Loading...
2019/08/08 Planning Commission Resolution (5) PLANNING COMMISSION RESOLUTION NO. 2019-29 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK RECOMMENDING TO THE CITY COUNCIL THE APPROVAL OF A TENTATIVE MAP TO ALLOW THE SUBDIVISION OF PROPERTY LOCATED SOUTH OF KEISER AVENUE, WEST OF PETALUMA HILL ROAD, AND NORTH OF ROHNERT PARK EXPRESSWAY (APN 045-262-001 THROUGH -004, 047-131-019, AND 047-131-024 AND -025) WHEREAS, the applicant, University District LLC, filed Planning Applications proposing a General Plan Amendment (PLGP19-0001), Specific Plan revision (PLSP19-0001), Tentative Map (PLSD19-0001), and Development Area Plan (PLDP19-0002) in connection with the proposed University District Specific Plan (“UDSP”) Project located south of Keiser Avenue, west of Petaluma Hill Road, and north of Copeland Creek (various APNs) (the “Project”), in accordance with the City of Rohnert Park Municipal Code (“RPMC”); and WHEREAS, in conjunction with Application No. PLSD19-0001, the applicant prepared a tentative map for the University District Vast Oak North property located south of Keiser Avenue, west of Petaluma Hill Road, and north of Rohnert Park Expressway (various APNs), as provided in the Proposed Tentative Map attached to this Resolution as Exhibit 1; and WHEREAS, the City Council of the City of Rohnert Park has certified the Final EIR prepared for the Project and the City has otherwise carried out all requirements for the Project pursuant to CEQA; and WHEREAS, pursuant to California State Law and the RPMC, public hearing notice was published for a minimum of 10 days prior to the first public hearing in the Community Voice; and WHEREAS, on August 8, 2019 the Planning Commission held a public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposal; and WHEREAS, the Planning Commission has reviewed and considered the information contained in Planning Application No. PLSD19-0001in Exhibit 1 for the proposed Tentative Map for the property; and NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Rohnert Park makes the following findings, determinations and recommendations with respect to the proposed Tentative Map for the property: Section 1. The above recitations are true and correct. Section 2. Environmental Review: A. On May 23, 2006, the City Council of the City of Rohnert Park certified the Final EIR for this Project, including adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program, as described in City Council Resolution No. 2006-141. 2 Reso 2019-29 The City Council approved the Addendum to the Final EIR, as described in City Council Resolution No. 2014-032 approved on April 8, 2014. The proposed Tentative Map is consistent with the analyses in the 2006 EIR and 2014 Addendum and will not result in additional environmental effects not previously evaluated in the EIR and Addendum. No additional environmental review is necessary. B. Further, CEQA Guidelines section 15162 provides that “no subsequent EIR shall be prepared” for a project unless the lead agency determines that (1) “substantial changes are proposed in the project which will require major revisions of the previous EIR”; or (2) “substantial changes occur with respect to the circumstances under which the project is undertaken”; or (3) “new information of substantial importance … shows” one or more significant effects not discussed in the original EIR, greater severity to previously-identified substantial effects, or newly-found feasible mitigation measures that would substantially reduce significant effects. The proposed Tentative Map will not result in any changes to the Project not previously analyzed in the 2006 EIR and 2014 Addendum and no new information of substantial importance shows any significant effects or newly found feasible mitigation measures that would substantially reduce significant effects. Section 3. Findings Regarding Tentative Map. The Planning Commission, in recommending to the City Council approval of Planning Application No. PLSD19-0001 hereby makes the following findings concerning the Tentative Map pursuant to Government Code section 66474: 1. The proposed map, and its design and improvements, are consistent with the general plan and any applicable specific plan, any policy or guideline implementing the general plan (including the city’s design guidelines), or other applicable provisions of this code. Criteria Satisfied. The proposed Tentative Map is consistent with the General Plan designations for the area, as well as the specific plan that applies to the property, as amended in conjunction with this application. The proposed Tentative Map will implement the General Plan in that it would increase the City’s existing housing stock consistent with the Project approvals, the variety of housing types and policies of the City’s Housing Element by complying with the City’s inclusionary housing ordinance. The proposed Tentative Map is consistent with the revised University District Specific Plan as it proposes to subdivide the property according to its requirements related to number of residential units, density, housing type, housing location, public improvements, open space and related amenities. The Tentative Map depicts the specific residential lots and uses consistent with those in the Specific Plan. The proposed Tentative Map has been designed to meet City standards which provide satisfactory pedestrian and vehicular circulation, including emergency vehicle access and on site improvements, such as streets, utilities, and drainage facilities have been designed and are conditioned to be constructed in conformance with City standards. 3 Reso 2019-29 2. The site is physically suitable for the type of development. Criteria Satisfied. The Tentative Map reflects the specific plan for this site, which is physically suitable for the proposed development. No major geologic hazards have been reported on the site or other limited conditions that would render it unsuitable for residential and commercial development. 3. The site is physically suitable for the proposed density of development. Criteria Satisfied. The site is of sufficient size and shape and appropriately shown in the Specific Plan to allow the proposed density of development. The subdivision has been designed to accommodate the development of 233 residential units, taking into consideration the shape and topography of the site. This development is consistent with the density ranges provided for in the Specific Plan. 4. The design of the subdivision or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat, absent a statement of overriding conditions. Criteria Satisfied. An Environmental Impact Report (EIR) for the University District Specific Plan Project (State Clearinghouse number 2003112011) has been prepared and approved which shows potential impacts related to the development of the site with the proposed uses. No significant unavoidable impacts related to existing habitats were identified. The Final EIR for this Project includes adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program. The contents of the Final EIR is incorporated herein by this reference. An Addendum to this EIR has been prepared and approved which concludes that the proposed changes to the project and the studies submitted to the City by the project applicant, the project as proposed to be changed would result in any significant effects not disclosed in the 2006 EIR. 5. The design of the subdivision or the type of improvements will not cause serious public health problems. Criteria Satisfied. The design of the subdivision is not expected to have negative impacts on the health or well being of project residents or occupants of the surrounding land uses. The design of the Tentative Map is in conformance with the City’s General Plan, Zoning Ordinance, and Subdivision Ordinance. The construction of all units on the site has been conditioned to comply with all applicable City ordinances, codes, and standards including, but not limited to, the California Uniform Building Code, the City’s Ordinances relating to Stormwater runoff management and controls. In addition, the design and construction of all improvements for the subdivision has been conditioned to be in conformance with adopted City street and public works standards. The City’s ordinances, codes, and standards have been created based on currently accepted standards and practices for the preservation of the public health, safety and welfare. Finally, the 5 Reso 2019-29 EXHIBIT 1 PROPOSED VAST OAK NORTH TENTATIVE MAP O'RYAN ROAD O X F O R D P L A C E O A K L E A F P L A C E O R C H A R D P L A C E O L I V E P L A C E ORCHARD W A Y O L Y M P I C P L A C E O C E A N P L A C E OVERLOOK WAY OTTER PLACE O V E R L O O K P L A C E OASIS PLACE GRIFFIN'S GROVE PARK KEISER AVENUE PROPOSED APARTMENT COMPLEX (NOT A PART) K E R R Y R O A D HINEBAUGH CREEK HINEBAUGH CREEK 18 21 15 25 125 128127126 116115114 140139138 101100 99 102 103 PARCEL C 188 195 196 203 204 211 212 187 9 7 8 11 10 12 4 5 13 1 16 19 20 23 17 24 118119 107 117 105 80 94 91 82 83 90 81 92 136137 131130 210208 202200 189191 129 197 205 213 186 194 201 209 190 6 165166167168 224 154 157158160 149150151152220 219 113112111 124123 84 89 164 156 141 161 153 144 163 155 142214 206 185 193 199 207 215 184 192226 173174 170169 172171 148147146145 93 223 216 231 228 227 134 122 110 133 121 109 106 132 120 108 135 22 198 159 162 143 3 2 14 183 182 177 26 94 78 175176 95 88 79 85 232 (STORM DRAIN EASEMENT) PEDESTRIAN BRIDGE (FUTURE DESIGN) 217 222 221 218 233 225 229 230 PARCEL D 226 181 180 20' EVA SECTION 178 96 87 86 77 97 98 104 57 56 55 62 54 61 53 60 52 59 51 58 50 49 69 76 68 75 67 74 66 73 65 72 64 71 63 70 40 32 39 31 38 30 37 29 36 28 35 34 41 33 42 27 44 43 47 4648 45 PARCEL F PARCEL G PARCEL E PARCEL B PARCEL A PARCEL H 179 VAST OAK NORTH TENTATIVE MAP CITY OF ROHNERT PARK, CALIFORNIA JULY 2019 WDID#: 1 49C370212 LEGEND TABLE OF CONTENTS ABBREVIATIONS VICINITY MAP PROJECT SITE OWNER/DEVELOPER/CONSULTANTS:UTILITY COMPANIES: BASIS OF ELEVATIONS - BENCHMARK: BASIS OF BEARINGS: Know what's below. before you dig.CallR 1 SHEET INDEX SEE SHEET 4 FOR LAYOUT AND DIMENSIONS SEE SHEET 6 FOR GRADING AND UTILITY PROPOSED LAND USE SUMMARY PARCEL LANDUSE OWNERSHIP MAINTENANCE AREA (NET) A PUBLIC PARK CITY OF R.P.CITY OF R.P. 6.45± AC B LANDSCAPE PARCEL HOA HOA 0.08± AC C LANDSCAPE PARCEL HOA HOA 0.06± AC D LANDSCAPEPARCEL HOA HOA 0.06± AC E LANDSCAPE PARCEL HOA HOA 0.02± AC F TRAIL WAY/ EVA CITY OF R.P.HOA 0.87± AC G OPEN SPACE - CREEK/ HOA HOA 7.61± AC STORM DRAIN EASEMENT H LANDSCAPE PARCEL HOA HOA 0.04± AC LOTS 28.12± AC ROADWAYS 8.72± AC TOTAL 52.03± AC GENERAL NOTES: 1.ASSESSOR'S PARCEL NUMBERS: 045-253-009, 045-253-010, 045-253-011 & 045-253-012 2.PROPERTY ACREAGE: 52.03 ACRES 3.EXISTING LAND USES INCLUDE THE APPROVED 2006 UNIVERSITY DISTRICT SPECIFIC PLAN. PROPOSED LAND USES WILL BE BASED ON THE PROPOSED UNIVERSITY DISTRICT SPECIFIC PLAN AMENDMENT. 4.INDIVIDUAL LOT AND PARCEL SIZES ARE SHOWN ON TENTATIVE MAP SHEETS 4-5. THE AGENT RESERVES THE RIGHT TO ADJUST LOT WIDTHS UP TO 2 FEET (SO LONG AS THEY MEET THE REQUIRED SETBACKS) AND ARE STILL IN CONFORMANCE WITH THE APPROVED MAP. FOR REFERENCE THE SMALLEST AND LARGEST FOR SALE LOTS ARE: ·SMALLEST - 58' X 58' = 3,364 SF (MULTIPLE LOTS) ·LARGEST - 15,998 SF (LOT 1) 5. EXISTING PROPERTY USE: DRY FARMED AGRICULTURAL LAND. 6. AREAS SUBJECT TO INUNDATION: ZONE AO (DEPTH 1 FOOT) PER FIRM PANEL 860 OF 1125, COVERS A PORTION ALONG HINEBAUGH CREEK. REFER TO EXISTING CONDITIONS MAP SHEET 3 FOR LIMITS OF AO ZONE AS DEFINED BY FEMA. 7. PERMANENT AND CONSTRUCTION ACCESS FOR THIS PROJECT SHALL BE FROM KERRY ROAD AND KEISER AVENUE. APPLICANT RESERVES THE RIGHT FOR FUTURE ACCESS TO THESE STREETS. 8. THE APPLICANT RESERVES THE RIGHT TO FILE MULTIPLE FINAL OR PARCEL MAPS ON THE PROPERTY AS LONG AS THEY ARE IN GENERAL CONFORMANCE WITH THE APPROVED TENTATIVE MAPS. THE APPLICANT INTENDS TO DEVELOP THE PROJECT IN PHASES CONSISTENT WITH THE PROVISIONS SET WITHIN THE "AMENDED AND RESTATED DEVELOPMENT AGREEMENT." 9. UNLESS OTHERWISE SPECIFICALLY STATED IN THE CONDITIONS OF APPROVAL, LOCAL AGENCY APPROVAL OF THIS MAP SHALL CONSTITUTE AN EXPRESS FINDING THAT THE PROPOSED SUBDIVISION AND DEVELOPMENT OF THE SUBJECT PROPERTY WILL NOT UNREASONABLY INTERFERE WITH THE FREE AND COMPLETE EXERCISE OF RIGHTS DESCRIBED IN GOVERNMENT CODE SECTION 66436(a)(3)(A)(i). 10. FACE OF CURB RADII ARE 25' (MIN) AT INTERSECTION / CURB RETURNS. 11. LANDSCAPE AND FENCING DETAILS FOR THE RESIDENTIAL AND THE PRIVATE HOA PARCELS WILL BE CONCEPTUALLY DETAILED WITH THE DEVELOPMENT AREA PLANS (DAP). ADDITIONALLY, THE DAP WILL PROVIDE DETAIL ON UNIT MIX, SETBACKS AND PARKING REQUIREMENTS. 12.FOR THE PUBLIC PARKS, FENCING AND LANDSCAPING WILL BE SHOWN ON THE SUBMITTAL TO THE PARKS AND RECREATION COMMISSION. 13. THE PROJECT SITE IS PART OF ASSESSMENT DISTRICT 05-01. 14. THE PRELIMINARY GRADES AND UTILITY ROUTING SHOWN ARE SUBJECT TO CHANGE BASED ON FINAL DESIGN. 15. DOMESTIC WATER SERVICE TO BE PROVIDED BY CITY OF ROHNERT PARK. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK AND SONOMA COUNTY WATER AGENCY (SCWA) STANDARDS. LOCATION OF FIRE HYDRANTS TO BE COORDINATED WITH CITY'S PUBLIC SAFETY DIVISION PRIOR TO FINAL DESIGN. 16. RECYCLED WATER SERVICE TO BE PROVIDED BY SANTA ROSA SUB-REGIONAL WASTEWATER SYSTEM. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK AND SUB-REGIONAL SYSTEM STANDARDS. 17. SEWAGE SERVICE TO BE PROVIDED BY CITY OF ROHNERT PARK. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK STANDARDS. 18. ELECTRIC AND GAS SERVICE TO BE PROVIDED BY PACIFIC GAS & ELECTRIC. WHEN INSTALLED IT SHALL BE IN CONFORM WITH CITY OF ROHNERT PARK AND PG&E STANDARDS. GENERAL NOTES CONTINUED: 19. TELEPHONE SERVICE TO BE PROVIDED BY AT&T (FORMERLY SBC) AND SHALL ADHERE TO THEIR STANDARDS WHEN INSTALLED. 20. SCHOOL DISTRICT: THE VAST OAK PROPERTY IS LOCATED COMPLETELY WITHIN AND WILL BE SERVICED BY THE COTATI-ROHNERT PARK UNIFIED SCHOOL DISTRICT. 21. PARKWAY STRIPS WITHIN PUBLIC STREETS AND WITHIN OPEN SPACE PARCELS AS SHOWN ON THIS MAP WILL BE MAINTAINED BY THE HOMEOWNERS ASSOCIATION (HOA). 22. FOR ALL LOTS INCLUDING COURTYARD PRODUCTS, ON LOT DRAINAGE SHALL FLOW TO THE FRONT OF EACH LOT. THE DRAINAGE PATTERNS WILL BE BETTER REFINED WITH THE DAP PROCESS. 23. LIGHTING WITHIN PUBLIC STREETS SHALL MEET CITY STANDARDS. LIGHTING WITHIN THE PRIVATE ALLEY MOTOR COURTS SHALL MEET THE CRITERIA ESTABLISHED IN THE SPECIFIC PLAN AMENDMENT. 24. UPON APPROVAL OF THIS MAP, APPLICANT ACKNOWLEDGES THAT ADDITIONAL STUDIES MAY BE REQUIRED (SUCH AS ACOUSTICAL) WITH FINAL DESIGN TO IMPLEMENT CONCEPTS SHOWN ON THIS TENTATIVE MAP APPLICATION. ADDITIONAL EASEMENTS, DEED RESTRICTIONS AND OR MAINTENANCE AGREEMENTS MAY BE NEEDED AS DETERMINED DURING THE FINAL DESIGN. PLANS FOR ALL ONSITE/OFFSITE IMPROVEMENTS WILL BE PREPARED AND SUBMITTED TO THE APPROPRIATE AGENCIES FOR APPROVAL PRIOR TO COMMENCEMENT OF CONSTRUCTION. 25. PARCEL A WILL BE DEDICATED TO THE CITY OF ROHNERT PARK AS A PARK. 26.REFER TO AMENDED AND RESTATED DEVELOPMENT AGREEMENT FOR REQUIREMENTS/TIMING OF AFFORDABLE HOUSING, PHASING/TIMING OF INFRASTRUCTURE AND ENERGY REQUIREMENT STANDARDS. 27.PRIOR TO SUBMITTAL OF IMPROVEMENT PLANS, PROJECT AGENT SHALL COORDINATE THE LOCATION OF PUBLIC TRANSIT FACILITIES WITHIN PROJECT AREA. SEE SHEET 5 FOR LAYOUT AND DIMENSIONS SEE SHEET 7 FOR GRADING AND UTILITY * Exhibit 1 AC A C PLAN 3A AC P L A N 2 A AC P L A N 1 A A C PLAN 4A A C ACAC A C A C AC AC P L A N 2 A AC PLAN 4A A C PLAN 3A AC P L A N 2 A AC P L A N 1 A A C PLAN 4A A C AC A C PAVEMENT DESIGN CHART: NOTE: PAVEMENT DESIGN SECTIONS ARE BASED THE PROJECT GEOTECHNICAL REPORT BY ENGEO DATED APRIL 03, 2006, REVISED DECEMBER 12, 2012, WHICH ASSUMES A PRELIMINARY 'R' VALUE OF 5. FINAL STRUCTURAL SECTION WILL BE DETERMINED AFTER 'R' VALUE TEST OF SUBGRADE MATERIAL IS COMPLETED FOLLOWING THE CALTRANS FLEXIBLE PAVEMENT DESIGN CRITERIA AND APPROVAL OF THE CITY ENGINEER. AB SHALL BE CLASS 2 (R=78) PER CALTRANS STANDARD SPECIFICATIONS. ASB SHALL BE CLASS 2 (R=50) PER CALTRANS STANDARD SPECIFICATIONS. REMOVE EXIST. PVMT. GRIND & REPAVE 1'2' 2" NEW SECTION & REPLACE EXIST. PVMT. EX. EP NOTE: 1.PAVEMENT CONFORM APPLIES TO BOTH LONGITUDINAL AND TRANSVERSE CONFORMS. SAWCUT PAVEMENT SECTIONS ABTIACSTREET NAME PRIVATE LANES/MOTOR COURT 10"5 3" LTSG 0" ALL OTHER NEIGHBORHOOD STREETS 4"7 5"18" 4" 1.5' 6" FALL 1.0' (TYP.) 1/2" R1"1" 3" FL 1/2" R 6" 4" M I N . CL A S S I I A B (TRC) TOP OF ROLLED CURB ELEV. 37.5' R/W 51' R/W 52' R/W 56' R/W 63' R/W ORCHARD WAY OTTER PLACE O'RYAN ROAD (ALONG GRIFFIN'S GROVE PARK) OXFORD PLACE OASIS PLACE OLYMPIC PLACE OLIVE PLACE ORCHARD PLACE OAK LEAF PLACE O'RYAN ROAD(ALONG APARTMENT SITE) OVERLOOK PLACE 20' PRIVATE LANE ALLEY 1-34 OCEAN PLACE 52' RIGHT OF WAY 32' CURB TO CURB 5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 5' S/W 6' PARKING 6' PARKING 10' DRIVE LANE 10' DRIVE LANE 52' R/W STREET NTS 28' CURB TO CURB 37.5' RIGHT OF WAY R/W R/W 5'0.5' 4"PCC/4"AB MIN 2'2' 6' PARKING 12' DRIVE LANE 10' DRIVE LANE RESIDENTIAL 4' L/S CLASS I BIKE PATH (PER CITY STD 238) S/W 2% 12' PATH 8' OPEN SPACE 5' 37.5' R/W STREET NTS C/L C/L 2%2%2%1.5% 1.5%2%2%2%2%1.5% 4"PCC/4"AB4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG 18" LTSG 5"AC OVER 4" AB FCFC FCFC 51' RIGHT OF WAY 36' CURB TO CURB 5' R/W PUBLIC PARK 5' L/S R/W RESIDENTIAL L/S 5' S/W 8' PARKING 8' PARKING 10' DRIVE LANE 10' DRIVE LANE 51' R/W STREET NTS C/L 1.5%2%2%2%1.5% 4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG FCFC 56' RIGHT OF WAY 36' CURB TO CURB 5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 5' S/W 8' PARKING 8' PARKING 10' DRIVE LANE 10' DRIVE LANE 56' R/W STREET NTS C/L 1.5%2%2%2%2%1.5% 4"PCC/4"AB4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG FCFC 63' RIGHT OF WAY 36' CURB TO CURB5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 12' S/W 8' PARKING 8' PARKING 10' DRIVE LANE 10' DRIVE LANE 63' R/W STREET NTS C/L 1.5%2%2%2%2%1.5% 4"PCC/4"AB 4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG FC FC TCB 20' PRIVATE LANE 2% CONCRETE BAND (SEE DETAIL RIGHT) 3" AC/ 10" AB TRC 3.5' ROLLED CURB AND GUTTER (SEE DETAIL RIGHT) 10.0' C/L 20' WIDE PRIVATE LANE NTS 10.0' SLOPE VARIES 2% MIN, 3:1 MAX CLASS I BIKE PATH PER CITY STD 238 2 STREET SECTION LEGEND SWLK + + + + + 2% MIN TYP HP (TYP) AD (TYP) STREET SLOPETHROUGH CURB DRAIN (4' FROM LOT LINE)FC AD R/W HP BIO-RETENTION CELL 5% MI N + + + + + 2% MIN TYP ALLEY SLOPETIE LOT DRAINAGE INTO SD MAIN AD HP BIO-RETENTION CELL 5% MI N 12 % M A X 2% M I N 12 % M A X 2% M I N HP (TYP) AD (TYP) TOP OF ROLLED CURB OR BACK OF CONCRETE BAND SD MAIN R/W TC SIDEWALK LANDSCAPE STRIP TRC SD PER CITY STD 864 (TYP) PER CITY STD 864 (TYP) SD SS TYPICAL 4-PACK MOTORCOURT DETAIL (WITH SINGLE SS DOWN ALLEY) NTS TYPICAL 6-PACK MOTORCOURT DETAIL NTS TYPICAL FINISHED LOT GRADING NTS PAVEMENT CONFORM NTS ROLLED CURB DETAIL NTS TYPICAL LOT DRAINAGE (WITHIN ALLEY) NTS TYPICAL LOT DRAINAGE (FACING STREET) NTS TYPICAL DRIVEWAY DETAIL NTS STANDARD CITY DETAILS 27' PAE, EVAE, PUE, SD ESMT, SS ESMT, WAT ESMT 3.5' 5' PUE 5' PUE 5' PUE 5' PUE 5' PUE 5' PUE 5' PUE 5' PUE C/L TYPICAL UTILITY LOCATIONS (51-63' ROW) NTS 7.25'-9.25'8'8' SS SD W TYPICAL UTILITY LOCATIONS (ALLEY - 20 WIDE) NTS C/L SD 7.5' FC R/W AND BW TYPICAL UTILITY/TREE LAYOUT (FACING STREET) NTS 4' MIN BETWEEN TREE AND D/W SS (ONLY IN 6-PACK ALLEYS) BIO CELL (49 SF TYP) BIO CELL (49 SF TYP) DUAL LOT BIO SWALE (98 SF TYP) DUAL LOT BIO SWALE (98 SF TYP) JT SERVICE (TYP) JT SERVICE (TYP) TRC BACK OF CONCRETE BAND BACK OF CONCRETE BAND FLUSH CONCRETE BAND 6" 6" SLOPE VARI E SDRIVEWAY A P R O N 8" 4" MIN. CLASS II AB (TYP.) 1/2" R NTS ( B E L ) T O P O F C O N C . B A N D E L E V . PUBLIC PARK P/L P/L 8"AC/4"AB 20' EVA8' PUE 10'10' 3 : 1 T O E X 2' OVERBUILD PAD 2 : 1 20' EVA NTS 2% C/L OVERLOOK WAY ALLEY A ON-LOT BIORETENTION DETAIL NTS SS BACK OF CONCRETE BANDSD PER CITY STD 864 (TYP) TYPICAL 4-PACK MOTORCOURT DETAIL (WITH DUAL SS DOWN ALLEY) NTS BIO CELL (49 SF TYP) DUAL LOT BIO SWALE (98 SF TYP) JT SERVICE (TYP) TRC DU A L S S 8' LME COMMUNITY WALL INSTALL 42" HIGH TUBULAR STEEL RAILING 1' OFF EDGE OF PAVEMENT ZONE AO (DEPTH 1') PER FEMA FIRM PANEL 860 OF 1125 EX KEISER AVE EX K E R R Y R O A D VAST OAK EAST - UNDER CONSTRUCTION EXISTING TREE TO BE REMOVED EXISTING TREES TO REMAIN WITHIN COMMUNITY PARK HINEBAUGH CREEK HINEBAUGH CREEK EXISTING VEGETATION (TYP.) APARTMENT SITE - UNDER CONSTRUCTION 3 NOTES 1.THE TOPOGRAPHY HAS NOT BEEN REVISED TO ACCOUNT FOR THE SHEET GRADING IMPLEMENTED IN 2010 TO THE CURRENT DATE OR FOR THE WETLAND CONSTRUCTED IN 2007. 2.ALL EXISTING TREES ARE TO REMAIN UNLESS NOTED. 3.PER FEMA MAP ZONE AO IS DEFINED AS: FLOOD DEPTHS OF 1 TO 3 FEET (USUALLY SHEET FLOW ON SLOPING TERRAIN), AVERAGE DEPTHS DETERMINED. PER FIRM PANEL 860 OF 1125, MAP NO. 06097C088IE OUR DEPTH WAS DETERMINED TO BE 1 FOOT. 4.ENGEO INCORPORATED HAS COMPLETED A DETAILED HYDROLOGY/HYDRAULIC STUDY. THIS STUDY COVERED BOTH COPELAND AND HINEBAUGH CREEKS AND ADDRESSES THE POTENTIAL IMPACTS AND SOLUTIONS NEEDED TO ALLOW FOR THE DEVELOPMENT OF THIS PROPERTY. THE HINEBAUGH CREEK WATER SURFACE ELEVATIONS SHOWN ON SHEETS 6-7 ARE TAKEN FROM THE STUDY. AS PART OF THE DEVELOPMENT OF THIS PROJECT THE APPLICANT WILL FILE A LOMR APPLICATION TO MODIFY THE CURRENT MAPPING, ALLOWING FOR THE DEVELOPMENT OF THE PROPERTY. CONSTRUCTED WETLANDS C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C V A N VAN O'RYAN ROAD O X F O R D P L A C E O A K L E A F P L A C E O R C H A R D P L A C E O L I V E P L A C E ORCHARD W A Y O V E R L O O K P L A C E OTTER PLACE O V E R L O O K P L A C E ALLEY 1 GRIFFIN'S GROVE PARK APARTMENT COMPLEX - UNDER CONSTRUCTION (NOT A PART) ALLEY 2 ALLEY 3 ALLEY 4 ALLEY 5 ALLEY 10 ALLEY 11 ALLEY 12 ALLEY 13 ALLEY 23 ALLEY 22 ALLEY 21 ALLEY 20 ALLEY 19 ALLEY 27 ALLEY 33 ALLEY 34 ALLEY 28 ALLEY 29 ALLEY 30 ALLEY 31 ALLEY 32 ALLEY 25 ALLEY 26 ALLEY 24 ALLEY 14 ALLEY 15 ALLEY 16 ALLEY 17 ALLEY 18 ALLEY 9 ALLEY 8 ALLEY 7 ALLEY 6 CO T A T I - R O H N E R T P A R K UN I F I E D S C H O O L D I S T R I C T 04 5 - 2 5 3 - 0 1 8 27' PAE, EVAE, PUE, SD ESMT, SS ESMT, WAT ESMT, (TYP.) NOTE: THE 2006 SPECIFIC PLAN AND THE PARKS AND RECREATION COMMISSION APPROVED THE USE OF PUBLIC PARKING FOR PROPOSED PARK, PARKING IS ASSUMED TO BE ON ADJOINING STREETS (EXCEPT KEISER AVE) AND APPROXIMATELY 40 SPACES ARE AVAILABLE. 5327± SF 135 3596± SF 198 3596± SF 159 3596± SF 162 3916± SF 143 3600± SF 84 3600± SF 89 3364± SF 164 3364± SF 156 3570± SF 141 3364± SF 161 3364± SF 153 3582± SF 144 3596± SF 163 3596± SF 155 3912± SF 142 3936± SF 214 3596± SF 206 3596± SF 185 3596± SF 193 3364± SF 199 3364± SF 207 3600± SF 215 3364± SF 184 3364± SF 192 3613± SF 226 3364± SF 173 3596± SF 174 3596± SF 170 3364± SF 169 3364± SF 172 3596± SF 171 4216± SF 178 3364± SF 148 3596± SF 147 3596± SF 146 3364± SF 145 3600± SF 93 3364± SF 223 3608± SF 216 3364± SF 231 3364± SF 228 3364± SF 227 4150± SF 134 4150± SF 122 4525± SF 110 3735± SF 133 3735± SF 121 4148± SF 109 3832± SF 106 3735± SF 132 3735± SF 120 4146± SF 108 3600± SF 118 3600± SF 119 3834± SF 107 4000± SF 117 4169± SF 105 3873± SF 80 3600± SF 94 4000± SF 91 4000± SF 82 3600± SF 83 3600± SF 90 4196± SF 81 4000± SF 92 4529± SF 136 3999± SF 137 3600± SF 131 3600± SF 130 3596± SF 210 3364± SF 208 3596± SF 202 3364± SF 200 3596± SF 189 3364± SF 191 4000± SF 129 3596± SF 197 3596± SF 205 3932± SF 213 3596± SF 186 3596± SF 194 3596± SF 201 3596± SF 209 3596± SF 190 3364± SF 165 3596± SF 166 3596± SF 167 3364± SF 168 3364± SF 224 3596± SF 154 3364± SF 157 3596± SF 158 3364± SF 160 3364± SF 149 3596± SF 150 3596± SF 151 3364± SF 152 3364± SF 220 3364± SF 219 3735± SF 113 3735± SF 112 4150± SF 111 3735± SF 124 4150± SF 123 3735± SF 125 4000± SF 128 3600± SF 127 3600± SF 126 4000± SF 116 3600± SF 115 3600± SF 114 3855± SF 140 3788± SF 139 4318± SF 138 4000± SF 101 3600± SF 100 3600± SF 99 4004± SF 102 3604± SF 103 2756± SF PARCEL C 3364± SF 188 3364± SF 195 3364± SF 196 3364± SF 203 3364± SF 204 3364± SF 211 3589± SF 212 3364± SF 187 3600± SF 84 3600± SF 89 3600± SF 93 3873± SF 80 3600± SF 94 3600± SF 83 3600± SF 90 3600± SF 100 3600± SF 99 3604± SF 103 62' 58 ' 9' 48' 64 ' 22' 58' 38'3 1 ' 58' 58 ' 62' 58 ' 62' 58 ' 58' 58' 58 ' 62' 58 ' 62' 58 ' 58 ' 58' 58' 58 ' 62' 58 ' 58 ' 62' 68' 58' 58' 58 ' 7 0 ' 6' 3 8 ' 2 4 ' 62'76' 10' 50'45'45' 74 ' 57 ' 58'62' 58 ' 62' 58 ' 58' 58 ' 58 ' 58 ' 62'62' 58 ' 58' 58 ' 58' 58 ' 58' 58 ' 58 ' 62' 58 ' 62' 58 ' 58' 58 ' 58' 58 ' 62' 58 ' 58 ' 58' 58 ' 58 ' 58' 58 ' 62' 62' 58 ' 62' 58 ' 58' 58' 58 ' 58 ' 58 ' 62'62'58' 58 ' 58 ' 58' 58 ' 62' 58 ' 62' 58 ' 58' 58 ' 58' 58 ' 62' 58 ' 62' 58 ' 58' 58 ' 3 1 ' 43 ' 63 ' 38' 63 ' 62' 64 ' 62' 44 ' 3 1 '38' 44 9 ' 58 ' 3 1 '38' 63 ' 58' 62' 63 ' 62' 62' 63 ' 62' 38'3 1 ' 58' 58' 58 ' 62' 58 ' 62' 58 ' 58' 58 ' 58' 58 ' 58 ' 62' 58 ' 62' 58 ' 58' 58' 58 ' 62' 58 ' 62'58' 58 ' 58 ' 58' 58 ' 58 ' 62' 58 ' 62'58' 58 ' 58' 58 ' 62' 58 ' 62'58' 58' 58 ' 58 ' 62' 58 ' 62' 58 ' 58' 58' 58 ' 62' 58 ' 62' 58 ' 58' 58 ' 46 ' 58 ' 58 ' 68 ' 62' 58 ' 58' 68 ' 92 ' 50' 72 ' 3 1 '30' 92 ' 45' 45' 45' 45' 85 ' 45' 85 ' 45' 45' 85 ' 45' 30'3 1 ' 65 ' 50' 50' 80 ' 80 ' 45' 80 ' 45' 45' 83 ' 45' 83 ' 50' 83 ' 50' 83 ' 83 ' 45' 83 ' 45' 80 ' 45' 80 ' 45' 80 ' 50' 50' 80 ' 45' 80 ' 45' 45' 83 ' 45' 83 ' 50' 83 ' 83 ' 50' 83 ' 83 ' 45'45' 45' 80 ' 45' 80 ' 50' 38' 78 ' 60 ' 2 6 ' 47' 90 ' 47' 83 ' 47' 95 ' 47' 10 7 ' 50' 2' 10 4 ' 77 ' 50' 80 ' 45' 80 ' 45' 80 ' 80 ' 45' 80 ' 50' 80 ' 80 ' 50' 80 ' 80 ' 45'45' 45' 80 ' 80 ' 45' 80 ' 50' 80 ' 80 ' 50' 80 ' 45' 80 ' 45' 85 ' 85 ' 87 ' 45' 65 ' 3 1 '31' 37 ' 58 ' 732' 5' 360'10 4' 120' 8 0 ' 80 ' 43 ' 58 ' 37' 248' 26' 80 ' 80 ' 58 ' 200'200'240'86' 50 7 ' 48 6 ' 49 5 ' 50 8 ' 111' 44 5 ' 46 2 ' 58 ' 92 ' 80 ' 83 ' 80 ' 83 ' 83 '80 ' 80 ' 83 ' 10 2 ' 45' 120' 29' 30 ' 53 7 ' 166' 107' 45' 45'54' 54'45'46' 45'54' 4046± SF 79 3600± SF 78 3600± SF 85 3600± SF 95 3600± SF 88 3596± SF 175 3364± SF 176 55 ' 80 ' 80 ' 80 ' 99' 58 ' 58 ' 58 ' 58 ' 58 ' 58 ' 58 ' 44 ' 53 1 ' 1 1 9 ' 6 3 ' 1254' 19 0 ' 508' 58 ' 58 ' 58 ' 58 ' 58 ' 58 ' 58 ' 58 ' 43 ' 33'36'61'61'42' 201' 2 9 ' 190' 4328± SF 183 4297± SF 182 7273± SF 177 114' 54' 99' 238' 58 ' 140' 80 ' 12 0 ' 6188± SF 232 116' 82 ' 62'58' VAST OAK EAST (PHASE 2B) HINEBAUGH CREEK 6507± SF 233 3925± SF 217 3605± SF 222 3601± SF 221 3598± SF 218 3609± SF 225 3616± SF 229 3620± SF 230 2758± SF PARCEL D 6' 58 ' 3919± SF 181 3418± SF 180 61'61'60' 67 ' 61 ' KE R R Y R O A D - U N D E R C O N S T R U C T I O N (S E E K E R R Y R O A D I M P R O V E M E N T P L A N S PR E P A R E D B Y M A C K A Y & S O M P S ) 186' 4287± SF 96 4287± SF 87 4287± SF 86 4287± SF 77 5506± SF 97 9864± SF 98 4150± SF 179 3604± SF 104 280945± SF PARCEL A 783± SF PARCEL E 49 64 113' 38004± SF PARCEL F 3544± SF PARCEL B 331310± SF PARCEL G (STORM DRAIN EASEMENT) 122'3' 51' 7' 3 3 ' 7'8' 55'1 4' 14'3 8 ' 10' 4 4 ' 190' 7' 34' 5'117' 5' 181' 10' 4 3 ' 53'1 4 ' 2' 54'3' 240' 14' 7' 6 6 ' 6 5 '2 0 '122' 11' 149' 149' 18 ' 6 6 ' 16' 12' 6' 21' 10' 89' 38 ' 2 5 ' 54'45' 3 2 ' 25' 3 5 ' 36 4 ' 80 ' 80 ' 80 ' 80 ' 19 ' 10 6 ' 70 ' 80 ' 4 SE E S H E E T 5 PROPOSED BUS STOP LOCATION O L Y M P I C P L A C E OVERLOOK WAY O V E R L O O K P L A C E OASIS PLACE O C E A N P L A C E A L L E Y A ALLEY 33 ALLEY 34 KEISER AVE - UNDER CONSTRUCTION (SEE KEISER AVE IMPROVEMENT PLANS PREPARED BY MACKAY & SOMPS) 14005± SF 22 15037± SF 6 15040± SF 9 15038± SF 7 15039± SF 8 15042± SF 11 15041± SF 10 15043± SF 12 15035± SF 4 15036± SF 5 15044± SF 13 15998± SF 1 14005± SF 16 14005± SF 19 14005± SF 20 14005± SF 23 14005± SF 17 14005± SF 24 14005± SF 18 14005± SF 21 14687± SF 15 14084± SF 25 95 88 85 78 14053± SF 26 15034± SF 3 15009± SF 2 50 ' 54 ' 169' 3 2 ' 59 ' 189' 215' 3 1 '195' 72 ' 215' 70 ' 215' 70 ' 215' 70 ' 215' 70 ' 215' 12 5 4 ' 215' 70 ' 215' 70 ' 215' 70 ' 215' 70 ' 215' 70 ' 70 ' 215' 215' 5 8 '72 ' 4 0 ' 11 0 ' 12 5 4 ' 161' 2 7 8 ' 508' 19 0 ' 58 ' 50 ' 174' 4 9 ' 1 0 3 '95' 75 ' 50 ' 189' 42 ' 3 7 ' 50 ' 50 ' 189' 95' 95' 95' 74 ' 74 ' 95' 50 ' 189' 74 ' 74 ' 50 ' 189' 74 ' 95' 95' 74 ' 50 ' 50 ' 189' 74 ' 95' 95' 74 ' 50 ' 189' 74 ' 50 ' 74 ' 189' 76 8 ' 95' 95' 95' 74 ' 50 ' 189' 74 ' 74 ' 50 ' 189' 74 ' 95' 91' 114' 121' 99 ' 880' 74 ' 46 ' 97 ' 97 ' 96 ' 3 9 ' 57 ' 51 ' 51 ' 51 ' 51 ' 51 ' 51 ' 51 ' 57 ' 74 ' 312' 70 ' 261' 74 ' 269' 98 ' 50 ' 50 ' 50 ' 72 ' 74 ' 53 ' 95' 3 8 ' 111'92' 54' 80 ' 54' 80 ' 80 ' 54' 70 ' 54' 2 2' 112'127'21' 46' 239' 17' 4' 66 ' 70 ' 70 ' 70 ' 70 ' 70 ' 70 ' 70 ' 70 ' 70 ' 70 ' 50 ' 81 6 ' 15199± SF 14 APPROXIMATE C/L OF CREEK 1-WAY STOP (OCEAN PLACE) TO BE INSTALLED PER CITY STD. 51 ' 51 ' 51 ' 51 ' 51 ' 4750± SF 37 4750± SF 29 4750± SF 28 4709± SF 41 4854± SF 42 6505± SF 44 6037± SF 43 4817± SF 57 4817± SF 56 4817± SF 55 5296± SF 62 4816± SF 54 4817± SF 61 4817± SF 53 4817± SF 60 4817± SF 52 4816± SF 59 4817± SF 51 4817± SF 58 4817± SF 50 5296± SF 49 4817± SF 69 5296± SF 76 4817± SF 68 4817± SF 75 4817± SF 67 4817± SF 74 4817± SF 66 4817± SF 73 4817± SF 65 4817± SF 72 4817± SF 64 4817± SF 71 5296± SF 63 4817± SF 70 5118± SF 47 5147± SF 46 5328± SF 48 5054± SF 45 4287± SF 96 4287± SF 87 4287± SF 86 4287± SF 77 5506± SF 97 9864± SF 98 4750± SF 40 4750± SF 39 4750± SF 31 4750± SF 38 4750± SF 30 5726± SF 27 331310± SF PARCEL G (STORM DRAIN EASEMENT) 3544± SF PARCEL B 1612± SF PARCEL H 47'53'53'53'121' 253'39' 4 2 ' 9' 4 5' 15' 141'1 4'31' 16' 6 6 ' 3 5' 3 2 ' 18 ' 12' 6' 21' 15' 7' 141' 8' 36' 5' 25 ' 36 4 ' 80 ' 80 ' 80 ' 80 ' 19 ' 38' 54' 150' 75'75' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95'95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 95' 3 1 '3 1 ' 37 ' 51 ' 51 ' 51 ' 51 ' 51 ' 51 ' 68 2 ' 51 ' 51 ' 51 ' 51 ' 51 ' 51 ' 37 ' 3 1'75' 150' 75'3 1 ' 37 ' 51 ' 51 ' 51 ' 51 ' 51 ' 51 ' 68 2 ' 51 ' 51 ' 51 ' 51 ' 51 ' 51 ' 37 ' 39 0 ' 2 5 ' 12' 21 ' 50 ' 50 ' 50 ' 50 ' 50 ' 50 ' 50 ' 50 ' 50 ' 69 9 ' 50 ' 50 ' 50 ' 50 ' 28 ' 2' 53' 145' 53'37' 3 1' 56 ' 10' 4 3'8' 5 8 ' 12' 10' 1 2 0 ' FUTURE PEDESTRIAN BRIDGE TO BE CONSTRUCTED WITH PHASE 3B (SEE SHEET 7) 238 210 238 210 5 SE E S H E E T 4 PARCEL G VAST OAK EAST PHASE 2B 790 M 28 GRIFFIN'S GROVE PARK DESIGNATED WETLANDS HINEBAUGH CREEK 3-WAY STOP AT INTERSECTION TO BE INSTALLED PER CITY STANDARD VAST OAK EAST PHASE 2C LP 142.1 LP 140.9 GB 140.5GB 138.4GB 136.6GB 134.6 137.2 GB 142.6 LP 138.8 HP 139.5 LP 133.9 GB 136.0 LP 133.6 LP 133.7 1 3 1 . 5 LP 131.2 132.2 131.9 132.6 133.0 133.4 133.8 134.2 134.6 135.0 135.6 136.6 1 3 1 . 3 140.5 P 1 4 7 . 0 P 1 4 7 . 8 P 1 4 6 . 1 P 1 4 5 . 3 P 1 4 4 . 3 P 1 4 4 . 0 P 1 4 3 . 8 P 1 4 3 . 9 P 1 4 3 . 8 P 1 4 3 . 8 P 1 4 3 . 7 P 1 4 3 . 5 P 1 4 3 . 2 P 1 4 3 . 1 P 1 4 2 . 4 P 1 4 2 . 3 P 1 4 3 . 3 P 1 4 3 . 4 P141.0 P143.5P143.7 P142.7P141.7P140.7P139.9P140.1P140.3P139.4P138.6P138.4 P143.4P143.6 P142.6P141.6P140.8 P142.7P142.9 P141.9P140.9P140.0 P142.6P142.8P142.3P141.3P140.3 P142.4P141.5P140.9 P142.4P141.4P140.5 P140.0P140.2P140.4 P139.2P139.4P139.6 P139.1P139.3P139.5 P139.9P140.1P140.3 P139.8P140.0P140.2 P139.4P138.7P138.5 P138.8P138.5P138.0 P139.3P138.6P138.1 P139.3P138.5P138.1 P139.2P138.5P138.1 P138.2P138.3P137.3P136.5 P138.3P138.4P137.4P136.6 P137.7P137.8P136.8P136.3 P137.8P137.9P136.9P136.4 P137.7P137.8P136.8P135.8 P137.8P137.8P136.7P135.7 P137.8P137.8P136.8P135.8 P137.6P137.7P136.7P135.7 P137.6P137.6P136.4P136.1 P137.6P137.6 P 1 3 6 . 1 P134.3P134.4 P136.1P136.2P135.2P134.6 P136.2P136.3P135.4P134.7 P135.5P135.6P135.2P135.1 P135.6P135.7P135.4P135.2 P135.1P135.2P135.2P135.1 P135.0P135.1P135.1P135.0 P134.5P134.6P134.5P134.4 P134.6P134.7P134.5P134.4 P135.0 P135.1 P135.3 P135.6 P134.4P134.5 P134.9P135.0 P135.0P135.1 P134.7P134.8 P134.6P134.7 P134.5P134.6 P134.5P134.6 P135.3P135.5 0.69%3.10%0.60%0.65%0.50% 1 . 7 0 % 0 . 9 3 % 0 . 5 0 % 0.91% 1 . 0 0 % 2 . 0 0 % 0.50%0.50% 0.50%0.50% 0.50%0.60% 2.00%0.50% 1.50% 0.50%1.50% 0.50%1.00% 0.50%1.30% 0.50%0.50% 0.50% 1.10% 0.90% 1.50% 1.50% 1.60% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 2.01% 0.31% 0.45% 2.13% 0.69% 0.54 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0.50% GB 133.8 HP 135.1 GB 135.8 HP 137.3 LP 136.9LP 134.2 1.50% GB 138.2 GB 139.3 GB 139.8 HP 141.5 LP 141.4 1.20% GB 138.6 140.0 LP 136.8 HP 137.6 0 . 5 0 % 0 . 5 0 % LP 137.0 138.1 GB 135.00.50% HP 133.8 LP 133.5 HP 134.7 P 1 3 7 . 1 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % GB 134.0 1.56% 0 . 8 6 % GB 139.0 0.88% 0 . 5 0 % HP 143.1 GB 142.3 1.65% 0.39%2.48% 0.52 % 2.54% O'RYAN ROAD O X F O R D P L A C E O A K L E A F P L A C E O R C H A R D P L A C E O L I V E P L A C E ORCHARD W A Y O V E R L O O K P L A C E OTTER PLACE O V E R L O O K P L A C E ALLEY 1 GRIFFIN'S GROVE PARK ALLEY 2 ALLEY 3 ALLEY 4 ALLEY 5 ALLEY 10 ALLEY 11 ALLEY 12 ALLEY 13 ALLEY 23 ALLEY 22 ALLEY 21 ALLEY 20 ALLEY 19 ALLEY 27 ALLEY 33 ALLEY 34 ALLEY 28 ALLEY 29 ALLEY 30 ALLEY 31 ALLEY 32 ALLEY 25 ALLEY 26 ALLEY 24 ALLEY 14 ALLEY 15 ALLEY 16 ALLEY 17 ALLEY 18 ALLEY 9 ALLEY 8 ALLEY 7 ALLEY 6 C O T A T I - R O H N E R T P A R K U N I F I E D S C H O O L D I S T R I C T 0 4 5 - 2 5 3 - 0 1 8 C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C V A N VAN APARTMENT COMPLEX (NOT A PART) K E R R Y R O A D - U N D E R C O N S T R U C T I O N - C O M P L E T I O N D E C E M B E R , 2 0 1 8 ( S E E K E R R Y R O A D I M P R O V E M E N T P L A N S P R E P A R E D B Y M A C K A Y & S O M P S ) W S E = 1 3 4 . 8 W S E = 1 3 3 . 8 W S E = 1 3 3 . 3 EXSS INV=119.2 SD INV=124.0 EXSD INV=123.6 SD INV=125.5 SD INV=127.7 SD INV=128.6 A A B B CC D D E E 141 125 128127126 116115114 140139138 101 99 102 103 PARCEL C 188 195 196 203 204 211 212 187 118119 107 117 105 80 94 91 82 83 90 81 92 136 137 131 130 210208 202200 189191 129 197 205 213 186 194 201 209 190 165166167168 224 154 157158160 149150151152220 219 113112111 124123 84 89 164 156 141 161 153 144 163 155 142214 206 185 193 199 207 215 184 192226 173174 170169 172171 178 148147146145 93 223 216 231 228 227 134 122 110 133 121 109 106 132 120 108 135 198 159 162 143 LP 142.1 LP 140.9 GB 140.5GB 138.4GB 136.6GB 134.6 137.2 GB 142.6 LP 138.8 HP 139.5 LP 133.9 GB 136.0 LP 133.6 LP 133.7 1 3 1 . 5 LP 131.2 132.2 131.9 132.6 133.0 133.4 133.8 134.2 134.6 135.0 135.6 136.6 1 3 1 . 3 140.5 P 1 4 7 . 0 P 1 4 7 . 8 P 1 4 6 . 1 P 1 4 5 . 3 P 1 4 4 . 3 P 1 4 4 . 0 P 1 4 3 . 8 P 1 4 3 . 9 P 1 4 3 . 8 P 1 4 3 . 8 P 1 4 3 . 7 P 1 4 3 . 5 P 1 4 3 . 2 P 1 4 3 . 1 P 1 4 2 . 4 P 1 4 2 . 3 P 1 4 3 . 3 P 1 4 3 . 4 P141.0 P143.5P143.7 P142.7P141.7P140.7P139.9P140.1P140.3P139.4P138.6P138.4 P143.4P143.6 P142.6P141.6P140.8 P142.7P142.9 P141.9P140.9P140.0 P142.6P142.8P142.3P141.3P140.3 P142.4P141.5P140.9 P142.4P141.4P140.5 P140.0P140.2P140.4 P139.2P139.4P139.6 P139.1P139.3P139.5 P139.9P140.1P140.3 P139.8P140.0P140.2 P139.4P138.7P138.5 P138.8P138.5P138.0 P139.3P138.6P138.1 P139.3P138.5P138.1 P139.2P138.5P138.1 P138.2P138.3P137.3P136.5 P138.3P138.4P137.4P136.6 P137.7P137.8P136.8P136.3 P137.8P137.9P136.9P136.4 P137.7P137.8P136.8P135.8 P137.8P137.8P136.7P135.7 P137.8P137.8P136.8P135.8 P137.6P137.7P136.7P135.7 P137.6P137.6P136.4P136.1 P137.6P137.6 P 1 3 6 . 1 P134.3P134.4 P136.1P136.2P135.2P134.6 P136.2P136.3P135.4P134.7 P135.5P135.6P135.2P135.1 P135.6P135.7P135.4P135.2 P135.1P135.2P135.2P135.1 P135.0P135.1P135.1P135.0 P134.5P134.6P134.5P134.4 P134.6P134.7P134.5P134.4 P135.0 P135.1 P135.3 P135.6 P134.4P134.5 P134.9P135.0 P135.0P135.1 P134.7P134.8 P134.6P134.7 P134.5P134.6 P134.5P134.6 P135.3P135.5 0.69%3.10%0.60%0.65%0.50% 1 . 7 0 % 0 . 9 3 % 0 . 5 0 % 0.91% 1 . 0 0 % 2 . 0 0 % 0.50%0.50% 0.50%0.50% 0.50%0.60% 2.00%0.50% 1.50% 0.50%1.50% 0.50%1.00% 0.50%1.30% 0.50%0.50% 0.50% 1.10% 0.90% 1.50% 1.50% 1.60% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 2.01% 0.31% 0.45% 2.13% 0.69% 0.54 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % 0.50% GB 133.8 HP 135.1 GB 135.8 HP 137.3 LP 136.9LP 134.2 1.50% GB 138.2 GB 139.3 GB 139.8 HP 141.5 LP 141.4 1.20% GB 138.6 140.0 LP 136.8 HP 137.6 0 . 5 0 % 0 . 5 0 % LP 137.0 138.1 GB 135.00.50% HP 133.8 LP 133.5 HP 134.7 P 1 3 7 . 1 0 . 5 0 % 0 . 5 0 % 0 . 5 0 % GB 134.0 1.56% 0 . 8 6 % GB 139.0 0.88% 0 . 5 0 % HP 143.1 GB 142.3 1.65% 0.39%2.48% 0.52 % 2.54% 78 95 88 79 85 100 232 175176 177 183 182 217 222 221 218 233 225 229 230 181 180 WS E = 1 3 4 . 3 W S E = 1 3 5 . 3 W S E = 1 3 5 . 8 W S E = 1 3 6 . 3 W S E = 1 3 6 . 8 W S E = 1 3 7 . 3 W S E = 1 3 7 . 8 W S E = 1 3 8 . 3 W S E = 1 3 8 . 8 W S E = 1 3 9 . 3 W S E = 1 3 9 . 8 W S E = 1 4 0 . 3 104 96 87 86 77 97 98 SD INV=132.0 SS INV=120.9 SS INV=121.8 SS INV=122.7 SS INV=126.7 SS INV=129.4 SS INV=128.4 SS INV=124.9 SS INV=121.6 SS INV=123.3 SS INV=125.1 SS INV=123.7 SS INV=130.1 SS INV=130.9 SS INV=131.7 SS INV=125.9 SS INV=126.0 SS INV=124.3 SS INV=122.3 SS INV=119.8 SS INV=120.6 SS INV=121.4 SS INV=122.1 SS INV=122.5 SS INV=130.0 SS INV=123.4 179 PARCEL B PARCEL F PARCEL E PARCEL D PARCEL A 6 SE E S H E E T 7 HINEBAUGH CREEK GANG MAILBOX LOCATIONS. TO BE ADJUSTED AS NEDED WITH FINAL DESIGN* * * * ** ** ** SECTION B-B NTS 3 : 1 SLOPE VARIES 2% MIN, 3:1 MAX 2' OVERBUILD SECTION A-A NTS 2% 3 : 1 2: 1 2' OVERBUILD 1' OVERBUILD PAD P/L VARIES VARIES 2'8' 12' TRAIL 2' P/L CONFORM TO EXISTING EXISTING GROUND EXISTING GROUND CONFORM TO EXISTING P/L12' TRAIL 8'2'2' 5' R/W LANDSCAPE 2%2% KERRY ROAD SECTION C-C NTS 1' OVERBUILD 6' LS PAD2:1 MAX BNDY BACK OF WALK TC PL 1.5% FUTURE APARTMENTS 3: 1 CONFORM TO EXISTING SECTION D-D NTS 5'5'VARIES 5.2' MAX 1' O'RYAN ROAD TCBNDY 1.5% SECTION E-E NTS 3:1 FUTURE GRIFFIN'S GROVE PARK O'RYAN ROAD 3 : 1 1' OVERBUILD CONFORM TO EXISTING BACK OF WALK BNDY EXISTING GROUND EXISTING GROUND NOTE: THE CITY IS CURRENTLY UPDATING THE HINEBAUGH CREEK HYDROLOGY. FINAL DESIGN SHALL BE BASED ON THE RESULTS OF THAT STUDY. 8' S/W 6' L/S VON 153.0 152.5 147.8 147.5 HP 147.8 GP 147.8 GB 145.2 LP 142.1 LP 140.9 GB 144.3 GB 142.6 HP 144.3 LP 143.8 LP 147.3 LP 145.5 148.5 148.7 149.0 149.2 149.5 150.4 152.6 153.9 156.7 140.5 P 1 4 5 . 6 P 1 4 6 . 6 P 1 4 5 . 3 P 1 4 6 . 3 P 1 4 5 . 1 P 1 4 6 . 1 P 1 4 5 . 1 P 1 4 6 . 1 P 1 4 5 . 3 P 1 4 6 . 3 P 1 4 5 . 4 P 1 4 6 . 4 P 1 4 5 . 2 P 1 4 6 . 2 P 1 4 4 . 9 P 1 4 5 . 9 P 1 4 6 . 7 P 1 4 7 . 7 P 1 4 7 . 4 P 1 4 8 . 4 P 1 4 8 . 0 P 1 4 9 . 0 P 1 4 8 . 7 P 1 4 9 . 7 P 1 5 0 . 4 P 1 5 0 . 8 P 1 5 0 . 4 P 1 5 1 . 4 P 1 5 0 . 5 P 1 5 1 . 5 P 1 4 7 . 0 P 1 4 8 . 0 P 1 4 7 . 8 P 1 4 8 . 8 P 1 4 6 . 1 P 1 4 7 . 1 P 1 4 5 . 3 P 1 4 6 . 3 P 1 4 4 . 3 P 1 4 5 . 3 P 1 4 4 . 0 P 1 4 5 . 0 P 1 4 3 . 8 P 1 4 4 . 8 P 1 4 3 . 9 P 1 4 4 . 9 P 1 4 3 . 8 P 1 4 4 . 8 P 1 4 3 . 8 P 1 4 4 . 8 P 1 4 3 . 7 P 1 4 4 . 7 P 1 4 3 . 5 P 1 4 4 . 5 P 1 4 3 . 2 P 1 4 4 . 2 P 1 4 3 . 1 P 1 4 4 . 1 P 1 4 5 . 1 P 1 4 4 . 6 P 1 4 5 . 2 P 1 4 4 . 7 P 1 4 5 . 4 P 1 4 4 . 9 P 1 4 5 . 2 P 1 4 4 . 7 P 1 4 5 . 0 P 1 4 4 . 5 P 1 4 5 . 2 P 1 4 4 . 7 P 1 4 5 . 5 P 1 4 5 . 0 P 1 4 5 . 8 P 1 4 5 . 3 P 1 4 6 . 0 P 1 4 5 . 5 P 1 4 6 . 6 P 1 4 6 . 1 P 1 4 7 . 3 P 1 4 6 . 8 P 1 4 8 . 0 P 1 4 7 . 5 P 1 4 8 . 7 P 1 4 8 . 2 P 1 4 9 . 3 P 1 4 8 . 8 P149.1P148.8P148.5 P149.6P149.3P149.0 P149.8 P 1 4 5 . 8 P 1 4 6 . 8 P 1 4 6 . 1 P 1 4 7 . 1 P 1 4 9 . 8 P149.3 P 1 4 9 . 4 P 1 4 2 . 4 P 1 4 2 . 3 P141.0 P143.5 P143.4 P142.7 P142.6 0 . 5 0 % 1 . 7 0 % 0 . 9 3 % 0 . 5 0 % 0 . 5 0 % 1 . 2 5 % 0 . 5 0 % 0 . 5 0 % 0 . 6 1 % 0 . 7 5 % 1 . 0 0 % 0.50% 1.34%0.91% 0.50%1.26% 0.50% 0.50% 0.54 % 1.58% GP 1 4 7 . 5 152.3 LP 141.4 143.9 GB 145.1 145.9 1.20% T W 1 5 1 . 0 B W 1 4 9 . 0 T W 1 5 0 . 4 B W 1 4 8 . 4 T W 1 5 0 . 2 B W 1 4 7 . 7 T W 1 5 0 . 1 B W 1 4 7 . 1 T W 1 4 9 . 8 B W 1 4 6 . 8 T W 1 4 9 . 1 B W 1 4 6 . 6 T W 1 4 8 . 3 B W 1 4 6 . 3 T W 1 4 8 . 1 B W 1 4 6 . 1 T W 1 4 8 . 1 B W 1 4 6 . 1 P 1 4 9 . 4 P 1 4 9 . 3 P 1 5 4 . 4 P 1 5 3 . 9 P 1 5 3 . 4 P 1 5 2 . 9 P 1 5 2 . 3 P 1 5 1 . 8 P 1 5 1 . 3 P 1 5 0 . 8 P 1 5 0 . 2 P 1 4 9 . 7 P 1 5 6 . 0 P 1 5 5 . 0 P 1 5 2 . 4 P 1 5 4 . 0 P 1 5 3 . 0 P 1 5 1 . 9 P 1 5 1 . 4 P 1 5 0 . 9 P 1 5 0 . 3 P 1 4 9 . 8 P 1 4 8 . 3 P 1 4 9 . 3 P 1 4 8 . 8 P 1 4 8 . 2 P 1 4 7 . 7 P 1 4 8 . 3 P 1 5 2 . 8 P 1 5 2 . 4 P 1 5 1 . 3 P 1 5 0 . 7 P 1 5 0 . 2 P 1 4 9 . 0 P 1 4 8 . 5 P 1 4 7 . 9 P 1 4 7 . 4 P 1 4 6 . 9 P 1 4 9 . 6 P 1 5 1 . 8 P 1 5 3 . 8 P 1 5 2 . 3 P 1 5 1 . 7 P 1 5 1 . 2 P 1 5 0 . 0 P 1 4 8 . 9 P 1 4 8 . 4 P 1 4 7 . 9 P 1 5 0 . 6 P 1 5 2 . 8 P 1 5 3 . 4 P 1 4 9 . 5 0 . 5 0 % HP 143.1 GB 142.3 GB 143.9 HP 144.4 2.54%1.19%1.10% O V E R L O O K P L A C E O L Y M P I C P L A C E O C E A N P L A C E O V E R L O O K P L A C E OASIS PLACE O C E A N P L A C E A L L E Y A ALLEY 33 ALLEY 34 KEISER AVE (SEE KEISER AVE IMPROVEMENT PLANS PREPARED BY MACKAY & SOMPS) F F JJ HH I I 22 6 9 7 8 11 10 12 4 5 13 1 16 19 20 23 17 24 18 21 15 25 OVERLOOK WAY G G 3 226 SS INV=141.7 SS INV=131.6 SS INV=139.8 SS INV=137.5 SS INV=135.2 SS INV=132.3 SS INV=130.0 SS INV=136.4SS INV=134.0 SS INV=133.3 SS INV=134.9 SS INV=135.2 153.0 152.5 147.8 147.5 HP 147.8 GP 147.8 GB 145.2 LP 142.1 LP 140.9 GB 144.3 GB 142.6 HP 144.3 LP 143.8 LP 147.3 LP 145.5 148.5 148.7 149.0 149.2 149.5 150.4 152.6 153.9 156.7 140.5 P 1 4 5 . 6 P 1 4 6 . 6 P 1 4 5 . 3 P 1 4 6 . 3 P 1 4 5 . 1 P 1 4 6 . 1 P 1 4 5 . 1 P 1 4 6 . 1 P 1 4 5 . 3 P 1 4 6 . 3 P 1 4 5 . 4 P 1 4 6 . 4 P 1 4 5 . 2 P 1 4 6 . 2 P 1 4 4 . 9 P 1 4 5 . 9 P 1 4 6 . 7 P 1 4 7 . 7 P 1 4 7 . 4 P 1 4 8 . 4 P 1 4 8 . 0 P 1 4 9 . 0 P 1 4 8 . 7 P 1 4 9 . 7 P 1 5 0 . 4 P 1 5 0 . 8 P 1 5 0 . 4 P 1 5 1 . 4 P 1 5 0 . 5 P 1 5 1 . 5 P 1 4 7 . 0 P 1 4 8 . 0 P 1 4 7 . 8 P 1 4 8 . 8 P 1 4 6 . 1 P 1 4 7 . 1 P 1 4 5 . 3 P 1 4 6 . 3 P 1 4 4 . 3 P 1 4 5 . 3 P 1 4 4 . 0 P 1 4 5 . 0 P 1 4 3 . 8 P 1 4 4 . 8 P 1 4 3 . 9 P 1 4 4 . 9 P 1 4 3 . 8 P 1 4 4 . 8 P 1 4 3 . 8 P 1 4 4 . 8 P 1 4 3 . 7 P 1 4 4 . 7 P 1 4 3 . 5 P 1 4 4 . 5 P 1 4 3 . 2 P 1 4 4 . 2 P 1 4 3 . 1 P 1 4 4 . 1 P 1 4 5 . 1 P 1 4 4 . 6 P 1 4 5 . 2 P 1 4 4 . 7 P 1 4 5 . 4 P 1 4 4 . 9 P 1 4 5 . 2 P 1 4 4 . 7 P 1 4 5 . 0 P 1 4 4 . 5 P 1 4 5 . 2 P 1 4 4 . 7 P 1 4 5 . 5 P 1 4 5 . 0 P 1 4 5 . 8 P 1 4 5 . 3 P 1 4 6 . 0 P 1 4 5 . 5 P 1 4 6 . 6 P 1 4 6 . 1 P 1 4 7 . 3 P 1 4 6 . 8 P 1 4 8 . 0 P 1 4 7 . 5 P 1 4 8 . 7 P 1 4 8 . 2 P 1 4 9 . 3 P 1 4 8 . 8 P149.1P148.8P148.5 P149.6P149.3P149.0 P149.8 P 1 4 5 . 8 P 1 4 6 . 8 P 1 4 6 . 1 P 1 4 7 . 1 P 1 4 9 . 8 P149.3 P 1 4 9 . 4 P 1 4 2 . 4 P 1 4 2 . 3 P141.0 P143.5 P143.4 P142.7 P142.6 0 . 5 0 % 1 . 7 0 % 0 . 9 3 % 0 . 5 0 % 0 . 5 0 % 1 . 2 5 % 0 . 5 0 % 0 . 5 0 % 0 . 6 1 % 0 . 7 5 % 1 . 0 0 % 0.50% 1.34%0.91% 0.50%1.26% 0.50% 0.50% 0.54 % 1.58% GP 1 4 7 . 5 152.3 LP 141.4 143.9 GB 145.1 145.9 1.20% T W 1 5 1 . 0 B W 1 4 9 . 0 T W 1 5 0 . 4 B W 1 4 8 . 4 T W 1 5 0 . 2 B W 1 4 7 . 7 T W 1 5 0 . 1 B W 1 4 7 . 1 T W 1 4 9 . 8 B W 1 4 6 . 8 T W 1 4 9 . 1 B W 1 4 6 . 6 T W 1 4 8 . 3 B W 1 4 6 . 3 T W 1 4 8 . 1 B W 1 4 6 . 1 T W 1 4 8 . 1 B W 1 4 6 . 1 P 1 4 9 . 4 P 1 4 9 . 3 P 1 5 4 . 4 P 1 5 3 . 9 P 1 5 3 . 4 P 1 5 2 . 9 P 1 5 2 . 3 P 1 5 1 . 8 P 1 5 1 . 3 P 1 5 0 . 8 P 1 5 0 . 2 P 1 4 9 . 7 P 1 5 6 . 0 P 1 5 5 . 0 P 1 5 2 . 4 P 1 5 4 . 0 P 1 5 3 . 0 P 1 5 1 . 9 P 1 5 1 . 4 P 1 5 0 . 9 P 1 5 0 . 3 P 1 4 9 . 8 P 1 4 8 . 3 P 1 4 9 . 3 P 1 4 8 . 8 P 1 4 8 . 2 P 1 4 7 . 7 P 1 4 8 . 3 P 1 5 2 . 8 P 1 5 2 . 4 P 1 5 1 . 3 P 1 5 0 . 7 P 1 5 0 . 2 P 1 4 9 . 0 P 1 4 8 . 5 P 1 4 7 . 9 P 1 4 7 . 4 P 1 4 6 . 9 P 1 4 9 . 6 P 1 5 1 . 8 P 1 5 3 . 8 P 1 5 2 . 3 P 1 5 1 . 7 P 1 5 1 . 2 P 1 5 0 . 0 P 1 4 8 . 9 P 1 4 8 . 4 P 1 4 7 . 9 P 1 5 0 . 6 P 1 5 2 . 8 P 1 5 3 . 4 P 1 4 9 . 5 0 . 5 0 % HP 143.1 GB 142.3 GB 143.9 HP 144.4 2.54%1.19%1.10% 14 W S E = 1 3 9 . 3 W S E = 1 4 0 . 3 W S E = 1 4 0 . 8 W S E = 1 4 1 . 3 W S E = 1 4 1 . 8 W S E = 1 4 2 . 3 W S E = 1 4 2 . 8 WS E = 1 4 3 . 3 WS E = 1 4 3 . 8 WS E = 1 4 4 . 3 WS E = 1 4 4 . 8 W S E = 1 4 5 . 3 WS E = 1 4 5 . 8 W S E = 1 4 6 . 3 W S E = 1 4 6 . 8 W S E = 1 4 7 . 3 W S E = 1 4 7 . 8 HINEBAUGH CREEK SS INV=138.3 44 43 51 50 4976 75 74 47 4648 45 40 39 41 42 54 53 5273 72 71 32 31 38 30 37 29 36 28 35 34 3357 56 55 62 61 60 59 58 69 68 67 66 65 64 63 70 27 APPROXIMATE ALIGNMENT OF PED BRIDGE CONNECTION. ALIGNMENT, PROFILE AND DESIGN TO BE DETERMINED AFTER REVISED HYDROLOGY IS COMPLETED. SEE BLOW-UP ON RIGHT. SD INV=134.3 SD INV=137.5 SD INV=134.3 GB 144.3 HP 144.3 P 1 4 4 . 2 P 1 4 4 . 1 P 1 4 5 . 1 P 1 4 4 . 6 P 1 4 5 . 2 P 1 4 4 . 7 0 . 6 1 % 1.34% 1.58%143.9GB 143.9 HP 144.41.19%1.10% OVERLOOK WAY GB 144.3 HP 144.3 P 1 4 4 . 2 P 1 4 4 . 1 P 1 4 5 . 1 P 1 4 4 . 6 P 1 4 5 . 2 P 1 4 4 . 7 0 . 6 1 % 1.34% 1.58%143.9GB 143.9 HP 144.41.19%1.10% W S E = 1 4 0 . 8 W S E = 1 4 1 . 3 W S E = 1 4 1 . 8 W S E = 1 4 2 . 3 62 6164 63 7 SE E S H E E T 6 DESIGNATED WETLANDSGRIFFIN'S GROVE PARK PARCEL G VAST OAK EAST PHASE 2B 790 M 28 GANG MAILBOX LOCATIONS. TO BE ADJUSTED AS NEDED WITH FINAL DESIGN* * * * * * * SECTION F-F NTS 2% 3 : 1 2' OVERBUILD 20' EVA P/L CONFORM TO EXISTING EXISTING GROUND 1.5% SECTION H-H NTS 3:1 FUTURE GRIFFIN'S GROVE PARK OVERLOOK PLACE 3 : 1 1' OVERBUILD CONFORM TO EXISTING BACK OF WALK BNDY EXISTING GROUND EXISTING GROUND SECTION I-I NTS LS AREA 5' SIDEWALK 6' BW TC PAD1.5%KEISER AVENUE SLOPE VARIES 1.5% MIN 3:1 MAX PL SECTION J-J NTS PAD WETLANDS EXISTING FENCE P/L CONFORM TO EG EXISTING GROUND 3 : 1 PAD EXCESS SPOILS CAN BE ACCOMMODATED ON REAR HALF OF ESTATE LOTS. CONFIRM WITH ENGINEER PRIOR TO THIS OPERATION. P/L 8' PUE LME PAD 2 : 1 HINEBAUGH CREEK NOTE: THE CITY IS CURRENTLY UPDATING THE HINEBAUGH CREEK HYDROLOGY. FINAL DESIGN SHALL BE BASED ON THE RESULTS OF THAT STUDY. SECTION G-G NTS 3 : 1 SLOPE VARIES 2% MIN, 3:1 MAX 2' OVERBUILD EXISTING GROUND CONFORM TO EXISTING P/L12' TRAIL 8'2'2' 7' R/W LANDSCAPE 2% COMMUNITY WALL (TYP) 42" HIGH TUBULAR FENCING (1' OFF PAVEMENT) EXISTING GRADE 143.0 BRIDGE DECK 143.5± WSE 141.5± PROPOSED CLEAR SPAN BRIDGE TO BE BUILT WITH PHASE 3B APPROXIMATE ABUTMENT LOCATION APPROXIMATE ABUTMENT LOCATION 6 Reso 2019-29 EXHIBIT 2 RECOMMENDED CONDITIONS OF APPROVAL VAST OAK NORTH TENTATIVE MAP ON-GOING CONDITIONS The conditions below shall apply to the Tentative Map (TM) for the Vast Oak North project within the University District Specific plan. The Vast Oak North project shall be developed in accordance with the General Plan (GP), University District Specific Plan (UDSP), Mitigation Measures identified in the University District Specific Plan Environmental Impact Report (FEIR), Development Agreement (DA) between the City and University District LLC and Vast Oak Properties L.P., the Rohnert Park Municipal Code (RPMC) and the Design and Construction Standards. The Conditions of Approval as stated herein are the obligation of the applicant/developer and place no obligation either express or implied on the City. These Conditions of Approval run with this TM as approved regardless of ownership at time of recording. General Requirements 1) The applicant shall comply with all documents approved by the City Council and adhere to all exhibits presented by the applicant at the Planning Commission and\or City Council meeting for approval of the University District Specific Plan project unless subsequently revised by the City. 2) In case of conflict between the various documents, the following order shall prevail: General Plan, Mitigation Measures for the Final Environmental Impact Report (FEIR), University District Specific Plan (UDSP), Development Agreement (DA), Tentative Map (TM) and its Conditions of Approval, Rohnert Park Municipal Code (RPMC), and Design and Construction Standards. 3) The applicant shall comply with the FEIR and Addendum. In addition the applicant shall pay the cost to monitor the Mitigation Measures identified in the FEIR for the University District Specific Plan project (SCH # 2003122014) kept on file in the Development Services Department. The requirements contained in the Mitigation Monitoring Program (MMP) shall be incorporated into these conditions and constructed in accordance with the MMP. 4) The applicant agrees to indemnify, hold harmless and defend the City, its officers, agents, elected and appointed officials, and employees, from any and all liability or claims that may be brought against the City arising out of its approval of this Tentative Map and associated entitlements pertaining to the University District Specific Plan save and except that caused by the City’s active negligence. 7 Reso 2019-29 5) By accepting the benefits conferred under this TM, the applicant acknowledges all the conditions imposed and accepts this TM subject to conditions, as may be amended from time to time, and the RPMC, as applicable. 6) The use of the property by the applicant/grantee for any activity authorized by this TM shall constitute acceptance of all of the conditions and obligations imposed by the City on this TM. The applicant/grantee by said acceptance waives any challenge as to the validity of these conditions. 7) Development shown on the TM may be phased. Each final map shall stand-alone and be self-sufficient as to access, traffic circulation, utilities, physical infrastructure, and land use pattern subject to approval by the City Engineer. 8) Prior to the approval of any final map the applicant shall provide the Development Services Director with a copy of the recorded covenants, conditions and restrictions (CC&R’s) on the deeds for all lots within the proposed final map, which inform subsequent property owners of the nature and extent of existing agricultural activities, operations, and facilities in the vicinity of the project site. The disclosure shall also provide notice of the potential conflicts or effects of typical agricultural activities outside of project including but not limited to noise, odors, dust, agricultural spraying, livestock and burning etc. a. Any covenants, conditions, and restrictions (CC&R’s) applicable to the project property shall be consistent with the terms of these conditions and the City Code. If there is conflict between the CC&R’s and the City Code or these conditions, the City Code or these conditions shall prevail. 9) If the City is required to enforce any of the conditions of approval, the applicant shall pay all costs. At the City’s sole discretion, the City may require a cash deposit to cover enforcement costs as a condition of the approval of any final map. 10) Prior to the issuance of Certificate of Occupancy, the applicant shall provide suitable escrow documentation reflecting City’s demand for payment of Regional Transportation Fee for each lot affected by this fee per the Development Agreement by and between University District LLC, Vast Oak Properties L.P., and City of Rohnert Park. Building Services 11) Building code provisions shall apply to the construction, alteration, moving, demolition, repair, maintenance and use of any building or structure within the jurisdiction of the City, except work located primarily in a public way, public utility towers and poles, mechanical equipment not specifically regulated by building code provisions, and hydraulic flood control structures. All projects shall comply with the most current code recognized by the City at the time of their building permit application. All State and local ordinances shall be applicable to current projects. 12) Geotechnical investigation reports shall be submitted for all building permit projects unless waived by the Building Official. When required by the Building Official, the 8 Reso 2019-29 potential for soil liquefaction and soil strength loss during earthquakes shall be evaluated during geo-technical investigations. Compaction reports and pad certifications are required for each building pad site and all compaction reports shall be submitted prior to a foundation inspection and in compliance with the soils and geo-technical recommendations. 13) A completed and approved wet fire hydrant system, or other system approved by the Building Official and Department of Public Safety (DPS), and all weather roads shall be in place prior to any flammable or combustible material (such as wood) being brought onto the site. Prior to meter installation, the applicant may tie to the water system for fire flow only. Fire access road shall meet the DPS Fire Access Road Standard. These fire access roads shall continue to be accessible until acceptance of the public streets by the City. 14) The applicant shall submit a mailbox plan (locations and sizes) for all lots prior to approval of any final map. The plan shall be approved by the Rohnert Park Post Office and included with the first submittal of the improvement plans. The applicant shall submit to the City a written confirmation from the Rohnert Park Post Office that the mailbox locations are approved. The City will review and approve the location plan to ensure adequate site distance and traffic safety measures are incorporated. 15) All public utilities easements (PUE) and public access easements shall be open and accessible at all times within phases under construction or occupied. 16) Copies of the soils and geology reports prepared by a licensed soils engineer and geologist shall be reviewed and approved by the developer’s soils engineer and geologist prior to issuance of a grading permit. The developer’s soils engineer shall sign the plans stating that they conform to the soils report recommendations. 17) The applicant shall submit plans and obtain separate building permits for retaining walls over four (4) feet in height and for all other walls, fences and signs over six (6) feet in height. 18) The applicant shall obtain a demolition permit for any structure to be demolished. All underground structures shall be abated, back-filled, inspected and approved by Sonoma County Environmental Health Services or the Building Official as applicable. 19) For any project requiring an on-site inspector to monitor grading, housing construction and/or development, the applicant shall deposit funds with the City to cover the full cost of an inspector prior to any land disturbance. The City Engineer, as appropriate, shall approve the amount and hire the inspector. 20) The developer shall implement a dust control program as part of the measures required by the FEIR for air quality control and the requirements of PM 10 and the Best Available Control Measures (BACM). The program shall ensure that, at the City Engineer’s discretion, a water vehicle for dust control operations is kept readily available at all times during construction. The developer shall provide the City Engineer and Building Official 9 Reso 2019-29 with the name and telephone number of the person directly responsible for dust control and operation of the water vehicle. Planning Services 21) A Tree Preservation and Removal Plan including a separate tree removal and sensitive area plan shall be submitted to the Development Services Department for review and approval in accordance with City ordinance. The plan shall show all sensitive areas and stands of trees that are to be protected during grading operations and include, in detail, the method proposed to protect these areas. 22) All areas to be graded and left undeveloped shall have a revegetation plan as part of the dust control program. The Development Services Director or designee shall review and approve the plan. The applicant shall guarantee through a grading bond the revegetation prior to issuance of grading permits. 23) Development Area Plans in conformance with Section 17.06.400 of the Rohnert Park Municipal Code shall be approved by the City Council for all development areas. 24) All material storage areas shall be fenced with at least a 6-foot high chain link fence with at least two 20-foot gates for emergency vehicle access. The fencing shall be shown on the construction fire and security protection site plan. 25) Unless otherwise specified in these conditions, the condition shall apply prior to recordation of each final map or large lot final map. A “final map” shall mean a map that results in buildable parcels of an acre or less in area. A “large lot final map” shall mean a map that results in parcels larger than one acre in area. 26) The applicant shall pay all application fees, plan check and inspection fees, recordation fees, park in-lieu fees, encroachment permit fees, segregation of assessment fees and other applicable miscellaneous fees in effect at the time the fee is paid as required in the Fee Schedule or RPMC. The applicant shall receive credit against, or reimbursement of, its park in-lieu fee for any dedication, or irrevocable offer of dedication, or parkland improvements. 27) The final map shall identify who is responsible to own and maintain all parcels to be created with the map. 28) The applicant shall make a good faith effort to acquire all required off-site property interest necessary to construct or provide improvements, including but not limited to temporary construction easements required by the City. If the applicant fails to do so, the applicant shall, at least 120 days prior to submittal of the final map for approval, enter into an agreement to complete the improvements, pursuant to Government Code Section 66462, at such time as the City acquires the property interests required for the improvements. The agreement shall provide for payment by applicant of all costs incurred by the City to acquire the off-site property interests. Security for a portion of these costs shall be in the form of a cash deposit in the amount specified in the appraisal report obtained by applicant, at applicant’s cost plus estimated legal and administration 10 Reso 2019-29 fees. The City Engineer shall approve or reject the appraiser prior to commencement of the appraisal report. 29) The improvement plans shall show water services to each building. All water meters shall be within the public right-of-way unless the Public Works Director specifically approves exceptions. The City shall not maintain water and sewer system lines beyond existing main line stub outs or on private property, unless otherwise agreed to by the City. Access easements shall be given to the City and recorded concurrently with the final map for any exceptions approved by the City Engineer that require access to private property. 30) If applicable, easements of record not shown on the tentative map shall be relinquished or relocated. Lots affected by proposed easements or easements of record, which cannot be relinquished or relocated, shall be redesigned. All easements for off-site grading and drainage shall be acquired prior to approval of construction on these properties. 31) The applicant shall provide cable or conduit for each residential lot for cable television and Internet access. The applicant shall provide cable or conduit for fiber optics or other smart technologies for each commercial lot for Internet access. The cable or conduit shall be shown on the joint trench improvement plans and constructed before the final lift of asphalt is placed on the adjacent street. 32) Prior to approval of the first final map that requires a homeowners’ association, the applicant shall incorporate a homeowners’ association consisting of all property owners of lands in the development at the time of incorporation. The homeowners’ association shall be responsible for maintaining all common facilities pertaining to the Home Owners Association, including but not limited to, the association’s property, common drive aisles, alleys, lanes, private streets, parking facilities and all utilities contained therein, and landscaping plus landscaping in adjacent public rights-of-way (such as parkway strips or other similar areas), and for paying for security lighting, any common garbage collection services, any security patrol services, if provided, and any other functions of a homeowners’ association. The homeowners’ association shall comply with all NPDES permit Best Management Practices in effect at the time. 33) The CC&R’s shall prohibit the on-site parking of recreational vehicles, including boats. Parking shall be prohibited along emergency vehicle access easements, private streets and alleys. The No Parking signs shall be approved by the DPS. A separate signing and striping plan shall be provided to address on-site stop signs and no parking areas prior to approval of any final map. 34) Private streets or alleys shall be private facilities and shall have private street maintenance, street sweeping and streetlights. Private streets shall have a visible demarcation between the public and private areas and identified with signage that which differentiates them from public streets. The City Engineer shall approve all signage for private facilities with the approval of individual improvement plans for the project. 35) The applicant shall provide adequate vehicle sight distance as specified by the State of California, Department of Transportation’s Highway Design Manual (latest edition) at all 11 Reso 2019-29 public and private street intersections. In addition, intersections and driveways shall comply with City requirements for sight triangles. The design of the streets shall incorporate public safety concerns, fire protection equipment movements, as well as the location and pickup of solid waste. 36) The applicant shall show the proposed structural sections for all private streets on the site improvement plans and pay the City’s plan check and inspection fee for the proposed private improvements, including the water, recycled water, sewer and storm drainage facilities in these areas, to assure that the improvements are designed and constructed to City standards, with exceptions as shown on the Tentative Map. 37) Safety lighting at the end and at any curve in any private street, alley, lane or place shall be provided for residential units that do not front on a public street. The lighting shall include individual lights on each residential unit and\or streetlights on street light poles. The City Engineer shall approve the lighting plans that include these facilities. 38) The applicant shall contact the solid waste franchised hauler and obtain their written approval of the proposed solid waste pickup locations on private streets, alleys, lanes or places. The pickup locations shall not be located in emergency vehicle access easements. A copy of the written approval from the solid waste franchised hauler shall be submitted with the street improvement plans for City review and approval. Provisions for paved areas for trash receptacles on certain parcels shall be identified in the improvement plans to service alley access residences; the trash receptacle cutouts shall be located on private parcels fronting public streets and accommodate the receptacles for the respective lots. 39) Where required, the landscaping for the detention and/or retention basins shall be reviewed and approved by the Development Services Director or designee. 40) The applicant will coordinate with the local bus system authority to facilitate local bus service in the project and to determine bus stop locations and shelter improvements. The bus shelter locations shall be shown on the improvement plans and reviewed and approved by the City Engineer. A copy of the written correspondence with the local bus system authority approving transit facilities shall be submitted with the first street improvement plans for each map. 41) Any above ground utility structures and appurtenances (e.g. cable TV boxes, phone splice boxes) shall be installed in a public utilities easement within the applicant’s property and within 10 feet behind street face of curbs. These structures and appurtenances shall be screened with landscaping to the satisfaction of the Development Services Director or designee. The landscape screening shall be included in Development Area Plans and shall not interfere with the utility companies’ or DPS’s access. 42) The electrical and water services shall be provided to all parks, landscape medians, and other landscape areas in accordance with plans approved by the Public Works Director. 43) Prior to the approval of the first final map including a large lot final map, the applicant shall be responsible for costs of implementation of ensuring compliance with Mitigation Measures contained in Mitigation Monitoring Plan (MMP) for the FEIR. The applicant 12 Reso 2019-29 shall provide funding, in an amount determined by the Development Services Director or designee to hire consultants or staff to implement compliance monitoring. 44) Prior to approval of the first final map, the street name and a theme for all street name signage, including traffic signal signage, street corner signage, directional signs, and other permanent fixtures depicting street names shall be submitted to the Development Services Director or designee for review and approval. 45) The public park acreage shall meet the requirements of the Rohnert Park Municipal Code for park dedication as approved by the Parks and Recreation Commission at their July 15, 2013 meeting. Griffin’s Grove Park will be approximately 6.0 acres. 46) Unless otherwise specified in these conditions, the conditions of approval shall apply to each building permit. 47) The applicant shall provide a master signage program for each residential subdivision, prior to issuance of building permits for each tentative map phase. The signing plan shall be submitted to the Development Service Director or designee for review and approval. 48) The declaration of covenants, conditions and restrictions (CC&R’s) filed for each development shall be prominently displayed in the project sales office at all times. The CC&R’s shall apply to both owners and renters. The CC&R’s shall be written to require renters to comply with the regulations of the CC&R’s, and a copy of the CC&R’s shall be given to each renter. 49) Design and placement of walls and fences for each neighborhood or land use district shall be in accordance with the standards in an approved Development Area Plan Walls and fences may be phased for each development area. All residential dwellings shall display illuminated street numbers in a prominent location in such a position that the numbers are easily visible to approaching emergency vehicles from both directions. The numbers shall be of a contrasting color to the background to which they are attached and four (4) inches minimum in height. Flag lots will have their address displayed in a prominent position at the driveway intersection with the street. 50) All buildings shall be connected to public water and sewer systems prior to occupancy. Water and sewer service accounts shall be set up with the City Finance Department for each structure with a building permit. 51) Prior to front yard landscaping installation by the applicant, plant species, location, container size, quality and quantity of all landscaping plants and materials shall be reviewed and approved by the Development Services Director or designee for consistency with the approved improvement plans. All plant replacements shall be to an equal or better standard than originally approved. 52) CONDITION ELIMINATED 53) CONDITION ELIMINATED 54) Hours of construction shall be limited to the hours in accordance with the RPMC. 13 Reso 2019-29 55) The applicant shall comply with all state federal and local laws. 56) Applicant shall submit the Buyer’s Disclosure document to City prior to commencement of sales, reservations, etc. to Director of Development Services or designee for review and approval. Engineering Services The proposed map was reviewed and the following conditions of approval were developed using the reference documents listed below. • Tentative Map, dated July 2019, prepared by MacKay & Somps, Sheets 1-7. • City’s Subdivision Ordinance – Title 16 in affect at the time of tentative map review • City’s Grading & Erosion and Sediment Control Ordinances – Title 15, Chapters 15.50 & 15.52 in affect at the time of tentative map review • City’s Manual of Standards, Detail and Specifications, adopted as of this review date On-going Conditions 57) Submit a copy of the CCRs and/or maintenance declarations for private improvements (such as for maintenance of alleys and private utilities) to the Director of Development Services or designee and City Attorney for review and approval prior to recording of each final map. Maintenance declaration(s) shall be required to be recorded concurrent with the recordation of the Final Map or prior to City Engineer approval of improvement plans for the respective design, whichever occurs first. The CC&R's will include provisions for maintenance of: a) All private storm drain systems. b) All private driveways c) All private alleys and motor courts, including lighting d) Privately-owned utilities within private easements, driveways, or alleys e) Common area landscaping and irrigation f) Planter strip landscaping and irrigation within public right-of-ways. g) Private walkway and access easements. h) Gang mailboxes i) The Hinebaugh Creek pedestrian bridge j) Frontyard and sideyard landscaping and irrigation outside of the fencing, as shown on the tentative map, including frontyard water quality measures. k) The Hinebaugh Creek pedestrian trail and landscaping. l) The Parcel B detention basin, the UD LLC detention basin and any additional water quality improvement. m) The Hinebaugh Creek parcels. The CC&R’s shall include a plan for a funding mechanism for the ongoing maintenance of these improvements. The plan shall include in a cash flow analysis, by year, showing 14 Reso 2019-29 both the ongoing maintenance costs and longer-term capital replacement costs, and expected revenues from the payment of the maintenance annuity with each certificate of occupancy. Costs shall consider the phasing of improvements with each phase of development. The analysis shall consider that certain improvements (e.g., the Vast Oak detention basin and the temporary UDLLC basin) will be constructed with the initial phase of development and that initial costs per occupied unit will not be proportionate to final costs per occupied unit at buildout. Developer shall provide an initial funding deposit as needed to cover costs as well as maintain an adequate reserve and/or identification of a phasing program that would reduce the monthly assessment impact upon Association homeowners. The CC&R’s shall include language that upon reasonable notice by the City to the HOA (except in an emergency), the City shall have the right to perform maintenance and repair work as needed to ensure that the creeks and basins will function as designed and will have adequate flood protection capacity. The City will have the right to invoice the HOA for costs incurred and the HOA will reimburse the City for these costs. As an option, the HOA and City may enter into a contract whereby the City will perform specified work on a long-term basis and the HOA pays the City for the cost of this work. Developer may also agree to provide a maintenance annuity for the cost of specified work to be performed by the City (the annuity will be separate and above from the annuity required under Section 4.06). The CC&R’s shall include a description and an exhibit of improvements within the Vast Oak and UDLLC Properties, clearly delineating those improvements to be maintained by the HOA and those to be maintained by the City. Each final map for the Vast Oak and UDLLC properties shall include a public drainage easement over the creek and basin properties. Developer and the HOA shall not contest the right of upstream 3rd parties to discharge existing runoff into the creeks and basins. 58) Developer shall enter into an agreement with the City which outlines the responsibilities of the HOA to operate and maintain into perpetuity all water quality improvements within the Vast Oak and UDLLC properties. The agreement shall run with the property and shall provide for the HOA to succeed Developer upon transfer of these parcels from Developer to the HOA. The agreement shall be subject to the approval of the North Coast Water Quality Control Board and generally conform to the City of Santa Rosa long-term maintenance agreement for stormwater treatment measures. This condition shall be satisfied by an amendment to the current Master Maintenance Agreement between the City and the Developer, dated November 24, 2015, and subsequently amended on November 14, 2017 and October 23, 2018. Maintenance of the Hinebaugh Creek flood control channel is also an obligation of the HOA. The Developer shall also cooperate in the execution of any agreements necessary to provide for the ongoing maintenance of Hinebaugh Creek, which may include Sonoma County Water Agency as a participant in the agreement. The developer shall be responsible for obtaining a long-term maintenance permit from the resources for the maintenance work, including the maintenance of the storm drain outfall from the Vast Oak West Detention basin into Hinebaugh Creek. 59) The City shall have no obligation to maintain or police the private maintenance of the alleys, motor courts, or private driveways. This provision shall be included in the 15 Reso 2019-29 CC&Rs. 60) Infrastructure shall be constructed in conformance with the Tentative Map and in conformance with Exhibit “C”, Dedications, Improvements, and Facilities Schedule of the Development Agreement. 61) The requirements for the design and construction of public improvements as set forth in the Development Agreement between Owner(s) and City shall be adhered to. In the case of a conflict between the requirement set forth in the Development Agreement and these Conditions of Approval, the more stringent conditions shall apply as solely determined by the City Engineer. Prior to the Approval of Improvement Plans or Start of Construction 62) Improvement Plans prepared by a Registered Civil Engineer shall be submitted for the review and approval of the City Engineer showing grading, paving, utilities, drainage, structures to be built, lighting and trash collection. Improvements shall conform to the requirements of Chapter 16.16 of the Municipal Code. The improvements plans shall include parking lots, street and utility information including all concrete curb and gutter, sidewalk, striping and signing, paving, water lines, storm drain lines and sewer lines as necessary, erosion control and any necessary transitions. All improvements shall be in accordance with the City of Rohnert Park Standard Improvement Details. Improvement Plans shall include a Storm Water Pollution Prevention Plan including winterization and erosion protection. 63) Storm drainage improvements shall be designed in accordance with the Sonoma County Water Agency criteria. Hydrology calculations, pipe sizing and storm drain plans shall be submitted for the review and approval of the City Engineer. 64) No lot- to- lot drainage is allowed except where easements are provided for drainage are provided. No drainage may discharge across sidewalks. 65) The applicant shall demonstrate for each building pad to the satisfaction of the City of Rohnert Park as follows: a) Adequate protection from 100-year frequency storm; and b) Feasible access during a 10-year frequency storm. 66) Fire protection shall be in accord with the requirements of Rohnert Park Public Safety Department. With the submittal of the improvement plans, calculations shall be provided to the City and the Rohnert Park Public Safety Department to ensure that adequate water pressures are available to supply hydrant flows and sprinkler flows. 67) The improvement plans shall show a sewer lateral to each building in accord with City Standards. 68) If private sewer lines are shared or if they cross property lines, a 10’ private sewer easement shall be shown in the Final Map / Parcel Map or recorded by separate document (if the development is done separate from recordation of a Final Map / Parcel Map. The maintenance of any private sewer line shall be included in the maintenance agreement for the overall site(s) which have an interest in the particular sewer. 69) CONDITION ELIMINATED 16 Reso 2019-29 70) CONDITION ELIMINATED 71) Unless the City and Developer agree that the City shall reconstruct and widen Keiser Avenue from the west boundary of Griffin’s Grove Park to Snyder Lane, the Improvement Plans for the first phase of development (first final map) shall include this work. Improvements shall include installation of a traffic signal and intersection improvements at the intersection of Keiser Avenue/ Snyder Lane. 72) The Improvement Plans for the first phase of development (final map) shall include reconstruction and widening of Keiser Avenue, from the west boundary of Griffin’s Grove Park to Petaluma Hill Road. The Improvements shall include a three-way STOP at the intersection of Keiser Avenue and Overlook Place and Keiser Avenue and Kerry Road. Improvement Plans for traffic signal and intersection improvements at the intersection of Keiser Avenue/ Petaluma Hill Road (Sonoma County jurisdiction) may be included as a separate submittal and shall be due with the final map for the second phase of development. 73) CONDITION ELIMINATED 74) CONDITION ELIMINATED 75) The Improvement Plans for the first phase of development (final map) shall include the design and construction of a recycled water line extension, connecting to the existing recycled water system at the Kerry Road/ Kincade Place intersection and extending northerly in Kerry Road then easterly in O’Ryan Road to Overlook Place, with a meter stub for Griffin’s Grove Park, subject to the review and approval of the City of Rohnert Park City Engineer. Prior to the extension of the existing Recycled Water system to the park, the developer shall temporarily use potable for irrigation. The water connection fee for the park site shall not be paid due to temporary use of potable water on the site. Developer shall pay the water consumption charges to City for potable water actually used at the site for irrigation. 76) The recycled water main shall be extended with each phase of construction as needed to serve landscaping within landscape parcels and other parcels as needed. 77) CONDITION ELIMINATED 78) CONDITION ELIMATED 79) The improvement plans for each phase of the project adjoining Hinebaugh Creek shall include the Hinebaugh Creek trail (including landscaping and other appurtenant improvements). The trail limits within each phase shall be extended to provide reasonable trail network connections with that phase. 80) The improvement plans for the second phase of development (second final map) shall include design for Griffin’s Grove Park and shall extend Parcel D along the Kerry Road frontage of Lot 233 to intersect with Parcel E (Sheet 4 of the Tentative Map). The park shall be designed by the developer, reviewed and approved by the City and constructed by the developer as stated within the timeframes identified in the Development Agreement. 81) The improvement plans for the second phase of development (second final map) shall include design for the pedestrian bridge across Hinebaugh Creek. 17 Reso 2019-29 82) Each phase of development shall include the design and construction of utilities within existing or proposed public right-of-way for electric, gas, telephone, communication and cable TV shall be submitted to the City Engineer and Director of Development Services for review and approval. Any above-ground utility boxes, cabinets or structures shall be specifically approved by the City and screened from public view to the satisfaction of the Director of Development Services and City Engineer and meet utility company’s installation criteria. 83) A grading permit application shall accompany submittal of the each phase of Subdivision Improvement Plans. Said application shall include the requirements listed in Sections 15.48 & 15.50 of the Municipal Code. The grading plans shall be in conformance with the Bay Area Air Quality Management District guidelines for reducing construction impacts and minimize dust emissions. 84) A geotechnical study acceptable to the City shall be conducted by an Engineer licensed in the State of California and qualified to perform soils work, or by a California Certified Geologist prior to site development. Recommendations shall be provided, as necessary, to prevent damage to Project facilities and compliance with these recommendations shall be required as a condition of development at the project site. The grading and improvement plans shall incorporate the recommendations of the approved geotechnical study. This geotechnical study shall at a minimum incorporate the following: a) The liquefaction potential of the Project site. b) The location and extent of expansive soils at the project site, including recommendations regarding the treatment and/or remedy of on-site soils, and the structural design of foundations and underground utilities. c) Seismic safety including recommendations regarding the structural design of foundations and underground utilities. 85) Unless otherwise agreed to by the City, each phase of development shall submit drainage plans subject to the review and approval of the Sonoma County Water Agency (“SCWA”), the City of Rohnert Park and these conditions of approval. Said plans shall meet or exceed SCWA standards and City standards, whichever is more restrictive. All proposed building pad , including garages, shall be a minimum of 18 inches above the post construction 100-year water surface elevations, as described and modeled in “Copeland Creek Regional Detention and Refugia Project, Technical Memorandum 3 – Existing Conditions Flood Plain Analysis”, prepared by GHD, Inc, dated February 15, 2019, as revised and updated. 86) CONDITION ELIMINATED 87) CONDITION ELIMINATED 88) CONDITION ELIMINATED 89) Each phase of development shall include the design by the project proponent for Erosion and Sediment control plans prepared by a professional such as a Civil Engineer or certified Erosion Control Specialist and shall meet the requirements listed in Section 15.52.030 of the Municipal Code. The plans shall provide measures to avoid the introduction or spread of noxious weeds into previously un-infested areas. These plans 18 Reso 2019-29 are subject to review and approval by the City. Erosion and Sediment control plans shall be in conformance with Chapter 15.52 of the Municipal Code except that the reference document for design criteria shall be the City of Santa Rosa Standard Urban Storm Water Management Plan (SUSMP) or most current City adopted SUSMP. 90) Each phase of development shall include design by the project proponent of lighting on public streets as well as private streets/alleys. All streetlights shall be LED, meeting the design criteria for the City of Los Angeles. The design shall be in accordance with City standards and P.G. & E. requirements. In addition, lighting for private streets and alleys shall be designed in accordance with the Zoning ordinance and to the Public Safety Department’s satisfaction, allowing for wall-mounted lighting. 91) All existing overhead utilities within the subdivision and all proposed utilities shall be placed underground. 92) The each phase of development shall include the design for the proposed bus stops as shown on the Tentative Map, subject to the review and approval of the Sonoma County Transit and the City. The design shall meet the minimum requirements set forth in the current City Standards. The developer shall obtain a written letter of satisfaction from the Sonoma County Transit. Transit stop provisions shall be provided via Twin Creeks Road to the high-density residential development on Parcel L subject to route approval. 93) Each phase of development shall include design by the project proponent for roadways. Street improvements not specifically called out in these conditions shall be completed in conjunction with each phase of development (final map). The City Engineer may require reasonable improvements outside of each phase if needed for the orderly and safe development of that phase. The design shall include slurry sealing specifications, subject to review and approval by the City. All streets shall be slurry sealed prior to issuance of the last certificate of occupancy or prior to acceptance of the public improvements, whichever occurs first within each phase of development. 94) Each phase of development shall include the design by the project proponent for installation of moisture barriers at the edges of all pavement sections for purposes of maintaining constant moisture content of pavement sections, subject to review and approval by the City. The design shall include moisture protection extending to 6 inches below the aggregate base layer. The moisture barrier shall be a minimum of 4 inches wide and consist of Controlled Low Strength Material (CLSM) in a 10 mil visqueen lined trench. Alternate designs may be proposed by the developer and considered by the City. 95) Soils beneath all roadways including alleys shall be lime treated based on site specific tests and as recommended by a geotechnical engineer. 96) Each phase of development shall include design by the project proponent and all public improvements shall comply with the latest version of the Rohnert Park Manual of Standards, Details and Specifications. Reference to particular standards shall be made on the improvement plans. Standards details and specifications shall not physically be included on the plans but shall be referenced. 97) For each phase of development the project proponent shall design alleys, with utilities and appurtenances. These shall be private. 98) No utilities (sewer, water or storm drains) shall flow from a private utility to a public 19 Reso 2019-29 utility and back to a private utility. No utilities (sewer, water or storm drains) shall flow from a public utility to a private utility and back to a public utility. 99) All utilities shall be located within dedicated and accepted public street rights-of-way. Any exception must receive prior approval from the City Engineer. 100) All existing wells and septic systems shall be abandoned in compliance with State and County codes, prior to issuance of an initial grading permit. 101) CONDITION ELIMINATED 102) CONDITION ELIMINATED 103) For each phase of the development the project proponent shall design all utilities in compliance with City Manual of Standards and the State Water Resources Control Board Division of Drinking Water Standards including vertical and horizontal separation between utilities, curbs, gutters and monuments. 104) CONDITION ELIMINATED Prior to Approval of Final Map 105) Submit each final map and improvement plans with a completed Land Development Review Submittal Sheet, Final-Parcel Map Completeness Checklist and Final-Parcel Map Submittal Checklist as available on the City web-site and all appropriate additional information. 106) The final map submittal shall include a title report (within last 30 days of initial submittal), supporting documents, and calculations for City Engineer review. All calculated points within the map shall be based on one common set of coordinates. All information shown on the map shall be directly verifiable by information shown on the closure calculation printout. The point (s) of beginning shall be clearly defined. All lot acreages shall be shown on the map and shall be verifiable from information shown on the closure calculation printout. 107) Prior to City Council approval of the first final map; the developer shall satisfy Rohnert Park Municipal Code section 16.14.010 D. 2 regarding off-site dedication of rights-of- way and easements. The first and subsequent final maps shall show offer of dedication of the necessary right-of-way in fee title, sidewalk easements, public utility easements and other easements for public water, sewer, and storm drain, as shown on the tentative map or as needed per the final improvement design. 108) CONDITION ELIMINATED 109) CONDITION ELIMINATED 110) The first final map shall include an offer of dedication of the Griffin’s Grove Park site. 111) CONDITION ELIMINATED 112) Each subdivision map for the phased development shall have a note on the local agency page stating: All fences, sound walls and retaining walls shall be constructed on private property and maintained by the private property owner or Association, unless specifically dedicated to and accepted by the City. 113) All property corners of lots within the subdivision shall be monumented in compliance 20 Reso 2019-29 with city standards, except as expressly permitted in writing by the City Engineer. 114) The developer/ property owner shall enter into a Subdivision Agreement (SIA) with the City, post the requisite bonds, and pay all applicable fees. The SIA shall be required to be recorded concurrent with the recordation of the final map. 115) The developer/ property owner shall enter into the Development Agreement by and among the City of Rohnert Park, University District LLC and Vast Oak L.P. and this development shall be subject to the requirements (including timing and phasing of improvements) stated in the Development Agreement. 116) The requirements for the design and construction of public improvements as set forth in the Development Agreement between Owner(s) and City shall be adhered to. In the case of a conflict between the requirement set forth in the Development Agreement and these Conditions of Approval, the more stringent conditions shall apply as solely determined by the City Engineer. 117) Street names will be subject to the approval of the City Council. Prior to the Issuance of Grading Permits 118) Pre-construction surveys shall be completed for western pond turtles, burrowing owls, and migratory birds, in accordance with Mitigation Measures BIO-12a, BIO-13a, and BIO-14a of the FEIR. This shall be noted on the grading plans. 119) Applicant must file a Notice of Intent to Comply with the Terms of General Permit to Discharge Storm Water Associated with Construction Activity (NOI) with the State of California Water Resources Control Board, and obtain a permit, prior to commencement of any construction activity. 120) No construction shall be initiated for each phase until the Grading Plans have been approved by the City, all applicable fees have been paid, an encroachment permit and/or grading permit has been issued and a project schedule has been submitted to the City Engineer and a pre-construction conference has been held with the City Engineer or his designee. 121) Resource agency permits shall be secured, with copies of the permits supplied to the City and with permit requirements incorporated into the plans. 122) Plans shall incorporate tree protection measures. Trees to be preserved shall be clearly noted on the plans. 123) All areas considered to be a sensitive biological resource shall have construction fencing installed around the sensitive resources to prevent damage during construction. 124) Developer shall secure an encroachment permit from the City prior to performing any work within the City right of way or constructing within a City easement. 125) Resource agency permits shall be secured, with copies of the permits supplied to the City and with permit requirements incorporated into the plans. Prior to the Issuance of Building Permits 126) Prior to issuance of building permits for a single family residential units, individual plot plans for each lot shall be prepared by the project proponent, submitted and reviewed and 21 Reso 2019-29 approved by the City. 127) Prior to issuance of building permits for commercial and multi-family residential units; site development plans shall be prepared by a California registered Civil Engineer, submitted and reviewed and approved by the City. 128) Prior to the issuance of building permits within the FEMA floodplain, a Letter of Map Revision (LOMR) shall be obtained for the lots within the development. 129) CONDTION ELIMINATED 130) CONDITION ELIMINATED 131) CONDITION ELIMINATED 132) CONDTION ELIMINATED 133) CONDITION ELIMINATED 134) CONDITION ELIMINATED 135) Prior to issuance of the 50th building permit, the construction of the Griffin’s Grove Park grading, utilities, and perimeter road shall be commenced. 136) Prior to the issuance of the 100th building permit, the construction of the Griffin’s Grove Park grading and utilities shall be complete. 137) Prior to issuance of the 100th building permit, the construction of the Griffin’s Grove Park improvements shall be commenced. 138) Prior to the issuance of the 150th building permit, the Griffin’s Grove Park improvements shall be complete. 139) Prior to issuance of the 100th building permit, the construction of the Hinebaugh Creek pedestrian bridge shall be commenced. 140) Prior to issuance of the 150th building permit, the construction of the Hinebaugh Creek pedestrian bridge shall be complete. 141) CONDITION ELIMINATED 142) CONDITION ELIMINATED. 143) CONDITION ELIMINATED. 144) CONDITION ELIMINATED 145) CONDITION ELIMINATED Prior to the Building Occupancy 146) CONDITION ELIMINATED 147) CONDITION ELIMINATED 148) Prior to issuance of 1st Certificate of Occupancy for a residential unit improvements to Keiser Avenue from Kerry Road to Snyder Lane shall be complete. 149) CONDITION ELIMINATED 150) CONDITION ELIMINATED 22 Reso 2019-29 151) CONDITION ELIMINATED 152) Prior to issuance of Certificated of Occupancy for any phase, the public improvements that are necessary for safe access to the site, all frontage improvements, hookup of utilities, energizing of street lights, and any specific improvements for that phase shall be complete. Department of Public Safety-Fire 153) Fire Hydrant spacing and placement should be consistent with the City of Rohnert Park Standards, comply with Appendix C of the 2007 California Fire code, and the amendments to table C105.1 by RPDPS ordinance #793. The specific location and spacing of Fire Hydrants shall be determined and approved on the final construction drawings. 154) All roadway, private lanes and drives shall comply with the City of Rohnert Park Standards. Specifically reference Standard #202 “Alley, in regards to: o Alley lighting shall meet the City’s minor street requirements. o 20 or more units will require a 24’ alley width o Alleys are to be used as secondary access only, with parking provided on primary access roads. 155) Roadway widths should be consistent with the City of Rohnert Park Standards except as shown on the Tentative Map, comply with Appendix D of the 2007 California Fire code, and the amendments to RPDPS ordinance #793 Section 15.28.D103.2 – 15.28.D106.1. 156) Minimum interior and exterior turning radius for Fire Apparatus Access shall be all 20 feet and 40 feet. 157) Water main sizes and GPM flow capacity for Fire suppression shall be determined and approved on the final construction drawing. Hydraulic flow calculations shall be included and approved with construction documents.