2019/04/23 City Council Resolution 2019-040RESOLUTION NO. 2019-040
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
AUTHROIZING AND APPROVING PROPOSED PROJECT LIST FOR SB 1 FUNDING
FROM THE STATE ROAD MAINTENANCE AND REHABILITATION ACCOUNT
(RMRA) AND SUBMITTAL OF THE PROJECT LIST TO THE
CALIFORNIA TRANSPORTATION COMMISSION
WHEREAS, in 2017, the Governor signed Senate Bill ("SB I"), also known as the Road
Repair and Accountability Act of 2017 to address basic road maintenance, rehabilitation and
critical safety needs on both the state highway and local streets and road system by increasing
per gallon fuel excise taxes, diesel fuel sales taxes, and vehicle registration fees; and
WHEREAS, California cities and counties are eligible to receive funding from the Road
Maintenance and Rehabilitation Account ("RMRA") created by SB 1 for basic road maintenance,
rehabilitation, and critical safety projects on the local streets and roads system; and
WHEREAS, the City expects to receive $721,618 in RMRA funds in FY 2019-20; and
WHEREAS, the RMRA funds provide a significant boost to the City's local streets and
roads for basic maintenance and safety, investing in complete streets infrastructure, using
cutting-edge technology, materials and practices, and has significant positive benefits; and
WHEREAS, SB 1 emphasizes the importance of accountability and transparency in the
delivery of California's transportation programs, and therefore requires cities and counties to
provide basic annual RMRA project reporting to the California Transportation Commission
("CTC") in order to be eligible for RMRA funding; and
WHEREAS, prior to receiving an apportionment of RMRA funds from the Controller in
a fiscal year, the City must submit to the CTC a list of projects proposed to be funded with these
funds, and include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement.
NOW, THEREFORE BE IT RESOLVED, ORDERED AND FOUND by the City
Council of the City of Rohnert Park:
1. The foregoing recitals are true and correct.
2. The following is a list of proposed projects to be funded in -part or solely with
Fiscal Year 2019-20 Road Maintenance and Rehabilitation Account revenues:
TABLE 1: Project List for FY 2019-20 Road Maintenance and Rehabilitation Account funding
Description of Project
Location of Project
Proposed
Estimated
Schedule
Useful Life
1
Traffic Signal
Rohnert Park Expressway:
August 2019 —
6-9 years
Component Upgrades
Labath Avenue to Knight Road
July 2020
(includes upgrades or
replacement of cabinets,
Golf Course Drive:
August 2019 -
6-9 years
hardware, software, other
Dowdell Avenue to Hillview Way
July 2021
Commerce Blvd:
August 2019 -
6-9 years
components)
Redwood Drive to Avram Avenue
July 2022
Snyder Lane:
August 2019 -
6-9 years
Circulo Grande to East Cotati Ave
July 2022
3. The following previously proposed and adopted projects may utilize FY 2019-20
Road Maintenance and Rehabilitation Account revenues in their delivery. The City is reaffirming
to the public and the State our intent to fund these projects with Road Maintenance and
Rehabilitation Account revenues by relisting these projects in the adopted fiscal year resolution:
TABLE 2: Relisted Projects for FY 2019-20 Road Maintenance and Rehahil$atina A,.,.,,..,,. G- 4;
TABLE]: Project List for FY 2019-20 Road Maintenance and Rehabilitation Account funding
Location of Project
Original
(continued)
Estimated
Park
way / State
TFarmTraffic
Rohnert Park Expressway
between Commerce Boulevard
July 2019 - 12-17 years
Project
Useful
and SMART Pathway
October 2021
ments Project
Schedule
Life
1
(includes traffic signal,
State Farm Drive from
July 2019 - 12-17 years
March 2019 —
pedestrian, median, and
:Rohnert
Park Expressway to Ene
October 2021
Rohnert Park City Limits at
striping improvements)
Drive
(Full -depth reclamation)
Enterprise Drive from Seed Farm
July 2019 - 12-17 years
years
Drive to State Farm Drive
October 2021
3. The following previously proposed and adopted projects may utilize FY 2019-20
Road Maintenance and Rehabilitation Account revenues in their delivery. The City is reaffirming
to the public and the State our intent to fund these projects with Road Maintenance and
Rehabilitation Account revenues by relisting these projects in the adopted fiscal year resolution:
TABLE 2: Relisted Projects for FY 2019-20 Road Maintenance and Rehahil$atina A,.,.,,..,,. G- 4;
DULY AND REGULARLY ADOPTED this 23rd day of April, 2019.
ATTEST:
i,
onnV� L e M. Buergler, City Cler
CITY OF ROHNERT PARK
In elfort ayor
ADAMS:MACKENZIE: STAFFORD: kl&t CALLINAN:,&V�,�
Description of Project
Location of Project
Original
Proposed
Estimated
FY
Project
Useful
Listing
Schedule
Life
1
East Cotati Avenue
East Cotati Avenue:
2017-18
March 2019 —
20-30
Rehabilitation
Rohnert Park City Limits at
Jul 2020
y
(Full -depth reclamation)
Sunflower Drive to Snyder
years
Lane
2
Country Club Drive
Overlay (Asphalt overlay
Country Club Drive:
Rohnert Park Expressway
2018-19
March 2019 —
6-10 years
with partial base
to Eleanor Avenue
August 2019
reconstruction)
3
Golf Course Drive
Pavement Preservation
Golf Course Drive:
Country Club Drive to
2018-19
October 2019 -
6-10 years
(Cape seal with digouts
Hillview Way
October 2020
and striping/signage
improvements)
DULY AND REGULARLY ADOPTED this 23rd day of April, 2019.
ATTEST:
i,
onnV� L e M. Buergler, City Cler
CITY OF ROHNERT PARK
In elfort ayor
ADAMS:MACKENZIE: STAFFORD: kl&t CALLINAN:,&V�,�
BELFORTE:
AYES: ( �) NOES: (
9D ) ABSENT: (( �) ABSTAIN: (���{- )
2019-040