1990/08/14 City Council Resolution (3)A RESOLUTION OF AWARD IRA
OF C?N�
OVERLAYS & RECONSTRUCTION 99
PRWECT NO. 1990-4 1
RE'SOLVED by the City Council of the City of Rohnert Lark, California,
that
kiffi-RF.AS, said Council did in open session on the 14th day of August,
1990, publicly examine and declare all scaled proposals or bids for the work
to be done and improvements to be made, as described and specified in the
Council approval of plans given by said Council on June 26, 1990 to which
approval, reference is hereby made for a description of the work and
improvements to be done and the materials, supplies and equipment to be
supplied therefore:
N IEFORE, IT IS OPOERED as follows:
1. That said Council hereby rojects all of said proposals or bids
except that hereinafter mentioned, and hereby awards the contract for doing
the work and improvements and furnishing the materials, supplies and equipment
necessary therefor, to the lowest responsible bidder, to wit:
at the unit prices named in its bid, for a total. contract price of $747,677.48
2, That the Mayor of said City is hereby authorized to make and enter
into a written contract with said successful bidder, and to receive and
approve all bonds in connection therewith, and the Clerk of said City is
hereby directed to attest his signature and affix thereto the official seal. of
said City.
DULY AM) REGULARLY ADOPTED this 14th day of August, 1990.
XrTSST:
Ci tv.-A I erk
COCHRAN AYE ECK -AYE HOPKINS)'KS—EN—TSPIM —AYE HOLLINGSWORTH AYE
AYES (4) NOES LOL ABSENT ( ABSTAIN -0 )—
UERLRVS & RECONSTRUCTION - 1990
'ROJECT NO. 1990 -4
ID SUMMARY
7- Rug-90 Engineer's
Description
'roject Sign
'avement Grinding
'emove RC Paving & Rock -
!eplace u /flC Paving
2" RC Overlay
Idj. Monument to Grade
Idj, TS Nandhole to Gr.
Idj. Uater Value to Gr.
Idj. Uater BO Box to Gr.
Idj. SS Cleanout to Gr.
Idj. SS Manhole to Gr.
Idj. Pull Box to Gr.
.og Seal
' hermoplastic Pvmt.
itriping & Markings
! eflective Raised Pumt.
{arkers
Ion-refl. Raised Pumt.
(arkers
'OTALS
Estimate
Quant. Unit Unit Price Total
Vintage Grading
& Paving Dan Did Co. Argonaut Constructors
Unit Price Total Unit Price Total Unit Price Total
1 Efl $ S5O.00 $ 550.00 $ 100.00 $ 100.00 $ 1,000.00 $ 1,000.00 $ 350.00 $ 3SO.00
45,000 Lf 0.90 40, 500.00 1.00 45, 000.00 1.25 S6,250-00 1.00 45, 000.00
9,000 TN 52.00 260,000-00 48.50 242, 500.00 48.50 242, 500.00 48.00 240, 000.00
10,600 T N 36.00 381, 600.00 35.50 376, 300.00 34.00 360, 400.00 38.85 411, 810.00
S9 EA 155.00 9,145.00 150.00 8,850.00 125.00 7,375.00 115.00 6,785.00
2 EA 100.00 200.00 100.00 200.00 165.00 330.00 115.00 230.00
141 EA 155.00 21,855.00 150.00 21,150.00 165.00 23,265.00 115.00 16,215.00
7 ER 175.00 1,225.00 100.00 700.00 165.00 1,155.00 115.00 805.00
14 Efl 175.00 2,450.00 100.00 1,400.00 165.00 2,310.00 115.00 1,610.00
S7 ER 300.00 17,100.00 175.00 9,975.00 190.00 10,830.00 180.00 10,260.00
1 EA 175.00 175.00 100.00 100.00 200.00 200.00 150.00 150.00
121,599 SY 0.12 14,591.88 0.12 14,591.88 0.14 17,023.86 0.08 9,727.92
1 LS 27,000.00 27,000.00 19,250.00 19,250.00 19,250.00 19,250.00 19,300.00 19,300.00
783 ER 3.40 2,662.20 3.20 2,505.60 3.20 2,505.60 3.50 2,740.50
3,370 ER 1.75 5,897.50 1.50 5,055.00 1.50 5,055.00 1.50 5,055.00
---- - - - - -- ---- - - - - -- ---- - - - - -- ---- - - - - --
$ 784,951.58 $ 747,677.48 * $ 749,449.46 $ 770,038.42
----------------------- - -
--------------------------------------
- - --
-
---- - - - - -- --
Piombo
North Bay
Construction Co.
Ghilotti
Bros, Inc.
Construction, Inc.
Description
Quant
Unit
Unit Price
Total
Unit Price
Total
Unit Price
Total
-------------------------------------------------------------------------------------------
'roject Sign
1
ER
$ 1,500.00
$ 1,500.00
$ 500.00
$ 500.00
$ SOD-06
$ 500.00
'auement Grinding
45,000
Lf
0.95
42,750.00
1.50
67,500.00
1.15
51,750.00
temove RC Paving & Rock-
5,000
TN
63.00
315,000.00
61.00
305,000.00
75.00
375,000.00
teplace u /flC Paving
12' AC Overlay
10,600
TN
37.00
392,200.00
38.15
404,390.00
37.50
397,500.00
Idj. Monument to Grade
59
EA
110.00
6,490.00
175.00
10, 325.00
125.00
7,375.00
idj. TS Nandhole to Gr.
2
EA
150.00
300.00
200.00
4D0.00
125.00
250.00
Idj. Uater Valve to Gr.
141
ER
110.00
15,510.00
175.00
24,675.00
125.00
17,625.00
Idj. Uater BO Box to Sr.
7
EA
125.00
875.00
175.00
1,225.00
125.00
875.00
Idj. SS Cleanout to Gr.
14
ER
110.00
1,540.00
175.00
2,450.00
125.00
1,750.00
Idj. SS Manhole to Gr.
57
EA
225.00
12,825.00
245.00
13,965.00
300.00
17,100.00
Idj, Pull Box to Gr.
1
EA
160.00
160.00
250.00
2SO.00
125.00
125.00
Fog Seal
121,599
SY
0.13
15,807.87
0.10
12,159.90
0.12
14,591.88
Thermoplastic Pvmt.
1
LS
19,250.00
19,250.00
18,600.00
18,600.00
27,300.00
27,300.00
Striping & Markings
Reflective Raised Punt.
783
Efl
3.20
2,SOS.60
3.25
2,549.75
3.30
2,583.90
'!arkers
Non-refl. Raised Punt.
3,370
ER
1.50
5,055.00
1.60
5,392.00
1.65
5,560.50
yarkers
- - - - --
---- - - - - --
--- - - - - --
TOTALS
----
$ 831,768.47
$ 869,376.65
$ 919,886.28
* Error in Contractor's
Extensions/Total
City of Rohnert Park
14-May-90
1990 -4$+ JGG
Overlays` - 1990
Project No.
L 0C- P_ t0�
Estimated
'roject
Cost
No.
Description
1.
------------------------------------------
Emma, Ethel, Etta, Eagan, Evelyn,
Elaine, Elsa,
Eric
3,780 LF x
32 ft wide x $
0.65 /sf = $
78,624
2.
Evonne Ave.
1,700 LF x
32 ft wide x S
0.65 /sf = $
35,360
3.
Lindsay Ave
850 LF x
36 ft wide x $
0.65 /sf = $
19,890
4.
Santa Alicia Dr
- Arlen Dr to Ava
$
Ave.
0.85 /sf = $
80,172
5.
2,620 LF x 36 ft wide x
Snyder Ln, W Side - E Cotati Ave to Southwest Blvd
1,250 LF x
32 ft wide x $
0.85 /sf = S
34,000
6.
Snyder Ln. - Holly
Ave. to N. City Limits
$ 0.65 /sf = $
21,450
550 LF x
60 ft wide x
7.
Snyder Ln. - RP
Expwy to Southwest Blvd.
$ 0.65 /lf = $
51,480
8.
2,200 LF x
Camino Colegio
36 ft wide x
- Cala Way to 100'
s/o Southwest
Blvd.
1,800 LF x
36 ft wide x $
0.65 /sf = $
42,120
9.
Medical Center
1,100 LF x
Drive
32 ft wide x $
0.65 /sf = $
22,880
10.
Golf Course Dr.
- NWPRR to Red Lion Dr.
$ 0.65 /sf = S
31,200
750 LF x
64 ft wide x
11.
State Farm Dr.
- RPX to Enterprise
$
Dr.
0.65 /sf = $
58,240
1,400 LF x
64 ft wide x
12.
Enterprise Dr.
- State Farm Dr to
Commerce Blvd
2,200 LF x
64 ft wide x $
0.65 /sf = $
91,520
13.
Hunter Dr. - Commerce Blvd to Enterprise
Dr.
560 LF x
64 ft wide x $
0.65 /sf = $
23,296
14.
RP Expressway,
S side - State Farm
Dr. -to NWPRR
1,150 LF x
32 ft wide x $
0.65 /sf = $
23,920
15.
RP Expressway
- Redwood Dr. to S/B
101 Ramps
450 LF x
82 ft wide x $
0.65 /sf = S
23,985
16.
Commerce Blvd,
W side - RPX to Hinebaugh
Creek
730 LF x
32 ft wide x $
0.65 /sf = $
15,184
17.
Utility Court
550 LF x
36 ft wide x $
0.65 /sf = $
12,870
18.
Boris Court
1,300 LF x
36 ft wide x $
0.65 /sf = $
30,420
$
696,611