Loading...
2003/06/10 City Council Resolution (8)RESOLUTION NO. 2003- 138 AMENDMENT TO CONSULTANT'S SCOPE OF WORK FOR THE STUDY FOR REMOVAL OF TWO WASTEWATER PONDS ON CITY -OWNED PROPERTY WHEREAS, the City Council approved the scope of work under the Winzler & Kelly's city engineering support services to perform the work for a fee not to exceed $20,000. The laboratory costs were additional direct costs and the work was performed by the City's contract laboratory, Sequoia Analytical Labs; and WHEREAS, additional technical support services and laboratory testing and analyses are needed in order to determine the presence of petroleum hydrocarbons in the soils and to obtain the necessary approvals from the Regional Water Quality Control Board for closure of the ponds. NOW, THEREFORE, Amendment #1 to Winzler & Kelly's scope of work for the Study for Removal of Two Wastewater Ponds on City -Owned Property is approved for a fee not to exceed $18,200. The laboratory testing and sampling by Friedman and Bruya for an estimated cost of $4,000 is also approved. DULY AND REGULARLY ADOPTED this 10th day of June, 2003. CITY OF ROHNERT PARK Mayor ATTEST: CJ Dep City Clerk a Y4� dpJ MACKENZIE: AYE NORDIN: AYE SPRADLIN: AYE VIDAK- MARTINEZ: AYE FLORES: AYE AYES: (5) NOES: (0) ABSENT: (0) ABSTAIN: (0)