2021/06/22 City Council Resolution 2021-071 RESOLUTION NO. 2021-071
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK
APPROVING THE PROJECT LIST FOR SB 1 FUNDING FROM THE
STATE ROAD MAINTENANCE AND REHABILITATION ACCOUNT (RMRA)AND
AUTHORIZING SUBMITTAL OF THE PROJECT LIST TO THE
CALIFORNIA TRANSPORTATION COMMISSION
WHEREAS, in 2017, the Governor signed Senate Bill ("SB1"), also known as the Road
Repair and Accountability Act of 2017 to address basic road maintenance, rehabilitation and
critical safety needs on both the state highway and local streets and road system by increasing
per gallon fuel excise taxes, diesel fuel sales taxes, and vehicle registration fees; and
WHEREAS,California cities and counties are eligible to receive funding from the Road
Maintenance and Rehabilitation Account ("RMRA")created by SB 1 for basic road maintenance,
rehabilitation, and critical safety projects on the local streets and roads system; and
WHEREAS, the City expects to receive$827,368 in RMRA funds in FY 2021-22; and
WHEREAS,the RMRA funds provide a significant boost to the City's local streets and
roads for basic maintenance and safety, investing in complete streets infrastructure, using
cutting-edge technology, materials and practices, and has significant positive benefits; and
WHEREAS, SB1 emphasizes the importance of accountability and transparency in the
delivery of California's transportation programs, and therefore requires cities and counties to
provide basic annual RMRA project reporting to the California Transportation Commission
("CTC") in order to be eligible for RMRA funding; and
WHEREAS, prior to receiving an apportionment of RMRA funds from the Controller in
a fiscal year,the City must submit to the CTC a list of projects proposed to be funded with these
funds, and include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement.
NOW,THEREFORE BE IT RESOLVED, ORDERED AND FOUND by the City
Council of the City of Rohnert Park:
1. The foregoing recitals are true and correct.
2. The following previously proposed and adopted projects may utilize FY 2021-22
Road Maintenance and Rehabilitation Account revenues in their delivery. The
City is reaffirming to the public and the State our intent to fund these projects
with Road Maintenance and Rehabilitation Account revenues by relisting these
projects in the adopted fiscal year resolution:
TABLE 1: Relisted Projects for FY 2021-22 Road Maintenance and Rehabilitation Account funding
Description of Project Location of Project Original Proposed Project Estimated
FY Listing Schedule Useful Life
1 Southwest/Commerce Intersection of 2020-21 July 2020— 25 years
Roundabout Southwest Boulevard December 2022
(Construction of roundabout, and Commerce
including pavement,concrete Boulevard
form, landscaping,signage,
pavement marking)
2 Southwest Boulevard Commerce Boulevard to 2018-19 July 2020- 6-10
Rehabilitation No Name Street December 2021 years
(Asphalt overlay with partial
base reconstruction)
3 East Cotati Avenue East Cotati Avenue: 2017-18 March 2019— 20-30
Rehabilitation Rohnert Park City December 2021 years
(Full-depth reclamation) Limits at Sunflower
Drive to Snyder Lane
4 Rohnert Park Expressway/ Rohnert Park 2019-20 July 2019- 12-17
State Farm Traffic Expressway between October 2023 years
Improvements Project Commerce Boulevard
(includes traffic signal, and SMART Pathway
pedestrian,median,and striping State Farm Drive from 2019-20 July 2019- 12-17
improvements) Rohnert Park October 2023 years
Expressway to
Enterprise Drive
Enterprise Drive from 2019-20 July 2019- 12-17
Seed Farm Drive to October 2023 years
State Farm Drive
DULY AND REGULARLY ADOPTED this 22nd day • June, 2021.
C OF ' I ERT PARK
1.211:4111,11101 0
AllrfAr4t
e, Mayor
ATTEST:
Sylvia Lo uevas, City Clerk
ADAMS: INARES: JLSTAFFORDARWELWARD:. GIUDICE;Al ..
AYES: ( it) OES: (0 ) ABSENT: ( t ) ABSTAI���IIlyyyyyy(((((( (4c1 ))
Resolution 2021-071
2