2018/11/13 City Council Resolution 2018-140 RESOLUTION NO. 2018-140
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT 1 TO TASK
ORDER NO. 2017-01 WITH LCA ARCHITECTS FOR ADDITIONAL DESIGN
SERVICES FOR THE WESTSIDE FIRE STATION(PROJECT NO.2004-13)AND
RELATED ACTIONS
WHEREAS, after a qualifications-based selection process and consistent with the
Purchasing Policy,the City entered into a Master Agreement with LCA Architects for Design
Professional Services on June 14, 2016 and Task Order No. 2016-01 for programming services;
and
WHEREAS, under the 2016 agreement the City entered into Task Order No. 2017-01
with LCA Architects for design services of the Westside Fire Station (Project No. 2004-13); and
WHEREAS, Task Order No. 2017-01 was intended for design services, bidding
assistance, and design support during construction, totaling $478,075; and
WHEREAS, during the design process, staff needed to add joint trench and corrosion
protection design services, and negotiated with LCA to provide those services under Task Order
No. 2017-01; and
WHEREAS, LCA Architects completed the construction drawings and the City put the
project out to bid, receiving nine sealed bids at the public bid opening on February 6th, 2018,but
all of the bids greatly exceeded the City's programmed funding; and
WHEREAS, at the City Council meeting on April 24th 2018, City Council rejected all
bids for the Westside Fire Station Project, and on July 10th, 2018 gave staff direction to redesign
the station to fit within the budget; and
WHEREAS, at this point, Task Order No. 2017-01 has $81,988.01 remaining on it for
design support during construction, and an additional $212,195 is required for additional services
staff had LCA provide during the initial design as well as station redesign services; and
WHEREAS,the total amount of Task Order No. 2017-01 with the amendment will
become $699,270; and
WHEREAS,the City Council considered Amendment 1 to Task Order No.2017-01 at its
duly noticed regular meeting of November 13th, 2018.
NOW,THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert
Park that it does hereby authorize the City Manager to execute Amendment 1 to Task Order No.
2017-01 by and between LCA Architects, a California Corporation, and the City of Rohnert Park,
a municipal corporation, for additional design services in an amount not to exceed two hundred
and twelve thousand one hundred and ninety-five dollars and no cents($212,195.00).
BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed
to take all actions to effectuate the amended Task Order on behalf of the City of Rohnert Park,
including execution, if necessary, in substantially similar form to the Task Order Amendment
1
attached hereto and incorporated by this reference as Exhibit"A," subject to minor modifications
by the City Manager or City Attorney.
BE IT FURTHER RESOLVED the Finance Director is authorized to increase
appropriations to the Task Order to a total of$690,270.00.
DULY AND REGULARLY ADOPTED this 13th day of November, 2018.
CITY OF ROHNERT PARK
-PI. -
Pam Stafford, Ma +r
ATTEST:
tAjtm
Caitlin Saldanha,Assistant City Clerk
Attachment: Exhibit A
AHANOTU: Q BELFORTE: 141 e MACKENZIE:' 1 e CALLINAN: 14 1. STAFFORD: 14y -e
AYES: ( c ) NOES: ( Q) ABSENT: ( 0 ) ABSTAIN: ( Q )
(2 )
2018-140
Exhibit A to Resolution
AMENDMENT 1 TO TASK ORDER NO. 2017-01
CITY OF ROHNERT PARK
AND LCA ARCHITECTS
AUTHORIZATION OF ADDITIONAL DESIGN SERVICES AND SUPPORT FOR THE
WESTSIDE FIRE STATION(Project No. 2004-13)
SECTION 1 —PURPOSE
The purpose of this Amendment 1 to Task Order No. 2017-01 ("Amendment") is to authorize
and direct LCA Architects to proceed with the work specified in Section 2 below in accordance
with the provisions of the MASTER AGREEMENT between the City of Rohnert Park("City")
and LCA Architects ("Consultant") dated June 14, 2016.
SECTION 2—SCOPE OF WORK
The additional items authorized by this Amendment are presented in Exhibit"A,"attached
hereto and incorporated herein.
SECTION 3—COMPENSATION AND PAYMENT
Compensation shall be as provided in the MASTER AGREEMENT between the parties
referenced in SECTION 1. The additional cost for the additional services as set forth in
SECTION 2 shall be actual costs(time and materials)based on Consultants' standard labor
charges in accordance with the provisions of the MASTER AGREEMENT and as shown in
Exhibit"B"attached hereto and incorporated herein, for an amount not-to-exceed $212,195.
Total compensation under Task Order No. 2017-01 and this Amendment shall not exceed
$690,270.
SECTION 4—TIME OF PERFORMANCE
The work described in SECTION 2 shall be completed by December 31, 2019, or as extended by
the City Engineer or her designee.
SECTION 5—ITEMS AND CONDITIONS
All items and conditions contained in the MASTER AGREEMENT for professional services
between City and Consultant are incorporated by reference.
Approved this 13th day of November, 2018.
CITY OF ROHNERT PARK LCA Architects
Darrin Jenkins, City Manager (Date) Carl Campos,President (Date)
Per Resolution No.2018- adopted by the
Rohnert Park City Council at its meeting of 11/13/18
ATTEST: APPROVED AS TO FORM:
City Clerk City Attorney
1 of 6
Exhibit A
;1'44:4 4
ADDITIONAL SERVICE REQUEST 5
Under the conditions of the Architect's Contract for Professional Services with the Owner,as required,the Architect notifies the
Owner and the Owner hereby authorizes the Architect to perform Additional Services as previously agreed.
PROJECT: Fire Station No.3 10/18/2018
LCA Fire Station#3 Job#17004
OWNER: City of Rohnert Park
Attention:Vanessa Garrett, Civil Engineer
LCA Architects Task Order No. 2017-01
WORK: REDESIGN FIRE STATION FOR REBIDDING
DESCRIPTION: Requesting additional services as follows:
Provide redesign and rebid services for the new Fire Station 3. The construction cost budget
shall be discussed and determined based on costs occurred to date.
A. Schematic Design/Design Approvals
1. Schematic architectural floor plan and site plan design.
2. Prepare architectural elevations and sections.
3. Prepare all documentation required for design review.
4. Meet with Public Safety to develop designs and discuss project progress.
5. Meet with City Planners to develop and present designs.
6. Attend public hearings to present designs at the City's Planning Commission and Design Review
Commission.
7. Provide City with 100%Schematic Design package for review.
8. Provide City with 100%Schematic Design cost estimate.
B. Design Development
1. Prepare design development documents based on the Public Safety approved schematic
designs. The design development documents shall describe the size and character of the project
as to the systems, materials,and other elements that may be appropriate.
590"gnacto Va ley Roac,,Lite 310,Walnj:Creek CA 94596 1 (925)944-'626 I www.Cca-architects.com
1810180.RPFS3-ASR 5-redeisgn I 10/19/2018
2 of 6
5
ADDITIONAL SERVICE REQUEST
1„„____J A R.1 F f i i E .. S
C. Construction Documents
1. Prepare construction documents (drawings and specifications).
2. Prepare Title 24 energy calculations.
3. Prepare fire sprinkler and fire alarm performance specifications.
4. Manage and coordinate subconsultant work.
5. Present CD package to Public Safety and City Project Manager.
6. Provide City with 50%Construction Document package for review.
7. Provide City with 50%Construction Document cost estimate.
8. Provide City with 90%Construction Document package for review.
9. Provide City with 90%Construction Document cost estimate.
D. Permitting
1. Assist Public Safety and City to obtain a building permit.
2. Prepare all required documents for permits.
3. Submit documents to Building Permit Authority.
4. Make necessary revisions to construction documents (plans and specifications) required by Plan
Check process to obtain permit.
E. Bidding
1. Assist Public Safety and City with bidding.
2. Attend Pre-Bid Walk with prospective Contractors.
3. Respond to Bidding Questions.
4. Issue Addenda as directed by Public Safety and the City.
5. Issue Conformed Set.
590"gnacio Va Icy Ronr.Sute 310,Waln.i'C•eel< CA 94596 (925)92:4-'626 www.lca-architects.com^ ��
1810180 RPFS3-ASR 5-redeisgn I 10/19/2018
3 of 6
iIi . AL ADDITIONAL SERVICE REQUEST 5
`°c_ `e1
A v€:F II Fc,..`
For this additional work,we respectfully request the following compensation:
ASR FEE SCHEDULE
LCA Architects % Fee
A. Schematic Design/ 15% $14,100.00
Design Approval
B. Design Development 25% $23,500.00
C. Construction Documents 50% $47,000.00
D. Permitting 8% $7,520.00
E. Bidding 2% $1,880.00
LCA total 100% $94,000.00
Civil: Brelje&Race $43,180.00 FIXED
Struct: Crosby $14,936.00 FIXED
MEP: FARD $24,600.00 FIXED
Title 24: Duct Testers $350.00 FIXED
Landscape: Camp&Camp $8,250.00 FIXED
Corrosion: JDH $1,000.00 FIXED
Joint Trench: Tarrar $1,800.00 FIXED
D13—Cost Estimation: Gleeds $10,000.00 FIXED
Consultant Total $104,116.00
Project Fee Total * $198,116.00
1, Lao.1 rr>
10/18/18
Carl Campos CEO DATE OWNER REPRESENTATIVE DATE
LCA Architects Inc. Authorization of Additional Services indicated
ATTACH M E NTS
• Fee Budget spreadsheet, dated 10/18/18(1 page)
590"gnacto Va loy Roar.,Suit.310 Waln,r C'eel, CA 94596 I (9?5)944-'626 1 www.lca-architects.com
1810180 RPFS3-ASR 5-redeisgn I 10/19/2018
4 of 6
10/18/2018
ri LCA
L.J ARC i-iTECTS
Fire Station 3-Rohnert Park
Total Arch Civil Struct Landscape Mech Elec Plumb T-24 Envelope T-24 Report Cost Corrosion Joint Trench Reimb
Redesign Bid Set of Docs LCA Architects 8relle&Race Crosby Camp&Camp FARD FARD FARD FARD Duct Testers Gleeds 1DH Tarrar
Redesign CDs $198,116.00 $94,000.00 $43,180.00 $14,936 00 $8,250.00 $4,800 00 $9,600.00 $7,200.00 $3,000.00 $350 00 $10,000 00 $1,000 00 $1,800.00
TOTAL $198,116.00 $94,000.00 $43,180.00 $14,936.00 $8,250.00 $4,800.00 $9,600.00 $7,200.00 $3,000.00 $350.00 $10,000.00 $1,000.00 $1,800.00 Cost+15%
Additional Services During Initial Design
ASR 1 SPAR Review Process $7,335 00 $7,335 00
ASR 2 Added consultants $6,744 00 $2,545 00 $4,199 00
Total $14,079
5 of6
Exhibit B
rill LEA
Lemi LCA ARCHITECTS, INC.
ARCHITECTS HOURLY FEE SCHEDULE
DESCRIPTION HOURLY RATE
Principal $210.00
Principal Emeritus $210.00
Associate $190.00 to$210.00
Project Manager $190.00
Project Architect $135.00 to$180.00
Quality Control Manager $190.00
Specifications Writer $190.00
Job Captain $110.00 to $125.00
Designer $90.00 to$170.00
CAD Tech $90.00 to$135.00
Project Coordinator $95.00 to$130.00
Administration/Research/Presentations $90.00 to$105.00
Clerical $105.00
Architectural Animation- Preparation of $165.00/hr.
computer generated views, renderings and
simulations of architectural interiors and
exteriors. Preparation of video"fly-by's,"
walkthrough's, and other simulations.
Expert Witness- Review of documents,
meetings, site visits, telephone conferences, $500.00/hr.
administration of the documents and
materials, research, deposition, testimony,
court appearances, and travel time.
Perspective Sketches and Renderings, Visual On a Per Drawing Basis
Simulations
Mileage(outside of the Walnut Creek area) 0.65.5/mile"
"as adjusted by IRS guidelines
Copies, prints, CADD plots, photography,preparing and compiling pdf. sets, scanning,
colored print mounting, long distance phone calls, FAX transmissions, postage, express
mail, and travel outside the Walnut Creek area will be billed on a reimbursable basis:
at cost plus 15%.
LCA ARCHITECTS Overtime - If overtime is required by staff, to meet a customer's timing request,
590 Ygnaao Valley Road additional hourly fee charges may apply. California employment law will apply.
Suite 310
Walnut Creek,CA 94596
T 925.944.1626
1970 Broadway
Suite 800
Oakland,CA 94612
T 510.272 1060
W Ica-architects.coin