Loading...
2019/09/10 City Council Resolution 2019-114 RESOLUTION NO. 2019-114 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING A DEVELOPMENT AREA PLAN (DAP) FOR VAST OAK NORTH ALDER AND SANDALWOOD NEIGHBORHOOD PARKWAYS, O'RYAN ROAD, NORTH KERRY ROAD, KEISER AVENUE STREETSCAPES AND HINEBAUGH CREEK(NORTH) BIKE TRAIL AT UNIVERSITY DISTRICT (APN 045-262-001 THROUGH-004, 047-131-019,AND 047-131-024 AND -025) WHEREAS, the applicant, Brookfield Homes filed Planning Applications proposing amendments to the General Plan(PLGP19-0001), an amended Specific Plan (PLSP19-0001), a Tentative Map (PLSD19-0001), and Development Area Plan (PLDP19-0002) for the University District Specific Plan("Project") located south of Keiser Avenue, west of Petaluma Hill Road, and north of Rohnert Park Expressway (various APNs), in accordance with the City of Rohnert Park Municipal Code ("RPMC"); and WHEREAS, in conjunction with Application No. PLDP19-0002, the applicant an submitted an application for a Vast Oak North DAP: Alder and Sandalwood Neighborhood Parkways, O'Ryan Road, North Kerry Road, Keiser Avenue Streetscapes and Hinebaugh Creek (north) Bike Trail at University District within the University District Specific Plan ("UDSP") Area attached to and incorporated in this Resolution as Exhibit 1; and WHEREAS, pursuant to California State Law and the RPMC, public hearing notice was published for a minimum of 10 days prior to the first public hearing in the Community Voice; and WHEREAS, the City Council of the City of Rohnert Park has certified the Final Environmental Impact Report (EIR) and Addendum prepared for the UDSP project and the City has otherwise carried out all requirements for the project pursuant to CEQA; and WHEREAS, on August 8, 2019, the Planning Commission held a public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposal and the Planning Commission recommended that the City Council approve the Development Area Plan; and WHEREAS, on September 10, 2019, the City Council held a public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposal; and WHEREAS, the City Council has reviewed and considered the information contained in Planning Application No. PLDP19-0002 for the proposed Development Area Plan. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rohnert Park makes the following findings, determinations and recommendations with respect to the proposed Development Area Plan: Section 1. The above recitations are true and correct. Section 2. Environmental Review: A. On May 23, 2006, the City Council of the City of Rohnert Park certified the Final EIR for this Project, including adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program, as described in City Council Resolution No. 2006-141. The City Council approved the Addendum to the Final EIR, as described in City Council Resolution No. 2014-032 approved on April 8, 2014. The proposed Development Area Plan is consistent with the analyses in the 2006 EIR and 2014 Addendum and will not result in additional environmental effects not previously evaluated in the EIR and Addendum. No additional environmental review is necessary. B. Further, CEQA Guidelines section 15162 provides that "no subsequent EIR shall be prepared" for a project unless the lead agency determines that (1) "substantial changes are proposed in the project which will require major revisions of the previous EIR"; or (2) "substantial changes occur with respect to the circumstances under which the project is undertaken"; or (3) "new information of substantial importance ... shows" one or more significant effects not discussed in the original EIR, greater severity to previously-identified substantial effects, or newly-found feasible mitigation measures that would substantially reduce significant effects. The proposed Development Area Plan will not result in any changes to the proposed project not previously analyzed in the 2006 EIR and 2014 Addendum and no new information of substantial importance shows any significant effects or newly found feasible mitigation measures that would substantially reduce significant effects. Section 3. Findings for Approval of Development Area Plan. The City Council makes the following findings concerning Planning Application No. PLDP19-0001, Development Area Plan for University District Specific Plan in accordance with Rohnert Park Municipal Code Section 17.06.400(E): 1. 1. The proposed development conforms to the applicable specific plan 2. Criteria Satisfied. The proposed Vast Oak North Development Area Plan conforms to the amended Specific Plan and would implement development of the University Specific Plan project. The proposed Development Area Plan provides additional details on the project including parkways for the Alder and Sandalwood neighborhoods and streetscapes along the major roadways within and adjacent to Vast Oak North. The proposed development is consistent with the specific plan because it conforms to the requirements in the specific plan related to density, housing type, housing location, and related amenities. 3. 2. Public infrastructure and services can be provided concurrently with the development 4. Criteria Satisfied. The developer will be required to participate in the Public Facilities Financing Plan, which will provide for necessary off-site public facilities, and shall be responsible for on-site facilities to meet the project's needs. The Development Agreement for the project sets forth the timing of the necessary facilities as they relate to the physical development of the site. Section 4. The City Council hereby approves the Vast Oak North DAP: Alder and Sandalwood Neighborhood Parkways, O'Ryan Road, North Kerry Road, Keiser Avenue Resolution 2019-114 2 Streetscapes and Hinebaugh Creek (north) Bike Trail at University District within the University District Specific Plan ("UDSP") in the form provided at Exhibit 1, subject to the recommended conditions of approval as provided in Exhibit 2. DULY AND REGULARLY ADOPTED on this 10th day of September, 2019 by the City of Rohnert Park City Council by the following vote: CITY OF ROHNERT PARK Gina Bel • -, . • ATTEST: LYv7 i (i'4) j JoAnne M. Buergler, City Cler Attachment: Exhibit 1 and Exhibit 2 ADAMS: AQP., MACKENZIE: STAFFORD: A LIC CALLINAN: NI0 BELFORTE: AYES: ( )4 ) NOES: ( ) ABSENT: ( ( ) ABSTAIN: (0 ) Resolution 2019-114 3 T A B L E O F C O N T E N T S NTS N T S C O V E R S H E E T P R E L I M I N A R Y L A N D S C A P E P L A N T I N G P L A N - N O R T H K E R R Y R O A D P R E L I M I N A R Y L A N D S C A P E P L A N T I N G P L A N - O ' R Y A N R O A D P A R C E L B E N L A R G E M E N T A N D T Y P I C A L P A R K W A Y P L A N T I N G P L A N - O ' R Y A N R O A D L A N D S C A P E M A S T E R P L A N - A L D E R - 5 0 X 9 5 L O T S & K E I S E R A V E N U E S T R E E T S C A P E L A N D S C A P E M A S T E R P L A N - S A N D A L W O O D E S T A T E L O T S & K E I S E R A V E N U E S T R E E T S C A P E P R E L I M I N A R Y L A N D S C A P E P L A N T I N G P L A N - H I N E B A U G H C R E E K T R A I L E N L A R G E M E N T S A N D S E C T I O N S - H I N E B A U G H C R E E K T R A I L L A N D S C A P E D E T A I L S L - 1 . 0 L - 1 . 1 L - 2 . 1 L - 2 . 2 L - 3 . 1 T O L - 3 . 2 L - 4 . 1 T O L - 4 . 2 L - 5 . 1 T O L - 5 . 2 L - 5 . 3 L - 6 . 1 S I T E M A P VICINITY MAP 3rd LAND DEVELOPMENT P H A S E - VAST OAK NORTH AT UNI V E R S I T Y D I S T R I C T ROHNERT PARK, CALIFOR N I A JULY 23, 2019 LANDSCAPE PLANS FOR:ALDER & SAND A L W O O D N E I G H B O R H O O D P A R K W A Y S NORTH KERRY R O A D , K E I S E R A V E N U E , O ' R Y A N R O A D STREETSCAPE & H I N E B A U G H C R E E K B I K E T R A I L AT UNIVERSITY D I S T R I C T L - 1 . 0 C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 S c a l e : S e e D e t a i l Development Area Plan N O R T H C o v e r S h e e t ALDER & S A N D A L W O O D Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 PROJECTSITE J U L Y 2 3 , 2 0 1 9 NORTH KERRY ROAD K E I S E R A V E N U E K I N C A D E P L A C E O ' R Y A N R O A D H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K A L D E R & S A N D A L W O O D E x h i b i t 1 C L O T 1 4 1 L O T 1 4 0 BB D D L O T 1 4 2 L O T 1 4 3 L O T 1 4 5 L O T 1 4 4 L O T 1 4 7 L O T 1 4 8 L O T 1 5 0 L O T 1 5 1 L O T 1 5 3 L O T 1 5 2 L O T 1 5 5 LIMIT OF WORK REFER TO MAGNOLIA NORTH PRODUCTION PLANS PREPARED BY VTA. MATCHLINEREFER TOTHIS SHEETMATCH L I N E REFER TO T H I S S H E E T MATCHLINE REFER TO SHEET L-2.1 C C L O T 1 5 6 L O T 1 5 7 P A R C E L D D D L O T 1 5 4 L O T 1 5 5 L I M I T O F W O R K R E F E R T O M A G N O L I A N O R T H P R O D U C T I O N P L A N S P R E P A R E D B Y V T A . M A T C H L I N E R E F E R T O T H I S S H E E T M A T C H L I N E R E F E R T O S H E E T L - 5 . 1 E E V A N VAN V A N VA N C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C CC C C CCCCC C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C O ' R Y A N R O A D V A S T O A K N O R T H A P A R T M E N T S LOT 141 LOT 140LOT 1 3 9 L O T 2 1 4 L O T 2 1 3 L O T 6 5 L I M I T O F W O R K R E F E R T O V A S T O A K N O R T H A P A R T M E N T P L A N S P R E P A R E D B Y O T H E R S . L I M I T O F W O R K R E F E R T O M A G N O L I A N O R T H P R O D U C T I O N P L A N S P R E P A R E D B Y V T A . L O T 6 6 L O T 6 7 L O T 6 8 MATCHLINE REFER TO THIS SHEET BB LIMIT OF WORKREFER TO VAST OAK APARTMENTSPLANS PREPARED BY OTHERS.MATCHLINEREFER TOTHIS SHEET KEIS E R A V E N U E MATCHLINE REFER TO SHEET L-3.2 A A MATCHLINE MATCHLINEREFER TOSHEET L-2.1 F F CC L O T 1 3 6 L - 1 . 1 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H P r e l i m i n a r y L a n d s c a p e P l a n - N o r t h K e r r y R o a d NORTH KERRY R O A D & K E I S E R A V E N U E Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 P A R K W A Y P L A N T I N G M A T E R I A L M A T C H E S T H O S E A P P R O V E D B Y T H E C I T Y F O R V A S T O A K . O ' R Y A N R O A D J U L Y 2 3 , 2 0 1 9 P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . I R R I G A T I O N D E S I G N 1 . P A R K W A Y S T R I P L A N D S C A P I N G S H A L L U T I L I Z E R E C Y C L E D W A T E R F R O M A C O M M O N H O A S Y S T E M . I R R I G A T I O N N O T E S 1 . T H E I R R I G A T I O N D E S I G N F O R T H E S I T E S H A L L C O M P L Y W I T H T H E G O V E R N O R ' S W A T E R C O N S E R V A T I O N M A N D A T E , W E L O , A N D A L L C U R R E N T L O C A L W A T E R D I S T R I C T R E G U L A T I O N S . 2 . T H E I R R I G A T I O N S Y S T E M S W I L L B E A U T O M A T I C A L L Y C O N T R O L L E D B Y A N E T I R R I G A T I O N C O N T R O L L E R C A P A B L E O F M U L T I P L E P R O G R A M M I N G A N D I N D E P E N D E N T T I M I N G O F I N D I V I D U A L I R R I G A T I O N S Y S T E M S . T H E C O N T R O L L E R W I L L H A V E A 2 4 - H O U R C L O C K T O A L L O W M U L T I P L E S T A R T T I M E S A N D R E P E A T C Y C L E S T O A D J U S T F O R S O I L P E R C O L A T I O N R A T E S . 3 . T H E I R R I G A T I O N S Y S T E M W I L L C O N S I S T O F L O W V O L U M E , L O W F L O W B U B B L E R S F O R T R E E S , A N D P O I N T S O U R C E D R I P I R R I G A T I O N F O R S H R U B S A N D G R O U N D C O V E R S . 4 . P L A N T S W I L L B E G R O U P E D O N T O S E P A R A T E V A L V E S A C C O R D I N G T O S U N E X P O S U R E A N D W A T E R U S E T O A L L O W F O R I R R I G A T I O N A P P L I C A T I O N B Y H Y D R O Z O N E . T H E I R R I G A T I O N S C H E D U L I N G W I L L R E F L E C T T H E R E G I O N A L E V A P O - T R A N S P I R A T I O N R A T E S . 5 . A L L A B 1 8 8 1 D O C U M E N T A T I O N I N C L U D I N G I R R I G A T I O N P L A N S , W A T E R U S E C A L C U L A T I O N S A N D C E R T I F I C A T E S S H A L L B E S U B M I T T E D W I T H T H E L A N D S C A P E I M P R O V E M E N T P L A N S F O R R E V I E W A N D A P P R O V A L . H I N E B A U G H C R E E K T R A I L N O R T H S E E S H E E T L - 5 . 1 . B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S Q U E R C U S R U B R A R E D O A K M O D . W U C O L S S I Z E 2 4 " B O X 1 G A L 1 G A L S H R U B S / G R A S S E S G R O U N D C O V E R A R C T O S T A P H Y L O S S P . M Y O P O R U M P A R V I F O L I U M M A N Z A N I T A C R E E P I N G M Y O P O R U M V . L O W L O W P H O R M I U M ' G U A R D S M A N ' P H O R M I U M ' Y E L L O W W A V E ' S A L V I A S P . W E S T R I N G I A F R U T I C O S A X Y L O S M A C O N G E S T U M F E S T U C A M A I R E I L E Y M U S ' C A N Y O N P R I N C E ' 5 G A L 5 G A L 1 G A L G U A R D S M A N N E W Z E A L A N D F L A X N E W Z E A L A N D F L A X O R N A M E N T A L S A G E C O A S T R O S E M A R Y X Y L O S M A A T L A S F E S C U E B L U E W I L D R Y E L O W L O W L O W O'RYANROAD NORTH KERRY ROADNORTH KERRY ROAD N O R T H K E R R Y R O A D N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K 6 ' P R O J E C T W A L L W I T H V E N E E R E D P I L A S T E R S A N D V I N E S . S E E D E T A I L B , S H E E T L - 6 . 1 A N D W A L L S & F E N C E S P L A N S P R E P A R E D B Y V T A . 6' PROJECT WALL WITHVENEERED PILASTERS ANDVINES. SEE DETAIL B, SHEETL-6.1 AND WALLS & FENCESPLANS PREPARED BY VTA.PARKWAY PLANTINGAREA, TYPICAL.NORTH- SOUTH THEMEDSTREET TREE, TYPICAL. P U B L I C S I D E W A L K , T Y P I C A L . PUBLIC SIDEWALK, TYPICAL.PUBLIC SIDEWALK,TYPICAL.SEE TYPICAL PARKWAYCONDITION, SHEET L-2.2. E X T E N T O F H I N E B A U G H C R E E K B R I D G E . EAST-WEST THEMEDSTREET TREE (TYP.) C C C C O ' R Y A N R O A D LOT 141 LOT 140LOT 139LOT 214 L O T 2 1 3 L O T 6 5 L I M I T O F W O R K REF E R T O V A S T O A K N O R T H A P A R T M E N T P L A N S P R E P A R E D B Y O T H E R S . LIMIT O F W O R K REFER TO M A G N O L I A N O R T H PRODUCTION PLAN S P R E P A R E D B Y V T A . L O T 6 6 L O T 6 7 L O T 6 8 MATCHLINEREFER TOSHEET L-1.1 MATCHLINE REFER TO THIS SHEET F F CC L O T 1 3 6 CCCCCCCCO'RYAN R O A D LOT 34LOT 33 L O T 5 L O T 4 L O T 3 L O T 1 P A R C E L B LIMI T O F W O R K REFER TO GR I F F I N ' S G R O V E P A R K DAP PLANS P R E P A R E D B Y V T A . LIMIT OF WORKREFER TO CYPRESS NORTHPRODUCTION PLANS PREPARED BY VT A . MATCHLINEREFER TOTHIS SHEET MATCHLINE REFER TO SHEET L-3.1 L O T 2 F G F G L - 2 . 1 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H P r e l i m i n a r y L a n d s c a p e P l a n - O ' R y a n R o a d O'RY A N R O A D Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 OXFORDPLACE OAK LEAF PLACE ORCHARD PLACE OLIVE PLACE PARKWAY PLANTING AREA, TYPICAL EAST-WEST THEMED STREET TREE, TYPICAL P A R K W A Y P L A N T I N G A R E A , T Y P I C A L EAST-WEST THEMEDSTREET TREE, TYPICAL6' PROJECT WALL WITH VENEEREDPILASTERS AND VINES. SEE DETAIL B,SHEET L-6.1 AND WALLS & FENCESPLANS PREPARED BY VTA.6' PROJECT WALL WITHVENEERED PILASTERS ANDVINES. SEE DETAIL B, SHEETL-6.1 AND WALLS & FENCESPLANS PREPARED BY VTA. P U B L I C S I D E W A L K , T Y P I C A L A B P A R K W A Y P L A N T I N G M A T E R I A L M A T C H E S T H O S E A P P R O V E D B Y T H E C I T Y F O R V A S T O A K . M A I L B O X D I S T R I B U T I O N M A I L B O X E N C L O S U R E A - P H A S E 3 B , 4 - P A C K L O T S ( 7 3 H O M E S ) ( 4 ) 4 C 1 6 D - 2 0 - P , 2 0 - U N I T C L U S T E R M A I L B O X E S ( 2 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X E S M A I L B O X E N C L O S U R E B - P H A S E 3 B , 4 - P A C K L O T S ( 7 4 H O M E S ) ( 4 ) 4 C 1 6 D - 2 0 - P , 2 0 - U N I T C L U S T E R M A I L B O X E S ( 2 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X E S M A I L B O X E N C L O S U R E C - P H A S E 3 A , 5 0 X 9 5 L O T S ( 6 0 H O M E S ) ( 3 ) 4 C 1 6 D - 2 0 - P , 2 0 - U N I T C L U S T E R M A I L B O X E S ( 2 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X E S M A I L B O X E N C L O S U R E D - P H A S E 3 A , E S T A T E S L O T S ( 2 6 H O M E S ) ( 1 ) 4 C 1 6 D - 2 9 - P , 2 9 - U N I T C L U S T E R M A I L B O X ( 1 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X A B · S E E D E T A I L C , S H E E T L - 6 . 1 . C D SEE PARCEL B E N L A R G E M E N T , S H E E T L - 2 . 2 . S E E T Y P I C A L P A R K W A Y C O N D I T I O N , S H E E T L - 2 . 2 . ORCHARDPLACE J U L Y 2 3 , 2 0 1 9 OVERLOOK PLACE N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . I R R I G A T I O N D E S I G N 1 . P A R K W A Y S T R I P L A N D S C A P I N G S H A L L U T I L I Z E R E C Y C L E D W A T E R F R O M A C O M M O N H O A S Y S T E M . I R R I G A T I O N N O T E S 1 . T H E I R R I G A T I O N D E S I G N F O R T H E S I T E S H A L L C O M P L Y W I T H T H E G O V E R N O R ' S W A T E R C O N S E R V A T I O N M A N D A T E , W E L O , A N D A L L C U R R E N T L O C A L W A T E R D I S T R I C T R E G U L A T I O N S . 2 . T H E I R R I G A T I O N S Y S T E M S W I L L B E A U T O M A T I C A L L Y C O N T R O L L E D B Y A N E T I R R I G A T I O N C O N T R O L L E R C A P A B L E O F M U L T I P L E P R O G R A M M I N G A N D I N D E P E N D E N T T I M I N G O F I N D I V I D U A L I R R I G A T I O N S Y S T E M S . T H E C O N T R O L L E R W I L L H A V E A 2 4 - H O U R C L O C K T O A L L O W M U L T I P L E S T A R T T I M E S A N D R E P E A T C Y C L E S T O A D J U S T F O R S O I L P E R C O L A T I O N R A T E S . 3 . T H E I R R I G A T I O N S Y S T E M W I L L C O N S I S T O F L O W V O L U M E , L O W F L O W B U B B L E R S F O R T R E E S , A N D P O I N T S O U R C E D R I P I R R I G A T I O N F O R S H R U B S A N D G R O U N D C O V E R S . 4 . P L A N T S W I L L B E G R O U P E D O N T O S E P A R A T E V A L V E S A C C O R D I N G T O S U N E X P O S U R E A N D W A T E R U S E T O A L L O W F O R I R R I G A T I O N A P P L I C A T I O N B Y H Y D R O Z O N E . T H E I R R I G A T I O N S C H E D U L I N G W I L L R E F L E C T T H E R E G I O N A L E V A P O - T R A N S P I R A T I O N R A T E S . 5 . A L L A B 1 8 8 1 D O C U M E N T A T I O N I N C L U D I N G I R R I G A T I O N P L A N S , W A T E R U S E C A L C U L A T I O N S A N D C E R T I F I C A T E S S H A L L B E S U B M I T T E D W I T H T H E L A N D S C A P E I M P R O V E M E N T P L A N S F O R R E V I E W A N D A P P R O V A L . B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S P I S T A C I A C H I N E N S I S ' K E I T H D A V E Y ' K E I T H D A V E Y C H I N E S E P I S T A C H E L O W W U C O L S 1 G A L 1 G A L S I Z E 2 4 " B O X S H R U B S / G R A S S E S G R O U N D C O V E R A R C T O S T A P H Y L O S S P . M Y O P O R U M P A R V I F O L I U M M A N Z A N I T A C R E E P I N G M Y O P O R U M V . L O W L O W P H O R M I U M ' G U A R D S M A N ' P H O R M I U M ' Y E L L O W W A V E ' S A L V I A S P . W E S T R I N G I A F R U T I C O S A X Y L O S M A C O N G E S T U M F E S T U C A M A I R E I L E Y M U S ' C A N Y O N P R I N C E ' 5 G A L 5 G A L 1 G A L G U A R D S M A N N E W Z E A L A N D F L A X N E W Z E A L A N D F L A X O R N A M E N T A L S A G E C O A S T R O S E M A R Y X Y L O S M A A T L A S F E S C U E B L U E W I L D R Y E L O W L O W L O W L I M I T O F W O R K R E F E R T O C Y P R E S S N O R T H P R O D U C T I O N P L A N S P R E P A R E D B Y V T A . L - 2 . 2 S c a l e : 1 " = 1 0 ' - 0 " 0 ' 5 ' 1 0 ' 2 0 ' 4 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H P a r c e l B E n l a r g e m e n t a n d T y p i c a l P a r k w a y L a n d s c a p e P l a n - O ' R y a n R o a d O' RY A N R O A D Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 TYPICAL PARKWAY CONDITION SECTIO N DRAWING N O T T O S C A L E PUBLICPARKWAY PARKWAYTREEPLANSCALE: 1" = 10'-0"PUBLICSIDEWALKPROJECTWALLPARCEL B ENGLARGEMENT B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S P I S T A C I A C H I N E N S I S ' K E I T H D A V E Y ' K E I T H D A V E Y C H I N E S E P I S T A C H E L O W W U C O L S 1 G A L 1 G A L S I Z E 2 4 " B O X S H R U B S / G R A S S E S P A R K W A Y A R C T O S T A P H Y L O S S P . M Y O P O R U M P A R V I F O L I U M M A N Z A N I T A C R E E P I N G M Y O P O R U M V . L O W L O W P H O R M I U M ' G U A R D S M A N ' P H O R M I U M ' Y E L L O W W A V E ' S A L V I A S P . W E S T R I N G I A F R U T I C O S A X Y L O S M A C O N G E S T U M F E S T U C A M A I R E I L E Y M U S ' C A N Y O N P R I N C E ' 5 G A L 5 G A L 1 G A L G U A R D S M A N N E W Z E A L A N D F L A X N E W Z E A L A N D F L A X O R N A M E N T A L S A G E C O A S T R O S E M A R Y X Y L O S M A A T L A S F E S C U E B L U E W I L D R Y E L O W L O W L O W O'R Y A N R O A D 1 G A L 1 G A L 1 G A L G R O U N D C O V E R F R A G A R I A C H I L O E N S I S H E L I A N T H E M U M N U M M U L A R I U M S C A E V O L A ' M A U V E C L U S T E R S ' C R E E P I N G S T R A W B E R R Y S U N R O S E P U R P L E S C A E V O L A M O D L O W M O D V I N E S F I C U S P U M I L A P A R T H E N O C I S S U S T R I C U S P I D A T A 5 G A L 5 G A L C R E E P I N G F I G B O S T O N I V Y M O D M O D J U L Y 2 3 , 2 0 1 9 P A R K W A Y P L A N T I N G M A T E R I A L M A T C H E S T H O S E A P P R O V E D B Y T H E C I T Y F O R V A S T O A K . L O T 8 5 L O T 8 6 L O T 3 LOT 1 P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K LOT 2 OLYMPIC PLACE OVERLOOK PLACELIMIT OF WORKREFER TO CYPRESS NORTH PRODUCTIONPLANS PREPARED BY VTA. MATCHLINE REFER TO SHEET LOT 1 PARCEL B L-4.2 M A T C H L I N E REFE R T O S H E E T L O T 3 6 L O T 3 5 L O T 3 4 L O T 3 3 L O T 3 2 L O T 3 1 L O T 3 0 L O T 2 9 L O T 2 8 L O T 2 7 L O T 5 4 LOT 71 L O T 5 5 LOT 70 L O T 5 6 LOT 69 L O T 5 7 LOT 68 L O T 5 8 LOT 67 L O T 5 9 LOT 66 L O T 6 0 LOT 65 L O T 6 1 LOT 64 L O T 6 2 LOT 63 L - 5 . 1 REFER TO CYPRESS NORTHPRODUCTION PLANS PREPARED BY VTA. I H I L - 3 . 2 M A T C H L I N E R E F E R T O S H E E T J J HMATCHLINEREFER TOSHEET L-2.1 GG L - 3 . 1 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H L a n d s c a p e M a s t e r P l a n - A l d e r & K e i s e r A v e n u e A L D E R Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 N O R T H - S O U T H T H E M E D S T R E E T T R E E ( T Y P . ) 6' PROJECT WALL WITHVENEERED PILASTERS ANDVINES. SEE DETAIL B, SHEETL-6.1 AND WALLS & FENCESPLANS PREPARED BY VTA. B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S L I R I O D E N D R O N T U L I P I F E R A P I S T A C I A C H I N E N S I S ' K E I T H D A V E Y ' P L A T A N U S X A C E R I F O L I A ` C O L U M B I A ` T U L I P T R E E K E I T H D A V E Y C H I N E S E P I S T A C H E L O N D O N P L A N E T R E E M O D L O W M O D W U C O L S S I Z E 2 4 " B O X 2 4 " B O X 2 4 " B O X 1 G A L 1 G A L G R O U N D C O V E R S A R C T O S T A P H Y L O S S P . M Y O P O R U M P A R V I F O L I U M M A N Z A N I T A C R E E P I N G M Y O P O R U M V . L O W L O W J U L Y 2 3 , 2 0 1 9 P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . P L A N T L I S T C O N S I S T E N T W I T H A P P R O V E D V A S T O A K P L A N T I N G . I R R I G A T I O N D E S I G N 1 . P A R K W A Y S T R I P L A N D S C A P I N G S H A L L U T I L I Z E R E C Y C L E D W A T E R F R O M A C O M M O N H O A S Y S T E M . N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K CCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCC KEISER A V E N U E O'RYAN ROA D LIMIT OF WORK REFER TO GRIFFIN'S GROVE PARK DAP PLANS PREPARED BY VTA. L I M I T O F W O R K R E F E R T O K E I S E R A V E N U E S T R E E T S C A P E P L A N S P R E P A R E D B Y V T A . OVERLOOK PLACE P A R C E L B LIMIT OF W O R K REFER TO GRIFFIN'S G R O V E P A R K DAP PLANS PREPA R E D B Y V T A . L - 3 . 1 M A T C H L I N E R E F E R T O S H E E T MATCHLINE REFER TO THIS SHEET L-4.1 L O T 4 8 L O T 4 7 L O T 4 6 L O T 4 5 L O T 4 4 L O T 4 3 L O T 4 2 L O T 4 1 L O T 4 0 L O T 3 9 L O T 3 8 L O T 3 7 L O T 3 6 L O T 3 5 L O T 3 4 L O T 4 9 L O T 7 6 L O T 5 0 L O T 7 5 L O T 5 1 L O T 7 4 L O T 5 2 L O T 7 3 L O T 5 3 L O T 7 2 L O T 5 4 L O T 7 1 L O T 5 5 L O T 7 0 OLYMPIC PLACE I I H THIS SHEET H MATCHLINE REFER TO SHEET L-2.1 LIMIT O F W O R K REFER TO GRIFFIN'S GROVE PA R K D A P P L A N S P R E P A R E D B Y V T A . AAMATCHLINEREFER TOSHEET L-1.1F G G L - 3 . 2 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H ALDER & K E I S E R A V E N U E Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 N O R T H - S O U T H T H E M E D S T R E E T T R E E ( T Y P . ) E A S T - W E S T T H E M E D S T R E E T T R E E ( T Y P . ) 6 ' P R O J E C T W A L L W I T H V E N E E R E D P I L A S T E R S A N D V I N E S . S E E D E T A I L B , S H E E T L - 6 . 1 A N D W A L L S & F E N C E S P L A N S P R E P A R E D B Y V T A . L a n d s c a p e M a s t e r P l a n - A l d e r & K e i s e r A v e n u e C MAILBO X D I S T R I B U T I O N MAILBOX ENCLO S U R E A - P H A S E 3 B , 4 - P A C K L O T S ( 7 3 H O M E S ) (4) 4C16D-20-P, 2 0 - U N I T C L U S T E R M A I L B O X E S (2) 4C16S-3P-P, 3 - U N I T P A R C E L B O X E S MAILBOX ENCLO S U R E B - P H A S E 3 B , 4 - P A C K L O T S ( 7 4 H O M E S ) (4) 4C16D-20-P, 2 0 - U N I T C L U S T E R M A I L B O X E S (2) 4C16S-3P-P, 3 - U N I T P A R C E L B O X E S MAILBOX ENCLO S U R E C - P H A S E 3 A , 5 0 X 9 5 L O T S ( 6 0 H O M E S ) (3) 4C16D-20-P, 2 0 - U N I T C L U S T E R M A I L B O X E S (2) 4C16S-3P-P, 3 - U N I T P A R C E L B O X E S MAILBOX ENCLO S U R E D - P H A S E 3 A , E S T A T E S L O T S ( 2 6 H O M E S ) (1) 4C16D-29-P, 2 9 - U N I T C L U S T E R M A I L B O X (1) 4C16S-3P-P, 3 - U N I T P A R C E L B O X AB · S E E D E T A I L C , S H E E T L - 6 . 1 . CD J U L Y 2 3 , 2 0 1 9 N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K BOTANICAL NAMESYMBOLCOMMON NAME PLANT PALETTESTREET TREESLIRIODENDRON TULIPIFERAPISTACIA CHINENSIS'KEITH DAVEY'PLATANUS X ACERIFOLIA`COLUMBIA`TULIP TREEKEITH DAVEYCHINESE PISTACHELONDON PLANE TREE MODLOWMOD WUCOLSSIZE24" BOX24" BOX24" BOX1 GAL1 GAL GROUNDCOVERSARCTOSTAPHYLOS SP.MYOPORUM PARVIFOLIUM MANZANITACREEPING MYOPORUM V. LOWLOWPLANTING NOTES1.THE LOCATION AND QUANTITY OF TREES IS SUBJECT TO CHANGE BY NO MORE THAN 5%BASED ON UTILITY COMPOSITION. PROVIDE 3' CLEAR AROUND ALL HYDRANTS PERCALIFORNIA FIRE CODE.2.THE PLANTING DESIGN FOR THE SITE IS DROUGHT TOLERANT AND UTILIZES NATIVE ANDADAPTED ORNAMENTAL PLANTING.3.ALL SHRUBS AND GROUNDCOVER MATERIAL SELECTED HAS A WUCOLS WATER USE RATINGOF LOW OR VERY LOW.4.PROPOSED TREE CANOPIES ARE SHOWN AT 85% MATURE GROWTH DIAMETER IN ORDER TOENSURE THERE IS SUFFICIENT ROOM FOR TREE GROWTH AND HEALTH.5.PROVIDE 3' CLEARANCE FROM TREES AROUND ALL HYDRANTS PER CALIFORNIA FIRE CODE.PLANT LIST CONSISTENT WITHAPPROVED VAST OAK PLANTING .IRRIGATION DESIGN1.PARKWAY STRIP LANDSCAPING SHALL UTILIZE RECYCLEDWATER FROM A COMMON HOA SYSTEM. S E E T Y P I C A L P A R K W A Y C O N D I T I O N , S H E E T L - 2 . 2 . KEISER AVENUE PETALUMA HILL ROAD LIMIT OF WORKREFER TO KEISER AVENUE STREETSCAPEPLANS PREPARED BY VTA. LIMIT OF WORK OCEAN PLACEMATCHLINEREFER TO SHEETL-4.1 MATCHLINEREFER TO THIS SHEET L-4.1L-3.2 LOT 15LOT 14LOT 16 LOT 13LOT 17 LOT 12LOT 18 LOT 11LOT 19 LOT 10LOT 20 LOT 9LOT 8 IHIH H L-4.2 LIMIT OF WORK AT PETALUMA HILL ROAD. PETALUMA HILL ROAD L - 4 . 1 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H SANDALWOOD & K E I S E R A V E N U E Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 6 ' P R O J E C T W A L L W I T H V E N E E R E D P I L A S T E R S A N D V I N E S . S E E D E T A I L B , S H E E T L - 6 . 1 A N D W A L L S & F E N C E S P L A N S P R E P A R E D B Y V T A . N O R T H - S O U T H T H E M E D S T R E E T T R E E ( T Y P . ) E X I S T I N G S C E N I C C O R R I D O R W E T L A N D S F E N C E . S E E V A S T O A K N O R T H W A L L & F E N C E P L A N S P R E P A R E D B Y V T A . L a n d s c a p e M a s t e r P l a n - S a n d a l w o o d E s t a t e s & K e i s e r A v e n u e J U L Y 2 3 , 2 0 1 9 B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S A C E R R U B R U M R E D M A P L E M O D W U C O L S S I Z E 2 4 " B O X P I S T A C I A C H I N E N S I S ' K E I T H D A V E Y ' K E I T H D A V E Y C H I N E S E P I S T A C H E L O W 2 4 " B O X 1 G A L 1 G A L G R O U N D C O V E R S A R C T O S T A P H Y L O S S P . M Y O P O R U M P A R V I F O L I U M M A N Z A N I T A C R E E P I N G M Y O P O R U M V . L O W L O W N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . E A S T - W E S T T H E M E D S T R E E T T R E E ( T Y P . ) P L A N T L I S T C O N S I S T E N T W I T H A P P R O V E D V A S T O A K P L A N T I N G . I R R I G A T I O N D E S I G N 1 . P A R K W A Y S T R I P L A N D S C A P I N G S H A L L U T I L I Z E R E C Y C L E D W A T E R F R O M A C O M M O N H O A S Y S T E M . S E E T Y P I C A L P A R K W A Y C O N D I T I O N , S H E E T L - 2 . 2 . OCEAN PLACEMATCHLINEREFER TO SHEET LIMIT OF WORK L-4.2 MATCHLINEREFER TO SHEETL-4.1L-3.1 LOT 21 L O T 8 LOT 22 L O T 7 LOT 23 L O T 6 LOT 24 L O T 5 LOT 25 L O T 4 L O T 3 L O T 1 L O T 2 LIM I T O F W O R K I H H IMATCHLINEREFER TO SHEETJJL-5.1 LOT 26 L - 4 . 2 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H SAN D A L W O O D Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 N O R T H - S O U T H T H E M E D S T R E E T T R E E ( T Y P . ) E X I S T I N G S C E N I C C O R R I D O R W E T L A N D S F E N C E . S E E V A S T O A K N O R T H W A L L & F E N C E P L A N S P R E P A R E D B Y V T A . L a n d s c a p e M a s t e r P l a n - S a n d a l w o o d E s t a t e s J U L Y 2 3 , 2 0 1 9 N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K VIEW FENC E ( T Y P . ) - SEE VAST OA K N O R T H WALL & FEN C E P L A N S PREPARE D B Y V T A B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S A C E R R U B R U M R E D M A P L E M O D W U C O L S S I Z E 2 4 " B O X P I S T A C I A C H I N E N S I S ' K E I T H D A V E Y ' K E I T H D A V E Y C H I N E S E P I S T A C H E L O W 2 4 " B O X 1 G A L 1 G A L G R O U N D C O V E R S A R C T O S T A P H Y L O S S P . M Y O P O R U M P A R V I F O L I U M M A N Z A N I T A C R E E P I N G M Y O P O R U M V . L O W L O W P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . P L A N T L I S T C O N S I S T E N T W I T H A P P R O V E D V A S T O A K P L A N T I N G . I R R I G A T I O N D E S I G N 1 . P A R K W A Y S T R I P L A N D S C A P I N G S H A L L U T I L I Z E R E C Y C L E D W A T E R F R O M A C O M M O N H O A S Y S T E M . D M A I L B O X D I S T R I B U T I O N M A I L B O X E N C L O S U R E A - P H A S E 3 B , 4 - P A C K L O T S ( 7 3 H O M E S ) ( 4 ) 4 C 1 6 D - 2 0 - P , 2 0 - U N I T C L U S T E R M A I L B O X E S ( 2 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X E S M A I L B O X E N C L O S U R E B - P H A S E 3 B , 4 - P A C K L O T S ( 7 4 H O M E S ) ( 4 ) 4 C 1 6 D - 2 0 - P , 2 0 - U N I T C L U S T E R M A I L B O X E S ( 2 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X E S M A I L B O X E N C L O S U R E C - P H A S E 3 A , 5 0 X 9 5 L O T S ( 6 0 H O M E S ) ( 3 ) 4 C 1 6 D - 2 0 - P , 2 0 - U N I T C L U S T E R M A I L B O X E S ( 2 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X E S M A I L B O X E N C L O S U R E D - P H A S E 3 A , E S T A T E S L O T S ( 2 6 H O M E S ) ( 1 ) 4 C 1 6 D - 2 9 - P , 2 9 - U N I T C L U S T E R M A I L B O X ( 1 ) 4 C 1 6 S - 3 P - P , 3 - U N I T P A R C E L B O X A B · S E E D E T A I L C , S H E E T L - 6 . 1 . C D P A R C E L B L O T 2 7 LIMIT OF WORK L - 5 . 1 L - 3 . 1 LIMIT OF WORKREFER TO CYPRESS NORTHPRODUCTION PLANSPREPARED BY VTA.MATCHLINEREFER TOTHIS SHEETK M A T C H L I N E R E F E R T O S H E E T L - 4 . 2 M A T C H L I N E R E F E R T O S H E E T J J J K L O T 2 1 L O T 2 2 LOT 64LOT 63 L I M I T O F W O R K L O T 2 6 L I M I T O F W O R K MATCHLINE REFER TO THIS SHEET K K L O T 6 2 L O T 6 1 L O T 6 0 L O T 5 9 L O T 9 7 L O T 9 8 L O T 9 9 L O T 1 0 0 L O T 1 0 4 L O T 1 0 5 LOT 106LOT 107LOT 156LOT 157 L O T 1 0 3 L O T 1 0 2 L O T 1 0 1 P A R C E L B PARCEL DMATCHLINEREFER TOSHEET L-1.1E E L - 5 . 1 S c a l e : 1 " = 3 0 ' - 0 " 0 ' 1 5 ' 3 0 ' 6 0 ' 1 2 0 ' C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H P r e l i m i n a r y L a n d s c a p e P l a n - H i n e b a u g h C r e e k HINEBA U G H C R E E K Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 T R A I L P L A N T I N G M A T E R I A L M A T C H E S T H O S E A P P R O V E D B Y T H E C I T Y F O R V A S T O A K W E S T . T Y P I C A L P L A N T I N G C O N D I T I O N A T R E S I D E N T I A L I N T E R F A C E . S E E E N L A R G E D P L A N A N D S E C T I O N , S H E E T L - 5 . 2 F U T U R E L O C A T I O N O F P E D E S T R I A N B R I D G E T O V A S T O A K E A S T P E R C I V I L E N G I N E E R ' S P L A N S T Y P I C A L P L A N T I N G C O N D I T I O N A T P A R K W A Y A D J A C E N T T O W E T L A N D S . S E E E N L A R G E D P L A N A N D S E C T I O N , S H E E T L - 5 . 2 6 ' P R O J E C T W A L L W I T H V E N E E R E D P I L A S T E R S A N D V I N E S . S E E D E T A I L B , S H E E T L - 6 . 1 A N D W A L L S & F E N C E S P L A N S P R E P A R E D B Y V T A . 6 ' P R O J E C T W A L L W I T H V E N E E R E D P I L A S T E R S A N D V I N E S . S E E D E T A I L B , S H E E T L - 6 . 1 A N D W A L L S & F E N C E S P L A N S P R E P A R E D B Y V T A . E A S T - W E S T T H E M E D S T R E E T T R E E , T Y P I C A L OVERLOOK PLACE OLYMPIC PLACE OCEAN PLACE OXFORDPLACE OAK LEAF PLACE OLIVEPLACE ORCHARD PLACE CLAS S I B I K E T R A I L J U L Y 2 3 , 2 0 1 9 N T S NORTH KERRY ROAD K E I S E R A V E N U E I N C A D E P L A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K A P A R T M E N T S H I N E B A U G H C R E E K E V A R O A D P E R C I V I L E N G I N E E R ' S P L A N S P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . S E E E N L A R G E M E N T , S H E E T L - 5 . 3 B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S C E R C I S O C C I D E N T A L I S P I S T A C I A C H I N E N S I S ` K E I T H D A V E Y ` Q U E R C U S A G R I F O L I A S E Q U O I A S E M P E R V I R E N S ` A P T O S B L U E ` W E S T E R N R E D B U D K E I T H D A V E Y C H I N E S E P I S T A C H E C O A S T L I V E O A K C O A S T R E D W O O D L O W L O W L O W H I G H W U C O L S 1 G A L S I Z E 2 4 " B O X 2 4 " B O X 2 4 " B O X 2 4 " B O X S H R U B S G R O U N D C O V E R M Y O P O R U M P A R V I F O L I U M C R E E P I N G M Y O P O R U M L O W C I S T U S P U R P U R E U S D O D O N A E A V I S C O S A ' P U R P U R E A ' F E S T U C A M A R E I M U H L E N B E R G I A R I G E N S P H O R M I U M ' B R O N Z E B A B Y ' P H O R M I U M ' Y E L L O W W A V E ' S A L V I A L E U C A N T H A W E S T R I N G I A ' W Y N Y A B B I E G E M ' 5 G A L 5 G A L 1 G A L 1 G A L 5 G A L 5 G A L 5 G A L 5 G A L O R C H I D R O C K R O S E P U R P L E H O P S E E D B U S H A T L A S F E S C U E D E E R G R A S S N E W Z E A L A N D F L A X N E W Z E A L A N D F L A X M E X I C A N B U S H S A G E L A V E N D E R R O S E M A R Y L O W L O W L O W L O W L O W L O W L O W L O W C R E E P I N G F I G B O S T O N I V Y 1 5 G A L 1 5 G A L V I N E S F I C U S P U M I L A P A R T H E N O C I S S U S T R I C U S P I D A T A M O D M O D V ( N / S F A C I N G ) V ( E / W F A C I N G ) 1 G A L P A R K W A Y A R C T O S T A P H Y L O S S P . M A N Z A N I T A V . L O W NORTH KERRY ROAD P L A N T L I S T C O N S I S T E N T W I T H A P P R O V E D V A S T O A K P L A N T I N G . L - 5 . 2 C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H E n l a r g e m e n t s , S e c t i o n s a n d B i k e P a t h D e t a i l - H i n e b a u g h C r e e k HINEBA U G H C R E E K Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 T Y P I C A L P L A N T I N G C O N D I T I O N @ P A R K W A Y S E C T I O N P U B L I C P A R K W A Y S T R I P P A R K W A Y T R E E P U B L I C R O A D W A Y C L A S S I B I K E T R A I L P E R C I T Y ' S M A N U A L O F S T A N D A R D S S E E D E T A I L A , T H I S S H E E T 2 ' 2 ' 8 ' C O N C R E T E B I K E T R A I L G R A V E L S H O U L D E R S D R A W I N G N O T T O S C A L E P L A N PLANSECTIONTYPICAL PLANTING CONDITION @ RESIDENTIAL INT E R F A C E DRAWING NOT TO SCALE S C A L E : 1 " = 1 0 ' - 0 " SCALE: 1" = 10'-0"C L A S S I B I K E T R A I L P L A N T I N G A R E A 2' G R A V E L SH O U L D E R C R E E K B U F F E R C L A S S I B I K E T R A I L P U B L I C P A R K W A Y P A R K W A Y T R E E 2 ' G R A V E L S H O U L D E R CLASS I BIKE TRAIL PERCITY'S MANUAL OF STANDARDSSEE DETAIL A, THIS SHEET PROJECT WALLHOME PAD2'2'8'CONCRETEBIKETRAIL GRAVELSHOULDERS A C L A S S I B I K E P A T H O R M U L T I - U S E T R A I L S C A L E : N T S J U L Y 2 3 , 2 0 1 9 S c a l e : 1 " = 1 0 ' - 0 " 0 ' 5 ' 1 0 ' 2 0 ' 4 0 ' L I M I T O F W O R K L - 5 . 3 C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . P r o j e c t N o . 0 7 6 1 7 Development Area Plan N O R T H P l a n t i n g a t E V A R o a d E n l a r g e m e n t - H i n e b a u g h C r e e k HINEBA U G H C R E E K Rohnert P a r k , C a l i f o r n i a Vast Oak North a t U n i v e r s i t y D i s t r i c t N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 PLANTING AT EVA ROAD ENLARGEMENT J U L Y 2 3 , 2 0 1 9 S c a l e : 1 " = 1 0 ' - 0 " 0 ' 5 ' 1 0 ' 2 0 ' 4 0 ' O C E A N P L A C E LO T 2 7 L O T 2 6 OLYMPICPLACE E V A R O A D P E R C I V I L E N G I N E E R ' S P L A N S T R A I L P L A N T I N G M A T E R I A L M A T C H E S T H O S E A P P R O V E D B Y T H E C I T Y F O R V A S T O A K W E S T . P L A N T I N G N O T E S 1 . T H E L O C A T I O N A N D Q U A N T I T Y O F T R E E S I S S U B J E C T T O C H A N G E B Y N O M O R E T H A N 5 % B A S E D O N U T I L I T Y C O M P O S I T I O N . P R O V I D E 3 ' C L E A R A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . 2 . T H E P L A N T I N G D E S I G N F O R T H E S I T E I S D R O U G H T T O L E R A N T A N D U T I L I Z E S N A T I V E A N D A D A P T E D O R N A M E N T A L P L A N T I N G . 3 . A L L S H R U B S A N D G R O U N D C O V E R M A T E R I A L S E L E C T E D H A S A W U C O L S W A T E R U S E R A T I N G O F L O W O R V E R Y L O W . 4 . P R O P O S E D T R E E C A N O P I E S A R E S H O W N A T 8 5 % M A T U R E G R O W T H D I A M E T E R I N O R D E R T O E N S U R E T H E R E I S S U F F I C I E N T R O O M F O R T R E E G R O W T H A N D H E A L T H . 5 . P R O V I D E 3 ' C L E A R A N C E F R O M T R E E S A R O U N D A L L H Y D R A N T S P E R C A L I F O R N I A F I R E C O D E . B O T A N I C A L N A M E S Y M B O L C O M M O N N A M E P L A N T P A L E T T E S T R E E T T R E E S C E R C I S O C C I D E N T A L I S P I S T A C I A C H I N E N S I S ` K E I T H D A V E Y ` Q U E R C U S A G R I F O L I A S E Q U O I A S E M P E R V I R E N S ` A P T O S B L U E ` W E S T E R N R E D B U D K E I T H D A V E Y C H I N E S E P I S T A C H E C O A S T L I V E O A K C O A S T R E D W O O D L O W L O W L O W H I G H W U C O L S 1 G A L S I Z E 2 4 " B O X 2 4 " B O X 2 4 " B O X 2 4 " B O X S H R U B S G R O U N D C O V E R M Y O P O R U M P A R V I F O L I U M C R E E P I N G M Y O P O R U M L O W C I S T U S P U R P U R E U S D O D O N A E A V I S C O S A ' P U R P U R E A ' F E S T U C A M A R E I M U H L E N B E R G I A R I G E N S P H O R M I U M ' B R O N Z E B A B Y ' P H O R M I U M ' Y E L L O W W A V E ' S A L V I A L E U C A N T H A W E S T R I N G I A ' W Y N Y A B B I E G E M ' 5 G A L 5 G A L 1 G A L 1 G A L 5 G A L 5 G A L 5 G A L 5 G A L O R C H I D R O C K R O S E P U R P L E H O P S E E D B U S H A T L A S F E S C U E D E E R G R A S S N E W Z E A L A N D F L A X N E W Z E A L A N D F L A X M E X I C A N B U S H S A G E L A V E N D E R R O S E M A R Y L O W L O W L O W L O W L O W L O W L O W L O W C R E E P I N G F I G B O S T O N I V Y 1 5 G A L 1 5 G A L V I N E S F I C U S P U M I L A P A R T H E N O C I S S U S T R I C U S P I D A T A M O D M O D V ( N / S F A C I N G ) V ( E / W F A C I N G ) 1 G A L P A R K W A Y A R C T O S T A P H Y L O S S P . M A N Z A N I T A V . L O W P L A N T L I S T C O N S I S T E N T W I T H A P P R O V E D V A S T O A K P L A N T I N G . N T S NORTH KERRY ROAD K E I S E R A V E N U E INCADE PL A C E O ' R Y A N R O A D PETALUMA HILL ROAD H I N E B A U G H C R E E K G R I F F I N ' S G R O V E P A R K V A S T O A K AP A R T M E N T S H I N E B A U G H C R E E K C o p y r i g h t 2 0 1 9 v a n d e r T o o l e n A s s o c i a t e s . T h e d r a w i n g s o r w r i t t e n m a t e r i a l s c o n t a i n e d h e r e i n c o n s t i t u t e t h e o r i g i n a l a n d u n p u b l i s h e d w o r k o f t h e l a n d s c a p e a r c h i t e c t . R e p r o d u c t i o n , u s e o r a l t e r a t i o n i n a n y f o r m i s s t r i c t l y p r o h i b i t e d w i t h o u t t h e w r i t t e n c o n s e n t o f v a n d e r T o o l e n A s s o c i a t e s . L - 6 . 1 P r o j e c t N o . 0 7 6 1 7 S c a l e : S e e D e t a i l Development Area Plan N O R T H L a n d s c a p e D e t a i l s ALDER & SA N D A L W O O D Rohnert Park, C a l i f o r n i a Vast Oak North at Univ e r s i t y D i s t r i c t B N a p a 8 5 5 B o r d e a u x W a y , S u i t e 2 4 0 N a p a , C A 9 4 5 5 8 t e l : 7 0 7 . 2 2 4 . 2 2 9 9 f a x : 7 0 7 . 2 2 4 . 6 8 2 1 w w w . v a n d e r T o o l e n . c o m t e l : 9 2 5 . 2 7 4 . 1 3 0 5 W a l n u t C r e e k 7 0 0 Y g n a c i o V a l l e y R d . S u i t e 1 0 0 W a l n u t C r e e k , C A 9 4 5 9 6 t e l : 9 1 6 . 2 4 4 . 3 0 0 0 W e s t S a c r a m e n t o 2 1 0 1 S t o n e B l v d . S u i t e 1 1 5 W . S a c r a m e n t o , C A 9 5 6 9 1 M A I L B O X E N C L O S U R E T Y P I C A L S C A L E : 1 / 4 " = 1 ' - 0 " E L E V A T I O N 1 2 3 4 5 6 7 8 1 P 2 P 1 8 1 7 1 6 1 5 1 4 1 3 1 2 9 1 0 2 0 1 9 S T A N D I N G S E A M M E T A L R O O F W I T H S C U P P E R D R A I N A G E T H R O U G H P I L A S T E R S A N D F A C E O F C U R B . R O O F S H A L L B E ' C O O L D A R K ' D U R A T E C H 5 0 0 0 A E P S P A N T O M A T C H P A R K S T R U C T U R E S . S T E E L T R E L L I S . C O L O R S H A L L B E ' R A L 7 0 4 7 G R E Y ' T O M A T C H P A R K S T R U C T U R E . S E E S T R U C T U R A L E N G I N E E R ' S D R A W I N G S A N D C A L C U L A T I O N S F O R M A T E R I A L S , C O N S T R U C T I O N A N D R E I N F O R C E M E N T . ( 2 , 3 O R 4 ) 1 2 - 2 6 U N I T C B U M A I L B O X E S A N D ( 2 ) 3 P A R C E L O N L Y B O X E S * , F R O N T L O A D I N G . * M A I L B O X D W I L L N O T H A V E A D D I T I O N A L P A R C E L O N L Y B O X E S . R E F E R T O M A I L B O X L E G E N D , S H E E T L - 1 . 1 , 2 . 2 A N D 3 . 1 , F O R S P E C I F I C A T I O N S A N D L O C A T I O N S . 2 ' X 3 ' P I L A S T E R S W I T H S T O N E V E N E E R T O M A T C H P R O J E C T W A L L . F O R C O N S T R U C T I O N A N D F O O T I N G R E F E R T O S T R U C T U R A L E N G I N E E R ' S D R A W I N G S . M A N U F A C T U R E R ' S P E D E S T A L . E M B E R L E D " E S H I N E " S H E L T E R S Y S T E M ( 2 0 1 ) 2 2 8 - 0 8 8 0 . S O L A R P A N E L A N D L E D L I G H T I N G P E R E L E C T R I C A L C O N T R A C T O R . 2 L I G H T S P E R B A Y . S U B M I T S H O P D R A W I N G S T O D E V E L O P E R A N D L A N D S C A P E A R C H I T E C T F O R A P P R O V A L . N O T E S : - S H O P D R A W I N G S F O R S T E E L O V E R H E A D , R O O F P A N E L S , G U T T E R A N D D O W N S P O U T S S H A L L B E P R E P A R E D A N D S U B M I T T E D T O D E V E L O P E R A N D L A N D S C A P E A R C H I T E C T F O R A P P R O V A L . - S T R U C T U R E S S H A L L B E S U B M I T T E D T O B U I L D I N G D E P A R T M E N T F O R B U I L D I N G P E R M I T . S E C T I O N V I E W 2 V A R I E S P E R L O C A T I O N 6 ' - 0 " 1 ' - 6 " V A R I E S P E R L O C A T I O N E Q . E Q . 2 ' - 0 " 1 ' - 5 " 1 ' - 2 " 1 ' - 8 " T Y P . 2 ' - 0 " 3 4 5 8 9 1 0 8 1 2 9 1 1 4 3 G O O D N E I G H B O R F E N C E O R P R O J E C T W A L L A T P R O P E R T Y L I N E . S E E V A S T O A K E A S T W A L L S A N D F E N C E S P L A N S P R E P A R E D B Y V T A . C O N C R E T E S I D E W A L K P E R C I V I L E N G I N E E R . P A R K W A Y . R E F E R T O V A S T O A K E A S T P R O D U C T I O N P L A N S F O R P L A N T I N G A N D I R R I G A T I O N . S T R E E T A N D C U R B . C I T Y A P P R O V E D T R A S H / R E C E P T A C L E C O N T A I N E R . T R A S H R E C E P T A C L E S S H A L L B E C I T Y A P P R O V E D D O U B L E C A S S I D Y 0 8 C L 1 7 0 8 , B L A C K . E X P A N S I O N B O L T T O C O N C R E T E P E R M A N U F A C T U R E R ' S S P E C I F I C A T I O N S . A V A I L A B L E T H R O U G H B A R C O P R O D U C T S . B O L T T O C O N C R E T E P E R M A N U F A C T U R E R ' S S P E C I F I C A T I O N S . L O C A T I O N P E R P L A N . C O N C R E T E P A V I N G . S E E D E T A I L A , T H I S S H E E T . 4 " P V C D R A I N T H R O U G H F A C E O F C U R B . P R O J E C T P I L A S T E R A T P R O P E R T Y L I N E C O R N E R S . D O G P I C K - U P S T A T I O N . 1 2 3 4 5 6 7 8 9 1 0 1 1 2 7 6 1 2 P L A N V I E W 7 1 2 6 1 2 ' - 6 " 2 ' - 6 " 1 0 1 2 1 3 1 2 4 1 3 3 P 2 P 1 P 2 P 1 P L P L C 1 4 1 4 1 2 1 5 1 5 1 1 1 2 3 4 5 6 7 8 1 P 2 P 1 8 1 7 1 6 1 5 1 4 1 3 1 2 9 1 0 2 0 1 9 1 1 1 2 3 4 5 6 7 8 1 P 2 P 1 8 1 7 1 6 1 5 1 4 1 3 1 2 9 1 0 2 0 1 9 1 1 1 2 3 4 5 6 7 8 1 P 2 P 1 8 1 7 1 6 1 5 1 4 1 3 1 2 9 1 0 2 0 1 9 1 1 3 P ACONCRETE PAVINGSCALE: 1-1/2" = 1'-0"1CONCRETE PAVING.4"234CLASS II AGGREGATE BASE,COMPACTION, & THICKNESS PER SOIL'SREPORT RECOMMENDATION.56 REINFORCING PER SOIL'S REPORTRECOMMENDATION.1/2" TOOLED RADIUS.COMPACTED SUBGRADE ORENGINEERED FILL.1/4" WIDE X 3/4" DEEP TOOLED CONTROLJOINT (SEE PLANS).73/8" WIDE FIBER FILLED EXPANSIONJOINT W/ POLYSULFIDE SEALANT.SEALANT COLOR TO MATCH ADJACENTPAVING. SEE PLAN FOR LOCATION.8FINISH GRADE. 2" BELOW TOP OFPAVING FOR PLANTING AREA.9THICKENED EDGE AT PLANTING AREAWHERE REQUIRED OR UNDERPEDESTALS.1236"89 6745 D E T A I L B & C : A L L W A L L A N D P I L A S T E R C O L O R S A N D M A T E R I A L S M A T C H C I T Y A P P R O V E D C O L O R S C H E M E F O R V A S T O A K . C DTREE STAKING N.T.S.23 4567811234856TREE.2" DIAMETER LODGE POLEPINE STAKE SET 30" INTOGRADE OR UNDISTURBEDSUBGRADE A MINIMUM OF12" BELOW BOTTOM OFROOTBALL. PLACE STAKESPERPENDICULAR TOPREVAILING WINDS.RECYCLED RUBBER TWISTTIES - KNOT AND ATTACH TOSTAKE W/ ROOFING TACK.TREE ROOTBALLSET ON LIGHTLYTAMPED SOIL. DONOT PENETRATEROOTBALL WITHSTAKES.3" DEEP WATERINGBASIN W/ 2" DEPTHBARK MULCHFINISH GRADE.AMENDED BACKFILL.(4) PLANT TABLETSRUBBER TWISTTIES WRAPPED INA FIGURE "8"AROUND TRUNK TWICE ROOTBALLDIAMETER 6"12"1/2 1/2 4"TO FIRST BRANCHPREVAILINGWINDPLANELEVATION752NOTE:-SCARIFY SIDES OF PLANTING PIT.-FERTILIZER TABS ARE NOT TO BEUSED WITH CALIFORNIA NATIVEPLANTS.-DO NOT USE AMENDED SOIL FORCALIFORNIA NATIVE TREES.-SET CROWN OF ROOTBALL 1"ABOVE GRADE. S H R U B N . T . S . S H R U B - S E T C R O W N O F R O O T B A L L 2 " A B O V E F I N I S H G R A D E . 3 " H I G H W A T E R I N G B A S I N . F I N I S H G R A D E . A M E N D E D B A C K F I L L . S E T R O O T B A L L O N L I G H T L Y T A M P E D S U P P O R T . ( 2 ) 2 1 G R A M P L A N T T A B L E T S . 3 " D E P T H M U L C H . C O M P A C T E D S U B G R A D E O R E N G I N E E R E D F I L L . 1 . F E R T I L I Z E R T A B S A R E N O T T O B E U S E D W I T H C A L I F O R N I A N A T I V E S H R U B S . 2 . D O N O T U S E A M E N D E D S O I L F O R C A L I F O R N I A N A T I V E S H R U B S . T W I C E R O O T B A L L D I A M E T E R 6"1" N O T E : 1 1 2 3 4 5 6 7 8 8 6 4 3 2 5 7 C B C N . T . S . G R O U N D C O V E R S P A C I N G C H A R T A A P L A N T I N G G R I D : A = T R I A N G U L A R S P A C I N G B = R O W S P A C I N G * C = P E R I M E T E R S E T - B A C K P L A N T S P A C I N G S C H E D U L E : 6 " 1 2 " 1 8 " 2 4 " 3 6 " 3 1 " ± 2 1 " ± 1 6 " ± 1 0 1 / 2 " ± 5 " ± * 0 . 8 6 6 X A 4 " 1 0 " 1 2 " 1 8 " 2 4 " F J U L Y 2 3 , 2 0 1 9 ACOUSTIC/PROJECT WALL W/ STONE VE N E E R P I L A S T E R S SCALE: 1/2" = 1'-0"37 46' AS VIEWED FROM PERIMETEROR EXTERIOR OF WALL5 566NOTE:1.SEE STRUCTURAL ENGINEER'SDRAWINGS @ BACK OF SET FORFOOTINGS & REINFORCEMENT.2.VINES TO BE PLANTED ON WALL W/MEDIAN SIZED SHRUB IN FRONT.3.WALL SHALL REQUIRE A SEPARATEBUILDING PERMIT.11'-0"2'-0"789 7287879 2'-0"8"2 1WALL CAP. CL A S S I C 1 0 " B Y S T E P S T O N E , C O L O R ' A L M O N D ' . FINISH GRADE.PILASTERS AT C O R N E R S , E N D S A N D E V E R Y P R O P E R T Y L I N E I N T E R S E C T I O N W I T H STONE VENEE R S E E S T R U C T U R A L E N G I N E E R ' S D R A W I N G S . PILASTER VEN E E R . N E W E U R O C A S T L E ' C H A R D O N N A Y ' B Y C U L T U R E D S T O N E . PILASTER CAP. 2 8 " C L A S S I C B Y S T E P S T O N E , C O L O R ' A L M O N D ' . DSM CONCRET E M A S O N R Y U N I T S . B A S A L I T E S P L I T F A C E D B O T H S I D E S , C O L O R 5 0 5 . REINFORCEME N T P E R S T R U C T U R A L E N G I N E E R ' S D R A W I N G S . FOOTING PER S T R U C T U R A L E N G I N E E R ' S D R A W I N G S . COMPACTED S U B G R A D E O R E N G I N E E R E D F I L L . 34 E Exhibit 2 VAST OAK NORTH PHASE 3A DEVELOPMENT AREA PLAN (DAP): ALDER, SANDALWOOD, O’RYAN ROAD AND HINEBAUGH CREEK (NORTH) BIKE TRAIL AT UNIVERSITY DISTRICT CONDITIONS OF APPROVAL ON-GOING CONDITIONS The conditions below shall apply to the Vast Oak North Development Area Plan (DAP): Alder and Sandalwood Neighborhood Parkways, O’Ryan Road, North Kerry Road, Keiser Avenue Streetscapes and Hinebaugh Creek (north) Bike Trail at University District. The University District Vast Oak North Land Development shall be developed in accordance with the General Plan (GP), University District Specific Plan (UDSP) including Design Guidelines, Mitigation Measures (MMs) identified in the UDSP Final Environmental Impact Report (FEIR), Development Agreement (DA) between the City and University District LLC, the Rohnert Park Municipal Code (RPMC), and the Design and Construction Standards. General Requirements 1) The applicant shall comply with all documents approved by the City Council and adhere to all verbal representations and exhibits presented by the applicant at the Planning Commission and\or City Council meeting for approval of the University District Specific Plan project unless subsequently revised by the City. 2) In case of conflict between the various documents, the following order shall prevail: General Plan, Mitigation Measures for the FEIR, UDSP, Vast Oak North Phase 3A DAP and conditions of approval, DA, Tentative Map and its Conditions of Approval, RPMC, and Design and Construction Standards. 3) The applicant shall comply with the FEIR. In addition the applicant shall pay the cost to monitor the mitigation measures identified in the FEIR for the UDSP Project (SCH # 2003122014) kept on file in the Development Services Department. The requirements contained in the Mitigation Monitoring Program (MMP) shall be incorporated into these conditions and constructed in accordance with the MMP. 4) The applicant agrees to indemnify, hold harmless and defend the City, its officers, agents, elected and appointed officials, and employees, from any and all liability or claims that may be brought against the City arising out of its approval of Vast Oak North Phase 3A DAP. 5) By accepting the benefits conferred under Vast Oak North DAP Alder and Sandalwood Neighborhood Parkways, O’Ryan Road, North Kerry Road, Keiser Avenue Streetscapes and Hinebaugh Creek (north) Bike Trail, the applicant acknowledges all the conditions imposed and accepts the DAP subject to those conditions with full awareness of the provisions of the Specific Plan, as may be amended from time to time, and the RPMC, as applicable. 6) The use of the property by the applicant/grantee for any activity authorized by Vast Oak North DAP Alder and Sandalwood Neighborhood Parkways, O’Ryan Road, North Kerry Road, Keiser Avenue Streetscapes and Hinebaugh Creek (north) Bike Trail shall constitute acceptance of all of the conditions and obligations imposed by the City on the DAP. The applicant/grantee by said acceptance waives any challenge as to the validity of these conditions. 7) All improvements shall comply with all applicable sections of the City of Rohnert Park Municipal Code and any other applicable relevant plans of affected agencies, unless superseded by the Specific Plan for this property. 8) The development of this phase shall be consistent with all other approvals associated with this project (e.g. UDSP/Design Guidelines, Tentative Map, DA). 9) The applicant shall obtain all necessary permits and clearances from the Rohnert Park Building and Public Safety Departments prior to occupancy of the project. 10) Any covenants, conditions, and restrictions (CC&R’s) applicable to the project property shall be consistent with the terms of these conditions and the City Code. If there is conflict between the CC&R’s and the City Code or these conditions, the City Code or these conditions shall prevail. Site Plan, Landscaping and Signs 11) All improvements shall be in conformance with the submitted Site Plans, Parkway and Streetscape Plans, and Landscape Plans, except as modified herein. 12) All plant materials proposed for use within the DAP areas of Vast Oak North shall be in conformance with the University District Plant Material Matrix contained in Appendix B of the Specific Plan. 13) The design of all entrances to the site shall be subject to Department of Public Safety approval. 14) The designs and locations of decorative paving treatments shall be subject to staff review and approval. 15) The Planning Manager shall have the authority to administratively approve minor variations to the DAP that may be subsequently proposed following DAP approval. 16) Design and placement of walls and fences, including acoustic walls, fences, and gates, for each neighborhood or land use district shall be in accordance with the standards included in Vast Oak North DAP Alder and Sandalwood Neighborhood Parkways, O’Ryan Road, North Kerry Road, Keiser Avenue Streetscapes and Hinebaugh Creek (north) Bike Trail and shall be approved by planning staff. 17) All exterior lighting shall be designed so as to prevent any spillover lighting onto adjacent properties and rights-of-way. Lighting elements will be required to be recessed within their fixtures to prevent glare. New lighting levels provided shall be compatible with general illumination levels in existing areas to avoid a noticeable contrast in light emissions, consistent with the need to provide for safety and security. Exterior project lighting shall be reviewed and approved by Development Services Director. 18) The design of any entry monument signage shall be submitted to the Planning Division for review and approval prior to installation. 19) The project applicant shall design and construct all project facilities in accordance with the most recent seismic standards of the California Building Standards Code. 20) The applicant shall design and construct the foundations for all project structures using standard engineering practices that account for, and minimize damage resulting from, expansive soil conditions. Specific design and constructed methods shall be as directed by Mitigation Measure GE0-8a of the FEIR for this project. 21) All trees within five feet of the public right-of-way shall have root barriers that are approved by the Engineering Division. 22) A permanent automatic sprinkler shall be installed to maintain all landscape materials and areas. 23) The applicant's engineer shall coordinate with the City Engineer to ensure that recycled water is used for irrigation of the project's landscaping, if available. 24) The final location for mailbox enclosures, enclosure sizes, and total number of mailboxes and parcel boxes per enclosure shall be subject to review and approval by the Planning Division and United States Post Office. 25) Prior to acceptance of the Hinebaugh Creek Trail (north) a barrier or landscaping will be installed on the southwest side of the Kerry Road bridge to discourage pedestrians on the west side of the bridge. Site Improvements 26) All double-check valves provided for domestic water and fire sprinkler systems shall be concealed from any public streets with decorative walls and landscaping. Plans shall be submitted to the Development Services Department and City Engineer for review and approval. 27) Any existing overhead utilities within the subdivision and all proposed utilities shall be placed underground. 28) Any changes in sidewalk configuration due to site grades and transformer locations shall be subject to review and approval by the Planning Manager and City Engineer. Construction Mitigation 29) For any project requiring an on-site inspector to monitor grading and/or development, the applicant shall deposit funds with the City to cover the full cost of an inspector prior to any land disturbance. The City Engineer, as appropriate, shall approve the amount and hire the inspector. 30) The developer shall comply with construction hours pursuant to Rohnert Park Municipal Code Section 9.44.120. 31) All construction material waste and other debris shall be recycled to the extent feasible. The applicant shall present a “clean site everyday” program to City building staff for approval. The program shall include on-site signage in English and Spanish to be posted at construction entrances. No animals shall be brought on site by construction personnel during work hours. 32) All material storage areas shall be fenced with at least a 6-foot high chain link fence with at least two separate points of access with sufficient width for emergency vehicles. The access points shall be shown on the construction fire and security protection site plan.