Loading...
2018/11/13 City Council Resolution 2018-140 RESOLUTION NO. 2018-140 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT 1 TO TASK ORDER NO. 2017-01 WITH LCA ARCHITECTS FOR ADDITIONAL DESIGN SERVICES FOR THE WESTSIDE FIRE STATION(PROJECT NO.2004-13)AND RELATED ACTIONS WHEREAS, after a qualifications-based selection process and consistent with the Purchasing Policy,the City entered into a Master Agreement with LCA Architects for Design Professional Services on June 14, 2016 and Task Order No. 2016-01 for programming services; and WHEREAS, under the 2016 agreement the City entered into Task Order No. 2017-01 with LCA Architects for design services of the Westside Fire Station (Project No. 2004-13); and WHEREAS, Task Order No. 2017-01 was intended for design services, bidding assistance, and design support during construction, totaling $478,075; and WHEREAS, during the design process, staff needed to add joint trench and corrosion protection design services, and negotiated with LCA to provide those services under Task Order No. 2017-01; and WHEREAS, LCA Architects completed the construction drawings and the City put the project out to bid, receiving nine sealed bids at the public bid opening on February 6th, 2018,but all of the bids greatly exceeded the City's programmed funding; and WHEREAS, at the City Council meeting on April 24th 2018, City Council rejected all bids for the Westside Fire Station Project, and on July 10th, 2018 gave staff direction to redesign the station to fit within the budget; and WHEREAS, at this point, Task Order No. 2017-01 has $81,988.01 remaining on it for design support during construction, and an additional $212,195 is required for additional services staff had LCA provide during the initial design as well as station redesign services; and WHEREAS,the total amount of Task Order No. 2017-01 with the amendment will become $699,270; and WHEREAS,the City Council considered Amendment 1 to Task Order No.2017-01 at its duly noticed regular meeting of November 13th, 2018. NOW,THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize the City Manager to execute Amendment 1 to Task Order No. 2017-01 by and between LCA Architects, a California Corporation, and the City of Rohnert Park, a municipal corporation, for additional design services in an amount not to exceed two hundred and twelve thousand one hundred and ninety-five dollars and no cents($212,195.00). BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to take all actions to effectuate the amended Task Order on behalf of the City of Rohnert Park, including execution, if necessary, in substantially similar form to the Task Order Amendment 1 attached hereto and incorporated by this reference as Exhibit"A," subject to minor modifications by the City Manager or City Attorney. BE IT FURTHER RESOLVED the Finance Director is authorized to increase appropriations to the Task Order to a total of$690,270.00. DULY AND REGULARLY ADOPTED this 13th day of November, 2018. CITY OF ROHNERT PARK -PI. - Pam Stafford, Ma +r ATTEST: tAjtm Caitlin Saldanha,Assistant City Clerk Attachment: Exhibit A AHANOTU: Q BELFORTE: 141 e MACKENZIE:' 1 e CALLINAN: 14 1. STAFFORD: 14y -e AYES: ( c ) NOES: ( Q) ABSENT: ( 0 ) ABSTAIN: ( Q ) (2 ) 2018-140 Exhibit A to Resolution AMENDMENT 1 TO TASK ORDER NO. 2017-01 CITY OF ROHNERT PARK AND LCA ARCHITECTS AUTHORIZATION OF ADDITIONAL DESIGN SERVICES AND SUPPORT FOR THE WESTSIDE FIRE STATION(Project No. 2004-13) SECTION 1 —PURPOSE The purpose of this Amendment 1 to Task Order No. 2017-01 ("Amendment") is to authorize and direct LCA Architects to proceed with the work specified in Section 2 below in accordance with the provisions of the MASTER AGREEMENT between the City of Rohnert Park("City") and LCA Architects ("Consultant") dated June 14, 2016. SECTION 2—SCOPE OF WORK The additional items authorized by this Amendment are presented in Exhibit"A,"attached hereto and incorporated herein. SECTION 3—COMPENSATION AND PAYMENT Compensation shall be as provided in the MASTER AGREEMENT between the parties referenced in SECTION 1. The additional cost for the additional services as set forth in SECTION 2 shall be actual costs(time and materials)based on Consultants' standard labor charges in accordance with the provisions of the MASTER AGREEMENT and as shown in Exhibit"B"attached hereto and incorporated herein, for an amount not-to-exceed $212,195. Total compensation under Task Order No. 2017-01 and this Amendment shall not exceed $690,270. SECTION 4—TIME OF PERFORMANCE The work described in SECTION 2 shall be completed by December 31, 2019, or as extended by the City Engineer or her designee. SECTION 5—ITEMS AND CONDITIONS All items and conditions contained in the MASTER AGREEMENT for professional services between City and Consultant are incorporated by reference. Approved this 13th day of November, 2018. CITY OF ROHNERT PARK LCA Architects Darrin Jenkins, City Manager (Date) Carl Campos,President (Date) Per Resolution No.2018- adopted by the Rohnert Park City Council at its meeting of 11/13/18 ATTEST: APPROVED AS TO FORM: City Clerk City Attorney 1 of 6 Exhibit A ;1'44:4 4 ADDITIONAL SERVICE REQUEST 5 Under the conditions of the Architect's Contract for Professional Services with the Owner,as required,the Architect notifies the Owner and the Owner hereby authorizes the Architect to perform Additional Services as previously agreed. PROJECT: Fire Station No.3 10/18/2018 LCA Fire Station#3 Job#17004 OWNER: City of Rohnert Park Attention:Vanessa Garrett, Civil Engineer LCA Architects Task Order No. 2017-01 WORK: REDESIGN FIRE STATION FOR REBIDDING DESCRIPTION: Requesting additional services as follows: Provide redesign and rebid services for the new Fire Station 3. The construction cost budget shall be discussed and determined based on costs occurred to date. A. Schematic Design/Design Approvals 1. Schematic architectural floor plan and site plan design. 2. Prepare architectural elevations and sections. 3. Prepare all documentation required for design review. 4. Meet with Public Safety to develop designs and discuss project progress. 5. Meet with City Planners to develop and present designs. 6. Attend public hearings to present designs at the City's Planning Commission and Design Review Commission. 7. Provide City with 100%Schematic Design package for review. 8. Provide City with 100%Schematic Design cost estimate. B. Design Development 1. Prepare design development documents based on the Public Safety approved schematic designs. The design development documents shall describe the size and character of the project as to the systems, materials,and other elements that may be appropriate. 590"gnacto Va ley Roac,,Lite 310,Walnj:Creek CA 94596 1 (925)944-'626 I www.Cca-architects.com 1810180.RPFS3-ASR 5-redeisgn I 10/19/2018 2 of 6 5 ADDITIONAL SERVICE REQUEST 1„„____J A R.1 F f i i E .. S C. Construction Documents 1. Prepare construction documents (drawings and specifications). 2. Prepare Title 24 energy calculations. 3. Prepare fire sprinkler and fire alarm performance specifications. 4. Manage and coordinate subconsultant work. 5. Present CD package to Public Safety and City Project Manager. 6. Provide City with 50%Construction Document package for review. 7. Provide City with 50%Construction Document cost estimate. 8. Provide City with 90%Construction Document package for review. 9. Provide City with 90%Construction Document cost estimate. D. Permitting 1. Assist Public Safety and City to obtain a building permit. 2. Prepare all required documents for permits. 3. Submit documents to Building Permit Authority. 4. Make necessary revisions to construction documents (plans and specifications) required by Plan Check process to obtain permit. E. Bidding 1. Assist Public Safety and City with bidding. 2. Attend Pre-Bid Walk with prospective Contractors. 3. Respond to Bidding Questions. 4. Issue Addenda as directed by Public Safety and the City. 5. Issue Conformed Set. 590"gnacio Va Icy Ronr.Sute 310,Waln.i'C•eel< CA 94596 (925)92:4-'626 www.lca-architects.com^ �� 1810180 RPFS3-ASR 5-redeisgn I 10/19/2018 3 of 6 iIi . AL ADDITIONAL SERVICE REQUEST 5 `°c_ `e1 A v€:F II Fc,..` For this additional work,we respectfully request the following compensation: ASR FEE SCHEDULE LCA Architects % Fee A. Schematic Design/ 15% $14,100.00 Design Approval B. Design Development 25% $23,500.00 C. Construction Documents 50% $47,000.00 D. Permitting 8% $7,520.00 E. Bidding 2% $1,880.00 LCA total 100% $94,000.00 Civil: Brelje&Race $43,180.00 FIXED Struct: Crosby $14,936.00 FIXED MEP: FARD $24,600.00 FIXED Title 24: Duct Testers $350.00 FIXED Landscape: Camp&Camp $8,250.00 FIXED Corrosion: JDH $1,000.00 FIXED Joint Trench: Tarrar $1,800.00 FIXED D13—Cost Estimation: Gleeds $10,000.00 FIXED Consultant Total $104,116.00 Project Fee Total * $198,116.00 1, Lao.1 rr> 10/18/18 Carl Campos CEO DATE OWNER REPRESENTATIVE DATE LCA Architects Inc. Authorization of Additional Services indicated ATTACH M E NTS • Fee Budget spreadsheet, dated 10/18/18(1 page) 590"gnacto Va loy Roar.,Suit.310 Waln,r C'eel, CA 94596 I (9?5)944-'626 1 www.lca-architects.com 1810180 RPFS3-ASR 5-redeisgn I 10/19/2018 4 of 6 10/18/2018 ri LCA L.J ARC i-iTECTS Fire Station 3-Rohnert Park Total Arch Civil Struct Landscape Mech Elec Plumb T-24 Envelope T-24 Report Cost Corrosion Joint Trench Reimb Redesign Bid Set of Docs LCA Architects 8relle&Race Crosby Camp&Camp FARD FARD FARD FARD Duct Testers Gleeds 1DH Tarrar Redesign CDs $198,116.00 $94,000.00 $43,180.00 $14,936 00 $8,250.00 $4,800 00 $9,600.00 $7,200.00 $3,000.00 $350 00 $10,000 00 $1,000 00 $1,800.00 TOTAL $198,116.00 $94,000.00 $43,180.00 $14,936.00 $8,250.00 $4,800.00 $9,600.00 $7,200.00 $3,000.00 $350.00 $10,000.00 $1,000.00 $1,800.00 Cost+15% Additional Services During Initial Design ASR 1 SPAR Review Process $7,335 00 $7,335 00 ASR 2 Added consultants $6,744 00 $2,545 00 $4,199 00 Total $14,079 5 of6 Exhibit B rill LEA Lemi LCA ARCHITECTS, INC. ARCHITECTS HOURLY FEE SCHEDULE DESCRIPTION HOURLY RATE Principal $210.00 Principal Emeritus $210.00 Associate $190.00 to$210.00 Project Manager $190.00 Project Architect $135.00 to$180.00 Quality Control Manager $190.00 Specifications Writer $190.00 Job Captain $110.00 to $125.00 Designer $90.00 to$170.00 CAD Tech $90.00 to$135.00 Project Coordinator $95.00 to$130.00 Administration/Research/Presentations $90.00 to$105.00 Clerical $105.00 Architectural Animation- Preparation of $165.00/hr. computer generated views, renderings and simulations of architectural interiors and exteriors. Preparation of video"fly-by's," walkthrough's, and other simulations. Expert Witness- Review of documents, meetings, site visits, telephone conferences, $500.00/hr. administration of the documents and materials, research, deposition, testimony, court appearances, and travel time. Perspective Sketches and Renderings, Visual On a Per Drawing Basis Simulations Mileage(outside of the Walnut Creek area) 0.65.5/mile" "as adjusted by IRS guidelines Copies, prints, CADD plots, photography,preparing and compiling pdf. sets, scanning, colored print mounting, long distance phone calls, FAX transmissions, postage, express mail, and travel outside the Walnut Creek area will be billed on a reimbursable basis: at cost plus 15%. LCA ARCHITECTS Overtime - If overtime is required by staff, to meet a customer's timing request, 590 Ygnaao Valley Road additional hourly fee charges may apply. California employment law will apply. Suite 310 Walnut Creek,CA 94596 T 925.944.1626 1970 Broadway Suite 800 Oakland,CA 94612 T 510.272 1060 W Ica-architects.coin 6 of 6