2020/03/10 City Council Resolution 2020-022 RESOLUTION NO. 2020-022
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
APPROVING THE PUBLIC SAFETY MAIN LOBBY IMPROVEMENTS AND
INTERIOR PAINT AND FLOOR REPLACEMENT PROJECT NO. 2017-28, FINDING
THE PROJECT EXEMPT FROM CEQA, APPROVING AND ADOPTING PLANS AND
SPECIFICATIONS,AUTHORIZING THE FINANCE MANAGER TO INCREASE
APPROPRIATIONS IN FY 19-20 FOR THE PROJECT AND AWARDING THE
CONTRACT TO AUGUST-JAYE CONSTRUCTION.
WHEREAS, the Public Safety Main Lobby Improvements and Interior Paint and Floor
Replacement Project No. 2017-28 ("Project") involves replacement of the lobby front counter
area and replacement of flooring and interior paint at the Public Safety Main Building; and,
WHEREAS, consistent with the Uniform Public Construction Cost Accounting Act
(UPCCAA) and the California Public Contract Code, an invitation to bid was advertised on
January 17 and was published on January 17 and 24, 2020 with the Community Voice; and,
WHEREAS, the plans and specifications for the Project were designed by STRATA AP
of Sonoma, California; and,
WHEREAS, six sealed bids were submitted for the Project and were publicly opened on
February 13, 2020; and,
WHEREAS, the bid from the apparent low bidder, DMR Builders is non-responsive
based on review by Public Works staff; and,
WHEREAS, as a result of the non-responsive bid, August-Jaye Contracting submitted
the lowest responsive bid based on review by Public Works staff; and,
WHEREAS, the Project is funded through Infrastructure Reserve; and,
WHEREAS, the Project included a Bid Alternate to replace the flooring and paint in the
first floor conference room; and
WHEREAS, The Project has a budget shortfall of$133,200; and
WHEREAS, the Project has been identified by the City Council as an important Capital
Improvement Project.
NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Rohnert
Park as follows:
Section 1. The above recitals are true and correct and material to this Resolution.
Section 2. In making its findings the City Council relied upon and hereby incorporates
by reference all of the bid materials, correspondence, staff reports and all other related materials.
Section 3. The Project is categorically exempt from the requirements of the California
Environmental Quality Act("CEQA")pursuant CEQA Guidelines sections 15301 (Existing
Facilities) and 15302 (Replacement or Reconstruction). (14 Cal. Code Regs. §§ 15301, 15302).
Section 4. The plans and specifications on file at City Clerk's Office for the Project are
hereby approved and adopted.
Section 5. In accordance with California Public Contract Code Section 20160 et seq. and
following any other applicable laws, the bids for the Project are accepted, and August-Jaye
Construction is hereby found to be the lowest responsive and responsible bidder and any
irregularities in such bid are waived in accordance with applicable law.
Section 6. The City Manager is hereby authorized and directed to execute an agreement
between August-Jaye Construction and the City of Rohnert Park for the Project in the amount of
Four-Hundred Forty-Four Thousand,Five Hundred Dollars ($444,500), which includes
awarding the base bid and Bid Alternate, and which has been prepared by the City and is
attached hereto as Exhibit"A." The City Manager is hereby authorized and directed to take all
actions necessary to effectuate this agreement for and on behalf of the City of Rohnert Park,
including execution of the agreement in substantially similar form to the agreement attached
hereto as Exhibit "A," subject to minor modifications by the City Manager or City Attorney.
Section 7. The City Manager is authorized to sign Contract Change Orders up to ten
percent(10%) of the construction contract award amount.
Section 8. The Finance Manager is authorized to transfer CIP Contingency funds to the
Project in the amount of$133,200.
Section 9. City staff is hereby directed to issue a Notice of Award to August-Jaye
Construction for the Project.
Section 10. This Resolution shall become effective immediately.
Section 11. All portions of this Resolution are severable. Should any individual
component of this Resolution be adjudged to be invalid and unenforceable by a body of
competent jurisdiction, then the remaining Resolution portions shall continue in full force and
effect, except as to those Resolution portions that have been adjudged invalid. The City Council
of the City of Rohnert Park hereby declares that it would have adopted this Resolution and each
section, subsection, clause, sentence,phrase and other portion thereof, irrespective of the fact
that one or more section, subsection, clause, sentence, phrase or other portion may be held
invalid or unconstitutional.
DULY AND REGULARLY ADOPTED this 10th day of March, 2020.
CITY OF ROHNE 1)P
Josep . Callinan, Mayor
ATTEST:
J. • • • • —: . _ - , City Clerk
SYLVIA LOPEZ CUEVAS
Attachments: Exhibit A
ADAMS: )4'i F, BELFORTE: A 1e.. STAFFORD: ,AVi MACKENZIE: A-'Ii. CALLINAN: A i/
AYES: ( , ) NOES: (p ) ABSENT: (p ) ABSTAIN: ( Q )
CONTRACT
PUBLIC SAFETY MAIN LOBBY IMPROVEMENTS AND INTERIOR PAINT AND FLOOR
REPLACEMENT PROJECT
PROJECT NO. 2017-28
THIS AGREEMENT, made and entered into this day of , 2020, by
and between August-Jaye Construction,hereinafter called"Contractor",and the City of Rohnert Park,
hereinafter called "City".
WITNESSETH :
WHEREAS, the City Council of said City has awarded a contract to Contractor for
performing the work hereinafter mentioned in accordance with the sealed proposal of said Contractor.
NOW,THEREFORE, IT IS AGREED, as follows:
1. Scope of Work: The Contractor must perform all the work and furnish all the labor,
materials,equipment and all utility and transportation services required to complete all of the work of
construction and installation of the improvements more particularly described in the Resolution
adopted by the City Council of said City on March 10, 2020, the items and quantities of which are
more particularly set forth in the Contractor's bid therefor on file in the office of the City Clerk,except
work to be performed by subcontractors as set forth in the Contractor's bid and for which the
Contractor retains responsibility.
2. Time of Performance and Liquidated Damages: The Contractor must begin work
within fifteen (15) calendar days after official notice by the City Engineer to proceed with the work
and must diligently prosecute the same to completion within 60 calendar days of that Notice. The
Contractor acknowledges and agrees that time is of the essence with respect to Contractor's work
and that Contractor shall diligently pursue performance of the work.
In the event the Contractor does not complete the work within the time limit so specified or
within such further time as said City Council must have authorized, the Contractor must pay to the
City liquidated damages in the amount of Five Hundred Dollars ($500) per day for each and every
day's delay in finishing the work beyond the completion date so specified. Additional provisions with
regard to said time of completion and liquidated damages are set forth in the specifications, which
provisions are hereby referred to and incorporated herein by reference.
3. Payments: Payments will be made by City to the Contractor for said work performed
at the times and in the manner provided in the specifications and at the unit prices stated in Contractor's
bid.
The award of the contract is for a total amount of Four-Hundred Forty-Four Thousand,
Five Hundred Dollars ($444,500).
4. Component Parts and Interpretation: This contract must consist of the following
documents, each of which is on file in the office of the City Clerk and all of which are incorporated
herein and made a part hereof by reference thereto:
a) This Agreement
b) Notice Inviting Sealed Proposals
Page 1
c) Instruction and Information to Bidders
d) Accepted Proposal, with all attachments and certifications
e) Performance Bond
f) Payment Bond
g) Special Provisions
h) Standard Specifications
i) Technical specifications
j) Design Standards
k) Plans, Profiles and Detailed Drawings
In the event of conflict between these documents, the following order of precedence will
govern: this contract; change orders; supplemental agreements and approved revisions to plans
and specifications; special conditions;standard specifications;detail plans;general plans; standard
plans; reference specifications. In the absence of a controlling or contrary provision in the
foregoing, the Standard Specifications (2010 edition) of the California Department of
Transportation shall apply to this project.
5. Independent Contractor. Contractor is and will at all times remain as to City
a wholly independent contractor. Neither City nor any of its officers, employees, or agents will
have control over the conduct of Contractor or any of Contractor's officers, employees, agents or
subcontractors, except as expressly set forth in the Contract Documents. Contractor may not at
any time or in any manner represent that it or any of its officers, employees, agents, or
subcontractors are in any manner officers, employees, agents or subcontractors of City.
6. Prevailing Wages: Copies of the determination of the Director of the
Department of Industrial Relations of the prevailing rate of per diem wages for each craft,
classification or type of worker needed to execute this Contract will be on file in, and available at,
the office of the Director at 601 Carmen Drive, Camarillo, California 93010.
Contractor must post at the work site, or if there is no regular work site then at its principal
office, for the duration of the Contract, a copy of the determination by the Director of the
Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code
§ 1773.2.)
Contractor, and any subcontractor engaged by Contractor, may pay not less than the
specified prevailing rate of per diem wages to all workers employed in the execution of the
contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section
1776 relative to the retention and inspection of payroll records.
Contractor must comply with all provisions of Labor Code section 1775. Under Section
1775, Contractor may forfeit as a penalty to City up to $200.00 for each worker employed in the
execution of the Contract by Contractor or any subcontractor for each calendar day, or portion
thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable
to pay the difference between the prevailing wage rates and the amount paid to each worker for
each calendar day, or portion thereof, for which each worker was paid less than the prevailing
wage rate.
Nothing in this Contract prevents Contractor or any subcontractor from employing properly
registered apprentices in the execution of the Contract. Contractor is responsible for compliance
with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that
Page 2
contractors and subcontractors must submit contract award information to the applicable joint
apprenticeship committee,must employ apprentices in apprenticeable occupations in a ratio of not
less than one hour of apprentice's work for every five hours of labor performed by a journeyman
(unless an exception is granted under § 1777.5), must contribute to the fund or funds in each craft
or trade or a like amount to the California Apprenticeship Council, and that contractors and
subcontractors must not discriminate among otherwise qualified employees as apprentices solely
on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices
defined in Labor Code section 3077, who are in training under apprenticeship standards and who
have written apprentice contracts, may be employed on public works in apprenticeable
occupations.
With each application for payment,Contractor shall also deliver certified payrolls to Owner
as set forth above in these General Conditions, and concurrently therewith (but in no event less
frequently than monthly)directly to the Labor Commissioner in the format prescribed by the Labor
Commissioner.
If federal funds are used to pay for the Work, Contractor and any subcontractor agree to
comply, as applicable, with the labor and reporting requirements of the Davis-Bacon Act(40 USC
§ 276a-7), the Copeland Act (40 USC § 276c and 18 USC § 874), and the Contract Work Hours
and Safety Standards Act (40 USC § 327 and following).
7. Hours of Labor: Contractor acknowledges that under California Labor Code
sections 1810 and following, eight hours of labor constitutes a legal day's work. Contractor will
forfeit as a penalty to City the sum of$25.00 for each worker employed in the execution of this
Contract by Contractor or any subcontractor for each calendar day during which such worker is
required or permitted to work more than eight hours in any one calendar day and 40 hours in any
one calendar week in violation of the provisions of Labor Code section 1810.
8. Apprentices: Attention is directed to the provisions in Sections 1777.5(Chapter 1411,
Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by the
Contractor or any Subcontractor under him.
Section 1777.5, as amended, requires the Contractor or Subcontractor employing tradesmen
in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of the
public works project and which administers the apprenticeship program in that trade for a certificate
of approval.The certificate will also fix the ratio of apprentices to journeymen that will be used in the
performance of the Contract. The ratio of apprentices to journeymen in such cases must not be less
than one to five except:
A. When unemployment in the area of coverage by the joint apprenticeship committee
has exceeded an average of 15 percent in the 90 days prior to the request for certificate,
or
B. When the number of apprentices in training in that area exceeds a ratio of one to five,
or
C. When the trade can show that it is replacing at least 1/30 of its membership through
apprenticeship training on an annual basis statewide or locally, or
D. When the assignment of an apprentice to any work performed under a public works
Contract would create a condition which would jeopardize his life or the life, safety,
Page 3
or property of fellow employees or the public at large,or if the specified task to which
the apprentice is to be assigned is of such a nature that training cannot be provided by
a journeyman, or
E. When the Contractor provides evidence that he employs registered apprentices on all
of his Contracts on an annual average of not less than one apprentice to eight
journeymen.
The Contractor is required to make contributions to funds established for the administration
of apprenticeship program if he employs registered apprentices or journeymen in any apprenticeable
trade on such Contracts and if other Contractors on the public works site are making such
contributions.
The Contractor and any Subcontractor under him must comply with the requirements of
Section 1777.5 and 1777.6 in the employment of apprentices.
Information relative to apprenticeship standards, wage schedules, and other requirements may be
obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship,
San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. .
9. Labor Discrimination: Attention is directed to Section 1735 of the Labor Code,which
reads as follows:
"A contractor must not discriminate in the employment of persons upon
public works on any basis listed in subdivision (a) of Section 12940 of the Government
Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code,
except as otherwise provided in Section 12940 of the Government Code. Every contractor
for public works who violates this section is subject to all the penalties imposed for a
violation of this chapter. "
10. Workmen's Compensation Insurance: In accordance with the provisions of Article 5,
Chapter 1, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part I, Division 4
(commencing with Section 3700) of the Labor Code of the State of California, the Contractor is
required to secure the payment of compensation to his employees and must for that purpose obtain
and keep in effect adequate Workmen's Compensation Insurance.
The undersigned Contractor is aware of the provisions of Section 3700 of the Labor Code
which requires every employer to be insured against liability for workmen's compensation or to
undertake self-insurance in accordance with the provisions of that Code, and will comply with such
provisions before commencing the performance of the work of this contract.
11. Indemnity and Insurance: To the fullest extent permitted by law (including without
limitation California Civil Code Section 2782), Contractor must indemnify, hold harmless, release
and defend City, its officers, elected officials, employees, agents, volunteers, and consultants from
and against any and all actions,claims,demands,damages,disability,losses,expenses including,but
not limited to, attorney's fees and other defense costs and liabilities of any nature that may be asserted
by any person or entity including Contractor, in whole or in part,arising out of Contractor's activities
hereunder, including the activities of other persons employed or utilized by Contractor including
subcontractors hired by the Contractor in the performance of this Agreement excepting liabilities due
to the sole negligence, intentional misconduct or active negligence of the City. This indemnification
obligation is not limited in any way by any limitation on the amount or type of damages or
compensation payable by or for Contractor under Worker's Compensation, disability or other
Page 4
employee benefit acts or the terms, applicability or limitations of any insurance held or provided by
Contractor and must continue to bind the parties after termination/completion of this Agreement.
Contractor shall procure and maintain throughout the time for performance of the work under
this Contract the insurance required by the Special Provisions. The requirement that Contractor
procure and maintain insurance shall in no way be construed to limit the Contractor's duty to
indemnify City as provided in the paragraph above.
Failure of City to monitor compliance with these requirements imposes no additional
obligations on City and will in no way act as a waiver of any rights hereunder.
12. City Right of Termination and Right to Complete the Work. The City may
terminate the Contract when conditions encountered during the work make it impossible or
impracticable to proceed, or when the City is prevented from proceeding with the Contract by act
of God, by law, or by official action of a public authority. In addition, the occurrence of any of
the following is a default by Contractor under this Contract:
A. Contractor refuses or fails to prosecute the Work or any part thereof with
such diligence as will insure its completion within the time specified or any
permitted extension.
B. Contractor fails to complete the Work on time.
C. Contractor is adjudged bankrupt, or makes a general assignment for the
benefit of creditors, or a receiver is appointed on account of Contractor's
insolvency.
D. Contractor fails to supply enough properly skilled workers or proper
materials to complete the Work in the time specified.
E. Contractor fails to make prompt payment to any subcontractor or for
material or labor.
F. Contractor fails to abide by any applicable laws, ordinances or instructions
of City in performing the Work.
G. Contractor breaches or fails to perform any obligation or duty under the
Contract.
Upon the occurrence of a default by Contractor, the Director will serve a written notice of
default on Contractor specifying the nature of the default and the steps needed to correct the
default. Unless Contractor cures the default within 10 days after the service of such notice, or
satisfactory arrangements acceptable to City for the correction or elimination of such default are
made,as determined by City, City may thereafter terminate this Contract by serving written notice
on Contractor. In such case, Contractor will not be entitled to receive any further payment,except
for Work actually completed prior to such termination in accordance with the provisions of the
Contract Documents.
In event of any such termination, City will also immediately serve written notice of the
termination upon Contractor's surety. The surety will have the right to take over and perform
pursuant to this Contract; provided, however,that if the surety does not give City written notice of
its intention to take over and perform this Contract within five days after service of the notice of
termination or does not commence performance within 10 days from the date of such notice, City
may take over the Work and prosecute the same to completion by contract or by any other method
it may deem advisable for the account and at the expense of Contractor. Contractor and the surety
Page 5
will be liable to City for any and all excess costs or other damages incurred by City in completing
the Work.
If City takes over the Work as provided in this Section, City may, without liability for so
doing, take possession of, and utilize in completing the Work, such materials, appliances, plant,
and other property belonging to Contractor as may be on the site of the Work and necessary for
the completion of the Work.
13. Substitution of Securities for Withheld Amounts: Pursuant to California Public
Contracts Code Section 22300, securities may be substituted for any moneys withheld by a public
agency to ensure performance under a contract. At the request and sole expense of the Contractor,
securities equivalent to the amount withheld must be deposited with the public agency,or with a state
or federally chartered bank as the escrow agent, who must pay such moneys to the Contractor upon
satisfactory completion of the contract.
Securities eligible for substitution under this section must include those listed in the California
Public Contracts Code Section 22300 or bank or savings and loan certificates of deposit. The
Contractor must be the beneficial owner of any securities substituted for moneys withheld and must
receive any interest thereon.
Alternatively, the Contractor may request and the City shall make payment of retentions
earned directly to the escrow agent at the expense of the Contractor. At the expense of the
Contractor, the Contractor may direct the investment of the payments into securities and the
Contractor shall receive the interest earned on the investments upon the same terms provided for
in Section 22300 for securities deposited by the Contractor. Upon satisfactory completion of the
Contract, the Contractor shall receive from the escrow agent all securities, interest, and payments
received by the escrow agent from the City, pursuant to the terms of this section.
Any escrow agreement entered into pursuant to this section must contain as a minimum the
following provisions:
a. The amount of securities to be deposited;
b. The terms and conditions of conversion to cash in case of the default of the Contractor;
and
c. The termination of the escrow upon completion of the contract.
14. General Provisions
A. Authority to Execute. Each Party represents and warrants that all necessary
action has been taken by such Party to authorize the undersigned to execute this Contract and to
bind it to the performance of its obligations.
B. Assignment. Contractor may not assign this Contract without the prior
written consent of City, which consent may be withheld in City's sole discretion since the
experience and qualifications of Contractor were material considerations for this Contract.
C. Binding Effect. This Agreement is binding upon the heirs, executors,
administrators, successors and permitted assigns of the Parties.
D. Integrated Contract. This Contract, including the Contract Documents, is
the entire, complete, final and exclusive expression of the Parties with respect to the Work to be
performed under this Contract and supersedes all other agreements or understandings,whether oral
or written, between Contractor and City prior to the execution of this Contract.
Page 6
E. Modification of Contract. No amendment to or modification of this
Contract will be valid unless made in writing and approved by Contractor and by the City Council
or City Manager, as applicable. The Parties agree that this requirement for written modifications
cannot be waived and that any attempted waiver will be void.
F. Counterparts, Facsimile or other Electronic Signatures. This Contract may
be executed in several counterparts, each of which will be deemed an original, and all of which,
when taken together, constitute one and the same instrument. Amendments to this Contract will
be considered executed when the signature of a party is delivered by facsimile or other electronic
transmission. Such facsimile or other electronic signature will have the same effect as an original
signature.
G. Waiver. Waiver by any Party of any term, condition, or covenant of this
Contract will not constitute a waiver of any other term, condition, or covenant. Waiver by any
Party of any breach of the provisions of this Contract will not constitute a waiver of any other
provision, or a waiver of any subsequent breach or violation of any provision of this Contract.
Acceptance by City of any Work performed by Contractor will not constitute a waiver of any of
the provisions of this Contract.
H. Interpretation. This Contract will be interpreted, construed and governed
according to the laws of the State of California. Each party has had the opportunity to review this
Contract with legal counsel. The Contract will be construed simply, as a whole, and in accordance
with its fair meaning. It will not be interpreted strictly for or against either party.
I. Severability. If any term, condition or covenant of this Contract is declared
or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the
remaining provisions of this Contract will not be affected and the Contract will be read and
construed without the invalid, void or unenforceable provision.
J. Venue. In the event of litigation between the parties, venue in state trial
courts will be in the County of Sonoma. In the event of litigation in a U.S. District Court, venue
will be in the Northern District of California.
IN WITNESS WHEREOF,the City of Rohnert Park has caused these presents to be executed
by its officers,thereunto duly authorized,and Contractor has subscribed same,all on the day and year
first above written.
CITY OF ROHNERT PARK AUGUST-JAYE CONSTRUCTION
City Manager Date Name/Title Date
Per Resolution No adopted by the Rohnert Park
City Council at its meeting of .2020
ATTEST: APPROVED AS TO FORM:
City Clerk City Attorney
Page 7