Loading...
2019/07/23 Planning Commission ResolutionPLANNING COMMMISSION RESOLUTION NO. 2015-08 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK, CALIFORNIA, APPROVING A CONDITIONAL USE PERMIT, SITE PLAN AND ARCHITECTURAL REVIEW FOR A NEW COSTCO FUELING FACILITY AND CONVERSION OF THE EXISTING FUELING FACILITY INTO CUSTOMER PARKING (APN 143-040-107) (Kim Katz for Costco) WHEREAS, the applicant, Kim Katz for Costco, filed Planning Application No. PLSU2015-0001 for a conditional Use Permit, Site Plan and Architectural Review to allow a new Costco fueling facility and conversion of the existing facility to parking on property located at 5901 Redwood Drive (APN 143- 040-107), in accordance with the City of Rohnert Park Municipal Code; WHEREAS, Planning Application No. PLSU2015-0001 was processed in the time and mariner prescribed by State and local law; WHEREAS, public hearing notices were transmitted to all property owners within a 300 foot radius of the subject property and to all agencies and interested parties as required by California State Planning Law, and a public hearing notice was published in the Community Voice for a minimum of 10 days prior to the first public hearing; WHEREAS, on July 23, 2015, the Planning Commission reviewed Planning Application No. PLSU2015-0001 at which time interested persons had an opportunity to testify either in support of or opposition to the project; and, WHEREAS, at the July 23, 2015, Planning Commission meeting, upon considering all testimony and arguments, if any, of all persons desiring to be heard, the Commission considered all the facts relating to Planning Application No. PLSU2015-0001. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the above recitations are true and correct. Section 2. Factors considered. The Planning Commission, in approving Planning Application No. PLSU2015-0001, makes the following factors, to wit: A. That the developments general appearance is compatible with existing development and enhances the surrounding neighborhood. Criteria Satisfied The new fueling facility will be similar in appearance with the existing facility and fit in with the overall appearance of the Costco building. The proposal will result in an increase in landscaping on the property. B. That the development incorporates a variation from adjacent on-site and off-site structures in height, bulk, and area; arrangement on the parcel; openings or breaks in the faVade facing the street; and/or the line and pitch of the roof. Criteria Satisfied. The canopy over the pump islands and the equipment and office enclosure are not large structures and their location is compatible with other structures on the site. C. That the development will be located and oriented in such a manner so as to provide pedestrian, bicycle and vehicular connections with adjacent properties, as appropriate, and avoids indiscriminate location and orientation. Criteria Satisfied. The relocation of the fueling facility will improve customer and gas truck circulation on the site. It will also provide new parking that is more convenient to customers using the main entrance to the Costco warehouse. D That the proposed location of the Conditional Use is consistent with the objectives of the Zoning Ordinance and the purposes of the district in which the site is located. Criteria Satisfied. The new fueling facility is replacing an existing facility that was in operation since 2001. The existing facility is consistent with the objectives of the Zoning Ordinance and the new facility will also be consistent with the objectives of the Zoning Ordinance and the purposes of the C-R Regional Commercial District. E. That the proposed location of the Conditional Use and the conditions under which it would be operated or maintained will not be detrimental to the public health, safety or welfare or materially injurious to properties or improvements in the vicinity, and the operation and maintenance of the Conditional Use will be compatible with the surrounding uses. Criteria Satisfied. The new fueling facility will incorporate all of the required safety equipment required for a gas station. The existing fueling facility has operated on the Costco property for many years with no known detriment to the surrounding properties or uses. F. The proposed Conditional Use will comply with each of the applicable provisions of this title. Criteria Satisfied. In evaluating this project it has been found that it complies with all of the provisions of the Zoning Ordinance, Section 3. Environmental Clearance. This proposal is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) since the project is replacement of a fueling facility with one that is similar to the existing facility. The new facility would not have a significant impact on the environment under Section 15061 (3). NOW THEREFORE BE IT RESOLVED, that the Planning Commission does hereby approve Planning Application No. PLUP2015-0001 subject to the following conditions: 1. The Conditional Use Permit, Site Plan and Architectural Review approval shall expire one year from the Planning Commission approval date, unless prior to the expiration a building permit is issued and construction is commenced and diligently pursued toward completion and the use is initiated, or an extension is requested and approved. 2. The facility shall comply with any and all applicable provisions of the Rohnert Park Municipal Code and any local, state or federal agency. 3. Any landscaping damaged during construction shall be replaced. 4. Prior to the installation of any signs, the applicant shall submit and receive approval of a Sign Program. 5. The Dowdell Avenue driveway entrance to the property shall not be blocked by delivery trucks accessing the recessed truck dock for the Costco store. 6. There shall be an on-site attendant when the station is open and that person shall assist handicapped motorists upon request. 7. The applicant shall conform to the requirements of the California Code of Regulations Article 7: Underground Storage Tank closure Requirements. 8. The applicant shall conform to regulations and agencies that govern gasoline facilities and the installation of underground storage tanks. 9. When the new facility is completed the city will issue a Temporary Certificate of Occupancy. When the existing facility has been demolished and converted to parking and landscaping including the removal of the underground storage tanks, a Certificate of Occupancy will be issued for the new facility. BE IT FURTHER RESOLVED that said action shall not be deemed final until the appeal period has expired and that the appeal period shall be ten (10) working days from the date of said action. No building permits shall be issued until the appeal period has expired, providing there are no appeals. DULY AND REGULARLY ADOPTED on this 23rd day of July, 2015 by the City of Rohnert Park Planning Commission by the following vote: AYES: -_!- L NOES: ABSENT: ABSTAIN: ADAMS " BLANQUIE;j b)I($ORBA GIUDICE HAYDON ohn Borba, Chairperson, Rohnert Park Planning Commission ti. Atteist: N f - t �--L 'I Bozic A ' redo, Re riling Secretary