Loading...
2005/08/23 City Council Resolution (10)RESOLUTION NO. 2005- 269 A RESOLUTION OF THE CITY COUNCIL. OF THE CITY OF ROHNERT PARK APPROVING CONTRACT CHANGE ORDER #1 WITH ARGONAUT CONSTRUCTORS, INC. FOR VARIOUS. STREET OVERLAYS 2004 PROJECT NO. 2003-27 FOR - $134,089.26 WHEREAS, the City approved a construction contract with Argonaut Constructors, Inc. on September 14, 2004; and WHEREAS, changes to the construction contract are needed to best implement the goals of the project; and NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that Contract Change Order #2 with Argonaut Constructors, Inc. is approved for the amount of - $134,089.26, and BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Contract Change Order. DULY AND REGULARLY ADOPTED this 23rd day of August, 2005. ATTEST: City Clerk CITY OF ROHNERT PARK Mayo 19 LINt)�NIF BREEZE: AYR ELORES- AYF SMITH: AYE VWAK MARTINEZ: W MAGKENZIE: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) R0t{^IERT. 19 - ". 62 CITY OF ROHNERT PARK 6750 Commerce Boulevard Rohnert Park, CA 94928 CAtrFo.RxP. Telephone (707) 588 -2232 FAX (707) 588-22' )8 Various Overlays 2004 Project No: 2003 -27 CONTRACT CHANCE ORDER NO.2 Date: July 25, 2005 Item Description Amount 1. Adjust Contract Quantities to reflect actual work performed. $- 134,809.26 Total Contract Change Order No. 2 .................................. ............................... $- 134,809.26 Existing Contract Amount .............................. ............................... ....................$664,071.30 Revised Contract Amount ....................... ..... ............................... ....................$529,262.04 Recommended by: onst � n Hager, Jim Libby Date Recommended by: Approved by: City Engineer, Darrin Jenkins City Manager, Steve Donley Date Date We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted by: on S Argaut Constructors Date Contract Change Order No.2 Page 1 of 1 Various Overlays 2001 Project No. 2003 -27 Various Overlays 2004 City of Rohnert Park Project # 2003 -27 CCO #2- Balancing Prepared by: Jim Libby, Construction Manager Date: 7/25/2005 Item Bid Item # Description 1 Project Sign 2 5' Pavement Grinding 3 10" Pavement Grinding 4 Pavement Removal (Enterprise Dr.) 5 Pavement Reinforcing Fabric 6 Pavement Reinforcement Grid (deleted) 7 1-1/2" AC Overlay and fog seal 8 Deep Lift AC 9 3" AC (Enterprise Dr.) 10 Adjust City Monument to grade 11 Adjust Water Valve to grade 12 Adjust Sewer Cleanout to grade 13 Adjust Manhole Rim to grade 14 Adjust Detector Handhole to Grade 15 4" Thermo Plastic Traffic Stripe 16 6" Thermo Plastic Traffic Stripe 17 8" Thermo Plastic Traffic Stripe 18 12" Thermo Plastic Traffic Stripe 19 Thermo Plastic Pavement Markings 20 Reflective Pavement Markers 21 Non - reflective Raised Pavement Markers 22(F) Type E Detector Loops 23 Remove & Replace Concrete Curb & Gutter TOTAL CONTRACT before balancing Contract Change Orders CCO #1 TOTAL CHANGE ORDERS ORIGINAL CONTRACT + CCO's Balancing CCO #2 FINAL CONTRACT Quantity Unit 5 EA 20300 LF 8900 LF 1530 SY 61700 SY 12000 SY 5005 TON 1020 TON 260 TON 10 EA 57 EA 3 EA 37 EA 24 EA 950 LF 10300 LF 1910 LF 3570 LF 1300 SF 590 EA 2490 EA 58 EA 100 LF Contract Unit Total Price Contract 1,000.00 5,000.00 1.35 27,405.00 2.55 22,695.00 2.50 3,825.00 0.85 52,445.00 68.00 340,340.00 96.00 97,920.00 80.00 20,800.00 250.00 2,500.00 250.00 14,250.00 250.00 750.00 350.00 12,950.00 250.00 6,000.00 0.50 475.00 0.70 7,210.00 1.00 1,910.00 2.50 8,925.00 2.85 3,705.00 3.00 1,770.00 2.00 4,980.00 335.00 19,430.00 40.00 4,000.00 Total to Quantity Amount 5 5,000.00 15,461.00 20,872.35 1,116.00 2,845.80 1460 3,650.00 31,340.00 26,639.00 0.00 - 3,986.38 271,073.84 1,183.45 113,611.20 283.29 22,663.20 8.00 2,000.00 39.00 9,750.00 3.00 750.00 26.00 9,100,00 9.00 2,250.00 0.00 - 9,447.00 6,612.90 1,595.00 1,595.00 3,690.00 9,225.00 1,137.00 3,240.45 381.00 1,143.00 1,537.00 3,074.00 28.00 9,380.00 0.00 - 659,285.00 1 LS 4,786.30 4,786.30 0 4,786.30 664,071.30 134,809.26 nce from Contract )uantit Amount 0.00 0.00 4839.00 6,532.65 7784.00 19,849.20 70.00 175.00 30360.00 25,806.00 12000.00 0.00 1018.62 69,266.16 - 163.45 - 15,691.20 -23.29 - 1,863.20 2.00 500.00 18.00 4,500.00 0.00 0.00 11.00 3,850.00 15.00 3,750.00 950.00 475.00 853.00 597.10 315.00 315.00 - 120.00 - 300.00 163.00 464.55 209,00 627.00 953.00 1,906.00 30.00 10,050.00 100.00 4,000.00 529,262.04 final contract amount 134,809.26 balancing 4,786.30