Loading...
2015/04/28 City Council Resolution 2015-094RESOLUTION NO. 2015-094 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AMENDING PLANNING, ENGINEERING, AND BUILDING FEE SCHEDULES WHEREAS, the City Council adopted Resolution No. 2008 -28 on August 12, 2008 approving an updated Engineering Fee Schedule; WHEREAS, the City Council adopted Resolution No. 2011 -26 on March 22, 2011 approving an updated Building Fee Schedule; WHEREAS, the City Council adopted Resolution No. 2012 -105 on September 11, 2012 approving an updated Planning Fee Schedule and additional Building Fee Schedule updates; WHEREAS, Rohnert Park Municipal Code Chapter 3.32, "Cost- Recovery - Fee and Service Charge System," provides for the "establishment of a fee system to recover costs of the City in providing certain services, products and regulatory activities," including a regular review of fees to assure that they "continue to recover the reasonable and proportional share of costs from applicants requesting services," and providing authority for the Council "to establish such fees by resolution to support the cost of providing the service or services" requested by applicants; WHEREAS, staff recommended updating both fee schedules to provide for reasonable cost recovery by amending flat fees for services to time - and - materials charges in order to ensure that the City recovers the actual costs of providing planning and engineering services to the applicants requesting services; WHEREAS, California Government Code Sec. 66015 limits permit fees for residential and commercial rooftop photovoltaic system; WHEREAS, staff recommended minor changes in the building fee schedule to reduce permit fees for residential and commercial rooftop photovoltaic system where the City's current fees exceed the State limits; WHEREAS, following staff presentation and a public hearing at a duly noticed public meeting on April 28, 2015, the City Council found that the amended fees are based on actual costs incurred and /or do not exceed the estimated reasonable cost of providing the services for which the fees are to be levied; WHEREAS, the City Council found that the new and amended fees are not a tax subject to the supermajority voting provisions of Article XIII of the California Constitution as amended by Proposition 26, but are an exception under Section 1(e)(2) of Article XIII C of the California Constitution as amended by Proposition 26, to wit: (e) As used in this article, "tax" means any levy, charge, or exaction of any kind imposed by a local government, except the following: ... (2) A charge imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product. WHEREAS, the City Council found that none of the fees outlined in the amended fee schedules are Development Impact Fees (fees imposed as a condition of approval of development) subject to state law requirements pertaining to those fees; WHEREAS, no fees are amended in these updated fee schedules for the purpose of acquiring funds for the construction of public improvements or the acquisition of equipment; WHEREAS, in accordance with California Government Code Section 66016, data indicating the amount of cost, or estimated cost, required to provide the service for which the fee or service charge is levied and the revenue sources anticipated to provide the service was made available for public review at least ten (10) days prior to the meeting at which the fee schedule amendments are to be adopted; WHEREAS, in accordance with California Government Code Section 66016, the City published notice for adoption of the fee schedule amendments and notification of the public hearing at which the amendments to the fee schedules were to be considered was mailed at least 14 days prior to the public meeting; WHEREAS, on April 28, 2015, the City Council of the City of Rohnert Park reviewed the amended fee schedules during a scheduled public meeting; at which time interested persons had an opportunity to testify either in support of or opposition to the proposed fees; and WHEREAS, at the April 28, 2015 City Council meeting, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the Council considered all the facts relating to the amended fee schedules. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. Recitals. That the above recitations are true and correct and material to this Resolution and are incorporated herein as if set forth herein in full and each is relied upon independently by the City Council for its adoption of this Resolution. Section 2. Environmental Clearance. The adoption of this Resolution is exempt from the California Environmental Quality Act as this action is not considered a "project" as defined in California Code of Regulations, Title 14, Chapter 3, Article 20, Section 15378(a): (a) "Project" means the whole of an action, which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment,... and is specifically excluded in Section 15378(b)(4), to wit: (b) "Project" does not include:... (4) The creation of government funding mechanisms or other government fiscal activities which do not involve any commitment to any specific project which may result in a potentially significant physical impact on the environment. Section 3. Adoption of Fees. The Planning Fee Schedule, Engineering Fee Schedule and Building Fee Schedule hereby amended as shown on Exhibit A, Exhibit B, and Exhibit C respectively which are attached hereto and incorporated by this reference, and shall be in full force and effect as of July 1, 2015. Except as shown on Exhibits A, B and C, all other fees for planning, engineering and building services shall continue to be in effect and shall remain as provided for in Resolution No. 2008 -28, Resolution No. 2011 -26 and Resolution No. 2012 -105. The City Council may review and amend the Planning Fee Schedule, Engineering Fee Schedule and Building Fee Schedule from time to time. For any annual period during which the City Council does not review these fees, the fee amounts shall be automatically adjusted once annually on July 1 st, based on the Consumer Price Index published by the U.S. Bureau of Labor Statistics for All Urban Consumers, All Items, in the San Francisco - Oakland -San Jose Area, measured in the month of December in the calendar year that ends in the previous fiscal year. Section 4. Constitutionality. If any action, subsection, sentence, clause or phrase of this Resolution or the fees levied by this Resolution shall be held invalid or unconstitutional by a court of competent jurisdiction, such invalidity shall not affect the validity of the remaining portions of this Resolution or the fees levied by this Resolution that can be given effect without the invalid provisions. Section 5. Waiver of Fee. The City Council is hereby authorized to waive any of the fees outlined in Exhibits A, B and C. If such a waiver occurs, the City Manager or his /her designee will ensure that any fee category for which a waiver was granted does not exceed the estimated reasonable cost of providing the service. DULY AND REGULARLY ADOPTED this 28th day of April, 2015. ATTEST: City Cler CITY OF ROHNERT PARK .1 n Mayor Attachments: Exhibit A — Planning Fee Schedule, Exhibit B — Engineering Fee Schedule, Exhibit C — Building Fee Schedule CALLINAN: ME MACKENZIE: )MF- STAFFORD: Nie, BELFORTE: 1\`10 AHANOTU: k 'q(Z� AYES: ( 5 ) NOES: (0 ) ABSENT: ( 0 ) ABSTAIN: ( a ) Exhibit A to Resolution City of Rohnert Park — Development Services PLANNING SCHEDULE OF FEES AND CHARGES Page 1 Service Fee Notes Actual cost of time & materials charged against an i 2 3 1 Annexation Initial Deposit as determined by staff. Residents: $281 plus the actual cost of publishing / 2 5 noticing 2 Appeals to City Council . .. .. .. . .. . ... ..................... ........ .............. Non - residents: Actual cost of time &materials 1, 2, 3 charged against an Initial Deposit of $1,125 Residents: $390 plus the actual cost of publishing/ 2,5 noticing 3 Appeals to Planning Commission .............................................. Non- residents: Actual cost of time &materials charged against an Initial Deposit of $1,560 1, 2, 3 $88 - one address ... ...... .............-----------................-------- .........---------- - - - - -- 4 ..................... ............... ............... $130 - 2 to 5 addresses 4 4 Assignment of Address ............ ..... ..................... ................... ..................- ...... ...... ............................... ........ $218 - 6 to 20 addresses ............ ................ ............ ............... ............................... ............ 4 ... .............. ...................... $348 - 21 or more addresses 4 5 Assignment of Temporary Power $65 4 Pole Address 6 Business License Research $85 4 7 Certificate of Zoning Compliance $520 4 8 Condition Modification/Waiver - $283 4 Administrative Condition Modification/Waiver - Actual cost of time & materials charged against an 1, 2, 3 9 Planning Commission Initial Deposit of $1,000. Development Agreement, Actual cost of time & materials charged against an 1, 2, 3 10 Processing & Amendment Initial Deposit as determined by staff. 11 Development Area Plan Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $9,000. $283 plus the actual cost of any outside agency Filing & Notice of Categorical fees (such as County Filing Fee, State 2,6 12 Exemption Clearinghouse Fee and Office of Planning & Research) Page 1 Exhibit A to Resolution City of Rohnert Park— Development Services PLANNING SCHEDULE OF FEES AND CHARGES Page 2 Actual cost of time & materials charged against an 13 Environmental Impact Report Initial Deposit as determined by staff. Applicant is 1,2,3 Review also responsible for any other agency fees (e.g. State Fish & Game fees, etc.) 14 Final Development Plan Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. 15 Final Specific Plan Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. 16 General Plan Amendment Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $5,000. 17 Home Occupation Permit $85 4 18 Pre - Application Conference $248 4 19 Pre - Application Conference - $990 4 Concept Plan Review Pre - Application Conference - 20 Single - Family Dwelling, Owner- $175 4 Occupied 21 Initial Study /Negative Declaration Actual cost of time & materials charged against an 1 2 3 Initial Deposit of $2,000. 22 Letter of Public $435 4 Necessity /Convenience $412 plus the actual cost of any outside agency 23 Notice of Determination fees (such as County Filing Fee, State Clearinghouse Fee and Office of Planning & 2,6 Research) Specific Plan /Planned Development: Actual cost of time & materials charged against an 1, 2, 3 24 Amendment/Revision of Related Initial Deposit as determined by staff. Items - Standard 25 Sign Review (Single Sign) $98 7 New - $520 7 SignProgram Review - - - ......................_....... .. ....._.. - ........._............. - - ........ - ................. 26 New /Revised Revised - $348 7 Page 2 Exhibit A to Resolution City of Rohnert Park — Development Services PLANNING SCHEDULE OF FEES AND CHARGES 27 Preliminary Development Plan Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. Actual cost of time & materials charged against an 1, 2, 3 28 Rezoning Initial Deposit of $6,450 Within existing footprint — Actual cost of time & materials charged against an 1, 2, 3 Site Plan & Architectural Review: In . itial . . . De . . p . osit of . $1 .. .. , . 480 . .................... . . .. .. ............. 29 Building Remodel (Commercial & Expansion of footprint — Industrial) Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. Site Plan & Architectural Review: Actual cost of time & materials charged against an 1, 2, 3 30 Building Remodel (? 2 Residential Initial Deposit of $1,210 Units) Site Plan & Architectural Review: Actual cost of time & materials charged against an 1, 2, 3 31 New Structure (Commercial & Initial Deposit of $1,200 Industrial) Site Plan & Architectural Review: Actual cost of time & materials charged against an 1, 2, 3 32 New Structure /Change -In -Use (? 2 Initial Deposit of $1,200 Residential Units) 33 Specific Plan - Preliminary Plan Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. 34 Specific Plan Amendment Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. 35 Specific Plan Preparation Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. 36 Subdivision: Extension to Approved Actual cost of time & materials charged against an 1, 2, 3 Minor Initial Deposit of $695 37 Subdivision: Revision to Approved Actual cost of time & materials charged against an 1, 2, 3 Minor Initial Deposit of $1,200. 38 Subdivision: Extension /Revision to Approved - Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. Major 39 Tentative Map - Major (? 5 Lots) Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit as determined by staff. Page 3 Exhibit A to Resolution City of Rohnert Park — Development Services PLANNING SCHEDULE OF FEES AND CHARGES 40 Tentative Map - Minor ( <_ 4 Lots) Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $4,000 41 Use Permit (Commercial /Industrial/ Actual cost of time & materials charged against an 1, 2, 3 Mixed -Use) Initial Deposit of $1,000 42 Use Permit - Residential >_ 2 Units Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $1,000 43 Variance Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $2,500 44 Zoning Confirmation Letter $85 4 45 Zoning Ordinance Text Change Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $5,000 Minor - $130 4 46 Temporary Use Permit ..................... ................. ............ ................ 9...... Major - Actual cost of time & materials charged 1, 2, 3 against an Initial Deposit of $1,000 47 Time Extension To Approved - Minor Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $175 48 Time Extension To Approved - Major Actual cost of time & materials charged against an 1, 2, 3 Initial Deposit of $695 49 Administrative Permit $650 4 50 Violation Correction $520 4 51 Planning review of building permits Actual cost of time and materials to be collected at 1, 2, 3 building permit issuance. 52 Tree Permit Clearance (Exemption) $201 4 53 Approval for Tree Removal (Tree Actual cost of time and materials to be billed 1, 2, 3 Removal Permit) against an initial deposit of $512 54 Lot Line Adjustments / Lot Line Actual cost of time and materials to be billed 1, 2, 3 Mergers / Reversion to Acreage against an initial deposit of $840 Planning Fee Schedule Table Notes Cost - recovery charges include all costs to provide services or process applications /projects. Costs that may be recovered include but are not limited to: City staff time at fully- burdened hourly rates, including those of City departments other than Development Services (e.g. Fire Page 4 Exhibit A to Resolution City of Rohnert Park — Development Services PLANNING SCHEDULE OF FEES AND CHARGES Services, Public Works, etc.); consultant costs; legal costs; administrative costs generated by application /project; public noticing and advertisement costs; and other public agency fees. 2. An Acknowledgement of Reimbursement Obligation for Payment of Full Cost Recovery Fees for Application Processing and Inspection Services form ( "Reimbursement Obligation Form ") or Reimbursement Agreement must be executed in conjunction with applications for these services and /or permits. The method by which the City recovers its costs from the applicant or financially - responsible party is determined by the cost - recovery obligation form or agreement used. Typically, cost recovery is either: (a) a draw -down from a deposit, or (b) billing in arrears for costs incurred by the City to provide services. The cost recovery method and terms are stipulated in the Reimbursement Obligation Form, Reimbursement Agreement, or specific terms of a development agreement or other negotiated instrument approved by City. 4. Applicant will be charged a flat fee as indicated for the service, unless the service and /or entitlement is part of a more complex project with multiple /concurrent applications and entitlements in which costs for processing are recovered pursuant to an executed Reimbursement Obligation Form, Reimbursement Agreement, or specific terms of a development agreement or other negotiated instrument approved by City. 5. Applicant or financially - responsible party will be charged a flat fee as indicated for the service, as well as additional costs for public noticing, mailing, and postage if incurred. Public noticing, mailing, and postage may be billed in arrears to the applicant or financially - responsible party. 6. Applicant or financially - responsible party will be charged a flat fee as indicated for the service, as well as outside agency fees (e.g. County Filing Fee, State Clearinghouse Fee and Office of Planning & Research, etc.). Outside agency fees may be billed in arrears to the applicant or financially - responsible party. 7. Applicant or financially - responsible party will be charged a flat fee as indicated for the service, as well as flat fee for engineering review if needed. Additional Notes about Fees and Charges Actual costs The actual cost of City staff time is the fully- burdened hourly rate of the staff providing service, which may include but is not limited to Development Services, Public Safety, Public Works, Administration (which includes City Attorney, City Manager's Office) providing review specifically for the project. Charges will be for increments of 0.25 hour. Page 5 Exhibit A to Resolution City of Rohnert Park — Development Services PLANNING SCHEDULE OF FEES AND CHARGES Consultant charges may apply In some cases, additional costs may be incurred by the City due to the necessity of using a consultant to assist Development Services with the review and processing of applications /projects. In such cases, the costs of the consultant's services will be passed through to the applicant, with an Administrative Fee in the amount of 7% of the consultant invoice cost, unless a different rate is stipulated for those services by a Reimbursement Agreement or Development Agreement. Concurrent/ multiple applications When two or more applications are filed and processed concurrently, the required initial deposit will be the sum of the individual application fees and /or deposits. Annual Adjustment of Flat Fees Flat fees are adjusted annually based on the Consumer Price Index published by the U.S. Bureau of Labor Statistics for All Urban Consumers, All Items, in the San Francisco - Oakland -San Jose Area, measured in the month of December in the calendar year that ends in the previous Fiscal Year. Annual Adjustment of Fully- Burdened Hourly Rate Fully- burdened hourly rates are adjusted annually based on the Consumer Price Index published by the U.S. Bureau of Labor Statistics for All Urban Consumers, All Items, in the San Francisco-Oakland- San Jose Area, measured in the month of December in the calendar year that ends in the previous Fiscal Year. Services Not Listed on Planning Schedule of Fees and Charges When engineering staff provide requested or necessary review, inspection or staff support services that are not included in this Planning Schedule of Fees and Charges, the Development Services Director may assess and collect such fees that are reasonably necessary to defray the cost of such services. Staff time shall be charged on a fully- burdened hourly rate basis or the actual cost of outside consultant, plus 7% administrative fee, or administrative fee rate as stipulated by applicable Reimbursement Agreement or Development Agreement. Page 6 Exhibit B to Resolution City of Rohnert Park— Development Services ENGINEERING FEE SCHEDULE Engineering Services — Schedule of Fees and Charges Engineering Services Fees / Charges Initial Deposit Notes 1 Grading /Site Improvement Plan Full cost - recovery $3,300+ 1, 2, 3, 4 Check and Inspection charges apply. 1.5% of Engineer's Estimated Cost of improvement 2 Public Improvement Plan Check and Full cost - recovery $3,200+ 1, 2, 3, 4 Inspection charges apply. 1.5% of Engineer's Estimated Cost of improvement 3 Subdivision Plan Check and Full cost - recovery $2,400+ 1, 2, 3, 4 Inspection charges apply. 1.5% of Engineer's Estimated Cost of improvement 4 Final Parcel Map Review Full cost - recovery $1,950 1, 2,3 charges apply. 5 Final Subdivision Map Review Full cost - recovery $3,800 1, 2, 3 charges apply. 6 Final Map Amendment /Revision $560 per map N/A 5 Review (Minor) 7 Final Map Amendment /Revision Full cost - recovery $1,100 1, 2, 3 Review (Major) charges apply. 8 Time Extension $100 per application n/a 5 9 Lot Line Adjustment Review Full cost - recovery $840 1, 2, 3 charges apply. 10 Street Vacation / Abandonment Full cost - recovery $1,250 1, 2, 3 Request charges apply. 11 Minor Encroachment $290 n/a 5 Permit /Inspection 12 Major Encroachment $1,200 n/a 5 Permit /Inspection 13 Major Encroachment Full cost - recovery $2,000 1, 2, 3 Permit /Inspection requiring time charges apply. and materials with initial deposit Exhibit B to Resolution City of Rohnert Park — Development Services ENGINEERING FEE SCHEDULE Engineering Fee Schedule Table Notes 1. Cost - recovery charges include all costs to provide services or process applications /projects. Costs that may be recovered include but are not limited to: City staff time at fully- burdened hourly rates, including those of City departments other than Development Services (e.g. Fire Services, Public Works, etc.), consultant costs, legal costs, administrative costs generated by application /project, public noticing and advertisement costs, and other public agency fees. 2. An Acknowledgement of Reimbursement Obligation for Payment of Full Cost Recovery Fees for Application Processing and Inspection Services form ( "Reimbursement Obligation Form ") or Reimbursement Agreement must be executed in conjunction with applications for these services and /or permits. 3. The method by which the City recovers its costs from the applicant or financially - responsible party is determined by the cost - recovery obligation form or agreement used. Typically, cost recovery is either: (a) a draw -down from a deposit, or (b) billing in arrears for costs incurred by the City to provide services. The cost recovery method and terms are stipulated in the Reimbursement Obligation Form, Reimbursement Agreement, or specific terms of a development agreement or other negotiated instrument approved by City. 4. Initial deposit due for these services will be determined by the City, based on the Engineer's Cost Estimate of improvement as provided by the applicant. The applicant - provided Engineer's Cost Estimate is subject to review and approval by the City. The initial deposit amount due may be adjusted by the City, based on recalculations of the Engineer's Cost Estimate approved by the City Engineer. 5. Applicant will be charged a flat fee as indicated for the service and /or permit, unless the service and /or permit is part of a more complex project with multiple /concurrent permits or entitlements in which costs for processing are recovered pursuant to an executed Reimbursement Obligation Form, Reimbursement Agreement, or specific terms of a development agreement or other negotiated instrument approved by City. 14 Plumbing Permit issued by $290 n/a 5 Engineering / Inspection 15 Transportation Permit $16 for single trip permit; $100 for annual n/a 6 permit *clerical correction: Annual Permit fee is $90 16 Sign Review $110 per plan 5,7 Engineering Fee Schedule Table Notes 1. Cost - recovery charges include all costs to provide services or process applications /projects. Costs that may be recovered include but are not limited to: City staff time at fully- burdened hourly rates, including those of City departments other than Development Services (e.g. Fire Services, Public Works, etc.), consultant costs, legal costs, administrative costs generated by application /project, public noticing and advertisement costs, and other public agency fees. 2. An Acknowledgement of Reimbursement Obligation for Payment of Full Cost Recovery Fees for Application Processing and Inspection Services form ( "Reimbursement Obligation Form ") or Reimbursement Agreement must be executed in conjunction with applications for these services and /or permits. 3. The method by which the City recovers its costs from the applicant or financially - responsible party is determined by the cost - recovery obligation form or agreement used. Typically, cost recovery is either: (a) a draw -down from a deposit, or (b) billing in arrears for costs incurred by the City to provide services. The cost recovery method and terms are stipulated in the Reimbursement Obligation Form, Reimbursement Agreement, or specific terms of a development agreement or other negotiated instrument approved by City. 4. Initial deposit due for these services will be determined by the City, based on the Engineer's Cost Estimate of improvement as provided by the applicant. The applicant - provided Engineer's Cost Estimate is subject to review and approval by the City. The initial deposit amount due may be adjusted by the City, based on recalculations of the Engineer's Cost Estimate approved by the City Engineer. 5. Applicant will be charged a flat fee as indicated for the service and /or permit, unless the service and /or permit is part of a more complex project with multiple /concurrent permits or entitlements in which costs for processing are recovered pursuant to an executed Reimbursement Obligation Form, Reimbursement Agreement, or specific terms of a development agreement or other negotiated instrument approved by City. Exhibit B to Resolution City of Rohnert Park —Development Services ENGINEERING FEE SCHEDULE 6. Transportation permit fees are determined by the State of California. 7. Added as additional flat fee to planning flat fee for this service. Additional Notes about Fees and Charges Actual costs The actual cost of City staff time is the fully- burdened hourly rate of the staff providing service, which may include but is not limited to Development Services, Public Safety, Public Works, and Administration providing review specifically for the project. Charges will be in increments of 0.25 hour. Consultant charges may apply In some cases, additional costs may be incurred by the City due to the necessity of using a consultant to assist Development Services with the review and processing of applications /projects. In such cases, the costs of the consultant's services will be passed through to the applicant, with an Administrative Fee in the amount of 7% of the consultant invoice cost, unless a different rate is stipulated for those services by a Reimbursement Agreement or Development Agreement. Concurrent / multiple applications When two or more applications are filed and processed concurrently, the required initial deposit will be the sum of the individual application fees and /or deposits. Investigative fee for work started without a permit If work on an engineering project is found to have commenced without a permit, an investigation fee will be charged equal to the amount of permit fee that would apply to that project. If the project is full cost - recovery (i.e. not a flat fee project), the investigation fee will be the cost of time - and- materials required for inspection and administrative support to process the project, prior to the project coming into compliance. This investigation fee is in addition to the permit fees that will be required to bring the project into compliance. Annual Adjustment of Flat Fees Flat fees are automatically adjusted annually on July 1st, based on the Consumer Price Index published by the U.S. Bureau of Labor Statistics for All Urban Consumers, All Items, in the San Francisco - Oakland -San Jose Area, measured in the month of December in the calendar year that ends in the previous fiscal year. Exhibit B to Resolution City of Rohnert Park — Development Services ENGINEERING FEE SCHEDULE Annual Adjustment of Fully- Burdened Hourly Rate Fully- burdened hourly rates are automatically adjusted annually on July 1st, based on the Consumer Price Index published by the U.S. Bureau of Labor Statistics for All Urban Consumers, All Items, in the San Francisco - Oakland -San Jose Area, measured in the month of December in the calendar year that ends in the previous fiscal year. Services Not Listed on Engineering Schedule of Fees and Charges When engineering staff provide requested or necessary review, inspection or staff support services that are not included in this Engineering Schedule of Fees and Charges, the Development Services Director may assess and collect such fees that are reasonably necessary to defray the cost of such services. Staff time shall be charged on a fully- burdened hourly rate basis or the actual cost of outside consultant, plus 7% administrative fee, or administrative fee rate as stipulated by applicable Reimbursement Agreement or Development Agreement. Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE Antenna— Telecom Facility Cellular /Mobile Phone, free - standing new structure each $1,727 _ Cellular /Mobile Phone, attached to existing structure each $941 Each addt'I co- located antenna each addt'I antenna $199 Application Meeting First Hour hourly rate $99 Each additional 1/2 hour hourly rate $49 Arbor/Trellis (R -3s only over 120ft, non R -3), Awning /Canopy (supported by building) R -3 each $147 Balcony addition (R -3) up to 200 SF $549 each additional 50 SF Balcony addition (R -3) over 200 SF - or portion thereof $131 Business License Inspections each $74 - Carport (R -3) - Plan Check each $224 Carport (R -3) - Inspection each $436 Change of Occupancy over the counter) - -- - - each $43 minimum fee, actual costs Change of Occupancy thereafter (1) $137 Chimney (factory- built, masonry), Chimney Repair each $424 Covered Porch (R3), Deck (wood) >30" above grade up to 200 SF $147 each additional 100 SF Covered Porch (R3), over 200 SF or portion thereof $78 Demolition Commercial - Inspection each $249 Residential - Inspection each $249 Disabled Access Compliance Inspection hourly rate $99 Door New door (non-structural) each $150 New door (structural shear wall /masonry) each $704 Duplicate /Replacement Job Card each $144 per 100 SF or portion Exterior Renovation, Non - Residential thereof $62 Building Plan Check and Inspection Services Miscellaneous Permits - Page 1 Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE i-ence _ - - -- - - -- - - Masonry- any height -- - - -- up to 100 LF $331 Non - masonry, over 6 feet in height; _ up to 100 LF $231 Non - masonry, over 6 feet in height; masonry any height, over Each additional 100 LF 100 LF or portion thereof $199 Final Inspection Permit (non - residential only) to reactivate an expired permit each (2) $325 Fireplace New Pre - Fabricated /Metal Fireplace - Plan Check each $212 New Pre - Fabricated /Metal Fireplace - Inspection each $318 Fireplace Repairs / Demolition - Plan Check each $195 Inspection each $183 Flag pole (over 20 feet in height) each $481 Fire Repairs -_ Residential, more than 30% damaged - Use Residential Addition Fee Residential, less than 30% damaged - Plan Check each $424 Residential, less than 30% damaged - Inspection each $560 Commercial, use New Construction Tenant Improvement Foundation Only Residential W/O New Construction Permit each $897 W/ New Construction Permit each $405 Foundation Repair, R3 each - $754 Foundation Repair, non -R3 each $904 Garage (detached) Wood frame up to 1,000 SF each $1,215 Wood frame over 1,000 SF and less than 2000 SF For portion of 1000 SF $230 Garage Conversion, Residential - each - $357 Generator each $624 Insulation (batt, blown -in, injection) each $129 Building Plan Check and Inspection Services Miscellaneous Permits - Page 2 Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE Master Plan - Revisions (3) Deferred Submittal Processing Fee each (3) (4) $364 Minor (no change in structure or square footage) each (3) (4) $231 Major (USE RESIDENTIAL NEW CONSTRUCTION - MASTER PLAN) (3) _ — Master Plan - Duplicate Set Processing Fee each (3) (4) $182 Oven (Commercial) each $735 Partition— Commercial, Interior (up to 30 LF) up to 30 LF $506 each additional 30 LF Partition over 30 LF - Plan Check or portion thereof $144 each additional 30 LF Partition over 30 LF - Inspection or portion thereof $137 Partition— Residential, Interior (up to 30 LF) up to 30 LF $268 each additional 30 LF Partition over 30 LF or portion thereof $169 Patio Cover (wood frame, metal frame, other) up to 300 SF $443 each additional 300 SF Patio, over 300 SF or portion thereof $312 Enclosed (wood frame, metal frame, other) up to 300 sf $935 each additional 300 SF Enclosed patio over 300 SF - Plan Check or portion thereof $268 each additional 300 SF Enclosed patio over 300 SF - Inspection or, portion thereof $62 Photovoltaic System (rooftop) - Residential 1 - 1- 5 kilowatts - Plan check and inspection each $306 16 - 31 kilowatts - Plan check and inspection each $515 32 - 50 kilowatts - Plan check and inspection each $742 Photovoltaic System (rooftop) - Commercial 1 - 15 kilowatts each $356 16 - 50 kilowatts each $742 51 --70-kilo w att s each $1,007 71 - 100 kilowatts each $1,147 101 - 131 kilowatts each $1,357 131 - 200 kilowatts each $1,570 201 - 250 kilowatts each $2,057 251 - 500 kilowatts each $2,045 501 kilowatts-- 1 megawatt each $3,655 Building Plan Check and Inspection Services Miscellaneous Permits - Page 3 Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE Plot Plan - Revision each (5) $137 minimum fee, actual costs Product Review thereafter (1) $118 Remodel — Residential Remodel up to 300 SF - Plan Check up to 300 SF $293 Remodel up to 300 SF - Inspection up to 300 SF $311 each additional 100 SF Rem__ odel, over 300 SF - Plan Check or portion thereof $68 each additional 100 SF Remodel, over 300 SF - Inspection or portion thereof $93 Kitchen - Plan Check each $268 Kitchen - Inspection each - $3 - 54 Bath - Plan Check each $15 Bath - Inspection each $236 minimum fee, actual costs Reinspection Fee / Final Inspection Fee (SFD) - thereafter (1),(3) $137 Repairs Repairs, non - residential, non - structural - Plan Check each $350 Repairs, non- residential, non - structural - Inspection each _ $365 Repairs, residential - Plan Check each $350 - Repairs, residential - Inspection each _ $365 Re -roof Single Family Dwelling (SFD) Residential only (w/ new roof sheathing) - Inspection each $306 Single Family Dwelling (SFD) Residential only (w /o new roof sheathing) - Inspection each $212 - Multi- Family Dwelling (Apartments /Condominiums) - each 5,000 SF or Inspection portion thereof $442 each 5,000 SF or Commercial - Plan Check portion thereof $56 each 5,000 SF or Commercial - Inspection portion thereof $404 - _ Revisions to approved plans Commercial New Minimum fee (4) $118 Tenant Improvement Minimum fee (4) $118 Single Family Dwelling Minimum fee (4) $118 Addition Minimum fee (4) $118 Remodel Minimum fee (4) $118 Building Plan Check and Inspection Services Miscellaneous Permits - Page 4 Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE Roof Structure Replacement - Plan Check up to 500 SF $212 Roof Structure Replacement - Inspection up to 500 SF $329 Siding each additional 100 SF Roof structure replacement, over 500 SF or portion thereof I_ $43 Sauna —steam each $723 SCEIP projects for which permits not typically issued (use Minimum Processing Fee) Siding Stone and Brick Veneer (interior or exterior), up to 800 sf up to 800 SF $461 Other Siding up to 800 SF -Plan Check (for commercial only) up to 800 SF $180 Other Siding up to 800 SF - Inspection up to 8_00 SF $230 each additional 800 SF Additional siding or portion thereof $169 Signs, new ( <_ 100 SF area) (6) Roof / Projecting Signs each (6) $306 Monument each (6) _$281 Pole (under 10') each (6) $306 Wall /Awning Sign, Non - Electric each (6) $262 Wall, Electric each (6) $287 Other Sign - Plan Check each (6) - - $212 Other Sign - Inspection each (6) $131 Signs, new ( >100 SF area) (6) — Roof / Projecting Signs _ (6) $499 _ Monument ---------each each (6) $350 Pole (over 10') each (6) $449 Wall /Awning Sign, Non - Electric each (6) $331 Wall, Electric each (6) $405 Other Sign - Plan Check each (6) - $274 Other Sign - Inspection each (6) $293 Site Accessibility per hour $99'. Skylight Less than 10 SF each $212 Greater than 10 SF or structural each $468 Solar Panels (Thermal), residential or equal - each $338 Building Plan Check and Inspection Services Miscellaneous Permits - Page 5 Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE Storage Racks Storage racks over 8 high, up to 100 LF first 100 LF $674 each additional 100 LF Storage racks over 8' high, over 100 LF or portion thereof- $237 Structural Repairs (Non - Residential) - Plan Check Each $518 -- - - -- - - - - -- Structural Repairs (Non - Residential) - Inspection Each $927 Structural Repairs (Residential) - Plan Check Each $405 Structural Repairs (Residential) - Inspection Each $442 Stucco Applications up to 400 SF $455 each additional 400 SF Stucco Application, over 400 SF —Check-Fe - or portion thereof $280 Supplemental Plan heck Fee (after 3rd review) First hour each (1) $137 per 1/2 hour or portion Each Additional 1/2 hour or portion thereof (1) $68 Supplemental Inspection Fee ___thereof First 1/2 hour each (1) $68 per 1/2 hour or portion Each Additional 1/2 hour or portion thereof thereof (1) $68 Swimming Pool /Spa Vinyl -lined (up to 800 sf) each $635 Fiberglass each $635 Gunite (up to 800 sf) each $635 Additional pool (over 800 sf or portion thereof) each $374 Commercial pool (up to 800 sf) each $1,095 Commercial pool (over 800 sf or portion thereof) each $1,268 Spa or Hot Tub (Pre- fabricated) each ___.-._...._...__. - $685 - -- — - - -- - -- - - - -- minimum fee, actual costs Temporary Occupancy Approval thereafter (4)– $449 Trash Enclosure each $624 Window or Sliding Glass Door New Window (change in opening size /location, non - structural) each $112 New window (structural shear wall /masonry) - Plan Check each $261 New window (structural shear wall /masonry) - Inspection each $162 - -_ Bay Window (structural) - Plan Check each $261 _ Bay Window (structural) - Inspection each $423 Minimum Processing Fee (Administrative - No Permit) _ each (7) $37 Building Plan Check and Inspection Services Miscellaneous Permits - Page 6 Exhibit C to Resolution Plan Check and Inspection Fees Miscellaneous Permits FEE TYPES Unit Note FEE Notes: 1. Minimum fee includes professional and minimum adminstrative staff time for service 2. Inspection fee for reactivation of residential permits is included in "Reinspection Fee." 3. Refer to Master Plan Policy 4. Processing fee only. Staff time and materials cost, or actual consultant fee + City administrative fee may be in addition to processing fee. 5. Refer to Plot Plan and Production Phase Policy 6. "New" signs means the replacement of an existing sign with a new one, or installation of a new sign with an existing electrical source. 7. Use for SCEIP projects & other "non- permit" projects for intake and processing costs. Building Plan Check and Inspection Services Miscellaneous Permits - Page 7