2017/06/27 City Council Resolution 2017-080RESOLUTION NO. 2017-080
A RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS FOR
THE 2017 PREVENTIVE MAINTENANCE (PROJECT NUMBER 2017-08),
AWARDING THE CONSTRUCTION CONTRACT TO TELFER PAVEMENT
TECHNOLOGIES LLC AND RELATED ACTIONS
WHEREAS, the 2017 Preventive Maintenance (Project Number 2017-08) ("Project")
includes the maintenance of pavement surfaces at various locations throughout the City; and
WHEREAS, the plans and specifications for the Project were prepared by the City's staff
and approved by the Deputy City Engineer; and
WHEREAS, the City of Rohnert Park Municipal Code Title 3 Chapter 3.04 provides that the
City's purchasing functions shall be governed by the City's purchasing policy; and
WHEREAS, consistent with City of Rohnert Park Purchasing Policy Section 3.6.17 Contracts
for Public Projects, which defers to the California Uniform Public Construction Cost Accounting
Act (CUPCCAA), an invitation to bid was posted/published on April 26, 2107, for the Project; and
WHEREAS, four bids were received on the bid opening date of May 26, 2017; and
WHEREAS, Development Services staff determined that Telfer Pavement Technologies
LLC submitted the lowest cost bid and is the lowest responsive and responsible bidder with a bid
amount of $557,810, adjusted for irregularities; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert
Park as follows:
1. The above recitals are true and correct and material to this Resolution.
2. The plans and specifications for the 2017 Preventive Maintenance (Project Number 2017-
08) are hereby approved and adopted.
3. The City Council finds that the Project is exempt from review under the California
Environmental Quality Act ("CEQA") because the scope of the project is pavement
rehabilitation, and is therefore categorically exempt under CEQA Guidelines section
15301 (Existing Facilities) and 15302 (Replacement or Reconstruction), and directs staff
to file a Notice of Exemption for the project.
4. In making its findings the City Council relied upon and hereby incorporates by reference
all of the bid materials, correspondence, staff reports and all other related materials.
5. In accordance with California Public Contract Code Section 20160 and following any
other applicable laws, the City Council of the City of Rohnert Park hereby finds the bid
of Telfer Pavement Technologies LLC for the Project to be the lowest, responsive bid
and waives any irregularities in such bid in accordance with applicable law.
6. The City Manager is hereby authorized and directed to execute the contract with Telfer
Pavement Technologies LLC, in substantially similar form to Exhibit A attached hereto
and incorporated by this reference, subject to minor revisions by the City Attorney or City
Manager, for the sum of the base bid for the five hundred fifty seven thousand eight
hundred ten dollars and sixty eight cents ($557,810.68) for construction of the Project in
accordance with the bid documents and applicable law upon submission by Telfer
Pavement Technologies LLC of all documents required pursuant to the Project bid
documents.
The City Manager is hereby authorized to execute change orders in an amount not to
exceed 10% of the base bid or fifty five thousand seven hundred eighty one dollars and
seven cents ($55,781.07).
8. The City Manager is hereby authorized to execute any other documents pertaining to this
transaction for and on behalf of the City of Rohnert Park.
9. City staff is hereby directed to issue a Notice of Award to Telfer Pavement Technologies
LLC for this project.
10. The City Council authorizes the 2017 Preventive Maintenance Project with an updated
budget of $626,100.00.
11. The Finance Director is authorized to amend the budget, make appropriations and
transfer funds as necessary to fund the authorized budget for the project.
12. This Resolution shall become effective immediately.
13. All portions of this resolution are severable. Should any individual component of this
Resolution be adjudged to be invalid and unenforceable by a body of competent
jurisdiction, then the remaining resolution portions shall continue in full force and effect,
except as to those resolution portions that have been adjudged invalid. The City Council
of the City of Rohnert Park hereby declares that it would have adopted this Resolution
and each section, subsection, clause, sentence, phrase and other portion thereof,
irrespective of the fact that one or more section, subsection, clause, sentence, phrase or
other portion may be held invalid or unconstitutional.
DULY AND REGULARLY ADOPTED this 27th day of June, 2017.
CITY OF ROHNERT PARK
Jake Mackenzie, Mayor
ATTEST:
Caitlin Saldanha, Deputy City Clerk
Attachment: Exhibit A
AHANOTIJ: � BELI<ORTE: A i e CALLINAN. 1 C STAFFORD: C MACKENZIE: P�
AYES: NOES: ( t9 ) ABSENT: ( I ) ABSTAIN: ( 0 )
(2)
2017-080
Exhibit A
CONTRAC
2017 PREVENTIVE MAINTENANCE
PROJECT NUMBER 2017-08
CONTRACT
PREVENTIVE MAINTENANCE
PROJECT NO. 2017-08
THIS AGREEMENT, made and entered into this day of . 20_, by
and between Telfer Pavement Technologies LLC, hereinafter called "Contractor", and the City of
Rohnert Park, hereinafter called "City".
WITNESSETH:
WHEREAS, the City Council of said City has awarded a contract to Contractor for
performing the work hereinafter mentioned in accordance with the sealed proposal of said
Contractor.
NOW, THEREFORE, IT IS AGREED, as follows:
1. Scope of Work: The Contractor must perform all the work and furnish all the labor,
materials, equipment and all utility and transportation services required to complete all of the work
of construction and installation of the improvements more particularly described in the Resolution
adopted by the City Council of said City on June 13, 2017, the items and quantities of which are
more particularly set forth in the Contractor's bid therefor on file in the office of the City Clerk,
except work to be performed by subcontractors as set forth in the Contractor's bid and for which the
Contractor retains responsibility.
2. Time of Performance and Liquidated Damages: The Contractor must begin work
within fifteen (15) calendar days after official notice by the City Engineer to proceed with the work
and must diligently prosecute the same to completion within thirty (30) working days of that Notice.
The Contractor acknowledges and agrees that time is of the essence with respect to Contractor's
work and that Contractor shall diligently pursue performance of the work.
In the event the Contractor does not complete the work within the time limit so specified or
within such further time as said City Council must have authorized, the Contractor must pay to the
City liquidated damages in the amount of $500 per day for each and every day's delay in finishing
the work beyond the completion date so specified. Additional provisions with regard to said time of
completion and liquidated damages are set forth in the specifications, which provisions are hereby
referred to and incorporated herein by reference.
3. Pam: Payments will be made by City to the Contractor for said work
performed at the times and in the manner provided in the specifications and at the unit prices stated
in Contractor's bid.
The award of the contract is for a total amount of $557,810.68.
4. Component Parts and In! cipretation: This contract must consist of the following
documents, each of which is on file in the office of the City Clerk and all of which are incorporated
herein and made a part hereof by reference thereto:
a) This Agreement
b) Notice Inviting Sealed Proposals
C) Instruction and Information to Bidders
d) Accepted Proposal, with all attachments and certifications
e) Faithful Performance Bond
f) Labor and Material Bond
g) Special Provisions
h) Standard Specifications
i) Technical Specifications
j) Design Standards
k) Plans, Profiles and Detailed Drawings
In the event of conflict between these documents, the following order of precedence will
govern: this contract; change orders; supplemental agreements and approved revisions to plans
and specifications; special conditions; standard specifications; detail plans; general plans;
standard plans; reference specifications. In the absence of a controlling or contrary provision in
the foregoing, the Standard Specifications (2006 edition) of the California Department of
Transportation shall apply to this project.
5. Independent Contractor. Contractor is and will at all times remain as to
City a wholly independent contractor. Neither City nor any of its officers, employees, or agents
will have control over the conduct of Contractor or any of Contractor's officers, employees,
agents or subcontractors, except as expressly set forth in the Contract Documents. Contractor
may not at any time or in any manner represent that it or any of its officers, employees, agents, or
subcontractors are in any manner officers, employees, agents or subcontractors of City.
6. Prevailing Wages: Copies of the determination of the Director of the
Department of Industrial Relations of the prevailing rate of per diem wages for each craft,
classification or type of worker needed to execute this Contract will be on file in, and available at
City Hall.
Contractor must post at the work site, or if there is no regular work site then at its
principal office, for the duration of the Contract, a copy of the determination by the Director of
the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor
Code § 1773.2.)
Contractor, and any subcontractor engaged by Contractor, may pay not less than the
specified prevailing rate of per diem wages to all workers employed in the execution of the
PA
contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code
section 1776 relative to the retention and inspection of payroll records.
Contractor must comply with all provisions of Labor Code section 1775. Under Section
1775, Contractor may forfeit as a penalty to City up to $200.00 for each worker employed in the
execution of the Contract by Contractor or any subcontractor for each calendar day, or portion
thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable
to pay the difference between the prevailing wage rates and the amount paid to each worker for
each calendar day, or portion thereof, for which each worker was paid less than the prevailing
wage rate.
Nothing in this Contract prevents Contractor or any subcontractor from employing
properly registered apprentices in the execution of the Contract. Contractor is responsible for
compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute
requires that contractors and subcontractors must submit contract award information to the
applicable joint apprenticeship committee, must employ apprentices in apprenticeable
occupations in a ratio of not less than one hour of apprentice's work for every five hours of labor
performed by a journeyman (unless an exception is granted under § 1777.5), must contribute to
the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council,
and that contractors and subcontractors must not discriminate among otherwise qualified
employees as apprentices solely on the ground of sex, race, religion, creed, national origin,
ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training
under apprenticeship standards and who have written apprentice contracts, may be employed on
public works in apprenticeable occupations.
If federal funds are used to pay for the Work, Contractor and any subcontractor agree to
comply, as applicable, with the labor and reporting requirements of the Davis -Bacon Act (40
USC § 276a-7), the Copeland Act (40 USC § 276c and 18 USC § 874), and the Contract Work
Hours and Safety Standards Act (40 USC § 327 and following).
7. Hours of Labor: Contractor acknowledges that under California Labor Code
sections 1810 and following, eight hours of labor constitutes a legal day's work. Contractor will
forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of this
Contract by Contractor or any subcontractor for each calendar day during which such worker is
required or permitted to work more than eight hours in any one calendar day and 40 hours in any
one calendar week in violation of the provisions of Labor Code section 1810.
8. Apprentices: Attention is directed to the provisions in Sections 1777.5 (Chapter
1411, Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by
the Contractor or any Subcontractor under him.
Section 1777.5, as amended, requires the Contractor or Subcontractor employing tradesmen
in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of
the public works project and which administers the apprenticeship program in that trade for a
certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will
be used in the performance of the Contract. The ratio of apprentices to journeymen in such cases
must not be less than one to five except:
A. When unemployment in the area of coverage by the joint apprenticeship committee
3
has exceeded an average of 15 percent in the 90 days prior to the request for
certificate, or
B. When the number of apprentices in training in that area exceeds a ratio of one to
five, or
C. When the trade can show that it is replacing at least 1/30 of its membership through
apprenticeship training on an annual basis statewide or locally, or
D. When the assignment of an apprentice to any work performed under a public works
Contract would create a condition which would jeopardize his life or the life, safety,
or property of fellow employees or the public at large, or if the specified task to
which the apprentice is to be assigned is of such a nature that training camiot be
provided by a journeyman, or
E. When the Contractor provides evidence that he employs registered apprentices on all
of his Contracts on an annual average of not less than one apprentice to eight
Journeymen.
The Contractor is required to make contributions to funds established for the administration
of apprenticeship program if he employs registered apprentices or journeymen in any apprenticeable
trade on such Contracts and if other Contractors on the public works site are making such
contributions.
The Contractor and any Subcontractor under him must comply with the requirements of
Section 1777.5 and 1777.6 in the employment of apprentices.
Information relative to apprenticeship standards, wage schedules, and other requirements may be
obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship,
San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
9. Labor Discrimination: Attention is directed to Section 1735 of the Labor Code,
which reads as follows:
"A contractor must not discriminate in the employment of persons upon
public works on any basis listed in subdivision (a) of Section 12940 of the Government
Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code,
except as otherwise provided in Section 12940 of the Government Code. Every
contractor for public works who violates this section is subject to all the penalties
imposed for a violation of this chapter. "
10. Workmen's Compensa.lion Insurance: In accordance with the provisions of Article
5, Chapter 1, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part 1, Division 4
(commencing with Section 3700) of the Labor Code of the State of California, the Contractor is
required to secure the payment of compensation to his employees and must for that purpose obtain
and keep in effect adequate Workmen's Compensation Insurance.
The undersigned Contractor is aware of the provisions of Section 3700 of the Labor Code
which requires every employer to be insured against liability for workmen's compensation or to
undertake self-insurance in accordance with the provisions of that Code, and will comply with such
provisions before commencing the performance of the work of this contract.
11. Indemnity and Insurance: To the fullest extent permitted by law, Contractor must
indemnify, hold harmless, release and defend City, its officers, elected officials, employees, agents,
volunteers, and consultants from and against any and all actions, claims, demands, damages,
4
disability, losses, expenses including, but not limited to, attorney's fees and other defense costs and
liabilities of any nature that may be asserted by any person or entity including Contractor, in whole
or in part, arising out of Contractor's activities hereunder, including the activities of other persons
employed or utilized by Contractor including subcontractors hired by the Contractor in the
performance of this Agreement excepting liabilities due to the active negligence of the City. This
indemnification obligation is not limited in any way by any limitation on the amount or type of
damages or compensation payable by or for Contractor under Worker's Compensation, disability or
other employee benefit acts or the terms, applicability or limitations of any insurance held or
provided by Contractor and must continue to bind the parties after termination/completion of this
Agreement.
Contractor shall procure and maintain throughout the time for performance of the work
under this Contract the insurance required by the Special Provisions. The requirement that
Contractor procure and maintain insurance shall in no way be construed to limit the Contractor's
duty to indemnify City as provided in the paragraph above.
Failure of City to monitor compliance with these requirements imposes no additional
obligations on City and will in no way act as a waiver of any rights hereunder.
12. City Right of Termination and Right to Complete the Work. The City may
terminate the Contract when conditions encountered during the work make it impossible or
impracticable to proceed, or when the City is prevented from proceeding with the Contract by act
of God, by law, or by official action of a public authority. In addition, the occurrence of any of
the following is a default by Contractor under this Contract:
A. Contractor refuses or fails to prosecute the Work or any part thereof with such
diligence as will insure its completion within the time specified or any permitted
extension.
B. Contractor fails to complete the Work on time.
C. Contractor is adjudged bankrupt, or makes a general assignment for the benefit of
creditors, or a receiver is appointed on account of Contractor's insolvency.
D. Contractor fails to supply enough properly skilled workers or proper materials to
complete the Work in the time specified.
E. Contractor fails to snake prompt payment to any subcontractor or for material or
labor.
F. Contractor fails to abide by any applicable laws, ordinances or instructions of City in
performing the Work.
G. Contractor breaches or fails to perform any obligation or duty under the Contract.
Upon the occurrence of a default by Contractor, the Director will serve a written notice of
default on Contractor specifying the nature of the default and the steps needed to correct the
default. Unless Contractor cures the default within 10 days after the service of such notice, or
satisfactory arrangements acceptable to City for the correction or elimination of such default are
made, as determined by City, City may thereafter terminate this Contract by serving written
notice on Contractor. In such case, Contractor will not be entitled to receive any further
payment, except for Work actually completed prior to such termination in accordance with the
provisions of the Contract Documents.
5
In event of any such termination, City will also immediately serve written notice of the
termination upon Contractor's surety. The surety will have the right to take over and perform
pursuant to this Contract; provided, however, that if the surety does not give City written notice
of its intention to take over and perform this Contract within five days after service of the notice
of termination or does not commence performance within 10 days from the date of such notice,
City may take over the Work and prosecute the same to completion by contract or by any other
method it may deem advisable for the account and at the expense of Contractor. Contractor and
the surety will be liable to City for any and all excess costs or other damages incurred by City in
completing the Work.
If City takes over the Work as provided in this Section, City may, without liability for so
doing, take possession of, and utilize in completing the Work, such materials, appliances, plant,
and other property belonging to Contractor as may be on the site of the Work and necessary for
the completion of the Work.
13. Substitution of Securities for Withheld Amounts: Pursuant to California Public
Contracts Code Section 22300, securities may be substituted for any moneys withheld by a public
agency to ensure performance under a contract. At the request and sole expense of the Contractor,
securities equivalent to the amount withheld must be deposited with the public agency, or with a
state or federally chartered bank as the escrow agent, who must pay such moneys to the Contractor
upon satisfactory completion of the contract.
Securities eligible for substitution under this section must include those listed in the
California Public Contracts Code Section 22300 or bank or savings and loan certificates of
deposit. The Contractor must be the beneficial owner of any securities substituted for moneys
withheld and must receive any interest thereon.
Alternatively, the Contractor may request and the City shall make payment of retentions
earned directly to the escrow agent at the expense of the Contractor. At the expense of the
Contractor, the Contractor may direct the investment of the payments into securities and the
Contractor shall receive the interest earned on the investments upon the same terms provided for
in Section 22300 for securities deposited by the Contractor. Upon satisfactory completion of the
Contract, the Contractor shall receive from the escrow agent all securities, interest, and payments
received by the escrow agent from the City, pursuant to the terms of this section.
Any escrow agreement entered into pursuant to this section must contain as a minimum the
following provisions:
a. The amount of securities to be deposited;
b. The terms and conditions of conversion to cash in case of the default of the
Contractor; and
C. The termination of the escrow upon completion of the contract.
14. General Provisions
A. Authority to Execute. Each Party represents and warrants that all necessary action
has been taken by such Party to authorize the undersigned to execute this Contract
and to bind it to the performance of its obligations.
B. Assignment. Contractor may not assign this Contract without the prior written
consent of City, which consent may be withheld in City's sole discretion since the
experience and qualifications of Contractor were material considerations for this
Contract.
0
C. Binding Effect. This Agreement is binding upon the heirs, executors, administrators,
successors and permitted assigns of the Parties.
D. Integrated Contract. This Contract, including the Contract Documents, is the entire,
complete, final and exclusive expression of the Parties with respect to the Work to
be performed under this Contract and supersedes all other agreements or
understandings, whether oral or written, between Contractor and City prior to the
execution of this Contract.
E. Modification of Contract. No amendment to or modification of this Contract will be
valid unless made in writing and approved by Contractor and by the City Council or
City Manager, as applicable. The Parties agree that this requirement for written
modifications cannot be waived and that any attempted waiver will be void.
F. Counterparts, Facsimile or other Electronic Signatures. This Contract may be
executed in several counterparts, each of which will be deemed an original, and all
of which, when taken together, constitute one and the same instrument.
Amendments to this Contract will be considered executed when the signature of a
party is delivered by facsimile or other electronic transmission. Such facsimile or
other electronic signature will have the same effect as an original signature.
G. Waiver. Waiver by any Party of any term, condition, or covenant of this Contract
will not constitute a waiver of any other term, condition, or covenant. Waiver by
any Party of any breach of the provisions of this Contract will not constitute a waiver
of any other provision, or a waiver of any subsequent breach or violation of any
provision of this Contract. Acceptance by City of any Work performed by
Contractor will not constitute a waiver of any of the provisions of this Contract.
H. Interpretation. This Contract will be interpreted, construed and governed according
to the laws of the State of California. Each party has had the opportunity to review
this Contract with legal counsel. The Contract will be construed simply, as a whole,
and in accordance with its fair meaning. It will not be interpreted strictly for or
against either party.
I. Severability. If any term, condition or covenant of this Contract is declared or
determined by any court of competent jurisdiction to be invalid, void or
unenforceable, the remaining provisions of this Contract will not be affected and the
Contract will be read and construed without the invalid, void or unenforceable
provision.
J. Venue. In the event of litigation between the parties, venue in state trial courts will
be in the County of Sonoma. In the event of litigation in a U.S. District Court, venue
will be in the Northern District of California.
IN WITNESS WHEREOF, the City of Rohnert Park has caused these presents to be
executed by its officers, thereunto duly authorized, and Contractor has subscribed same, all on the
day and year first above written.
CITY OF ROHNERT PARK
City Manager Date
Per Resolution No. adopted by the Rohnet Park
City Council at its meeting of
7
Telfer Pavement Technologies LLC
Name/Title
Date
ATTEST:
City Clerk
APPROVED AS TO FORM;
City Attorney