Loading...
Truck Co. Std 2 - 8 Cut Vertical Ventilation 2 Person ROHNERT PARK FIRE DIVISION TRUCK COMPANY STANDARDS Title: 8 Cut Vertical Ventilation - Residential Standard Number: 2 Time Standard: N/A TOPIC: Vertical Ventilation (Residential) 3 Person GIVEN: Truck Company, extension ladder, 2 axes in belts, 1 rubbish hook, and 1 chain saw PERFORMANCE: Create a 4’X 8’ opening in a roof for vertical ventilation STANDARD: Using the proper cut sequence in a safe manner REFERENCES: Truck Company Operations, John Mittendorf; Orange County Fire Authority, Truck Company Operations MATERIALS: Roof prop, PPE (including SCBA) extension ladder, axes in belts, rubbish hook, and chain saw PREPARATION: Residential vent is essential to safe and effective interior fire attack. Having consistency and proficiency in this performance is essential to maintaining a professional workforce. PRESENTATION OPERATION: KEY POINTS: 1. Starting from the truck, ladder the 1a. Wearing all PPE building 1b. Either utilizing the truck or ground ladders 1c. Place secondary ladder 2. Retrieve tools needed to perform vent 2a. 1 chain saw, 1 rubbish hook, axes in belts 3. Sounds roof 3a. Before getting onto roof to assure structural stability ROHNERT PARK FIRE DIVISION TRUCK COMPANY STANDARDS Title: 8 Cut Vertical Ventilation - Residential Standard Number: 2 Time Standard: N/A 4. Crew walks along structurally stable 4a. Top plates, Valleys, Beams, Ridges building elements 4b. To location hole is to be cut 5. Cut 1 5a. ID Cut 5b. Using bottom of bar 5c. Bump rafter 1 5d. Remove bar from kerf 6. Cut 2 6a. Insert bar in the kerf to cut opposite ID cut 6b. Make a head cut 6c. Roll three rafters 6d. Bump the fourth 7. Cut 3 7a. Down cut on the inside of rafter 1 8. Cut 4 8a. Down cut on the inside of rafter 3 9. Cut 5 9a. Down cut on the outside of rafter 3 10. Cut 6 10a. Down cut on the inside of rafter 5 11. Cut 7 11a. Bottom cut 4’ below head cut 11b. Start inside rafter 1 11c. Roll rafter 2 11d. Bump rafter 3 12. Cut 8 12a. Bottom cut 4’ below head cut 12b. Start outside rafter 3 12c. Roll rafter 4 12d. Bump rafter 5 13. Open the first hole 13a. Louver over rafter 2 13b. Punch through sheetrock below 14. Open the second hole 14a. Louver over rafter 4 14b. Punch through sheetrock below 15. If conditions require a larger opening 15a. Extend down cuts on each hole ROHNERT PARK FIRE DIVISION TRUCK COMPANY STANDARDS Title: 8 Cut Vertical Ventilation - Residential Standard Number: 2 Time Standard: N/A 15b. Louver over rafter 2 15c. Punch through sheetrock below 15d. Louver over rafter 4 15e. Punch through sheetrock below 16. Exit Roof 16a. Sounder in front of the crew to egress roof and sound for structural stability