Loading...
2006/07/11 City Council Resolution (3)RESOLUTION NO. 20W194 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK, CALIFORNIA, ADOPTING A MITIGATED NEGATIVE DECLARATION AND A MITIGATION MONI'T'ORING PROGRAM FOR THE EASTSIDE TRUNK SEWER PROJECT #2004 -05 AND PHASE 1 SNYDER LANE ROADWAY WIDENING PROJECT (PROJECT #TR 26) AND APPROVING THE PROJECT WHEREAS, on September 28, 2004, the City Council gave direction to investigate the construction of the Eastside Trunk Sewer Project extending east from the City's sewage lift station on J. Rogers Lane to increase reliability and capacity of the critical conveyance system as part of the 2004 -05 Capital Improvement Program budget; and WHEREAS, on November 22, 2005, the City Council gave direction to provide for the design and construction of the Eastside Trunk Sewer Project as part of the 2005 -06 Capital Improvement Program; and WHEREAS, construction of the existing City sewer system was initiated in 1956 and has a limited capacity to convey existing and projected future flows identified in the City's General Plan; and WHEREAS, the City Engineer reviewed a Route Study prepared dated December 2004, which concludes that a route primarily along Redwood Drive, Santa Alicia Drive, Southwest Boulevard, and Snyder Lane will best serve the City's needs; and WHEREAS, the City Engineer reviewed a Pre- Design Report dated September 2005, which describes in detail the Eastside Trunk Sewer Project; and WHEREAS, as part of the Eastside Trunk Sewer Project, the City will also construct improvements to Snyder Lane between Jasmine Circle and Southwest Boulevard, also described in the City's General Plan, in order to complete both projects concurrently and avoid redundant construction impacts; and WHEREAS, the proposed Snyder Lane improvements are identified as the Phase 1 Snyder Lane Roadway Widening Project #TR -26 in the City's 2006 -07 and 2007 -08 Capital Improvement Program; and WHEREAS, at the request of the City Engineer, a Draft Initial Study and Proposed Mitigation Negative Declaration for the Eastside Trunk Sewer Project, including the Phase 1 Snyder Lane Roadway Widening Project, was prepared in conformance with the requirements of the California Environmental Quality Act; and WHEREAS, on April 28, 2006, the Draft Initial Study and Proposed Mitigated Negative Declaration were circulated for a period of no less than 30 days and a Notice of Intent to Adopt a Mitigated Negative Declaration was published prior to that circulation period in the Press Democrat and mailed to adjacent property owners within 300 feet of the project alignment; and WHEREAS, on June 13, 2006 the City Council received public comments at which time interested persons had an opportunity to testify regarding the Draft Initial Study and Proposed Mitigated Negative Declaration; and; WHEREAS, the Draft Initial Study and Response to Comments did not identify any significant environmental impacts of the project after implementation of mitigation measures, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT PARK DOES RESOLVE, MAKE FINDINGS, DETERMINE, AND ORDER AS FOLLOWS: That the above recitations are true and correct; That the Council has read, reviewed, and considered the information contained in the Mitigated Negative Declaration, and the Mitigated Negative Declaration reflects the Council's independent judgment and analysis; That on the basis of the whole record before the Council, there is no substantial evidence that the project, as mitigated, will have a significant effect on the environment; That the record of the proceeding on which this decision is based shall be maintained by the Planning Director at the City of Rohnert Park Planning Department; and NOW THEREFORE BE IT RESOLVED, based on the records and the findings made above, the Council determines that the Eastside Trunk Sewer Project will not have a significant effect on the environment with implementation of the mitigation measures identified in the Mitigated Negative Declaration; and BE IT FURTHER RESOLVED, that the City Council adopts the Mitigated Negative Declaration and Mitigation Monitoring Program for the proposed project and approves the Eastside Trunk Sewer Project. DULY AND REGULARLY ADOPTED on this I Ith day of July, 2005, by the City Council of the City of Rohnert Park. CITY OF ROHNERT ATTEST: / � C RolINBRT N't City Clerk ^G� _% 19 � � CALIPORIOp BREEZE: AYE FLORES: AYE MACKENZIE: AYE VIDAK- MARTINEZ: AYE SMITH: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0)