Loading...
2005/08/23 City Council Resolution (7)RESOLUTION NO. 2005- 268 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING CONTRACT CHANGE ORDER #1 WITH ARGONAUT CONSTRUCTORS, INC. FOR VARIOUS STREET OVERLAYS 2004 PROJECT NO. 2003-27 FOR $4,7$6.30 WHEREAS, the City approved a construction contract with Argonaut Constructors, Inc. on September 14, 2004; and WHEREAS, changes to the construction contract are needed to best implement the goals of the project; and NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that Contract Change Order #I with Argonaut Constructors, Inc. is approved for the amount of $4,786.30, and BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Contract Change Order. DULY AND REGULARLY ADOPTED this 23`d day of August, 2005. CITY OF ROHNERT PARK Ma or ATTEST: E� I r 11 � .1 -6 IFORtO BREEZE: AY FWRES: AYE SMITH: -AY-E VWAK MARTINEZ: AYE MACKENZIE: AYE AYES: (S) NOES: (0) ABSENT. (0) ABSTAIN: (0) N EE RT PARK w� s7 CITY OF ROHNERT PARK 6750 Commerce Boulevard Cg Rohnert Park, CA 94928 LtFOatitr Telephone (707) 588 -2232 FAX (707) 588 -2238 Various Overlays 2004 Project No: 2003 -27 CONTRACT CHANGE ORDER NO. 1 Date: July 25, 2005 Item Description Amount 1. Additional conform grinding at Redwood / RP Expressway $971.69 2. Additional patch paving requested by City. 3. Additional striping requested by City. Total Contract Change Order No. 1 .............................. ............................... Existing Contract Amount ............................................ ............ ........... ........ Revised Contract Amount ........... ............................... ...... Recommended by: �1I onstru alter, Jim Libby Recommended by: Approved by: 3,205.61 609.00 ........$4,786.30 ....$659,285.00 ....$664,071.30 7 s ar Date City Engineer, Darrin Jenkins Date City Manager, Steve Donley Date We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted by: 8 Z O Argonaut Constructors Date Contract Change Order No. l Page 1 of 1 Various Overlays 2004 Project No. 2003 -27 -- - City Of Rohnert Park r° Contract: Contractor Job: B01 - Various Street Overlays 2004 Ticket No. Work Performed By. Argonaut Constructors Description of work: Conform Grind & Edge Grind @ Redwood & R.P. Expressway 2003 -27 B01 -3 ❑ Signed Change Order Billing Number Report Date Perform Date 003 7.0 6/13/2005 5/11/2005 Labor Charges Craft ID Em Ioyee Name RT Hrs OT Hrs Subs Units RT Rate OT Rate Subs Rate Extended Labor Charges RT Labor 197.31 L01 OE 19 VS Tyree, Sr. 1.00 52.640 52.64 SC 17.00% 33.53 Lot LBR 04 F Leon 1.00 33.440 33.44 OT Labor 0.00 L03 OE 14 DR Rosenquist 1.00 46.250 46.25 sc 15.00% L04 LBR 03 VF Tyree, Jr. 1.00 32.490 32.49 Subtotal Labor 230.84 L05 LBR 03 RL Anderson 1.00 32.490 32.49 Subsistence 0.00 Equipment Charges Equipment ID Class Make Model Al A2 RT Hrs OT Hrs RT Rate OT Rate Delay Factor Extended other Expenses MU 33.00% 0.00 76.17 E01 PT152 TRUCK T &TT 06 -12 1.00 14.080 14.08 Labor Total 307.01 Eoz pT136 TRUCK T &TT 06 -12 1.00 14.080 14.08 E03 BS019 TRACS <50 C 1.00 14.830 14.83 Equipment Charges 42.99 Material /Specialist Work/Lump Sum or Unit Price Payment Invoice No, Invoice Date Vendor Name / Invoice Description Units Unit Price Extended Subtotal MU 15.00% Equipment Total 6.44 49.43 Mot 46101 5/11 /2005 R &S Trucking I 1.000 LS 75.00 75.00 _ M02 91304 STMT 5/11/2005 ABSL Construction / 1:000 Ls 350.00 350.00 Material Charges M03 MAY05AC. 1 5/1112005 Tauzer Sweeping ! 1.000 LS 110.00 110.00 Subtotal 535.00 MU 15.00% Material Total 80.25 615.25 Activity Total 971.69 Bill Surcharge Work Total 971.69 Subcontract Markup Bill Subtotal 971.69 Sharing Discount Accepted: Contractor: For O�er /Resident Engineer's Use Only Bill Total + 971.69 New Bill Resubmittal Approved for Payment 0 Returned for Correction Dat of tio n p ��o (�� Dat R e eived g �' ��r Owner: Page t CIAlTni rrh _ F1A /R illc rnm NTS Universal Bill Form 010704 City Of Rohnert Park Contractor Job: B01 - Various Street Overlays 2004 Work Performed By: Argonaut Constructors Description of Work: Day Patch Pave For Inspector COPY contract: Ticket No. 2003-27 B01-4 ❑ Signed Change Order 004 ` Billing Number 4.0 Report Date 5/25/2005 Perform Date 5/17/2005 Labor Charges Craft ID Employee Name RT Hrs OT Hrs Subs Units RT Rate OT Rate Subs Rate . Extended Labor Charges RT Labor 1,240.00 SDI OE 19 VS Tyree, Sr. 1.00 52.640 52,64 Sc 17.00% 210.81 L02 OE 14 DR Rosenquist 8.00 46.250 370.00 OT Labor 0.00 L03 LBR 04 JH Mondragon 8.00 33.440 267.52 sc 15.00% L04 LBR 47 GR Corral 8.00 36.240 289.92 Subtotal Labor 1,450.81 105 LBR 03 PT Dore 8.00 32.490 259.92 Subsistence - 0.00 Equipment Charges Equipment ID Class Make Model Al A2 RT Hrs OT Hrs RT Rate OT Rate Delay Factor Extended Other Expenses 0.00 MU 33.00% 478.77 E01 PT152 TRUCK T &TT 06 -12 1.00 14.080 14.08 Labor Total 1,929.58 E02 RL027 ROVIB I -R 3572 8.00 24.510 196.08_ -- E03 PT085 TRUCK T &TT 06 -12 8.00 14.080 112.64 Equipment Charges E04 CP023 AIRCP PORT 025 -045 4.00 19.840 79.36 Subtotal 761.92 15.00% 114.29 Eos PT123 TRUON TRUN 2AXL 4.00 29.980 119.92 MU Eos PT120 TRUON TRUN 2AXL 8.00 29.980 239.84 Equipment Total - 876.21 Material /Specialist Work/Lump Sum or Unit Price Payment Invoice No. Invoice Date Vendor Name / Invoice Description Units Unit Price Extended Material Charges Subtotal 347.67 M01 13268 5117/2005 Windsor Fuel Co. / 1.000 LS 57.75 57.75 MU 15.00% 52.15 M02 146936 5/17/2005 Syar Industries, Inc. / 1.000 LS 180.62 180.62 Material Total 399.82 _ M03 13298 5/17/2005 Windsor Fuel Co. / 1.000 LS 109.30 109.30 Activity Total 3,205.61 Bill Surcharge Work Total 3,205.61 Subcontract Markup Bill Subtotal 3,205.61 Sharing Discount Accepted: Contractor: For Owner /Resident Engineer's Use Only Bill Total + 3,205.61 _ New Bill Approved for Payment Resubmittal El Returned for Correction Dat o Action �r Dat R�ceived r 0 S Owner. Page l NTS Universal Bill Form 010704 EWToucll - EWBdls.com ovc2taJS A C A L I F O R N I A C O R P O R A T I O N CONTRACTORS LICENSE NO 171432 o54�w 0� pw May 21, 2005 City of Rohnert Park c/o W=* Ier & Kelly 495 Tescoru Circle Santa Rosa, CA 95406 Attn : Jim Libby Re: Various Overlays 2004 City of Rohnert Park Argonaut Job No. B -1, Letter No. B 1 -05 Dear Jim, cCO 17�/l 3 - SVzt �(, TEL: (707) 542 -4862 FAX: (707) 542 -3210 EST FAX: (707) 5424897 1236 CENTRAL AVENUE P.O. BOX 639 SANTA ROSA, CALIF 95402 -0639 Per the City's request, please find our quotation for the installation of thermoplastic "Keep Clear" pavement markings and associated 12" thermoplastic traffic stripes. The two markings and two stripes will be installed on Redwood Drive near the Chevron Station. The exact location is to be marked out in the field by the City Inspector. This work is to be done in conjunction with the other contract striping on Redwood Drive. Our quotation is as follows; Install 100 L.F. of 12" thermoplastic stripe and 2 ea thermoplastic "Keep Clear" pavement markings for the lump sum stated below. Subcontractor's quote = $580.00 General Contractor's Mark -up (5 %) 29.00 Lump Sum Total $609.00 We trust that this quotation will meet with your approval and request that a contract change order be issued to include this work within the contract. If you have any questions or require additional information, please contact this office at the number listed above. Sincerely, P nderson Project Manager