Loading...
1990/08/14 City Council Resolution (3)A RESOLUTION OF AWARD IRA OF C?N� OVERLAYS & RECONSTRUCTION 99 PRWECT NO. 1990-4 1 RE'SOLVED by the City Council of the City of Rohnert Lark, California, that kiffi-RF.AS, said Council did in open session on the 14th day of August, 1990, publicly examine and declare all scaled proposals or bids for the work to be done and improvements to be made, as described and specified in the Council approval of plans given by said Council on June 26, 1990 to which approval, reference is hereby made for a description of the work and improvements to be done and the materials, supplies and equipment to be supplied therefore: N IEFORE, IT IS OPOERED as follows: 1. That said Council hereby rojects all of said proposals or bids except that hereinafter mentioned, and hereby awards the contract for doing the work and improvements and furnishing the materials, supplies and equipment necessary therefor, to the lowest responsible bidder, to wit: at the unit prices named in its bid, for a total. contract price of $747,677.48 2, That the Mayor of said City is hereby authorized to make and enter into a written contract with said successful bidder, and to receive and approve all bonds in connection therewith, and the Clerk of said City is hereby directed to attest his signature and affix thereto the official seal. of said City. DULY AM) REGULARLY ADOPTED this 14th day of August, 1990. XrTSST: Ci tv.-A I erk COCHRAN AYE ECK -AYE HOPKINS)'KS—EN—TSPIM —AYE HOLLINGSWORTH AYE AYES (4) NOES LOL ABSENT ( ABSTAIN -0 )— UERLRVS & RECONSTRUCTION - 1990 'ROJECT NO. 1990 -4 ID SUMMARY 7- Rug-90 Engineer's Description 'roject Sign 'avement Grinding 'emove RC Paving & Rock - !eplace u /flC Paving 2" RC Overlay Idj. Monument to Grade Idj, TS Nandhole to Gr. Idj. Uater Value to Gr. Idj. Uater BO Box to Gr. Idj. SS Cleanout to Gr. Idj. SS Manhole to Gr. Idj. Pull Box to Gr. .og Seal ' hermoplastic Pvmt. itriping & Markings ! eflective Raised Pumt. {arkers Ion-refl. Raised Pumt. (arkers 'OTALS Estimate Quant. Unit Unit Price Total Vintage Grading & Paving Dan Did Co. Argonaut Constructors Unit Price Total Unit Price Total Unit Price Total 1 Efl $ S5O.00 $ 550.00 $ 100.00 $ 100.00 $ 1,000.00 $ 1,000.00 $ 350.00 $ 3SO.00 45,000 Lf 0.90 40, 500.00 1.00 45, 000.00 1.25 S6,250-00 1.00 45, 000.00 9,000 TN 52.00 260,000-00 48.50 242, 500.00 48.50 242, 500.00 48.00 240, 000.00 10,600 T N 36.00 381, 600.00 35.50 376, 300.00 34.00 360, 400.00 38.85 411, 810.00 S9 EA 155.00 9,145.00 150.00 8,850.00 125.00 7,375.00 115.00 6,785.00 2 EA 100.00 200.00 100.00 200.00 165.00 330.00 115.00 230.00 141 EA 155.00 21,855.00 150.00 21,150.00 165.00 23,265.00 115.00 16,215.00 7 ER 175.00 1,225.00 100.00 700.00 165.00 1,155.00 115.00 805.00 14 Efl 175.00 2,450.00 100.00 1,400.00 165.00 2,310.00 115.00 1,610.00 S7 ER 300.00 17,100.00 175.00 9,975.00 190.00 10,830.00 180.00 10,260.00 1 EA 175.00 175.00 100.00 100.00 200.00 200.00 150.00 150.00 121,599 SY 0.12 14,591.88 0.12 14,591.88 0.14 17,023.86 0.08 9,727.92 1 LS 27,000.00 27,000.00 19,250.00 19,250.00 19,250.00 19,250.00 19,300.00 19,300.00 783 ER 3.40 2,662.20 3.20 2,505.60 3.20 2,505.60 3.50 2,740.50 3,370 ER 1.75 5,897.50 1.50 5,055.00 1.50 5,055.00 1.50 5,055.00 ---- - - - - -- ---- - - - - -- ---- - - - - -- ---- - - - - -- $ 784,951.58 $ 747,677.48 * $ 749,449.46 $ 770,038.42 ----------------------- - - -------------------------------------- - - -- - ---- - - - - -- -- Piombo North Bay Construction Co. Ghilotti Bros, Inc. Construction, Inc. Description Quant Unit Unit Price Total Unit Price Total Unit Price Total ------------------------------------------------------------------------------------------- 'roject Sign 1 ER $ 1,500.00 $ 1,500.00 $ 500.00 $ 500.00 $ SOD-06 $ 500.00 'auement Grinding 45,000 Lf 0.95 42,750.00 1.50 67,500.00 1.15 51,750.00 temove RC Paving & Rock- 5,000 TN 63.00 315,000.00 61.00 305,000.00 75.00 375,000.00 teplace u /flC Paving 12' AC Overlay 10,600 TN 37.00 392,200.00 38.15 404,390.00 37.50 397,500.00 Idj. Monument to Grade 59 EA 110.00 6,490.00 175.00 10, 325.00 125.00 7,375.00 idj. TS Nandhole to Gr. 2 EA 150.00 300.00 200.00 4D0.00 125.00 250.00 Idj. Uater Valve to Gr. 141 ER 110.00 15,510.00 175.00 24,675.00 125.00 17,625.00 Idj. Uater BO Box to Sr. 7 EA 125.00 875.00 175.00 1,225.00 125.00 875.00 Idj. SS Cleanout to Gr. 14 ER 110.00 1,540.00 175.00 2,450.00 125.00 1,750.00 Idj. SS Manhole to Gr. 57 EA 225.00 12,825.00 245.00 13,965.00 300.00 17,100.00 Idj, Pull Box to Gr. 1 EA 160.00 160.00 250.00 2SO.00 125.00 125.00 Fog Seal 121,599 SY 0.13 15,807.87 0.10 12,159.90 0.12 14,591.88 Thermoplastic Pvmt. 1 LS 19,250.00 19,250.00 18,600.00 18,600.00 27,300.00 27,300.00 Striping & Markings Reflective Raised Punt. 783 Efl 3.20 2,SOS.60 3.25 2,549.75 3.30 2,583.90 '!arkers Non-refl. Raised Punt. 3,370 ER 1.50 5,055.00 1.60 5,392.00 1.65 5,560.50 yarkers - - - - -- ---- - - - - -- --- - - - - -- TOTALS ---- $ 831,768.47 $ 869,376.65 $ 919,886.28 * Error in Contractor's Extensions/Total City of Rohnert Park 14-May-90 1990 -4$+ JGG Overlays` - 1990 Project No. L 0C- P_ t0� Estimated 'roject Cost No. Description 1. ------------------------------------------ Emma, Ethel, Etta, Eagan, Evelyn, Elaine, Elsa, Eric 3,780 LF x 32 ft wide x $ 0.65 /sf = $ 78,624 2. Evonne Ave. 1,700 LF x 32 ft wide x S 0.65 /sf = $ 35,360 3. Lindsay Ave 850 LF x 36 ft wide x $ 0.65 /sf = $ 19,890 4. Santa Alicia Dr - Arlen Dr to Ava $ Ave. 0.85 /sf = $ 80,172 5. 2,620 LF x 36 ft wide x Snyder Ln, W Side - E Cotati Ave to Southwest Blvd 1,250 LF x 32 ft wide x $ 0.85 /sf = S 34,000 6. Snyder Ln. - Holly Ave. to N. City Limits $ 0.65 /sf = $ 21,450 550 LF x 60 ft wide x 7. Snyder Ln. - RP Expwy to Southwest Blvd. $ 0.65 /lf = $ 51,480 8. 2,200 LF x Camino Colegio 36 ft wide x - Cala Way to 100' s/o Southwest Blvd. 1,800 LF x 36 ft wide x $ 0.65 /sf = $ 42,120 9. Medical Center 1,100 LF x Drive 32 ft wide x $ 0.65 /sf = $ 22,880 10. Golf Course Dr. - NWPRR to Red Lion Dr. $ 0.65 /sf = S 31,200 750 LF x 64 ft wide x 11. State Farm Dr. - RPX to Enterprise $ Dr. 0.65 /sf = $ 58,240 1,400 LF x 64 ft wide x 12. Enterprise Dr. - State Farm Dr to Commerce Blvd 2,200 LF x 64 ft wide x $ 0.65 /sf = $ 91,520 13. Hunter Dr. - Commerce Blvd to Enterprise Dr. 560 LF x 64 ft wide x $ 0.65 /sf = $ 23,296 14. RP Expressway, S side - State Farm Dr. -to NWPRR 1,150 LF x 32 ft wide x $ 0.65 /sf = $ 23,920 15. RP Expressway - Redwood Dr. to S/B 101 Ramps 450 LF x 82 ft wide x $ 0.65 /sf = S 23,985 16. Commerce Blvd, W side - RPX to Hinebaugh Creek 730 LF x 32 ft wide x $ 0.65 /sf = $ 15,184 17. Utility Court 550 LF x 36 ft wide x $ 0.65 /sf = $ 12,870 18. Boris Court 1,300 LF x 36 ft wide x $ 0.65 /sf = $ 30,420 $ 696,611