Loading...
2020/06/23 City Council Resolution 2020-051 RESOLUTION NO. 2020-051 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING THE PROJECT LIST FOR SB 1 FUNDING FROM THE STATE ROAD MAINTENANCE AND REHABILITATION ACCOUNT (RMRA) AND AUTHORIZING SUBMITTAL OF THE PROJECT LIST TO THE CALIFORNIA TRANSPORTATION COMMISSION WHEREAS, in 2017, the Governor signed Senate Bill ("SB1"), also known as the Road Repair and Accountability Act of 2017 to address basic road maintenance, rehabilitation and critical safety needs on both the state highway and local streets and road system by increasing per gallon fuel excise taxes, diesel fuel sales taxes, and vehicle registration fees; and WHEREAS, California cities and counties are eligible to receive funding from the Road Maintenance and Rehabilitation Account("RMRA")created by SB1 for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system; and WHEREAS,the City expects to receive $744,852 in RMRA funds in FY 2020-21; and WHEREAS, the RMRA funds provide a significant boost to the City's local streets and roads for basic maintenance and safety, investing in complete streets infrastructure, using cutting-edge technology, materials and practices, and has significant positive benefits; and WHEREAS,SB1 emphasizes the importance of accountability and transparency in the delivery of California's transportation programs, and therefore requires cities and counties to provide basic annual RMRA project reporting to the California Transportation Commission ("CTC") in order to be eligible for RMRA funding; and WHEREAS, prior to receiving an apportionment of RMRA funds from the Controller in a fiscal year,the City must submit to the CTC a list of projects proposed to be funded with these funds, and include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement. NOW,THEREFORE BE IT RESOLVED,ORDERED AND FOUND by the City Council of the City of Rohnert Park: 1. The foregoing recitals are true and correct. 2. The following is a list of proposed projects to be funded in-part or solely with Fiscal Year 2020-21 Road Maintenance and Rehabilitation Account revenues: TABLE 1:Project List for FY 2020-21 Road Maintenance and Rehabilitation Account funding Description of Project Location of Project Proposed Estimated Schedule Useful Life 1 Southwest/Commerce Intersection of Southwest July 2020— 25 years Roundabout Boulevard and Commerce December 2022 (Construction of Boulevard roundabout, including pavement,concrete form, landscaping,signage, pavement marking) 3. The following previously proposed and adopted projects may utilize FY 2020-21 Road Maintenance and Rehabilitation Account revenues in their delivery. The City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues by relisting these projects in the adopted fiscal year resolution: TABLE 2: Relisted Projects for FY 2020-21 Road Maintenance and Rehabilitation Account funding Description of Project Location of Project Original Proposed Estimated FY Project Useful Listing Schedule Life 1 East Cotati Avenue East Cotati Avenue: 2017-18 March 2019— 20-30 Rehabilitation Rohnert Park City Limits at December years (Full-depth reclamation) Sunflower Drive to Snyder 2021 Lane 2 Country Club Drive Country Club Drive: 2018-19 March 2019— 6-10 years Overlay(Asphalt overlay Rohnert Park Expressway to December with partial base Eleanor Avenue 2020 reconstruction) 3 Southwest Boulevard Commerce Boulevard to 2018-19 July 2020- 6-10 years Rehabilitation No Name Street December (Asphalt overlay with 2021 partial base reconstruction) 4 Rohnert Park Rohnert Park Expressway 2019-20 July 2019- 12-17 Expressway/State between Commerce October 2021 years Farm Traffic Boulevard and SMART Improvements Project Pathway (includes traffic signal, State Farm Drive from 2019-20 July 2019- 12-17 pedestrian,median, and Rohnert Park Expressway to October 2021 years striping improvements) Enterprise Drive Enterprise Drive from Seed 2019-20 July 2019- 12-17 Farm Drive to State Farm October 2021 years Drive 5 Traffic Signal Rohnert Park Expressway: 2019-20 August 2019— 6-9 years Component Upgrades Labath Avenue to Knight July 2021 (includes upgrades or Road replacement of cabinets, Golf Course Drive: 2019-20 August 2019- 6-9 years hardware, software,other Dowdell Avenue to Hillview July 2021 components) Way Commerce Blvd: 2019-20 August 2019- 6-9 years Redwood Drive to Avram July 2022 Avenue Snyder Lane: 2019-20 August 2019- 6-9 years Circulo Grande to East July 2022 Cotati Ave Resolution 2020-051 2 DULY AND REGULARLY ADOPTED this 23`d day of June, 2020. CITY OF ROHN T PARK Joseph allinan, Mayor ATTEST: Sylvia Lopez Cuevas,Assistant City Clerk ADAMS; BELFORTE: STAFFORD: MACKENZIE: CALLINAN: AYES: ( OES: ( �) ABSE : ( I ) ABSTAI 0 ) AIL Resolution 2Q20-051 3