2022/04/28 Planning Commission Resolution 2022-07
PLANNING COMMMISSION RESOLUTION NO. 2022-07
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ROHNERT PARK APPROVING SITE PLAN AND ARCHITECTURAL
REVIEW FOR THE NORCAL KENWORTH PROJECT
(APNS 143-040-143 AND 143-040-144)
FILE NO. PROJ21-0005
WHEREAS, the applicant, Tom Bertolino for NorCal Kenworth, filed Planning
Application No. PROJ21-0005, PLSR21-0007 & PLEN21-0004 for Site Plan and Architectural
Review for construction of new industrial building located at 5535 & 5555 Redwood Drive
(APNs 143-040-143 & 143-040-144), in accordance with the City of Rohnert Park Municipal
Code; and
WHEREAS, Planning Applications No. PLSR21-0007 was processed in the time and
manner prescribed by State and local law;
WHEREAS, on April 28, 2022, the Planning Commission reviewed Planning
Application No. PLSR21-0007 at which time interested persons had an opportunity to testify
either in support of or opposition to the project; and,
WHEREAS, at the April 28, 2022, Planning Commission meeting, upon considering all
testimony and arguments, if any, of all persons desiring to be heard, the Commission considered
all the facts relating to Planning Application No. PLSR21-0007.
NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF
ROHNERT PARK DOES RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. That the above recitations are true and correct.
Section 2. Factors Considered. The Planning Commission, in approving Planning
Application No. PLSR22-0002, makes the following factors, to wit:
A. That the developments general appearance is compatible with existing development and
enhances the surrounding neighborhood.
Criteria Satisfied. This development is the third new building project near the Press
Democrat property and is a building with an industrial design which will also have a
strong commercial component (truck sales). The development is compatible with
existing surrounding development and reflects extensive use of high-quality,
contemporary design, incorporating unifying, community wide design elements such as
variations in the roof elevation, decorative window treatments and a complementary color
palette. The building’s exterior is architecturally pleasing while enhancing the character
of the surrounding neighborhood.
2
Reso 2022-07
B. That the development incorporates a variation from adjacent on-site and off-site
structures in height, bulk, and area; arrangement on the parcel; openings or breaks in
the façade facing the street; and/or the line and pitch of the roof.
Criteria Satisfied. The new building is of modern design with gray metal siding along the
top and grey CMU wall along the bottom. “Kenworth Red” is used as the accent color for
the bollards and metal canopies above the aluminum storefront glass façade windows and
entries. Volumes are simple and asymmetrical, yet balanced. Repetitive and alternating
elements are present, with additional articulation provided using colors, materials,
screening, and recesses.
C. That the development will be located and oriented in such a manner so as to provide
pedestrian, bicycle and vehicular connections with adjacent properties, as appropriate,
and avoids indiscriminate location and orientation.
Criteria Satisfied. Access to the new industrial building is from one driveway on
Redwood Drive, which is shared with the existing Press Democrat building. Pedestrian
and bicycle access to the building would be from Redwood Drive. Existing pedestrian,
bicycle and vehicular connections would be retained as part of the project and would
therefore avoid indiscriminate location and orientation of the proposed industrial building
impacting access.
Section 3. Environmental Clearance. A Mitigated Negative Declaration was prepared for
the larger Press Democrat site as part of a lot split and adopted by the Planning Commission on
January 25, 2018 by resolution 2018-06 in conformance with the California Environmental
Quality Act (CEQA).
NOW THEREFORE BE IT RESOLVED, that the Planning Commission does hereby
approve Planning Application No. PLSR21-0007subject to the Site Plan and Architectural Review
submittal package attached as Exhibit A and Conditions of Approval attached as Exhibit B.
BE IT FURTHER RESOLVED that said action shall not be deemed final until the appeal
period has expired and that the appeal period shall be ten (10) working days from the date of said
action. No building permits shall be issued until the appeal period has expired, providing there are
no appeals.
DULY AND REG ULARLY ADO PTED on this 28th day of April, 2022 by the City of
Rohnert Park Planning Commission by the following vote:
AYES: 3 NOEs:_!b__ ABSENT:_d_ ABSTAIN:L
AUSTIN-DILLON~ BLANQUIE~ORLOFF ~ STRIPLE~LAM-/1bJx,vt
~ ~-~
-FaRny Lam, Ch-aiFp@-fS0ft, City of Rohnert Park Planning Commission
\ (1ffflt-'¥' -hi:~hY\ :bi\ t:f\ 1 Pt~~ Chv-
edna, Recording Secretary
Attachments:
Exhibit A- NorCal Kenworth Site Plan and Architectural Review submittal package
Exhibit B - Conditions of Approval
3
Reso 2022-07
Exhibit A to Resolution
.CIVILENGINEERINGCIVILENGINEERINGLANDPLANNINGMELLESNU
CIVILENGINEERINGCIVILENGINEERINGLANDPLANNINGMELLESNUPROPOSED IMPERVIOUS
AREA
1
NorCal Kenworth Industrial Park Project COAs
EXHIBIT B
ADOPTED PER PLANNING COMMISSION RESOLUTION NO. 2022-07
CONDITIONS OF APPROVAL: NORCAL KENWORTH SITE PLAN AND
ARCHITECTURAL REVIEW
The conditions below shall apply to the NorCal Kenworth Avenue Industrial Park project located
at 5535 & 5555 Redwood Drive (PLSR21-0007).
General Conditions
1. The facility shall comply with any and all applicable provisions of the Rohnert Park
Municipal Code (RPMC) and any state or federal agency. The violation of any condition
listed herein shall constitute a nuisance and a violation of the Rohnert Park Municipal
Code. In conformity with Chapter 1.16 of the RPMC, a violation of the RPMC may be an
infraction or a misdemeanor and shall be punishable as provided by law. In addition to
criminal penalties, the City may seek injunctive relief. The Applicant agrees to pay for all
attorney’s fees and costs, including, but not limited to, staff time incurred by the City in
obtaining injunctive relief against the Applicant as a result of a failure of the Applicant to
fully perform and adhere to all of the Conditions of Approval.
2. The Applicant agrees to defend, indemnify, hold harmless and release the City of Rohnert
Park, its agents, officers, attorneys and employees from any claim, action or proceedings
brought against any of the above, the purpose of which is to attack, set aside, void, or annul
the approval of this application or certification of the environmental document which
accompanies it. This indemnification obligation shall include but not be limited to,
damages, costs, expenses, attorney or expert witness fees that may be asserted by any
person or entity, including the Applicant, whether or not there is concurrent passive or
active negligence on the part of the City, its agents, officers, attorneys or employees.
3. The Site Plan and Architectural Review approval shall expire one year from the Planning
Commission approval date unless a building permit is issued and construction is
commenced and diligently pursued toward completion and the use is initiated, or an
extension is requested and approved prior to the expiration of the approval.
Planning Conditions
1. Due to the limited parking on the site, a detailed parking study shall be required for
subsequent phases of development prior to issuance of a building permit.
2. Any trees removed from the site shall follow the requirements of Chapter 17.15 of the
RPMC. Prior to removing existing trees on the parcel, the following information shall be
submitted to the Planning Department for approval:
• A site plan drawn to scale showing the location of the tree to be altered,
removed or relocated, adjacent structures and utilities, and any other pertinent
information;
2
NorCal Kenworth Industrial Park Project COAs
• A brief description of the tree(s), including number, type, diameter, and height,
and reason for alteration, removal, or relocation;
• A letter or report describing the health and condition of the tree prepared and
signed by a licensed and certified arborist; and
• Photographs of the tree(s) to be altered, removed, or relocated.
3. As per Section 17.16.140, a bicycle parking facility shall be provided at a ratio of one
bicycle parking space per 15 off-street parking spaces, for a total of two bicycle spaces.
Bicycle parking shall be inverted “U” racks.
4. All lighting shall be situated and/or shielded to prevent glare and light spillover onto
adjacent parcels. A photometric analysis shall be submitted to illustrate this
requirement.
5. All mechanical equipment shall be screened from the view of a public right-of-way:
ground-mounted equipment shall be screened by a solid wall or adequate landscaping,
and roof-mounted equipment shall be located behind a parapet wall.
6. The area labeled “Pallets” to the south of the proposed building shall be screened from
view by a solid six-foot wall matching the design of the building.
7. A final landscape plan shall be submitted with the building permit application. Additional
landscaping, including small trees and shrubs, shall be provided to adequately screen the
roll-up doors visible from Redwood Drive, as approved by Planning staff.
8. Obtain an Administrative Permit (per Zoning Ordinance 17.25.050) from Planning for the
proposed use, as well as the establishment of a Master Sign Program.
Master Sign Program submittal requirements:
a. Provide a site plan showing existing improvements and proposed sign locations,
including directional signs.
b. Provide detailed elevations showing the proposed signage, including the dimensions,
locations, proposed illumination and method of attachment or mounting.
Environmental Compliance Conditions
9. The proposed wash rack shall connect to an oil/water separator, without plumbing by-
passes, to City sanitary sewer or storm drain system.
10. A sampling manhole shall be installed with frame and cover downstreamfrom the oil/water
separator. Floor drains or sumps are prohibited in the repair shop or service area. Please
contact Patrick Pulis at (707) 543-3451 for more information.
Public Safety Conditions
11. The new structure will require a fully automatic fire sprinkler system that meets the NFPA
13 standard. (FS-10)
3
NorCal Kenworth Industrial Park Project COAs
12. The project will require a fire alarm system that meets U.L. certification for central station
maintenance and runner servi ce per local ordinance. An additional external horn/strobe is
required and shall be visible from the street.
13. A separate Fire Civil permit will be required. (FS-3) All plans and permit applications shall
be submitted directly to the Fire Prevention Division. The Fire Prevention Division may
be reached at (707) 584-2641.
14. Sheet C-1: Keynote 8 shall be modified to read: “with a fire hydrant within 50’ and a
divorced FDC with a 4” STORZ connection.” Please address the existing monitored PIVs
on the drive aisle (This will be verified with the Fire Civil permit).
15. Fire extinguishers shall be provided as per CFC.
16. Address numbers shall be a minimum of 12” and illuminated, visible from the street, and
shall compy with Ordinance 938.
17. All Aerial Fire Apparatus Roads must be a minimum of 26’ in width, and as specified in
the CFC and RP Information Bulletin.
18. A key box and set of permanently labelled keys for each building shall be provided for
emergency responders’ use. Boxes may be purchased by contacting the Fire Prevention
Bureau at (707) 584-2641.
19. Underground storage tanks and hazardous materials are managed by Sonoma County Fire
District. Please contact their division for their requirements. (707) 565-2024.
20. The existing fire hydrants on the site shall be replaced with the current style. This includes
one hydrant on the Redwood Drive frontage and one in the island to the west. Red curbs
and signage shall be provided.
21. All driveways shall be considered fire lanes.
22. Any gate systems will require a FS-27 permit.
23. Additional conditions may apply as the project develops.
Engineering Conditions
24. In addition to the comments contained in the attached Engineering memo, the following
conditions apply for the construction documents:
a. Provide a separate utility plan sheet.
b. The General Notes of the plans shall include the following:
4
NorCal Kenworth Industrial Park Project COAs
• “The contractor shall maintain one clean set of marked plans showing all changes
and “as built” information. This set of plans will be submitted to the City engineer
upon completion of work.”
• “The Contractor is responsible for the removal of all USA markings created within
the project limits, and in relation to the project. Replacement and restoration must
meet the approval of the City Engineer.”
• “All utility covers shall meet final paving elevations. More than 0.25 inch of
deviation between the top of the utility cover and the surrounding paving at any
location shall be cause for rejection.”
25. Provide an exhibit showing the stormwater measures layout and DMA boundaries (this is
shown as Appendix G in the Table of Contents but is not included in the document.
Delineation of the three DMAs is needed to corroborate the sixing calculations with the
plans.
26. Stormwater Measures 1 and 3 and undersized. BMP-1 provides 2605 cf of storage but the
report indicates that 4376 cf is needed. BMP-3 provides 822 cf of storage but 1039 cf is
shown to be needed. While the overall storage provided (5843 cf) exceeds what is required
(5775 cf), each stormwater treatment needs to be sized to treat and store runoff from its’
respective DMA.
BMP-2 is oversized, with 2416 cf of storage provided and only 347 cf needed. Could the
DMA boundaries be revised to direct additional runoff to BMP-2, balancing out the storage
needs.
27. The sizing calculations use a filter medium with an infiltration rate of 24”/ hour. This
infiltration rate is very high. Confirm that material is available that allows this rate and that
the material provides the filtering requirements of the Santa Rosa design guidelines. It
would also seem that the high infiltration rate could cancel out any storage.
The project exceeds one acre and is subject to 100% volume capture, not treatment and
incremental volume capture, so it is not clear why these calculations are being provided.
28. Appendix D: The Stormwater Calculator sheets are not complete (% goal achieved not
filled in). Each stormwater treatment shall be sized to treat and store runoff from its
respective DMA.
29. Provide a floor sump in the trash enclosure, tied to the sanitary sewer, as shown on the
civil plans.
30. The existing Press-Democrat domestic water meter shall be relocated to the Redwood
Drive public right-of-way, near the connection point of the rerouted water line to the
Redwood Drive water main.
5
NorCal Kenworth Industrial Park Project COAs
31. BMP-1 needs to be relocated out of the PUE.
32. The geotechnical report indicates groundwater at a depth of 6’-7” in Boring 15. Provide a
map showing the location of Boring 15; shallow groundwater could conflict with the
stormwater basins.
33. The applicant shall demonstrate how utility service, including water, sewer and electricity
and gas services, will be maintained to the site of the current Press Democrat Building.
The Applicant’s proposal cannot result in discontinuation of utility service to the
adjacent, independently-owned property. If easements are required to maintain this
service, the easements need to be shown on the site plan. If the intent is to abandon the
existing gas line connection to the Press-Democrat building, provide confirmation from
the owner.
34. The existing Press Democrat potable water meter shall be relocated to the public right-of-
way in either Redwood Drive or Business Park Drive.
35. The applicant shall perform the sewer assessment prior to Public Works approval. The
City has sent a proposal from GHD (City’s consultant) to the applicant for acceptance
prior to having GHD proceed with the work. GHD will need to complete the study and
any recommendations incorporated as Conditions of Approval prior to entitlement.
36. Provide all utility conflicts with the necessary information of inverts, pipe size, cover,
etc., both on the private and public property.
37. A photometric study of the public ROW is required as part of the entitlement package.
38. Post-construction storm water BMPs shall be installed in general conformance with the
City of Santa Rosa LID manual: https://www.srcity.org/1255/Low-Impact-Development
as modified under the January 6, 2016 Municipal MS4 Storm Water Permit (effective May
3, 2017).
39. Post-construction storm water treatment measures should include trash capture
requirements adopted by the State Water Resources Control Board in April 2015, and in
conformance with the January 6, 2016 Municipal MS4 Storm Water Permit (effective May
6, 2017). Treatment measures shall include full trash control measures confirming to the
State’s MS4 Trash Reduction requirements (5-mm. screen for 1-year, 1 -hour storm).
40. All applicable provisions of the City of Rohnert Park Municipal Code (RPMC) are made a
part of these conditions of approval in their entirety, as if fully contained herein.
41. Landscaping shall be constructed in accordance with the State’s Model Water Efficient
Landscaping Ordinance (MWELO), or in accordance with water conservation standards
which meet or exceed the requirements of the MWELO. The Applicant shall submit a
landscaping and irrigation plan that identifies landscape material types and locations,
irrigation, water usage calculations, and other information as required. The plan shall be
6
NorCal Kenworth Industrial Park Project COAs
submitted to and reviewed and approved by the Development Services Department prior
to construction. All costs for review of the requirements of the MWELO shall be borne by
the Applicant. All landscaping and irrigation subject to the MWELO shall be substantially
complete prior to the issuance of a Certificate of Occupancy.
42. All improvements shall be designed in conformance with: the City of Rohnert Park,
Manual of Standards, Details and Specifications in effect at the time of development.
43. The Project benchmark shall be based on a City approved USGS benchmark.
44. Improvements plans shall include an erosion control (winterization) plan and designed in
accordance with the City or Rohnert Park’s Grading Ordinance. All documentation
required in the Ordinance shall be submitted at the time of the grading permit application.
The plan must include an order of work and staging/scheduling component indicating when
facilities must be installed and when they may be removed. A separate Rain Event Action
Plan (REAP) shall be required and prepared as part of the Storm Water Pollution
Prevention Plan (SWPPP). A copy of the REAP shall be kept on-site throughout the
duration of construction activities.
45. Improvement plans for all onsite and offsite improvements shall be prepared by a
Professional Civil Engineer licensed to practice in the State of California and submitted for
review and approval by the City Engineer prior to issuance of permits or start of
construction. At the completion of construction, prirot to release of bonds, a set of as-built
plans shall be provided to the City (mylar, CAD files, and pdf file).
46. A grading permit is required for all onsite improvements.
47. An encroachment permit is require for all work in the public right-of-way.