2020/06/04 Planning Commission Resolution (2)PLANNING COMMISSION RESOLUTION NO. 2020-10
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT
PARK FINDING THE FY 2020-21 CAPITAL IMPROVEMENTS PROGRAM IS
CONSISTENT WITH THE ROHNERT PARK GENERAL PLAN 2020
File No. PLCI20-0001
(City of Rohnert Park)
WHEREAS, on July 25, 2000 the City Council approved Resolution No. 2000-152
adopting a comprehensive update of the City's General Plan which included specific policies and
objectives for infrastructure, construction and maintenance of public facilities; and
WHEREAS, the Planning Commission is appointed by the City Council as the Planning
Agency for the City of Rohnert Park and is required by State law to review and find that all
proposed projects included in the Capital Improvement Program (CIP) as provided in Exhibit A
are consistent with the adopted General Plan; and
WHEREAS, in accordance with the California Environmental Quality Act, the Project
manager has determined that finding the Capital Improvement Program in conformance with the
General Plan is not a project pursuant to Section 15378 of the CEQA Guidelines, and additionally,
since this is consistency finding, the previous environmental documentation for the General Plan
is adequate CEQA documentation; and
WHEREAS, on June 4, 2020, the Planning Commission reviewed Planning Application
No. PLCI20-0001 FY 2020-21 Capital Improvement Program General Plan Consistency, at which
time interested persons had an opportunity to testify either in support or opposition to the project;
and,
WHEREAS, at the June 4, 2020 Planning Commission special meeting, upon hearing and
considering all testimony and arguments, if any, of all persons desiring to be heard, the
Commission considered all the facts relating to PLCI20-0001 FY 2020-21 Capital Improvement
Program General Plan Consistency.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ROHNERT PARK DOES RESOLVE: that the Planning Commission of the City of Rohnert
Park does hereby find that the proposed FY 2020-21 Capital Improvement Program, as attached
and incorporated herein, is consistent with the adopted City of Rohnert Park Comprehensive
General Plan and incorporates all information and comment provided at its June 4, 2020 public
meeting as part of its finding, including the staff report.
NOW THEREFORE BE IT FURTHER RESOLVED, that the Planning Commission
does hereby report to the City Council that FY 2020-21 Capital Improvement Program, Planning
Application No. PLCI20-0001 is consistent with the Rohnert Park General Plan 2020.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
1
CIP #Proj. #Project Title Description Location Funding Source Project Status
CITY FACILITIES
OF-65 2017-24 Gold Ridge Multi-Use
Building Roof Replacement
At Gold Ridge Recreation Center, re-roof of
Multi-Use Building. (Demolition of
Administrative Building was previously included
in original project; this work will be addressed
as a separate project instead.)
Gold Ridge Recreation
Center (1455 Golf
Course Drive)
Infrastructure Reserve Construction anticipated for
Summer 2020.
OF-72 2018-27 ADA Transition Plan
Implementation
Implementation of measures to comply with
Americans with Disabilities Act (ADA) standards
for accessibility, as recommended in City's
updated ADA Self-Evaluation and Transition
Plan.
City-owned facilities Infrastructure Reserve Modifications and upgrades to City
facilities through 2020.
OF-76 2019-23 Public Safety Northern
Station Roof Replacement Replace roof at Northern Fire Station
Northern Fire Station
(5200 Country Club
Drive)
Infrastructure Reserve Fund Repairs in Summer 2020.
OF-78 2019-27 Buildings Major Repairs Various major repair and maintenance projects Citywide Infrastructure Reserve Fund Ongoing program as current
funding allows.
OF-83 2020-24 Habitat Mitigation &
Monitoring Plan
Biological resource mitigation (e.g. native plant
re-estasblishment) in conjunction with CEQA,
NEPA and/or resource agency environmental
requirements for capital projects
Various locations in
accordance with
project environmental
document, mitigation
and monitoring plan
Public Facilities Fee
Coordinating with Water Agency
for hand off to their maintenance
plan for Eastside Trunk Sewer
mitigation. Currently have 3 years
left for Water Tank 8 Mitigation
Monitoring.
PARKS AND RECREATION
PR-49 2007-19 Trail to Crane Creek
Regional Park
Construction of multi-use trail connecting
service road to Water Tank No. 8 east of
Petaluma Hill Road to Crane Creek Regional
Park. This trail is part of a multi-phased project
connecting the Copeland Creek Bike Path at its
terminus in Sonoma State University to the
regional park.
East of Petaluma Hill
Road
Open Space District matching
grant, City in-kind match (staff
time, value of water tank service
road), Transportation
Development Act Article 3 (TDA3)
allocation
Phase 1 - Segment A (water tank
service road) is constructed. Phase
1- Segment B (multi-use trail from
water tank road to Crane Creek
Regional Park) is undergoing
engineering and design. Traffic
signal is undergoing engineering
and design.
Exhibit A to Resolution
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
2
CIP #Proj. #Project Title Description Location Funding Source Project Status
OF-63 2017-22
Neighborhood Upgrades:
Creek Path and Sidewalk
Replacement
Replacement of asphalt bicycle/pedestrian
paths in various locations with concrete path;
replacement of damaged concrete sidewalk
Locations for 2020-21
phase TBD, dependent
on funding
Infrastructure Reserve,
Neighborhood Upgrade Fund,
Gas Tax, Casino Supplemental
Contribution, Wilfred Lane
Maintenance
Design for replacement standard is
complete. PDA connector path
design underway. Project locations
of next phase of construction to be
determined.
PR-119 2019-25 Community Center
Upgrades
Community Center Multi-Use Room flooring
replacement, various modifications and repairs
to storage rooms, doors
Rohnert Park
Community Center
(5401 Snyder Lane)
Rohnert Park Foundation,
Infrastructure Reserve
Project scoping complete.
Bids/quotes obtained. Awaiting
approval of FY 2020-21 CIP Budget
for construction.
PR-124 2020-30 Magnolia Pool Replastering Replastering of deteriorating pool surface Magnolia Pool Infrastructure Reserve
Project scoping complete. Awaiting
approval of FY 2020-21 CIP Budget
to initiate next phase of project.
TRANSPORTATION
TR-120 2018-34 Country Club Drive
Rehabilitation
Pavement treatment on segments of Country
Club Drive between Rohnert Park Expressway
and Eleanor Drive
Country Club Drive,
Rohnert Park
Expressway to Eleanor
Avenue
Gas Tax, Road Repair &
Accountablity Act ("SB 1") and
Refuse Road Impact Fund
Engineering and design for Country
Club Drive Overlay in progress.
Construction planned Fall 2020.
TR-126 2019-28 Traffic Signal System Non-
Routine Maintenace
Program of ongoing traffic signal system
components replacement
Various locations
Citywide
Road Maintenance and Repair
Act ("SB1"), Gas Tax, Casino
Supplemental Contribution
As needed infrastructure repairs on
a complaint/ needed basis.
Ongoing.
TR-128 2020-12 Railroad Adjacent Safety
Improvements
Pedestrian, bicycle, and vehicle safety
improvements in vicinity of SMART rail
crossings at Golf Course Drive, Rohnert Park
Expressway, and Southwest Boulevard
SMART rail crossings at
Golf Course Drive,
Rohnert Park
Expressway, and
Southwest Boulevard
Gas Tax, Measure M, Road
Maintenance and Repair Act
("SB1")
Study underway. Design for Phase
1 improvements expected to begin
Summer 2020, with
implementation once Federal
Railroad Authority and SMART
approve design.
TR-129 2020-19 ATMS Signal Integration Adding advanced traffic management system
(ATMS) network control of signals
4 arterial locations to
be determined
Casino Supplemental
Contribution
Awaiting approval of FY 2019-20
CIP Budget before project initiation.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
3
CIP #Proj. #Project Title Description Location Funding Source Project Status
TR-130 2020-20 Dowdell Avenue Alignment
Study
Conceptually laying out the alignment for
Dowdell Avenue to support growth in the NWSP
and Wilfred-Dowdell Specific Plan.
Dowdell Avenue
between Business Park
Drive and Golf Course
Drive West
Public Facilities Fee Analysis and design work expected
to start Fall 2020.
TR-131 2020-21 2020-21 Various Streets
Preventative Maintenance
Preventative mainenance treatments as guided
by Pavement Management Program
Locations TBD, pending
updated 2020
Pavement Mangement
Program report
Gas Tax, Road Repair &
Accountablity Act ("SB 1") and
Refuse Road Impact Fund
Performing preventative
maintenance on our streets per our
preventative maintenance
schedule. Design to begin fall 2020
with construction expected
Summer 2021.
TR-132 2020-22 Local Road Safety Plan
Data-driven traffic safety plan to identify and
analyze safety problems and recommend safety
improvements that reduce traffic accident
fatalities and serious injuries on City streets.
Citywide / Locations
TBD Federal transportation grant
Joined with 7 other agencies to
distribute a joint RFP for consultant
selection; Starting Fall 2020.
TR-133 2020-23
Southwest Blvd Rehab
(Roundabout to No Name
St)
Pavement rehabilitation of Southwest
Boulevard between Commerce Boulevard and
No Name Street
Southwest Blvd
(Commerce Boulevard
to No Name St)
Road Maintenance and Repair
Act ("SB1")
Awaiting approval of FY 2020-21
CIP Budget prior to initiation of
preliminary engineering and design.
TR-134 2020-25 Traffic Signal Infrastructure
Replacement
Replacement program of hardware, cabinets,
controllers,
Citywide, with priority
on main arterials
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-135 2020-26
Video Detection
Replacements
(Commerce/Redwood)
Replacement of video detection at select
intersections
Citywide, with priority
on main arterials
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-136 2020-27 Battery Backup / Battery
Replacement Program
Installation of battery backups for traffic signals,
replacement of existing batteries
Citywide, with priority
on main arterials
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-142 2020-28 RPX/Commerce Pedestrian
Safety Improvements
Implementation of pedestrian safety measures
which may include pedestrian refuge, enhanced
crossing, signal timing adjustments, intersection
reconfiguration.
Rohnert Park
Expressway at
Commerce Boulevard
Casino Supplemental
Contribution
Awaiting approval of FY 2020-21
CIP Budget before project initiation
TR-84 2017-07 Southwest / Commerce
Roundabout
Conversion of existing Intersection into a
roundabout, as as informed by Traffic Signals
System Needs Study (TR-104) and Traffic Flow
Improvement Study (TR-102)
Commerce Blvd @
Southwest Blvd
Public Facilities Fee, Traffic
Signalization Fee Fund, Measure
M, Gas Tax
Project scoping, preliminary
engineering and pre-design in
progress.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
4
CIP #Proj. #Project Title Description Location Funding Source Project Status
TR-124 2018-41
Rohnert Park Expwy/State
Farm Dr Traffic
Improvements
Modifications to Rohnert Park Expressway and
State Farm Drive to add pedestrian refuges, add
two traffic signals, median improvements, and
modify signal timing and striping; median and
pedestrian improvements on Enterprise Drive
Rohnert Park
Expressway, State
Farm Drive, Enterprise
Drive
SB1 Gas Tax, Infrastructure
Reserve, 2007R Bond Loan
Repayment
Design phase in Summer 2020.
OF-71 2018-26 Wooden Pole Streetlights
Replacement
Replacement of wooden pole streetlights with
current street light standard.
F and H Section
neighborhoods, Golf
Course Drive
Casino Mitigation MOU /
Neighborhood Upgrade &
Workforce Housing Contribution,
Infrastructure Reserve Fund, Gas
Tax
Fairway Drive replacements
planned for next phase, pending
availability of funding. Scaled-back
replacement program will be for
replacing streetlight pole
knockdowns only.
TR-117 2017-20 Hwy 101 Bike/Ped Crossing
Feasibility Study
Study to determine the feasibliity and planning-
level cost of a bicycle and/or pedestrian
crossing of Highway 101 within the Rohnert
Park City Limits
Study area limits are
along Highway 101,
bounded by Commerce
Boulevard to the north
and approximately at
the Laguna Channel to
the south.
Measure M, Gas Tax Study is in progress.
TR-98 2015-11
Pavement Repair Services
(ongoing non-capital
pavement maintenance)
Repairs to pavement throughout the City Various locations
Citywide Refuse Road Impact Fund Budget appropriation for project is
established.
WASTEWATER
WW-
34 2018-07 Utilities Office (Sewer
Component)
A facility planning/programming study and pre-
design for new or rehabilitated building for
utilities (sewer and water) staff and functions.
To be determined Sewer Utility Fund Facility programming and design to
commence in 2020.
WW-
37 2019-20 A Section Sewer Line
Replacement
Rehabilitation and/or replacement of sewer
system infrastructure, which may include mains
and lower laterals.
Adele Avenue, Alison
Avenue, Commerce
Boulevard and vicinity
Sewer Utility Fund
Project scoping, preliminary
engineering and pre-design in
progress.
WW-
40 2020-14 L-Section Siphon
Replacement
Replacement of siphon lines in-kind or with
gravity line as determined by study.L Section Sewer Capital Preservation Engineering analysis and design in
Winter 2020.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
5
CIP #Proj. #Project Title Description Location Funding Source Project Status
WW-
41 2018-34
Manhole Lid Replacement
on Country Club Drive
Paving
Replacement of manhole lids on segments of
Country Club Drive paving project.
Country Club Drive
(Rohnert Park
Expressway to Eleanor
Avenue)
Sewer Capital Preservation
Engineering and design for Country
Club Drive Overlay in progress.
Construction planned Fall 2020.
WW-
42 2017-07 Roundabout Manhole
Abandonment
Sewer manhole abandonment in preparation
for roundabout project.
Vicinity of Commerce
Blvd @ Southwest Blvd Sewer Capital Preservation
Roundabout project is in project
scoping and preliminary
engineering.
WW-
43 2017-17 Manhole Lid Replacement
on East Cotati Ave Paving
Replacement of manhole lids on segments of
East Cotati Avenue concurrent with paving
project.
East Cotati Avenue
(Sunflower Drive to
Snyder Lane)
Sewer Capital Preservation
Design and construction drawings
of paving project (including
manhole cover adjustments) are
near completion. Coordination with
PG&E in progress.
WW-
45 2020-15 I & I Reduction - B Section
(East of Adrian)
Various strategies to reduce groundwater and
surface water inflow and infiltration (I & I) into
sewer collection system
Locations in B Section
as determined by
sewer master plan
Sewer Capital Preservation Awaiting approval of FY 2019-20
CIP Budget before project initiation
WATER
WA-27 2019-29 Commerce Water Line
Replacement
Water line upgrade along Commerce Boulevard
from State Farm Drive to Golf Course Drive,
including 300 feet of State Farm Drive at the
Commerce Blvd intersection, and along Golf
Course Drive from Commerce Boulevard to
Roberts Lake Road
Commerce Boulevard,
State Farm Drive, Golf
Course Drive
Water Preservation Charge,
Water Capacity Charge Project scoping.
WA-44 2017-30 Water Systems Controls and
Telemetry Upgrade of water telemetry system Citywide Water Utility Fund, Water Capital
Preservation Charge Implementation in progress.
WA-59 2019-18 Water Meter Replacements Replacement of large commercial water meters Various locations
Citywide
Water Capital Preservation
Charge, Sewer Capital
Preservation Charge
Awaiting approval of FY 2019-20
CIP Budget before adding meters to
be replaced.
WA-60 2019-19 Well Pump/Motor
Replacement Replacing well pumps and motors Citywide Water Capital Preservation
Charge
Awaiting approval of FY 2019-20
CIP Budget before project initiation
WA-63 2020-16
Wells 7, 11, 13, 16, 27 & 39
Electrical & Structural
Upgrades
Upgrades of electrical systems at water wells
sites; stuctural repairs to building, inlcuding
roofing, siding, and doors and locks; well site
security.
Wells 7, 11, 13, 16, 27
& 39
Water Capacity Charge, Water
Capital Preservation Charge
Project scoping underway. Awaiting
approval of FY 2019-20 CIP Budget
before further work on project.
FY 2020-21 CAPITAL IMPROVEMENTS PLAN (CIP) BUDGET
PROJECT DESCRIPTIONS
6
CIP #Proj. #Project Title Description Location Funding Source Project Status
WA-64 2020-17
Tank & Pump Seismic
Bracing Evaluation &
Correction
Water system resiliency and seismic upgrades
to water distrubution system infrastructure Citywide Water Capital Preservation
Charge
Project scoping underway. Awaiting
approval of FY 2019-20 CIP Budget
before further work on project.
WA-65 2019-20 A Section/Commerce Water
Line Replacement Ph 1
Water main replacement and/or upgrade
concurrent with sewer system work in
southwest A Section
Adele Avenue, Alison
Avenue, Commerce
Boulevard and vicinity
Water Utility Fund
Project scoping underway. Awaiting
approval of FY 2019-20 CIP Budget
before further work on project.