2015/04/14 City Council Resolution 2015-061RESOLUTION NO. 2015 -061 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AMENDMENT I TO TASK ORDER 2014 -03 WITH BRELJE & RACE CONSULTING ENGINEERS FOR DESIGN REVIEW ENGINEERING SERVICES FOR THE EAST SIDE TRUNK SEWER PHASE III AND SNYDER LANE WIDENING PROJECT NUMBER 2014 -01 WHEREAS, the City of Rohnert Park (City) General Plan and Public Facilities Finance Plan include projects for East Side Trunk Sewer, widening Snyder Lane and widening the Snyder Lane Bridge at Copeland Creek; and WHEREAS, City has approved Task Order 2014 -03 with Brelje & Race Consulting Engineers (Consultant) by Resolution No. 2014 -03, dated May 13, 2014 for design review engineering services for the East Side Trunk Sewer Phase III and Snyder Lane Widening Project; and WHEREAS, City has requested that Consultant perform additional work beyond the scope of the original agreement, specifically the review of one additional submittal package; and WHEREAS, Consultant has submitted a proposal to amend the existing Task Order. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve the Amendment 1 to Task Order 2014 -03 with Brelje & Race Consulting Engineers. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to take all actions to effectuate this amendment for and on behalf of the City of Rohnert Park, including execution, if necessary, in substantially similar form to the amendment attached hereto as Exhibit "A," subject to minor modifications by the City Manager or City Attorney. DULY AND REGULARLY ADOPTED this 14th day of April, 2015. CITY OE RO>f INERT PARK ATTEST: IoAnne M. Buergler, Cit Clerk CALLINAN: J-Vi MACKENZIE: ( -4J-� STAFFORD: BELFORTE: Age, AHANOTU: 1_1r)c'' AYES: ( ) NOES: ( 0 ) ABSENT: ( 1 ) ABSTAIN: (6 ) AMENDMENT 1 TO TASK ORDER NO. 2014 -03 CITY OF ROHNERT PARK AND BRELJE & RACE AUTHORIZATION OF ADDITIONAL ENGINEERING SERVICES FOR EASTSIDE TRUNK SEWER PHASE III AND SNYDER LANE WIDENING PROJECT NO. 2014 -01 SECTION 1— PURPOSE The purpose of this Task Order is to authorize and direct Brelje & Race to proceed with the work specified in Section 2 below in accordance with the provisions of the MASTER AGREEMENT between the City of Rohnert Park ( "City ") and Brelje & Race ( "Consultant ") dated February 25, 2011. SECTION 2 — SCOPE OF WORK The additional items authorized by this Task Order are presented in Exhibit "A ". SECTION 3 — COMPENSATION AND PAYMENT Compensation shall be as provided in the MASTER AGREEMENT between the parties hereto referenced in SECTION 1 above. The additional cost for the additional services as set forth in SECTION 2 shall be actual costs (time and materials) based on Consultants' standard labor charges in accordance with the provisions of the MASTER AGREEMENT and as shown in Exhibit "B" for an amount not -to- exceed $14,450.00. Total compensation under this Task Order with this Amendment shall not exceed $97,080.00. SECTION 4 — TIME OF PERFORMANCE The work described in SECTION 2 shall be completed with twelve months of the approval date of this Amendment, as set forth below. SECTION 5 — ITEMS AND CONDITIONS All items and conditions contained in the MASTER AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this day of )2015. CITY OF ROHNERT PARK Darrin Jenkins, City Manager Per Resolution No. 2015- adopted by the Rohnert Park City Council at its meeting of 4/14/15 BRELJE & RACE John S. Locey, President Exhibit A March 6, 2015 Mary Grace Pawson City of Rohnert Park 130 Avrain Avenue Rohnert Park, CA 94928 Subject: ESTS Ph. III & Snyder Lane Widening Project — Revised Request for Amendment to Task Order No. 2014 -03; City Project No. 2014 -01 B &R File No. 3891.01 Dear Mary Grace: For your consideration, Brelje & Race respectfully requests amending Task Order No. 2014 -03 to account for the extra hours required to date, and hours still anticipated necessary to adequately complete the peer review work. The extra hours have resulted from additional, out -of -scope services performed (or to be performed), services that were unanticipated due to the complexity of the project and /or changes within the design scope, and missing or ornitted information at each review stage that required more extensive review at later stages of the design. The original contract budget amount of $82,630 has been exceeded as of our current billing cycle. Additionally, Brelje & Race has been requested to attend an on -site meeting and to review the signed plans and specifications after bid advertising commences and after the first addendum is completed in order to ensure comments from the 100% review have been adequately and frilly incorporated. Any comments generated at that point would be addressed by a second addendum to be distributed ahead of the bid opening. This last review was not included in our original scope of services, however it is strongly recommended that Brelje & Race perform a final check since there were still sevelal 101111dred comments generated in the 100% review, and some of the comments (and the pending site meeting) deal with substantial constructability issues including conflicting design information or completely missing information. Some services originally anticipated were not performed, such as meetings and coordination with the High School, however the hours for those tasks were small and absorbed by other tasks. The unanticipated work items that were either outside of the original scope of services or were due to changes in the design scope are outlined below: 1. Additional length was added to the project roadway work and paving of the adjacent parking lots at the Spreckles Center were added requiring extra time for review and comment. 2. Due to missing information at the 75% review, a substantial increase in time was necessary to complete the 90% review. (40+ sheets were added between submittals — this is where the largest increase in review time was noticed). 470 Aviation Blvd, Suite 120 � Santa Rosa, CA 05403 v, 707 - 670,1322 wwwbron,corn Mary Grace Pawson March 6, 2015 Page 2 of 2 At the 100% review, no 90% review comment responses were provided, requiring additional time to hunt for the changed (and unchanged) items within the plans and the specifications. Plus, there was a substantial amount of new information added between the 90% and 100% reviews that required a first review, rather than simply checking that the recommendations of the previous review were followed. Time to review new information at the 100% review level was not originally anticipated. 4. Several meetings were added during the design and attended by various members of the B&R team. Attached is the original Task, Work Hour and Cost Tabulation worksheet which estimated the time to complete each task and an Actual Work Hour and Cost Tabulation worksheet which shows the actual hours spent by our team on each of the planned tasks, plus an estimate of the time necessary to perform the review of the final bid documents and addendum. It can be seen by comparing the spreadsheets that we were under budget through the 75% review, but due to a fair amount of missing information at the 75% review, the budget was exceeded at the 90% and 100% review periods. At each of the final review stages, there was a substantial amount of new information that had not been reviewed previously, requiring extra time to complete. AMENDED FEE Our current billing through the end of last month and which will be sent to the City shortly indicates that the budget has been exceeded by $6,850.00 to date, which is requested to be added to the budget. Additionally, a fee of $7,600 has been estimated for performing the requested review of the final contract documents and to attend the planned site meeting. The total amended fee request is $14,450. Our fees will continue to be billed on a time and materials basis, and will not exceed the requested amount without prior written approval. Please contact me should you have any questions or should you care to discuss any of the items within this amendment request. Very truly yours, BRELJE & RACE M. Sean Jeane enclosures H C7 z W z z W W WN� 17 H rho V J Q w �i ad W H N V � i-I v � V v Hill 0 71 W M l0 ro U N OC) U U to!) � �L bbA r N 'd' V N H 1 !�1 U .w OU W bA H H v bA - o o O C � r C 't7 q y G w0 611) os V) x d M M O G1 N G� x a c O C �3 W n scr cq N v w E C M J J w 69 J � � O o � ill UJ N M P'� � ✓: P C bA VV 7 C y J N V 7 co to O v 1.4 l y ,� J a V •U H 7 O = im 0 ! '' L�Cr W 3 c cn W H � :J � � O C) O Z C7 O y J V E -d W cn x c Q C o C� w �/ y C ;f � `J J T r ✓� W Q Q E E E Cl) 0 O O O O 7 w A 71 W z R P� F 0 z Q' O a0 J N U d z W z Hi z W W H W W z A N L." W bA o � N w O U V T �Q x I 0 !n � N PI cl � r N PI cl � O C G r C v U an a n v cq 00 00 v v v M H C. .ti q C C bA V W F» v> bA q :c r x n' M H O .0 x w v W us v) 00 M 00 v M G G o � W n v3 -- 0 0 _ 7 N c en � M O G � 'bn � v� W � v3 P. N m 'C W c. 0 0 z H in ✓ � cd � �r . J ti U � J 0 0 0 0 0 0 W A