2005/06/14 City Council Resolution (16)RESOLUTION NO. 2005-179
APPROVAL OF CONTRACT CHANGE ORDER #2
TELSTAR INSTRUMENTS, INC.
SEWER FLOW METER REPLACEMENT PROJECT
PROJECT NO. 2003-32
FOR $11,521.20
WHEREAS, the City received bids and entered into a construction contract with
Telstar Instruments, Inc. on October 12, 2004 to replace a sewer flow meter at the City
pump station; and
WHEREAS, since the commencement of the contracted work, Change Order #1
was authorized so that a second sewer flow meter would be replaced; and
WHEREAS, during the course of the second flow meter installation, unforeseen
conditions resulted in changes in the scope of work necessitating a field change order,
which was approved on site in order to reduce delays to the project; and
WHEREAS, adjustments to the telemetry system are required to complete the
second flow meter installation.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of
Rohnert Park that Contract Change Order #2 with Telstar Instruments, Inc. is approved
for the amount of $11,521.20 and the City Manager is authorized to execute the Contract
Change Order.
DULY AND REGULARLY ADOPTED this 14th day of June, 2005.
CITY OF ROHNERT PARK
ayor
ATTEST:
ig
�.p1111ERT
City Clerk a a
FLORES: AYE SMITH: AYE SPRADLIN: ALMINT VIDAK- MARTINET: &" MACKENZI E: AYE
AYES: (4) NOES: (0) ABSENT: (1) ABSTAIN: (0)
r