Loading...
2005/11/08 City Council Resolution (11)RESOLUTION NO. 2005- 330 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AMENDMENT NO.2 TO TASK ORDER 2004 -10 WITH WINZLER & KELLY CONSULTING ENGINEERS FOR PROFESSIONAL SERVICES ASSOCIATED WITH THE PREPARATION OF A CITY- WIDE WATER SUPPLY ASSESSMENT WHEREAS, on September 23, 2003, the City entered into an agreement with Jones & Stokes to prepare an Environmental Impact Report (EIR) for the University District Specific Plan Area; WHEREAS, a Draft EIR for the project has been circulated for public review and a number of comments have been received on that document related to the City's Water Supply Assessment (WSA); WHEREAS, the City desires that the preparers of the WSA, Winzler & Kelly Consulting Engineers, assist in the preparation of the responses to the comments related to the WSA; WHEREAS, the City has received and reviewed a Scope of Work from Winzler & Kelly to perform the additional work desired; WHEREAS, the cost of the additional work per the proposal shall be the ultimate responsibility of the proponents of the University District Specific Plan; WHEREAS, Staff has prepared Amendment Number 2 to Task Order No. 2004 -10 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation, for additional professional services related to responding to comments on the City - Wide Water Supply Assessment as a result of the public review of the University District Specific Plan Draft EIR; WHEREAS, the City Council of the City of Rohnert Park has reviewed and considered the information contained in the Staff Report and all relevant materials regarding Amendment Number 2 to Task Order No. 2004 -10 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve Amendment No. 2 to Task Order No. 2004 -10 by and between Winzler & Kelly Consulting Engineers, a California Corporation, and the City of Rohnert Park, a municipal corporation, for additional professional services related to responding to comments on the City - Wide Water Supply Assessment as a result of the public review of the University District Specific Plan Draft EIR. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute this agreement in substantially similar form to the attached agreement for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this date of November 8, 2005. ATTEST: 30MN ITY OF ROHNERT PARK ig City 6FOarAt BREEZE: AYE FLORES: AYE SMITH: AYE VIDAK- MARTINEZ: AYE MACKENZIE: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0) AMENDMENT No. 2 TASK ORDER NO. 2004-10 CITY OF ROHNERT PARK AND WINZLER & KELLY AUTHORIZATION OF PROFESSIONAL SERVICES TO PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR THE CITY -WIDE WATER SUPPLY ASSESSMENT SECTION 1— PURPOSE The purpose of this Task Order is to authorize and direct Winzler & Kelly to proceed with the work specified in Section 2 below in accordance with the provisions of the AGREEMENT between the City of Rohnert Park ( "City ") and Winzler & Kelly ( "Consultant ") hereto dated June 24, 2003. SECTION 2 — SCOPE OF WORK The items authorized by this Task Order are presented in Attachment A — Scope of Services and consists of tasks necessary to respond to public comments received on the City's Water Supply Assessment as part of the review process for the University District Specific Plan Area Draft Environmental Impact Report. SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the AGREEMENT between the parties heretofore referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charge, which is attached as Attachment B. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 is anticipated to be complete within 3 months of the City's Notice to Proceed. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this day of 2005. CITY OF ROHNERT PARK WINZLER & KELLY ENGINEERS Stephen Donley, City Manager (Date) Marc Solomon, Region Manager (Date) Per Resolution No. 2005- adopted by the City Council on Attachment A Scope of Services Overview: The City has circulated the draft Environmental Impact Report for the University District Specific Plan Area which included the City -wide Water Supply Assessment as a technical appendix. The City received 29 comment letters and took oral testimony at a Public Hearing. A number of the comments made on the Draft EIR were directed at the Water Supply Assessment. In order to assure a consistent presentation of the technical findings in the Water Supply Assessment, Winzler & Kelly will provide written responses to these questions. Tasks included in the Scope of Services 1. Attend general coordination meetings or conference calls with City staff, City Attorney and Jones & Stokes. 2. Review comment letters and public hearing transcripts that have been preliminarily organized by Jones & Stokes. 3. Update comment organization and numbering as necessary to provide clear responses to the technical questions put forward in the comments. 4. Develop a list of comments that can be grouped for "Master Response ". Review with City staff, City Attorney and Jones & Stokes. Finalize based on comments received. 5. Prepare preliminary written Master Responses and individual responses. Review with City staff, City Attorney and Jones & Stokes. Finalize based on comments received. 6. Attend Planning Commission and City Council Public Hearings as requested to present responses and address questions that may be raised by the decision makers. Attachment B Rate Schedules L UHDORFF AND SCALMANINI CONSULTING ENGINEERS 500 FIRST STREET WOODLAND, CALIFORNIA 95695 SCHEDULE OF FEES - ENGINEERING AND FIELD SERVICES Janu ,2005 Professional: Y Senior Principal $ 200.001hr. Principal Professional $135.001hr. Project Manager $135.001hr. Senior Professional $129 001hr. Project Professional $104.001hr. Staff Professional $ 78.001hr. Technical. Engineering Inspector $ 85.001hr. Engineering Assistant $ 70.00/hr. Technician $ 68.001hr. ACAD Drafting $ 80.001hr. Clerical Support: Word Processing, Clerical $ 45.001hr. Vehicle Use $ 0.48 1mi. AiT t Use $ 325.001hr. Subsistence Cost Plus 15% Groundwater Sampling Equipment $130.00/hr. ncludes Operator) copies .20 ea. Pro essional or Technical Testimony 200% of Regular Rates Re uested Technical Overtime 150% o Regular Rates Outside Services/Rentals Cost Plus 15% Services by Associate Firms Cost Plus I S% �TIN2LER�-ZK�;LLY C O N S U 1 i 4 N G E N G t N E E R 8 FEE SCHEDULE - CENTRAL CALIFORNIA (Effective July 2005) Hourly Rates(*) Principal Associate Engineer Senior Project Engineer Project Engineer Staff Engineer Associate Scientist Senior Project Scientist Project Scientist 3- Person Survey Crew 2- Person Survey Crew 1- Person Survey Crew Construction Manager Construction Inspector Staff Technician Designer CADD Word Processor & Clerical Support $ 180-245 160-210 115-170 90-120 65-90 145-185 110-150 80-120 240-300 160-215 80-130 110-160 80-110 55-115 75-125 75-115 45-85 Employee time will be billed in accordance with the fees listed above. These rates are subject to change on an annual basis. For other than professional employees, time spent over 8 hours per day, time spent on swing shifts, and time spent on Saturdays will be charged at 1.5 times the hourly billing rate. Work on Sundays will be charged at 2.0 times the hourly billing rate and holiday work will be charged at 2.5 times the hourly billing. rate. All field personnel charges are portal to portal. Professional employees will not be charged out at premium charge rates for overtime work Expenses and other similar project related costs are billed out at cost plus 15 %. The cost of using equipment and specialized supplies is billed on the basis of employee hours dedicated to projects. Our rates are: A. Office consumables $5.001hr B. Environmental Department, Survey and inspector consumables $10.001hr C. Environmental, Construction and Land Surveying equipment Various at market Payment for work and expenses is due and payable upon receipt of our invoice. Amounts unpaid thirty (30) days after the issue date of our invoice shall be assessed a service charge of one and one half (1.5) percent. �j These rates do not apply to forensio-related services, or to work for which Prevailing Wage obligations exist. It is the responsibility of the client to notify winzler & Kelly in writing rf Prevailing Wage obligations are applicable, in which case the fees will be adjusted proportionate to the increase in labor cost. Central CA Fee Schedule July 2005