONAL SERVICES E%H11111T "A" Senior Principal ...................... ........:..:............................................. .... ....••-- ••---._........-- -- $160.00 /hour AssociatePrincipal ......--°------......•-• ..........................•---°.... .............................._ .135.00 /hour Associate................ ...... _ .......... -...........:.._...-- ............................. _------------------- 115.00 to 125.00 /hour Senior Engineer ............... .. ............ .- ............................................... , ....... ....... 105.00 to 115.00 /hour Engineer. ..........-• ................•---........................... .- ,....------ .....----- ....• - -- .._.._ .... 90.00 to 100.00 /hour Engineering Technician ............................................... ......... .......... ------- _- - - -- 80.00 to 85.00 /hour SeniorPlanner ---------•---------- ............................... .......................... ................... 100 -00 to 150.00 /hour Planner............................................................................. ..................•-- •- ........ 80.00 to 95.00 /hour Senior Surveyor ....... ............ ___ ........... ........... .. . ...... ___ .................. ......... 105 -00 to 115.00 /hour Surveyor.................... ............................................ ... ........................................ 95.00 to 100.00 /hour Survey Technician .... ... .................. ........................................... .............. _. 80.00 to 90 -00 /hour CHID Technician-- --- --- -- -- -- ------ -----•---.......-----.......-.....---. ...................:,.... -..... 85.00 to 95.00 /hour. Constriction Technician .................... .. ............. ..-........................................... 80.00 to 90.OQ /hour EXPERT WITNESS & MEDIATION SERVICES $300.00 /hour FIELD SURVEYING One -man Party $145.00 /hour (Including Surrey Equipment & Vehicle) Two -man Party $195.00 /hour (Including Survey= Equipment & Vehicle) Three -man Party $230.00 /hour (Including Survey Equipment & Vehicle) TYPING AND CLERICAL $55.00 /hour OUTSIDE CONSULTANTS Cost + 15% Handling Charge MATERIALS & OUTSIDE SERVICES Cost + 15% Handling Charge Stages, Pipes, Monuments, Nlaps, Reproduction Services, etc- IN-HOUSE PLOTTING Vellum or Bond $8.00 /sheet Nlylar 20.00 /sheet MILEAGE $0.50 /mile C: \Dacumenti and Settin,gf eane \Loral SerhagATemporag Internet File; \OLICDF\RaleSchedul Std- 2007 -doc 4 of 4 E%HrBIT "B" Construction Management Services City o, f Rohnert Park Booster Pump Stations Improvements Project Project No. 2003 -12 PRELIMINARY TA.SKAND (YORK HOUR ESTIMATE Revised - 0412012007 TASK WORK HOURS Principal Project Engineer Electrical Engineer Clerical BIDDING ASSISTANCE SERVICES 1 Distribute Bid Documents 1 g 4 2 Review and respond to bidder's questions and requests for information 8 8 2 3 Conduct pre bid meeting and lead tour of sites 2 4 1 4 Prepare and distribute addenda, as needed 1 4 4 4 5 Attend bid opening and tabulate bids 4 1 6 Review bids and check bidder references 2 2 7 lRecommetidaward 1 2 1 2 Biddin Assistance Services Subtotal 3 30 19 14 SERVICES DURING CONSTRUCTION 8. Monitor and update construction schedule and progress 1 8 9 Attend construction meetings (assume bi- weekly) 20 1 10 Prepare daily construction reports (see Note 2) 4 70 11 Log, review and process shop drawings 16 16 2 12 Observe construction (see Note 2) 8 158 56 13 Log, review and respond to requests for information 8 20 2 14 Assist Contractor with programming issues 0 15. Log, review and process change order requests 2 8 4 16 Review and process progress payment requests 1 8 4 17 Observe start up and testing (see Note 2) 2 24 0 Services During Construction Subtotal 18 320 1 92 1 3 POST CONSTRUCTION SERVICES 18 Assist with final acceptance_ and closeout of project 2 12 2 19 Prepare record drawings _ 1 16 8 20 _ _ Review Operation & Maintenance Manuals 1 8 16 _ Post Construction Services Subtotal 4 36 24 2 TOTAL ESTIMATE 25 386 135 29 - LVVLGJ: - 1. Work tour Estimates based on 150 calendar days / 107 working days contract duration (22 weeks). 2. The sum of the work hours for Items 10, 12 and 17 is 252. This is based on 4 hours /day for 63 working days. 3. Project locations include 7 individual tank sites and the central control computer at the corporation yard. W.�V412858kESM858 -070420rev rev- cmest.xls L of 2 EXHIBIT "B" (continued) Construction Management Services City of Rohnert Park. Booster Pump Stations Improvements - Project Project No, 2003 -I2 PRELIAIINAR Y COST ESTIAIATE Revised - 0412012007 W: \iM28581ES7 \2858- 074420rev• rev- cmest.xis 2 of 2 Bidding Assistance Services Services During Construction Post Construction Services Staff Rate Hours Cost Hours Cost Hours Cost Principal 150 3 $450.00 18 $2,700.00 .4 $600.00 Project Engineer Ito 30 $3,300.00 320 $35,200.00 36 $3,9b0.00 Electrical Engine 115 19 -$2,185.00 92 $10,580.00 24 $2,760.00 Clerical 55 14 —$6,705.001 $770.00 13 $7lSAO 2 $110.00 Totals $49,195.001 T$7,430.001 Total Estimate $63,330.00 W: \iM28581ES7 \2858- 074420rev• rev- cmest.xis 2 of 2