Loading...
2006/09/26 City Council Resolution (7)RESOLUTION NO. 2006- 241 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING AMENDMENT 4 TO TASK ORDER 2004 -10 WITH WINZLER & KELLY FOR FINALIZATION OF THE CITY'S 2005 URBAN WATER MANAGEMENT PLAN WHEREAS, the City is required by California Water Code Division 6, Part 2.6, Sections 10610 through 10657 to prepare and adopt an Urban Water Management Plan (UWMP) every 5 years; and WHEREAS, the City has worked with the Sonoma County Water Agency (Agency) and its consultants for approximately 2 years to develop the UWMP; and WHEREAS, both the City and Agency agree that the analysis and description required to complete the UWMP is best completed by the City Engineer and his designees because it relates to the City's local supplies and management strategies; and WHEREAS, Winzler & Kelly is most familiar with the City's water supply systems because of its work on the Citywide Water Supply Assessment; NOW, THEREFORE, be it resolved by the City Council of the City of Rohnert Park that it does hereby authorize and approve Amendment No. 4 to Task Order No. 2004 -10 with Winzler & Kelly Consulting Engineers to include finalization of the 2005 Urban Water Management Plan for an amount not to exceed $25,000. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 26h day of September, 2006. ATTE T: City Clerk (19 CITY OF ROHNERT PARK Mayor Trim. _Smith 0— oNe�MP.: o. LIMORN BREEZE: AYE FLORES: AYE MACKENZIE: AYE VIDAK- MARTINEZ: ABSENT SMATIJOAYE AYES: (4) NOES: (0) ABSENT: (1) ABSTAIN: (0) AMENDMENT 4 TO TASK ORDER NO. 2004-10 CITY OF ROHNERT PARK AND WINZLER & KELLY CONSULTING ENGINEERS AUTHORIZATION OF ADDITIONAL ENGINEERING SERVICES TO FINALIZE 2005 URBAN WATER MANAGEMENT PLAN (UWMP) SECTION 1— PURPOSE The purpose of this amended Task Order is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the MASTER AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") dated June 27, 2006. SECTION 2 — SCOPE OF WORK The additional items authorized by this Task Order are presented in Attachment "N'— Scope of Services. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties hereto referenced in SECTION I above. The additional cost for the additional services as set forth in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charges in accordance with the provisions of the AGREEMENT and as shown in Attachment "B" for an amount not -to- exceed $25,000. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 shall be completed during Fiscal Year 2006/07 or as extended by the City Manager. SECTION 5 -- ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 26th day of September, 2006. CITY OF ROHNERT PARK Stephen R. Donley, City Manager (Date) Per Resolution No. 2006- 241 adopted by the City Council on September 26, 2006 WINZLER & KELLY ENGINEERS Theodore B. Whiton Regional Manager (Date) ATTACHMENT "A" AMENDMENT 4 TASK ORDER NO. 2004-10 SCOPE OF SERVICES FINALIZE THE 2005 URBAN WATER MANAGEMENT PLAN 1. General Description and Background California Water Code Section Division 6, Part 2.6, Sections 10610 through 10657 (the Urban Water Management Planning Act) requires that all public water suppliers with more than 3,000 service connections prepare an Urban Water Management Plan (UWMP) every 5 years. Historically the City has worked with the Sonoma County Water Agency to participate in the preparation of a single document that covers all of the Agency's contractors. The Agency began the UWMP preparation process in 2004 and hired a consultant to prepare an individualized document for each of its contractors. Over the course of the past 2 years, it has become clear that because of the complexity of the City's supply sources (which include groundwater and recycled water in addition to Agency supply); it would be efficient for the City to utilize the Agency's initial draft document in order to independently complete its UWMP. The City will continue to coordinate with Agency staff, its consultants and other contractors on a coordinated presentation of the Agency's water supply. 2. Project Tasks Task I Prepare Administrative Draft of the UWMP Using the MS Word files provided by the Agency and working from both the Citywide Water Supply Assessment and supplemental demand information developed by the Agency, Consultant shall prepare an administrative draft of the UWMP for review by City staff and the City Attorney. The administrative draft will be delivered as an MS Word file to facilitate review. Task 2 Finalize the UWMP The Consultant will finalize the UWMP based on comments received from City staff and the City Attorney. The budget includes an allowance for preparing graphics and preparing an Urban Water Shortage Contingency Plan to implement the provisions of Municipal Code Section 13.66. If the City is able to secure either graphic files or a draft of the Urban Water Shortage Contingency Plan from the Agency, the Consultant's level of effort will be reduced accordingly. Fifteen hard copies, one copy ready original and one CD of the Final UWMP and will be delivered to the City. Task 3 Assist with Adoption The Consultant shall assist the City with the adoption process including, assisting in coordination with other agencies, responding to comments received end preparing for and attending the required public hearing. Consultant share prepare an MS Powerpoint presentation for City's use. sang class $24,720 Attachment s Pee Estimate for Finalizing the 2008 Urban Water Management Plan Prkhctpa! a 7 6 2 sumot 6 1 crew Print vj in project pr*d Boarwal Staff Tech Licensed Survey Survey chwo B wmw Engineer ErOhw Ergk»x 0081WW 9&Dr Surveyor CAD Crew CADoownent8 and SeONWVwuMLoo2i SeW p kTenW=ry lydernM FIWOLK231TO 200410 Amend 4 Attach B_4.20-06 011812D08 ::ie4iu { subs & subtotad Tva M.O. Pawson rda era TO N. Cox a AstoY N nIa Ne o ` kd.,ot cost expenses dorasammbies experues subtotal cost Task S 205 S i60 155 110 S 110 S go S 65 S 110 $ 0 $ Task 1 iku0ae U*W 38 6 $ 8.440 $ $ 220 E 220 S 8,880 Task 1.1 Prepar* A tntstre0vs DrMR UWMP - 18 18 S 0,200 $ $ 380 $ 300 S 91500 Task 12 ft iNtlN1P • 40 40 - - - - 20 $ 300 S 300 $ 8,500 Task 1.3 As9W vft Adoptlon - Subtotals 116 36 24 176 23,840 BBD 680 24,720 CADoownent8 and SeONWVwuMLoo2i SeW p kTenW=ry lydernM FIWOLK231TO 200410 Amend 4 Attach B_4.20-06 011812D08