2005/08/09 City Council Resolution (14)RESOLUTION NO. 2005-250 APPROVAL OF CONTRACT CHANGE ORDER #3 TELSTAR INSTRUMEN'T'S, INC. SEWER FLOW METER REPLACEMENT PROJECT PROJECT NO. 2003-32 FOR $5,1160.00 WHEREAS, the City received bids and entered into a construction contract with Telstar Instruments, Inc. on October 12, 2004 to replace a sewer flow meter at the City pump station; and WHEREAS, since the commencement of the contracted work, a second sewer flow meter was authorized for replacement through the project; and WHEREAS, the two sewer flow meters and corresponding transmitters have been replaced and are now operational; and WHEREAS, adjustments to the telemetry system are required. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that Contract Change Order 93 with Telstar Instruments, Inc. is approved for the amount of $5,860.00 and the City Manager is authorized to execute the Contract Change Order. DULY AND REGULARLY ADOPTED this 9'h day of August, 2005. ATTEST: City Clerk CITY OF ROHNERT PARK Mayor 0.o0NEAT pq BREEZE: AYE FLORES: AYE SMITH: AYE AYES: (5) NOES: (0) vwAK MARTINEZ: AYE MACKENZIE: AYE ABSENT: (0) ABSTAIN: (0) CITY OF ROHNERT PARK 6750 Commerce Boulevard Rohnert Park, CA 94928 Telephone (707)588 -2232 FAX (707)588 -2238 Sewer Flow Meter Replacement Project Project No. 2003 -32 CONTRACT CHANGE ORDER NO. 3 819105 item Description Amount Modify the program of PLC RTU72A located in Sewer Lift Station to add the $ 6,380.00 1 totalizer function for Station #I and #2 flows; modify the SCADA screen "Sewer Lift Station" to add the totalizer reading for both station #I and #2 flows and fix the existing station #1 flow rate reading problem; modify the SCADA screen "Current Flow Rate" to fix the existing Sewer Lift Station # 1 flow rate reading problem; modify the SCADA screen "Flow Total" to add "Avg. Daily Flow (Month)" reading and "Total Flow (Month) reading for Sewer Lift Station #I and #2 and total of both stations; modify the Excel spreadsheet "Monthly Wastewater Report.xls" to have the Sewer Lift Station # 1 and #2 flow rate readings; provide copy of the updated files on CD. Credit for Adder and miscellaneous materials in CCO #2 $ (540.00) Total Contract Change Order No. # 3 (items 1 & 2) $ 5,860.00 Existing Contract Amount $ 59,601.20 Revised Contract Amount $ 65,461.20 Recommended by: Shishir Doctor, Project Engineer, Winzler & Kelly Date Recommended by: g J d 4an�-Injen�kins,, City Engineer, Date Approved by: f 7 Steve Donley, City ger Date Per Resolution No. 2005 -y3Q adopted by the ohnert Park City Council on August 9, 2005 We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted by: Robert Marston, Jr., Telstar Instruments Date RR i_ ELECTRICAL CONTRACTING, INSTRUMENTATION SALES & SERVICE Electronic • Pneumatic • Chemical • Telemetry • Analytical • Computer Systems July 15, 2005 Winder & Kelly Sent via e-mail to Shishirpoctor @w- and -k.com Attn: Shishir Doctor Subj: Rohnert Park SCADA system upgrades for Sewer Lift Station #1 and #2 Flow Readings Ref: SR13945, CO #3 Dear Shishir, During our last visit to the Sewer Lift Pump Station and Corp Yard, we found that the existing SCADA system does not include the flow rate reading for Station #1, and totalizer readings for both stations. There is no totalizer function in PLC RTU 72A for these flow signals. Therefore a modification to the PLC program and the Intouch program is needed to have this information available in the SCADA system. The scope of work follows: 1) Modify the program of PLC RTU72A located in Sewer Lift Station to add the totalizer function for Station #1 and #2 flows. 2) Modify the SCADA screen "Sewer Lift Station" to add the totalizer reading for both station #1 and #2 flows, and to fix the existing station #1 flow rate reading problem. 3) Modify the SCADA screen "Current Flow Rate" to fix the existing Sewer Lift Station #1 flow rate reading problem. 4) Modify the SCADA screen "Flow Total" to add "Avg. Daily Flow (Month)" reading and "Total Flow (Month)" reading for Sewer Lift Station #l, Station 92, and the total of both Stations. 4) Modify the Excel spread sheet "Monthly Wastewater Report.xls" to have the Sewer Lift Station 41 and #2 flow rate readings. 5) Provide copy of the updated files on CD. The price for the labor and materials for this project is .......................... ............................... $6,380.00 As part of CO #2, we met with yourself and the Rohnert Park representative to discuss the requirement for the flow signal and programming. As per your request, we connected the flow signal from Station 1 to Santa Rosa's telemetry. We did not use the adder because it was decided to have individual flow signals rather than cumulative. The adder was returned. You will receive a credit of $540 for the adder and miscellaneous materials. The labor for the adder in CO #2 was instead used to re- route the cables to Santa Rosa's telemetry box, connect and test. 4212 North Freeway Blvd, Unit 4 • Sacramento, CA 95834 0 916 -646 -1999 s Fax 916- 646 -1096 1717 Solano Way, Unit 34 • Concord, CA 94520 •925 -671 -2888 • Fax 925 - 671 -9507 202 South Douty Street • Hanford, CA 93230 • 559 - 584 -7116 • Fax 559- 584 -8028 Page 2 Shishir Doctor July 15, 2005 The programming part of CO #2 was to provide the additional flow signal on the local telemetry display. This was not completed because we did not have the correct version of the software required. We have received the correct software from the manufacturer. This was completed on July 13`h and this closes out the project. The cost of the additional work for Change Order No. 3 is as follows: The price for the labor and materials for CO #3 is ................................... ............................... $6,380.00 Credit for Adder and miscellaneous materials (in CO #2) is ...... ............................... ($540.00) This price does not include tax or freight. We can commence with this at your direction. This quote is valid for thirty days. This quote is based on information provided to Telstar and may or may not be correct or complete. Please review this proposal for compliance with the complete and final specifications and drawings before acceptance. Our terms are due and payable 30 days from date of invoice. Payments must be made on a minimum of a monthly basis. If payment is not received by the 30th day, a .05% daily service charge (18 -3/4% per annum) will be charged on all accounts past due. Attorney's fees, court costs and costs of collection will be paid to prevailing party. Permits and bonding are excluded unless otherwise noted herein. Our standard insurance applies unless agreed to in writing by Telstar. We accept no responsibility for consequential damages and our standard warranty applies. Please reference the above stated quote number in all correspondence and purchase orders. Unless otherwise noted, this quote is based on standard straight time hours and does not include any prevailing wage rates unless agreed in writing by Telstar. Vehicle expense will be in addition to the price quote, unless specifically excluded within the body of this quote. Only original or faxed copies of quotes will be honored by Telstar, e- mailed quotes are not valid. The price quoted herein is for the labor and materials specifically listed within the body of this quote. Service calls carry a 4 -hour minimum per person. Cancellation charges apply including engineering, labor, materials, quote and estimating time, markup, % of profit, return goods fees, etc. at the time of written cancellation notice to Telstar. If you have any questions, please do not hesitate to contact me at 925- 671 -2888. Sincerely, Jun ohnsen General Manager