2020/06/04 Planning Commission Agenda Packet
City of Rohnert Park
Planning Commission
SPECIAL MEETING NOTICE AND AGENDA
NOTICE IS HEREBY GIVEN THAT A SPECIAL MEETING
will be held on Thursday June 4, 2020 6:00 P.M.
* COVID-19 NOTICE *
Consistent with Executive Orders No. N-25-20 and No. N-29-20 from the Executive Department
of the State of California and the Sonoma County Health Official’s March 17, 2020 and March
31, 2020 Shelter in Place Orders, the Planning Commission Meeting will not be physically
open to the public and Planning Commissioners will be teleconferencing into the meeting via
Zoom Video Communications software.
How to observe the Meeting:
To maximize public safety while still maintaining transparency and public access, members of
the public can observe the meeting on Cable Channel 26 or by visiting meeting central on our
website https://www.rpcity.org/city_hall/city_council/meeting_central
How to submit Public Comment:
Members of the public may provide public comment by sending comments to the Recording
Secretary by email at planning@rpcity.org. Comments are requested by 3:00 p.m. on the day of
the meeting, but can be emailed until the close of the Agenda Item for which the comment is
submitted. Email comments must identify the Agenda Item Number in the subject line of the
email and should be a maximum of 350 words, which corresponds to approximately 3 minutes of
speaking time. The comments will be read for the record, with a maximum allowance of 30
minutes of total public comments, subject to the Chair’s discretion. If a comment is received
after the agenda item is heard but before the close of the meeting, the comment will still be
included as a part of the record of the meeting but will not be read for the record or considered in
connection with the agenda item.
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL (Blanquie____Borba____Giudice____Haydon_____Orloff____)
4. PUBLIC COMMENT – Persons who wish to speak to the Commission regarding an
item that is not on the agenda may do so at this time. Please see above for details on how to
submit public comments.
5. CONSENT CALENDAR - ADOPTION OF MINUTES
Commissioner Motion/Roll Call Vote:
(Borba_____Guidice_____Orloff_____Haydon_____Blanquie_____)
5.1 Approval of the Draft Minutes of the Planning Commission Meeting March 26,
2020
6. AGENDA ITEMS
6.1 MASTER SIGN PROGRAM – File No. PLSI19-0017 – Signs Par Excellence –
Consideration of Resolution 2020-09 Approving a Master Sign Program for the
Empire Park Industrial Complex at 5625 State Farm Drive (APN 143-021-031)
CEQA: This project is categorically exempt from the California Environmental
Quality Act (CEQA), Article 19, Section 15311, Accessory Structures, On-
Premises Signs
Commissioner Motion/Roll Call Vote:
(Borba_____Guidice_____Orloff_____Haydon_____Blanquie_____)
6.2 PRESENTATION – City of Rohnert Park – Annual Review of the Growth
Management Program Report
6.3 PRESENTATION – City of Rohnert Park – Receive the Annual Status of the
General Plan for Calendar Year 2019
6.4 GENERAL PLAN CONSISTENCY FINDING – File No. PLCI20-0001 - City
of Rohnert Park – Consideration of Resolution No. 2020-10 - Finding the FY
2020-21 Capital Improvements Program is consistent with the Rohnert Park
General Plan 2020.
Commissioner Motion/Roll Call Vote:
(Borba_____Guidice_____Orloff_____Haydon_____Blanquie_____)
7. ITEMS FROM THE PLANNING COMMISSION
8. ITEMS FROM THE DEVELOPMENT SERVICES STAFF
9. ADJOURNMENT
NOTE: If you challenge the nature of the proposed action in court, you may be limited to
raising only those issues you or someone else raised at public hearing(s) described in this agenda,
or in written correspondence delivered to the City of Rohnert Park at, or prior to the public
hearing(s).
AMERICAN DISABILITY ACT ACCOMMODATIONS: In compliance with the Americans
with Disabilities Act, if you need special assistance to participate in this meeting please call
(707) 588-2231. Notification 72 hours in advance of the meeting will enable the City to make
Appeals of any decisions made tonight must be received by the Planning Division within 10
days and no later than 5:00 p.m. on June 15, 2020.
reasonable arrangements to ensure accessibility to the meeting (28 CFR 35.102.35.104 AD Title
III).
CERTIFICATION OF POSTING OF AGENDA
I, Jennifer Sedna, Community Development Assistant, for the City of Rohnert Park, declare that
the foregoing notice and agenda for the June 4, 2020 Planning Commission Special Meeting of
the City of Rohnert Park was posted and available for review on June 2, 2020 at Rohnert Park
City Hall, 130 Avram Avenue, Rohnert Park, California 94928. The agenda is available on the
City of Rohnert Park’s website at www.rpcity.org.
Signed this 2nd day of June, 2020 at Rohnert Park, California.
/s/
Minutes of the Planning Commission
Of the City of Rohnert Park
Thursday, March 12, 2020
6:00 P.M.
130 Avram Avenue, Rohnert Park
1. CALL TO ORDER
Chairperson Blanquie called the regular meeting to order at 6:00 p.m.
2. PLEDGE OF ALLEGIANCE
Led by Chairperson Blanquie.
3. ROLL CALL
Present: Daniel A. Blanquie, Chairperson
John E. Borba, Commissioner
Marc Orloff, Commissioner
Absent: Gerard Giudice, Commissioner
Susan Haydon, Vice Chair
Staff Present: Planning Manager, Jeff Beiswenger, Planner I, Suzie Azevedo, Housing
Specialist, Jenna Garcia, and Recording Secretary, Jennifer Sedna, were present.
4. PUBLIC COMMENT
None.
5. CONSENT CALENDAR - ADOPTION OF MINUTES
5.1 Approval of the Draft Minutes of the Planning Commission Meeting February 27,
2020.
ACTION: Moved/seconded (Orloff /Borba) to approve the Draft Minutes of the
Planning Commission Meeting February 27, 2020.
Motion carried by the following unanimous 3-0-2 vote: AYES: Blanquie, Borba,
and Orloff; NOES: None; ABSTAIN: None; ABSENT: Giudice and Haydon.
6. AGENDA ITEMS
6.1 PUBLIC HEARING: TEMPORARY CONDITIONAL USE PERMIT – File
No. PLTU19 -0025 – Signature Homes – Consideration of Resolution No. 2020-07
Approving a Temporary Conditional Use Permit for the University District Bristol
Land Development Model Home Complex.
Planner I, Suzie Azevedo, presented the item and answered questions from the
Commission regarding the estimated time for completion of Keiser Road. Recommended
Action(s): Adopt Resolution No. 2020-07 approving a Temporary Conditional Use
Permit for the University District Bristol Land Development Model Home Complex.
Applicant, Scott Jones from Signature Homes, came to the podium to answer questions
from the Commissioners but there were none.
Hearing opened.
Public Comment: None.
Hearing closed.
ACTION: Moved/seconded (Borba/Orloff) to adopt Resolution No. 2020-07
Approving a Temporary Conditional Use Permit for the University District Bristol
Land Development Model Home Complex.
Motion carried by the following unanimous 3-0-2 vote: AYES: Blanquie, Borba,
and Orloff; NOES: None; ABSTAIN: None; ABSENT: Giudice and Haydon.
6.2 PUBLIC HEARING: MUNICIPAL CODE AMENDMENT – File No.
PLMC20 -0001 – City of Rohnert Park – Consideration of Resolution No. 2020-08
Recommending to City Council Amendments to Rohnert Park Municipal Code
Title 17 - Zoning with Respect to Accessory Dwelling Units and Junior Accessory
Dwelling Units.
Housing Specialist, Jenna Garcia, presented the item. Recommended Action(s): Continue
the Public Hearing to the Planning Commission meeting on Thursday, March 26 to
introduce the proposed changes to Section 17.07.020(X) – Accessory Dwelling Units
(ADUs), 17.10.060 – Accessory Structures, and Section 17.16.040 – Parking Exemptions
within the Rohnert Park Municipal Code to implement changes to State law related to
ADUs.
ACTION: Moved/Seconded (Borba/Orloff) to continue the Public Hearing of the
Planning Commission Resolution 2020-08 to a date certain on March 26, 2020 to
introduce the proposed changes to Section 17.07.020(X) – Accessory Dwelling
Units (ADUs), 17.10.060 – Accessory Structures, and Section 17.16.040 –
Parking Exemptions within the Rohnert Park Municipal Code to implement
changes to State law related to ADUs.
Motion carried by the following unanimous 3-0-2 vote: AYES: Blanquie, Borba,
and Orloff; NOES: None; ABSTAIN: None; ABSENT: Giudice and Haydon.
6.3 STUDY SESSION: Changes to State Law Concerning Accessory Dwelling Units
and Junior Accessory Dwelling Units
Housing Specialist, Jenna Garcia presented the item: Recommended Action(s):
Participate in a study session for Changes to State Law Concerning Accessory Dwelling
Units and Junior Accessory Dwelling Units.
ACTION: By Consensus (none opposed), Planning Commission participated in
the study session by offering input on various topics such as owner occupancy
restrictions, the total number of ADUs allowed per single-family parcel, cost of
ADUs, if ADUs have been primarily built by owners or contractors, rent control,
typical sewer and water fees associated, impact fee limits, and enforcement of
tenant protection rights. The Commission directed staff to find out the average
cost of building an ADU in the past few years in the City.
7. ITEMS FROM THE PLANNING COMMISSION
Commissioner Borba stated he may not be able to attend the March 26, 2020 meeting.
Chairperson Blanquie requested clarification on the staff email regarding gatherings and
meetings due to Covid-19.
8. ITEMS FROM THE DEVELOPMENT SERVICE STAFF
None.
9. ADJOURNMENT
Chairperson Blanquie adjourned the regular meeting at 6:42 p.m.
____________________________________ ___________________________________
Daniel A. Blanquie, Chairperson Jennifer Sedna, Secretary
1
CITY OF ROHNERT PARK
PLANNING COMMISSION STAFF REPORT
Meeting Date: June 4, 2020
Item No: 6.1
Prepared By: Suzie Azevedo, Planner I
Agenda Title: PLS I19-0017, Sign Program Empire Park Industrial Complex
Location: 5625 State Farm Drive
GP/Zoning: I-L, Industrial
Applicant/Owner: Michael Flanagan, Signs Par Excellence/New California Land Co.
RECOMMENDED ACTION: Staff recommends that the Planning Commission adopt
Resolution No. 2020-09 approving a Master Sign Program for the Empire Park industrial
complex located at 5625 State Farm Drive. This proposal is consistent with the Industrial land
use designation in the General Plan and the associated I-L– Industrial zoning district. (Figure 1)
Figure 1: Project Location
BACKGROUND: The existing Empire Park industrial park is developed with a 28 unit, 36,400
square foot single story tilt-up concrete light industrial building on a 2.09 acre site. The building
houses a variety of light industrial, office and service commercial tenants. The applicant, Sign
Par Excellence, has submitted an application requesting approval of a Master Sign Program to
set criteria relative to location, size, design and materials for each tenant space as well as the
2
industrial park as a whole at this location. There is currently no sign program for the Empire
Park development and the City has encouraged the owner to submit a program before any
additional sign requests are made and in an effort to clean up illegal and non-conforming signage
that currently exists.
The sign program proposal was originally presented at the October 10, 2019 Planning
Commission meeting. The Commission unanimously voted to continue the item for an
unspecified period of time to allow further review of the Master Sign Program and give an
opportunity for the sign vendor to work with the City and property management for the site,
Keegan & Coppin, to design a sign program that would meet the needs of all tenants and allow
for the possibility of additional signage throughout the site.
Staff met with the applicant, Signs par Excellence, and provided direction and examples of
additional sign allowances and locations that would be supported by the City. The submittal
before the Commission does not fully take advantage of those recommendations provided;
however, the applicant has indicated that through careful consideration and discussion with all
tenants and the property management firm, the proposal before the Commission satisfies the
current and future needs of the industrial complex.
Table 17.27-4 Standards for Signage in C-R, I-L, and I-L/O Districts allows for 200 sf of signage
per lot of record, which may be exceeded with a Sign Program. The submitted sign program
allows for one freestanding sign, one ten (10) sq. ft. wall sign for each unit and allowances for
secondary lettering per private entry as contained in this report and defined and attached as
Exhibit A. It also calls for the removal of any tenant signage that is considered non-conforming
and unpermitted at this time by either the tenant or by the landlord at the tenant’s expense.
ANALYSIS: The Industrial District is intended to provide appropriate areas for businesses that
manufacture, process, assemble, repair, or otherwise create and maintain goods. The proposed
sign program accommodates all current businesses and will support future tenants and
approximately 20 businesses including, but not limited to, Reliable Auto Glass and Repair,
eWaste Sonoma, Old Caz Brewery, Plumbing Services, Inc.
The applicant has submitted a Sign Program for the industrial park as follows:
Wall Signage: The total sign area of fascia signage for a single front Tenant shall not exceed 10
square feet. The sign area allowed is 5’ x 2’ and is centered immediately above the door
entrance. The sign sub-straight as proposed is made up of 3/16” aluminum composite and with a
1/2” MDO wood frame.
Freestanding Signage: The proposed location of the freestanding/directory sign will be at the
southeast entrance of property. It will replace the “Keegan and Coppin” real estate sign that
currently exists and be placed out of the public right of way. The sign will be double faced, with
the sign structure measuring approximately 9.8’ x 8’ feet tall, with the frame and posts made of
4x4 wood posts, a MDO wood background with Dibond inserts, black cut vinyl for the tenant
slots, and white print cut vinyl for the street address. Each unit will be designated an
approximately 5.3” dibond insert. Tenants occupying multiple units will be designated a larger
sign copy within the frame of the sign structure accordingly. As the tenant population changes,
3
the sign structure, as designed, will accommodate and will be modified to allocate space based
on the number of units occupied.
Window/Glass Signage: Signage is allowed on the front door and on the window immediately
next to the front door entrance. Signage may not exceed twenty percent of the total glazed area.
The City of Rohnert Park Design Guidelines provides standards that sign colors and materials be
compatible with the existing building designs and should contribute to legibility and design
integrity. Signs should convey simple messages and should use high quality durable materials
that relate to the building. Metal or dibond panels are recommended. Additionally, Chapter
17.27.080 of the Rohnert Park Municipal Code notes that all signs must be constructed and
maintained in compliance with the following standards and these standards have been added as a
condition of approval in the attached Resolution 2019-32.
• Every sign and all parts, portions and materials must be maintained in good repair.
The display surface of all signs must be kept clean, neatly painted, and free from rust,
cracking, peeling, corrosion or other states of disrepair. This maintenance obligation
includes the replacement of broken faces, repainting of rust, chipped or peeling
structures or faces within fifteen days following written notification by the city. When
there is a change or discontinuance of a business or occupancy such that a sign no
longer represents a place of business or occupancy, the sign must be removed or the
name of the prior business or occupant either removed, or the sign face covered in a
manner that blends with the building or supporting structure.
As proposed, the sign program presented for the Empire Park industrial complex ensures that
signage is clearly stated, appropriately scaled, and in harmony with the character and appearance
of the building and use that is being identified.
ENVIRONMENTAL DETERMINATION: This project is categorically exempt from the
California Environmental Quality Act (CEQA), Article 19, Section 15311, Accessory Structures,
On-Premises Signs.
PUBLIC NOTIFICATION: Public notification is not required for a Sign Program.
• Planning Manager Approval Date: May 21, 2020
Attachments (list in packet assembly order):
1. Planning Commission Resolution 2020-09
2. Exhibit A - Applicant’s submittal package dated December 6, 2019
PLANNING COMMMISSION RESOLUTION NO. 2020-09
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ROHNERT PARK APPROVING A SIGN PROGRAM FOR THE EMPIRE
PARK INDUSTRIAL COMPLEX AT 5625 STATE FARM DRIVE
(APN 143-021-031)
(Michael Flanagan, Signs par Excellence)
WHEREAS, the applicant, Michael Flanagan, filed Planning Application No. PLS I19-
0017 for a Master Sign Program for the property located at 5625 State Farm Drive (APN 143-
021-031), in accordance with the City of Rohnert Park Municipal Code;
WHEREAS, Planning Application No. PLSI19-0017 was processed in the time and
manner prescribed by State and local law;
WHEREAS, on October 10, 2019, the Planning Commission reviewed Planning
Application No. PLSI19-0017 at which time interested persons had an opportunity to testify
either in support of or opposition to the project; and,
WHEREAS, at the October 10, 2019 Planning Commission meeting, upon considering
all testimony and arguments, continued the item to a date uncertain to allow the applicant an
opportunity to further review the Master Sign Program and design a sign program that would
meet the needs of all tenants and allow for the possibility of additional signage throughout the
site.
WHEREAS, at the June 4, 2020 Planning Commission special meeting, upon
considering all testimony and arguments, if any, of all persons desiring to be heard, the Planning
Commission considered all the facts relating to Planning Application No. PLSI19-0017;
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. That the above recitations are true and correct.
Section 2. Factors considered. The Planning Commission, in approving Planning
Application No. PLSI19-0017 makes the following factors, to wit:
A. That the proposed location of the use is in accordance with the objectives of the zoning
ordinance and the purposes of the district in which the sign is located.
Criteria Satisfied. The signage is appropriately sized, located and designed. The
proposed locations of the signs are in accordance with the Zoning Ordinance and purpose
of the “I-L” zoning district in which the signs are located. Approving the application will
create a sign program as required by the sign code and creates framework to allow for
approval of future signs in accordance with its provisions.
2
Resolution 2020-09
B. That the proposed location of the sign and the conditions under which the sign would be
operated and maintained will not be detrimental to the public health, safety or welfare, or
materially injurious to properties or improvements in the vicinity.
Criteria Satisfied. The proposed locations of the monument sign, wall signs, and window
signs will continue to maintain the public’s health, safety and welfare. The sign
installation work will be completed with the appropriate permits. All signs will be
attractive and present an orderly appearance in accordance with the regulations and
standards of the Zoning Ordinance.
Section 4. Environmental Clearance. The project is categorically exempt from the
California Environmental Quality Act (CEQA), Article 19, Section 15311 accessory
structures on-premises signs.
NOW THEREFORE BE IT RESOLVED, that the Planning Commission does hereby
approve Planning Application No. PLSI19-0017 subject to the following conditions:
1. The Sign Program approval shall expire one year from the Planning Commission
approval date, unless prior to the expiration a sign and building permit is issued and
construction is commenced and diligently pursued toward completion or an
extension is requested and approved.
2. The facility shall comply with any and all applicable provisions of the Rohnert Park
Municipal Code and any state or federal agency requirements.
3. Prior to the installation of any signs, the applicant shall submit and receive approval
of a Sign Review application.
4. The signs shall conform to Exhibit A attached hereto.
5. Every sign and all parts, portions and materials must be maintained in good repair.
The display surface of all signs must be kept clean, neatly painted, and free from rust,
cracking, peeling, corrosion or other states of disrepair. This maintenance obligation
includes the replacement of broken faces, repainting of rust, chipped or peeling
structures or faces within fifteen days following written notification by the city. When
there is a change or discontinuance of a business or occupancy such that a sign no
longer represents a place of business or occupancy, the sign must be removed or the
name of the prior business or occupant either removed, or the sign face covered in a
manner that blends with the building or supporting structure.
6. All unpermitted and non-conforming signage that currently exists must be removed.
BE IT FURTHER RESOLVED that said action shall not be deemed final until the
appeal period has expired and that the appeal period shall be ten (10) working days from the date
of said action. No building permits shall be issued until the appeal period has expired, providing
there are no appeals.
3
Resolution 2020-09
DULY AND REGULARLY ADOPTED on this 4th day of June, 2020 by the City of
Rohnert Park Planning Commission by the following vote:
AYES: _____ NOES:_____ ABSENT:_____ ABSTAIN:_____
BLANQUIE _____ BORBA _____ GIUDICE _____ HAYDON ____ORLOFF _____
________________________________________________________
Daniel Blanquie, Chairperson, Rohnert Park Planning Commission
Attest: ________________________________
Jennifer Sedna, Recording Secretary
Attachment: Exhibit A
Exhibit A
SIGN PROGRAM December 6, 2019
5625 State Farm
Rohnert Park, CA
PURPOSE AND INTENT:
The following sign criteria has been established and adopted by the City of Rohnert
Park, as its operative sign criteria for 5625 State Farm Drive Industrial Park (Empire
Park), for the purpose of assuring a consistent, effective, well designed, sign program
for Industrial Park and for the mutual benefit of all tenants. Flexibility of creative design
is encouraged and at the same time overall visual harmony is maintained. Conformity
with this criterion will be enforced by the Landlord. The sign code will be enforced by the
City of Rohnert Park. Any non-conforming or unapproved sign will be brought into
conformity at the expense of the Tenant or removed by Landlord at Tenant's cost and
expense.
The following sign program shall be adhered to by anyone wanting to erect/install
signage at Empire Park at 5625 State Farm Drive (see Exhibit A)
APPROVAL PROCEDURES:
1) Prior to the manufacturing of any sign the Tenant shall submit to the Landlord, for
approval,
a) two copies of
i) detail shop drawings Including: font size, layout, color (including all copy and
graphics) and materials used.
ii) A site plan showing proposed sign location
iii) Detailed elevation drawings showing proposed signage including dimensions
and location:
2) Landlord’s written approval of Tenant’s prepared sign drawings and specifications is
required. Landlord shall review submittal for conformance with this criteria and
overall design quality. Approval or disapproval of sign submittals based on
aesthetics of design shall remain the sole right of the Landlord
3) Prior to sign production and installation, the Tenant shall submit three (3) copies of
the detailed shop drawings, that have been approved by Landlord, to the City of
Rohnert Park for approval. Minimum information shall include:
a) detail shop drawings Including: font size, layout, color (including all copy and
graphics) materials used, and method or attachment with landlord’s signature
approval.
b) A site plan showing the proposed sign location with landlord’s signature approval
c) Detailed elevations showing proposed signage, including dimensions and
location with the landlord’s approval signature
4) Tenant shall pay all costs for its signs including design, manufacture, installation,
maintenance and City permits/certificates.
5) Tenant shall be responsible for and repair any damage to the sign fascia or any
other surface caused by the signage or its installation or removal.
6) Landlord reserves the right to periodically hire an independent engineer or sign
company, at Tenants sole expense, to inspect the installation of Tenants signs.
Tenant will be required to have any discrepancies and/or code violations corrected at
Tenants expense. All code violations, request for sign removal, and/or discrepancies
not corrected or completed within, twenty-one (21) days of written notice, may be
corrected by the Landlord at the Tenants expense.
7) Landlord shall have the right to disapprove any sign(s), even if said sign meets all
the applicable criteria mentioned herein, if Landlord in its sole and absolute
discretion determines that the sign proposed does not fit into the space available on
the storefront sign fascia. In such an event Landlord will work closely with the Tenant
and its sign contractor to develop an acceptable sign.
SIGN CRITERIA
1) SIGNS ALLOWED
a) One Tenant sign on building (see exhibit C &D)
b) One Tenant sign on Sign Directory (see exhibit A & B, Landlord responsible)
c) Window/ Glass Door sign
2) SIGN CONSTRUCTION
a) Tenant Sign on building (see exhibit C & D)
i) The total sign area of fascia signage for a single front Tenant shall not exceed
10 square feet. The Sign Area allowed is 5’ x 2’ and is centered immediately
above the door entrance. The sign sub-straight must be made of aluminum
composite and must be 5’ wide and 2’ in height.
ii) Copy height shall not exceed twenty-four (24") inches. The overall height of
the sign shall not exceed twenty-four (24") from the top of the tallest letter to
the bottom of the lowest letter.
iii) Signs shall be limited to the store name and logo.
iv) Letter and logo face, color, and font are subject to Landlord approval and design
review by the City of Rohnert Park.
b) Tenant sign on Sign Directory. (see exhibit B)
i) Directory sign consists of 50 sqft on each side. There are 30 tenant spaces for
signs. Signs included Suite number and name of company in an Arial Font. All
directory signs must conform to these specifications.
ii) The landlord will be responsible for the maintance of the directory sign
c) Window/Glass Door Sign
i) Signage is allowed on the front door and on the window immediately next to
the front door entrance. Signage may not exceed 20% of the total window /
door area. Window/Glass Door sign shall be non-illuminated. Only exterior
adhesive vinyl signage may be installed on window/door.
3) SIGN INSTALLATION
a) All exterior signs shall be properly secured.
b) All signs shall be designed to minimize the number of holes to be drilled into the
sign fascia
4) SIGN LOCATIONS
a) Building – Tenant sign
i) The sign area allowed is 5’ x 2’ and is centered immediately above the door.
Exhibit C & D
b) Monument sign -Tenant sign on Sign Directory
i) The monument sign is locate at the EAST Entrance
ii) The Landlord shall create a double sided directory sign per specifications and
located in South end of property, see picture (see Exhibits A & B).
c) Window/Glass door sign.
i) Signage is allowed on Door and large window immediately next to the door.
5) NOT ALLOWED SIGNAGE
a) No Temporary sign, window signs (except as stated under Sign Criteria 2Ci),
placards, flags, pennants and banners of any type shall be prohibited, except as
otherwise previously approved by the Landlord and if required by the City of
Rohnert Park prior to installation.
b) No sign manufacturers names, stamps, or decals visible from normal viewing
angles.
c) No paper, cardboard, or Styrofoam signs, stickers or decals hung around, on or
behind storefronts.
d) No Animated, flashing, moving and/or audible signs.
e) No Signs located above the fascia or on the roof. Roof mounted signs are
prohibited.
f) No Signs in the public right of way or on public property.
g) No Signs located within a vision triangle.
h) Any sign that has not been specifically approved by Landlord and, if required, the
City of Rohnert Park.
EXHIBIT A – 5625 State Farm Drive, Rohnert Park location of directory sign
Exibit B
Exhibit C
Exhibit D
1
Meeting Date: June 4, 2020
Item Number: 6.2
Prepared By: Jeffrey Beiswenger, Planning Manager
Agenda Title: Annual Review of the Growth Management Program Report
Location: Citywide
Applicant/Owner: City of Rohnert Park
RECOMMENDED ACTION: No action required. Presentation only.
BACKGROUND: Chapter 17.19 of the Rohnert Park Municipal Code (RPMC) contains the
City’s Growth Management Program (GMP). The purpose of the GMP is to assure that the rate
of population growth does not exceed an average annual growth rate of one percent per year.
This allows for 225 units per year, on average. The City conducts an annual review under the
GMP to monitor residential development. If necessary, the GMP allows the City to impose
“trigger caps” on new, market-rate building permits to ensure that an average population growth
rate of 1% per year is maintained.
The GMP requires that the annual review include:
• The number of units included in final discretionary approvals granted for each of the five
previous calendar years, within the July 2000 City Limits and within Specific Plan Area;
• The number of units included in final map filings within the July 2000 City Limits and
within each Specific Plan Area;
• The number of building permits approved within the July 2000 City Limits and within
each Specific Plan Area;
• Projected housing units by year per approved and pending development agreements; and
• Applications pending for new residential units or mixed-use developments with a
residential component.
If the annual report demonstrates that both the combined number of residential building permits
implemented in any two prior calendar years exceeds five hundred sixty (560) housing units, and
the development pace for the preceding three-year period has exceeded an average of two
hundred twenty-five (225) units per year, then a cap on new residential development in the
following calendar year shall be established.
The GMP allows “carry over” of building permits from year to year, which means that the City
can build up a bank of unit credits during years where less than 225 building permits are
“implemented” and use that bank during periods where the “trigger cap” could otherwise be
imposed. The GMP defines a building permit as “implemented” one year after it was issued
(roughly the time it takes to build and occupy a unit of housing).
The GMP exempts certain types of housing units from counting towards the trigger cap. These
types of housing units are required to be reported separately and include:
CITY OF ROHNERT PARK
PLANNING COMMISSION STAFF REPORT
2
• Single-family dwellings on legal lots of record within the July 2000 City Limits that are
not within an approved subdivision;
• Housing that is affordable to low and very-low income households and affordable to
moderate-income households under the City’s inclusionary housing requirements;
• Second dwelling units (accessory dwelling units);
• Conversions of mobile homes or apartments to condominium ownership;
• Rehabilitation, remodel, or replacement of existing housing;
• Model homes (until they receive an occupancy permit); and
• Residential infill projects where there is adequate infrastructure and no general plan
amendment was required.
ANALYSIS: Over the last six years (2014-2019) a total of 2,238 new housing units have
received final discretionary approvals. Also over the last six years, 1,196 units were included in
Final Map approvals. The number of building permits issued over the last six years for new
housing subject to the GMP totals 1,216 (excluding affordable and infill housing units). This is
an average of just over 200 residential building permits per year.
Exhibit A presents additional detail on the total number of residential building permits issued
within the 2000 City Limits and within each Specific Plan Area that are subject to the GMP.
Exhibit B presents detail on the building permits that were exempt from the GMP. Exhibit C
presents the number of non-exempt, residential building permits implemented or projected to be
implemented based on approved development plans and compares these to the GMP “trigger
caps” and the backlog of building permit credits.
Based on the analysis presented in Exhibit C, staff is projecting that the City could exceed the
two year total of 560 implemented building permits as early as 2020. Staff is projecting that the
City could exceed both the two-year total and the three-year average in 2022. This projection
includes implemented building permits in Sonoma Mountain Village, together with ongoing
development in University District and the Southeast Specific Plan Area and buildout in the
Stadium Lands Planned Development.
Exhibit C also illustrates that the City has a large “bank” of building permit “credits” (over 2,800
units) that have accumulated since the GMP was adopted. This is result of very slow growth in
the period between 2000 and 2014 when only 491 total building permits implemented. Before
limiting growth based on the trigger caps, this accumulation of annual unit credits should be
depleted. Assuming that non-exempt residential development continues at an average rate of
200-400 dwelling units per year, it is unlikely that Rohnert Park would have to begin limiting
residential construction within the next decade.
Planning Manager Approval Date: 05/21/20
Attachments (list in packet assembly order):
1. Exhibit A – Annual review of Housing Units per Section 17.19.030.B.1-3
2. Exhibit B – Housing Units Not Subject to Growth Management Ordinance’s Trigger
Cap (Building Permits Issues)
3. Exhibit C – Growth Management Program Annual Housing Permits Implemented and
Trigger Cap Projections Table
3
Exhibit A – Annual Review of Housing Units per Section 17.19.030.B.1-3
14 15 16 17 18 19
Final Discretionary Approvals
2000 City Limits 84 0 0 135 0 0
Stadium Lands PD 84 0 0 135 0 0
Sonoma Mountain Village PD* 0 0 0 0 0 0
Central Rohnert Park PDA 0 0 0 550 0 0
Other 0 0 0 0 0 0
Northwest SPA 0 0 0 0 0 0
Northeast SPA 0 0 0 0 0 0
University District SPA (Vast Oak, UDLLC & Bristol) 1425 0 0 0 42 0
Southeast SPA* 0 0 0 0 0 2
Total 1509 0 0 685 42 2
Number of Units on Final Map
2000 City Limits 0 0 0 135 0 0
Stadium Lands PD 0 0 0 135 0 0
Sonoma Mountain Village PD 0 0 0 0 0 0
Central Rohnert Park PDA 0 0 0 0 0 0
Northwest SPA 0 0 0 0 0 0
Northeast SPA 0 0 0 0 0 0
University District SPA (Vast Oak East & West) 0 399 0 323 105 0
Southeast SPA 0 0 105 0 129 0
Total 0 399 105 458 234 0
Number of Non-Exempt Building Permits Issued
2000 City Limits 244 84 0 0 0 0
Stadium Lands PD 244 84 0 0 135 0
Sonoma Mountain Village PD 0 0 0 0 0 0
Central Rohnert Park PDA 0 0 0 0 0 83**
Other 0 0 0 0 15 0
Northwest SPA 0 0 0 0 0 0
Northeast SPA 0 0 0 0 0 0
University District SPA (Vast Oak East & West) 0 0 136 143 120 126
Southeast SPA 0 0 0 56 10*** 64
Total 244 84 136 199 280 273
*Units within Sonoma Mountain Village and Southeast Specific Plan were approved in 2010. An
application to amend the Sonoma Mountain Village plan is currently under review.
**excludes seven affordable units in the Bella Creek Project
**excludes four affordable units
4
Exhibit B – Housing Units Not Subject to Growth Management Ordinance’s
Trigger Cap (Building Permits Issued)
2014 2015 2016 2017 2018 2019
Single-family Dwelling Lots not in a Subdivision 0 0 0 0 0 0
Units Affordable to Low and Very Low Income 0 0 0 0 218 7
Accessory Dwelling Units 0 0 1 7 4 0
Conversion of Mobile Homes Parks to Condos 0 0 0 0 0 0
Rehab, Remodel or Replacement of Existing
Homes 31 48 96 16 13 8
Model Homes 0 0 9 6 7 2
Exempted Infill Units 0 0 0 0 0 31*
Total 31 48 106 23 238 48
*Edgeway (31 units) qualifies as infill projects
Exhibit C - Growth Management Program Annual Housing Permits Implemented and "Trigger Cap" Projections
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
2022 2023
2000 City Limits 0 0 0 0 244 84 0 0 150 83 74 100 100
Stadium Lands PD2 0 0 0 0 244 84 0 0 135 0 74 0 0
Sonoma Mountain Village PD 0 0 0 0 0 0 0 0 0 0 0 100 100
Central Rohnert Park PDA 0 0 0 0 0 0 0 0 0 83 0 0 0
Other 0 0 0 0 0 0 0 0 15 0 0 0 0
Northwest SPA 0 0 0 0 0 0 0 0 0 0 0 0 0
Northeast SPA 0 0 0 0 0 0 0 0 0 0 0 0 0
University District SPA 0 0 0 0 0 0 136 143 120 126 130 252 223
Vast Oak 0 0 0 0 0 0 136 143 120 126 120 120 120
Bristol 0 0 0 0 0 0 0 0 0 0 10 32 0
UD LLC 0 0 0 0 0 0 0 0 0 0 0 100 103
Southeast SPA 0 0 0 0 0 0 0 56 10 64 50 50 50
Trigger Cap Calculations
Annual Total 0 0 0 0 244 84 136 199 280 273 254 402 373
TWO-YEAR TOTAL (4)Trigger = 560 0 0 0 0 244 328 220 335 479 553 527 656 775
THREE-YEAR AVERAGE (5)Trigger = 225 0 0 0 0 81 109 155 140 205 251 269 310 343
Cap Trig. Cap Trig.
Residual Development Cap as of 2010 = 1,7593 1,984 2,209 2,434 2,659 2,640 2,781 2,870 2,896 2,841 2,793 2,764 2,587 2,439
CAP CAP
Applications Pending
2000 City Limits
Stadium Lands PD
Sonoma Mountain Village PD
Central Rohnert Park PDA
Northwest SPA
Northeast SPA
University District SPA
Southeast SPA
(6) Pending building permits are calculated based on the numbers of lots available on Final Maps where a building permit has not been issued (see Exhibit B)
Number of Building Permits Implemented1
(1) "Residential building permit implementation" means completion of the dwelling unit that a permit pertains to and is deemed to take place one year after the permit is issued (RPMC 17.19.020.D).
Additional 74 Units Approved for SAMP
None
460 Units approved within Station Avenue (exempt from GMP)
None
None
(2) Stadium Lands PD includes Fiori Estates, Reserve at Dowdell, and Residences at Five Creek
(4)(5) Formula for Applying the Trigger Cap (RPMC 17.19.050) - "Beginning in the calendar year 2005, if the annual report demonstrates both that the combined number of residential permits implemented in any two
successive (i.e. prior) calendar years exceeds five hundred sixty housing units (five hundred sixty represents one hundred twenty-five percent of the two-year average growth of four hundred fifty housing units), and
the development pace for the preceding three-year period has exceeded an average of two hundred twenty-five units per year, then a cap on residential development in the following calendar year shall be established."
(3) 10 yrs x 225 (2001-2010), less 491 units permitted during that time frame (2002-14 units, 2003-66 units, 2004-214 units, 2005-197 units)
302 Building Permits Pending6
104 Building Permit Pending6
1
Meeting Date: June 4, 2020
Item Number: 6.3
Prepared By: Jeffrey Beiswenger, Planning Manager
Jenna Garcia, Planner III
Agenda Title: Receive the Annual Status of the General Plan for Calendar Year 2019
Location: Citywide
Applicant/Owner: City of Rohnert Park
RECOMMENDED ACTION: No action required. Presentation only.
BACKGROUND: Government Code Section 65400 mandates that each city’s planning agency
submit an annual report on the status of the General Plan and progress on its implementation to
their legislative bodies, the Governor’s Office of Planning and Research (OPR) and the
Department of Housing and Community Development (HCD) each year. The report offers the
City’s progress on General Plan implementation, including the progress in meeting its share of
regional housing needs. The intent of this requirement is to ensure that the General Plan directs
all land use decisions and remains an effective guide for future development. The information
that follows is provided for compliance with the Government Code requirements related to the
provision of an annual report on the status of the Rohnert Park General Plan. Also included is the
Housing Element Progress Report.
ANALYSIS: The Rohnert Park General Plan 2020 was adopted in July 2000 and has been
amended a number of times since then. The General Plan includes the following mandatory
elements:
• Land Use
• Transportation
• Open Space (Parks and Recreation)
• Environmental Conservation
• Health and Safety
• Noise
• Housing
Local governments are required to keep their General Plans current and internally consistent.
There is no specific requirement that a local government update its General Plan on a particular
timeline, with the exception of the Housing Element, which is required to be updated every
seven years.
The following report represents the progress the City has made towards implementing the goals
and policies of the General Plan during the 2019 calendar year. Goals where there has been
CITY OF ROHNERT PARK
PLANNING COMMISSION AGENDA REPORT
2
significant progress or action are cited specifically in the attached reports. Two reports are
attached: (1) Annual Report on the Status of the Rohnert Park General Plan (Calendar Year
2019); and (2) Annual Element Progress Report, Housing Element Implementation (Calendar
Year 2019.)
Planning Manager Approval Date: 05/21/20
Attachments (list in packet assembly order):
1. Annual Report on the Status of the Rohnert Park General Plan (Calendar Year 2019)
2. Annual Housing Element Progress Report (2019)
3
Attachment 1
Annual Report on the Status of the Rohnert Park General Plan (Calendar Year 2019)
INSERT
4
Attachment 2
Annual Housing Element Progress Report (2019)
INSERT
Page 1
Attachment 1
Annual Report on the Status of the Rohnert Park General Plan
Calendar Year 2019
Government Code Section 65400 mandates that the planning agencies of cities submit an annual report on
the status of the General Plan and progress on the implementation to their legislative bodies, the
Governor’s Office of Planning and Research (OPR), and the Department of Housing and Community
Development (HCD) each year. The report must address each City’s progress in its General Plan
implementation, including the progress in meeting its share of regional housing needs. The intent of this
requirement is to ensure that the General Plan directs all land use decisions and remains an effective guide
for future development. The information that follows complies with the Government Code requirements
related to the provision of an annual report on the status of the Rohnert Park General Plan.
Status of the Rohnert Park General Plan
The Rohnert Park General Plan was adopted in July 2000 and has been amended a number of times to stay
current. The General Plan includes the following mandatory elements:
• Land Use
• Transportation/Circulation
• Housing
• Open Space (Parks and Recreation)
• Noise
• Health and Safety
• Environmental Conservation
Local governments are required to keep their General Plans current and internally consistent. There is no
specific requirement that a local government update its General Plan on a particular timeline, with the
exception of the Housing Element, which is required to be updated every seven years.
The City made progress in 2019 toward achieving General Plan Goals and Policies as listed in the
subsequent tables in this report. Notably, the City renewed its Urban Growth Boundary in 2019, an effort
which included removal of 80 acres in the southeast portion of the City consistent with its General Plan
policies.
Page 2
General Plan Map Amendments
During 2019, the General Plan map was amended, primary resulting in updated to Figure 2.2-1 (General Plan Diagram), but also
resulting in updates to Figure 2.4-1, 2.5-2, 3.1-1, 3.1-2, 3.2-6, 3.2-13, 4.1-1, 4.4-1, 5.1-1, 5.1-2, 5.2-1, 5.3-1, 6.2-1, 6.2-2, 7.1-1, 7.1-2,
7.2-1, 7.2-2, 8.2-1, 9-6
Table 1 – Map Amendments in 2019
Location Description
1 80 acres located at parcel
number 047-111-050
Open Space –
Agriculture &
Resource
Management
This 80 acre vacant parcel was zoned as Open Space –
Agriculture & Resource Management within the City of
Rohnert Park’s Urban Growth Boundary (UGB). Ballot
Measure B removed this section of land from the UGB.
2 80 acres of land (Willowglen
project), located south of
Canon Manor, north of Valley
House Drive, and Between
Petaluma Hill Rd and Bodway
Parkway
Specific Plan,
Medium Density
Residential
As a result of the changes to the water supply and storage
strategy, this amendment allowed for removal of an on-site
water tank and creation of two new residential lots on site. As
well, the phasing plan was revised.
General Plan Goals
The following series of tables represents the progress the City has made towards implementing its general plan goals during the 2019
calendar year. As is to be expected, the City did not work on all goals in this calendar year and the list covers only activities that took
place in 2019.
Table 2 –Implementation of Land Use Goals and Policies in 2019
Goal or Policy Progress in 2019
Goal LU-A Maintain a compact urban form, with a
defined urban growth boundary and urban
development intensities in land designated for
urban uses. Work with other agencies to
On-going In 2019, Residents voted to revise the urban growth
boundary to remove a section located in the
southeast portion of the City. This change ensured
that no urban development would be permitted in that
Page 3
ensure that land surrounding the city is
maintained in open space.
area and open space shall be maintained
surrounding the city.
Goal LU-B Provide soft urban edges and ensure that
designated intensities provide gradual
transition to open space at city edges.
On-going The University District and Southeast Specific Plan
provide low densities of housing and an open space
buffer as they transition towards Petaluma Hill Road.
Goal LU-F Create a new mixed-use University District
north of Sonoma State University that would
draw visitors, serve as destination point for
the City, offer a wide mix of residential
employment opportunities and foster close
physical and visual relationship between the
campus and the City.
On-going Construction of housing in the University District
Specific Plan (UDSP) continued with 136 new homes
built in 2019. The affordable apartment complex in
the University District continues to move forward
and should be completed by late 2020.
Goal LU-I Provide a range of housing variety in type and
price, including large-lot homes and housing
oriented to students.
On-going Construction of homes continues in the UDSP and
the Southeast Specific Plan (SESP, Willowglen) with
136 new homes built in UDSP and 52 homes built in
SESP.
Goal LU-K Promote a diverse range of jobs within the
city.
On-going The Planning Commission approved several site plan
and architectural reviews (SPARs) for new
businesses in Rohnert Park, including: a new fire
station, a billiards parlor, a dairy processing plant,
two fast food restaurant remodels, three apartment
remodels, and one industrial buildings.
Policy LU-34 Areas in the City Planning area, outside the
Urban Growth Boundary, should be
maintained in agricultural and open space
uses consistent with the land use designation
in the Sonoma County General Plan.
On-going Residents voted to revise the UGB to remove a
section located in the southeast portion of the City.
This land would be maintained as open space.
Page 4
Table 3 –Implementation of Growth Management Goals in 2019
Table 4 –Implementation of Urban Form Goals in 2019
Goal or Policy Progress in 2019
Goal CD-B Establish strong connections between adjacent
neighborhoods and between neighborhoods and
On-going In 2019, the City continued to work towards plans
for the extension of the Hinebaugh Creek bikeway
within the University District providing a safe way
Goal or Policy Progress in 2019
Goal GM-B Undertake efforts to facilitate provision of
housing affordable to low and very low income
household by exemption affordable housing
form any numerical “trigger cap” restrictions.
On-going The City’s growth management ordinance exempts
affordable housing units from trigger caps.
Goal GM-C Ensure that growth is paced to achieve General
Plan buildout over a 20-year period,
representing an annual average population
growth rate of one percent.
On-going Housing construction rates are averaging less than one
percent per year in Rohnert Park. The City has a
“backlog” of building permits under its growth
management ordinance as a result of relatively few
new units constructed between 2000 through 2013.
Goal GM-F Ensure all new development provides
necessary public facilities to support
development.
On-going In 2019, the City approved improvement plans to
support development in the University District,
Southeast and Stadium areas. These improvements are
being funded by new development at no cost to the
existing residents. Developer-funded improvements to
Rohnert Park Expressway were completed in 2019.
Improvements to Martin Avenue and Keiser Avenue
will be completed in 2020.
Goal GM-H Minimize impacts – physical, visual and fiscal
– of growth and annexation on existing homes
and businesses.
On-going The City continued collecting Maintenance Annuity
Fund deposits from builder in the University District to
support the cost of service for new residents. The City
has begun collecting special taxes for services in the
Southeast Specific Plan Area.
Page 5
activity centers in order to encourage walking and
biking.
to walk and bike between existing neighborhoods
and this new development.
Goal CD-C Establish an open space network that links
residential neighborhoods, parks and open space
areas.
On-going In 2019, the City continued developing plans for the
extension of the Hinebaugh Creek bikeway and Twin
Creeks Park within the University District,
culminating in a groundbreaking for a new trail
leading to Crane Creek Regional Park.
Goal CD-D Preserve and enhance views of the eastern
ridgeline.
On-going The specific plans in the vicinity of Petaluma Hill
Road are designed to protect the view of the hills
from within the specific plan area and from existing
properties.
Goal CD-F Maintain a distinct urban edge, while creating a
gradual transition between urban uses and open
space.
On-Going Specific Plans along City borders have gradual
transitions to open space and maintain scenic
corridors.
Table 5 –Implementation of Street System Goals in 2019
Goal or Policy Progress in 2019
Goal
TR-B
Maintain high levels of mobility along all major street
segments and at major intersections.
On-going In 2019, the City continued traffic signal
improvements, implemented its Automated Traffic
Management System (ATMS) on the Rohnert Park
Expressway and Golf Course corridors, and improved
the Golf Course Redwood Intersection. The City
conducted a permissive left turn study at 32
intersections to alleviate traffic at key intersections.
Goal
TR-C
Build new roads and improve existing roadways,
where necessary, in conjunction with new
development.
On-going Rohnert Park Expressway widening at the University
District was completed. Roadway construction is
within the Stadium Lands Planned Development Area
and on Keiser Avenue.
Page 6
Table 6 –Implementation of Transportation Demand Goal in 2019
Goal or Policy Progress in 2019
Goal TR-
1 and
TR-2
Establish LOS C as the minimum standard for all
arterial and collector roadway segments and
intersections. Require mitigation measures, as
needed, for new development that increases traffic
such that LOS levels fall below the established
minimum standard.
On-going Mitigation of traffic impacts is required of new
developments to maintain a minimum level of
service
Goal TR-
37
Provide continuous sidewalks along all existing and
future streets.
On-going Installation of sidewalks on existing streets are
required for any new development. All new street
construction requires the installation of sidewalks.
Goal TR-
43
Establish requirements for bicycle parking as part of
the Zoning Ordinance update. Ensure that secure
bicycle parking is provided in conjunction with new
development.
On-going All new commercial and industrial development
requires the installation of bicycle parking facilities.
New project entitlements include conditions of
approval to require the installation.
Goal TR-
N
Promote safe, efficient, and comfortable circulation
for cyclists and pedestrians throughout Rohnert
Park.
On-going Public Works continues to clean the creek paths by
removal of any trash, debris, and weeds. Multiple
sidewalks and multi-use paths around the City that
have deteriorated have been repaved and/or
replaced.
Table 7 –Implementation of Open Space Goals in 2019
Goal or Policy Progress in 2019
Goal
OS-D
Maintain and enhance the Petaluma Hill Road Scenic
corridor.
On-going Development along the east side of Petaluma Hill
Road will be designed to protect the view of the hills
to the east from the roadway. Sonoma Mountain
Village, Southeast Specific Plan and University
District Specific Plan are also designed to create
view corridors of the hills to the east. CEQA
Page 7
documents for development projects require
consideration of the impact of a development.
Goal
OS-E
Maintain publicly owned open space areas in their
natural state; provide public access in a manner that is
compatible with the conservation of habitat.
On-going As in 2018, in 2019 a number of the creeks in
Rohnert Park were cleared of rubbish and overgrown
vegetation to enhance their appearance and improve
the flow of runoff during winter storms. Some of the
paved trails along the top of creek bank were also
improved.
Goal
OS-G
Develop additional parkland in the City to meet the
standards of required park acreage for new residents.
On-going The Residences at Five Creek project’s 0.65 acre
park was constructed in 2019 providing the first park
west of Highway 101..
Table 8 –Implementation of Wastewater Goals in 2019
Goal or Policy Progress in 2019
Goal
PF-7
Continue participation in the planning, financing and
construction of wastewater treatment capacity
expansions of the Subregional Wastewater Disposal
System. Explore opportunities for increasing
reclaimed water use and decreasing potable water
demand.
On-going Participation in regional coordination meetings.
Recycled water has been extended into new
developments at the University District, Southeast
Specific Plan and Stadium lands.
Goal
PF-P
Require developers to install or pay for new sewer
lines and other sewer improvements needed to
accommodate new development.
On-going New developments are required to provide and pay
for the necessary infrastructure including upgrading
existing sewer and wastewater systems or the
installation of new systems.
Page 8
Table 9 –Implementation of Water Supply and Conservation Goals in 2019
Goal or Policy Progress in 2019
Goal
PF-G
Continue to encourage water conservation through the
use of reclaimed water and reduction of water
consumption and discharge, for both existing and new
development.
On-going All new development requires water conserving
devices and where feasible, connecting irrigation
systems to recycled water.
Goal
PF-H
Ensure that groundwater withdrawal does not exceed
safe yield.
On-going The City monitors and manages its groundwater use
and groundwater levels are rising under Rohnert
Park. The City participates in the Joint Powers
Authority for the Santa Rosa Plain Groundwater
Sustainability Agency.
Table 10 –Implementation of Historic and Archaeological Resources Goals in 2019
Goal or Policy Progress in 2019
Goal
EC-A
Conserve historic and archaeological resources for the
aesthetic, educational, economic and scientific
contribution they make to Rohnert Park’s identity and
quality of life.
On-going New development approval must conform to the
California Environmental Quality Act (CEQA).
Under CEQA, archaeological resources must be
mitigated if found in the development site.
Table 11–Implementation of Habitat and Biological Resources Goals in 2019
Goal or Policy Progress in 2019
Goal
EC-C
Protect special status species and supporting habitats
within Rohnert Park, including species that are State
or federally listed as Endangered, Threatened, or
Rare.
On-going The City regularly implements protection of
endangered, threatened, or rare species through
California Environmental Quality Act review for
any project.
Page 9
Goal
EC-C
Protect sensitive habitat areas and wetlands in the
following order of protection preference: 1)
avoidance, 2) on-site mitigation, 3) off-site
mitigation.
On-going The City regularly implements these policies
through the California Environmental Quality Act
review for any project.
Goal
EC-D
Maintain existing native vegetation and encourage
planting of native plants and trees.
On-going A Tree Preservation Ordinance became part of the
Zoning Ordinance in 2007. The Ordinance requires
a tree removal permit to remove any tree. Native
trees are required to be included in new landscape
plans for private development projects and for
public improvements.
Table 12 –Implementation of Water Quality Goals in 2019
Goal or Policy Progress in 2019
Goal EC-
F
Enhance the quality of surface and groundwater
resources and prevent their contamination.
On-going The City participates in a regular working group
hosted by the water board to coordinate activities on
maintaining and improving water quality.
Goal EC-
G
Undertake steps to minimize the depletion of
groundwater resources.
On-going The City has an adopted ground policy resolution
that limits groundwater pumping to 2,577 acre-feet
per year. The City manages its pumping to this level
and monitors groundwater levels (levels have been
rising since 2006). The City participates in the Joint
Powers Authority that is the Santa Rosa Plain
Groundwater Sustainability Agency.
Goal EC-
I
Ensure that the City’s drinking water continues to
meet or exceed water quality standards.
On-going The City monitors and maintains its water system
and regularly exceed state and federal water quality
standards.
Goal EC-
J
Discourage use of insecticides, herbicides, or toxic
chemical substances within the city and encourage
development and use of pesticide and fertilizer
management plans for landscaped areas.
On-going City Council revised the Integrated Pest
Management (IPM) program to eliminate the use of
Ranger Pro Glyphosate. The updated IPM includes
addition of alternatives to glyphosate approved by
Non-Toxic Neighborhoods.
Page 10
Table 13 –Implementation of Air Quality Goals in 2019
Goal or Policy Progress in 2019
Goal EC-K Continue to work toward improving air quality
and meeting all federal and state ambient air
quality standards by reducing the generation of
air pollutant from both stationary and mobile
sources, where feasible.
On-going New projects are required to implement mitigation
measures to reduce air quality impacts of new
development.
Table 14 –Implementation of Seismic and Geological Hazards Goals in 2019
Goal or Policy Progress in 2019
Goal HS-A Minimize the risk to life and property from
seismic and geologic hazards in Rohnert Park.
On-going The City enforces the Uniform Building Code and
requires soils reports for new development.
Table 15 –Implementation of Drainage, Erosion, Stormwater and Flooding Goals in 2019
Goal or Policy Progress in 2019
Goal HS-B Minimize the risk to life and property from
flooding.
On-going In accordance with Federal Emergency
Management Agency (FEMA) requirements, the
City does not prevent new development in areas of
flooding and requires drainage study and review
during its development review process. The City
adopted a Local Hazard Mitigation Plan which was
certified by FEMA and California OES.
Goal HS-C Control erosion and sedimentation to provide
flood protection and water quality.
On-going The City has adopted and enforces a grading
ordinance and requires all development be
designed to the Sonoma County low impact
Page 11
development standards. All construction projects of
any size are required to secure coverage under the
State Water Board’s General Construction Permit.
Table 16 –Implementation of Solid Waste Management and Recycling Goals in 2019
Goal or Policy Progress in 2019
Goal HS-D Reduce the generation of solid waste and recycle
those material that are used to slow the filling of
local and regional landfills, in accord with the
California Integrated Waste Management Act of
1989.
On-going The City encourage the recycling of household and
commercial waste and is continuing efforts to
improve recycling services. The City enforces
CALGreen requirements for construction and 50
percent of construction waste must be recycled.
Table 17 –Implementation of Hazardous Materials Goals in 2019
Goal or Policy Progress in 2019
Goal HS-E Minimize the risk to life and property from
the generation, storage and transportation of
hazardous material and waste in Rohnert
Park and assure the property disposal of all
hazardous waste that may be generated in
Rohnert Park.
On-going No specific activity in 2019, beyond on-going
monitoring
Goal HS-F Comply with all applicable regulations and
provisions for the storage, use and handling
of hazardous substance as established by
federal (EPA), State (DTSC, RWQCB, Cal
OSHA, CAL EPA) and local (County of
Sonoma, City of Rohnert Park) regulations.
On-going No specific activity in 2019, beyond on-going
monitoring
Goal HS-G Protect groundwater and soil from
contamination by hazardous materials.
On-going The City coordinates with the Sonoma County Waste
Management Agency, the Santa Rosa Subregional
System and other local agencies on hazardous waste
collection events and the dissemination of
Page 12
information regarding hazardous material
management. Signs at storm drains are maintained
on an ongoing basis throughout the City. City public
works, public safety and code enforcement staff
respond to and abate hazardous material spills.
Table 18 –Implementation of Emergency Management Goals and Policies in 2019
Goal or Policy Progress in 2019
Goal HS-H Use the Standardized Emergency
Management Plan as a guide for
emergency management in Rohnert Park.
On-going The City utilizes the National Incident Management System
to ensure a standard emergency response. In 2019, the City,
CalOES, and FEMA finalized and approved the Local
Hazard Mitigation Plan. In addition, as a result of the
October 2017 fire event, the City exercised its Emergency
Management Plan.
Goal HS-I Cooperate with other public agencies to
store, organize, distribute and administer
emergency medical equipment, supplies,
services and communication systems.
On-going The City engages in a mutual aid program with neighboring
agencies, and exercised those in response to the October
2019 fire event.
Goal HS-J As part of the concurrency requirement
for development on the west side,
construct a public safety station west of
US 101 in the general vicinity of the
Wilfred Avenue/Labath Avenue
intersection.
On-going The City completed the planning for a new west side fire
station. The project was bid in 2019 with construction
planned to commence in 2020.
Policy HS-23 Prepare and disseminate information to
help households prepare for emergency
situations.
On-going In response to the PG&E power shutoffs and 2019 Kincade
fire event, the City of Rohnert Park activated its Emergency
Operations Center. Frequent communication with the
public was accomplished through press releases, social
media tools, and other emergency notification methods and
services.
Page 13
Policy HS-24 Require adequate access for emergency
vehicles, including adequate street width
and vertical clearances, on new streets.
On-going For all projects, including new developments, and
infrastructure improvements, plans are reviewed and
approved by Public Safety personnel.
Table 19 – New Emergency Management Policy in 2019
Goal or Policy Progress in 2019
Policy HS-
26
Locate a new public safety station in the
Stadium Lands Planned Development; require
new development on the west side (west of
Highway 101) to contribute funds to the Public
Facilities Financing Plan for construction.
Adopted The City completed the planning and design for a new
west side fire station. Construction is expected in 2020.
Table 20 –Implementation of Noise Goals in 2019
Goal or Policy Progress in 2019
Goal NS-A Protect public health and welfare by
eliminating or minimizing excessive noise
levels.
On-going Noise is evaluated as new projects are proposed in
compliance with the city noise ordinance.
Goal NS-B Minimize the exposure of noise-sensitive
uses – including residences, schools,
churches, hospitals and other public uses –
to excessive noise levels.
On-going In 2019, the City used its approval authority to review the
noise impacts of projects and impose conditions of
approval to minimize noise impacts.
Annual Progress Report January 2020
Jurisidiction Name
Reporting Calendar Year
First Name
Last Name
Title
Email
Phone
Street Address
City
Zipcode
v 2_27_20
Optional: Click here to import last year's data. This is best used
when the workbook is new and empty. You will be prompted to pick
an old workbook to import from. Project and program data will be
copied exactly how it was entered in last year's form and must be
updated.
130 Avram Avenue
Rohnert Park
94928
Please Start Here
General Information
2019
Rohnert Park
Contact Information
Jenna
Garcia
Planner III (Housing Specialist)
jgarcia@rpcity.org
7075882233
Mailing Address
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Notes
2 3 4 6 7 8 9 10
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total PROPOSED
Units by Project
Total
APPROVED
Units by project
Total
DISAPPROVED
Units by Project
(Auto-calculated
Can Be
Overwritten)
Was APPLICATION
SUBMITTED
Pursuant to GC
65913.4(b)?
(SB 35
Streamlining)
Notes+
Summary Row: Start Data Entry Below 0 0 0 0 0 0 0 0 0 0 0
0 0
0
0
0
0
0
0
0
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Housing Development Applications Submitted
Table A
Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
51
Project Identifier Unit Types Proposed Units - Affordability by Household Incomes
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
Table A2
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
Term of Affordability
or Deed Restriction Notes
2 3 5 6 8 9 11 12 13 14 15 16 17 18 19 20 21
Prior APN+Current APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates
of
Occupancy
or other
forms of
readiness
(see
instructions)
Date Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?+
Was Project
APPROVED using
GC 65913.4(b)?
(SB 35 Streamlining)
Y/N
Infill Units?
Y/N+
Assistance Programs
for Each Development
(see instructions)
Deed Restriction
Type
(see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Dest
royed Units+
Demolished or
Destroyed Units+
Demolished/De
stroyed Units
Owner or
Renter+
Notes+
Row: Start Data Entry Below 0 0 0 0 0 0 0 0 7 0 0 0 0 0 306 313 0 0 0 0 4 1 203 208 0 0 0 0 0
143-340-061 1445 E Cotati Ave Edgeway MH R 0 31 5/13/2019 31 0 N143-370-010 435 Southwest Blvd Southwest Blvd Apts MH R 0 0 15 12/16/19 15 N143-380-022 100 Avram Ave Bella Creek MH R 0 7 83 9/19/2019 90 0 N DB 55
143-573-002 872 'A' Santa Dorotea Circle
ADU R
0
0 1 12/12/2019 1 N
Average rent for ADU units of
comparable size in Sononoma
County at or below rents for
moderate-income households.
159-560-001 1802 Kyle Place Vast Oak SFD O 0 0 1 6/21/2019 1 N
159-560-002 5144 Kevin Place Vast Oak SFD O 0 0 1 7/17/19 1 N
159-560-003 5140 Kevin Place Vast Oak SFD O 0 0 1 7/18/19 1 N
159-560-004 5136 Kevin Place Vast Oak SFD O 0 0 1 7/17/19 1 N
159-560-005 5132 Kevin Place Vast Oak SFD O 0 0 1 7/19/19 1 N
159-560-019 1857 Kelly Place Vast Oak SFD O 0 0 1 5/2/19 1 N
159-560-020 1861 Kelly Place Vast Oak SFD O 0 0 1 5/2/19 1 N
159-560-022 5133 Kolton Place Vast Oak SFD O 0 0 1 5/17/19 1 N
159-560-023 5137 Kolton Place Vast Oak SFD O 0 0 1 5/17/19 1 N
159-560-024 5141 Kolton Place Vast Oak SFD O 0 0 1 5/17/19 1 N
159-560-025 5145 Kolton Place Vast Oak SFD O 0 0 1 5/28/19 1 N
159-560-026 1806 Kyle Place Vast Oak SFD O 0 0 1 6/21/2019 1 N
159-560-027 1810 Kyle Place Vast Oak SFD O 0 0 1 6/21/19 1 N
159-560-028 5138 Kolton Place Vast Oak SFD O 0 0 1 4/24/19 1 N
159-560-029 5134 Kolton Place Vast Oak SFD O 0 0 1 4/25/19 1 N
159-560-030 5130 Kolton Place Vast Oak SFD O 0 0 1 4/25/19 1 N
159-560-031 5126 Kolton Place Vast Oak SFD O 0 0 1 3/22/2019 1 N
159-560-033 1814 Kyle Place Vast Oak SFD O 0 0 1 3/22/19 1 N
159-560-034 1818 Kyle Place Vast Oak SFD O 0 0 1 1/28/19 1 N
159-560-038 5209 Kim Place Vast Oak SFD O 0 0 1 1/28/19 1 N
159-560-039 5213 Kim Place Vast Oak SFD O 0 0 1 2/11/19 1 N
159-560-040 5220 Kim Place Vast Oak SFD O 0 0 1 2/25/19 1 N
159-560-041 5216 Kim Place Vast Oak SFD O 0 0 1 2/22/19 1 N
159-560-042 5212 Kim Place Vast Oak SFD O 0 0 1 2/22/19 1 N
159-560-043 5208 Kim Place Vast Oak SFD O 0 0 1 2/25/19 1 N
159-560-047 1718 Kenwood Place Vast Oak SFD O 0 0 1 1/14/19 1 N
159-570-014 5009 King Place Vast Oak SFD O 0 0 1 9/10/19 1 N
159-570-015 5005 King Place Vast Oak SFD O 0 0 1 6/17/2019 1 N
159-570-016 5001 King Place Vast Oak SFD O 0 0 1 6/20/19 1 N
159-570-017 5000 King Place Vast Oak SFD O 0 0 1 6/20/19 1 N
159-570-018 5004 King Place Vast Oak SFD O 0 0 1 9/25/2019 1 N
159-570-019 5008 King Place Vast Oak SFD O 0 0 1 6/17/2019 1 N
159-570-046 5027 Karrington Road Vast Oak SFD O 0 0 1 3/19/2019 1 N
159-570-047 5023 Karrington Road Vast Oak SFD O 0 0 1 2/8/19 1 N
159-570-048 5019 Karrington Road Vast Oak SFD O 0 0 1 3/19/19 1 N
159-570-050 5011 Karrington Road Vast Oak SFD O 0 0 1 10/24/19 1 N
159-570-051 5007 Karrington Road Vast Oak SFD O 0 0 1 12/2/19 1 N
159-570-052 5003 Karrington Vast Oak SFD O 0 0 1 5/30/2019 1 N
159-580-001 1401 Kincade Place Vast Oak SFD O 0 0 1 6/17/19 1 N
159-580-002 1405 Kincade Place Vast Oak SFD O 0 0 1 9/10/19 1 N
159-580-003 1409 Kincade Place Vast Oak SFD O 0 0 1 9/13/19 1 N
159-580-004 1413 Kincade Place Vast Oak SFD O 0 0 1 7/11/19 1 N
159-580-005 1417 Kincade Place Vast Oak SFD O 0 0 1 10/24/19 1 N
159-580-006 1421 Kincade Place Vast Oak SFD O 0 1 5/16/2019 1 0 N
159-580-007 1425 Kincade Place Vast Oak SFD O 0 1 5/16/2019 1 0 N
159-580-008 1429 Kincade Place Vast Oak SFD O 0 1 5/16/2019 1 1 12/19/19 1 N
159-580-009 1433 Kincade Place Vast Oak SFD O 0 1 5/16/2019 1 0 N
159-580-010 1437 Kincade Place Vast Oak SFD O 0 1 7/31/2019 1 0 N
159-580-011 1441 Kincade Place Vast Oak SFD O 0 1 7/31/2019 1 0 N
159-580-012 1445 Kincade Place Vast Oak SFD O 0 1 7/31/2019 1 0 N
159-580-013 1449 Kincade Place Vast Oak SFD O 0 1 7/31/2019 1 0 N
159-580-014 1453 Kincade Place Vast Oak SFD O 0 1 7/31/2019 1 0 N
159-580-018 1540 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-580-019 1536 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-580-021 1528 Keats Place Vast Oak SFD O 0 1 5/16/2019 1 0 N
159-580-022 1524 Keats Place Vast Oak SFD O 0 1 5/16/2019 1 0 N
159-580-023 1520 Keats Place Vast Oak SFD O 0 1 5/16/2019 1 0 N
159-580-027 1504 Keats Place Vast Oak SFD O 0 0 1 9/25/19 1 N
159-580-029 1501 Keats Vast Oak SFD O 0 0 1 3/19/2019 1 N
159-580-030 1505 Keats Place Vast Oak SFD O 0 0 1 2/28/19 1 N
159-580-031 1509 Keats Place Vast Oak SFD O 0 0 1 3/7/19 1 N
159-580-032 1513 Keats Place Vast Oak SFD O 0 0 1 2/26/19 1 N
159-580-034 1521 Keats Place Vast Oak SFD O 0 0 1 3/11/19 1 N
159-580-036 1529 Keats Place Vast Oak SFD O 0 0 1 3/19/19 1 N
159-580-037 1533 Keats Place Vast Oak SFD O 0 0 1 3/22/19 1 N
159-580-038 1537 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-580-039 1541 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-580-040 1545 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-580-041 1549 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-580-042 1553 Keats Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-590-018 1853 Kelly Place Vast Oak SFD O 0 0 1 5/8/19 1 N
159-590-019 1857 Kelly Place Vast Oak SFD O 0 0 1 5/2/2019 1 N
159-590-020 1861 Kelly Place Vast Oak SFD O 0 0 1 5/2/2019 1 N
159-590-025 1849 Kelly Place Vast Oak SFD O 0 0 1 5/2/19 1 N
159-590-063 5355 Kelliann Place Vast Oak SFD O 0 0 1 2/20/19 1 N
159-590-064 5359 Kelliann Place Vast Oak SFD O 0 0 1 2/20/19 1 N
159-590-065 5363 Kelliann Place Vast Oak SFD O 0 0 1 2/20/19 1 N
159-590-066 5351 Kelliann Place Vast Oak SFD O 0 0 1 2/20/19 1 N
159-600-030 1556 Keats Place Vast Oak SFD O 0 0 1 12/17/2019 1 N
159-600-031 1560 Keats Place Vast Oak SFD O 0 0 1 12/17/19 1 N
159-600-032 1564 Keats Place Vast Oak SFD O 0 0 1 12/5/19 1 N
159-600-033 1568 Keats Place Vast Oak SFD O 0 1 9/4/2019 1 0 N
159-600-034 1572 Keats Place Vast Oak SFD O 0 1 9/4/2019 1 0 N
159-610-020 7716 Watson Drive SESP SFD O 0 0 1 4/11/2019 1 N
159-610-021 7720 Watson Drive SESP SFD O 0 0 1 4/11/2019 1 N
159-610-027 7600 Watson Drive SESP SFD O 0 0 1 3/8/2019 1 N
159-610-028 7604 Watson Drive SESP SFD O 0 0 1 3/9/2019 1 N
159-610-029 7608 Watson Drive SESP SFD O 0 0 1 3/14/2019 1 N
159-610-030 7612 Watson Dr SESP SFD O 0 0 1 3/14/19 1 N
159-610-031 7616 Watson Dr SESP SFD O 0 0 1 3/21/19 1 N
159-610-032 7620 Watson Dr SESP SFD O 0 0 1 3/21/19 1 N
159-610-033 7624 Watson Dr SESP SFD O 0 0 1 3/26/19 1 N
159-610-034 7682 Wildrose Way SESP SFD O 0 1 3/1/19 1 1 7/10/19 1 N
159-610-035 7678 Wildrose Way SESP SFD O 0 1 3/1/19 1 1 7/11/19 1 N
159-610-036 7674 Wildrose Way SESP SFD O 0 1 3/12/19 1 1 7/12/19 1 N
159-610-043 1642 Winterberry Ln SESP SFD O 0 0 1 1/3/19 1 N
159-610-044 1638 Winterberry Ln SESP SFD O 0 0 1 1/11/19 1 N
159-610-045 1634 Winterberry Ln SESP SFD O 0 0 1 1/16/19 1 N
159-610-046 1630 Winterberry Ln SESP SFD O 0 0 1 1/23/19 1 N
159-610-053 1602 Winterberry Ln SESP SFA O 0 0 1 4/19/19 1 N INC 1000
159-610-054 7904 Wall St SESP SFA O 0 0 1 4/17/19 1 N INC 1000
159-610-055 7900 Wall St. SESP SFA O 0 0 1 4/26/2019 1 N INC 1000
159-610-056 1601 Wildflower Way SESP SFA O 0 0 1 4/26/2019 1 N INC 1000
159-610-085 7801 Wyatt Way SESP SFD O 0 0 1 2/11/19 1 N
159-610-086 7805 Wyatt Way SESP SFD O 0 0 1 2/5/19 1 N
159-610-087 7809 Wyatt Way SESP SFD O 0 0 1 2/6/19 1 N
159-610-088 1702 Waterside Ln SESP SFD O 0 0 1 2/14/19 1 N
159-610-089 1706 Waterside Ln SESP SFD O 0 0 1 2/20/19 1 N
159-610-090 1710 Waterside Ln SESP SFD O 0 0 1 2/20/19 1 N
159-610-091 1714 Waterside Ln SESP SFD O 0 0 1 2/26/19 1 N
159-610-092 1718 Waterside Ln SESP SFD O 0 0 1 4/5/19 1 N
159-610-093 1722 Waterside Ln SESP SFD O 0 0 1 4/5/19 1 N
159-610-094 1726 Waterside Ln SESP SFD O 0 0 1 8/13/19 1 N
159-610-095 1730 Waterside Ln SESP SFD O 0 0 1 8/14/19 1 N
159-610-096 1734 Waterside Ln SESP SFD O 0 0 1 8/14/19 1 N
159-610-103 1659 Winterberry Ln SESP SFD O 0 0 1 1/4/19 1 N
159-610-104 1655 Winterberry Ln SESP SFD O 0 0 1 1/14/19 1 N
159-610-105 1651 Winterberry Ln SESP SFD O 0 0 1 1/25/19 1 N
159-620-013 2049 Kingwood Road Vast Oak SFD O 0 1 4/2/19 1 1 11/13/19 1 N
159-620-014 2053 Kingwood Road Vast Oak SFD O 0 1 4/2/19 1 1 11/15/19 1 N
159-620-015 2057 Kingwood Road Vast Oak SFD O 0 1 4/2/19 1 1 11/13/19 1 N
159-620-016 2061 Kingwood Road Vast Oak SFD O 0 1 4/2/19 1 1 11/6/19 1 N
159-620-017 2065 Kingwood Road Vast Oak SFD O 0 1 4/2/19 1 1 11/8/19 1 N
159-620-018 2069 Kingwood Road Vast Oak SFD O 0 1 4/2/19 1 1 10/29/19 1 N
159-620-019 2073 Kingwood Vast Oak SFD O 0 0 1 6/25/2019 1 N
159-620-020 2077 Kingwood Vast Oak SFD O 0 0 1 6/26/2019 1 N
159-620-021 2081 Kingwood Road Vast Oak SFD O 0 0 1 7/22/19 1 N
159-620-022 2085 Kingwood Road Vast Oak SFD O 0 0 1 6/7/19 1 N
159-620-023 2089 Kingwood Road Vast Oak SFD O 0 0 1 5/29/19 1 N
159-620-024 2093 Kingwood Road Vast Oak SFD O 0 0 1 5/29/19 1 N
159-620-025 2101 Kingwood Road Vast Oak SFD O 0 0 1 3/27/19 1 N
159-620-026 2105 Kingwood Road Vast Oak SFD O 0 0 1 4/8/19 1 N
159-620-027 2109 Kingwood Road Vast Oak SFD O 0 0 1 3/28/19 1 N
159-620-028 2113 Kingwood Road Vast Oak SFD O 0 0 1 3/28/19 1 N
159-620-029 2117 Kingwood Road Vast Oak SFD O 0 0 1 3/27/19 1 N
159-620-030 2121 Kingwood Road Vast Oak SFD O 0 0 1 3/27/19 1 N
159-620-034 2137 Kingwood Road Vast Oak SFD O 0 0 1 1/16/19 1 N
159-620-037 2149 Kingwood Road Vast Oak SFD O 0 0 1 1/30/19 1 N
159-620-038 2153 Kingwood Road Vast Oak SFD O 0 0 1 3/15/19 1 N
159-620-041 2165 Kingwood Road Vast Oak SFD O 0 0 1 3/5/19 1 N
159-620-042 2169 Kingwood Road Vast Oak SFD O 0 0 1 1/24/19 1 N
159-620-043 2173 Kingwood Road Vast Oak SFD O 0 1 2/27/19 1 1 9/13/19 1 N
159-620-044 2177 Kingwood Road Vast Oak SFD O 0 1 2/27/19 1 1 9/18/19 1 N
159-620-045 2181 Kingwood Road Vast Oak SFD O 0 1 2/27/19 1 1 9/26/19 1 N
159-620-073 2068 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-074 2064 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-075 2060 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-076 2056 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-077 2052 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-078 2048 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-079 2044 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-080 2040 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
1
Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building Permits Affordability by Household Incomes - Certificates of Occupancy
4 7 10
(CCR Title 25 §6202)
Note: "+" indicates an optional field
Housing with Financial Assistance
and/or Deed Restrictions Demolished/Destroyed UnitsProject Identifier
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Note: "+" indicates an optional field
159-620-081 2036 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-082 2032 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-083 2028 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-084 2024 Karen Place Vast Oak SFD O 0 1 12/20/2019 1 0 N
159-620-085 2020 Karen Place Vast Oak SFD O 0 1 10/15/2019 1 0 N
159-620-086 2016 Karen Place Vast Oak SFD O 0 1 10/15/2019 1 0 N
159-620-087 2012 Karen Place Vast Oak SFD O 0 1 10/15/2019 1 0 N
159-620-088 2008 Karen Place Vast Oak SFD O 0 1 10/15/2019 1 0 N
159-620-089 2004 Karen Place Vast Oak SFD O 0 1 10/15/2019 1 0 N
159-620-090 2000 Karen Place Vast Oak SFD O 0 1 10/15/2019 1 0 N
159-620-091 2023 Karen Place Vast Oak SFD O 0 1 6/19/2019 1 0 N
159-620-092 2019 Karen Place Vast Oak SFD O 0 1 6/19/2019 1 0 N
159-620-093 2015 Karen Place Vast Oak SFD O 0 1 6/19/2019 1 0 N
159-620-094 2011 Karen Place Vast Oak SFD O 0 1 6/19/2019 1 0 N
159-620-095 2007 Karen Place Vast Oak SFD O 0 1 6/19/2019 1 0 N
159-620-096 2003 Karen Place Vast Oak SFD O 0 1 6/19/2019 1 0 N
159-620-097 2208 Kaitlyn Place Vast Oak SFD O 0 1 6/19/19 1 1 12/19/19 1 N
159-620-098 2204 Kaitlyn Place Vast Oak SFD O 0 1 6/19/19 1 1 12/20/19 1 N
159-620-099 2200 Kaitlyn Place Vast Oak SFD O 0 1 6/19/19 1 1 12/19/19 1 N
159-630-001 5501 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 8/30/19 1 N
159-630-002 5505 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 8/15/19 1 N
159-630-003 5509 Kennedy Place Vast Oak SFD O 0 1 1/24/2019 1 0 N
159-630-004 5513 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 8/14/19 1 N
159-630-005 5517 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 8/13/19 1 N
159-630-036 5510 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 9/13/19 1 N
159-630-037 5506 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 9/16/19 1 N
159-630-038 5502 Kennedy Place Vast Oak SFD O 0 1 1/24/19 1 1 9/17/19 1 N
159-630-039 1901 Kendal Place Vast Oak SFD O 0 1 1/24/19 1 1 9/25/19 1 N
159-630-040 1905 Kendal Place Vast Oak SFD O 0 1 1/24/19 1 1 10/1/19 1 N
159-630-041 1909 Kendal Place Vast Oak SFD O 0 1 1/24/19 1 1 9/25/19 1 N
159-630-042 5601 Kelsey Place Vast Oak SFD O 0 1 2/22/19 1 1 11/19/19 1 N
159-630-043 5605 Kelsey Place Vast Oak SFD O 0 1 2/22/19 1 1 11/22/19 1 N
159-630-044 5609 Kelsey Place Vast Oak SFD O 0 1 2/22/19 1 1 11/22/19 1 N
159-630-045 5613 Kelsey Place Vast Oak SFD O 0 1 2/22/19 1 1 11/25/19 1 N
159-630-046 5617 Kelsey Place Vast Oak SFD O 0 1 2/22/19 1 1 11/22/19 1 N
159-630-047 5621 Kelsey Place Vast Oak SFD O 0 1 2/22/19 1 1 11/25/19 1 N
159-630-048 5625 Kelsey Place Vast Oak SFD O 0 1 2/22/2019 1 0 N
159-630-049 5629 Kelsey Place Vast Oak SFD O 0 1 2/22/2019 1 0 N
159-630-050 5633 Kelsey Place Vast Oak SFD O 0 1 2/22/2019 1 0 N
159-630-051 5637 Kelsey Place Vast Oak SFD O 0 1 2/22/2019 1 0 N
159-630-052 5641 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-053 5645 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-054 5649 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-055 5653 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-056 5657 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-057 5661 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-058 5665 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-059 5669 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-060 5673 Kelsey Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-630-061 5668 Kelsey Place Vast Oak SFD O 0 0 1 4/30/19 1 N
159-630-062 5664 Kelsey Place Vast Oak SFD O 0 0 1 6/25/19 1 N
159-630-063 5660 Kelsey Place Vast Oak SFD O 0 0 1 6/27/19 1 N
159-630-064 5656 Kelsey Place Vast Oak SFD O 0 0 1 5/13/19 1 N
159-630-065 5652 Kelsey Place Vast Oak SFD O 0 0 1 6/27/19 1 N
159-630-066 5648 Kelsey Place Vast Oak SFD O 0 0 1 7/9/19 1 N
159-630-067 5644 Kelsey Place Vast Oak SFD O 0 0 1 7/8/19 1 N
159-630-068 5640 Kelsey Place Vast Oak SFD O 0 0 1 7/8/19 1 N
159-630-069 5636 Kelsey Place Vast Oak SFD O 0 0 1 5/24/19 1 N
159-630-070 5632 Kelsey Place Vast Oak SFD O 0 0 1 10/7/19 1 N
159-630-071 5628 Kelsey Place Vast Oak SFD O 0 0 1 10/18/19 1 N
159-630-072 5624 Kelsey Place Vast Oak SFD O 0 0 1 10/21/19 1 N
159-630-073 5620 Kelsey Place Vast Oak SFD O 0 0 1 10/24/19 1 N
159-630-074 5616 Kelsey Place Vast Oak SFD O 0 0 1 10/24/19 1 N
159-630-075 5612 Kelsey Place Vast Oak SFD O 0 0 1 10/25/19 1 N
159-630-076 5608 Kelsey Place Vast Oak SFD O 0 0 1 10/28/19 1 N
159-630-077 5604 Kelsey Place Vast Oak SFD O 0 0 1 10/29/19 1 N
159-640-010 5639 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-011 5643 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-012 5647 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-013 5651 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-014 5655 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-015 5659 Kameron Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-640-016 5663 Kameron Place Vast Oak SFD O 0 1 6/12/19 1 1 12/9/19 1 N
159-640-017 5667 Kameron Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-640-018 5671 Kameron Place Vast Oak SFD O 0 1 6/12/19 1 1 11/26/19 1 N
159-640-019 5674 Kameron Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-640-020 5670 Kameron Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-640-021 5666 Kameron Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-640-022 5662 Kameron Place Vast Oak SFD O 0 1 6/12/2019 1 0 N
159-640-023 5658 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-024 5654 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-025 5650 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-026 5646 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-027 5642 Kameron Place Vast Oak SFD O 0 1 9/30/2019 1 0 N
159-640-063 5744 Kassandra Place Vast Oak SFD O 0 0 1 2/1/19 1 N
159-650-047 5807 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-048 5811 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-049 5815 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-050 5819 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-055 5858 Kittyhawk Place Vast Oak SFD O 0 1 4/12/19 1 1 7/3/19 1 N
159-650-056 5854 Kittyhawk Place Vast Oak SFD O 0 1 4/12/19 1 1 7/3/19 1 N
159-650-057 5850 Kittyhawk Place Vast Oak SFD O 0 1 9/19/2019 1 0 N
159-650-066 5814 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-067 5810 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-068 5806 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-069 5802 Kittyhawk Place Vast Oak SFD O 0 1 11/18/2019 1 0 N
159-650-070 5901 Keegan Place Vast Oak SFD O 0 1 6/25/2019 1 0 N
159-650-071 5905 Keegan Place Vast Oak SFD O 0 1 6/25/2019 1 0 N
159-650-072 5909 Keegan Place Vast Oak SFD O 0 1 6/25/2019 1 0 N
159-650-073 5913 Keegan Place Vast Oak SFD O 0 1 6/25/2019 1 0 N
159-650-074 5917 Keegan Place Vast Oak SFD O 0 1 6/25/2019 1 1 12/13/2019 1 N
159-650-075 5921 Keegan Place Vast Oak SFD O 0 1 6/25/19 1 1 11/27/19 1 N
159-650-076 5925 Keegan Place Vast Oak SFD O 0 1 6/25/19 1 1 11/25/19 1 N
159-650-077 5929 Keegan Place Vast Oak SFD O 0 1 6/13/19 1 1 12/9/19 1 N
159-650-078 5933 Keegan Place Vast Oak SFD O 0 1 6/13/19 1 1 11/22/19 1 N
159-650-079 5937 Keegan Place Vast Oak SFD O 0 1 6/13/19 1 1 11/25/19 1 N
159-650-080 5941 Keegan Place Vast Oak SFD O 0 1 6/13/19 1 1 12/10/19 1 N
159-650-081 5945 Keegan Place Vast Oak SFD O 0 1 6/13/19 1 1 11/25/19 1 N
159-660-001 1708 Wildflower Way SESP SFD O 0 1 6/26/19 1 1 12/20/19 1 N
159-660-002 1712 Wildflower Way SESP SFD O 0 1 6/26/2019 1 0 N
159-660-003 1716 Wildflower Way SESP SFD O 0 1 6/26/2019 1 0 N
159-660-004 1720 Wildflower Way SESP SFD O 0 1 6/26/2019 1 0 N
159-660-005 1724 Wildflower Way SESP SFD O 0 1 6/26/2019 1 0 N
159-660-006 1728 Wildflower Way SESP SFD O 0 1 6/27/2019 1 0 N
159-660-007 1732 Wildflower Way SESP SFD O 0 1 7/17/2019 1 0 N
159-660-008 1736 Wildflower Way SESP SFD O 0 1 7/17/2019 1 0 N
159-660-058 1711 Warmstone Way SESP SFD O 0 1 10/22/2019 1 0 N
159-660-059 1715 Warmstone Way SESP SFD O 0 1 10/22/2019 1 0 N
159-660-060 1714 Warmstone Way SESP SFD O 0 1 9/3/2019 1 0 N
159-660-061 1710 Warmstone Way SESP SFD O 0 1 9/3/2019 1 0 N
159-660-062 7545 Windward Drive SESP SFD O 0 1 9/3/2019 1 0 N
159-660-063 7549 Windward Drive SESP SFD O 0 1 9/3/2019 1 0 N
159-660-064 7537 Windward Drive SESP SFD O 0 1 8/16/2019 1 0 N
159-660-065 7541 Windward Drive SESP SFD O 0 1 8/16/2019 1 0 N
159-660-066 7529 Windward Drive SESP SFD O 0 1 7/30/2019 1 0 N
159-660-067 7533 Windward Drive SESP SFD O 0 1 8/16/2019 1 0 N
159-660-068 7521 Windward Drive SESP SFD O 0 1 7/30/2019 1 0 N
159-660-069 7525 Windward Drive SESP SFD O 0 1 7/30/2019 1 0 N
159-660-070 7513 Windward Drive SESP SFD O 0 1 7/30/2019 1 0 N
159-660-071 7517 Windward Drive SESP SFD O 0 1 7/30/2019 1 0 N
159-660-072 7505 Windward Drive SESP SFD O 0 1 7/30/2019 1 0 N
159-660-073 7509 Windward Drive SESP SFD O 0 1 7/17/2019 1 0 N
159-660-078 7706 Wildrose Way SESP SFD O 0 1 6/17/2019 1 0 N
159-660-079 7710 Wildrose Way SESP SFD O 0 1 6/17/2019 1 0 N
159-660-080 7714 Wildrose Way SESP SFD O 0 1 6/17/2019 1 0 N
159-660-081 7718 Wildrose Way SESP SFD O 0 1 6/17/19 1 1 12/27/19 1 N
159-660-082 7722 Wildrose Way SESP SFD O 0 1 5/31/19 1 1 12/23/19 1 N
159-660-083 7726 Wildrose Way SESP SFD O 0 1 5/31/2019 1 0 N
159-660-084 7730 Wildrose Way SESP SFD O 0 1 5/31/2019 1 0 N
159-660-085 7734 Wildrose Way SESP SFD O 0 1 5/31/19 1 1 12/18/19 1 N
159-660-086 7738 Wildrose Way SESP SFD O 0 1 5/9/19 1 1 12/18/19 1 N
159-660-087 7742 Wildrose Way SESP SFD O 0 1 5/9/19 1 1 12/20/19 1 N
159-660-088 7746 Wildrose Way SESP SFD O 0 1 5/9/19 1 1 12/20/19 1 N
159-660-089 7750 Wildrose Way SESP SFD O 0 1 5/9/19 1 1 12/18/19 1 N
159-660-090 1702 Warmstone Way SESP SFD O 0 1 5/9/19 1 1 12/27/19 1 N
159-660-091 1706 Warmstone Way SESP SFD O 0 1 5/9/2019 1 0 N
159-660-092 1707 Warmstone Way SESP SFD O 0 1 10/22/2019 1 0 N
159-660-093 1703 Warmstone Way SESP SFD O 0 1 10/22/2019 1 0 N
159-660-094 7602 Wildrose Way SESP SFD O 0 1 11/4/2019 1 0 N
159-660-095 7606 Wildrose Way SESP SFD O 0 1 11/4/2019 1 0 N
159-660-096 7610 Wildrose Way SESP SFD O 0 1 11/4/2019 1 0 N
159-660-097 7614 Wildrose Way SESP SFD O 0 1 11/4/2019 1 0 N
159-660-098 7618 Wildrose Way SESP SFD O 0 1 11/12/2019 1 0 N
159-660-114 7619 Wildrose Way SESP SFD O 0 1 11/12/2019 1 0 N
159-660-115 7615 Wildrose Way SESP SFD O 0 1 11/12/2019 1 0 N
159-660-116 7611 Wildrose Way SESP SFD O 0 1 11/4/2019 1 0 N
159-660-117 7607 Wildrose Way SESP SFD O 0 1 11/12/2019 1 0 N
159-660-118 7603 Wildrose Way SESP SFD O 0 1 10/22/2019 1 0 N
159-660-119 7741 Wildrose Way SESP SFD O 0 1 5/9/2019 1 0 N
159-660-120 7739 Wildrose Way SESP SFD O 0 1 5/9/19 1 1 12/16/19 1 N
159-660-121 7735 Wildrose Way SESP SFD O 0 1 5/22/19 1 1 12/16/19 1 N
159-660-122 7731 Wildrose Way SESP SFD O 0 1 6/5/19 1 1 12/16/19 1 N
159-660-123 7727 Wildrose Way SESP SFD O 0 1 6/5/19 1 1 12/17/19 1 N
159-660-124 7723 Wildrose Way SESP SFD O 0 1 6/5/19 1 1 12/17/19 1 N
159-660-125 7719 Wildrose Way SESP SFD O 0 1 6/5/19 1 1 12/16/19 1 N
159-660-126 7715 Wildrose Way SESP SFD O 0 1 6/17/19 1 1 12/18/19 1 N
159-660-127 7711 Wildrose Way SESP SFD O 0 1 5/31/19 1 1 12/23/19 1 N
159-660-128 7707 Wildrose Way SESP SFD O 0 1 5/31/19 1 1 12/27/19 1 N
159-660-129 7703 Wildrose Way SESP SFD O 0 1 6/17/19 1 1 12/23/19 1 N
0 0 0
0 0 0
0 0 0
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Note: "+" indicates an optional field
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Note: "+" indicates an optional field
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Note: "+" indicates an optional field
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Note: "+" indicates an optional field
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation
(CCR Title 25 §6202)
1 3 4
RHNA Allocation
by Income Level 2015 2016 2017 2018 2019 2020 2021 2022 2023 Total Units to
Date (all years)
Total Remaining
RHNA by Income
Level
Deed Restricted 109 7
Non-Deed Restricted
Deed Restricted 109
Non-Deed Restricted
Deed Restricted 2
Non-Deed Restricted 1 13 3
Above Moderate 484 244 161 165 371 306 1247
899
244 162 178 594 313 1491 173
Note: units serving extremely low-income households are included in the very low-income permitted units totals
Cells in grey contain auto-calculation formulas
108
116
This table is auto-populated once you enter your jurisdiction name and current year data. Past
year information comes from previous APRs.
19Moderate
181
107
127
Please contact HCD if your data is different than the material supplied here
109
2
Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
65
Total RHNA
Total Units
Income Level
Very Low
Low
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2019 (Jan. 1 - Dec. 31)Housing Element Implementation
Date of Rezone Type of Shortfall
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very Low-Income Low-Income Moderate-Income Above Moderate-
Income
Type of Shortfall Parcel Size
(Acres)
General Plan
Designation Zoning Minimum
Density Allowed
Maximum
Density Allowed
Realistic
Capacity Vacant/Nonvacant Description of Existing
Uses
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Summary Row: Start Data Entry Below
83
Project Identifier RHNA Shortfall by Household Income Category Sites Description
1
Sites Identified or Rezoned to Accommodate Shortfall Housing Need
Table C
Jurisdiction Rohnert Park
Reporting Year 2019 (Jan. 1 - Dec. 31)
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation
The City shall continue to
work with regional
agencies to ensure an
adequate long-term water
supply and wastewater
disposal system.
Facilitate residential development within
the growth areas Ongoing
Presently processing several Specific Plans and revisions of existing Specific
Plans. The Eastside Trunk Sewer Line project was completed in 2014 which
provide sewer capacity for new housing development on the eastside of the
community.
During the application and
review process for
Specific Plans, ensure that
they provide for the
diversity of housing types
specified in the Land Use
and Growth Management
Element.
Promote a diversity of housing types.Ongoing
The approved Specific Plans in Rohnert Park provide a diversity of housing types.
Additional apartment complexes and single homes were under construction in
2019. This includes very low-, low-, and moderate-income units.
Continue to publicize
openings on City boards
and commissions through
several newspapers.
Receive community wide representation
on boards and commissions.Ongoing The City advertises vacancies on boards and commissions in the local
newspaper and on the City web site.
Require the planting of
trees as part of residential
projects to provide
cooling during the
summer months.
Reduce the impact of summer heat on
parked vehicles and provide a more
pleasant living environment.
Ongoing
In open parking areas, the Zoning Ordinance requires the planting of one tree for
every four (4) parking spaces. Landscaped setbacks are required in all new
residential projects.
The City shall develop a
procedure to provide
expedited review where
possible for affordable
housing developments
(i.e., projects in which all
units are affordable to
moderate-, low-, very low-,
or extremely low-income
households).
To provide housing for low and
moderate income households.Ongoing
Affordable housing projects are proposed in several of the City's Specific Plan
areas and construction is expected to be completed during the RHNA period. The
City is working with the affordable housing developers to expedite the
development as much as possible. In 2020, we expect the 218 all-affordable
housing units at Redwoods at University District (formerly known as "Parkside")
to be completed and occupied.
The City shall develop and
distribute information
about Sonoma County
Community Development
Commission's (CDCRP)
rehabilitation programs to
individuals with
disabilities, seniors and
the elderly and advocacy
groups that represent
these special needs
groups.
To provide housing for individuals with
disabilities, seniors and the elderly.Ongoing Upon request the City will make this information available.
The City shall reach out
annually to developers of
supportive housing to
encourage development of
projects targeted for
persons with disabilities
including developmental
disabilities. The City shall
support applications for
County, State and Federal
funding in support of
housing construction and
rehabilitation for persons
with disabilities, including
developmental disabilities.
To provide housing for persons with
disabilities including developmental
disabilities.
Ongoing
While the City does not have a specific program to provide housing for persons
with disabilities, a certain number of units within each apartment project are
required to be accessible to individuals with disabilities. The City supports the
programs of the Sonoma County, Community Development Commission to assist
persons with disabilities.
The City shall post
information regarding
local, State and Federal
fair housing programs in
public places, such as City
Hall, the Community
Center, the Senior Center
and local post offices.
To provide information regarding fair
housing programs.Ongoing This information is available at City Hall and will be made available at other
locations upon request.
The City shall continue to
partner with Sonoma
County Community
Development Commission
on housing rehabilitation
program for low- and
moderate-income
households.
To provide information to low- and
moderate-income households on
housing rehabilitation.
Ongoing The City will continue this partnership.
The City shall maintain
guidelines and sample
plans to assist owners of
wood-frame homes in
adequately securing
structures to foundations
and providing bracing
against earthquakes.
To assist homeowners in securing their
homes to foundations and providing
bracing against earthquakes.
Ongoing Most home bracing is performed by contractors who submit plans to the City for
approval and issuance of a Building Permit.
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing
element.
Table D
Program Implementation Status pursuant to GC Section 65583
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
(CCR Title 25 §6202)
The City shall implement
actions and programs
prescribed in the Housing
Element in a timely
manner. The City shall
monitor and annually
report on its progress in
implementing the policies
and programs in the
Housing Element Annual
Report to the California
Department of Housing
and Community
Development and the
Office of Planning and
Research before April 1
each year.
Annual Report to the HCD and OPR Ongoing The City reports annually to the HCD and OPR by April 1.
Annual Progress Report January 2020
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2019 (Jan. 1 - Dec. 31)Housing Element Implementation
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7
Table E
Note: "+" indicates an optional field
Project Identifier
1 2
(CCR Title 25 §6202)
Cells in grey contain auto-calculation
formulas
Annual Progress Report January 2020
Jurisdiction Rohnert Park ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field
Reporting Period 2019 (Jan. 1 - Dec. 31)Housing Element Implementation Cells in grey contain auto-calculation formulas
(CCR Title 25 §6202)
Extremely Low-
Income+Very Low-Income+Low-Income+TOTAL UNITS+
Extremely Low-
Income+
Very Low-
Income+Low-Income+TOTAL UNITS+
Rehabilitation Activity
Preservation of Units At-Risk
Acquisition of Units
Total Units by Income
Table F
This table is optional. Jurisdictions may list (for informational purposes only) units that do not count toward RHNA, but were substantially rehabilitated, acquired or preserved. To enter units in this table as progress toward RHNA, please contact HCD at
APR@hcd.ca.gov. HCD will provide a password to unlock the grey fields. Units may only be credited to the table below when a jurisdiction has included a program in its housing element to rehabilitate, preserve or acquire units to accommodate a portion of its
RHNA which meet the specific criteria as outlined in Government Code section 65583.1(c)(2).
Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be
counted, please contact HCD to receive the password that will enable you
to populate these fields.The description should adequately document how each
unit complies with subsection (c)(7) of Government
Code Section 65583.1+
Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c)(2)
Jurisdiction Rohnert Park
Reporting Period 2019 (Jan. 1 - Dec. 31)
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
4
APN Street Address Project Name+Local Jurisdiction
Tracking ID+
Realistic Capacity
Identified in the
Housing Element
Entity to whom the site
transferred Intended Use for Site
1
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of
Project Identifier
NOTE: This table must only be filled out if the housing element sites
inventory contains a site which is or was owned by the reporting
jurisdiction, and has been sold, leased, or otherwise disposed of
during the reporting year.
Jurisdiction Rohnert Park
Reporting Year 2019 (Jan. 1 - Dec. 31)
Current Year
Deed Restricted 7
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
306
313
0
0
0
0
0
0
0
0
Income Rental Ownership Total
Very Low 0 0 0
Low 0 0 0
Moderate 0 0 0
Above Moderate 0 0 0
Total 0 0 0
Cells in grey contain auto-calculation formulas
Income Level
Very Low
Low
Moderate
Above Moderate
Units Constructed - SB 35 Streamlining Permits
Number of Streamlining Applications Approved
Total Developments Approved with Streamlining
Total Units Constructed with Streamlining
Total Housing Applications Submitted:
Number of Proposed Units in All Applications Received:
Total Housing Units Approved:
Total Housing Units Disapproved:
Total Units
Housing Applications Summary
Use of SB 35 Streamlining Provisions
Note: Units serving extremely low-income households are included in the very low-
income permitted units totals
Number of Applications for Streamlining
Building Permits Issued by Affordability Summary
1
CITY OF ROHNERT PARK
PLANNING COMMISSION STAFF REPORT
Meeting Date:
Item No:
Prepared By:
Agenda Title:
Location:
June 4, 2020
6.4
Eydie Tacata, Management Analyst
PLCI20-0001/City of Rohnert Park/FY 2020-21 Capital Improvements
Program/General Plan Consistency
Citywide
Applicant/Owner: City of Rohnert Park
RECOMMENDED ACTION: Based on the analysis and findings of this report and the
attached resolution, Staff recommends that the Planning Commission, by motion, adopt Planning
Commission Resolution No. 2020-10 reporting to the City Council that the proposed FY 2020-21
Capital Improvements Program is consistent with the Rohnert Park General Plan 2020.
BACKGROUND: The Planning Commission is charged with the responsibility for ensuring that
adopted plans are consistent with goals and policies of the adopted General Plan. The Planning
Commission is being requested to review the attached proposed FY 2020-21 Capital
Improvements Program (CIP) to determine consistency with the General Plan. The proposed FY
2020-21 CIP will be considered for adoption by the Rohnert Park City Council with the FY
2020-21 City Budget.
The CIP is a document that addresses the long-term capital improvement needs of the City (i.e.
public facilities, infrastructure improvements, and capital equipment needs). The CIP provides a
relatively long-term (five-year) strategy for physical facility and infrastructure investment, to be
approved annually in concept by the City Council. Every year, the City Council also considers
for approval a budget for the first year of the five-year CIP.
Section 65401 of the California Government Code requires that for agencies that have adopted a
general plan, a “coordinated program of proposed public works ensuing fiscal year” (i.e. a capital
2
improvement plan) is to be “submitted to the city planning agency for review…as to conformity
with the adopted general plan or part thereof.” The Planning Commission has been charged with
this responsibility by the City Council. The determination of consistency (or “conformity” as it is
sometimes called) is needed prior to the City Council’s adoption of the CIP as part of the budget
process. The Council will use the Commission’s determination for this purpose.
The proposed FY 2020-21 CIP is attached for the Commission’s reference. Staff has reviewed
these projects and recommends adoption of the attached resolution on finding the CIP consistent
with the General Plan. A discussion of the General Plan policies pertaining to the proposed Capital
Improvement Program projects follows.
ANALYSIS: The CIP has been reviewed for consistency with the goals and policies of the Rohnert
Park General Plan 2000 and has been found to be consistent. The following paragraphs summarize
the findings of consistency with the General Plan for each of the program areas in the CIP.
City Facilities. The FY 2020-21 CIP focuses on the preservation of City assets. To this end, the
CIP includes re-roofings of the Gold Ridge Center Multi-Use Building and Public Safety Northern
Station and continued implementation of the City’s updated Americans with Disabilities Act Self-
Evaluation and Transition Plan.
These projects are consistent with the following General Plan goals and policies:
General: Maintaining the ability of the City to maintain its facilities and provide adequate services
to its residents is consistent with the overall intent of both the public facilities and health and safety
elements of the General Plan.
Parks and Recreation. The CIP includes major maintenance and capital replacement projects for
parks and recreation facilities throughout the City, including projects at the Community Center;
Magnolia Pool; and reconstruction of off-street bicycle/pedestrian pathways. The CIP also
includes construction of new recreational facilities, including a new multi-use trail to Crane Creek
Regional Park to provide access from the urbanized area of Rohnert Park to nearby open space
resources.
This project is consistent with the following General Plan goals and policies:
OS-B: Maintain land surrounding the city as open space for the enjoyment of scenic beauty,
recreation, and protection of natural resources of the community.
OS-E: Maintain publicly owned open space areas in their natural state; provide public access
in a manner that is compatible with the conservation of habitat.
OS-F: Provide an integrated system of parks and trails throughout the City to meet the
community’s recreational needs.
OS-H Ensure adequate funding for parks and recreation facilities acquisition, development,
and maintenance.
3
Transportation. The FY 2020-21 CIP includes street, bike and pedestrian facility improvements
including pavement preservation projects such as overlays; street reconstruction projects; bicycle
and pedestrian path reconstruction, including accessibility upgrades; traffic signal system
improvements; and intersection improvements for optimizing traffic flow.
These improvements are consistent with the following General Plan goals and policies:
CD-I Ensure that neighborhood streets provide an attractive physical environment for
motorists, pedestrians, and cyclists.
CD-J Maintain the character of existing neighborhoods while undertaking streetscape and
signage improvements in selected areas.
CD-K Provide safe, convenient, and comfortable pedestrian connections within commercial
centers and between commercial centers and adjacent sites and residential
neighborhoods.
TR-A: Promote safe and efficient vehicular circulation throughout Rohnert Park.
TR-B: Maintain high levels of mobility along all major street segments and at major
intersections.
TR-C: Build new roads and improve existing roadways, where necessary, in conjunction with
new development.
TR-F: Encourage alternative modes of travel….
TR-2: Ensure that mitigation measures are coordinated with roadway improvements
programmed for funding through transportation-related impact fees.
TR-6, TR-11, and TR-12: Use the City's Capital Improvement Program as a means to prioritize
and undertake roadway improvements….; to prioritize and undertake the intersection
improvements….; and to establish priorities for roadway improvements and prepare
an action program for implementation.
TR-N: Promote safe, efficient, and comfortable circulation for cyclists and pedestrians
throughout Rohnert Park.
TR-R: Continue to develop a comprehensive network of bikeways that promote bicycle
riding for transportation and recreation.
TR-T Balance the need of arterial and collector roadways to efficiently carry traffic, with
establishing Central Rohnert Park as a walkable, bikable community, with pedestrian-
oriented streets, centers, and mixed-use subareas.
TR-47 Retrofit existing streets as complete streets, in addition to providing vehicular access
that supports safe and continuous bike and pedestrian facilities and landscape
improvements.
Water System. The proposed CIP includes various improvements to the water system, including
upgrading water pipelines; replacing large commercial water meters; replacing aging well pumps
and motors; and upgrade of controls and telemetry to better monitor well production and overall
distribution and flow water supply and fire suppression.
4
These projects are consistent with the following General Plan goals and policies:
PF-E: Provide sufficient quantities of water for Rohnert Park residents and businesses, while
ensuring that safe groundwater is not exceeded.
PF-11: monitor the operation of the municipal well field on a monthly basis to ensure that
production does not exceed the recharge rates….
Wastewater System. The proposed CIP includes projects that preserve the sewer collection
system such as sewer pipe lining, manhole rehabilitation, and improvements at the Rohnert Park
Pump Station replacement of variable frequency drives and motors. Sewer upgrades to serve the
new Downtown are also planned in the early implementation of this CIP.
These projects are consistent with the following General Plan goals and policies:
PF-D: Ensure that adequate wastewater facilities and services are available to meet the needs
of existing and new development.
ENVIRONMENTAL DETERMINATION: The recommended finding of consistency is not a
project pursuant to Section 15378 of the California Environmental Quality Act Guidelines
(CEQA) and additionally, since this is a consistency finding the previous environmental
documentation for the General Plan is adequate CEQA documentation.
PUBLIC NOTIFICATION: Pursuant to Government Code Section 65401 and City Ordinance,
no public hearing is required to report on the Capital Improvement Program’s consistency with the
General Plan.
Planning Manager Approval Date: June 2, 2020
Attachments (list in packet assembly order):
1. Planning Commission Resolution No. 2020-10
2. FY 2020-21 Capital Improvements Program: Project Descriptions
PLANNING COMMISSION RESOLUTION NO. 2020-10
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT
PARK FINDING THE FY 2020-21 CAPITAL IMPROVEMENTS PROGRAM IS
CONSISTENT WITH THE ROHNERT PARK GENERAL PLAN 2020
File No. PLCI20-0001
(City of Rohnert Park)
WHEREAS, on July 25, 2000 the City Council approved Resolution No. 2000-152
adopting a comprehensive update of the City's General Plan which included specific policies and
objectives for infrastructure, construction and maintenance of public facilities; and
WHEREAS, the Planning Commission is appointed by the City Council as the Planning
Agency for the City of Rohnert Park and is required by State law to review and find that all
proposed projects included in the Capital Improvement Program (CIP) as provided in Exhibit A
are consistent with the adopted General Plan; and
WHEREAS, in accordance with the California Environmental Quality Act, the Project
manager has determined that finding the Capital Improvement Program in conformance with the
General Plan is not a project pursuant to Section 15378 of the CEQA Guidelines, and additionally,
since this is consistency finding, the previous environmental documentation for the General Plan
is adequate CEQA documentation; and
WHEREAS, on June 4, 2020, the Planning Commission reviewed Planning Application
No. PLCI20-0001 FY 2020-21 Capital Improvement Program General Plan Consistency, at which
time interested persons had an opportunity to testify either in support or opposition to the project;
and,
WHEREAS, at the June 4, 2020 Planning Commission special meeting, upon hearing and
considering all testimony and arguments, if any, of all persons desiring to be heard, the
Commission considered all the facts relating to PLCI20-0001 FY 2020-21 Capital Improvement
Program General Plan Consistency.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ROHNERT PARK DOES RESOLVE: that the Planning Commission of the City of Rohnert
Park does hereby find that the proposed FY 2020-21 Capital Improvement Program, as attached
and incorporated herein, is consistent with the adopted City of Rohnert Park Comprehensive
General Plan and incorporates all information and comment provided at its June 4, 2020 public
meeting as part of its finding, including the staff report.
NOW THEREFORE BE IT FURTHER RESOLVED, that the Planning Commission
does hereby report to the City Council that FY 2020-21 Capital Improvement Program, Planning
Application No. PLCI20-0001 is consistent with the Rohnert Park General Plan 2020.
Reso 2020-10
2
DULY AND REGULARLY ADOPTED on this 4th day of June, 2020 by the City of
Rohnert Park Planning Commission by the following vote:
AYES: _____ NOES:_____ ABSENT:_____ ABSTAIN:_____
BLANQUIE _____BORBA_____GIUDICE_____HAYDON____ORLOFF____
__
Daniel Blanquie, Chairperson, Rohnert Park Planning Commission
Attest: __________________________________________
Jennifer Sedna, Recording Secretary
Attachments: Exhibit A
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
1
CIP #Proj. #Project Title Description Location Funding Source Project Status
CITY FACILITIES
OF-65 2017-24 Gold Ridge Multi-Use
Building Roof Replacement
At Gold Ridge Recreation Center, re-roof of
Multi-Use Building. (Demolition of
Administrative Building was previously included
in original project; this work will be addressed
as a separate project instead.)
Gold Ridge Recreation
Center (1455 Golf
Course Drive)
Infrastructure Reserve Construction anticipated for
Summer 2020.
OF-72 2018-27 ADA Transition Plan
Implementation
Implementation of measures to comply with
Americans with Disabilities Act (ADA) standards
for accessibility, as recommended in City's
updated ADA Self-Evaluation and Transition
Plan.
City-owned facilities Infrastructure Reserve Modifications and upgrades to City
facilities through 2020.
OF-76 2019-23 Public Safety Northern
Station Roof Replacement Replace roof at Northern Fire Station
Northern Fire Station
(5200 Country Club
Drive)
Infrastructure Reserve Fund Repairs in Summer 2020.
OF-78 2019-27 Buildings Major Repairs Various major repair and maintenance projects Citywide Infrastructure Reserve Fund Ongoing program as current
funding allows.
OF-83 2020-24 Habitat Mitigation &
Monitoring Plan
Biological resource mitigation (e.g. native plant
re-estasblishment) in conjunction with CEQA,
NEPA and/or resource agency environmental
requirements for capital projects
Various locations in
accordance with
project environmental
document, mitigation
and monitoring plan
Public Facilities Fee
Coordinating with Water Agency
for hand off to their maintenance
plan for Eastside Trunk Sewer
mitigation. Currently have 3 years
left for Water Tank 8 Mitigation
Monitoring.
PARKS AND RECREATION
PR-49 2007-19 Trail to Crane Creek
Regional Park
Construction of multi-use trail connecting
service road to Water Tank No. 8 east of
Petaluma Hill Road to Crane Creek Regional
Park. This trail is part of a multi-phased project
connecting the Copeland Creek Bike Path at its
terminus in Sonoma State University to the
regional park.
East of Petaluma Hill
Road
Open Space District matching
grant, City in-kind match (staff
time, value of water tank service
road), Transportation
Development Act Article 3 (TDA3)
allocation
Phase 1 - Segment A (water tank
service road) is constructed. Phase
1- Segment B (multi-use trail from
water tank road to Crane Creek
Regional Park) is undergoing
engineering and design. Traffic
signal is undergoing engineering
and design.
Exhibit A to Resolution
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
2
CIP #Proj. #Project Title Description Location Funding Source Project Status
OF-63 2017-22
Neighborhood Upgrades:
Creek Path and Sidewalk
Replacement
Replacement of asphalt bicycle/pedestrian
paths in various locations with concrete path;
replacement of damaged concrete sidewalk
Locations for 2020-21
phase TBD, dependent
on funding
Infrastructure Reserve,
Neighborhood Upgrade Fund,
Gas Tax, Casino Supplemental
Contribution, Wilfred Lane
Maintenance
Design for replacement standard is
complete. PDA connector path
design underway. Project locations
of next phase of construction to be
determined.
PR-119 2019-25 Community Center
Upgrades
Community Center Multi-Use Room flooring
replacement, various modifications and repairs
to storage rooms, doors
Rohnert Park
Community Center
(5401 Snyder Lane)
Rohnert Park Foundation,
Infrastructure Reserve
Project scoping complete.
Bids/quotes obtained. Awaiting
approval of FY 2020-21 CIP Budget
for construction.
PR-124 2020-30 Magnolia Pool Replastering Replastering of deteriorating pool surface Magnolia Pool Infrastructure Reserve
Project scoping complete. Awaiting
approval of FY 2020-21 CIP Budget
to initiate next phase of project.
TRANSPORTATION
TR-120 2018-34 Country Club Drive
Rehabilitation
Pavement treatment on segments of Country
Club Drive between Rohnert Park Expressway
and Eleanor Drive
Country Club Drive,
Rohnert Park
Expressway to Eleanor
Avenue
Gas Tax, Road Repair &
Accountablity Act ("SB 1") and
Refuse Road Impact Fund
Engineering and design for Country
Club Drive Overlay in progress.
Construction planned Fall 2020.
TR-126 2019-28 Traffic Signal System Non-
Routine Maintenace
Program of ongoing traffic signal system
components replacement
Various locations
Citywide
Road Maintenance and Repair
Act ("SB1"), Gas Tax, Casino
Supplemental Contribution
As needed infrastructure repairs on
a complaint/ needed basis.
Ongoing.
TR-128 2020-12 Railroad Adjacent Safety
Improvements
Pedestrian, bicycle, and vehicle safety
improvements in vicinity of SMART rail
crossings at Golf Course Drive, Rohnert Park
Expressway, and Southwest Boulevard
SMART rail crossings at
Golf Course Drive,
Rohnert Park
Expressway, and
Southwest Boulevard
Gas Tax, Measure M, Road
Maintenance and Repair Act
("SB1")
Study underway. Design for Phase
1 improvements expected to begin
Summer 2020, with
implementation once Federal
Railroad Authority and SMART
approve design.
TR-129 2020-19 ATMS Signal Integration Adding advanced traffic management system
(ATMS) network control of signals
4 arterial locations to
be determined
Casino Supplemental
Contribution
Awaiting approval of FY 2019-20
CIP Budget before project initiation.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
3
CIP #Proj. #Project Title Description Location Funding Source Project Status
TR-130 2020-20 Dowdell Avenue Alignment
Study
Conceptually laying out the alignment for
Dowdell Avenue to support growth in the NWSP
and Wilfred-Dowdell Specific Plan.
Dowdell Avenue
between Business Park
Drive and Golf Course
Drive West
Public Facilities Fee Analysis and design work expected
to start Fall 2020.
TR-131 2020-21 2020-21 Various Streets
Preventative Maintenance
Preventative mainenance treatments as guided
by Pavement Management Program
Locations TBD, pending
updated 2020
Pavement Mangement
Program report
Gas Tax, Road Repair &
Accountablity Act ("SB 1") and
Refuse Road Impact Fund
Performing preventative
maintenance on our streets per our
preventative maintenance
schedule. Design to begin fall 2020
with construction expected
Summer 2021.
TR-132 2020-22 Local Road Safety Plan
Data-driven traffic safety plan to identify and
analyze safety problems and recommend safety
improvements that reduce traffic accident
fatalities and serious injuries on City streets.
Citywide / Locations
TBD Federal transportation grant
Joined with 7 other agencies to
distribute a joint RFP for consultant
selection; Starting Fall 2020.
TR-133 2020-23
Southwest Blvd Rehab
(Roundabout to No Name
St)
Pavement rehabilitation of Southwest
Boulevard between Commerce Boulevard and
No Name Street
Southwest Blvd
(Commerce Boulevard
to No Name St)
Road Maintenance and Repair
Act ("SB1")
Awaiting approval of FY 2020-21
CIP Budget prior to initiation of
preliminary engineering and design.
TR-134 2020-25 Traffic Signal Infrastructure
Replacement
Replacement program of hardware, cabinets,
controllers,
Citywide, with priority
on main arterials
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-135 2020-26
Video Detection
Replacements
(Commerce/Redwood)
Replacement of video detection at select
intersections
Citywide, with priority
on main arterials
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-136 2020-27 Battery Backup / Battery
Replacement Program
Installation of battery backups for traffic signals,
replacement of existing batteries
Citywide, with priority
on main arterials
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-142 2020-28 RPX/Commerce Pedestrian
Safety Improvements
Implementation of pedestrian safety measures
which may include pedestrian refuge, enhanced
crossing, signal timing adjustments, intersection
reconfiguration.
Rohnert Park
Expressway at
Commerce Boulevard
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-84 2017-07 Southwest / Commerce
Roundabout
Conversion of existing Intersection into a
roundabout, as as informed by Traffic Signals
System Needs Study (TR-104) and Traffic Flow
Improvement Study (TR-102)
Commerce Blvd @
Southwest Blvd
Public Facilities Fee, Traffic
Signalization Fee Fund, Measure
M, Gas Tax
Project scoping, preliminary
engineering and pre-design in
progress.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
4
CIP #Proj. #Project Title Description Location Funding Source Project Status
TR-124 2018-41
Rohnert Park Expwy/State
Farm Dr Traffic
Improvements
Modifications to Rohnert Park Expressway and
State Farm Drive to add pedestrian refuges, add
two traffic signals, median improvements, and
modify signal timing and striping; median and
pedestrian improvements on Enterprise Drive
Rohnert Park
Expressway, State
Farm Drive, Enterprise
Drive
SB1 Gas Tax, Infrastructure
Reserve, 2007R Bond Loan
Repayment
Design phase in Summer 2020.
OF-71 2018-26 Wooden Pole Streetlights
Replacement
Replacement of wooden pole streetlights with
current street light standard.
F and H Section
neighborhoods, Golf
Course Drive
Casino Mitigation MOU /
Neighborhood Upgrade &
Workforce Housing Contribution,
Infrastructure Reserve Fund, Gas
Tax
Fairway Drive replacements
planned for next phase, pending
availability of funding. Scaled-back
replacement program will be for
replacing streetlight pole
knockdowns only.
TR-117 2017-20 Hwy 101 Bike/Ped Crossing
Feasibility Study
Study to determine the feasibliity and planning-
level cost of a bicycle and/or pedestrian
crossing of Highway 101 within the Rohnert
Park City Limits
Study area limits are
along Highway 101,
bounded by Commerce
Boulevard to the north
and approximately at
the Laguna Channel to
the south.
Measure M, Gas Tax Study is in progress.
TR-98 2015-11
Pavement Repair Services
(ongoing non-capital
pavement maintenance)
Repairs to pavement throughout the City Various locations
Citywide Refuse Road Impact Fund Budget appropriation for project is
established.
WASTEWATER
WW-
34 2018-07 Utilities Office (Sewer
Component)
A facility planning/programming study and pre-
design for new or rehabilitated building for
utilities (sewer and water) staff and functions.
To be determined Sewer Utility Fund Facility programming and design to
commence in 2020.
WW-
37 2019-20 A Section Sewer Line
Replacement
Rehabilitation and/or replacement of sewer
system infrastructure, which may include mains
and lower laterals.
Adele Avenue, Alison
Avenue, Commerce
Boulevard and vicinity
Sewer Utility Fund
Project scoping, preliminary
engineering and pre-design in
progress.
WW-
40 2020-14 L-Section Siphon
Replacement
Replacement of siphon lines in-kind or with
gravity line as determined by study.L Section Sewer Capital Preservation Engineering analysis and design in
Winter 2020.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
5
CIP #Proj. #Project Title Description Location Funding Source Project Status
WW-
41 2018-34
Manhole Lid Replacement
on Country Club Drive
Paving
Replacement of manhole lids on segments of
Country Club Drive paving project.
Country Club Drive
(Rohnert Park
Expressway to Eleanor
Avenue)
Sewer Capital Preservation
Engineering and design for Country
Club Drive Overlay in progress.
Construction planned Fall 2020.
WW-
42 2017-07 Roundabout Manhole
Abandonment
Sewer manhole abandonment in preparation
for roundabout project.
Vicinity of Commerce
Blvd @ Southwest Blvd Sewer Capital Preservation
Roundabout project is in project
scoping and preliminary
engineering.
WW-
43 2017-17 Manhole Lid Replacement
on East Cotati Ave Paving
Replacement of manhole lids on segments of
East Cotati Avenue concurrent with paving
project.
East Cotati Avenue
(Sunflower Drive to
Snyder Lane)
Sewer Capital Preservation
Design and construction drawings
of paving project (including
manhole cover adjustments) are
near completion. Coordination with
PG&E in progress.
WW-
45 2020-15 I & I Reduction - B Section
(East of Adrian)
Various strategies to reduce groundwater and
surface water inflow and infiltration (I & I) into
sewer collection system
Locations in B Section
as determined by
sewer master plan
Sewer Capital Preservation Awaiting approval of FY 2019-20
CIP Budget before project initiation
WATER
WA-27 2019-29 Commerce Water Line
Replacement
Water line upgrade along Commerce Boulevard
from State Farm Drive to Golf Course Drive,
including 300 feet of State Farm Drive at the
Commerce Blvd intersection, and along Golf
Course Drive from Commerce Boulevard to
Roberts Lake Road
Commerce Boulevard,
State Farm Drive, Golf
Course Drive
Water Preservation Charge,
Water Capacity Charge Project scoping.
WA-44 2017-30 Water Systems Controls and
Telemetry Upgrade of water telemetry system Citywide Water Utility Fund, Water Capital
Preservation Charge Implementation in progress.
WA-59 2019-18 Water Meter Replacements Replacement of large commercial water meters Various locations
Citywide
Water Capital Preservation
Charge, Sewer Capital
Preservation Charge
Awaiting approval of FY 2019-20
CIP Budget before adding meters to
be replaced.
WA-60 2019-19 Well Pump/Motor
Replacement Replacing well pumps and motors Citywide Water Capital Preservation
Charge
Awaiting approval of FY 2019-20
CIP Budget before project initiation
WA-63 2020-16
Wells 7, 11, 13, 16, 27 & 39
Electrical & Structural
Upgrades
Upgrades of electrical systems at water wells
sites; stuctural repairs to building, inlcuding
roofing, siding, and doors and locks; well site
security.
Wells 7, 11, 13, 16, 27
& 39
Water Capacity Charge, Water
Capital Preservation Charge
Project scoping underway. Awaiting
approval of FY 2019-20 CIP Budget
before further work on project.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
6
CIP #Proj. #Project Title Description Location Funding Source Project Status
WA-64 2020-17
Tank & Pump Seismic
Bracing Evaluation &
Correction
Water system resiliency and seismic upgrades
to water distrubution system infrastructure Citywide Water Capital Preservation
Charge
Project scoping underway. Awaiting
approval of FY 2019-20 CIP Budget
before further work on project.
WA-65 2019-20 A Section/Commerce Water
Line Replacement Ph 1
Water main replacement and/or upgrade
concurrent with sewer system work in
southwest A Section
Adele Avenue, Alison
Avenue, Commerce
Boulevard and vicinity
Water Utility Fund
Project scoping underway. Awaiting
approval of FY 2019-20 CIP Budget
before further work on project.