Loading...
2005/09/13 City Council Resolution (8)RESOLUTION NO. 2005- 283 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING CONTRACT CHANGE ORDER #1 WITH DAMA CONSTRUCTION, INC. FOR ROBERTS LAKE DOG PARK PROJECT NO. 2000-11 FOR $6,789.82 WHEREAS, the City approved a construction contract with DAMA Construction, Inc. on May 10, 2005; and WHEREAS, changes to the construction contract are needed to best implement the goals of the project; and NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that Contract Change Order #1 with DAMA Construction, Inc. is approved for the amount of $6,789.82, and BE iT FURTHER RESOLVED that the City Manager is authorized to execute the Contract Change Order. DULY AND REGULARLY ADOPTED this 13th day of September, 2005. CITY OF ROHNERT PARK Mayor ATTEST: City Clerk o , O 119 ERT BREEZE: AYE FLORES: AYE SMITH: AU VIDAK MARTTNEZ E MACKENZIE: AYE AYES: (3) NOES: (0) ABSENT: (0) ABSTAIN: (0) CITY OF ROHNERT PARK 6750 Commerce Boulevard Rohnert Park, CA 94928 Telephone (707)588 -2232 FAX (707)588 -2238 Roberts Lake Dog Park PROJECT NO. 2000-11 CONTRACT CHANGE ORDER NO. 1 8 -31 -05 Item Description Amount 1 Plans called to connect to downstream side of existing 2" water meter on $ 6,789.82 the north end of the project, install a new backflow preventor and new dog drinking fountain. The existing water meter box is housing cable TV cables. The contractor was directed to install a water service like the proposed service on the south end of the project using the unit price in the original bid. Water main was located approximately 8' below finish grade. The water main was constructed this way to avoid a conflict with an existing crossing storm drain. This is an unforeseen condition and extra costs were incurred by contractor to facilitate this new service. These costs include labor and materials for additional excavation and spoils, slurry backfill material and trench plate rentals. Total Contract Change Order No. # 1 (item 1) $ 6,789.82 Existing Contract Amount $ 37,520.70 Revised Contract Arno nt $ 44,310.52 Recommended by: Public Work%4nspector, George Frostick Dfate Recommended by: Lwm-"� 9 Lo City Eng eer, Darrin Jenkins ate Approved by: City Manager, Steve Donley Date Accepted by: Margaret Clardy, DAMA Construction Date Contract Change Order No. 1 Roberts Lake Dog Park Project No. 2000 -11