Loading...
2020/05/26 City Council Resolution 2020-046 RESOLUTION NO. 2020-046 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING THE POSTPONEMENT OF THE SCHEDULED SEWER RATE INCREASE AND SEWER CAPITAL PRESERVATION FEE INCREASE WHEREAS, The Reed Group, Inc. prepared the Sewer Rate Study that outlined a Sewer Rate increase and Sewer Capital Preservation Fee increase on an annual schedule; and WHEREAS, on April 24, 2018 the City Council accepted the Final Sewer Rate Study Report and adopted Resolution 2018-060 to adopt new sewer service rates; and WHEREAS, a temporary postponement of the scheduled Sewer Rate increase and Sewer Capital Preservation Fee increase may provide a small measure of relief for Sewer customers who may be adversely impacted by the economic circumstances as a result of the COVID-19 pandemic; and WHEREAS, by adopting a temporary postponement in light of COVID-19, the City Council does not repeal Resolution No. 2018-060 or its approval of the Final Sewer Rate Study, and rates shall remain subject to increase up to the maximum amounts previously approved under Resolution 2018-060 to meet long-term costs of service. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve the postponement of the Sewer Rate increase and Sewer Capital Preservation Fee increase until June 2021, and approve a postponement in each scheduled increase thereafter that was approved by Resolution No. 2018-060 by a one-year period, as set forth in the attached Exhibit. BE IT FURTHER RESOLVED that this postponement may be modified or rescinded where determined necessary by the City Council in order to provide for long-term costs of service. DULY AND REGULARLY ADOPTED this 26th day of May, 2020. CITY OF ROHNE PARK Joseph 0 A P1 - . Callinan, Mayor ATTEST: Sylvia Lo Cuevas, Assistant City Clerk On behalf of JoAnne M. Buergler, City Clerk Attachments: Exhibit A and Exhibit B -: ADAMS: BELFORTE: At STAFFORD: MACKENZIE: CALLINAN: AYES: ( s) NOES: ( � ) BSENT: Current Rate  (1) June 2020 (4)June 2021 June 2022 June 2023 Single Family Residential (2) Monthly Base Charge 10.01$            10.01$            10.31$            10.62$            10.94$            Flow Charge ($/gal.) (3) 0.01143$      0.01143$      0.01177$      0.01212$       0.01248$      Sewer Only Flat Rate ($/mo.)53.88$           53.88$           55.50$           57.17$            58.89$           Multi‐Family and Non‐Residential Customers Monthly Base Charge Up to 3/4" meter 30.33$           30.33$           31.24$           32.18$            33.15$           1" meter 46.24$           46.24$           47.63$           49.06$            50.53$           1 1/2" meter 85.63$           85.63$           88.20$           90.85$            93.58$           2" meter 133.10$        133.10$        137.09$        141.20$         145.44$        3" meter 243.93$        243.93$        251.25$        258.79$         266.55$        4' meter 402.24$        402.24$        414.31$        426.74$         439.54$        6" meter 797.62$        797.62$        821.55$        846.20$         871.90$        8" meter 1,272.29$     1,272.29$     1,310.46$     1,349.77$      1,390.26$     Flow Charge ($/gal.) (3) Multi‐Family Residential  0.01143$      0.01143$      0.01177$      0.01212$       0.01248$      Non‐Residential Low Strength 0.01197$      0.01197$      0.01233$      0.01270$       0.01308$      Medium Strength 0.01626$      0.01626$      0.01675$      0.01725$       0.01777$      High Strength 0.02480$      0.02480$      0.02554$      0.02631$       0.02710$      Notes: (1) Current rate was udated on June 2019 per the current schedule adopted February 15, 2018 following all Proposition 218 Requirements (2) Individual dwelling units with individual city‐owned meters shall be categorized as single family residential customers.  Multi‐family units with master meters shall be charged as multi‐family residential. (3) Flow charges are determined based on gallons of flow, rather than rounded to 1,000 gallon increments. (4) Scheduled increase for June 2020 is postponed 1 year, shifting all other increases by one year from original schedule Current schedule above outlines the new scheduled increases. Exhibit A City of Rohnert Park ‐ Sewer Utility  Current and Proposed Sewer Rates Reflecting Sewer Rate Postponement of Scheduled Increase Current Rate  (1) June 2020 (2)June 2021 June 2022 June 2023 Single Family Residential (2) Monthly Capital Preserv. Charge ($/DU) 4.00$             4.00$             6.00$             8.00$              10.00$           Multi‐Family and Non‐Residential Customers Monthly Capital Preservation Charge Up to 3/4" meter 10.00$           10.00$           15.00$           20.00$            25.00$           1" meter 16.70$           16.70$           25.00$           33.30$            41.70$           1 1/2" meter 33.30$           33.30$           50.00$           66.70$            83.30$           2" meter 53.30$           53.30$           80.00$           106.70$         133.30$        3" meter 100.00$        100.00$        150.00$        200.00$         250.00$        4' meter 166.70$        166.70$        250.00$        333.30$         416.70$        6" meter 333.30$        333.30$        500.00$        666.70$         833.30$        8" meter 533.30$        533.30$        800.00$        1,066.70$      1,333.30$     Notes: (1) Current rate was udated on June 2019 per the current schedule adopted February 15, 2018 following all Proposition 218 Requirements (2) Scheduled increase for June 2020 is postponed 1 year, shifting all other increases by one year from original schedule Current schedule above outlines the new scheduled increases. Exhibit B City of Rohnert Park ‐ Sewer Utility  Current and Proposed Sewer System Capital Preservation Charges Reflecting Sewer Rate Postponement of Scheduled Increase