Loading...
2021/05/25 City Council Resolution 2021-058 RESOLUTION NO. 2021-058 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK APPROVING A TENTATIVE MAP TO ALLOW THE SUBDIVISION OF PROPERTY LOCATED SOUTH OF ROHNERT PARK EXPRESSWAY,EAST OF THE GREEN MUSIC CENTER,AND NORTH OF COPELAND CREEK(APN 047- 131-026 AND 027) WHEREAS, the applicant, University District LLC, filed a Tentative Map (attached to this Resolution as Exhibit 1) for a 203-small lot subdivision of 34.34-acres in the University District Specific Plan ("UDSP") area located south of Rohnert Park Expressway, east of the Green Music Center, and north of Copeland Creek (APN 047-131-026 and 027) (the "Project"), in accordance with the City of Rohnert Park Municipal Code("RPMC"); and WHEREAS, on May 23, 2006 the City Council of the City of Rohnert Park adopted Resolution 2006-141 certifying the Final EIR prepared for the UDSP and associated General Plan amendments; and WHEREAS, the City Council approved an Addendum to the Final EIR, as described in City Council Resolution No. 2014-032 on April 8, 2014; and WHEREAS, on March 25, 2021 the Planning Commission held a duly noticed public hearing at which time interested persons had an opportunity to testify either in support or opposition to the Project; and WHEREAS, the Planning Commission adopted Resolution No. 2021-06 recommending the City Council approve the Tentative Map; and WHEREAS, on May 25, 2021 the City Council held a duly noticed public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposal; and WHEREAS, pursuant to California State Law and the RPMC, public hearing notice was published for a minimum of 10 days prior to the public hearing in the Community Voice; and WHEREAS, the City Council reviewed and considered the information contained in Planning Application No. PLSD20-003 in Exhibit 1 for the proposed Tentative Map for the property; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby make the following findings and determinations: Section 1. The above recitations are true and correct. Section 2. Environmental Review: A. On May 23, 2006, the City Council of the City of Rohnert Park certified the Final EIR for this Project, including adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program, as described in City Council Resolution No.2006-141. The City Council approved the Addendum to the Final EIR, as described in City Council Resolution No. 2014-032 approved on April 8, 2014. The proposed Tentative Map is consistent with the analyses in the 2006 EIR and 2014 Addendum and will not result in additional environmental effects not previously evaluated in the EIR and Addendum. No additional environmental review is necessary. B. Further, CEQA Guidelines section 15162 provides that "no subsequent FIR shall be prepared" for a project unless the lead agency determines that (1) "substantial changes are proposed in the project which will require major revisions of the previous EIR"; or (2) "substantial changes occur with respect to the circumstances under which the project is undertaken"; or (3) "new information of substantial importance ... shows" one or more significant effects not discussed in the original EIR, greater severity to previously-identified substantial effects, or newly-found feasible mitigation measures that would substantially reduce significant effects. The proposed Tentative Map will not result in any changes to the project not previously analyzed in the 2006 EIR and 2014 Addendum and no new information of substantial importance shows any significant effects or newly found feasible mitigation measures that would substantially reduce significant effects. Section 3. Findings Regarding Tentative Map. The City Council hereby makes the following findings pursuant to Rohnert Park Municipal Code 16.10.090(E)(1): 1. The proposed map, and its design and improvements, are consistent with the general plan and any applicable specific plan, any policy or guideline implementing the general plan (including the city's design guidelines), or other applicable provisions of this code. Criteria Satisfied. The proposed Tentative Map is consistent with the General Plan designations for the area, as well as the specific plan that applies to the property, as amended in conjunction with this application. The proposed Tentative Map will implement the General Plan in that it would increase the City's existing housing stock consistent with the Project approvals, the variety of housing types and policies of the City's Housing Element by complying with the City's inclusionary housing ordinance. Resolution 2021-058 2 The proposed Tentative Map is consistent with the revised University District Specific Plan as it proposes to subdivide the property according to its requirements related to number of residential units, density, housing type, housing location, public improvements, open space and related amenities. The Tentative Map depicts the specific residential lots and uses consistent with those in the Specific Plan. The proposed Tentative Map has been designed to meet City standards which provide satisfactory pedestrian and vehicular circulation, including emergency vehicle access and on-site improvements, such as streets, utilities, and drainage facilities have been designed and are conditioned to be constructed in conformance with City standards. 2. The site is physically suitable for the type ofdevelopment. Criteria Satisfied. With implementation of conditions of approval pertaining to relocating the temporary stormwater detention basin from the Project site, the Tentative Map reflects the specific plan for this site, which is physically suitable for the proposed development. No major geologic hazards have been reported on the site or other limited conditions that would render it unsuitable for residential development. 3. The site is physically suitable for the proposed density of development. Criteria Satisfied. The site is of sufficient size and shape and appropriately shown in the Specific Plan to allow the proposed density of development. The subdivision has been designed to accommodate the development of 203 residential units, taking into consideration the shape and topography of the site. This development is consistent with the density ranges provided for in the General Plan and Specific Plan. 4. The design of the subdivision or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat, absent a statement of overriding conditions. Criteria Satisfied. An Environmental Impact Report (EIR) (State Clearinghouse number 2003112011) and an Addendum to the EIR were prepared and certified for the University District Specific Plan and associated General Plan amendments which identified potential impacts related to the development of the site with the proposed uses, including uses proposed with the subject Tentative Map Project. No significant unavoidable impacts related to existing habitats were identified. The Final EIR for the UDSP and associated General Plan amendments with which the Project is consistent included adoption of associated CEQA Findings, Statement of Overriding Considerations, and a Mitigation Monitoring and Reporting Program. The contents of the Final EIR are incorporated herein by this reference. 5. The design of the subdivision or the type of improvements will not cause serious public health problems. Resolution 2021-058 3 Criteria Satisfied. The design of the subdivision is not expected to have negative impacts on the health or wellbeing of project residents or occupants of the surrounding land uses. The design of the Tentative Map is in conformance with the City's General Plan, Zoning Ordinance, and Subdivision Ordinance. The construction of all units on the site has been conditioned to comply with all applicable City ordinances, codes, and standards including, but not limited to, the California Uniform Building Code, the City's Ordinances relating to Stormwater runoff management and controls. In addition, the design and construction of all improvements for the subdivision has been conditioned to be in conformance with adopted City street and public works standards. The City's ordinances, codes, and standards have been created based on currently accepted standards and practices for the preservation of the public health, safety and welfare. Finally, the proposed street system throughout the subdivision will provide appropriate emergency vehicular access for the Project. 6 The design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property with the proposed subdivision, absent alternative, equivalent easements. Criteria Satisfied. The project will respect all existing easements, and any new easements required by the project have been made conditions of the map approval. 7. Any proposed phases and their proposed sequence of construction are identified on the submitted map. Criteria Satisfied. There are no proposed phases as the Project will be constructed in a single phase. Section 4. Approval of Tentative Man. The City Council hereby approves the Tentative Map (Planning Application No. PLSD20-003) subject to the Conditions of Approval in Exhibit 2 and the City Manager is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 25th day of May 2021. CIgOFNERT PARK , Mayor ATTEST: Sylvia Lope as, City Clerk Resolution 2021-058 �= 4 Attachments: Exhibit 1 Exhibit 2 LINARES: STAFFORD: ELWARD: �GIUDICE: ADAMS: _--t AYES: ( ) NOES: (.g) ABSENT: (g) ABSTAIN: (�) Resolution 202]-058 5 I-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETI-8 STREET I-9 STREET PARCEL B 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 113 114 118 147 121 146 109 110 122 PARCEL C 36 34 3 2 138 198 117 84 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 175 172 184 183 180 179 176 163 151 152 155 156 159 160 PARCEL G 143 19 6263104105140 2160 PARCEL E 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 ROHNERT PARK EXPRESSWAY SONOMA STATE UNIVERSITY COPELAND CREEK J-SECTION PARCEL D PARCEL F 39 144 145 PARCEL A I-10 STREET PARCEL H 37 UNIVERSITY DISTRICT UDLLC PROPERTY CITY OF ROHNERT PARK, CALIFORNIA DECEMBER 2020 TABLE OF CONTENTS LEGEND ABBREVIATIONS OWNER/DEVELOPER/CONSULTANTS:UTILITY COMPANIES: BASIS OF ELEVATIONS - BENCHMARK: BASIS OF BEARINGS: Know what's below. before you dig.CallR * GENERAL NOTES: 1.ASSESSOR'S PARCEL NUMBERS: 047-131-027 AND 047-131-026 2.PROPERTY ACREAGE: 34.34 ACRES 3.EXISTING LAND USES: REFER TO 2014 UNIVERSITY DISTRICT SPECIFIC PLAN (APPROVED). 4.INDIVIDUAL LOT AND PARCEL SIZES ARE SHOWN ON TENTATIVE MAP SHEET 4. THE APPLICANT RESERVES THE RIGHT TO ADJUST LOT WIDTHS UP TO 2 FEET (SO LONG AS THEY MEET THE REQUIRED SETBACKS) AND ARE STILL IN CONFORMANCE WITH THE APPROVED MAP. FOR REFERENCE THE SMALLEST AND LARGEST FOR SALE LOTS ARE: ·SMALLEST - 58' X 58' = 3,364 SF (MULTIPLE LOTS) ·LARGEST - 7,295 SF (LOT 184) 5.EXISTING PROPERTY USE: VACANT / TEMPORARY STORM WATER DETENTION. 6.AREAS SUBJECT TO INUNDATION: PER VAST OAK LOMAR PROCESSED BY ENGEO FOR COPELAND CREEK REFER TO EXISTING CONDITIONS MAP SHEET C2 FOR LIMITS OF FLOOD PLAIN. 7.PERMANENT AND CONSTRUCTION ACCESS FOR THIS PROJECT SHALL BE FROM ROHNERT PARK EXPRESSWAY. APPLICANT RESERVES THE RIGHT FOR FUTURE ACCESS TO THESE STREETS AND OTHER STREETS TO BE CONSTRUCTED. 8.UNLESS OTHERWISE SPECIFICALLY STATED IN THE CONDITIONS OF APPROVAL, LOCAL AGENCY APPROVAL OF THIS MAP SHALL CONSTITUTE AN EXPRESS FINDING THAT THE PROPOSED SUBDIVISION AND DEVELOPMENT OF THE SUBJECT PROPERTY WILL NOT UNREASONABLY INTERFERE WITH THE FREE AND COMPLETE EXERCISE OF RIGHTS DESCRIBED IN GOVERNMENT CODE SECTION 66436(a)(3)(A)(i). 9.LANDSCAPE AND FENCING DETAILS FOR THE RESIDENTIAL AND THE PRIVATE HOA PARCELS WILL BE CONCEPTUALLY DETAILED WITH THE DEVELOPMENT AREA PLANS (DAP). ADDITIONALLY, THE DAP WILL PROVIDE DETAIL ON UNIT MIX, SETBACKS AND PARKING REQUIREMENTS. 10.THE PROJECT SITE IS PART OF ASSESSMENT DISTRICT 05-01. 11.THE PRELIMINARY GRADES AND UTILITY ROUTING SHOWN ARE SUBJECT TO CHANGE BASED ON FINAL DESIGN. 12.DOMESTIC WATER SERVICE TO BE PROVIDED BY CITY OF ROHNERT PARK. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK AND SONOMA COUNTY WATER AGENCY (SCWA) STANDARDS. LOCATION OF FIRE HYDRANTS TO BE COORDINATED WITH CITY'S PUBLIC SAFETY DIVISION PRIOR TO FINAL DESIGN. 13.SEWAGE SERVICE TO BE PROVIDED BY CITY OF ROHNERT PARK. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK STANDARDS. 14.ELECTRIC AND GAS SERVICE TO BE PROVIDED BY PACIFIC GAS & ELECTRIC. WHEN INSTALLED IT SHALL BE IN CONFORM WITH CITY OF ROHNERT PARK AND PG&E STANDARDS. GENERAL NOTES CONTINUED: 15. TELEPHONE SERVICE TO BE PROVIDED BY AT&T (FORMERLY SBC) AND SHALL ADHERE TO THEIR STANDARDS WHEN INSTALLED. 16.SCHOOL DISTRICT: THE UDLLC PROPERTY IS LOCATED COMPLETELY WITHIN AND WILL BE SERVICED BY THE COTATI-ROHNERT PARK UNIFIED SCHOOL DISTRICT. 17.FOR ALL LOTS INCLUDING MOTORCOURT PRODUCTS, ON LOT DRAINAGE SHALL FLOW TO THE FRONT OF EACH LOT. THE DRAINAGE PATTERNS WILL BE BETTER REFINED WITH THE DAP PROCESS. 18.LIGHTING WITHIN THE PRIVATE ALLEY MOTORCOURTS SHALL BE PROVIDED BY HOUSE LIGHTS. 19.UPON APPROVAL OF THIS MAP, APPLICANT ACKNOWLEDGES THAT ADDITIONAL STUDIES MAY BE REQUIRED (SUCH AS ACOUSTICAL) WITH FINAL DESIGN TO IMPLEMENT CONCEPTS SHOWN ON THIS TENTATIVE MAP APPLICATION. ADDITIONAL EASEMENTS, DEED RESTRICTIONS AND OR MAINTENANCE AGREEMENTS MAY BE NEEDED AS DETERMINED DURING THE FINAL DESIGN. PLANS FOR ALL ONSITE/OFFSITE IMPROVEMENTS WILL BE PREPARED AND SUBMITTED TO THE APPROPRIATE AGENCIES FOR APPROVAL PRIOR TO COMMENCEMENT OF CONSTRUCTION. 20.REFER TO AMENDED AND RESTATED DEVELOPMENT AGREEMENT FOR REQUIREMENTS/TIMING OF AFFORDABLE HOUSING, PHASING/TIMING OF INFRASTRUCTURE AND ENERGY REQUIREMENT STANDARDS. VICINITY MAP Exhibit 1 to Resolution M MAPPED FLOOD PLAIN (ENGEO)118119120125125 120128 12513 0 135 140 14014 0 125130135130135 140145120 125 130 125 120128 ROHNERT PARK EXPRESSWAY APPROXIMATE CENTERLINE OF CREEK COPELAND CREEK EXISTING CANOPY LINE EXISTING WETLAND PARCEL G 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105 140 2160 PARCEL E EXISTING DETENTION BASIN KARRINGTON ROAD KERRY ROAD 145 144 37 PARCEL H PARCEL FPARCEL DPARCEL A LEGEND MAPPED FLOOD PLAIN (ENGEO) EXISTING WETLAND EXISTING CANOPY LINE APPROXIMATE CENTERLINE OF CREEK PLAN 2AACPLAN 4A ACPLAN 3A ACPLAN 2AACPLAN 1AACPLAN 4A ACACACW SS WW WSS 59' RIGHT OF WAY 36' CURB TO CURB 5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 8' TRAIL 8' PARKING 8' PARKING 10' DRIVE LANE 10' DRIVE LANE 59' R/W STREET C/L 1.5%2%2%2%2%1.5% 5"AC OVER 4" AB 18" LTSG FCFC NTS PAVEMENT DESIGN CHART: NOTE: PAVEMENT DESIGN SECTIONS ARE BASED THE PROJECT GEOTECHNICAL REPORT BY ENGEO DATED APRIL 03, 2006, REVISED DECEMBER 12, 2012, WHICH ASSUMES A PRELIMINARY 'R' VALUE OF 5. FINAL STRUCTURAL SECTION WILL BE DETERMINED AFTER 'R' VALUE TEST OF SUBGRADE MATERIAL IS COMPLETED FOLLOWING THE CALTRANS FLEXIBLE PAVEMENT DESIGN CRITERIA AND APPROVAL OF THE CITY ENGINEER. AB SHALL BE CLASS 2 (R=78) PER CALTRANS STANDARD SPECIFICATIONS. ASB SHALL BE CLASS 2 (R=50) PER CALTRANS STANDARD SPECIFICATIONS. PAVEMENT SECTIONS ABTIACSTREET NAME PRIVATE LANES/MOTORCOURT 10"5 3" LTSG 0" NEIGHBORHOOD STREETS 4"7 5"18"4"1.5'6"FALL 1.0' (TYP.) 1/2" R1"1"3"FL 1/2" R 6"4" MIN.CLASS II AB(TRC) TOP OF ROLLED CURB ELEV. 36.5' R/W 52' R/W 59' R/W I-9 I-1 THROUGH I-5 I-6 52' RIGHT OF WAY 32' CURB TO CURB 5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 5' S/W 6' PARKING 6' PARKING 10' DRIVE LANE 10' DRIVE LANE 52' R/W STREET NTS 28' CURB TO CURB 37.5' RIGHT OF WAY R/W 5'0.5' 4"PCC/4"AB 6' PARKING 12' DRIVE LANE 10' DRIVE LANE RESIDENTIAL 4' L/S S/W 37.5' R/W STREET NTS C/L C/L 2%2%2%1.5% 1.5%2%2%2%2%1.5% 4"PCC/4"AB4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG 18" LTSG 5"AC OVER 4" AB FCFC FCFC TCB 20' PRIVATE LANE 2% CONCRETE BAND (SEE DETAIL RIGHT) 3" AC/ 10" AB TRC 3.5' ROLLED CURB AND GUTTER (SEE DETAIL RIGHT) 10.0' C/L 20' WIDE PRIVATE LANE NTS 10.0' STREET SECTION LEGEND SWLK + + + + + 2% MIN TYP HP (TYP) AD (TYP) THROUGH CURB DRAIN OR SD STUB FC AD R/W HP BIO-RETENTION CELL (LOCATION VARIES)5%MIN12% MAX(LOW SIDE)1% MINR/W TC SIDEWALK LANDSCAPE STRIP ROLLED CURB DETAIL NTS TYPICAL LOT DRAINAGE NTS TYPICAL DRIVEWAY DETAIL NTS STANDARD CITY DETAILS 27' PRAE, PUE 3.5' 5' PUE 5' PUE 5' PUE FC R/W AND BW TYPICAL UTILITY/TREE LAYOUT (FACING STREET) NTS 4' MIN BETWEEN TREE AND D/W FLUSH CONCRETE BAND 6"6"SLOPE VARI E SDRIVEWAY A P R O N 8"4" MIN. CLASS II AB (TYP.) 1/2" R NTS(BEL) TOP OF CONC.BAND ELEV.ON-LOT BIORETENTION DETAIL NTS BACK OF CONCRETE BANDSD PER CITY STD 864 (TYP) TYPICAL 4-PACK MOTORCOURT DETAIL (WITH DUAL SS DOWN ALLEY) NTS BIO CELL (49 SF TYP) DUAL LOT BIO SWALE (98 SF TYP) JT SERVICE (TYP) TRC DUAL SSROHNERT PARK EXPRESSWAY SLOPE VARIES 1.5% MIN. - 3:1 MAX 4" PCC/ 4" AB4" PCC/4" AB 5' PUE 5' PUE 37.5' R/W I-7 THROUGH I-8 NOTE: BIOSWALE LOCATION TO BE DETERMINED WITH DEVELOPMENT AREA PLAN R/W 8' L/S 1.5% PAD P/L PAD TYPICAL REAR OR SIDEYARD DETAIL NTS KICKBOARD UNDER FENCE BNDY/ RPX R/W 36.5' RIGHT OF WAY 27' CURB TO CURB4' R/W RESIDENTIAL L/S 5' S/W R/W OPEN SPACE 9.5' TRAIL 6' PARKING 10' DRIVE LANE 11' DRIVE LANE 36.5' R/W STREET NTS C/L 1.5%2%2%2%1.5% 4"PCC/4"AB4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG FCFC 5' PUE 1' P/L PARCEL E 0.5' BUUBLE-UP GRAVEL SHOULDER 42" HIGH BLACK TUBULAR STEEL FENCE 18" ACACACACACACN0°02'45"E 300.00' BNDYN89°23'45"E 95.00' BNDY N0°02'45"E80.00' BNDYN89°23'45"E 95.00' BNDY N0°02'45"E 342.98' BNDY1671'N0°02'01"W 871.58' BNDYM PRIVATE MOTORCOURT (TYP.) I-8 STREETI-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETI-9 STREET OPEN SPACE PUBLIC STORM DRAIN EASEMENT WATER QUALITY BASIN PUBLIC STORM DRAIN EASEMENT ** * LANDSCAPE 3816± SF 175 3816± SF 172 3816± SF 184 3816± SF 183 3816± SF 180 3816± SF 179 3816± SF 176 3816± SF 163 3816± SF 151 3816± SF 152 3816± SF 155 3816± SF 156 3816± SF 159 3816± SF 160 3596± SF 35 3596± SF 32 3596± SF 31 3596± SF 28 3596± SF 27 3596± SF 24 3596± SF 23 3596± SF 5 3596± SF 6 3596± SF 9 3596± SF 10 3596± SF 13 3596± SF 14 3596± SF 17 3596± SF 18 3596± SF 92 3596± SF 75 3596± SF 87 3596± SF 80 3596± SF 88 3596± SF 79 3596± SF 91 3596± SF 76 3596± SF 100 3596± SF 67 3596± SF 95 3596± SF 72 3596± SF 96 3596± SF 71 3596± SF 99 3596± SF 68 3596± SF 103 3596± SF 64 3744± SF 194 3710± SF 197 3811± SF 190 3777± SF 193 3844± SF 189 4984± SF 41 3596± SF 58 3596± SF 57 3596± SF 54 3596± SF 53 3596± SF 50 3596± SF 49 3596± SF 46 3596± SF 45 3596± SF 42 3816± SF 171 3816± SF 164 3364± SF 44 3364± SF 47 3364± SF 48 3364± SF 51 3364± SF 52 3364± SF 55 3364± SF 56 3364± SF 43 3364± SF 59 3906± SF 20 3906± SF 61 3364± SF 33 3364± SF 22 3364± SF 25 3364± SF 26 3364± SF 29 3364± SF 30 3364± SF 15 3364± SF 12 3364± SF 11 3364± SF 8 3364± SF 7 3364± SF 4 4318± SF 107 3364± SF 120 4793± SF 108 4708± SF 111 3568± SF 112 3364± SF 115 3364± SF 116 3364± SF 119 4793± SF 138 3714± SF 126 3741± SF 142 3714± SF 129 3714± SF 130 3714± SF 133 3948± SF 134 4793± SF 137 3364± SF 199 3364± SF 196 3364± SF 195 3364± SF 192 3364± SF 191 3527± SF 123 4126± SF 167 4126± SF 168 4747± SF 40 3570± SF 165 3570± SF 150 3570± SF 153 3570± SF 154 3570± SF 157 3570± SF 158 3570± SF 161 3570± SF 162 4126± SF 148 4126± SF 187 4295± SF 106 4024± SF 113 3784± SF 114 3784± SF 118 4382± SF 147 3784± SF 121 3741± SF 146 4793± SF 109 4793± SF 110 3758± SF 122 0.65±AC PARCEL C 7295± SF 39 3596± SF 36 3364± SF 34 3654± SF 3 3655± SF 2 4671± SF 1 6738± SF 38 3677± SF 198 3784± SF 117 3628± SF 84 3364± SF 89 3364± SF 90 3364± SF 93 3364± SF 94 3364± SF 97 3364± SF 98 3364± SF 101 3364± SF 86 3364± SF 102 3628± SF 83 3308± SF 85 3308± SF 82 3364± SF 70 3364± SF 73 3364± SF 74 3364± SF 77 3364± SF 78 3364± SF 65 3364± SF 81 3364± SF 66 3364± SF 69 0.11±AC PARCEL B 3923± SF 202 3654± SF 203 3331± SF 201 3074± SF 200 3484± SF 188 3570± SF 174 3570± SF 177 3570± SF 178 3570± SF 181 3570± SF 182 3570± SF 185 3570± SF 170 3570± SF 173 3774± SF 169 3774± SF 166 3774± SF 149 3774± SF 186 3513± SF 124 3364± SF 16 3687± SF 125 4793± SF 139 4708± SF 136 3568± SF 135 3364± SF 132 3364± SF 131 3364± SF 128 4063± SF 141 3364± SF 127 3868± SF 143 3502± SF 19 3568± SF 62 3906± SF 63 3906± SF 104 3568± SF 105 3980± SF 140 3568± SF 213644± SF 60 0.36±AC PARCEL E 3364± SF 37 0.15±AC PARCEL A 3741± SF 145 4123± SF 14431'38'67'58'47'67'62' 62'67'62' 62'31'47'58' 38'62'58'62'62'62'62'62'58'62'58'62'62'62'62'58'62'62'58'62'62' 62'62'62'62'58'62'62'58'62'62'62'62'62'62'58' 58'62'62'62'62'62'62'58'62'62'58'62'62'62'62'62'62'58'62'58'62'62'62'62'62'58'62'62'58'62'62'62'62'62'62'58'67'62'67'62'67'47'3 1'38'38'31'47'14' 56'58'58'20'31'58'66' 67'58'65'58'58'58'58'58'58'58'65'58'64'58'58'58'58'58'58'58'64'58'63'58'58'53'58'53'58'53'63'63'62'63'58'63'238'130'37'204'10' 561' 20' 58'72' 10' 49'15'186'14'4 8' 9'24'38'58'58'43'64'16'58'64'58'58'58'58'58'58'58'64'58'64'58'58'58' 58'58'58'58'64'43'3 1'44'63'38'31'43'65'43'16'60'58'73'39'22'58' 58'58'58'65'58'58'65'58'58'58' 58'58'58'65'58'58'65'58'58'58'43'3 1'38'63'45'31'43'54'64'74'44'31'74'64'74'64'64'11'63'64'28'47' 74'64'74'64'44'30'64'60'14' 74' 54'3 1 '44'72'60' 7'64'39'71'54'3 3'73'58' 58'65'58'65'69'58'22'65'58' 36'65'65'63'44'19'24'31' 38'59'58'39'31' 62' 62'59'59'62' 62'38'3 1 '39'58'58'58'58'62'58'62'58'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'62'58'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'63'38'31'43'63'62'63'62'43'3 1'38'63'36'33'45'58'63'52'10' 62'62'63'62'43'3 1'38' 58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58' 58'58'58'62'58'62'58'58'58'58'58'58'62'58'62'58'58'58'108'60'58'62'58'58'58'67'80'51'31'62'80'79'6'61'20'10' 53'14'188'14'4 6' 9' 20' 622' 28' 63'70'78'68'10'58'63'48'58'5' 58'58'58'58'58' 57'58'62'58'58'62'58'58'58'58'62'58'58'58'58'58'58'62'58'58'62'58'58'58'58'58'62'58'58'62'58'58'58' 56'15 '33'18'58'62'58'17'10' 55'1 8'304'38'195' 41'255'71'66'144'18'5 5' 11' 6 9'14'144'6 5'72'255'42' 195' 38'304'1 4'52'22'128'143'30'19'43'208'343'0.40±ACPARCEL D2.95±AC PARCEL G 143'20' 20' OPEN SPACE LANDSCAPE 98'107'62'N89°23'45"E 1692.78' BNDY N89°55'52"E 1691.47' BNDY ROHNERT PARK EXPRESSWAY EX MAINTENANCE EASEMENT OVER COPELAND CREEK I-10 STREET * 5.88±AC PARCEL F 0.16±AC PARCEL H ACACACACACAC*GANG MAILBOX LOCATIONS TO BE ADJUSTED, AS NEEDED, WITH FINAL DESIGN BASED ON APPROVAL OF POSTAL SERVICE TYPICAL 4-PACK MOTORCOURT DETAIL NTS FRONT DOOR ORIENTATION FC R/W AND BW HOUSES FACING STREET NTS TYPICAL 4-PACK MOTORCOURT DETAIL (LOTS FRONTING I-3 STREET) NTS 12 0 12 5 13 0 120120 120120120 120 120120120125125125 125125125125 125125130130 130130130130130 130135131131132133134 136136 137138139130 130 130 130 130130130 130 120 120125 125 125 130130 135135135 135 140140 140 140 140 140 1 4 0 14014014014 0 14 0 140140125 125 125125 120 120 125 125 12 5 M INV 114.6± 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5%0.5%0.5%0.5% 0 . 5 % 1.0%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%1.0%0.5%0.5%0.7%0.5%0.5%1.0%0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 3.5:1 MAX 0.5%0.5%0.5%0.5%0.5%136.0 132.6 HP 133.6 GB 130.9 LP 128.9 129.7 128.8LP 128.2128.4HP 128.7LP 128.3HP 128.6 LP 127.9 HP 128.5 LP 128.0 HP 128.4 LP 126.8 HP 127.6 LP 127.1 HP 127.9 LP 127.2 HP 128.0 LP 127.3 128.9 LP 128.2 LP 129.3 LP 130.0 HP 130.4 LP 132.4 HP 132.6 LP 130.8 131.2 135.30.5%0.5%0.5%0.5% P135.3 P135.4 P135.2 P135.3 P134.7 P134.8 P134.6 P134.7 P134.2 P134.3 P134.1 P134.2 P133.6 P133.7 P133.5 P133.6 P135.8 P135.7 P135.2 P135.1 P135.1 P135.0 P134.7 P134.6 P134.6 P134.5 P134.2 P134.1 P134.1 P134.0 P133.2 P133.2 P130.9 P131.4 P130.5 P131.0 P131.5 P132.0 P131.0 P131.5 P132.0 P132.5 P131.6 P132.1 P132.1 P132.6 P131.9 P132.4 P132.9 P133.3 P132.2 P132.7 P135.1 P135.6 P135.0 P135.5 P134.5 P135.0 P134.4 P134.9 P134.0 P134.5 P133.9 P134.4 P133.4 P133.9 P133.3 P133.8 P132.8 P133.3 P132.7 P133.2 P134.2 P134.3 P133.7 P133.6 P133.6 P133.5 P133.4 P133.3 P133.5 P133.4 P133.0 P132.9 P132.9 P132.8 P132.4 P132.3 P132.3 P132.2 P131.8 P131.7 P131.7 P131.6P130.6 P131.1 P130.0 P130.3 P129.9 P129.9 P130.3 P130.2 P130.2 P130.1 P130.8 P130.7 P130.6 P130.5 P130.7 P130.6 P130.2 P130.1 P130.7 P130.6 P131.3 P131.2 P132.8P132.5 P135.8 P135.9 P136.3 P136.3 P128.5 P128.3 P128.3 P128.2 P128.2 P128.1 P128.4 P128.3 P128.5 P128.4 P128.5 P128.4 P128.6 P128.5 P128.5 P128.4 P128.6 P128.5 P129.6 P129.5 P128.9 P128.8 P129.0 P128.9 P129.2 P129.1 P129.3 P129.2 P129.0 P128.9 P128.9 P128.8 P128.9 P129.4 P129.0 P129.5 P129.2 P129.3 P129.1 P129.2 P128.9 P129.4 P128.6 P129.1 P128.8 P129.3 P129.1 P129.6 P128.7 P129.2 P128.5 P128.7 P128.2 P128.3 P128.1 P128.2 P128.8 P128.9 P128.7 P128.8 P129.0 P129.1 P128.9 P129.0 P129.1 P129.2 P129.2 P129.3 P129.5 P129.8 P129.0 P129.5 P136.4 P128.8 P128.7 P128.9 P128.8 2.5%2.0% 2.5%2.0% 2.5%2.0% 4.0%2.0% 4.0%2.0% 3.5%2.0% 3.5%2.0% 3.5%2.0% 0.5% 0.5% 0.5% 0.5% 0.5% 3.5%2.0%0.5%1.0%HP 129.7 0.5%4:1MAX0.5%129.8 GB1.0%0.5%0.5% P129.9 P129.8 P135.9 P135.8 2.0% 2.0% 2.0% 2.0% 2.0% EX TC 122.6 EX TC 129.3 EX TC 130.5 EX TC 136.1 EX TC 137.1 EX TC 139.5 FG 119.4 SD INV 116.19 GRT 123.1 COPELAND CREEK I-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETSD INV 127.4 SD INV 127.1 SD INV 126.8 SD INV 126.7 SD INV 126.4 SD INV 126.0 SD INV 125.6 SD INV 125.1 SD INV 125.0 SD INV 124.7 SD INV 125.3 SD INV 125.6 SD INV 126.2 SD INV 126.3 SD INV 126.3 SD INV 124.9 SD INV 124.5 SD INV 124.1 SD INV 123.9 SD INV 124.2 SD INV 124.4 SD INV 124.6 SD INV 125.3 SD INV 125.5 SD INV 125.9 SD INV 123.5 SD INV 123.3 SD INV 123.4 SD INV 123.0 SD INV 123.1 SD INV 122.4 SD INV 122.5 SD INV 122.0 SD INV 121.8SD INV 121.9 SD INV 122.9 SD INV 121.3 SD INV 120.3 SD INV 120.8 SD INV 120.3 SD INV 120.6 SD INV 121.1 SD INV 121.2 SD INV 121.4 SD INV 122.1 SD INV 121.9 SD INV 122.0 SD INV 122.4 SD INV 122.7 SD INV 122.8 SD INV 122.9 SS INV 114.96 SS INV 116.5 SS INV 119.1 SS INV 118.1 SS INV 116.9 SS INV 118.2 SS INV 121.5 SS INV 120.4 SS INV 119.2 SS INV 120.3 SS INV 121.5 SS INV 122.3 SS INV 122.5 SS INV 118.1 SS INV 119.2 SS INV 120.3 SS INV 119.1 SS INV 117.0 SS INV 118.2 HH I I EE I-8 STREET G G LIMIT OF GRADING ROHNERT PARK EXPRESSWAY PARCEL G 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105 140 2160 PARCEL E SD INV 120.1 B B CC D D SD INV 124.0 SS INV 119.1 SD INV 125.6 SD INV 125.4 SD INV 126.6 SS INV 119.5 SD INV 126.1 144 145 37 SS INV 121.2 SD INV 121.5 SD INV 122.9 SD INV 125.9 SD INV 124.7 SS INV 115.6 SD INV 125.8 I-9 STREET I-10 STREET PARCEL H PARCEL FPARCEL DLIMIT OF GRADING PARCEL A J J F F K K K K BIO-SWALE SD INV 117.0 FULL TRASH CAPTURE DEVICE (FROM STATE APPROVED LIST) COMPLIANT WITH STATE TRASH REDUCTION TO BE PROVIDED RECYCLED WATER TO BE EXTENDED INTO SITE TO IRRIGATE COMMON AREAS AND PLANTER STRIPS AA SUBDRAIN INV 116.2 SUBDRAIN INV 116.2 6" MINIMUM 18" APPROX. 10' CLASS 2 PERMEABLE MATERIAL OR EQUAL 8" PERFORATED SUBDRAIN PIPE (ASTM-3031) 4" PERMEABLE SOIL MATERIAL 14"± OR AS DETERMINED BY STORMWATER ENGINEER TO CAPTURE SUMMER DRY WEATHER FLOW 24" 4:14:1 18" MINIMUM SOIL MIX 5" INCHES/HOUR INFILTRATION NOTES: 1.MODIFY EXISTING SIGNALIZED INTERSECTIONS AT ROHNERT PARK EXPRESSWAY 2.MINIMUM STREET SLOPE IS 0.5% 3.TRASH CAPTURE DEVICE (FROM STATE APPROVED LIST) TO BE INSTALLED AT BASIN OUTLET SECTION A-A NTS3:1PL SECTION E-E NTS SECTION G-G NTS SECTION B-B NTS SECTION H-H NTS*3:1EXISTING GROUND CONFORM TO EXISTING P/LPARCEL E 9.5' TRAIL 1' R/W *2:1 MAX MAY BE ALLOWED AT CERTAIN LOCATIONS TO AVOID EXISTING CREEK CANOPY 2% 3 : 1 PAD P/L 2'8' 12' BENCH 2' PL 3:1CONFORM TO EXISTING 2' OVERBUILD PAD VARI E S 3.5: 1 M A X 2' OVERBUILD PLBNDY20' EX SD EASEMENT 20' EX SD EASEMENT BNDY EXISTING PARCEL C BASIN PAD3 : 1 2' 10' CONFORM TO EXISTING PARCEL C BASIN SECTION C-C NTS 3 : 1 3' OVERBUILD R/W PARCEL C BASIN I-1 STREET SECTION D-D NTS BNDY R/W EXISTING 1.5% 3 : 1 PARCEL C BASIN 8'3'10' L/S 6' S/W VARIE S 4:1 M A X EXISTING PARCEL B 5' S/W 5' L/S 1.5% EXISTING GROUND 8' COMPACTED AB BIO-SWALE, SEE DETAIL THIS SHEET COMPACTED AB SECTION J-J NTS BNDY R/W 1.5% PARCEL A VARIES 2% 6' L/S 6' S/W 8' L/S SECTION I-I NTS BNDY R/W 1.5% PARCEL A VARIES 2% 6' L/S 6' S/W 8' L/S ROHNERT PARK EXPRESSWAY ROHNERT PARK EXPRESSWAY TYPICAL BIO-SWALE DETAIL NTS LEGEND OVERLAND RELEASE COMPACTED AB SECTION F-F NTS * 3 : 1 2'OVERBUILD EXISTING GROUND CONFORM TO EXISTING P/LPARCEL E 8' TRAIL 2'*2:1 MAX MAY BE ALLOWED AT CERTAIN LOCATIONS TO AVOID EXISTING CREEK CANOPY 1.5% PAD P/L 2'5' L/S VARI E S 2'OVERBUILD BIO-SWALE, SEE DETAIL THIS SHEET 6' L/S 6' HIGH TUBULAR STEEL FENCE TUBULAR STEEL FENCE TUBULAR STEEL FENCE WOOD FENCE NEIGHBORHOOD WALL NEIGHBORHOOD WALL SECTION K-K NTS BNDY R/W 1.5% PARCEL A VARIES 2% MIN 6' L/S 6' S/W VARIES L/S ROHNERT PARK EXPRESSWAY NEIGHBORHOOD WALL HIGH PAD LOW PAD SDCB 22 GR 118.54 INV 113.81 7LF 18"SD S=0.003 M 118119120125125120128 12513 0 135 140 14014 0 125130135130135 140145120 125 130 125 120128ROHNERT PARK EXPRESSWAY COPELAND CREEKJASMINE CIRCLEI-8 STREETI-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETAPPROXIMATE CENTERLINE OF CREEK OPEN SPACE WATER QUALITY BASIN FUTURE J-SECTION BRIDGE (APPROXIMATE LOCATION) EXISTING BUS STOP 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 138 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105140 2160 PARCEL E SONOMA STATE CONNECT TO SIDEWALK ON ROHNERT PARK EXPRESSWAY (TYP) 144 145 PARCEL A PARCEL DPARCEL G FUTURE TRAIL CONNECTION I-10 STREET PARCEL H PARCEL F 37 I-9 STREET LEGEND EXISTING TRAILS PROPOSED TRAIL CONNECTIONS I-8 STREETI-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETI-9 STREET ROHNERT PARK EXPRESSWAY 143 19 6263104105 140 2160 PARCEL E 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 PARCEL B 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 175 172 184 183 180 179 176 163 151 152 155 156 159 160 PARCEL G COPELAND CREEK (PUBLIC STORM DRAIN EASEMENT) 37 PARCEL A 145 144 PARCEL D PARCEL F I-10 STREET PARCEL H LEGEND PROPOSED LAND USE SUMMARY PARCEL LANDUSE OWNERSHIP AREA (NET) A LANDSCAPE/OPEN SPACE/HOA 0.11± AC ENTRY MONUMENT B LANDSCAPE/OPEN SPACE HOA 0.11± AC C WATER QUALITY BASIN HOA 0.66± AC D OPEN SPACE CITY 0.40± AC E TRAIL CITY 0.35± AC F OPEN SPACE HOA 5.88± AC G OPEN SPACE HOA 2.95± AC H LANDSCAPE/OPEN SPACE/HOA 0.16± AC ENTRY MONUMENT MOTORCOURTS 1.73± AC ROADWAYS 6.49± AC LOTS 15.50± AC TOTAL 34.34± AC MAINTENANCE RESPONSIBILITIES RESIDENTIAL LOTS S/W - OWNED & MAINTAINED BY CITY NTS S/W - OWNED & MAINTAINED BY CITY TERMINATE AT FENCE (TYP) ROHNERT PARK EXPRESSWAY JASMINE CIRCLEUNIVERSITY DISTRICT LLC DOC. 2001-110858 APN 047-131-026 APN 047-131-027 N0°02'01"W 871.58'N0°02'45"E 300.00'N0°02'45"E 342.98'N89°55'52"E 1691.47' N89°23'45"E 1692.78' N89°23'45"E 95.00' N89°23'45"E 95.00'N0°02'45"E80.00' EXHIBIT 2 CONDITIONS OF APPROVAL UNIVERSITY DISTRICT LLC TENTATIVE MAP (TM) The proposed map was reviewed and the following conditions of approval were developed using the reference documents listed below. • Tentative Map, dated December 2020, prepared by MacKay & Somps, Sheets 1-8 • City’s Subdivision Ordinance – Title 16 in affect at the time of tentative map review • City’s Grading & Erosion and Sediment Control Ordinances – Title 15, Chapters 15.50 & 15.52 in affect at the time of tentative map review • City’s Manual of Standards, Detail and Specifications, adopted as of this review date ON-GOING CONDITIONS The conditions below shall apply to the University District Tentative Map (herein “Project”). The Project shall be developed in accordance with the General Plan (GP), University District Specific Plan (UDSP), Mitigation Measures identified in the University District Specific Plan Environmental Impact Report (FEIR), Development Agreement (DA) between the City and University District LLC, the Rohnert Park Municipal Code (RPMC) and the Design and Construction Standards. The Conditions of Approval as stated herein are the obligation of the applicant/developer and place no obligation either express or implied on the City. These Conditions of Approval run with this TM as approved regardless of ownership at time of recording. General Requirements 1) The applicant shall comply with all documents approved by the City Council and adhere to all exhibits presented by the applicant at the Planning Commission and\or City Council meeting for approval of the University District Specific Plan project and this Project unless subsequently revised by the City. 2) In case of conflict between the various documents, the following order shall prevail: General Plan, University District Specific Plan (UDSP), Mitigation Measures for the Final Environmental Impact Report (FEIR), Rohnert Park Municipal Code (RPMC), Development Agreement (DA), , Tentative Map (TM) and its Conditions of Approval, , and Design and Construction Standards. 3) The applicant shall comply with the FEIR and Addendum. In addition, the applicant shall pay the cost to monitor the Mitigation Measures identified in the FEIR for the University District Specific Plan project (SCH # 2003122014) kept on file in the Development Services Department. The requirements contained in the Mitigation Monitoring Program (MMP) shall be incorporated into these conditions and constructed in accordance with the MMP. 4) The applicant agrees to indemnify, hold harmless and defend the City, its officers, agents, elected and appointed officials, and employees, from any and all liability or claims that may be brought against the City arising out of its approval of this Tentative Map and associated entitlements pertaining to the University District Specific Plan. 5) By accepting the benefits conferred under this TM, the applicant acknowledges all the conditions imposed and accepts this TM subject to conditions, as may be amended from time to time, and the RPMC, as applicable. 6) The use of the property by the applicant/grantee for any activity authorized by this TM shall constitute acceptance of all conditions and obligations imposed by the City on this TM. The applicant/grantee by said acceptance waives any challenge as to the validity of these conditions. 7) Approval of the Tentative Map is conditioned upon completion of offsite improvements to the satisfaction of the City in the Copeland Creek and Hinebaugh Creek watersheds that will provide replacement floodwater detention for the detention currently provided by the temporary detention basin within the site, in a manner that allows the existing basin to be abandoned in its entirety without resulting flooding of the UDLLC property and without adverse impacts to adjoining properties above those conditions that existed prior to development of the Vast Oak and UDLLC properties. These offsite improvements shall be constructed and functional and approved by City prior to the existing basin being removed. The final design of the offsite improvements has not been completed; design work will be completed by the City and/or the applicant as determined at a later date. The final cost and source of funding for the offsite improvements has not been determined. The measures will likely require approval by multiple resource agencies; the timing, mitigation requirements and costs for obtaining permits has not been determined. 8) Phasing is not proposed or approved. The Subdivision is considered a single-phase development. All improvements shall be designed and guaranteed through an improvement agreement and surety with the Final Map, unless otherwise noted. 9) Submit a copy of the CCRs (or as an alternative, add the lots within UD LLC to the existing project CC&Rs) and/or maintenance declarations for private improvements (such as for maintenance of alleys and private utilities) to the Director of Development Services or designee and City Attorney for review and approval prior to recording of each final map. The applicant shall clarify if the UDLLC property will be annexed into the existing Homeowner’s Association, or if a new Association will be formed for the UDLLC property. Maintenance declaration(s) shall be required to be recorded concurrent with the recordation of the Final Map or prior to City Engineer approval of improvement plans for the respective design, whichever occurs first. The CC&R's will include provisions for maintenance of: a) All private storm drain systems. b) All private driveways c) All private alleys and motor courts, including lighting d) Privately-owned utilities within private easements, driveways, or alleys e) Common area landscaping and irrigation f) Planter strip landscaping and irrigation within public right-of-ways. g) Private walkway and access easements. h) Gang mailboxes i) The Copeland Creek pedestrian bridge j) Front yard and side yard landscaping and irrigation outside of the fencing, as shown on the tentative map, including front yard water quality measures. k) The Copeland Creek pedestrian trail and landscaping. l) The Parcel C detention basin and any additional water quality improvement. m) The Copeland Creek parcels. The CC&R’s shall include a plan for a funding mechanism for the ongoing maintenance of these improvements. The plan shall include in a cash flow analysis, by year, showing both the ongoing maintenance costs and longer-term capital replacement costs, and expected revenues from the payment of the maintenance annuity with each certificate of occupancy. The analysis shall consider that certain improvements (e.g., the Parcel C detention basin and pedestrian bridge will be constructed with the map in advance of building permits being issued for the entire development.. Developer shall provide an initial funding deposit as needed to cover costs as well as maintain an adequate reserve and/or identification of a phasing program that would reduce the monthly assessment impact upon Association homeowners. The CC&R’s shall include language that upon reasonable notice by the City to the HOA (except in an emergency), the City shall have the right to perform maintenance and repair work as needed to ensure that the creeks and basins will function as designed and will have adequate flood protection capacity. The City will have the right to invoice the HOA for costs incurred and the HOA will reimburse the City for these costs. As an option, the HOA and City may enter into a contract whereby the City will perform specified work on a long-term basis and the HOA pays the City for the cost of this work. Developer may also agree to provide a maintenance annuity for the cost of specified work to be performed by the City (the annuity will be separate and above from the annuity required under Section 4.06). The CC&R’s shall include a description and an exhibit of improvements within the UDLLC Property clearly delineating those improvements to be maintained by the HOA and those to be maintained by the City. The City shall have no obligation to maintain or police the private maintenance of the alleys, motor courts, or private driveways. This provision shall be included in the CC&Rs. The CC&R’s shall inform subsequent property owners of the nature and extent of existing agricultural activities, operations, and facilities in the vicinity of the project site. The disclosure shall also provide notice of the potential conflicts or effects of typical agricultural activities outside of project including but not limited to noise, odors, dust, agricultural spraying, livestock and burning etc 10) If the City is required to enforce any of the conditions of approval, the applicant shall pay all costs. At the City’s sole discretion, the City may require a cash deposit to cover enforcement costs as a condition of the approval of any final map. 11) If there is conflict between the CC&R’s and the City Code or these conditions, the City Code or these conditions shall prevail. 12) Prior to the issuance of Certificate of Occupancy, the applicant shall provide suitable escrow documentation reflecting City’s demand for payment of Regional Transportation Fee for each lot affected by this fee per the Development Agreement by and between University District LLC, and City of Rohnert Park. Building Services 13) Building code provisions shall apply to the construction, alteration, moving, demolition, repair, maintenance and use of any building or structure within the jurisdiction of the City, except work located primarily in a public way, public utility towers and poles, mechanical equipment not specifically regulated by building code provisions, and hydraulic flood control structures. All projects shall comply with the most current code recognized by the City at the time of their building permit application. All State and local ordinances shall be applicable to current projects. 14) Geotechnical investigation reports shall be submitted for all building permit projects unless waived by the Building Official. When required by the Building Official, the potential for soil liquefaction and soil strength loss during earthquakes shall be evaluated during geo- technical investigations. Compaction reports and pad certifications are required for each building pad site and all compaction reports shall be submitted prior to a foundation inspection and in compliance with the soils and geo-technical recommendations. 15) A completed and approved wet fire hydrant system, or other system approved by the Building Official and Department of Public Safety (DPS), and all weather roads shall be in place prior to any flammable or combustible material (such as wood) being brought onto the site. Prior to meter installation, the applicant may tie to the water system for fire flow only. Fire access road shall meet the DPS Fire Access Road Standard. These fire access roads shall continue to be accessible until acceptance of the public streets by the City. 16) The applicant shall submit a mailbox plan (locations and sizes) for all lots prior to approval of any final map. The plan shall be approved by the Rohnert Park Post Office and included with the first submittal of the improvement plans. The applicant shall submit to the City a written confirmation from the Rohnert Park Post Office that the mailbox locations are approved. The City will review and approve the location plan to ensure adequate site distance and traffic safety measures are incorporated. 17) All public utilities easements (PUE) and public access easements shall always be open and accessible within phases under construction or occupied. 18) Copies of the soils and geology reports prepared by a licensed soils engineer and geologist shall be reviewed and approved by the developer’s soils engineer and geologist prior to issuance of a grading permit. The developer’s soils engineer shall sign the plans stating that they conform to the soils report recommendations. 19) The applicant shall submit plans and obtain separate building permits for retaining walls over four (4) feet in height and for all other walls, fences and signs over six (6) feet in height. 20) The applicant shall obtain a demolition permit for any structure to be demolished. All underground structures shall be abated, back-filled, inspected and approved by Sonoma County Environmental Health Services or the Building Official as applicable. 21) For any project requiring an on-site inspector to monitor grading, housing construction and/or development, the applicant shall deposit funds with the City to cover the full cost of an inspector prior to any land disturbance. The City Engineer, as appropriate, shall approve the amount and hire the inspector. 22) The developer shall implement a dust control program as part of the measures required by the FEIR for air quality control and the requirements of PM 10 and the Best Available Control Measures (BACM). The program shall ensure that, at the City Engineer’s discretion, a water vehicle for dust control operations is always kept readily available during construction. The developer shall provide the City Engineer and Building Official with the name and telephone number of the person directly responsible for dust control and operation of the water vehicle. Planning Services 23) A Tree Preservation and Removal Plan including a separate tree removal and sensitive area plan shall be submitted to the Development Services Department for review and approval in accordance with City ordinance. The plan shall show all sensitive areas and stands of trees that are to be protected during grading operations and include, in detail, the method proposed to protect these areas. 24) All areas to be graded and left undeveloped shall have a revegetation plan as part of the dust control program. The Development Services Director or designee shall review and approve the plan. The applicant shall guarantee through a grading bond the revegetation prior to issuance of grading permits. 25) Development Area Plans in conformance with Section 17.06.400 of the Rohnert Park Municipal Code shall be approved by the City Council for all development areas. 26) All material storage areas shall be fenced with at least a 6-foot high chain link fence with at least two 20-foot gates for emergency vehicle access. The fencing shall be shown on the construction fire and security protection site plan. 27) These conditions shall apply prior to recordation of each final map or large lot final map, unless otherwise specified herein. A “final map” shall mean a map that results in buildable parcels of an acre or less in area. A “large lot final map” shall mean a map that results in parcels larger than one acre in area. 28) The applicant shall pay all application fees, plan check and inspection fees, recordation fees, park in-lieu fees, encroachment permit fees, segregation of assessment fees and other applicable miscellaneous fees in effect at the time the fee is paid as required in the Fee Schedule or RPMC. The applicant shall receive credit against, or reimbursement of, its park in-lieu fee for any dedication, or irrevocable offer of dedication, or parkland improvements. 29) The final map shall identify who is responsible to own and maintain all parcels to be created with the map. 30) The applicant shall make a good faith effort to acquire any required off-site property interest necessary to construct or provide improvements, including but not limited to temporary construction easements required by the City. If the applicant fails to do so, the applicant shall, at least 120 days prior to submittal of the final map for approval, enter into an agreement to complete the improvements, pursuant to Government Code Section 66462, at such time as the City acquires the property interests required for the improvements. The agreement shall provide for payment by applicant of all costs incurred by the City to acquire the off-site property interests. Security for a portion of these costs shall be in the form of a cash deposit in the amount specified in the appraisal report obtained by applicant, at applicant’s cost plus estimated legal and administration fees. The City Engineer shall approve or reject the appraiser prior to commencement of the appraisal report. 31) The improvement plans shall show water services to each building. All water meters shall be within the public right-of-way unless the Public Works Director specifically approves exceptions. The City shall not maintain water and sewer system lines beyond existing main line stub outs or on private property, unless otherwise agreed to by the City. Access easements shall be given to the City and recorded concurrently with the final map for any exceptions approved by the City Engineer that require access to private property. 32) If applicable, easements of record not shown on the tentative map shall be relinquished or relocated. Lots affected by proposed easements or easements of record, which cannot be relinquished or relocated, shall be redesigned. All easements for off-site grading and drainage shall be acquired prior to approval of construction on these properties. 33) The applicant shall provide cable or conduit for each residential lot for cable television and Internet access. The applicant shall provide cable or conduit for fiber optics or other smart technologies for each commercial lot for Internet access. The cable or conduit shall be shown on the joint trench improvement plans and constructed before the final lift of asphalt is placed on the adjacent street. 34) Prior to approval of the first final map that requires a homeowners’ association, the applicant shall incorporate a homeowners’ association consisting of all property owners of lands in the development at the time of incorporation (or as an alternative, add the lots within UD LLC to the existing Vast Oak homeowners association). The homeowners’ association shall be responsible for maintaining all common facilities pertaining to the Home Owners Association, including but not limited to, the association’s property, common drive aisles, alleys, lanes, private streets, parking facilities and all utilities contained therein, and landscaping plus landscaping in adjacent public rights-of-way (such as parkway strips or other similar areas), and for paying for security lighting, any common garbage collection services, any security patrol services, if provided, and any other functions of a homeowners’ association. The homeowners’ association shall comply with all NPDES permit Best Management Practices in effect at the time. 35) The CC&R’s shall prohibit the on-site parking of recreational vehicles, including boats. Parking shall be prohibited along emergency vehicle access easements, private streets and alleys. The No Parking signs shall be approved by the DPS. A separate signing and striping plan shall be provided to address on-site stop signs and no parking areas prior to approval of any final map. 36) Private streets or alleys shall be private facilities and shall have private street maintenance, street sweeping and streetlights. Private streets shall have a visible demarcation between the public and private areas and identified with signage that which differentiates them from public streets. The City Engineer shall approve all signage for private facilities with the approval of individual improvement plans for the project. 37) The applicant shall provide adequate vehicle sight distance as specified by the State of California, Department of Transportation’s Highway Design Manual (latest edition) at all public and private street intersections. In addition, intersections and driveways shall comply with City requirements for sight triangles. The design of the streets shall incorporate public safety concerns, fire protection equipment movements, as well as the location and pickup of solid waste. 38) The applicant shall show the proposed structural sections for all private streets on the site improvement plans and pay the City’s plan check and inspection fee for the proposed private improvements, including the water, recycled water, sewer and storm drainage facilities in these areas, to assure that the improvements are designed and constructed to City standards, with exceptions as shown on the Tentative Map. 39) Safety lighting at the end and at any curve in any private street, alley, lane or place shall be provided for residential units that do not front on a public street. The lighting shall include individual lights on each residential unit and\or streetlights on streetlight poles. The City Engineer shall approve the lighting plans that include these facilities. 40) The applicant shall contact the solid waste franchised hauler and obtain their written approval of the proposed solid waste pickup locations on private streets, alleys, lanes or places. The pickup locations shall not be located in emergency vehicle access easements. A copy of the written approval from the solid waste franchised hauler shall be submitted with the street improvement plans for City review and approval. Provisions for paved areas for trash receptacles on certain parcels shall be identified in the improvement plans to service alley access residences; the trash receptacle cutouts shall be located on private parcels fronting public streets and accommodate the receptacles for the respective lots. 41) Where required, the landscaping for the detention and/or retention basins shall be reviewed and approved by the Development Services Director or designee. 42) The applicant will coordinate with the local bus system authority to facilitate local bus service in the project and to determine bus stop locations and shelter improvements. The bus shelter locations shall be shown on the improvement plans and reviewed and approved by the City Engineer. A copy of the written correspondence with the local bus system authority approving transit facilities shall be submitted with the first street improvement plans for each map. 43) Any above ground utility structures and appurtenances (e.g. cable TV boxes, phone splice boxes) shall be installed in a public utilities’ easement within the applicant’s property and within 10 feet behind street face of curbs. These structures and appurtenances shall be screened with landscaping to the satisfaction of the Development Services Director or designee. The landscape screening shall be included in Development Area Plans and shall not interfere with the utility companies’ or DPS’s access. 44) The electrical and water services shall be provided to all parks, landscape medians, and other landscape areas in accordance with plans approved by the City. 45) Prior to the approval of this map, the applicant shall be responsible for costs of implementation of ensuring compliance with Mitigation Measures contained in Mitigation Monitoring Plan (MMP) for the FEIR. The applicant shall provide funding, in an amount determined by the Development Services Director or designee to hire consultants or staff to implement compliance monitoring. 46) Prior to approval of this map, the street name and a theme for all street name signage, including traffic signal signage, street corner signage, directional signs, and other permanent fixtures depicting street names shall be submitted to the Development Services Director or designee for review and approval. 47) Unless otherwise specified in these conditions, the conditions of approval shall apply to each building permit. 48) The applicant shall provide a master signage program for each residential subdivision, prior to issuance of building permits for this tentative map phase. The signing plan shall be submitted to the Development Service Director or designee for review and approval. 49) The declaration of covenants, conditions and restrictions (CC&R’s) filed for each development shall be prominently displayed in the project sales office at all times. The CC&R’s shall apply to both owners and renters. The CC&R’s shall be written to require renters to comply with the regulations of the CC&R’s, and a copy of the CC&R’s shall be given to each renter. 50) Design and placement of walls and fences for each neighborhood or land use district shall be in accordance with the standards in an approved Development Area Plan Walls and fences may be phased for each development area. Walls, fences and landscaping should not obstruct pedestrian travel to Rohnert Park Expressway, specifically at Parcel A and Parcel B (the I-7 and I-8 Street Segments) If a continuous wall or fence is used, a gate shall be provided. 51) All residential dwellings shall display illuminated street numbers in a prominent location in such a position that the numbers are easily visible to approaching emergency vehicles from both directions. The numbers shall be of a contrasting color to the background to which they are attached and four (4) inches minimum in height. Flag lots will have their address displayed in a prominent position at the driveway intersection with the street. 52) All buildings shall be connected to public water and sewer systems prior to occupancy. Water and sewer service accounts shall be set up with the City Finance Department for each structure with a building permit. 53) Prior to front yard landscaping installation by the applicant, plant species, location, container size, quality and quantity of all landscaping plants and materials shall be reviewed and approved by the Development Services Director or designee for consistency with the approved improvement plans. All plant replacements shall be to an equal or better standard than originally approved. 54) Hours of construction shall be limited to the hours in accordance with the RPMC. 55) The applicant shall comply with all state federal and local laws. 56) Applicant shall submit the Buyer’s Disclosure document to City prior to commencement of sales, reservations, etc. to Director of Development Services or designee for review and approval. 57) Applicant shall adjust the size of Lot Nos. 38 and 39 to be no more than 5,500 square feet, consistent with the P/I/Medium Density SFD Land Use Designation of the UDSP. 58) When fencing is used between parcels and open space parcels (Parcels A through G), it shall be open view fencing that is no less than 50% visually open. The location and design of the fencing shall be approved by the City prior to final map. Engineering Services 59) The grading plan as shown on the Tentative Map is not approved. The grading plan places numerous lot pads below the Copeland Creek and Sonoma State University wetlands top of bank. These watercourses are source of current overland flow onto the site. Following completion of the upstream detention measures design, a hydraulic analysis shall be complete for Copeland Creek where it adjoins the development, showing the elevation and path of the 100-year flood. The grading shall be adjusted as needed to place lot pads a minimum of 18” above the 100-year flood and all streets above the 100-year flood, subject to approval by City. 60) The final map for the UDLLC property shall include a public drainage easement over the creek and basin properties. Developer and the HOA shall not contest the right of upstream 3rd parties to discharge existing runoff into the creeks. 61) Developer shall enter into an agreement with the City which outlines the responsibilities of the HOA to operate and maintain into perpetuity all water quality improvements within the UDLLC property. The agreement shall run with the property and shall provide for the HOA to succeed Developer upon transfer of these parcels from Developer to the HOA. The agreement shall be subject to the approval of the North Coast Water Quality Control Board and generally conform to the City of Santa Rosa long-term maintenance agreement for stormwater treatment measures. This condition shall be satisfied by an amendment to the current Master Maintenance Agreement between the City and the Developer, dated November 24, 2015, and subsequently amended on November 14, 2017 and October 23, 2018, as well as further amendments. Maintenance of the Copeland Creek flood control channel is also an obligation of the HOA, where located within the development. The Developer shall also cooperate in the execution of any agreements necessary to provide for the ongoing maintenance of Copeland Creek, which may include Sonoma County Water Agency as a participant in the agreement. The developer shall be responsible for obtaining a long-term maintenance permit from the resource agencies for the maintenance work. 62) Infrastructure shall be constructed in conformance with the Tentative Map and in conformance with Exhibit “C”, Dedications, Improvements, and Facilities Schedule of the Development Agreement. 63) The requirements for the design and construction of public improvements as set forth in the Development Agreement between Owner(s) and City shall be adhered to. In the case of a conflict between the requirement set forth in the Development Agreement and these Conditions of Approval, the more stringent conditions shall apply as solely determined by the City Engineer. Prior to the Approval of Improvement Plans or Start of Construction 64) Improvement Plans prepared by a Registered Civil Engineer shall be submitted for the review and approval of the City Engineer showing grading, paving, utilities, drainage, structures to be built, lighting and trash collection. Improvements shall conform to the requirements of Chapter 16.16 of the Municipal Code. The improvements plans shall include parking lots, street and utility information including all concrete curb and gutter, sidewalk, striping and signing, paving, water lines, storm drain lines and sewer lines as necessary, erosion control and any necessary transitions. All improvements shall be in accordance with the City of Rohnert Park Standard Improvement Details. Improvement Plans shall include a Storm Water Pollution Prevention Plan including winterization and erosion protection. 65) Storm drainage improvements shall be designed in accordance with the Sonoma County Water Agency criteria. Hydrology calculations, pipe sizing and storm drain plans shall be submitted for the review and approval of the City Engineer. 66) No lot- to- lot drainage is allowed except where easements are provided for drainage are provided. No drainage may discharge across sidewalks. 67) The applicant shall demonstrate for each building pad to the satisfaction of the City of Rohnert Park as follows: a) Adequate protection from 100-year frequency storm; and b) Feasible access during a 10-year frequency storm. 68) Fire protection shall be in accord with the requirements of Rohnert Park Public Safety Department. With the submittal of the improvement plans, calculations shall be provided to the City and the Rohnert Park Public Safety Department to ensure that adequate water pressures are available to supply hydrant flows and sprinkler flows. 69) The improvement plans shall show a sewer lateral to each building in accord with City Standards. 70) The recycled water main shall be extended as needed to serve landscaping within landscape parcels and other parcels as needed. 71) The existing traffic signals at the intersections of Karrington Road and Kerry Road with Rohnert Park Expressway shall be modified to include signalization of the new southerly approaches. Improvements shall include revisions needed for pedestrian access and decorative pavement similar to that on the north side of the intersection. The signals shall be operational prior to the occupancy of any homes. 72) The Parcel C detention/ water quality basin shall be constructed and operational prior to paving or start of home construction (with the exception of landscaping, which shall be completed prior to final acceptance of improvements and release of bonds OR occupancy of homes). The basin shall include a trash capture device at the outlet into the basin meeting State full-trash capture requirements (5-mm. screen, 1-year, 1-hour storm with high-flow bypass). 73) The improvement plans for the project shall include the Copeland Creek trail (including landscaping and other appurtenant improvements). 74) The improvement plans for the development shall include design for the pedestrian bridge across Copeland Creek, along with connections to the existing Copeland Creek trail and the “J” Section trail system, in general conformance with the Trail Exhibit on Sheet 6 of the Tentative Map. The bridge shall be designed and guaranteed with the Final Map. Construction shall begin prior to issuance of the 100th building permit and shall be constructed within 12 months of the start of construction. The development shall include the design and construction of utilities within existing or proposed public right-of-way for electric, gas, telephone, communication and cable TV shall be submitted to the City Engineer and Director of Development Services for review and approval. Any above-ground utility boxes, cabinets or structures shall be specifically approved by the City and screened from public view to the satisfaction of the Director of Development Services and City Engineer and meet utility company’s installation criteria. 75) A grading permit application shall accompany submittal of the Subdivision Improvement Plans. Said application shall include the requirements listed in Sections 15.48 & 15.50 of the Municipal Code. 76) The grading plans shall be in conformance with the Bay Area Air Quality Management District guidelines for reducing construction impacts and minimize dust emissions. 77) A geotechnical study acceptable to the City shall be conducted by an Engineer licensed in the State of California and qualified to perform soils work, or by a California Certified Geologist prior to site development. Recommendations shall be provided, as necessary, to prevent damage to Project facilities and compliance with these recommendations shall be required as a condition of development at the project site. The grading and improvement plans shall incorporate the recommendations of the approved geotechnical study. This geotechnical study shall at a minimum incorporate the following: a) The liquefaction potential of the Project site. b) The location and extent of expansive soils at the project site, including recommendations regarding the treatment and/or remedy of on-site soils, and the structural design of foundations and underground utilities. c) Seismic safety including recommendations regarding the structural design of foundations and underground utilities. 78) Unless otherwise agreed to by the City, the development shall submit drainage plans subject to the review and approval of the Sonoma County Water Agency (“SCWA”), the City of Rohnert Park and these conditions of approval. Said plans shall meet or exceed SCWA standards and City standards, whichever is more restrictive. All proposed building pad , including garages, shall be a minimum of 18 inches above the post construction 100-year water surface elevations, as described and modeled in “Copeland Creek Regional Detention and Refugia Project, Technical Memorandum 3 – Existing Conditions Flood Plain Analysis”, prepared by GHD, Inc, dated February 15, 2019, as revised and updated, or as shown in other subsequent modeling and approved by the City, SCWA, and FEMA. 79) The development shall include the design by the project proponent for Erosion and Sediment control plans prepared by a professional such as a Civil Engineer or certified Erosion Control Specialist and shall meet the requirements listed in Section 15.52.030 of the Municipal Code. The plans shall provide measures to avoid the introduction or spread of noxious weeds into previously un-infested areas. These plansare subject to review and approval by the City. Erosion and Sediment control plans shall be in conformance with Chapter 15.52 of the Municipal Code except that the reference document for design criteria shall be the City of Santa Rosa Standard Urban Storm Water Management Plan (SUSMP) or most current City adopted SUSMP. 80) The development shall include design by the project proponent of lighting on public streets as well as private streets/alleys. All streetlights shall be LED, meeting the design criteria for the City of Los Angeles. The design shall be in accordance with City standards and P.G. & E. requirements. In addition, lighting for private streets and alleys shall be designed in accordance with the Zoning ordinance and to the Public Safety Department’s satisfaction, allowing for wall-mounted lighting. 81) All existing overhead utilities within the subdivision and all proposed utilities shall be placed underground. 82) The development shall include design by the project proponent for roadways. Street improvements not specifically called out in these conditions shall be completed in conjunction with each phase of development (final map). The City Engineer may require reasonable improvements outside of each phase if needed for the orderly and safe development of that phase. The design shall include slurry sealing specifications, subject to review and approval by the City. All streets shall be slurry sealed prior to issuance of the last certificate of occupancy or prior to acceptance of the public improvements, whichever occurs first within each phase of development. 83) The development shall include the design by the project proponent for installation of moisture barriers at the edges of all pavement sections for purposes of maintaining constant moisture content of pavement sections, subject to review and approval by the City. The design shall include moisture protection extending to 6 inches below the aggregate base layer. The moisture barrier shall be a minimum of 4 inches wide and consist of Controlled Low Strength Material (CLSM) in a 10 mil visqueen lined trench. Alternate designs may be proposed by the developer and considered by the City. 84) Soils beneath all roadways including alleys shall be lime treated based on site specific tests and as recommended by a geotechnical engineer. 85) The development shall include design by the project proponent and all public improvements shall comply with the latest version of the Rohnert Park Manual of Standards, Details and Specifications. Reference to particular standards shall be made on the improvement plans. Standards details and specifications shall not physically be included on the plans but shall be referenced. 86) The project proponent shall design motor courts, with utilities and appurtenances. These shall be private. 87) No utilities (sewer, water or storm drains) shall flow from a private utility to a public utility and back to a private utility. No utilities (sewer, water or storm drains) shall flow from a public utility to a private utility and back to a public utility. 88) All utilities shall be located within dedicated and accepted public street rights-of- way. Any exception must receive prior approval from the City Engineer. 89) All existing wells and septic systems shall be abandoned in compliance with State and County codes, prior to issuance of an initial grading permit. 90) The development the project proponent shall design all utilities in compliance with City Manual of Standards and the State Water Resources Control Board Division of Drinking Water Standards including vertical and horizontal separation between utilities, curbs, gutters and monuments. Prior to Approval of Final Map 91) Submit each final map and improvement plans with a completed Land Development Review Submittal Sheet, Final-Parcel Map Completeness Checklist and Final- Parcel Map Submittal Checklist as available on the City web-site and all appropriate additional information. 92) The Final Map submittal shall include a title report (within last 30 days of initial submittal), supporting documents, and calculations for City Engineer review. All calculated points within the map shall be based on one common set of coordinates. All information shown on the map shall be directly verifiable by information shown on the closure calculation printout. The point (s) of beginning shall be clearly defined. All lot acreages shall be shown on the map and shall be verifiable from information shown on the closure calculation printout. 93) Prior to City Council approval of the Final Map; the developer shall satisfy Rohnert Park Municipal Code section 16.14.010 D. 2 regarding off-site dedication of rights-of- way and easements. The Final Map shall show offer of dedication of the necessary right-of-way in fee title, sidewalk easements, public utility easements and other easements for public water, sewer, and storm drain, as shown on the tentative map or as needed per the final improvement design. 94) The Final Map for the development shall have a note on the local agency page stating: All fences, sound walls and retaining walls shall be constructed on private property and maintained by the private property owner or Association, unless specifically dedicated to and accepted by the City. 95) All property corners of lots within the subdivision shall be monumented in compliance with city standards, except as expressly permitted in writing by the City Engineer. 96) The developer/ property owner shall enter into a Public Improvement Agreement (PIA) with the City, post the requisite bonds, and pay all applicable fees. The SIA shall be required to be recorded concurrent with the recordation of the Final Map. 97) Street names will be subject to the approval of the City Council. Prior to the Issuance of Grading Permits 98) Pre-construction surveys shall be completed for western pond turtles, burrowing owls, and migratory birds, in accordance with Mitigation Measures BIO-12a, BIO-13a, and BIO -14a of the FEIR. This shall be noted on the grading plans. 99) Applicant must file a Notice of Intent to Comply with the Terms of General Permit to Discharge Storm Water Associated with Construction Activity (NOI) with the State of California Water Resources Control Board, and obtain a permit, prior to commencement of any construction activity. 100) No construction shall be initiated until the Grading Plans have been approved by the City, all applicable fees have been paid, an encroachment permit and/or grading permit has been issued and a project schedule has been submitted to the City Engineer and a pre- construction conference has been held with the City Engineer or his designee. 101) Resource agency permits shall be secured, with copies of the permits supplied to the City and with permit requirements incorporated into the plans. 102) Plans shall incorporate tree protection measures. Trees to be preserved shall be clearly noted on the plans. 103) All areas considered to be a sensitive biological resource shall have construction fencing installed around the sensitive resources to prevent damage during construction. 104) Developer shall secure an encroachment permit from the City prior to performing any work within the City right of way or constructing within a City easement. 105) Resource agency permits shall be secured, with copies of the permits supplied to the City and with permit requirements incorporated into the plans. Prior to the Issuance of Building Permits 106) Prior to issuance of building permits for a single family residential units, individual plot plans for each lot shall be prepared by the project proponent, submitted and reviewed and approved by the City. 107) Prior to the issuance of building permits within the current Copeland Creek FEMA floodplain, a Letter of Map Revision (LOMR) shall be obtained for the lots within the development. 108) Prior to issuance of the 100th building permit, the construction of the Copland Creek pedestrian bridge shall be commenced. The construction of the Copeland Creek pedestrian bridge shall be completed within 12 months of the start of construction, or issuance of further building permits will be withheld. . Prior to the Building Occupancy 109) Prior to issuance of Certificated of Occupancy for any phase, the public improvements that are necessary for safe access to the site, all frontage improvements, hookup of utilities, energizing of street lights, and any specific improvements for that phase shall be complete. Department of Public Safety-Fire 110) Fire Hydrant spacing and placement should be consistent with the City of Rohnert Park Standards, comply with Appendix C of the 2007 California Fire code, and the amendments to table C105.1 by RPDPS ordinance #793. The specific location and spacing of Fire Hydrants shall be determined and approved on the final construction drawings. 111) All roadway, private lanes and drives shall comply with the City of Rohnert Park Standards. Specifically reference Standard #202 “Alley, in regards to: a) Alley lighting shall meet the City’s minor street requirements. b) 20 or more units will require a 24’ alley width c) Alleys are to be used as secondary access only, with parking provided on primary access roads. 112) Roadway widths should be consistent with the City of Rohnert Park Standards except as shown on the Tentative Map, comply with Appendix D of the 2007 California Fire code, and the amendments to RPDPS ordinance #793 Section 15.28.D103.2 – 15.28.D106.1. 113) Minimum interior and exterior turning radius for Fire Apparatus Access shall be all 20 feet and 40 feet. 114) Water main sizes and GPM flow capacity for Fire suppression shall be determined and approved on the final construction drawing. Hydraulic flow calculations shall be included and approved with construction documents.