Loading...
FF Orientation ScheduleROHNERT PARK DPS FIREFIGHTER ORIENTATION OUTLINE & SCHEDULE 9/30/19 Day 1 - Introduction to Fire Division  Personal Protective Equipment (PPE) o Familiarization o Donning for time o Limitations  Self-Contained Breathing Apparatus (SCBA) o Familiarization / Intro to MSA G7 o Donning for time o Cylinder Change / Fill / Air Truck Orientation o “Don’t Breathe Smoke” o Truck 9953 Breathing Air / Fill Procedure  Bendix King (BK) Radios o Overview / General Use o Build Command Bank o Lock Function  REDCOM o Agencies o Clear Text o County Identifiers o Control / Tac Channels  Responses o In District (Matrix) o Auto Aid vs. Mutual Aid o Upgrade of assignments o Cal Fire / SRA Responses  Medical Equipment orientation to include brief refresher 10/1/19 Day 2 – Hose Evolutions  Forward Lay with Crosslay and 2.5” Deployment  Apartment Load with bundles  Blitz Fire Set Up  Hoseline Advancement Techniques  Dry Barrel Adapter (Burton/Bernice Example)  Front Bumper (Discuss Vehicle Fire Attack)  Reel Line and Limitations ROHNERT PARK DPS FIREFIGHTER ORIENTATION OUTLINE & SCHEDULE 10/2/19 Day 3 – Forcible Entry / RIC / Utilities  Forcible Entry o Size Up – See doors in RP o Force inward / outward / double o Panic Hardware and Drop Bars o Force Bag (Truck 9953)  Rapid Intervention Crew (RIC) o Policy o Tools / Cache o Soften the building o Additional egress o FF Drags o Discuss FF Survival / Self Rescue Techniques and Demo  Utilities o Why / When? o Gas Meter o Electric Panel o Service drop awareness o Do not turn back on! 10/3/19 Day 4 – Auto Extrication  Review Concepts / Techniques / Vehicle Anatomy (PPT) o Include scene size up and hazard mitigation  Stabilization o Rescue 42 Video o Lift (Air) Bags o Cribbing o Use Rescue 42’s  Hydraulic Tools o Door Removals (Including 3rd door conversion if avail) o Roof Removal / Flap o Dash Roll and Lift  Remove manikin to include proper C – Spine to back board  Discuss MCI Plan and Rescue Resources Available in Sonoma County ROHNERT PARK DPS FIREFIGHTER ORIENTATION OUTLINE & SCHEDULE 10/7/19 Day 5 – Ladders  Ground Ladders o Ladder Parts Review o RPDPS Complement o Placement Review o Throw Ground Ladders  Aerial Ladders o Truck 9953 Orientation o Aerial Considerations / Safety o Aerial Policies o Set Up and Fly Aerial  Salvage and Overhaul 10/8/19 Day 6 – Ventilation  Ventilation Concepts Review o Improper Vent Video (as seen in FF packet)  Building Construction Review  Ventilation Methods (Horizontal / Vertical / Etc) o V.E.S. o Discuss PPV and hazards/considerations  Roof Walks o Discuss walking on structural members and ID’ing them o Residential vs Commercial o Inspection Hole vs Smoke Indicators vs Heat/Vent o Sounding  Cut Holes to include 4’ X 8’ and extending to 8’ X 8’ 10/9/19 Day 7 – Wildland  Methods / Tactics / 10’s & 18’s / LCES / Shelters  Hand Tools  Hose Lays  Structure Defense  Sharpen / Put Rigs Back in service ROHNERT PARK DPS FIREFIGHTER ORIENTATION OUTLINE & SCHEDULE 10/10/19 Day 8 – Ropes and Scenarios  Rope Rescue Equipment and Limitations o Considerations / Safety  Anchors  Weights  Edge Protection  Out of Service Criteria  Low Angle Refresher o RPM System o Stokes Basket Ops  High Angle Rescue o Using the truck o Systems and change of directions  Scenarios to be determined by instructors