Loading...
2020/06/11 Planning Commission Resolution (2)PLANNING COMMISSION RESOLUTION NO. 2020-014 A RESOLUTION OF THE PLANNING COMMISSSION OF THE CITY OF ROHNERT PARK RECOMMENDING TO THE CITY COUNCIL APPROVAL OF A REVISED DEVELOPMENT AREA PLAN FOR THE SOUTHEAST SPECIFIC PLAN PROJECT LOCATED SOUTH OF THE CANON MANOR SPECIFIC PLAN AREA, WEST OF PETALUMA HILL ROAD, EAST OF BODWAY PARKWAY AND NORTH OF VALLEY HOUSE DRIVE (VARIOUS APNS) WHEREAS, the applicant, Penn Grove Mountain LLC filed Planning Applications proposing amendments to the General Plan (PLGP20-0001), an amended Specific Plan (PLSP20- 0001), and a revised Development Area Plan (PLDP20-0001) for the Southeast Specific Plan (“SESP”) located south of the Canon Manor Specific Plan Area, west of Petaluma Hill Road, east of Bodway Parkway and north of Valley House Drive (various APNs), in accordance with the City of Rohnert Park Municipal Code (“RPMC”); and WHEREAS, in conjunction with Application No. PLDP20-0001, the applicant seeks approval of a revised development area plan for the entire Project site, as provided in the proposed Development Area Plan – Southeast Area attached to and incorporated in this Resolution as Exhibit 1; and WHEREAS, the purpose of the proposed revised plan is to allow for the elimination of 10,000 square feet for commercial development, allow for the addition of 36 units of affordable housing to be constructed on the southwest corner of the property and adjust certain development standards (parking, open space and unit size); and WHEREAS, pursuant to California State Law and the RPMC, public hearing notices were mailed to all property owners within an area encompassing a three hundred foot radius of the subject property and a public hearing was published for a minimum of 10 days prior to the first public hearing in the Community Voice; and WHEREAS, on June 11, 2020, the Planning Commission held a public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposal; and WHEREAS, the Planning Commission has reviewed and considered the information contained in Planning Application No. PLDP20-000 for the proposed Development Area Plan. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Rohnert Park makes the following findings, determinations and recommendations with respect to the proposed Development Area Plan: Section 1. The above recitations are true and correct. Section 2. Environmental Review: A. On December 10, 2010, the City of Rohnert Park certified the Final EIR for the Southeast Specific Plan Project, including adoption of associated CEQA Findings, Statement of 2 Reso 2020-014 Overriding Considerations, and the Mitigation Monitoring and Reporting Program, as described in City Council Resolution No. 2010-134. The proposed revised DAP will not result in additional environmental effects not previously evaluated in the EIR and are consistent with the analysis in the 2010 EIR, as set forth in the staff report and memorandum analyzing the project’s consistency with the EIR. No additional environmental review is necessary. B. Further, CEQA Guidelines section 15162 provides that “no subsequent EIR shall be prepared” for a project unless the lead agency determines that (1) “substantial changes are proposed in the project which will require major revisions of the previous EIR”; or (2) “substantial changes occur with respect to the circumstances under which the project is undertaken”; or (3) “new information of substantial importance … shows” one or more significant effects not discussed in the original EIR, greater severity to previously-identified substantial effects, or newly- found feasible mitigation measures that would substantially reduce significant effects. The proposed revisions (addition of two lots, revised phasing, removal of the water tank and alternate water service), are minor and will not result in any changes to the proposed project not previously analyzed in the 2010 EIR and no new information of substantial importance shows any significant effects or newly found feasible mitigation measures that would substantially reduce significant effects. Section 3. Findings Regarding: Development Area Plan – Southeast Area. The Planning Commission hereby recommends that the City Council make the following findings concerning the revised Development Area Plan – Southeast Area Plan proposed by Planning Application No. PLDP20 -0001 pursuant to Rohnert Park Municipal Code section 17.06.400(E): 1. The proposed development conforms to the specific plan. Criteria Satisfied. The revised Development Area Plan conforms to the specific plan and provides details on the project including residential floor plans and elevations by housing type, landscaping pedestrian walkways, infrastructure summaries, streetscape and park details. The proposed revised plan is consistent with the specific plan because it conforms to the requirements in the specific plan related to density, housing type and location and public improvements. 2. Public infrastructure and services can be provided concurrently with the development. Criteria Satisfied. Each phase of the Project is designed to have adequate infrastructure, integrated with existing City roadways, streets, bicycle paths, and walkways. All streets and thoroughfares will meet the standards of the City. The proposed development has been designed to provide satisfactory vehicular circulation and public improvements, such as utilities and drainage facilities have been designed and are conditioned to be constructed in conformance with City standards. Section 4. The Planning Commission does hereby recommend that the City Council adopt the Findings stated hereinabove and recommend City Council approval of the revised City of Rohnert Park Development Area Plan - Southeast Area Resolution No. 2020-XX June 2020 Applicant: Redwood Equities LLC Contact: Ben vanZutphen P.O. Box 2357 Healdsburg, CA 95448 Phone: (707) 484-5944 Prepared by: William Hezmalhalch Architects (WHA) Contact: Robert Lee 5000 Executive Parkway, Suite 375 San Ramon, CA 94583 Phone: (925) 463-1700 Fax: (925) 463-1725 Exhibit 1 to Resolution Design Team APPLICANT: Applicant: Redwood Equities LLC Contact: Ben vanZutphen P.O. Box 2357 Healdsburg, CA 95448 Phone: (707) 484-5944 LANDSCAPE ARCHITECT: Landesign Group 3344 Gravenstein Highway No. Sebastopol, CA 95472 Phone: (707) 829-2580 Fax: (707) 829-3417 ARCHITECTS: William Hezmalhalch Architects 5000 Executive Parkway, Suite 375 San Ramon, CA 94583 Phone: (925) 463-1700 Fax: (925) 463-1725 CIVIL ENGINEER: Civil Design Consultants 2200 Range Avenue, Suite 204 Santa Rosa, CA 95403 Phone: (707) 542-4820 Fax: (707) 542-4535 June 2020 Table of Contents Summary ......................................................................................................................................... 2 Land Use ......................................................................................................................................... 3 Affordable Housing Plan .................................................................................................................. 4 Streets ............................................................................................................................................. 6 Pedestrian Ways and Bike Ways ....................................................................................................... 7 Preliminary Infrastructure - Water ................................................................................................... 8 Preliminary Infrastructure - Sewer ................................................................................................... 9 Preliminary Infrastructure - Storm Drain ........................................................................................ 10 Rural Estate: Preliminary Elevations ............................................................................................... 11 Rural Estate: Typical Plot Plan & Preliminary Floor Plans - First Floor ............................................ 12 Rural Estate: Preliminary Floor Plans - Second Floor...................................................................... 13 Low Density: Preliminary Elevations .............................................................................................. 14 Low Density: Typical Plot Plan & Preliminary Floor Plans - First Floor ............................................ 15 Low Density: Preliminary Floor Plans - Second Floor ..................................................................... 16 SE Medium Density - Conventional: Preliminary Elevations ........................................................... 17 SE Medium Density - Conventional: Typical Plot Plan & Preliminary Floor Plans - First Floor .......... 18 SE Medium Density - Conventional: Preliminary Floor Plans - Second Floor .................................. 19 SE Medium Density - Conventional Duet: Preliminary Elevations ................................................... 20 SE Medium Density - Conventional Duet: Preliminary Floor Plans ................................................. 21 SE Medium Density - Motorcourt: Preliminary Elevations .............................................................. 22 SE Medium Density - Motorcourt: Typical Plot Plan & Preliminary Floor Plans - First Floor ............ 23 SE Medium Density - Motorcourt: Preliminary Floor Plans - Second Floor ..................................... 24 SE Medium Density - Motorcourt: Typical Plot Plan & Preliminary Floor Plans - First Floor ............ 25 SE Medium Density - Motorcourt: Preliminary Floor Plans - Second Floor ...................................... 26 Mixed-Use Site - Conceptual Site Plan with Parking & Loading ........................................................ 27 Apartments: Preliminary Elevations ............................................................................................... 28 Apartments: Preliminary Floor Plans - First Floor Building A ......................................................... 29 Apartments: Preliminary Floor Plans - Second Floor Building B ..................................................... 30 Apartments: Floor Plan and Elevation - Community Recreation Building ........................................ 31 Townhomes - 5-Plex: Preliminary Elevations .............................................................................. 3132 Townhomes - 5-Plex: Preliminary Floor Plans - First Floor .......................................................... 3233 Townhomes - 5-Plex: Preliminary Floor Plans - Second Floor ...................................................... 3334 Townhomes - 6-Plex: Preliminary Elevations .............................................................................. 3435 Townhomes - 6-Plex: Preliminary Floor Plans - First Floor ......................................................... 3536 Townhomes - 6-Plex: Preliminary Floor Plans - Second Floor ..................................................... 3637 Retail: Preliminary Elevations ........................................................................................................ 37 Retail: Preliminary Floor Plans ....................................................................................................... 38 Trash Enclosure ......................................................................................................................... 3938 Illustrative Landscape Plan ......................................................................................................... 4039 Mixed-Use Site - Illustrative Landscape Plan .............................................................................. 4140 Community Monumentation - Petaluma Hill Road Streetscape & Elevation ............................... 4241 Estate Lot View Corridors .......................................................................................................... 4342 Perimeter Streetscape Details - Valley House Road .................................................................... 4443 Perimeter Streetscape Details - Valley House Road .................................................................... 4544 Perimeter Streetscape Details - Bodway Parkway ...................................................................... 4645 Perimeter Streetscape Sections ................................................................................................. 4746 Conceptual Lighting Details ....................................................................................................... 4847 Representative Imagery: Perimeter Streetscapes ....................................................................... 4948 Neighborhood Park - Site Plan ................................................................................................... 5049 Neighborhood Park - Detention Pond Sections .......................................................................... 5150 Neighborhood Park - Playground ............................................................................................... 5251 Neighborhood Park - Dog Park ................................................................................................... 5352 June 2020 Summary 3.05 1.75 1.52 2 3 21 24 Retail 81 Development Area Plan - Southeast Area2 Land Use Specific Plan Development Standards Proposed Approx. Gross Ac.1 Units Maximum Density (Du/Ac) Non- Residential Bldg Area ( 1,000 s.f.) Parking Required Approx. Gross Ac.1 Units Density (Du/Ac) Non- Residential Bldg Area (s.f.) Parking Provided Rural Estate Residential 16.0 29 2.0 n.a.2 per unit 15.95 29 1.8 n.a.2 garage space per unit Low Density Residential 21.0 128 6.0 n.a.2 per unit 21.05 128 6.0 n.a.2 garage space per unit SE Medium Density Residential 27.6 239 12.0 n.a.2 per unit 27.53 Conventional: 112 Motorcourt: 99 Duet: 28 Total: 239 8.7 n.a. 2 garage space per unit 2 garage space per unit 1 covered, 1 uncovered space per unit Mixed Use Development 7.0 117 24.0 102 Per Rohnert Park Zoning Code - Single-Family Attached (Townhomes): 2 spaces per unit, one of which must be covered, plus 1 space per 4 units for guest parking (102 Required) Multi Family (Apartments) • 1 space per studio or 1 bedroom unit; • 2 spaces per 2 bedroom unit; • 2.5 spaces per 3 bedroom unit; and • 1 guest parking space for every 4 units (66 67 Required for Phase 1; 67 Required for Phase 2) Per California Government Code Sections 65915 – 65918)- Density Bonus Project Parking • 1 space per studio or 1 bedroom unit; • 2 spaces per 2 or 3 bedroom unit; (54 Required for Phase 1; 54 Required for Phase 2) Townhomes = 3.06 Apt (Phase1) = 1.78 Apt (Phase 2) = 1.55 Net Total = 6.39 (6.96 gross) Townhomes 3 Bedroom: 29 4 Bedroom: 16 Subtotal: 45 Apartments (Phase1) 1 Bedroom: 18 2 Bedroom: 11 3 Bedroom 7 Subtotal 36 Apartments (Phase2) 1 Bedroom: 18 2 Bedroom: 9 3 Bedroom 9 Subtotal 36 Total: 117 Townhomes = 14.7 Apt(Phase1)= 20.2 Apt(Phase2)= 23.2 10,340 Townhomes Garage: 90 Guest: 1615 Accessible: 1 Subtotal: 106 Apartments (Phase1) Carport: 36 Guest: 3025 3 Bedroom 6 Accessible: 3 Subtotal 6664 Apartments (Phase2) Carport: 36 Guest: 15 Accessible: 3 Subtotal: 54 Retail Loading 15’x30’: 1 Parks 7.93 n.a. n.a. n.a.n.a.7.982 n.a.n.a.n.a.n.a. Total 79.5 513 n.a. n.a.n.a.79.47 477 513 n.a.n.a.n.a. (1) Gross Acreage includes all rights-of-way located within the project boundary, measured to the center line of the street (2) 10,000 s.f. retail or 36 additional affordable housing residential dwelling units (3) Includes a 5.0 net acre park and a 2.1 net acre basin (7.1 net acres total) June 2020 Land Use Development Area Plan - Southeast Area3 Land Use Approx. Gross Ac.Total Units Density Rural Estate Residential 15.95 29 1.8 Low Density Residential 21.31 128 6.0 SE Medium Density Residential 27.53 239 8.7 Mixed Use Development 6.96 117 16.8 Parks 7.98 (5.0 Net)0 n.a. Total 79.73 513 6.4 LEGEND 81 47779.47 n.a 6.0 June 2020 Affordable Housing Plan pp p14 DUET (28 UNITS) • If For Rent: 50% very low-income + 50% low-income • If For Sale: 50% low-income + 50% moderate income 8 TOWNHOMES • If For Rent: 50% very low-income + 50% low-income • If For Sale: 50% low-income + 50% moderate income 36 APARTMENTS • Phase 1 - 36 Units, 50% very low-income + 50% low- income Density Bonus • Phase 2 - 36 Units, moderate income or lower TOTAL 14 Duet (28 Units) 8 Townhome 36 Apartments = 72 Affordable Homes Density Bonus 36 Apartments (phase 2) p Development Area Plan - Southeast Area4 June 2020 In the event that the required 72 units are constructed on site, these units will be distributed throughout the SESPA. The 72 units include a 36 -unit apartment complex, 14 duets (28 units), and 8 townhomes. An additional 36-unit apartment (phase 2), per state density bonus law, can be added in place of the commercial retail. The City’s affordable requirement states that fifty percent (50%) of the rental apartment units shall be rented to very-low income households and fifty percent (50%) shall be rented to low income households. Since an affordable housing provider typically manages low income rental units, the 36 72 low income restricted units need to be located near one another to ensure efficient management of the property; therefore, these units have been located within the mixed use parcel. The timing of their construction will be determined by the development agreement and the agreement with the affordable housing provider. The remaining 36 units have been distributed throughout the SE Medium Density and mixed use townhouse land use designation. These units will be duets that look similar to the adjacent market rate units. The construction phasing of these units will occur at the same time as the adjacent market rate units. If operated as rental housing, fifty percent (50%) of the duets and townhomes will be rented to very-low income households. The remaining fifty percent (50%) will be rented to low-income households. If sold as owner-occupied housing, fifty percent (50%) of the duets and townhomes will be sold to low income households. The remaining fifty percent (50%) will be sold to moderate income households. Development Area Plan - Southeast Area5 June 2020 Streets Development Area Plan - Southeast Area6 June 2020 Pedestrian Ways and Bike Ways Multi-Use Trail (Class I bike lane) Sidewalk (Both Sides of Street) Sidewalk (One Side of Street) Park Trails Internal Trails Class II Bike Lane Enhanced Pedestrian Crossing Development Area Plan - Southeast Area7 June 2020 Preliminary Infrastructure - Water Development Area Plan - Southeast Area8 June 2020 Preliminary Infrastructure - Sewer Development Area Plan - Southeast Area9 June 2020 Preliminary Infrastructure - Storm Drain Development Area Plan - Southeast Area10 June 2020 Minimum Lot Size: 17,000 SF Minimum Lot Width: 90’ Minimum Lot Depth: 100’ Maximum Lot Coverage: 30% Minimum Setbacks: Front: 20’ to Porch; 20’ to Primary Building; 20’ to Garage Rear: 25’ to Primary Building; 5’ to Detached Garage Side: 10’ Interior; 20’ Corner Preliminary Elevations Rural Estate Plan 2 - Spanish Colonial Plan 4 - Italianate Plan 1 - Italianate Plan 3 - Cottage 11 The Spanish Colonial Style is an adaptation of Mission Revival enriched with additional Latin American details and elements. The homes are mostly asymmetrical 1 and 2 storied massing with one strong element. Roofs are finished with ‘S’ shape concrete tile over 4:12 hip or gabled roof forms. The walls are finished with a light to medium texture stucco, and are accented with the occasional use of decorative brick or ceramic tile. The windows are vertical multi- paned and trimmed with simple cementitious material (wood like) or stucco head and sill trim. Featured windows may occur in a recessed wall plane. Exterior accents may include cylindrical towers, porches, balconies, arched openings, and cementitious material (wood-like), stucco or wrought iron details. The Spanish Colonial color palettes demonstrated in the street scenes were selected to reflect the architectural theme of the style in early 1900’s. These colors will include a color range in off-whites or beige tones to light tans for the primary wall colors. The trim color is made up of lighter wood tones and darker colors, simulating the look of stain. Accent colors are deep jewel tones as well as rich earth tones. Roof colors are a subtle blend of terra-cotta shades. The Italianate Home’s sophisticated façade and graceful details, especially the decorative brackets, make it easily recognizable. Roofs are ‘S’ shape concrete tile covering low pitch, usually at 4:12, hipped planes providing a continuous eave line. Walls of lightly textured stucco provide a vernacular that is enriched with selective use of cut stone as an entire surface material or as entry and corner accent. Vertical multi-paned windows are trimmed at the head and sill and occasionally at the jamb and may have arched or curved window tops. Exterior accents may include a pronounced entry with door surrounds of cementitious material (wood-like), stucco or simulated stone, pot shelves, balconies of decorative wrought iron, and shutters. The Italianate color palettes demonstrated in the street scenes were selected to reflect the architectural theme of their origin. These colors will include rich, saturated hues of yellow, tan, and salmon for the primary wall colors. The trim color is deeply tinted whites or lighter wood tones and sometimes will include a darker secondary trim color. Accents are emphasized with the use of bolder jewel tones as well as rich earth tones. Roof colors are a complex blend of terra-cottas, browns, tans, and warm reds. Cottage is a picturesque style that reflects the rural setting of the area. The primary wall material is medium textured stucco, typically accented with stone or brick with a rusticated appearance or a mix of cementitious (wood like) horizontal, board & batten siding and stucco. The main roof is hipped and may have intersecting gables. Premium grade composition shingles or flat concrete tiles cover varied roof pitches from 4:12 to 8:12. Vertical multi-paned windows are trimmed at the jamb head and sill. Exterior accents may include porches, balconies of wood or wrought iron, shutters, pot shelves and window bays. The Cottage color palettes demonstrated in the street scenes were selected to reflect the architectural theme of earlier examples. These colors will include soft, mid-value hues of beige, tan, yellow, gray, and green for the primary wall colors. The trim color is usually soft tinted whites that are in subtle contrast to the body color. Accent colors of muted blue, green, and red are used on entry doors, shutters, and other features. Roof colors are shades of gray, blue, green, and brown. Spanish Colonial Italianate Cottage Development Area Plan - Southeast Area11 June 2020 Plan 2 +/- 3153 Sq.Ft. 4 Bdrm/3Ba/Den 3 Car Garage Options: Den/Music Room Plan 4 4015 - 4284 Sq.Ft. 3-5 Bdrm/4.5-5.5 Ba/Studio 3 Car Garage Options: Casita/4 Car Garage/Media Room/Extended Family/Loft Plan 1 2521 - 2738 Sq.Ft. 5 Bdrm/2.5-3.5 Ba/Den 2 Car Garage Options: Den/Guest Suite/3- Car Garage Plan 3 3553-3794 Sq.Ft. 6 Bdrm/4-5 Ba/Teen Room/Office 4 Car Garage Options: Guest Suite/Optional Rural Estate Typical Plot Plan & Preliminary Floor Plans - First Floor Development Area Plan - Southeast Area12 June 2020 Plan 4 Plan 3 Rural Estate Preliminary Floor Plans - Second Floor Development Area Plan - Southeast Area13 June 2020 Minimum Lot Size: 5,000 SF Minimum Lot Width: 50’ Minimum Lot Depth: 90’ Maximum Lot Coverage: 50% Minimum Private Yard: 750 SF Minimum Setbacks: Front: 10’ to Porch; 15’ to Primary Building; 20’ to Garage Rear: 15’ to Primary Building; 5’ to Garage Side: 5’ Interior; 10’ Corner Plan 1X - CraftsmanPlan 3 - Cottage Plan 2 - TraditionalPlan 1 - Farmhouse Low Density The Craftsman Style is characterized by the rustic texture of the building materials, broad overhangs, and exposed rafter tails at the eaves. The homes are often characterized by 2-story massing with a significant single story element nestled against the main body of the structure. Roofs are finished with premium grade composition shingles or flat concrete tile cover low pitches of 3:12 to 5:12, often with cross gabled forms. The walls are predominately finished with cementitious (wood like) siding or stucco with a medium texture as a primary or secondary material. The walls are accented with the occasional use of a masonry wainscot in either textural rubble like stone or brick of a rustic handmade look. The windows have a vertical proportion with mullions in the upper half and trimmed with simple or shaped trim surrounds. Exterior accents include porches, stout columns, pot shelves, ridge beams and purlins with knee braces, and gable end articulation. The Craftsman color palettes demonstrated in the street scenes were selected to reflect a modern interpretation of historic themes. These colors will include earth tones ranging from warm greens and light browns to tans and ochre yellows for the primary wall colors. The trim is a complimentary color to the wall color selected from the same earth tone range. Accent colors typically used on the entry door and railings are rich, light earthy shades of green, red, and brown. Roof colors are shades of warm green and brown. Preliminary Elevations Traditional Cottage is a picturesque style that reflects the rural setting of the area. The primary wall material is medium textured stucco, typically accented with stone or brick with a rusticated appearance or a mix of cementitious (wood like) horizontal, board & batten siding and stucco. The main roof is hipped and may have intersecting gables. Premium grade composition shingles or flat concrete tiles cover varied roof pitches from 4:12 to 8:12. Vertical multi-paned windows are trimmed at the jamb head and sill. Exterior accents may include porches, balconies of wood or wrought iron, shutters, pot shelves and window bays. The Cottage color palettes demonstrated in the street scenes were selected to reflect the architectural theme of earlier examples. These colors will include soft, mid-value hues of beige, tan, yellow, gray, and green for the primary wall colors. The trim color is usually soft tinted whites that are in subtle contrast to the body color. Accent colors of muted blue, green, and red are used on entry doors, shutters, and other features. Roof colors are shades of gray, blue, green, and brown. Cottage Craftsman The Traditional style has evolved with respect to American culture and traditions primarily rooted in the East Coast and Midwest. The main roof may have simple cornice trim at the gable ends. Premium composition shingles or flat concrete roof tiles, cover roof pitches from 4:12 to 12:12. Walls are primarily covered with board and batten or horizontal siding. Vertical multi-paned windows with true divided lites or inserts are trimmed with cementitious material (wood-like) at the 4 jambs head and sill. The trim may be multi-layered. Exterior accents include white-painted columns, shuttered windows, wood porches and balconies, decorative broken pediment trim, pot shelves and painted cementitious material (wood-like) or composite vents at the gable ends. The Traditional color palette demonstrated in the street scenes were selected to reflect historic architectural themes. Colors are primarily whites, off-whites, light colors, and some dark. The trim colors are whites or light or dark colors to contrast with the primary field color of the house. Accents include white, light, or dark colors on the shutters, entry door, and other features to contrast or harmonize with the house color. Roof colors are shades of warm gray and brown. The Farmhouse style has evolved with respect to rural American culture and traditions, primarily found in the Mid-West. The main roof may be gabled or hipped with simple cornice trim at the gable ends. Decorative brackets may be found at the gables ends as well. Premium grade composition or flat concrete roof tiles cover roof pitches from 4:12 to 12:12. Walls are primarily covered with horizontal siding or board and batten. Vertical multi-paned windows with divided lites or inserts are trimmed at the jamb head and sill. The trim may be muti- layered at feature windows. Exterior accents include white-painted columns, shuttered windows, wood porches and balconies, decorative broken pediment trim, pot shelves and painted cementitious material (wood-like) vents at the gable end. The Farmhouse color palette demonstrated in the street scenes were selected to reflect historic architectural themes. Colors are primarily whites, off-whites, light colors, and some dark. The trim colors are whites or light or dark colors to contrast with the primary field color of the house. Accents include white, light, or dark colors on the shutters, entry door, and other features to contrast or harmonize with the house color. Roof colors are shades of warm gray and brown. Farmhouse Development Area Plan - Southeast Area14 June 2020 Plan 1 +/- 1888 Sq.Ft. 2 Bdrm/2.5 Ba/Den 2 Car Garage Plan 1X +/- 2308 Sq.Ft. 2 Bdrm/2.5 Ba/Den/Bonus 2 Car Garage Plan 2 +/- 2549 Sq.Ft. 3 Bdrm/2.5 Ba/Den/Opt. Suite 2 Car Garage Opt. California Room +/- 162 Sq.Ft. Plan 3 +/- 2855 Sq.Ft. 4 Bdrm/Loft/3.5 Ba 2 Car Garage Opt. California Room +/- 135 Sq.Ft. Low Density Typical Plot Plan & Preliminary Floor Plans - First Floor OPT. CA ROOM OPT. CA ROOM Development Area Plan - Southeast Area15 June 2020 Plan 1 Plan 1XPlan 2Plan 3 Low Density Preliminary Floor Plans - Second Floor Development Area Plan - Southeast Area16 June 2020 Minimum Lot Size: 3,000 SF Minimum Lot Width: 35’ Minimum Lot Depth: 80’ Maximum Lot Coverage: 50% Minimum Private Yard: 400 SF Minimum Setbacks: Front: 5’ to Porch; 10’ to Primary Building; 20’ to Garage Rear: 10’ to Primary Building; 5’ to Garage Side: 4’ Interior; 10’ Corner Plan 1 - TraditionalPlan 2 - Craftsman Plan 3 - CottagePlan 3 - FarmhousePlan 2 - Traditional SE Medium Density - Conventional Cottage is a picturesque style that reflects the rural setting of the area. The primary wall material is medium textured stucco, typically accented with stone or brick with a rusticated appearance or a mix of cementitious (wood like) horizontal, board & batten siding and stucco. The main roof is hipped and may have intersecting gables. Premium grade composition shingles or flat concrete tiles cover varied roof pitches from 4:12 to 8:12. Vertical multi-paned windows are trimmed at the jamb head and sill. Exterior accents may include porches, balconies of wood or wrought iron, shutters, pot shelves and window bays. The Cottage color palettes demonstrated in the street scenes were selected to reflect the architectural theme of earlier examples. These colors will include soft, mid-value hues of beige, tan, yellow, gray, and green for the primary wall colors. The trim color is usually soft tinted whites that are in subtle contrast to the body color. Accent colors of muted blue, green, and red are used on entry doors, shutters, and other features. Roof colors are shades of gray, blue, green, and brown. Cottage The Craftsman Style is characterized by the rustic texture of the building materials, broad overhangs, and exposed rafter tails at the eaves. The homes are often characterized by 2-story massing with a significant single story element nestled against the main body of the structure. Roofs are finished with premium grade composition shingles or flat concrete tile cover low pitches of 3:12 to 5:12, often with cross gabled forms. The walls are predominately finished with cementitious (wood like) siding or stucco with a medium texture as a primary or secondary material. The walls are accented with the occasional use of a masonry wainscot in either textural rubble like stone or brick of a rustic handmade look. The windows have a vertical proportion with mullions in the upper half and trimmed with simple or shaped trim surrounds. Exterior accents include porches, stout columns, pot shelves, ridge beams and purlins with knee braces, and gable end articulation. The Craftsman color palettes demonstrated in the street scenes were selected to reflect a modern interpretation of historic themes. These colors will include earth tones ranging from warm greens and light browns to tans and ochre yellows for the primary wall colors. The trim is a complimentary color to the wall color selected from the same earth tone range. Accent colors typically used on the entry door and railings are rich, light earthy shades of green, red, and brown. Roof colors are shades of warm green and brown. Craftsman Preliminary Elevations Traditional The Traditional style has evolved with respect to American culture and traditions primarily rooted in the East Coast and Midwest. The main roof may have simple cornice trim at the gable ends. Premium composition shingles or flat concrete roof tiles, cover roof pitches from 4:12 to 12:12. Walls are primarily covered with board and batten or horizontal siding. Vertical multi-paned windows with true divided lites or inserts are trimmed with cementitious material (wood-like) at the 4 jambs head and sill. The trim may be multi-layered. Exterior accents include white-painted columns, shuttered windows, wood porches and balconies, decorative broken pediment trim, pot shelves and painted cementitious material (wood-like) or composite vents at the gable ends. The Traditional color palette demonstrated in the street scenes were selected to reflect historic architectural themes. Colors are primarily whites, off-whites, light colors, and some dark. The trim colors are whites or light or dark colors to contrast with the primary field color of the house. Accents include white, light, or dark colors on the shutters, entry door, and other features to contrast or harmonize with the house color. Roof colors are shades of warm gray and brown. The Farmhouse style has evolved with respect to rural American culture and traditions, primarily found in the Mid-West. The main roof may be gabled or hipped with simple cornice trim at the gable ends. Decorative brackets may be found at the gables ends as well. Premium grade composition or flat concrete roof tiles cover roof pitches from 4:12 to 12:12. Walls are primarily covered with horizontal siding or board and batten. Vertical multi-paned windows with divided lites or inserts are trimmed at the jamb head and sill. The trim may be muti-layered at feature windows. Exterior accents include white-painted columns, shuttered windows, wood porches and balconies, decorative broken pediment trim, pot shelves and painted cementitious material (wood- like) vents at the gable end. The Farmhouse color palette demonstrated in the street scenes were selected to reflect historic architectural themes. Colors are primarily whites, off-whites, light colors, and some dark. The trim colors are whites or light or dark colors to contrast with the primary field color of the house. Accents include white, light, or dark colors on the shutters, entry door, and other features to contrast or harmonize with the house color. Roof colors are shades of warm gray and brown. Special Condition: Two SE Mledium Density lots located at the northwest corner of the Specific Plan will be developed using a one-story home from the Low Density -Plan 1. Farmhouse Development Area Plan - Southeast Area17 June 2020 Plan 1 +/- 2103-2111 Sq.Ft. 3 Bdrm/Loft(Opt.Bdrm 4)/2.5 Ba 2 Car Garage Plan 2 +/- 2238 Sq.Ft. 4 Bdrm/Opt. Den/3 Ba 2 Car Garage Plan 3 +/- 2480-2495 Sq.Ft. 4 Bdrm/Loft/Den (Opt. Bdrm 5 )/2.5 Ba(Opt.Ba 3) 2 Car Garage TY P . SE Medium Density - Conventional Typical Plot Plan & Preliminary Floor Plans - First Floor 80 ’ M i n . Development Area Plan - Southeast Area18 June 2020 Plan 1 Plan 2 Plan 3 SE Medium Density - Conventional Preliminary Floor Plans - Second Floor Development Area Plan - Southeast Area19 June 2020 Minimum Lot Size: 1,800 SF Minimum Lot Width: 29’ Minimum Lot Depth: 60’ Maximum Lot Coverage: 70% Minimum Private Yard: 250 SF Minimum Setbacks: Front: 5’ to Porch; 8’ to Primary Building; 18’ to Garage Side: 0/8’ Aggregate SE Medium Density - Conventional Duet Preliminary Elevations The Craftsman Style is characterized by the rustic texture of the building materials, broad overhangs, and exposed rafter tails at the eaves. The homes are often characterized by 2-story massing with a significant single story element nestled against the main body of the structure. Roofs are finished with premium grade composition shingles or flat concrete tile cover low pitches of 3:12 to 5:12, often with cross gabled forms. The walls are predominately finished with cementitious (wood like) siding or stucco with a medium texture as a primary or secondary material. The walls are accented with the occasional use of a masonry wainscot in either textural rubble like stone or brick of a rustic handmade look. The windows have a vertical proportion with mullions in the upper half and trimmed with simple or shaped trim surrounds. Exterior accents include porches, stout columns, pot shelves, ridge beams and purlins with knee braces, and gable end articulation. The Craftsman color palettes demonstrated in the street scenes were selected to reflect a modern interpretation of historic themes. These colors will include earth tones ranging from warm greens and light browns to tans and ochre yellows for the primary wall colors. The trim is a complimentary color to the wall color selected from the same earth tone range. Accent colors typically used on the entry door and railings are rich, light earthy shades of green, red, and brown. Roof colors are shades of warm green and brown. Craftsman Cottage is a picturesque style that reflects the rural setting of the area. The primary wall material is medium textured stucco, typically accented with stone or brick with a rusticated appearance or a mix of cementitious (wood like) horizontal, board & batten siding and stucco. The main roof is hipped and may have intersecting gables. Premium grade composition shingles or flat concrete tiles cover varied roof pitches from 4:12 to 8:12. Vertical multi-paned windows are trimmed at the jamb head and sill. Exterior accents may include porches, balconies of wood or wrought iron, shutters, pot shelves and window bays. The Cottage color palettes demonstrated in the street scenes were selected to reflect the architectural theme of earlier examples. These colors will include soft, mid-value hues of beige, tan, yellow, gray, and green for the primary wall colors. The trim color is usually soft tinted whites that are in subtle contrast to the body color. Accent colors of muted blue, green, and red are used on entry doors, shutters, and other features. Roof colors are shades of gray, blue, green, and brown. Cottage Right Side - Craftsman Plan 4 Plan 5 Right Side - Cottage Plan 4 Plan 5 Front - Craftsman Plan 4 Front - Cottage Plan 4 Development Area Plan - Southeast Area20 June 2020 Plan 4 +/- 1214 Sq.Ft. 2 Bdrm/2.5 Ba 1 Car Garage Plan 5 +/- 1412 Sq.Ft. 3 Bdrm/2.5 Ba 2 Car Garage SE Medium Density - Conventional Duet Conceptual First Floor Plan Plan 5 Plan 4 Conceptual Second Floor Plan Preliminary Floor Plans Development Area Plan - Southeast Area21 June 2020 20’ Private Drive 20’ Private Drive Plan 4 - CraftsmanPlan 3 - Farmhouse Plan 3 - TraditionalPlan 4 - Cottage Farmhouse SE Medium Density - Motorcourt The Craftsman Style is characterized by the rustic texture of the building materials, broad overhangs, and exposed rafter tails at the eaves. The homes are often characterized by 2-story massing with a significant single story element nestled against the main body of the structure. Roofs are finished with premium grade composition shingles or flat concrete tile cover low pitches of 3:12 to 5:12, often with cross gabled forms. The walls are predominately finished with cementitious (wood like) siding or stucco with a medium texture as a primary or secondary material. The walls are accented with the occasional use of a masonry wainscot in either textural rubble like stone or brick of a rustic handmade look. The windows have a vertical proportion with mullions in the upper half and trimmed with simple or shaped trim surrounds. Exterior accents include porches, stout columns, pot shelves, ridge beams and purlins with knee braces, and gable end articulation. The Craftsman color palettes demonstrated in the street scenes were selected to reflect a modern interpretation of historic themes. These colors will include earth tones ranging from warm greens and light browns to tans and ochre yellows for the primary wall colors. The trim is a complimentary color to the wall color selected from the same earth tone range. Accent colors typically used on the entry door and railings are rich, light earthy shades of green, red, and brown. Roof colors are shades of warm green and brown. The Traditional style has evolved with respect to American culture and traditions primarily rooted in the East Coast and Midwest. The main roof may have simple cornice trim at the gable ends. Premium composition shingles or flat concrete roof tiles, cover roof pitches from 4:12 to 12:12. Walls are primarily covered with board and batten or horizontal siding. Vertical multi-paned windows with true divided lites or inserts are trimmed with cementitious material (wood-like) at the 4 jambs head and sill. The trim may be multi-layered. Exterior accents include white-painted columns, shuttered windows, wood porches and balconies, decorative broken pediment trim, pot shelves and painted cementitious material (wood-like) or composite vents at the gable ends. The Traditional color palette demonstrated in the street scenes were selected to reflect historic architectural themes. Colors are primarily whites, off-whites, light colors, and some dark. The trim colors are whites or light or dark colors to contrast with the primary field color of the house. Accents include white, light, or dark colors on the shutters, entry door, and other features to contrast or harmonize with the house color. Roof colors are shades of warm gray and brown. Craftsman Traditional The Coastal Cottage style is characterized by The primary wall material is medium textured stucco, typically accented with stone or brick with a rusticated appearance or a mix of cementitious (wood like) horizontal, board & batten siding and stucco. The main roof is hipped and may have intersecting gables. Premium grade composition shingles or flat concrete tiles cover varied roof pitches from 4:12 to 8:12. Vertical multi-paned windows are trimmed at the jamb head and sill. Exterior accents may include porches, balconies of wood or wrought iron, shutters, pot shelves and window bays. The Cottage color palettes demonstrated in the street scenes were selected to reflect the architectural theme of earlier examples. These colors will include soft, mid-value hues of beige, tan, yellow, gray, and green for the primary wall colors. The trim color is usually soft tinted whites that are in subtle contrast to the body color. Accent colors of muted blue, green, and red are used on entry doors, shutters, and other features. Roof colors are shades of gray, blue, green, and brown. Cottage Preliminary Elevations The Farmhouse style has evolved with respect to rural American culture and traditions, primarily found in the Mid-West. The main roof may be gabled or hipped with simple cornice trim at the gable ends. Decorative brackets may be found at the gables ends as well. Premium grade composition or flat concrete roof tiles cover roof pitches from 4:12 to 12:12. Walls are primarily covered with horizontal siding or board and batten. Vertical multi-paned windows with divided lites or inserts are trimmed at the jamb head and sill. The trim may be muti- layered at feature windows. Exterior accents include white-painted columns, shuttered windows, wood porches and balconies, decorative broken pediment trim, pot shelves and painted cementitious material (wood-like) vents at the gable end. The Farmhouse color palette demonstrated in the street scenes were selected to reflect historic architectural themes. Colors are primarily whites, off-whites, light colors, and some dark. The trim colors are whites or light or dark colors to contrast with the primary field color of the house. Accents include white, light, or dark colors on the shutters, entry door, and other features to contrast or harmonize with the house color. Roof colors are shades of warm gray and brown. Minimum Lot Size: 3,000 SF Minimum Lot Width: 50’ Minimum Lot Depth: 55’ Maximum Lot Coverage: 60% Minimum Private Yard: 350 SF Minimum Setbacks: Front: 5’ to Porch; 8’ to Primary Building; 20’ to Garage from Public Street and 18’ from Private street Rear: 10’ to Primary Building Side: 4’ Interior; 7’ Corner Development Area Plan - Southeast Area22 June 2020 SE Medium Density - Motorcourt Plan 3 +/- 2100 Sq.Ft. 3 Bdrm/3 Ba/Den(Opt. Bdrm 4) 2 Car Garage Plan 1 +/- 1931 Sq.Ft. 3 Bdrm/2.5 Ba 2 Car Garage Plan 4 +/- 2215 Sq.Ft. 3 Bdrm/3 Ba/Den(Opt. Bdrm 4) 2 Car Garage Public Street P r i v a t e D r i v e Plan 2 +/- 1894-1905 Sq.Ft. 4 Bdrm/3 Ba/Den (Opt. Bdrm 4) 2 Car Garage Typical Plot Plan & Preliminary Floor Plans - First Floor Development Area Plan - Southeast Area23 June 2020 SE Medium Density - Motorcourt Preliminary Floor Plans - Second Floor Plan 3 Plan 1 Plan 4 Plan 2 Public Street P r i v a t e D r i v e Development Area Plan - Southeast Area24 June 2020 SE Medium Density - Motorcourt Typical Plot Plan & Preliminary Floor Plans - First Floor Plan 3 +/- 2100 Sq.Ft. 3 Bdrm/3 Ba/ Den(Opt. Bdrm 4) 2 Car Garage Plan 3 +/- 2100 Sq.Ft. 3 Bdrm/3 Ba/Den(Opt.Bdrm 4) 2 Car Garage Plan 1 +/- 1931 Sq.Ft. 3 Bdrm/2.5 Ba 2 Car Garage Plan 4 +/- 2215 Sq.Ft. 3 Bdrm/3 Ba/ Den(Opt.Bdrm 4) 2 Car Garage Plan 4 +/- 2215 Sq.Ft. 3 Bdrm/3 Ba/Den(Opt.Brdm 4) 2 Car Garage Plan 2 +/- 1894-1905 Sq.Ft. 3 Bdrm/3 Ba/Den(Opt.Bdrm 4) 2 Car Garage Public Street Public Street P r i v a t e D r i v e Development Area Plan - Southeast Area25 June 2020 SE Medium Density - Motorcourt Preliminary Floor Plans - Second Floor Plan 3 Plan 3 Plan 1 Plan 4 Plan 4 Plan 2 Public Street Public Street P r i v a t e D r i v e Development Area Plan - Southeast Area26 June 2020 Townhomes: Total Site Area: 133,178 SF (3.06 AC) 100% Total Building Footprint: 51,796 SF 39% On-Grade Private Open Space: 8,216 SF 6% Total Open Space/Landscaped Area:39,777 SF 30% Total Paving Area: 33,389 SF 25% Gross Floor Area: 95,389 SF Unit Count: 45 Total 3 Bedroom: 29 4 Bedroom: 16 Density: 14.7 DU/AC FAR: 0.72 Parking: 15 Public Spaces 1 Accessible Space 90 Private Garage Spaces 106 Total Spaces (102 required) Apartments (Phase 1) : Total Site Area: 77,517 SF (1.78 AC) 100% Dwelling Unit (DU) Count: 36 Total 1 Bedroom: 18 2 Bedroom: 11 3 Bedroom: 7 Density: 20.2 DU/AC Total Building Footprint: 26,956 SF 35% Total Open Space/Landscaped Area:33,757 SF 44% Total Paving Area: 16,804 SF 21% Gross Floor Area: 50,178 SF FAR: 0.65 Total Private Open Space: 3,162 SF Parking: 25 Guest Spaces 3 Accessible Spaces 36 Private Carport Spaces 64 Total Spaces (54 per State Density Bonus) Apartments (Phase 2) : Total Site Area: 67,735 SF (1.55 AC) 100% Dwelling Unit (DU) Count: 36 Total 1 Bedroom: 18 2 Bedroom: 9 3 Bedroom: 9 Density: 23.2 DU/AC Total Building Footprint: 26,956 SF 40% Total Open Space/Landscaped Area:26,908 SF 40% Total Paving Area: 13,871 SF 20% Gross Floor Area: 50,178 SF FAR: 0.74 Total Private Open Space: 3,162 SF Parking: 15 Guest Spaces 3 Accessible Spaces 36 Private Carport Spaces 54 Total Spaces ( 54 per State Density Bonus) Trash EnclosureTrash Enclosure Mixed-Use Site - Conceptual Site Plan with Parking 76,230 (1.75) 20,220 12 6 20.6 0.53 28 66 66 132,780 (3.05) 21 24 0.73 48,100 3,120 48,370 33,190 97,537 2 3 27,202 40,800 23,740 40,440 23% 48% 28% 36% 2% 36% 26% Tot Lot BLDG ABLDG B BLDG A 6-Plex A 6-Plex A 5-Plex A 5-Plex A 5-Plex A 6-Plex B 6-Plex B 6-Plex A BLDG BBLDG B BLDG B Resident Entrance Valley House Dr Bo d w a y P k w y Resident EntranceResident Entrance Apartment (Phase 2)Apartment (Phase 1) Development Area Plan - Southeast Area27 June 2020 Maximum Lot Coverage: 80% Minimum Private Yard: 50 SF Minimum Setbacks: Front: 20’ to Primary Building Rear: 10’ to Primary Building Side: 20’ to Corner Apartments The 2-story Apartments are a collection of 1, 2, and 3 bedroom flats and attached 1-car garages arranged in (2) two different 12-unit buildings for a total of (3) three buildings and (36) units. The elevation facades are designed in a Traditional Style with paneled elements, shutters, and fully trimmed windows, and paneled columns on a brick base. Particular attention has been paid to the building massing to provide a variety of forms and window arrangements to differentiate ‘like units’ and give a more eclectic appearance. The low pitched roofs are at a 4:12 pitch with a mix of gables and hipped roof forms. The exterior facades are stucco with (2) two complementary colors to articulate the massing between first and second floors. Each apartment has either a covered patio at grade (first floor) or a covered deck at the second floor for private outdoor space. The (12) twelve first floor units (a mix of 1, 2, or 3 bedroom) are ADA accessible. Preliminary Elevations Building A Building B Development Area Plan - Southeast Area28 June 2020 Apartments Preliminary Floor Plans - First Floor Building A Plan 1-ADA +/- 626 606 Sq.Ft. (Net) +/- 647 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 1 +/- 626 603 Sq.Ft. (Net) +/- 643 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 1 +/- 626 603 Sq.Ft. (Net) +/- 643 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 2-ADA +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage Plan 3 2 +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage Plan 2-ADA +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage Plan 3 2 +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage Plan 4 3 +/- 1114 1060 Sq.Ft. (Net) +/- 1116 Sq.Ft. (Gross) +/- 77 Sq.Ft. (Patio) 3 Bdrm/2 Ba 1 Car Garage Plan 4 3 +/- 1114 1060 Sq.Ft. (Net) +/- 1116 Sq.Ft. (Gross) +/- 77 Sq.Ft. (Patio) 3 Bdrm/2 Ba 1 Car Garage Plan 1X-ADA +/- 629 Sq.Ft. (Net) +/- 673 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 11X +/- 625 Sq.Ft. (Net) +/- 670 Sq.Ft. (Gross)1 +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 1 +/- 626 603 Sq.Ft. (Net) +/- 643 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage First FloorSecond Floor Development Area Plan - Southeast Area29 June 2020 Apartments Preliminary Floor Plans - Second Floor Building B Plan 3-ADA +/- 1258 Sq.Ft. (Net) +/- 1323 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 3 Bdrm/2 Ba 1 Car Garage Plan 1 +/- 626 603 Sq.Ft. (Net) +/- 643 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 1 +/- 626 603 Sq.Ft. (Net) +/- 643 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 3 2 +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage Plan 3 2 +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage Plan 4 3 +/- 1114 1060 Sq.Ft. (Net) +/- 1116 Sq.Ft. (Gross) +/- 77 Sq.Ft. (Patio) 3 Bdrm/2 Ba 1 Car Garage Plan 4 3 +/- 1114 1060 Sq.Ft. (Net) +/- 1116 Sq.Ft. (Gross) +/- 77 Sq.Ft. (Patio) 3 Bdrm/2 Ba 1 Car Garage Plan 11X +/- 625 Sq.Ft. (Net) +/- 670 Sq.Ft. (Gross)1 +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 1 +/- 626 603 Sq.Ft. (Net) +/- 643 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 2-ADA +/- 920 899 Sq.Ft. (Net) +/- 952 Sq.Ft. (Gross) +/- 99 Sq.Ft. (Patio) 2 Bdrm/2 1 Ba 1 Car Garage First FloorSecond Floor Plan 1-ADA +/- 626 606 Sq.Ft. (Net) +/- 647 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio) 1 Bdrm/1 Ba 1 Car Garage Plan 1X-ADA +/- 629 Sq.Ft. (Net) +/- 673 Sq.Ft. (Gross) +/- 84 Sq. Ft. (Patio)1 Bdrm/1 Ba 1 Car Garage Development Area Plan - Southeast Area30 June 2020 Apartments Floor Plan and Elevation - Community Recreation Building (NEW PAGE ADDED) Minimum Setbacks: Bldg to Public Street (Wisdom Ln) : 6’ Bldg to Bldg: 25’ Bldg to Side Property Line: 6’ Development Area Plan - Southeast Area31 June 2020 Plan 1 Plan 3 2 Plan 4Plan 32Plan 2 3 Townhomes - 5-Plex Preliminary Elevations Maximum Lot Coverage: 80% Minimum Private Yard: 50 SF Minimum Setbacks: Front: 10’ to Primary Building Rear: 10’ to Primary Building Side: 10’ to Corner 31 The 2-story Townhomes for the Craftsman Style elevation are an assemblage of both lap siding and board and batt siding exteriors with some common trim details. The 5-unit and 6-unit buildings both have a collection of 3 or 4 of the plan types. The buildings that side onto a street have the Plan 4 (building end unit with front door facing street) with the side entry to give a stronger aesthetic presence to the street orientation. The buildings do have inside corner breaks (for change in exterior material) between units to allow for an architecturally correct break for both materials and colors. This will lend itself to stronger individuality to each unit in the building. The Craftsman style buildings reflect dominate gable 5:12 pitch roof forms with single story porch elements. The paired single hung windows reinforce the Craftsman theme along with the stone bases to the entry porch columns. Development Area Plan - Southeast Area32 June 2020 Plan 1 +/- 1444 1463 Sq.Ft. 2 3 Bdrm/2.5 Ba/Loft 2 Car Garage Plan 32 +/- 16091556 Sq.Ft. 3 Bdrm/2.5 Ba/Loft 2 Car Garage Plan 32 +/- 16091556 Sq.Ft. 3 Bdrm/2.5 Ba/Loft 2 Car Garage Townhomes - 5-Plex Plan 23 +/- 1513 1785 Sq.Ft. 2 3 Bdrm/2.5 Ba/Loft Optional Bdrm 4 2 Car Garage Plan 4 +/- 1794 1745 Sq.Ft. 3 Bdrm/2.5 Ba/Loft Optional Bdrm 4 2 Car Garage Preliminary Floor Plans - First Floor 32 Development Area Plan - Southeast Area33 June 2020 Townhomes - 5-Plex Preliminary Floor Plans - Second Floor 33 Plan 1Plan 32 Plan 32Plan 23 Plan 4 Development Area Plan - Southeast Area34 June 2020 Maximum Lot Coverage: 80% Minimum Private Yard: 50 SF Minimum Setbacks: Front: 10’ to Primary Building Rear: 10’ to Primary Building Side: 10’ to Corner Total Open Space/Landscpaed Area: 41460 39,777 SF Total Private Open Space: 3,120 8,216 SF Parking: 20 16 Public Spaces 90 Private Garage Spaces Townhomes - 6-Plex Plan 3 1Plan 2 3 Plan 1 2 Plan 3 2 Total Public Open Space Plan 4Plan 1 The 2-story Townhomes for the Craftsman Style elevation are an assemblage of both lap siding and board and batt siding exteriors with some common trim details. The 5-unit and 6-unit buildings both have a collection of 3 or 4 of the plan types. The buildings that side onto a street have the Plan 4 (building end unit with front door facing street) with the side entry to give a stronger aesthetic presence to the street orientation. The buildings do have inside corner breaks (for change in exterior material) between units to allow for an architecturally correct break for both materials and colors. This will lend itself to stronger individuality to each unit in the building. The Craftsman style buildings reflect dominate gable 5:12 pitch roof forms with single story porch elements. The paired single hung windows reinforce the Craftsman theme along with the stone bases to the entry porch columns. Preliminary Elevations 34 Development Area Plan - Southeast Area35 June 2020 Townhomes - 6-Plex Preliminary Floor Plans - First Floor Plan 3 1 +/- 1609 1463 Sq.Ft. 3 Bdrm/2.5 Ba/Loft 2 Car Garage Plan 1 +/- 1444 1463 Sq.Ft. 2 3 Bdrm/2.5 Ba/Loft 2 Car Garage Plan 3 2 +/- 1609 1556 Sq.Ft. 3 Bdrm/2.5 Ba/Loft 2 Car Garage Plan 1 2 +/- 1444 1556 Sq.Ft. 2 3 Bdrm/2.5 Ba/Loft 2 Car Garage Plan 2 3 +/- 1513 1785 Sq.Ft. 2 3 Bdrm/2.5 Ba/Loft Optional Bdrm 4 2 Car Garage Plan 4 +/- 1794 1745 Sq.Ft. 3 Bdrm/2.5 Ba/Loft Optional Bdrm 4 2 Car Garage 35 Development Area Plan - Southeast Area36 June 2020 Townhomes - 6-Plex Preliminary Floor Plans - Second Floor 36 Plan 3 1 Plan 1 Plan 3 2Plan 1 2Plan 2 3 Plan 4 Development Area Plan - Southeast Area37 June 2020 Trash Enclosure 39 Conceptual Plan View Conceptual Plan View New Graphic Added New Graphic Added Development Area Plan - Southeast Area38 June 2020 Illustrative Landscape Plan 40 Development Area Plan - Southeast Area39 June 2020 Mixed-Use Site - Illustrative Landscape Plan 41 Development Area Plan - Southeast Area40 June 2020 Community Monumentation Corner of Valley House & Petaluma Hill Road Streetscape Petaluma Hill Road - Elevation 42 Development Area Plan - Southeast Area41 June 2020 Estate View Corridors Section at Petaluma Hill Road Project - Estate Lots 43 Development Area Plan - Southeast Area42 June 2020 Perimeter Streetscape Details - Valley House Road Valley House Road - Elevation at Estate Lots Valley House Road - Streetscape 44 Development Area Plan - Southeast Area43 June 2020 Perimeter Streetscape Details - Valley House Road Valley House Road - Elevation at MDA Lots Valley House Road - Streetscape 45 Development Area Plan - Southeast Area44 June 2020 Perimeter Streetscape Details - Bodway Parkway 46 Development Area Plan - Southeast Area45 June 2020 Perimeter Streetscape Sections Section A - Valley House Road Section C - Bodway Parkway Section B - Valley House Road Section D - Bodway Parkway 47 Development Area Plan - Southeast Area46 June 2020 Cobra style street light for use only along Bodway Parkway to match existing street lights. Pursuant to City of Rohnert Park Standard Detail 610. LED Era®Bell decorative street light for use along residential streets. Pursuant to City of Rohnert Park Standard Detail. Conceptual Lighting Details SCALE: 1"=20' NORTH SHEET: OF: MARCH 2015 12 L10 8040200 MASTER PLANNING (707) 829 - 2580 FAX 829 - 3417 3344 Gravenstein Hwy. No. Sebastopol, CA 95472 ROHNERT PARK, CALIFORNIA 7279 PETALUMA HILL ROAD SOUTHEAST ROHNERT PARK MIXED USE LIGHTING V A L L E Y H O U S E D R I V EMIXED USE SITE LIGHTING RETAIL APARTMENTS TOWNHOMES STREET LIGHTING LEGEND 14' INTERIOR STREET LIGHT SCALE: NTS MIXED USE LIGHTING LEGEND 48 Development Area Plan - Southeast Area47 June 2020 Typical Frontage FencingPerimeter Streetscape Representative Imagery Perimeter StreetscapePerimeter Streetscape 49 Development Area Plan - Southeast Area48 June 2020 Neighborhood Park - Site Plan 50 NOTE: All street lighting shall be LED. Development Area Plan - Southeast Area49 June 2020 Neighborhood Park - Detention Pond Sections Section A - Bodway Parkway Section B - Waterside Lane Plan View - West End of Park Section C - Wrenwood Way 51 Development Area Plan - Southeast Area50 June 2020 Neighborhood Park - Playground 52 Development Area Plan - Southeast Area51 June 2020 Neighborhood Park - Dog Park 53 Development Area Plan - Southeast Area52 June 2020 Exhibit 2 to Resolution 1 EXHIBIT 2 CONDITIONS OF APPROVAL DEVELOPMENT AREA PLAN – SOUTHEAST AREA ON-GOING CONDITIONS The conditions below shall apply to the Development Area Plan (DAP) for the Southeast Area within the Southeast Specific Plan. The Southeast Area Project shall be developed in accordance with the General Plan (GP), Southeast Specific Plan (SESP) including Design Guidelines, Mitigation Measures (MM) identified in the Southeast Specific Plan Environmental Impact Report (FEIR), Development Agreement (DA) between the City and Penn Grove Mountain, LLC, the Rohnert Park Municipal Code (RPMC) and the Design and Construction Standards. These conditions replace the Conditions of Approval adopted by Rohnert Park City Council Resolution 2014-167 on November 24, 2014. General Requirements 1) The applicant shall comply with all documents approved by the City Council and adhere to all verbal representations and exhibits presented by the applicant at the Planning Commission and/or City Council meeting for approval of the Southeast Specific Plan project unless subsequently revised by the City. 2) In case of conflict between or among the various documents, the following order shall prevail: General Plan, Mitigation Measures for the Final Environmental Impact Report (FEIR), Southeast Specific Plan (SESP), Development Area Plan (DAP) and its conditions of approval, Development Agreement (DA), Tentative Map and its Conditions of Approval, RPMC, and Design and Construction Standards. 3) The applicant shall comply with the FEIR. In addition the applicant shall pay the cost to monitor the Mitigation Measures identified in the FEIR for the Southeast Specific Plan Project (SCH # 2003112011) kept on file in the Development Services Department. The requirements contained in the Mitigation Monitoring Program (MMP) shall be incorporated into these conditions and constructed in accordance with the MMP. 4) The applicant agrees to indemnify, hold harmless and defend the City, its officers, agents, elected and appointed officials, and employees, from any and all liability or claims that may be brought against the City arising out of its approval of this DAP save and except that caused by the City’s active negligence. 5) By accepting the benefits conferred under this DAP, the applicant acknowledges all the conditions imposed and accepts this DAP subject to those conditions with full awareness of the provisions of the FDP, as may be amended from time to time, and the RPMC, as applicable. Exhibit 2 to Resolution 2 6) The use of the property by the applicant/grantee for any activity authorized by this DAP shall constitute acceptance of all of the conditions and obligations imposed by the City on this DAP. The applicant/grantee by said acceptance waives any challenge as to the validity of these conditions. 7) The two new lots permitted under this amended shall be developed with single story, single family residences. Two story residences are not permitted to be located on these lots. 8) The applicant shall install screening landscaping along the northerly property line of the two new lots permitted created by this DAP, prior to issuance of the certificate of occupancy of these residences. A backyard landscaping plan, providing a plan showing a 36-inch box tree as a landscaping treatment in the backyard, shall be submitted for review and approval of the Director of Development Services prior to issuance of a building permit on either parcel. 9) The improvements shall be in compliance with the site plan, exterior elevations and landscaping plans as presented herein. 10) Building colors and materials shall be in compliance with the palettes presented in the DAP as approved. Any minor changes shall be reviewed and approved by staff. 11) Any decorative paving shall be reviewed and approved by staff. 12) Architectural elements such as stone or brick wainscots shall be extended around the sides of structure that will be visible from street sides including corners. All window framing trim treatments shall be required on side and rear elevations. 13) All building footprints shall be identified by floor plan model and architectural style on the master plotting plan. Single plots shall be submitted with each building permit application. The developer shall ensure that a diverse set of plan models and colors shall be evenly dispersed in each neighborhood. 14) Applicant shall comply with the Conditions of Approval for its Model Home Complex adopted by Rohnert Park Planning Commission Resolution 2016-09 on April 14, 2016. 15) In each neighborhood, prior to issuance of building permits in that district, the applicant shall install and maintain on-site display signs. The on-site display signs shall indicate the location for future development of lighted and non-lighted parks and commercial parcels, cul-de-sac openings, apartments, or higher density residential areas. These signs shall be located in a manner to be clearly visible to all potential homebuyers in the Southeast Area community. The signing plan shall be submitted to the City planning staff for review and approval. 16) The declaration of covenants, conditions and restrictions (CC&R’s) filed for each development shall be prominently displayed in the project sales office at all times. The CC&R’s shall apply equally to both owners and renters. The CC&R’s shall be written to Exhibit 2 to Resolution 3 require renters to comply with the regulations of the CC&R’s, and a copy of the CC&R’s shall be given to each renter. 17) The applicant shall comply with its existing master signage program approved by Rohnert Park Planning Commission Resolution 2018-14 on February 8, 2018. 18) Design and placement of walls and fences for each residential neighborhood and public facility shall be in accordance with the standards in the FDP and shall be approved by planning staff. 19) All residential dwellings shall display illuminated street numbers in a prominent location in such a position that the numbers are easily visible to approaching emergency vehicles from both directions. The numbers shall be of a contrasting color to the background to which they are attached and four (4) inches minimum in height. Flag lots will have their address displayed in a prominent position at the driveway intersection with the street. 20) All roof or ground mounted mechanical equipment shall be screened from public view. 21) All site plans for residential units shall include a behind gate concrete pad for garbage and recycling bins. The concrete pad may be incorporated into a concrete sidewalk behind front fenced gate if the clearance allows for passage from the gate to the rear yard with receptacles in storage. Motor court units shall shall provide for a paved designated area fronting a public street or, for units not abutting a public street, a paved designated area within the motor court for weekly garbage pickup area. These areas shall be reviewed and approved by City planning staff and by the solid waste collection franchisee. 22) The project applicant shall contract with a qualified acoustical consultant to ensure the design of the housing units along Petaluma Hill Road, Bodway Parkway and Valley House Drive do not allow for interior noise levels greater than 45dB Ldn. The acoustical consultant shall prepare and submit to the planning staff a report detailing the acoustical treatments to be used for compliance with this performance standard. The report shall be reviewed and approved by the City prior to the issuance of building permits. 23) All buildings shall be connected to public water and sewer systems prior to occupancy. Water and sewer service accounts shall be set up with the City Finance Department for each structure with a building permit. 24) Prior to installation by the applicant, plant species, location, container size, quality and quantity of all landscaping plants and materials shall be reviewed and approved by the Planning staff (or designee) for consistency with the approved landscape plans. All plant replacements shall be to an equal or better standard than originally approved. 25) Applicant shall provide front yard landscaping and corner lot side yard landscaping outside of fenced areas. A permanent automatic sprinkler shall be installed to maintain all landscape materials and trees. Applicant shall install front and side yard fencing prior to occupancy. Exhibit 2 to Resolution 4 26) Project lighting shall be reviewed and approved by planning staff. All exterior lighting shall be designed to avoid spillover onto adjacent properties and right-of-ways. Lighting elements shall be recessed to prevent glare. All building entrances shall include recessed or soffit lights. 27) The developer shall comply with construction hours as designated in the Rohnert Park Municipal Code. 28) The developer shall obtain and adhere to an approved truck route for deliveries and construction material haulers. 29) All construction material waste and other debris shall be recycled to the extent possible. The applicant shall present a “clean site everyday” program to City building staff for approval. The program shall include on-site signage in English and Spanish to be posted at construction entrances. No animals shall be brought on site by construction personnel during work hours. 30) Prior to the issuance of a building permit a shared access/ parking/ maintenance easement should be recorded between the two parcels. 31) Prior to the issuance of a building permit, the existing storm drain easement shall be relocated or abandoned. The current easement location would be underneath proposed buildings. 32) Provide a preliminary stormwater control plan and calculations, confirming that there is adequate space for stormwater treatment measures. 33) Prior to the issuance of a building permit, the Applicant shall prepare and submit Improvement Plans to the Fire Marshal for review and approval. All fire services shall be indicated and approved. Additional Fire Department permits will be required. Fire hydrants must be in place and fully operational within 150’ before the delivery of any combustible materials to the site. An approved weather-proof access road, capable of supporting fully-loaded fire apparatus must be in place. Contact the Fire Prevention Bureau for a clearance memo. 34) Prior to the issuance of any Certificate of Occupancy, all fire hydrants and systems shall be fully functional, with blue reflective pavement markers indicating the hydrant locations on the street and red curbs per City Standards and as approved by the Fire Marshal. Fire hydrants shall be spaced per City standard and their locations shall be as shown on the approved Improvement Plans. 35) Fire sprinklers and alarm systems are required for all structures. They shall be designed, sized and installed in compliance with the current California Fire Code, national standards and local ordinances. 36) All properties shall be clearly marked with lighted address numbering on the front of each unit and on both front and rear of the units having rear alley access; rear addressing Exhibit 2 to Resolution 5 shall include the street name utilizing street signage in conformance with Design Standards. A complex directory shall be erected at each entry to the development. Details of the directory shall be submitted for review and approval by the Fire Marshal. 37) Fire Apparatus Access Roads and Fire Lanes must be fully identified with signage and/or curb markings as approved by the Fire Marshal. Aerial Fire Apparatus Access Roads will be as required by Fire Code. 38) Due to the exposure to running wildfire, non-combustible fencing is highly recommended for all perimeter fences, and as practical within the development. 39) Each development phase or portion of a phase shall indicate building type, size, and construction features. Plans shall be reviewed by the Public Safety Department for fire and life safety requirements such as: fire flow, fire hydrants, fire sprinklers, fire department connections, alarm systems, smoke control systems, public-safety, radio amplification systems, gates, egress, and exiting. Such plans will be reviewed and commented on for individual blocks and buildings. 40) Prior to issuance of a grading permit, the Applicant for each development phase shall submit a satisfactory Environmental Site Assessment covering any areas of known concern of possible contamination. 41) Prior to issuance of a demolition permit or building permit, the Applicant shall submit evidence of inspection of the existing onsite buildings proposed for demolition removal and/or remodeling or reconstruction of exterior or interior portions of existing buildings. The inspection shall determine if hazardous materials are present in existing buildings in levels that require special handling. If materials are present at such levels, materials shall be handled in accordance with federal and state regulations and guidelines, including those of the Bay Area Air Quality Management District, the California Division of Occupational Safety and Health Administration, and the California Department of Toxic Substances Control. 42) Prior to issuance of a Certificate of Occupancy, the Applicant shall obtain Operational Permits as required by the California Fire Code and local ordinances. 43) Throughout the construction period, all standard measures for mitigating fire and life safety risks shall be maintained at all times. The Applicant shall obtain all required Construction Permits as per California Fire Code and the City Fire Marshal. 44) Prior to the issuance of a building permit, the Applicant shall submit to the Fire Marshal a list of all hazardous, flammable and combustible liquids, solids or gases to be stored, used or handled on site. These materials shall be classified according to the California Fire Code, and the information the Applicant submits to the Fire Marshal shall include a summary listing the totals for storage and use for each hazard class. Prior to the issuance of a building permit, the Applicant shall also complete and submit to the Fire Marshal a Exhibit 2 to Resolution 6 copy of a "Hazardous Materials Inventory Statement and Hazardous Materials Business Plan" packet. 45) Applicant/operator shall store, manifest, transport, and dispose of all onsite generated waste that meets hazardous waste criteria in accordance with California Code of Regulations Title 22 and in a manner to the satisfaction of the Sonoma County Environmental Health Department and Emergency Services Department. Applicant shall keep storage, transportation, and disposal records on site and open for inspection to any government agency upon request. 46) The jobsite security shall be the responsibility of the Applicant. The project shall be maintained in a safe condition as specified in California Fire Code Chapter 33 and NFPA 241. A Fire Protection Program shall be submitted to the Fire Department for review. Weed abatement may need to be carried out on an on-going basis. 47) Prior to building permit, the developer shall execute an affordable housing agreement ensuring the continued affordability of the units in a form to be approved by the City.