Loading...
2022/04/28 Planning Commission Resolution 2022-06 PLANNING COMMMISSION RESOLUTION NO. 2022-06 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK APPROVING SITE PLAN AND ARCHITECTURAL REVIEW FOR THE DOWDELL AVENUE INDUSTRIAL PARK PROJECT (APN 143-040-134) FILE NO. PLSR22-0002 WHEREAS, the applicant, Steve Beauchamp for Panattoni Development Company, filed Planning Application No. PLSR22-0002 for Site Plan and Architectural Review for construction of two new industrial buildings located at the southwest corner of Dowdell Avenue and Business Park Drive (APN 143-040-134), in accordance with the City of Rohnert Park Municipal Code; and WHEREAS, Planning Applications No. PLSR22-0002 was processed in the time and manner prescribed by State and local law; and WHEREAS, on April 28, 2022, the Planning Commission reviewed Planning Application No. PLSR22-0002 at which time interested persons had an opportunity to testify either in support of or opposition to the project; and WHEREAS, at the April 28, 2022, Planning Commission meeting, upon considering all testimony and arguments, if any, of all persons desiring to be heard, the Commission considered all the facts relating to Planning Application No. PLSR22-0002. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the above recitations are true and correct. Section 2. Factors Considered. The Planning Commission, in approving Planning Application No. PLSR22-0002, makes the following factors, to wit: A. That the developments general appearance is compatible with existing development and enhances the surrounding neighborhood. Criteria Satisfied. This development is the second new industrial building project approved near in the vicinity of Dowdell Avenue and Business Park Drive. An industrial building (approximately 70,000 square feet) was recently constructed behind the Press Democrat press facility. The site is located on the perimeter of the Labath Avenue and Martin Avenue industrial area, which has anchored the City of Rohnert Park commercial activities since early in the city’s history. The development is compatible with existing surrounding development and reflects extensive use of high-quality, contemporary design, incorporating unifying, community wide design elements such as variations in the roof elevation, decorative window treatments and a complementary color palette. The 2 Reso 2022-06 building’s exterior is architecturally pleasing while enhancing the character of the surrounding neighborhood. B. That the development incorporates a variation from adjacent on-site and off-site structures in height, bulk, and area; arrangement on the parcel; openings or breaks in the façade facing the street; and/or the line and pitch of the roof. Criteria Satisfied. The new buildings have an attractive office space element to the north and south elevations with prominent aluminum storefront glass façade windows with dark grey metal awnings that enhances the appearance of the building from the main entrances off Dowdell Avenue and Business Park Drive. The proposed building massing is inspired by traditional forms. Volumes are simple, asymmetrical yet balanced, and includes variations in height. Repetitive and alternating elements are present, with additional articulation provided using colors, materials, screening, and recesses. The roof line of the entry is elevated above the remainder of the roof adding interest to the appearance of the building from the street. C. That the development will be located and oriented in such a manner so as to provide pedestrian, bicycle and vehicular connections with adjacent properties, as appropriate, and avoids indiscriminate location and orientation. Criteria Satisfied. Primary entryway access to the new industrial buildings would be from Dowdell Avenue. Secondary access would be from a “right in, right out” driveway accessed from Business Park Drive. Pedestrian and bicycle access to the building would be from Business Park Drive and Dowdell Avenue. Existing pedestrian, bicycle and vehicular connections would be retained as part of the project and would therefore avoid indiscriminate location and orientation of the proposed industrial building impacting access. Section 3. Environmental Clearance. A Mitigated Negative Declaration was adopted for the industrial building project by the Planning Commission on June 25, 2020 by Resolution 2020-15 in conformance with the California Environmental Quality Act (CEQA). NOW THEREFORE BE IT RESOLVED, that the Planning Commission does hereby approve Planning Application No. PLSR22-0002 subject to the Site Plan and Architectural Review submittal package attached as Exhibit A and Conditions of Approval attached as Exhibit B. BE IT FURTHER RESOLVED that said action shall not be deemed final until the appeal period has expired and that the appeal period shall be ten (10) working days from the date of said action. No building permits shall be issued until the appeal period has expired, providing there are no appeals. A1.1 SITE PLAN: FULL BUILD-OUTSEE SHEET A1.2 FOR INTERMEDIATE SITE PLAN SHOWING PROPOSEDPHASED CONSTRUCTION FOR BUILDING B.PHASING DESCRIPTION 2/17/2022Exhibit A PHASE 1A67,276 S.F.PHASE 289,896 S.F.PHASE 1B - YARD22,620 S.F.HAS 2 INTERMEDIATE PHASE BUILD-OUT2/17/2022PHASING SUMMARY:FOR INTERMEDIATE PHASE BUILD-OUT, BUILDING B FOOTPRINTFOOTPRINT WOULD BE REDUCED AND YARD SPACE ENCLOSED BY10-FOOT TALL SCREEN WALL.COMPLETE VERSION OF BUILDING B AS SHOWN ON SHEET A1.1WOULD BE CONSTRUCTED AT A LATER DATE.(SEE SHEET A1.1 FOR ADDITIONAL INFORMATION)PHASING DESCRIPTION 2/17/2022INTERMEDIATEPHASE67,276 S.F.INTERMEDIATE PHASE -YARD22,620 S.F. WAREHOUSE BUILDINGFOR SPECROHNERT PARK, CADOWDELL AVENUE,9806 Old Winery Place, Suite 1Sacramento, California 95827Tel 916.854.9901 Fax 916.854.9840A R C H I T E C T U R EE N G I N E E R I N GDateProject No.Sheet No.Drawn ByChecked BySheet TitleProjectClientNo.RevisionDate8775 FOLSOM BLVD, SUITE 201SACRAMENTO, CA 95826Ph 916 340 2400 Fx 916 418 2923FLOOR PLANBUILDING ADESIGN REVIEW COMMENTS #207/26/2019DESIGN REVIEW COMMENTS #309/13/2019DESIGN REVIEW COMMENTS #409/25/2019 WAREHOUSE BUILDINGFOR SPECROHNERT PARK, CADOWDELL AVENUE,9806 Old Winery Place, Suite 1Sacramento, California 95827Tel 916.854.9901 Fax 916.854.9840A R C H I T E C T U R EE N G I N E E R I N GDateProject No.Sheet No.Drawn ByChecked BySheet TitleProjectClientNo.RevisionDate8775 FOLSOM BLVD, SUITE 201SACRAMENTO, CA 95826Ph 916 340 2400 Fx 916 418 2923FLOOR PLANBUILDING BDESIGN REVIEW COMMENTS #207/26/2019DESIGN REVIEW COMMENTS #209/13/2019DESIGN REVIEW COMMENTS #410/25/2019 ABDECWAREHOUSE BUILDINGFOR SPECROHNERT PARK, CADOWDELL AVENUE,9806 Old Winery Place, Suite 1Sacramento, California 95827Tel 916.854.9901 Fax 916.854.9840A R C H I T E C T U R EE N G I N E E R I N GDateProject No.Sheet No.Drawn ByChecked BySheet TitleProjectClientNo.RevisionDate8775 FOLSOM BLVD, SUITE 201SACRAMENTO, CA 95826Ph 916 340 2400 Fx 916 418 2923BUILDING AEXTERIORELEVATIONSDESIGN REVIEW COMMENTS #207/26/2019DESIGN REVIEW COMMENTS #410/25/2019DESIGN REVIEW COMMENTS #502/26/2020SEE COLORED ELEVATIONS FORUPDATED PANEL JONTSSEE COLORED ELEVATIONS FORUPDATED PANEL JONTS 121110987654321ABDECABDEC1110987654321WAREHOUSE BUILDINGFOR SPECROHNERT PARK, CADOWDELL AVENUE,9806 Old Winery Place, Suite 1Sacramento, California 95827Tel 916.854.9901 Fax 916.854.9840A R C H I T E C T U R EE N G I N E E R I N GDateProject No.Sheet No.Drawn ByChecked BySheet TitleProjectClientNo.RevisionDate8775 FOLSOM BLVD, SUITE 201SACRAMENTO, CA 95826Ph 916 340 2400 Fx 916 418 2923BUILDING BEXTERIORELEVATIONSDESIGN REVIEW COMMENTS #207/26/2019DESIGN REVIEW COMMENTS #410/25/2019DESIGN REVIEW COMMENTS #402/26/2020SEE COLORED ELEVATIONS FORUPDATED PANEL JONTSSEE COLORED ELEVATIONS FORUPDATED PANEL JONTS Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-3 P-2 P-1 P-5 GL-1 SF-1 P-4 P-3 P-2 P-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-3 P-2 P-1 P-5 GL-1 SF-1 P-4 P-3 P-2 P-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 37' 6" 37' - 6" P-3 P-2 P-5 P-1 P-1 P-3 P-3 P-2 P-5 P-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-3P-2P-5P-1P-5P-5GL-1SF-1P-4P-3P-2P-5P-1 144 North Orange Street, Orange, California 92866 714 / 639-9860 aoarchitects.com Scale Job No. Date 3/64" = 1'-0" COLORED ELEVATION - BLDG A Dowdell Avenue Rohnert Park, CA 94928 03.0A 01/31/22 Project Number Scale:3/64" = 1'-0"1 A - OVERALL ELEVATION NORTH Scale:3/64" = 1'-0"2 A - OVERALL ELEVATION SOUTH Scale:3/64" = 1'-0"3 A - OVERALL ELEVATION EAST Scale:3/64" = 1'-0"4 A - OVERALL ELEVATION WEST ROHNERT PARK SPEC BUILDING MATERIAL SCHEDULE EXTERIOR GLAZING GL-1 INSULATED GLASS PANEL: 1-INCH INSULATED, GRAY TINTED, LOW–E COATED GLASS PANELS MASONRY CMU-1 INTEGRAL COLOR PRECISION CMU PAINTED TO MATCH P-3 METAL SF-1 CLEAR ANODIZED ALUMINUM PAINT P-1 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7004 SNOWBOUND P-2 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7007 CEILING BRIGHT WHITE P-3 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7016 MINDFUL GREY P-4 EXTERIOR PRIME & PAINT COLOR TO MATCH SW6087 TRUSTY TAN P-5 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7052 GRAY AREA 2 SW7004 SNOWBOUND SW7016 MINDFULGREY SW6087 TRUSTYTAN SW7007 CEILINGBRIGHTWHITE BLUETINTED GLAZING CLEARANODIZE ALUMINUM WINDOWSANDSTOREFRONT OVERHEADDOORS DRIVEINDOORS-PREFINISHEDWHITE DOCKDOORS-PREFINISHEDWHITE SW7052 GRAYAREA Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-3 P-2 P-1 P-5 GL-1 SF-1 P-4 P-3 P-2 P-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-3 P-2 P-1 P-5 GL-1 SF-1 P-4 P-3 P-2 P-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-4 GL-1SF-1 P-3P-2P-5P-1P-5 P-5P-1 P-5 P-2 P-3 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 37' 6" 37' - 6" P-3 P-2 P-1P-5 P-3 P-1 P-1P-5P-2P-3 144 North Orange Street, Orange, California 92866 714 / 639-9860 aoarchitects.com Scale Job No. Date 3/64" = 1'-0" COLOR ELEVATION - FULL BUILDOUT Dowdell Avenue Rohnert Park, CA 94928 03.0B 01/31/22 Project Number Scale:3/64" = 1'-0"1 B - COLOR ELEVATION NORTH Scale:3/64" = 1'-0"2 B - COLOR ELEVATION SOUTH Scale:3/64" = 1'-0"3 B - COLOR ELEVATION EAST Scale:3/64" = 1'-0"4 B - COLOR ELEVATION WEST ROHNERT PARK SPEC BUILDING MATERIAL SCHEDULE EXTERIOR GLAZING GL-1 INSULATED GLASS PANEL: 1-INCH INSULATED, GRAY TINTED, LOW–E COATED GLASS PANELS MASONRY CMU-1 INTEGRAL COLOR PRECISION CMU PAINTED TO MATCH P-3 METAL SF-1 CLEAR ANODIZED ALUMINUM PAINT P-1 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7004 SNOWBOUND P-2 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7007 CEILING BRIGHT WHITE P-3 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7016 MINDFUL GREY P-4 EXTERIOR PRIME & PAINT COLOR TO MATCH SW6087 TRUSTY TAN P-5 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7052 GRAY AREA 2 SW7004 SNOWBOUND SW7016 MINDFULGREY SW6087 TRUSTYTAN SW7007 CEILINGBRIGHTWHITE BLUETINTED GLAZING CLEARANODIZE ALUMINUM WINDOWSANDSTOREFRONT OVERHEADDOORS DRIVEINDOORS-PREFINISHEDWHITE DOCKDOORS-PREFINISHEDWHITE SW7052 GRAYAREA Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6"10'-0"P-1 P-2 P-4 P-5CMU-1 P-5 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 37' 6" 37' - 6"10'-0"P-3 P-2 P-1P-5 P-3 P-1 CMU-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6"10'-0"P-3 P-2P-1 P-4 GL-1SF-1 P-3P-2P-5P-1P-5 P-5CMU-1 Level 1 0' - 0" T.O.P. 40' 0" 40' - 0" T.O.P. 36' 6" 36' - 6" P-3 P-2 P-1 P-5 GL-1 SF-1 P-4 P-3 P-2 P-1 144 North Orange Street, Orange, California 92866 714 / 639-9860 aoarchitects.com Scale Job No. Date 3/64" = 1'-0" COLOR ELEVATIONS - INTERMEDIATE PHASE Dowdell Avenue Rohnert Park, CA 94928 03.1B 01/31/22 Project Number ROHNERT PARK SPEC BUILDING MATERIAL SCHEDULE EXTERIOR GLAZING GL-1 INSULATED GLASS PANEL: 1-INCH INSULATED, GRAY TINTED, LOW–E COATED GLASS PANELS MASONRY CMU-1 INTEGRAL COLOR PRECISION CMU PAINTED TO MATCH P-3 METAL SF-1 CLEAR ANODIZED ALUMINUM PAINT P-1 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7004 SNOWBOUND P-2 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7007 CEILING BRIGHT WHITE P-3 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7016 MINDFUL GREY P-4 EXTERIOR PRIME & PAINT COLOR TO MATCH SW6087 TRUSTY TAN P-5 EXTERIOR PRIME & PAINT COLOR TO MATCH SW7052 GRAY AREA Scale:3/64" = 1'-0"1 B - COLOR ELEVATION SOUTH Scale:3/64" = 1'-0"2 B - COLOR ELEVATION WEST Scale:3/64" = 1'-0"3 B - COLOR ELEVATION EAST Scale:3/64" = 1'-0"4 B - COLOR ELEVATION NORTH SW7004 SNOWBOUND SW7016 MINDFULGREY SW6087 TRUSTYTAN SW7007 CEILINGBRIGHTWHITE BLUETINTED GLAZING CLEARANODIZE ALUMINUM WINDOWSANDSTOREFRONT OVERHEADDOORS DRIVEINDOORS-PREFINISHEDWHITE DOCKDOORS-PREFINISHEDWHITE SW7052 GRAYAREA 3 NOTES:1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.2. ALL DIMENSIONS ARE CONSIDERED TRUE AND REFLECT MANUFACTURER'S SPECIFICATIONS.FRONT VIEWBOTTOM VIEWISOMETRIC VIEWBUILDINGS A & BBUILDING SECTIONSDESIGN REVIEW COMMENTS #207/26/2019DESIGN REVIEW COMMENTS #4 10/25/2019WAREHOUSE BUILDINGFOR SPECROHNERT PARK, CADOWDELL AVENUE,9806 Old Winery Place, Suite 1Sacramento, California 95827Tel 916.854.9901 Fax 916.854.9840A R C H I T E C T U R EE N G I N E E R I N GDateProject No.Sheet No.Drawn ByChecked BySheet TitleProjectClientNo. RevisionDate8775 FOLSOM BLVD, SUITE 201SACRAMENTO, CA 95826Ph 916 340 2400 Fx 916 418 2923 5 Reso 2022-06 EXHIBIT B ADOPTED PER PLANNING COMMISSION RESOLUTION NO. 2022-06 CONDITIONS OF APPROVAL: DOWDELL AVENUE INDUSTRIAL PARK SITE PLAN AND ARCHITECTURAL REVIEW The conditions below shall apply to the Dowdell Avenue Industrial Park project located at the southwest corner of Business Park Drive and Dowdell Avenue (PLSR22-0002). General Conditions 1. The facility shall comply with any and all applicable provisions of the Rohnert Park Municipal Code (RPMC) and any state or federal agency. The violation of any condition listed herein shall constitute a nuisance and a violation of the Rohnert Park Municipal Code. In conformity with Chapter 1.16 of the RPMC, a violation of the RPMC may be an infraction or a misdemeanor and shall be punishable as provided by law. In addition to criminal penalties, the City may seek injunctive relief. The Applicant agrees to pay for all attorney’s fees and costs, including, but not limited to, staff time incurred by the City in obtaining injunctive relief against the Applicant as a result of a failure of the Applicant to fully perform and adhere to all of the Conditions of Approval. 2. The Applicant agrees to defend, indemnify, hold harmless and release the City of Rohnert Park, its agents, officers, attorneys and employees from any claim, action or proceedings brought against any of the above, the purpose of which is to attack, set aside, void, or annul the approval of this application or certification of the environmental document which accompanies it. This indemnification obligation shall include but not be limited to, damages, costs, expenses, attorney or expert witness fees that may be asserted by any person or entity, including the Applicant, whether or not there is concurrent passive or active negligence on the part of the City, its agents, officers, attorneys or employees. 3. The Site Plan and Architectural Review approval shall expire one year from the Planning Commission approval date, unless prior to the expiration a building permit is issued and construction is commenced and diligently pursued toward completion and the use is initiated, or an extension is requested and approved. Planning Conditions 4. The project shall be completed consistent with the Architectural plans labeled “Warehouse Building for Spec”, drawn by GBDH Design Group, Inc. and received by the City on March 9, 2022. Substantial revisions require a Site Plan and Architectural Review, while small revisions may require an Administrative Permit. 5. Due to the limited parking on the site, a detailed parking study shall be required for subsequent phases of development prior to issuance of a building permit. 6. Customer parking is prohibited in the internal loading dock area. The applicant shall place signs stating “Employee Parking Only” at the north and south entrances of the loading dock area. 6 Reso 2022-06 7. If Option 2 is utilized, updated building elevations, floorplans, and landscaping plans shall be submitted and approved prior to issuance of a building permit. 8. If Option 2 is utilized on the site, the outdoor storage yard proposed on the southern end of the Phase 1 building shall be contained by a solid 10-foot-tall solid wall matching the design of the building. 9. As per Section 17.16.140, a bicycle parking facility shall be provided at a ratio of one bicycle parking space per 15 off-street parking spaces, for a total of 19 bicycle spaces. Bicycle parking shall be inverted “U” racks. 10. Obtain an Administrative Permit (per Zoning Ordinance 17.25.050) from Planning for the establishment of a Master Sign Program. Master Sign Program submittal requirements: a. Provide a site plan showing existing improvements and proposed sign locations, including directional signs. b. Provide detailed elevations showing the proposed signage, including the dimensions, locations, proposed illumination and method of attachment or mounting. Public Safety Conditions 11. Prior to issuance of a grading permit, the Applicant for each development phase shall submit a satisfactory Environmental Site Assessment covering any areas of known concern of possible contamination. 12. Jobsite security shall be the responsibility of the Applicant. The project shall be maintained in a safe condition as specified in California Fire Code Chapter 33 and NFPA 241. A Fire Protection Program shall be submitted to the Fire Department for review prior to ANY construction activities. This program shall be updated on a monthly basis, as conditions change. A Program Manager shall be responsible for all components of the Program. 13. Prior to the issuance of a building permit, the Applicant shall prepare and submit Improvement Plans to the Community Development Department and Fire Marshal for review and approval. All fire services shall be indicated and approved. All improvements shall be approved and comply with current City Standards. Additional Fire Department permits will be required. 7 Reso 2022-06 14. Fire hydrants must be in place and fully operational within 150’ before the delivery of any combustible materials to the site. An approved weather-proof access road, capable of supporting fully-loaded fire apparatus must be in place. Contact the Fire Prevention Bureau for a clearance memo. 15. Fire Apparatus Access Roads and Fire Lanes must be fully identified with signage and/or curb markings as approved by the Fire Marshal. Aerial Fire Apparatus Access Roads will be as required by Fire Code with a minimum of first lift of AC paving. 16. Applicant/operator shall store, manifest, transport, and dispose of all onsite generated waste that meets hazardous waste criteria in accordance with California Code of Regulations Title 22 and in a manner to the satisfaction of the Sonoma County Environmental Health Department and Emergency Services Department. Applicant shall keep storage, transportation, and disposal records on site and open for inspection to any government agency upon request. 17. Prior to the issuance of any Certificate of Occupancy, all fire hydrants and systems shall be fully functional, with blue reflective pavement markers indicating the hydrant locations on the street and red curbs per City Standards and as approved by the Fire Marshal. Fire hydrants shall be spaced per City standard and their locations shall be as shown on the approved Improvement Plans. All hydrants shall conform to City Standard 857. 18. Fire sprinklers and alarm systems are required for all structures. They shall be designed, sized and installed in compliance with the current California Fire Code, national standards and local ordinances. Separate Fire Department permits shall be obtained. All properties shall be clearly marked with lighted address numbering on the front of each unit and on both front and rear of the units having rear alley access; rear addressing shall include the street name utilizing street signage in conformance with Design Standards. A complex directory shall be erected at each entry to the development. Details of the directory shall be submitted for review and approval by the Fire Marshal. 19. Due to the exposure to running wildfire, non-combustible fencing is highly recommended for all perimeter fences, and as practical within the development. Each development phase or portion of a phase shall indicate building type, size, and construction features. Plans shall be reviewed by the Public Safety Department for fire and life safety requirements such as: fire flow, fire hydrants, fire sprinklers, fire department connections, alarm systems, smoke control systems, public-safety, radio amplification systems, gates, egress, and exiting. Such plans will be reviewed and commented on for individual blocks and buildings. 20. Prior to issuance of a Certificate of Occupancy, the Applicant shall obtain Operational Permits as required by the California Fire Code and local ordinances. Throughout the construction period, all standard measures for mitigating fire and life 8 Reso 2022-06 safety risks shall be maintained at all times. The Applicant shall obtain all required Construction Permits as per California Fire Code and the City Fire Marshal. A hydrant flow test is necessary to establish the existing water supply limits. Please contact the Fire Prevention Division at (707)584-2641 to initial the flow test. For a facility this large, a fire pump is envisioned. 21. Weed abatement shall be carried out on an on-going basis. Engineering Conditions 22. Sheet UT-1: All potable water backflow devices and meters shall be installed in sidewalk or back of sidewalk prior to the installation of the bioretention system per City Standards. 23. Provide a raised median across the Business Park Drive driveway to physically restrict left turns in and out of the site, as recommended by the Traffic Impact Study. 24. Trucks exiting onto Business Park Drive are forced into the eastbound left turn pocket onto Dowdell Avenue, and would need to merge back into the thru lane, potentially cutting off a following vehicle. The east driveway return should be widened to allow turns into the thru lane. 25. The acoustic study recommends, in addition to the 10’ CMU sound wall along the south property line that certain operational restrictions (delivery truck types, hours of trash pick-up, and truck routing) be put in place. 26. The existing sanitary sewer and recycled water easements on the south side of the property need to be extended to include through the driveway, a minimum of a 14 foot easement for access per City Standards Volume 1 Sewer Design Standards Section XVII. This will allow City vehicles to access the utility lines via the driveway and not over the curb. 27. All applicable provisions of the City of Rohnert Park Municipal Code (RPMC) are made a part of these conditions of approval in their entirety, as if fully contained herein. 28. All potable water backflow devices and meters shall be installed in sidewalk or back of sidewalk within the PUE, on the City side of the biorentention system. Suggest moving the water line on Dowdell Avenue further south to the proposed driveway and coming through there and install the backflow and meter in order to avoid the bioretention system and additional crossings. 29. A new sewer easement and recycled water easement shall be dedicated over southerly 30’ of the property. This will accommodate the two existing lines and allow for future repairs/ replacement of the lines, including installation of parallel lines in the widened easement. 9 Reso 2022-06 30. The sound wall along the south side of the property shall designed to be freestanding in the event of trenching the existing utilities on either side of the wall. The wall shall be built on extended footings that extend below the zone of influence for the trenches. 31. Improvements plans shall include an erosion control (winterization) plan and designed in accordance with the City or Rohnert Park’s Grading Ordinance. All documentation required in the Ordinance shall be submitted at the time of the grading permit application. The plan must include an order of work and staging/scheduling component indicating when facilities must be installed and when they may be removed. A separate Rain Event Action Plan (REAP) shall be required and prepared as part of the Storm Water Pollution Prevention Plan (SWPPP). A copy of the REAP shall be kept on-site throughout the duration of construction activities. 32. Sheet A1.1: The Applicant shall coordinate the sound wall design with the property owner to the south to replace the existing tubular steel fence, or to integrate it with the new sound wall. The design shall eliminate or minimize dead space between the walls. 33. Sheet A1.1: The portion of the sound wall along the west property line crossing the trunk sewer and the recycled water line shall be designed to “bridge” the easement with no support from or load on the surface area within the easement. The wall shall be designed to be removable across the easement. 34. The Biological Assessment notes the presence of jurisdictional wetlands and habitat on the site, requiring the need for resource agency permits and mitigation lands for both. 35. The geotechnical report shows the presence of groundwater as shallow as 5’ below the existing grade. This must be considered in the design of the stormwater treatment measures. 36. The geotechnical report provides preliminary pavement sections. The sections do not include lime treatment of subgrade and it is not clear if expansion soil was considered in the pavement design. The need for lime treatment and/ or a thicker structural section to offset soil expansion shall be included. 37. Trash-capture measures consistent with the State’s trash-capture requirements (5-mm. screen for 1-year, 1-hour storm) shall be provided in the final design. 38. Provide joint trench plans for dry utilities. 39. The Fire Marshal shall review the final fire line design and fire flow/ pressure calculations. 40. The Well Installation and Sampling Report indicates the need for the following design measures to address possible methane and other gases in the soil: • Installation of a sub-slab venting/depressurization system beneath the buildings. 10 Reso 2022-06 • Installation of a vapor barrier beneath the buildings. • Installation of utility trench dams • Ongoing O & M plans, including inspections and maintenance 41. Include all City Standards for the project, sidewalk, backflow devices, curb and gutter replacement, driveway, streetlights, etc. City Standards shall be included or referenced for each item of work within the plans. 42. Show the extents of road rehabilitation following City Standard 215. 43. The Civil Drawings shall include general notes regarding dust control, City Standards, BMPs, etc., in addition to these four: a) "The Contractor is responsible for the removal of all USA markings created within the project limits, and in relation to the project. Replacement and restoration must meet the approval of the City Engineer." b) "The contractor shall maintain one clean set of marked plans showing all changes and “as built” information. This set of plans will be submitted to the City engineer upon completion of work.” c) "All utility covers shall meet final paving elevations. More than 0.25 inch of deviation between the top of the utility cover and the surrounding pavement in a six foot radius at any location shall be cause for rejection." d) “Any non-compliant existing or new curb, gutter, or sidewalk shall be replaced by the developer to City Standard at the discretion of the City Engineer.” 44. The applicant shall record the 30-foot sewer easement as shown on the Sewer Easement Exhibit” completed by KPFF and dated February 11, 2022. 45. The recycled water line needs a backflow. Please include the City Standard. 46. All utilities within the public right of way need to be shown in a profile view. 47. Submit exemptions to the Water Board for any water lines located under other wet utility lines.