2006/10/24 City Council Resolution (3)RESOLUTION NO. 2006- 255 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AMENDMENT NO.3 TO TASK ORDER 2004 -14 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR SUPPLEMENTAL ENGINEERING SERVICES ASSOCIATED WITH THE EASTSIDE TRUNK SEWER PROJECT (CITY PROJECT NO. 2004-05) WHEREAS, Winzler & Kelly will provide supplemental services for easement negotiations and public outreach related to the Trunk Sewer, and the design of Snyder Lane improvements from Jasmine Circle to the north side of Rohnert Park Expressway, as related to the City of Rohnert Park Eastside Trunk Sewer Project. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Amendment No. 3 to Task Order No. 2004 -14 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation, for design and supplemental services associated with the Eastside Trunk Sewer (City Project No. 2004 -05). BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this amendment in substantially similar form to the attached amendment for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 24"' day of October, 2006. ATTEST: City Clerk CITY OF ROHNERT PARK ayor Tim Smith BREEZE: AVE FLORES: AVE MACKENZIE: AVE VIDAK- MARTINEZ: AYE SMITH: AYE AYES: (S) NOES: (0) ABSENT: (0) ABSTAIN: (0) AMENDMENT NO.3 TO TASK ORDER NO. 2004-14 CITY OF ROHNERT PARK AND WINZLER & KELLY AUTHORIZATION OF PROFESSIONAL SERVICES TO PROVIDE SUPPLEMENTAL SERVICES ASSOCIATED WITH THE EASTSIDE TRUNK SEWER PROJECT (CITY PROJECT NO. 2004-05) SECTION 1— PURPOSE The purpose of this Task Order is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto dated July 26, 2006. SECTION 2 — SCOPE OF WORK The items authorized by this Task Order are presented in Attachment A -- Scope of Services and consists of tasks necessary to complete supplemental services for easement negotiations and public outreach related to the Trunk Sewer and the design of Snyder Lane improvements as part of the Eastside Sewer Trunk Project. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties heretofore referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 are presented in Attachment B and shall be actual costs (time and materials) not to exceed $143,630. SECTION 4 -- TIME OF PERFORMANCE The work described in SECTION 2 is anticipated to be completed in summer 2007. SECTION S — ITEMS AND CONDITIONS All 'items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 24th day of October, 2006. CITY OF ROHNERT PARK Stephen R. Donley, City Manager (Date) Per Resolution No. 2006- 255 adopted by the City Council on October 24, 2006 WINZLER & KELLY ENGINEERS Marc Solomon, Region Manager (Date) . ATTACHMENT "A" CITY OF ROHNERT PARK EASTSIDE TRUNK SEWER SCOPE OF SERVICES -- AMENDMENT NO.3 SUPPLEMENTAL SERVICES Winzler & Kelly will provide supplemental services for easement negotiations and public outreach related to the Trunk Sewer, and the design of Snyder Lane improvements from Jasmine Circle to the north side of Rohnert Park Expressway, as related to the City of Rohnert Park Eastside Trunk Sewer as follows: Eastside Trunk Sewer Tgsis Task 1-- Easement Appraisal & Negotiations: Winzler & Kelly will meet with meet with representatives of COSTCO and Cotati Rohnert Park Unified School District ( CRPUSD), prepare an appraisal in accordance with standard "Right of Way" appraisal practices, and negotiate acquisition of both temporary and permanent sewer easements crossing the COSTCO and CRPUSD property in Rohnert Park. Sales agreement and deeds will be prepared for execution by property owners and City. Deliverables: Appraisal Sales Agreements & Deeds Task 2 — Public Outreach: Winzler & Kelly will assist the City in executing a Public Outreach Plan, crafting and distributing construction information, and addressing and mitigating concerns with construction impacted residents, businesses, and schools. We will meet with schools and businesses directly impacted by construction to accommodate concerns. A web page will be maintained throughout construction to keep the public informed as the project progresses. A construction "hotline" will to respond to public questions and or complaints. Deliverables: Web Page Construction Phone Hotline Media Material Sn d r Lane Widenin g Tas - 3 Mming!Circig 12 Rohnert Park Expressway Task I — Geotechnical Investigation: 1. No additional Geotechnical Investigation is proposed. 2. Consultant will review and utilize the finding of the geotechnical report for the original design segment of Snyder Lane (south of Jasmine) and review existing geotechnical data available from previously proposed improvements related to adjacent development projects. R values from these reports will be utilized for pavement design. 1 of 4 Task 2 -- Easement(s) — Temporary Construction Easement (TCE): Consultant will obtain Title.Reports for the following parcel(s): + No additional reports anticipated. 2. Consultant will perform field surveys to locate property boundary markers, where available, for the adjacent properties (i.e. subdivision north of Jasmine). 3. Neither a permanent easement, TCE, nor additional rights of way are anticipated for the proposed improvements related to this amendment. Task 3 - Utility Coordination, Locating & Potholing: 1. Existing utilities associated with the proposed signal installation and roadway improvements will be located. 2. No additional potholing is proposed. Task 4 - Supplemental Surveys 1. Consultant will prepare supplemental field surveys to support preparation of the contract drawings. The proposed supplemental coverage area is a swath approximately 50 feet wide and generally following the existing right of way along Snyder Lane, from Jasmine to Rohnert Park Expressway, and including the intersection or RPX and Snyder Lane. 2. Consultant will survey mark outs made by utility locator as applicable. Task S — Construction Documents: Task includes incremental additional effort related to the Snyder Lane/RPX Intersection project work associated with the following subtasks: 1. Consultant will prepare plans and specifications suitable for public bid. 2. Plans will detail the work to be completed (as applicable) including temporary facilities, abandonment and demolition of existing facilities, plan and profile drawings for new roadway, utility relocation design, construction details and conceptual traffic control plans showing allowable lane closures, work area, and detours. For traffic design components: Conceptual Signal Design and Modification plans will be prepared, including the lane geometrics, changes to signing on signal poles, preliminary placement or relocation of poles, and existing and proposed new vehicle and pedestrian heads, pull boxes, controller and service cabinets, detector loops and luminaires. Based on comments received from the City .on the conceptual signal plans, Preliminary plans (90 percent submittal) will be prepared. These plans will include all of the existing and proposed new conduits, pullboxes, poles, vehicle and pedestrian heads, controller and service cabinets, luminaires, conductor and equipment schedules, preemption equipment, and all pertinent notes and legends. 2 of 4 3. Drawings will be prepared using AutoCAD Version 2006 software and formatted for 11" x 17" and 22" x 34" sheets. Consultant will utilize City standard details where applicable. Consultant will use its own drafting standards. 4. Specifications will establish the minimum level of quality acceptable including relevant reference standards, allowable materials and construction methods, and testing procedures and acceptance requirements. Consultant will also provide editing of the City's standard bid and contract forms to meet funding agency requirements and the specifics of the project. Special provisions for the traffic signal installation and modification will be prepared based on the Caltrans Special Provisions and modified to meet the City of Rohnert Park's requirements. Specifications and other documents will be prepared using Microsoft Word 2000 software in CSI format. 5. An estimate of probable construction cost will be provided with a detailed breakdown of material and labor costs organized by specification section, with a separate summary in the same format as the bid schedule. 6. A Progress Submittal will be made at an approximate 35% level of completion. Formal design submittals will be provided at the 90% and Final design levels. Review comments from the 90% submittal will be addressed and a Final design will be prepared for back -check review by the City. The City will receive six copies of the design submittals, with half-size (11" x 17 ") drawings. 7. Consultant will provide quality assurance and quality control review of each design submittal before submitting to the City. Task 6 — Bid Phase Services: Task includes incremental additional effort related to the Snyder Lane/RPX Intersection project work associated with the following subtasks: 1. Consultant will provide the City with photo -ready signed originals of the bid documents for reproduction by the City. Drawings will be provided in both full and half -size sets. 2. Consultant will attend the pre -bid meeting and job walk as a representative of the City and be prepared to address technical questions, as appropriate. 3. Consultant will respond to questions from plan holders and document responses. 4. Consultant will prepare addenda to be distributed to plan holders by the City. 5. Consultant will attend the bid opening at the City's offices in Rohnert Park. Consultant will evaluate bids and prepare the bid tabulation. A letter of recommendation for award will also be provided. 6. Consultant will prepare photo -ready conformed documents incorporating all addenda for reproduction by the City. Drawings will be provided in both full and half -size sets (5 EA, respectively). 3 of 4 Task 7 -- Project Management: Task includes incremental additional effort related to the Snyder Lane/RPX Intersection project work associated with the following subtasks: 1. Consultant will conduct a project kickoff meeting with the City's staff. The kickoff meeting will be used to communicate the project work plan, propose design alternatives, gather background information, and solicit comments and questions from the City. 2. Consultant will convene regular coordination meetings at its office in Santa Rosa to review progress to date, identify key issues on the critical path, and prepare action items for the next two -week period. The City will be invited to attend the coordination meetings at their option. 3. Consultant will submit progress reports each month summarizing the work accomplished, critical issues requiring resolution, and budget and schedule status. The progress reports will be submitted with invoices that identify the City's project number, hours worked, hourly charges with staff classifications, progress and percent completion. Task S --- City Coordination and Support Services: Task includes incremental additional effort related to the Snyder Lane/RPX Intersection project work associated with the following subtasks: I . Consultant will coordinate and support the City staff in various meetings (our fee includes S Meetings) and tasks such as reports to Council, attending meetings with staff, developers and others upon request, and attending design team meetings to communicate City administrative /policy requirements needed to make project implementation consistent with said City requirements. 2. Consultant will prepare record drawings following the completion of the project. Record drawings will be completed using clear and accurate markups provided by the contractor. 4of4 Eastside Trunk Sewer Project Amendment No. 3 9/13/2006 Desi n Personnel Estimated Man -Hours by Project Item: _Position_ PIC Pro' A/ C Pro' Staff Strnet Elec Env Survey LLS Staff CADD Acct WP Total Data Geoff W -Trans Consum- Other Total_ _ Mgr En r En r En r En r Bio Crew Survey_ MH instincts Hornsb ables Costs Cost Task Description - Design Phase - P g i MS MMIBS TW TM MH SB EP JO AB LW BB AA C =�' £- 'Y ;' \ \ \\ '"-?i _ ..t?b L+?i� 3 / "ry,Y.n 7 '.. �.P.euc✓n .r.,.��%2a.eoxhv.G \...... -. t „.. : ,..t. ... ._ . ..,.. . ,. _ L a ...,._.._.. [ ........ __.._.”. ...... `�1.�.�.._.".".. c'k} I Public Outreach 8 j 40 Subtotal ! 8 40 Snyder Lane Widenin Tasks Jasmine Circle to Rohnert Park Expresswa T €eci►lEl ittYBtJga4r9i?_ _ W .< — [ IIGeotechmcalInvestigatior 8 21 Klement Geotechnical Recommendation Subtotal 8 2 Easements ,Temp onstructe04 Easements " ", .; [ I - .. I Title Reports � 21 Supplemental ROW Surve} 3 Legal Descriptions - -_- : 1 .. ___- . ; —__ - - -- . .... I ,_ -- - 4!Easement Acquisition Assitance �3. _ ... ._._.. _..._ Subtotal ta� . 1 Utility Locating — 2 i Utility Potholing i - -, - - - 3! Utility Coordination - -- - -_ _ Subtotal 4 Sup�Im - .:,.,,,.�_..a, 1 Field Surveys " 2'Uti(ity Surveys - - - - Subtotal S�C,onstraction Iiocuments _ { } t 1:35% Plans 2:;35% Specifications - - 3,35% Cost Estimate 4;90% Plans 4.. 2' 16; 121 121 - -- 5!90% Specifications -- - - _.- .. _..._ - - - -p - -_ - - 4 2 16 g 8 6;95% Cost Estimate 4 2 4. 12 7' Final Plans 4 2. 16 121 12 8! Final Specs -- 4 2! 12: 81 Final Cost Estimate 2' 2 12 9 Landscape & Irrigation (Optional' Subtotal 22 12 68 24 36 40 6 tBtd.:Phase Services - , € I Pre -bid Meeting & Questiow 4 2'Addenda 2 g _ Subtotal 6 8 1 City Meetings 4 - i 2 Coordination Meeting 4 - - - — - - - -- 3' Progress Report /Financial /Project Tracking 16 Subtotal 24 $" `City Coorii natiott c4c" Suppo rt ScrAces k _ I Council Meeting /External Coordination Meeting 2 Record Drawings 8 / - Subtotal 8 12 Total Fee 44 1 8 40 i ri Luc r� aiaa�goiare He quisttion or x.osrco nasemwm 1 Subtotal 1 12 1 1 ! $ � �".i ;'f4' Reis �L-. «may / / k i i'i /p., y Y/ t tl 4r .�