Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1963/08/05 City Council Resolution 108
RESOLUTION NO. o' RESOLUTION ACCEPTING PROPOSAL OF HARDING ASSOCIATES BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROHNERT P1ARK THAT THE PROPOSAL OF HARDING ASSOCIATES TO PERFORM CERTAIN ENGINEERING SERVICES FOR THEE CITY OF ROHNERT PARK AS SET FORTH IN A LETTER TO THE CITY COUNCIL DATED JULY 91 1963 BE AND THE SAME IS HEREBY ACCEPTED AND THE MAYOR IS AUTHORIZED TO EXECUTE SAID ACCEPTANCE FOR AND ON BEHALF OF THE CITY OF ROWERT PARK. DULY AND REGULARLY ADOPTED THIS j �r DAY OF AUGUST, 1963. AYES: - _°e � /�Jf- ' G2- NOES: ABSENT:r Jr APPROVED: L� MAYOR ATTEST: CITY CLERK RICHARD S. HARDING, CIVIL ENGINEER EUGENE A. MILLER, CIVIL ENGINEER OLIVER E. MERWIN ROBERT T. LAWSON. CIVIL ENGINEER City of Rohnert Park 6950 Commeree mvd. Ro nert Park, Califomia HARDING ASSOCIATES SOIL MECHANICS ENGINEERS 2630 MENDOCINO "1- • SANTA ROSA. CALIFORNIA Attention: 'f-sr. Pete Callinan, City Manager aenaemen: LIBERTY 5 -3291 Res :foil Engineering Services JUU 9, 196 Pollowinv our recent discussion cae are pleased to su1mit this letter Of Pr"", outlining the servi ces to be provided. by Nar in- Assciat®a in OOMOcti= ieitli road -my construction within Rohnert Park. our services would include consultation with city officials and inspectors, the review of pavement thickness desi7ms (=_'f requested), the development of approporiate specifications for pavement construction and/or line stabilization of subgrade soils, the field engineering control during sub�ade preparation, conditionin- and compaction, and during the placement and compaction of base coarse materials. This office Would work closely v�ith your city manager and inspectors coordinating the inspection and testini, Fjor,c necessary. During the course of our t rk our field en�eer would be upped witL3 a mobile laboratory so that field density and eampa.ction testy could be run in the field and tide contractor ;provided with test results on the site. 4t,r services mould be provided on an "ern -e an' basis as rem :tied by the contractor's operations, his cooperation and rate of progress. our work will be done on a -dime- and - expense basis in accordance with our Standard. Schedule ©f Charges Mich is attached.. Our billings will be made on a monthly basis and ve vaould e=lect payment within 30 days thereafter. Should you have further questions concerning either the scope of work proposed or our schedule of Charges please do not hesitate to call. When you wish us to procede kind sign the authorization below and return one copy of this letter to us. AUTHORIZATION Si ned Title } PL4 P Date ✓'_G , _ Attacbmenti Schedule of Charges Three copies submitted Yours very traly, HARDING ASSOCIATES SOIL MECHANICS ENGINEERS Glenwood 41720 56 Harbor Street, San Rafael, California SCHEDULE OF CHARGES Professional Services Principal Senior Engineer Engineer or Geologist Non - Professional Services Laboratory Technician (Laboratory equipment included) Per Hour Per Hour Per Hour Per Hour 2630 Mendocino Ave. Santa Rosa, California Llberty 5 -3291 $18.00 - 20.00 12.00 - 15.00 8.00 - 10.00 8.00 Field Assistant Per Hour 7.00 Technical Illustration Per Hour 7.00 Clerical Per Hour 6.00 All travel time will be charged at the regular hourly rate unless other arrangements are made. Vehicles and Equipment Mobile Laboratory or other vehicle including the use of soil sampler, hand drilling equip- ment, or field density test equipment when used by our personnel — Per Hour 1.50 Geophysical Equipment Per Hour 3.00 Outside Services These services include rental of test drilling equipment, special equipment not ordinarily furnished by the Soils Engineer, day laborers, printing, travel by public carrier, subsistence, telephone, etc.