Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2024/03/12 City Council Agenda Packet
,-p HN ERT Pq Rk 19 "'~ sz "We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. " �AL1 FO Rl31 P� ROHNERT PARK CITY COUNCIL, ROHNERT PARK FINANCING AUTHORITY (RPFA), SUCCESSOR AGENCY TO THE COMMUNITY DEVELOPMENT COMMISSION JOINT REGULAR MEETING Tuesday, March 12, 2024 Open Session: 5:00 PM MEETING LOCATION: CITY HALL - COUNCIL CHAMBER 130 Avram Avenue, Rohnert Park, California PUBLIC PARTICIPATION: The Rohnert Park City Council welcomes your attendance, interest and participation at its regular meetings scheduled on the second and fourth Tuesdays of each month at 5:00 p.m. in the Council Chambers. Members of the public are encouraged to observe the meeting on Cable Channel 26, by visiting meeting central on our website https://www.rpcity.org/city_hall/city_council/meeting_central, or at our YouTube channel at https://www.youtube.com/CityofRohnertPark. PUBLIC COMMENTS: Provides an opportunity for public comment on items not listed on the agenda, or on agenda items if unable to comment at the scheduled time (limited to three minutes per appearance with a maximum allowance of 30 minutes allotted per comment period, with time limits subject to modification by the City Council in accordance with the adopted City Council Protocols). Please fill out a speaker card prior to speaking. Members of the public may also provide advanced comments by email at publiccomment@rpcity.org Comments are requested by 3:00 p.m. on the day of the meeting, but can be emailed until the close of the Agenda Item for which the comment is submitted. Email comments must identify the Agenda Item Number in the subject line of the email. The emails will not be read for the record but will be provided to Council. Please note that all a -mails sent to the City Council are considered to be public records and subject to disclosure under the California Public Records Act. City Council/RPFA agendas and minutes may be viewed at the City's website: www.rpcity.org. PUBLIC HEARINGS: Council/RPFA may discuss and/or take action on any or all of the items listed on this agenda. If you challenge decisions of the City Council or the Rohnert Park Financing Authority of the City of Rohnert Park in court, you may be limited to raising only those issues you or someone else raised at public hearing(s) described in this agenda, or in written correspondence delivered to the City of Rohnert Park at, or prior to the public hearing(s). RIGHT TO APPEAL: Judicial review of any city administrative decision pursuant to Code of Civil Procedure Section 1094.5 may be had only if a petition is filed with the court no later than the deadlines specified in Section 1094.6 of the California Code of Civil Procedure, which generally limits the time within which the decision may be challenged to the 90th day following the date that the decision becomes final. SIMULTANEOUS MEETING COMPENSATION DISCLOSURE (Government Code Section 54952.3): Members of the City Council receive no additional compensation as a result of convening this joint meeting of the City Council and the Rohnert Park Financing Authority. CITY COUNCIL STRATEGIC PRIORITIES: The Rohnert Park City Council adopted the following strategic priorities for 2023-2024 (listed below in no particular order): 1. Progress on Downtown 2. Financial Health 3. Infrastructure, Maintenance and Beautification 4. Provide Equitable Services to All 5. Complete General Plan and Integrate Climate Change 6. Police/Community Relations and Accountability 7. Housing for All 8. Attract and Retain Staff 9. Memorable Community Experiences For All 1. CITY COUNCIL/RPFA/SUCCESSOR AGENCY JOINT REGULAR MEETING - CALL TO ORDER/ROLL CALL (Elward Rodriguez Sanborn Giudice Adams 2. CLOSED SESSION 2.A Report on Closed Session Previously Held on February 27, 2024, in Conference Room 2.A. to Consider Conference Personnel Matters (Government Code § 54957): Public Employee Annual Performance Evaluation - Title: City Manager 3. READING OF THE LAND ACKNOWLEDGMENT The City of Rohnert Park acknowledges Indigenous Peoples as the traditional stewards of the land. Let it be acknowledged that the City of Rohnert Park is located within the traditional homelands of the Federated Indians of Graton Rancheria, comprised of Coast Miwok and Southern Pomo peoples. 4. PLEDGE OF ALLEGIANCE 5. PRESENTATIONS 5.A Mayor's Proclamation: Proclaiming March as American Red Cross Month in the City of Rohnert Park Item 5.A. 5.13 Plaque of Special Recognition to the City of Rohnert Park for their Support to the Education Foundation of Cotati & Rohnert Park Presented by Education Foundation Executive Director Vera Blanquie and Education Foundation President Dan Blanquie 5.0 Mayor's Proclamation: Proclaiming March 31, 2024 as Transgender Day of Visibility in the City of Rohnert Park Item 5.C. 6. DEPARTMENT HEAD BRIEFINGS 7. PUBLIC COMMENTS Persons wishing to address the Council on any Consent Calendar item or on City business not listed on the Agenda may do so at this time. Each speaker will be allotted three minutes. Those wishing to address the Council should refer to Page I for information on how to submit public comments. 8. CONSENT CALENDAR All items on the Consent Calendar will be considered together by one or more action(s) of the City Council and/or the Rohnert Park Financing Authority and Successor Agency to the Community Development Commission, whichever is applicable, unless any Council Member or anyone else interested in a consent calendar item has a question about the item. Council Motion/Vote: (Elward Rodriguez Sanborn Giudice Adams 8.A Acceptance of Reports from Finance Department: 1. City Bills/Demands for Payment dated February 9, 2024 through February 26, 2024 Item 8.A. 8.13 Approval of Minutes for City Council/RPFA/Successor Agency Joint Regular Meeting, February 27, 2024 Item 8.13. 8.0 By Minute Order, Cancel City Council Regular Meeting of March 26, 2024, due to Strategic Priority Workshop Item 8.C. 8.1) Receive and File the Complete Streets Annual Report for 2023 Pursuant to Resolution 2012-111 (City's Complete Streets Policy) Item 8.D. 8.E Receive and File the Annual Review Report of the Growth Management Program per Municipal Code Section 17.19.030 Item 8.E. 8.F Receive the Annual Report on the Status of the General Plan and Housing Element for Calendar Year 2023, and Direct Staff to forward the Annual Report to the State Office of Planning and Research and the Department of Housing and Community Development Item 8.F. 8.G Receive and Accept the Annual Development Agreement Review Report for Southeast Specific Plan, University District Specific Plan, Five Creek Planned Development, Station Avenue Planned Development and Redwood Crossing as required by California Government Code Section 65865.1 & Rohnert Park Municipal Code Section 17.21.050 Item 8.G. 8.H Adopt Resolution 2024-015 Authorizing and Approving an Impact Fee Credit Agreement with SOMO Village, LLC for the Camino Colegio Impact Fee Required by the Amended and Restated Development Agreement (CEQA Status: Consistent with the Supplemental EIR Adopted on March 9, 2021) Item 8.H. 8.I Adopt Resolution 2024-016 Authorizing a Budget Amendment for the Appropriation of $76,440 in the Vehicle Replacement Fund for the Purchase of an Electric Vehicle to be Reimbursed by the Department of Energy's "Energy Efficiency and Conservation Block Grant" Item 8.I. 8.J Adopt Resolution 2024-017 Adopt a Resolution to Accept a Grant in the Amount of $21,171 from the Department of Justice (DOJ) Edward Byrne Memorial Justice Assistance Grant (JAG) Program for Purchase of Portable Radios and Authorizing the Finance Director to Increase FY 2023/24 Budget Appropriations by $21,171 Item 8.J. 8.K Adopt Resolution 2024-018 Authorizing the City Manager to Execute a Consultant Services Agreement with Sandis Inc. for Design of the Water Tank and Well System Seismic Retrofit Project No. 2020-17 in the amount of $616,888 and to Increase Appropriations in Project No. 2020-17 by $290,190.75 from the Federal Emergency Management Act (FEMA) Hazard Mitigation Grant Program Item 8.K. 8.L Adopt Resolution 2024-019 Finding the Pathway Replacement Project (Phase 1), Project No. CIP 1722 Exempt from CEQA Pursuant to CEQA Guidelines Section 15301 c, Awarding the Construction Contract to SkyView Tree Experts, Inc. for $46,000, and Authorizing the City Manager to Approve up to 15% ($6,900) in Change Orders Item 8.L. 8.M Adopt Resolution 2024-020 Accepting State Transportation Grant Funds, Authorizing City Manager to Execute Caltrans Program Supplement No. A00000422 for the Southwest Boulevard Complete Streets Project (State Project No. CRASL-5379(026) / City Project No. CIP2023), and Appropriating $2,285,000 in State Funds Item 8.M. 9. REGULAR ITEMS 9.A Sonoma Water Fiscal Year 2024-25 Proposed Budget and Rates Water Transmission System Presentation by Sonoma Water Finance Manager Jake Spaulding and Consider Authorizing the City's Representative to the Water Advisory Committee to Recommend Approval of the Proposed Fiscal Year 2024-25 Budget for Sonoma Water A. Staff Report B. Public Comments C. Council Discussion/Direction Item 9.A. Item 9.A. Presentation 9.13 Discuss and Consider Approving The Installation of 10 Fixed Location Automated Flock ® License Plate Reader (ALPR) Cameras in the City of Rohnert Park A. Staff Report B. Public Comment C. Council Discussion/Direction Item 9.13. Item 9.13. Presentation 9.0 Receive an Informational Presentation on the Results of the Capital Improvement Program Project 2022-10 Holly Fauna Emergency Access Bridge Feasibility Study A. Staff Report B. Public Comment C. Council Discussion/Direction Item 9.C. Item 9.C. Presentation 10. COMMITTEE / LIAISON / OTHER REPORTS This time is set aside to allow Council members serving on Council committees or on regional boards, commissions or committees to present a verbal report on the activities of the respective boards, commissions or committees on which they serve. Per Government Code Section 53232. 3(b), Councilmembers shall provide brief reports on meetings attended at the expense of the City. No action may be taken. 10.A City Standing Committees: 10.B Council Liaison Assignments: 10.0 Outside Agency and Mayors & Councilmembers/City Selection Committee Appointments: 1. Homeless Coalition Board (Formerly Sonoma County Continuum of Care Board) Meeting (2/28) Elward 2. Sonoma Clean Power Authority Board of Directors Meeting (3/7) Elward/Adams 3. Sonoma County Transportation Authority/Regional Climate Protection Authority (SCTA/RCPA) Board of Directors Meeting (3/11) Giudice/Elward 4. Water Advisory Committee (WAC) (3/4) Sanborn/Rodriguez 10.13 Reports Under Government Code Section 53232.3(b): 1. North Bay Business Journal Economic Outlook Summit at SSU (2/29) Adams, Giudice, & Sanborn 2. 2024 California Conference for Women (2/29) Rodriguez 3. Chamber of Commerce Noon Times (3/6) Adams 11. COMMUNICATIONS Copies of communications have been provided to Council for review prior to this meeting. Council Members desiring to read or discuss any communication may do so at this time. No action may be taken except to place a particular item on a future agenda for Council consideration. 12. ADDING AGENDA ITEMS TO A FUTURE CITY COUNCIL MEETING AGENDA At this time, any Councilmember may request the City Manager or Designee to add an item to a future agenda. Pursuant to the City Council Protocols, a concurrence of two Councilmembers is needed for the City Manager to consider the request. In accordance with the Brown Act, Councilmembers may only discuss whether the item should be placed on a subsequent agenda for deliberation and action. The City Manager will be responsible for placement of requested items on the agenda after evaluation of all requests for, among other things, time -sensitivity, and number of items already agendized. 13. PUBLIC COMMENTS Persons wishing to address the Council on any Consent Calendar item or on City business not listed on the Agenda may do so at this time. Each speaker will be allotted three minutes. Those wishing to address the Council should refer to Page I for information on how to submit public comments. 14. ADJOURNMENT NOTE: Time shown for any particular matter on the agenda is an estimate only. Matters may be considered earlier or later than the time indicated depending on the pace at which the meeting proceeds. If you wish to speak on an item under discussion by the Council which appears on this agenda, please refer to page 1 for more details on submitting a public comment. Any item raised by a member of the public which is not on the agenda and may require Council action shall be automatically referred to staff for investigation and disposition which may include placing on a future agenda. If the item is deemed to be an emergency or the need to take action arose after posting of the agenda within the meaning of Government Code Section 54954.2(b), Council is entitled to discuss the matter to determine if it is an emergency item under said Government Code and may take action thereon. AGENDA REPORTS & DOCUMENTS: A paper copy of all staff reports and documents subject to disclosure that relate to each item of business referred to on the agenda are available for public inspection at City Hall, 130 Avram Avenue, Rohnert Park, California 94928. Electronic copies of all staff reports and documents subject to disclosure that relate to each item of business referred to on the agenda are available for public inspection on https://www.rpcity.org/city_hall/city_council/meeting_central. Any writings or documents subject to disclosure that are provided to all, or a majority of all, of the members of the City Council regarding any item on this agenda after the agenda has been distributed will be made available for inspection at City Hall and on our website at the same time. Any writings or documents subject to disclosure that are provided to the City Council during the meeting will be made available for public inspection during meeting and on our website following the meeting. AMERICAN DISABILITY ACT ACCOMMODATION: Any member of the public who needs accommodations should email the ADA Coordinator at jcannon@rpcity.org or by calling 707-588-2221. Notification at least 72 hours prior to the meeting will enable the ADA Coordinator to use her best efforts to provide reasonable accommodations to provide as much accessibility as possible while also maintaining public safety in accordance with the City procedure for resolving reasonable accommodation requests. Information about reasonable accommodations is available on the City website at https://www.rpcity.org/city_hall/departments/human resources/a d a and accessibility_resources . CERTIFICATION OF POSTING OF AGENDA I, Sylvia Lopez Cuevas, for the City of Rohnert Park, declare that the foregoing agenda was posted and available for review on March 7, 2024, at Rohnert Park City Hall, 130 Avram Avenue, Rohnert Park, California 94928. The agenda is also available on the City web site at www.rpcity.org. Executed this 7 day of March, 2024 at Rohnert Park, California. Sylvia Lopez Cuevas, Office of the City Clerk Item 5.A. ,,ANERT Pn RM 9 62 �rt lIhORNiP IF roclamatiun THE ROHNERT PARK CITY COUNCIL CELEBRATES MARCH 2O24 AS AMERICAN RED CROSS MONTH IN THE CITY OF ROHNERT PARK Vbereag, during American Red Cross Month in March, we recognize the compassion of people in Rohnert Park and reaffirm our commitment to care for one another in times of crisis; and Wbereag, this generous spirit is woven into the fabric of our community and advances the humanitarian legacy of American Red Cross founder Clara Barton a revered woman in our country's history —who nobly dedicated herself to alleviating suffering; and Wbereag, today, kindhearted individuals in Rohnert Park exemplify Barton's commitment as they serve in the Red Cross in the Northern California Coastal Region to provide a beacon of hope for our neighbors in need. Through their voluntary and selfless contributions, generous individuals make a lifesaving difference during a sudden time of great need whether it's delivering shelter, food, and comfort during disasters; providing critical blood donations for hospital patients; supporting military families, veterans, and caregivers through the unique challenges of service; saving lives with first aid, CPR and other skills; or delivering aid and reconnecting loved ones separated by global crises; and V bereag, to honor individuals who lead with their hearts to serve people in need, we invite everyone within reach of this proclamation to join our commitment to strengthen our community; and PoW, Tljerefore, I, Susan Hollingsworth Adams, on behalf of the City Council, do hereby proclaim March 2024 as American Red Cross Month, and encourage our residents to support its purpose — to protect life and health and to ensure respect for every human being. 30ulp aub Regularlp Pruclaimeb this 12t' day of March 2024. March is Red Cross Month AmMcan Red Coss CITY OF ROHNERT PARK Susan H. Adams, MAYOR V' y}NERT rt CAL 1,0 RO �ruclamation THE CITY COUNCIL OF THE CITY OF ROHNERT PARK Proclaims MARCH 31, 2024 AS TRANSGENDER DAY OF VISIBILITY IN THE CITY OF ROHNERT PARK 30berea.5, International Transgender Day of Visibility celebrates transgender people, raises awareness of the discrimination they face, and acknowledges their contributions to our lives; and 30berea.5, this moment in time raises the visibility of transgender people in the City of Rohnert Park and address issues they face in our community while encouraging our neighbors and friends to love one another, especially those they may not know or understand; and Wbereao, the City of Rohnert Park recognizes the contributions made by our transgender friends and affirms they are a welcome, loved, valued, and essential part of our community; and Vbereac Rohnert Park is an inclusive community — we take pride in our diversity and strive to provide safety, prosperity, equality, and hope for ALL who live, work, and play here; and Vbereac the good people of Rohnert Park support and sustain the human rights of all residents and call for an end to all forms of prejudice, discrimination, and violence. ,eoW, Tberefore, be tt Protlatmeb, that I, Susan Hollingsworth Adams, as Mayor and on behalf of the City Council, proclaim March 31, 2024, Transgender Day of Visibility in the City of Rohnert Park. With this proclamation, we affirm our commitment to support equal rights for every community member. )Dulp aub Regularlp Protlatmeb this 12th day of March 2024. CITY OF ROHNERT PARK Susan H. Adams, MAYOR Item 8A CITY BILLS/DEMANDS FOR PAYMENT March 12, 2024 Check Number: 600006573 - 600006928 22, 8, 0.26 Dated: February 9, 2024 - February 26, 2024 TOTAL $2,608,610.26 CITY BILLS DEMANDS FOR PAYMENT DATED FEBRUARY 9 2024 THROUGH FEBRUARY 26 2024 �4 0 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT lOP AMOUNT 600006573 02/09/2024 AT&T Information Technology ISF Communication -Phone 7,903.26 600006574 02/09/2024 AT&T General Fund Communication -Phone 55.61 600006575 02/09/2024 AT&T General Fund Communication -Phone 139.03 600006576 02/09/2024 AT&T General Fund Communication -Phone 374.66 600006577 02/09/2024 AT&T General Fund Communication -Phone 55.61 600006578 02/09/2024 AT&T Information Technology ISF Communication -Phone 83.41 600006579 02/09/2024 AT&T General Fund Communication -Phone 53.78 600006580 02/09/2024 AT&T General Fund Communication -Phone 1,436.13 600006581 02/09/2024 AT&T General Fund Communication -Phone 83.40 600006582 02/09/2024 AT&T General Fund Communication -Phone 278.11 600006583 02/09/2024 AT&T General Fund Communication -Phone 55.61 600006584 02/09/2024 AT&T General Fund Communication -Phone 166.83 600006585 02/09/2024 AT&T General Fund Communication -Phone 55.61 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 55.41 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 204.50 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 112.62 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 224.34 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 135.86 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 209.99 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 648.16 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 97.37 600006586 02/09/2024 AT&T MOBILITY General Fund Communication -Phone 41.42 600006586 02/09/2024 AT&T MOBILITY Information Technology ISF Communication -Phone 56.31 600006586 02/09/2024 AT&T MOBILITY Fleet Services ISF Communication -Phone 56.31 600006586 02/09/2024 AT&T MOBILITY Sewer Utility Fund Communication -Phone 196.54 600006586 02/09/2024 AT&T MOBILITY Sewer Utility Fund Communication -Phone 28.16 600006586 02/09/2024 AT&T MOBILITY Water Utility Fund Communication -Phone 266.36 600006586 02/09/2024 AT&T MOBILITY Water Utility Fund Communication -Phone 28.15 600006587 02/09/2024 AUTOZONE INC Fleet Services ISF Other Expense 28.73 600006588 02/09/2024 BARCODES LLC General Fund Equipment, Small Office & Tool 769.60 600006588 02/09/2024 BARCODES LLC General Fund Equipment, Small Office & Tool 3,352.32 600006589 02/09/2024 CAL -STEAM INC General Fund Repair & Maintenance 265.17 600006589 02/09/2024 CAL -STEAM INC Measure M Parks PW Other Expense 9,986.22 600006590 02/09/2024 CALMAT CO Water Utility Fund System Repairs 77.10 600006590 02/09/2024 CALMAT CO Water Utility Fund System Repairs 389.07 600006591 02/09/2024 CDW GOVERNMENT General Fund Other Expense 2,399.50 600006592 02/09/2024 COMCAST General Fund Communication -Phone 153.65 600006593 02/09/2024 COMCAST General Fund Communication -Phone 16.31 600006594 02/09/2024 COMCAST General Fund Communication -Phone 206.65 Page 1 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006595 02/09/2024 COMCAST General Fund Communication -Phone 109.90 6G0006596 02/09/2024 COMCAST General Fund Communication -Phone 176.20 600006597 02/09/2024 COMMUNIQUE INTERPRETING INC General Fund Contract -Outside Services 420.00 600006598 02/09/2024 BUTLER ANIMAL HEALTH HOLDING COMPANY LLC General Fund Other Exp-Animal Clinic NonElg 1,103.96 600006599 02/09/2024 CPS HR CONSULTING General Fund Contract -Outside Services 444.50 600006600 02/09/2024 CULLIGAN General Fund Other Expense 163.95 600006601 02/09/2024 DC ELECTRIC GROUP INC General Fund Contract -Outside Services 366.12 600006602 02/09/2024 DERRICK B LEONARD General Fund Contract -Outside Services 104.00 600006603 02/09/2024 FASTENAL General Fund Other Expense 341.23 600006603 02/09/2024 FASTENAL General Fund Other Expense 130,20 600006603 02/09/2024 FASTENAL General Fund Other Expense 253.04 600006603 02/09/2024 FASTENAL General Fund Other Expense 341.23 600006603 02/09/2024 FASTENAL General Fund Other Expense 130.20 600006603 02/09/2024 FASTENAL General Fund Other Expense 25304 600006603 02/09/2024 FASTENAL Water Utility Fund Other Expense 300,00 600006603 02/09/2024 FASTENAL Water Utility Fund Other Expense 130.20 600006604 02/09/2024 FRIEDMAN'S HOME IMPROVEMENT General Fund Other Expense 31.12 600006604 02/09/2024 FRIEDMAN'S HOME IMPROVEMENT General Fund Other Expense 7.01 600006604 02/09/2024 FRIEDMAN'S HOME IMPROVEMENT Sewer Utility Fund Equipment, Small Office & Tool 21.69 600006604 02/09/2024 FRIEDMAN'S HOME IMPROVEMENT Water Utility fund System Repairs 56.32 600006605 02/09/2024 GARDENERS AID INC General Fund Equipment, Small Office & Tool 163.87 600006605 02/09/2024 GARDENERS AID INC General Fund Equipment, Small Office & Tool 819.35 600006606 02/09/2024 GOLDEN GATE TRUCK CENTER Fleet Services ISF Fleet Veh Repairs for Fire 288.78 600006606 02/09/2024 GOLDEN GATE TRUCK CENTER Fleet Services ISF Fleet Veh Repairs for Fire 149.65 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 20.73 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 65.40 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 46.09 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 98.49 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 283.68 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 64.25 600006607 02/09/2024 GRAINGER INC General Fund Repair & Maintenance 44.96 600006607 02/09/2024 GRAINGER INC General Fund Equipment, Small Office & Tool 59.15 600006608 02/09/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for Police 225.72 600006608 02/09/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for Police 365.75 600006608 02/09/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for Police 182.87 600006608 02/09/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for Streets 34.09 600006609 02/09/2024 HOMEFIRST OF SANTA CLARA COUNTY General Fund Contract -Outside Services 149,724.47 600006610 02/09/2024 JAKE WATERMAN General Fund Contract -Outside Services 2,038.40 600006611 02/09/2024 KINETIC ENERGY SYSTEMS CORP Water Utility Fund Equipment, Small Office & Tool 1,952.28 600006612 02/09/2024 LIFE ASSIST INC General Fund Other Exp-First Aid Supplies 325.56 600006613 02/09/2024 REDACTED RETIREE General Fund Retiree -Benefit Medical Reimb 1,266.40 600006614 02/09/2024 MINDBASE LLC General Fund Contract -Outside Services 9,162.00 600006615 02/09/2024 MOONLIGHT BPO LLC General Fund Communication Advertising 898.70 600006616 02/09/2024 NICK BARBIERI TRUCKING LLC General Fund Fuel 309.84 600006617 02/09/2024 OFFICE DEPOT General Fund Office Expense 17,43 600006617 02/09/2024 OFFICE DEPOT General Fund Office Expense 299.48 600006617 02/09/2024 OFFICE DEPOT General Fund Other Expense 83.07 Page 2 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006617 02/09/2024 OFFICE DEPOT General Fund Other Expense 115.32 600006617 02/09/2024 OFFICE DEPOT General Fund Office Expense 227.98 600006617 02/09/2024 OFFICE DEPOT General Fund Office Expense 169.05 600006618 02/09/2024 ONE STEP GPS General Fund Contract -Outside Services 1,026.00 600006619 02/09/2024 JUSTIN BRANDT General Fund Tuition Reimbursement 1,379.54 600006620 02/09/2024 D.R. Horton Bay, Inc Water Utility Fund AR-UB-Fire Hydrant 2,347.65 600006621 02/09/2024 D.R. Horton Bay, Inc Water Utility Fund AR-UB-Fire Hydrant 2,250.00 600006622 02/09/2024 Judith E Abbott Water Utility Fund AR-UB Residential 213.27 600006623 02/09/2024 THE PAPE' GROUP INC Vehicle Replacement ISF Capital Asset -Vehicles 199,150.00 600006624 02/09/2024 ROHNERT PARK TENNIS CLUB General Fund Contract -Outside Services 2,960.00 600006625 02/09/2024 SANTA ROSA CAMPWAY INC Water Utility Fund Repair & Maintenance 2,736.49 600006626 02/09/2024 SOILAND CO INC General Fund Othr Accrued Liab.-Sales Tax (5.99) 600006626 02/09/2024 SOILAND CO INC Water Utility Fund System Repairs 5.99 600006626 02/09/2024 SOILAND CO INC Water Utility Fund System Repairs 66.50 600006627 02/09/2024 STEVEN FOGLE General Fund Recruitment 2,150.00 600006628 02/09/2024 STEVEN GROVER AND ASSOCIATES CIP - Government Capital Projects 1,820.00 600006629 02/09/2024 STROUPE PETROLEUM Fleet Services ISF Repair & Maintenance 2,736.90 600006630 02/09/2024 THYSSENKRUPP ELEVATOR CORPORATION General Fund Repair & Maintenance 480.96 600006631 02/09/2024 UNITED RENTALS NORTH AMERICAN INC General Fund Other Expense 120.18 600006631 02/09/2024 UNITED RENTALS NORTH AMERICAN INC General Fund Other Expense 1,291.55 600006632 02/09/2024 HD SUPPLY INC General fund Other Expense 2,207.05 600006633 02/09/2024 WHEELER ZAMARONI General Fund Other Expense 210.10 600006634 02/09/2024 WITMER PUBLIC SAFTEY GROUP INC General Fund Equipment, Small Office & Tool 841.57 600006635 02/09/2024 JEROME P FANUCCI CIP - Government Capital Projects 14,813.76 600006635 02/09/2024 JEROME P FANUCCI CIP - Government Capital Projects 14,813,77 600006636 02/09/2024 LEAF CAPITAL FUNDING LLC Sports Ctr Capitl Faciliy Rsry Lease -Equipment 3,079,20 600006637 02/13/2024 ABM SERVICES INC General Fund Contract -Outside Services 2,572.50 600006638 02/13/2024 AIR EXCHANGE INC General Fund Repair & Maintenance 129.59 600006639 02/13/2024 HAROLD A. STEUBER INC General Fund Other Expense 35.32 600006639 02/13/2024 HAROLD A. STEUBER INC Sewer Utility Fund Other Expense 88.44 600006640 02/13/2024 AT&T General Fund Communication -Phone 27.80 600006641 02/13/2024 AT&T Water Utility Fund Communication -Phone 57.74 600006642 02/13/2024 AT&T Sewer Utility Fund Communication -Phone 27.80 600006643 02/13/2024 AT&T General Fund Communication -Phone 27.80 600006644 02/13/2024 AT&T General Fund Communication -Phone 57.20 600006645 02/13/2024 AT&T General Fund Communication -Phone 85.03 600006646 02/13/2024 AT&T General Fund Communication -Phone 55.61 600006647 02/13/2024 AT&T General Fund Communication -Phone 40.60 600006648 02/13/2024 AT&T General Fund Communication -Phone 27.80 600006649 02/13/2024 CALIFORNIA ASSOCIATION FOR LOCAL ECONOMIC General Fund Communication Advertising 4,000.00 600006650 02/13/2024 CALMAT CO General Fund Other Expense 348.52 600006650 02/13/2024 CALMAT CO General Fund Other Expense 536.55 600006650 02/13/2024 CALMAT CO Water Utility Fund System Repairs 400.78 600006651 02/13/2024 CDW GOVERNMENT General Fund Other Expense 84.87 600006652 02/13/2024 CELLCO PARTNERSHIP General Fund Communication -Phone 250.10 600006652 02/13/2024 CELLCO PARTNERSHIP General Fund Communication -Phone 266.07 600006652 02/13/2024 CELLCO PARTNERSHIP General Fund Communication -Phone 76.02 Page 3 of 17 CHECK NUMBER 600G06652 600006652 600006652 600006652 600006652 600006652 600006652 600006652 600006652 600006652 600006652 600006653 600006654 600006655 600006656 600006657 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006658 600006659 600006660 600006661 600006662 600006662 600006662 600006662 600006663 600006664 600006665 600006666 CHECK DATE VENDOR NAME 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CELLCO PARTNERSHIP 02/13/2024 CINQUINI & PASSARINO INC 02/13/2024 CLUBCAREINC 02/13/2024 CO MCAST 02/13/2024 CO MCAST 02/13/2024 CO MCAST 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CSG CONSULTANTS INC 02/13/2024 CALIFORNIA SOCIETY OF MUNICIPAL FINANCE OFFICERS 02/13/2024 DAILEY WELLS COMMUNICATIONS INC 02/13/2024 DATA TICKET INC 02/13/2024 DC ELECTRIC GROUP INC 02/13/2024 DC ELECTRIC GROUP INC 02/13/2024 DC ELECTRIC GROUP INC 02/13/2024 DC ELECTRIC GROUP INC 02/13/2024 DELL FINANCIAL SERVICES LLC 02/13/2024 DIANE MICHELI 02/13/2024 DIGI-KEY CORPORATION 02/13/2024 GLD INVESTMENTS INC FUND General Fund Information Technology ISF Information Technology ISF Fleet Services ISF Sewer Utility Fund Water Utility Fund Water Utility Fund Recycled Water Utility Fund Graton Nghbrhd & Workforce Graton-Waterway CLOSE Successor Agency Housing Fund CIP - Government Sports Ctr Capitl Faciliy Rsry General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund General Fund Graton Mitigation Graton )EPA Wilfred Information Technology ISF General Fund General Fund General Fund ACCOUNT Communication -Phone Communication -Phone Communication -Phone Communication -Phone Communication -Phone Communication -Phone Communication -Phone Contract -Outside Services Communication -Phone Communication -Phone Communication -Phone Capital Projects Repair & Maintenance Communication -Phone Communication -Phone Communication -Phone Deposit Payable Deposit Payable Deposit Payable Deposit Payable Deposit Payable Deposit Payable Other Rev -Developer Deposit Other Rev -Developer Deposit Other Rev -Developer Deposit Other Rev -Developer Deposit Other Rev -Developer Deposit Other Rev -Developer Deposit Developer Deposit Expense Developer Deposit Expense Developer Deposit Expense Developer Deposit Expense Developer Deposit Expense Developer Deposit Expense Contract -Outside Services Contract -Outside Services Dues & Subscriptions Equipment, Small Office & Tool Contract -Outside Services Contract -Outside Services Contract -Outside Services Contract -Outside Services Contract -Outside Services Lease -Equipment Contract -Outside Services Repair & Maintenance General Liab Self Insur'd Loss AMOUNT 266.07 474.84 266.50 38.01 152.04 266.07 227.98 37.99 38.01 38.01 38.01 7,766.25 383.64 568.83 176.05 146.97 3,010.00 490.00 70.00 70.00 1,260,00 420.00 (3,010,00) (490.00) (70.00) (70.00) (1,260.00) (420.00) 3,010.00 490.00 70.00 70.00 1,260.00 420,00 115.00 2,932.50 135.00 21,054.09 88.00 4,967.13 549.18 5,298.27 772.66 449.90 864.00 421.30 5,709.57 Page 4 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006666 02/13/2024 GLD INVESTMENTS INC General Fund General Liab Self Insur'd Loss 1,430.84 600006666 02/13/2024 GLD INVESTMENTS INC General Fund General Liab Minor Claim Damag 1,889.24 600006666 02/13/2024 GLD INVESTMENTS INC General Fund Repair & Maintenance 169.01 600006667 02/13/2024 DUDEK General Fund Deposit Payable 471.25 600006667 02/13/2024 DUDEK General Fund Other Rev -Developer Deposit (471,25) 600006667 02/13/2024 DUDEK General Fund Developer Deposit Expense 471.25 600006668 02/13/2024 MICHAEL RUBIN General Fund Communication Advertising 189.53 600006669 02/13/2024 FASTENAL General Fund Maintenance -Janitorial 873.11 600006669 02/13/2024 FASTENAL General Fund Other Expense 63.60 600006669 02/13/2024 FASTENAL General Fund Other Expense 63.60 600006669 02/13/2024 FASTENAL Water Utility fund Other Expense 63.60 600006670 02/13/2024 FIRST ALARM SECURITIES SERVICES General Fund Repair & Maintenance 552.71 600006671 02/13/2024 FRIEDMAN'S HOME IMPROVEMENT General Fund Repair & Maintenance 22.40 600006671 02/13/2024 FRIEDMAN'S HOME IMPROVEMENT General Fund Repair & Maintenance 16.18 600006671 02/13/2024 FRIEDMAN'S HOME IMPROVEMENT Sewer Utility Fund Repair & Maintenance 55.38 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 6.45 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 50.46 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance (27.79) 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 50.81 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 9.94 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 283.68 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 51.85 600006672 02/13/2024 GRAINGER INC General Fund Repair & Maintenance 59.79 600006672 02/13/2024 GRAINGER INC General Fund Other Expense 9.65 600006672 02/13/2024 GRAINGER INC General Fund Other Expense 72.98 600006672 02/13/2024 GRAINGER INC General Fund Other Expense 9.05 600006672 02/13/2024 GRAINGER INC Sewer Utility Fund Repair & Maintenance 10.21 600006672 02/13/2024 GRAINGER INC Sewer Utility Fund Repair & Maintenance 84.86 600006672 02/13/2024 GRAINGER INC Sewer Utility Fund Other Expense 123.02 6000O6672 02/13/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 103.79 600006672 02/13/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 260.35 600006672 02/13/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 204.95 600006672 02/13/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 427.26 600006673 02/13/2024 GREEN VALLEY CONSULTING ENGINEERS CIP - Government Capital Projects 6,500.00 600006674 02/13/2024 MUNICIPAL EMERGENCY SERVICES INC General Fund Equipment, Small Office & Tool 597.78 600006674 02/13/2024 MUNICIPAL EMERGENCY SERVICES INC General Fund Equipment, Small Office & Tool 539.32 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC. General Fund Inventories 285.80 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 618.00 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,201.62 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,096.70 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,298.13 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,378.64 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 768.48 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Fuel 106.35 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Fuel 1,245.99 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Fuel 462.91 600006675 02/13/2024 NICK BARBIERI TRUCKING LLC General Fund Fuel 370.74 Page 5 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006676 02/13/2024 OCCUPATIONAL HEALTH CENTERS OF CALIFORNIA General Fund Contract -Outside Services 216.00 600006677 02/13/2024 JUSTIN WAX General Fund Travel and Training 320.00 600006678 02/13/2024 KEVIN ESCHER General Fund Travel and Training 320.00 600006679 02/13/2024 SARAH GIAMPAOLI Sewer Utility Fund Conservation Measures 500.00 600006679 02/13/2024 SARAH GIAMPAOLI Water Utility Fund Conservation Measures 500.00 600006680 02/13/2024 Darrell R White Water Utility Fund AR-UB Residential 550.84 600006681 02/13/2024 Jonathon Clark Water Utility Fund AR-UB Residential 5,369.63 600006682 02/13/2024 PACE SUPPLY Water Utility Fund System Repairs 291.63 600006683 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 2,279,97 600006683 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 657.87 600006683 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 2,606.49 600006684 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 15,088.13 600006684 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Debt -Principal 5,456.87 600006684 02/13/2024 PACIFIC GAS & ELECTRIC Graton JEPA Wilfred Utility -Electric 170.76 600006685 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 7,222,45 600006685 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 5,894.19 600006685 02/13/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 9,644.42 600006686 02/13/2024 PETALUMA COMMUNITY ACCESS General Fund Contract -Outside Services 743.75 600006687 02/13/2024 PETHEALTH SERVICES (USA INC General Fund Community Outreach 4,534.40 600006688 02/13/2024 REXEL USA INC Fleet Services ISF Equipment, Small Office & Tool 406.83 600006689 02/13/2024 REAL VNC LIMITED Information Technology ISF Software 2,924.81 600006690 02/13/2024 REDWOOD LOCK INC General Fund Equipment, Small Office & Tool 404.25 600006690 02/13/2024 REDWOOD LOCK INC General Fund Repair & Maintenance 25.07 600006691 02/13/2024 REXEL USA INC CIP Water Capital Projects 405.02 600006691 02/13/2024 REXEL USA INC CIP Water Capital Projects 810.04 600006692 02/13/2024 ROTO-ROOTER General Fund Contract -Outside Services 1,435,00 600006693 02/13/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 79.70 600006693 02/13/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 90.62 600006693 02/13/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 556,46 600006693 02/13/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 648.02 600006693 02/13/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 637.09 600006694 02/13/2024 SHANE DEMARTA General Fund Contract -Outside Services 731.25 600006695 02/13/2024 SONOMA COUNTY SHERIFF General Fund Repair & Maintenance 507.80 600006696 02/13/2024 SONOMA COUNTY TAX COLLECTOR General Fund Othr Accrued Liab.-BIA TOT 113,859.48 600006696 02/13/2024 SONOMA COUNTY TAX COLLECTOR General Fund BIA Charges for Services (2,277.19) 600006697 02/13/2024 SSA LANDSCAPE ARCHITECTS INC CIP - Government Capital Projects 2,347.50 600006698 02/13/2024 STATE WATER RESOURCES CONTROL BOARD CIP - Government Capital Projects 369.DO 600006699 02/13/2024 STEVEN GROVER AND ASSOCIATES CIP - Government Non -Capital Projects 3,186.75 600006699 02/13/2024 STEVEN GROVER AND ASSOCIATES CIP - Government Capital Projects 3,500.00 600006699 02/13/2024 STEVEN GROVER AND ASSOCIATES CIP - Government Capital Projects 7,285.00 600006700 02/13/2024 STUDIO FUWAFUWA General Fund Communication Advertising 122.50 600006700 02/13/2024 STUDIO FUWAFUWA General Fund Printing 2,600.00 600006700 02/13/2024 STUDIO FUWAFUWA General Fund Other Expense 140.00 600006700 02/13/2024 STUDIO FUWAFUWA General Fund Ohter Exp-Special Events 52.50 600006700 02/13/2024 STUDIO FUWAFUWA General Fund Ohter Exp-Special Events 140.00 600006700 02/13/2024 STUDIO FUWAFUWA Measure M Parks PW Ohter Exp-5peciai Events 70.00 600006701 02/13/2024 SUE STUBBLEBINE General Fund Contract -Outside Services 253.50 Page 6 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006702 02/13/2024 THE ABY MANUFACTURING GROUP INC General Fund Othr Accrued Liab.-Sales Tax (6.81) 600006702 02/13/2024 THE ABY MANUFACTURING GROUP INC General Fund Other Expense 6.81 600006702 02/13/2024 THE ABY MANUFACTURING GROUP INC General Fund Other Expense 2,190,05 600006703 02/13/2024 TROPE GROUP INC General Fund Other Expense 33,384.34 600006704 02/13/2024 UNITED RENTALS NORTH AMERICAN INC General Fund Other Expense 1,193.23 600006704 02/13/2024 UNITED RENTALS NORTH AMERICAN INC General Fund Contract -Outside Services 1,147,13 600006704 02/13/2024 UNITED RENTALS NORTH AMERICAN INC Water Utility Fund Equipment, Small Office & Tool 49.71 600006704 02/13/2024 UNITED RENTALS NORTH AMERICAN INC Water Utility Fund System Repairs 61.55 600006705 02/13/2024 UNITED STATES POST OFFICE Sewer Utility Fund Postage & Shipping 250.00 600006705 02/13/2024 UNITED STATES POST OFFICE Water Utility Fund Postage & Shipping 250,00 600006706 02/13/2024 VCA ANIMAL CARE CENTER OF SONOMA COUNTY General Fund Other Exp-Animal Clinic NonElg 3.20 600006707 02/13/2024 VCA PETCARE EAST VETERINARY HOSPITAL General Fund Other Exp-Animal Clinic NonElg 20.00 600006708 02/13/2024 NORTH BAY BOHEMIAN General Fund Communication Advertising 255.75 600006709 02/13/2024 WERLE ENTERPRISE LLC NATIONAL PRINT & PROMO General Fund Office Expense 1,301.51 600006710 02/13/2024 WESTERN EXTERMINATOR General Fund Contract -Outside Services 480.00 600006710 02/13/2024 WESTERN EXTERMINATOR General Fund Repair & Maintenance 64.20 600006710 02/13/2024 WESTERN EXTERMINATOR General Fund Repair & Maintenance 80.25 600006711 02/13/2024 WHEELER ZAMARONI Water Utility Fund System Repairs 530.83 600006712 02/13/2024 WIXEN MUSIC PUBLISHING INC General Fund Other Expense 360.00 600006713 02/15/2024 ABM SERVICES INC General Fund Contract -Outside Services 1,649.15 600006713 02/15/2024 ABM SERVICES INC General Fund Contract -Outside Services 1,464.65 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 300.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 250.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 155.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 300.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 25.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 275.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 275A0 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 50,00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 300.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 300.00 600006714 02/15/2024 ALPHA ANALYTICAL LABORATORIES INC Water Utility Fund Contract -Outside Services 300.00 600006715 02/15/2024 AT&T Information Technology iSF Communication -Phone 91.19 600006716 02/15/2024 BADGER METER INC General Fund Othr Accrued Liab.-Sales Tax (2.97) 600006716 02/15/2024 BADGER METER INC Water Utility Fund Meter & Supplies Existing 2.97 600006716 02/15/2024 BADGER METER INC Water Utility Fund Meter & Supplies Existing 33.00 600006717 02/15/2024 BARBARA LEACH D.V.M. General Fund Contract -Outside Services 2,486.25 600006717 02/15/2024 BARBARA LEACH D.V.M. Spay and Neuter Fund Contract -Outside Services 552.50 600006718 02/15/2024 BAUER COMPRESSORS INC General Fund Contract -Outside Services 4,870.00 600006719 02/15/2024 BRADY INDUSTRIES NORCAL, LLC General Fund Maintenance -Janitorial 501.45 600006719 02/15/2024 BRADY INDUSTRIES NORCAL, LLC General Fund Maintenance -Janitorial 400.91 600006720 02/15/2024 CAPTIONS UNLIMITED OF NEVADA INC General Fund Contract -Outside Services 120.00 600006721 02/15/2024 CITY ELECTRIC SUPPLY General Fund Repair & Maintenance 142.03 600006722 02/15/2024 CITY OF FAIRFIELD General Fund Travel and Training 2,712.00 600006723 02/15/2024 COMCAST General Fund Communication -Phone 260.65 600006724 02/15/2024 COMCAST General Fund Communication -Phone 46.88 600006725 02/15/2024 COMCAST General Fund Communication -Phone 10,73 Page 7 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006726 02/15/2024 THE COMMUNITY VOICE/SHAH FAMILY LLC General Fund Deposit Payable 319.00 600006726 02/15/2024 THE COMMUNITY VOICE/SHAH FAMILY LLC General Fund Other Rev -Developer Deposit (319,00) 600006726 02/15/2024 THE COMMUNITY VOICE/SHAH FAMILY LLC General Fund Developer Deposit Expense 319.00 600006727 02/15/2024 COMPLETE WELDERS SUPPLY General Fund Other Exp-First Aid Supplies 38.26 600006727 02/15/2024 COMPLETE WELDERS SUPPLY General Fund Repair & Maintenance 51.28 600006728 02/15/2024 DAILEY WELLS COMMUNICATIONS INC Vehicle Replacement ISF Capital Asset -Vehicles 11,570.84 600006729 02/15/2024 DATA TICKET INC General Fund Contract -Outside Services 101.00 600006730 02/15/2024 DC ELECTRIC GROUP INC General Fund Retention Payable 1,494.25 600006730 02/15/2024 DC ELECTRIC GROUP INC General Fund Retention Payable 1,498.25 600006730 02/15/2024 DC ELECTRIC GROUP INC General Fund Contract -Outside Services 6,460.02 600006730 02/15/2024 DC ELECTRIC GROUP INC Graton Mitigation Contract -Outside Services 6,890.68 600006730 02/15/2024 DC ELECTRIC GROUP INC Graton JEPA Wilfred Contract -Outside Services 1,004,89 600006730 02/15/2024 DC ELECTRIC GROUP INC CIP - Government Retention Payable 489,59 600006730 02/15/2024 DC ELECTRIC GROUP INC CIP - Government Retention Payable 633.00 600006730 02/15/2024 DC ELECTRIC GROUP INC CIP - Government Retention Payable 647.50 600006731 02/15/2024 DFM ASSOCIATES General Fund Elections 76.47 6G0006732 02/15/2024 GLD INVESTMENTS INC General Fund Repair & Maintenance 2,316.40 600006733 02/15/2024 DUDEK General Fund Contract -Outside Services 3,247.50 600006734 02/15/2024 LMS INVESTMENTS Information Technology ISF Repair & Maintenance 215.82 600006735 02/15/2024 EUREKA OXYGEN CO Sewer Utility Fund Repair & Maintenance 84.50 600006735 02/15/2024 EUREKA OXYGEN CO Senior Center Bingo CLOSE Special Events 38.00 600006736 02/15/2024 FASTENAL General Fund Maintenance -Janitorial 8.81 600006736 02/15/2024 FASTENAL General Fund Maintenance -Janitorial 6,95 600006736 02/15/2024 FASTENAL General Fund Maintenance -Janitorial 8.81 600006736 02/15/2024 FASTENAL General Fund Maintenance -Janitorial 21.79 600006736 02/15/2024 FASTENAL General fund Other Expense 53.17 600006736 02/15/2024 FASTENAL General Fund Maintenance -Janitorial 1,987.19 600006736 02/15/2024 FASTENAL General fund Other Expense 500.00 600006736 02/15/2024 FASTENAL General Fund Other Expense 500.00 600006736 02/15/2024 FASTENAL Sewer Utility Fund Repair & Maintenance 25.94 600006736 02/15/2024 FASTENAL Water Utility Fund Other Expense 595.20 600006737 02/15/2024 FEDERAL EXPRESS CORPORATION General Fund Postage & Shipping 76.68 600006738 02/15/2024 FIRST RESPONDERS RESILIENCY INC General Fund Travel and Training 2,000.00 600006739 02/15/2024 FRIEDMAN'S HOME IMPROVEMENT Water Utility Fund Other Expense 27.40 600006740 02/15/2024 FRIZELLE-ENDS COMPANY General Fund Othr Accrued Liab.-Sales Tax (2.03) 600006740 02/15/2024 FRIZELLE-ENOS COMPANY General Fund Community Outreach 1,01 600006740 02/1S/2024 FRIZELLE-ENDS COMPANY General Fund Community Outreach 119,75 600006740 02/15/2024 FRIZELLE-ENOS COMPANY General Fund Other Expense 1.02 600006740 02/15/2024 FRIZELLE-ENDS COMPANY General Fund Other Expense 319.13 600006741 02/15/2024 FROZEN FRESH FOODS INC General Fund Maintenance -Janitorial 483.19 600006741 02/15/2024 FROZEN FRESH FOODS INC General Fund Other Expense (45.92) 600006742 02/15/2024 GOVOS INC Information Technology ISF Software 9,801.00 600006743 02/15/2024 GRAINGER INC General Fund Other Expense 45.79 600006743 02/15/2024 GRAINGER INC Vehicle Replacement ISF Capital Asset -Vehicles 485.96 600006743 02/15/2024 GRAINGER INC Sewer Utility Fund Equipment, Small Office & Tool 368.75 600006744 02/15/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for WTR 291.33 600006744 02/15/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for DS 126.86 Page 8 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006744 02/15/2024 HANSEL FORD INC Fleet Services ISF Fleet Veh Repairs for Parks 222.07 600006745 02/15/2024 HILL'S PET NUTRITION SALES INC General Fund Other Expense 603.26 600006745 02/15/2024 HILL'S PET NUTRITION SALES INC General Fund Other Expense 269.17 600006746 02/15/2024 IDEXX DISTRIBUTION INC General Fund Other Exp-Animal Clinic NonE1g 621.45 600006746 02/15/2024 IDEXX DISTRIBUTION INC General Fund Other Exp-Animal Clinic NonElg 15.14 600006747 02/15/2024 INDUSTRIAL CHEM LABS &SVC Sewer Utility Fund Repair & Maintenance 984.39 600006748 02/15/2024 JOHN DEERE FINANCIAL General Fund Other Expense 136.19 600006749 02/15/2024 MOONLIGHT BPO LLC CIP Sewer Capital Projects 734.92 600006749 02/15/2024 MOONLIGHT BPO LLC CIP Water Capital Projects 404.49 600006750 02/15/2024 MTI ENTERPRISES INC General Fund Other Expense 2,691.21 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 601.06 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 794.89 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC General Fund inventories 1,526.70 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,539.10 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,083.89 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC General Fund Fuel 492.84 600006751 02/15/2024 NICK BARBIERI TRUCKING LLC Water Utility Fund Fuel 544.98 600006752 02/15/2024 OFFICE DEPOT General Fund Office Expense 60.05 600006753 02/15/2024 JONATHAN HEATON General Fund License & Permit 350.00 600006754 02/15/2024 MATTHEW HICKS General Fund Tuition Reimbursement 799.44 600006755 02/15/2024 PACE SUPPLY Water Utility Fund Other Expense (4.59) 600006755 02/15/2024 PACE SUPPLY Water Utility Fund Other Expense 229.43 600006755 02/15/2024 PACE SUPPLY Water Utility Fund System Repairs 273.13 600006756 02/15/2024 REXEL USA INC General Fund Repair & Maintenance 10.88 600006757 02/15/2024 SONOMA COUNTY DEPT OF HEALTH SERVICES General Fund Contract -Outside Services 2,400,00 6000067S8 02/15/2024 SONOMA MEDIA INVESTMENTS LLC General Fund Communication Advertising 490.00 600006759 02/15/2024 STACY ALLISON RUTZ General Fund Contract -Outside Services 1,125.00 600006760 02/15/2024 STRATA AP INC CIP - Government Capital Projects 9,500.00 600006761 02/15/2024 SYCAL ENGINEERING INC CIP Water Capital Projects 9,294.50 600006762 02/15/2024 TRI CITY FENCE CO INC General Fund Other Expense 3,986.81 600006763 02/15/2024 TROPE GROUP INC General Fund Other Expense 5,891.18 600006763 02/15/2024 TROPE GROUP INC General Fund Equipment, Small Office & Tool 2,071.51 600006764 02/15/2024 UNITED RENTALS NORTH AMERICAN INC Water Utility Fund System Repairs 834.15 600006765 02/15/2024 WERLE ENTERPRISE LLC NATIONAL PRINT & PROMO General Fund Printing 166.29 600006765 02/15/2024 WERLE ENTERPRISE LLC NATIONAL PRINT & PROMO General Fund Printing 2,870.54 600006766 02/15/2024 AFELIX GENERAL ENGINEERING INC CIP - Government Capital Projects 2,039.74 600006767 02/15/2024 WHEELER ZAMARONI General Fund Othr Accrued Liab.-Sales Tax (0.97) 600006767 02/15/2024 WHEELER ZAMARONI General Fund Othr Accrued Liab.-Sales Tax (0.81) 600006767 02/15/2024 WHEELER ZAMARONI General Fund Other Expense 0.97 600006767 02/15/2024 WHEELER ZAMARONi General Fund Other Expense 209.13 600006767 02/15/2024 WHEELER ZAMARONI General Fund Other Expense 140.07 600006767 02/15/2024 WHEELER ZAMARONI General Fund Other Expense 0.81 600006767 02/15/2024 WHEELER ZAMARONI General Fund Other Expense 198.69 600006768 02/20/2024 120 WATER AUDIT INC Water Utility Fund Contract -Outside Services 613.75 600006769 02/20/2024 4 LEAF INC General Fund Contract -Outside Services 14,460,00 600006769 02/20/2024 4 LEAF INC General Fund Contract -Outside Services 4,824.40 600006769 02/20/2024 4 LEAF INC CIP - Government Capital Projects 290.00 Page 9 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006770 02/20/2024 ABM SERVICES INC General Fund Contract -Outside Services 3,288.93 600006771 02/20/2024 ACCESS CIG LLC General Fund Contract -Outside Services 46.85 600006771 02/20/2024 ACCESS CIG LLC General Fund Contract -Outside Services 140.54 600006771 02/20/2024 ACCESS CIG LLC General Fund Contract -Outside Services 46.85 600006772 02/20/2024 ALPHA CM INC CIP Sewer Capital Projects 1,162.29 600006772 02/20/2024 ALPHA CM INC CIP Water Capital Projects 639.71 600006773 02/20/2024 AMERICAN STORAGE LLC General Fund Contract -Outside Services 240.00 600006774 02/20/2024 HAROLD A. STEUBER INC General Fund Other Expense 8.00 600006774 02/20/2024 HAROLD A. STEUBER INC General Fund Other Expense 8.00 600006774 02/20/2024 HAROLD A. STEUBER INC General Fund Other Expense 8.00 600006775 02/20/2024 BACKFLOW SOLUTIONS INC Water Utility Fund Dues & Subscriptions 1,295.00 600006776 02/20/2024 BC ENGINEERING GROUP INC General Fund Deposit Payable 466.25 600006776 02/20/2024 BC ENGINEERING GROUP INC General Fund Other Rev -Developer Deposit (466.25) 600006776 02/20/2024 BC ENGINEERING GROUP INC General Fund Developer Deposit Expense 466.25 600006777 02/20/2024 BKF ENGINEERS CIP - Government Capital Projects 2,565.00 600006779 02/20/2024 BRADY INDUSTRIES NORCAL, LLC General Fund Other Expense 171.86 600006779 02/20/2024 REXEL USA INC CIP Water Capital Projects 6,811.74 600006779 02/20/2024 REXEL USA INC CIP Water Capital Projects 23,988.07 600006779 02/20/2024 REXEL USA INC CIP Water Capital Projects 24,691.25 600006780 02/20/2024 BWS DISTRIBUTORS INC General Fund Uniform - Purchase 254.66 600006781 02/20/2024 CALMAT CO Water Utility Fund Other Expense 1,142.56 600006782 02/20/2024 CDW GOVERNMENT General Fund Software 763.41 600006782 02/20/2024 CDW GOVERNMENT General Fund Software 763.41 600006782 02/20/2024 CDW GOVERNMENT General Fund Software 763.41 600006782 02/20/2024 CDW GOVERNMENT General Fund Software 667.82 600006782 02/20/2024 CDW GOVERNMENT General Fund License & Permit 763.41 600006782 02/20/2024 CDW GOVERNMENT Information Technology ISF Software 10,286.41 600006783 02/20/2024 CINTAS General Fund Repair & Maintenance 176.54 600006784 02/20/2024 CITY OF FAIRFIELD General Fund Travel and Training 777.00 600006785 02/20/2024 ADB ENTERPRISE LLC General Fund Contract -Outside Services 430.00 600006786 02/20/2024 COAR DESIGN GROUP CIP - Government Non -Capital Projects 763.00 600006786 02/20/2024 COAR DESIGN GROUP CIP Sewer Capital Projects 286.95 600006786 02/20/2024 COAR DESIGN GROUP CIP Water Capital Projects 286.95 600006787 02/20/2024 COASTLAND CIVIL ENGINEERING INC GIP Sewer Capital Projects 400.00 600006788 02/20/2024 COMPLETE WELDERS SUPPLY General Fund Repair & Maintenance 45.31 600006789 02/20/2024 CORELOGIC INFORMATION SOLUTIONS INC General Fund Software 189.57 600006789 02/20/2024 CORELOGIC INFORMATION SOLUTIONS INC Water Utility Fund Contract -Outside Services 42.28 600006790 02/20/2024 COUNTY OF SONOMA FIRE PREVENTION & HAZMAT DIVISION General Fund License & Permit 920.00 600006791 02/20/2024 CPS HR CONSULTING General Fund Contract -Outside Services 6,690.00 600006791 02/20/2024 CPS HR CONSULTING General Fund Contract -Outside Services 6,290,00 600006792 02/20/2024 CULLIGAN General Fund Other Expense 92.00 600006792 02/20/2024 CULLIGAN General Fund Other Expense 92.00 600006793 02/20/2024 DAIOHS USA INC General Fund Other Expense 50.00 600006794 02/20/2024 DATA TICKET INC General Fund Contract -Outside Services 246.00 600006794 02/20/2024 DATA TICKET INC General Fund Contract -Outside Services 259.50 600006795 02/20/2024 DC ELECTRIC GROUP INC General Fund Contract -Outside Services 227.10 600006795 02/20/2024 DC ELECTRIC GROUP INC Graton Mitigation Contract -Outside Services 242.24 Page 10 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006795 02/20/2024 DC ELECTRIC GROUP INC Graton JEPA Wilfred Contract -Outside Services 35.32 600006795 02/20/2024 DC ELECTRIC GROUP INC CIP - Government Non -Capital Projects 366.12 6000G6796 02/20/2024 REDACTED RETIREE General Fund Retiree -Benefit Medical Reimb 1,254.88 60GO06797 02/20/2024 DRAFTECH BLUEPRINTING INC General Fund Othr Accrued Liab.-Sales Tax 1.36 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC General Fund Othr Accrued Liab.-Sales Tax 0.90 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP - Government Capital Projects 77.75 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Sewer Capital Projects (0.68) 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Sewer Capital Projects 381.93 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Sewer Capital Projects (0.45) 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Sewer Capital Projects 252.27 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Water Capital Projects 113.50 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Water Capital Projects (0.68) 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Water Capital Projects 210.21 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Water Capital Projects (0.45) 600006797 02/20/2024 DRAFTECH BLUEPRINTING INC CIP Water Capital Projects 138.85 600006798 02/20/2024 EDDY DENIZ General Fund Repair & Maintenance 2,525.00 600006799 02/20/2024 EILEEN MORRIS General Fund Reimbursements 595.00 600006800 02/20/2024 FASTENAL General Fund Maintenance -Janitorial 750.84 600006800 02/20/2024 FASTENAL General Fund Other Expense 221.46 600006800 02/20/2024 FASTENAL General Fund Other Expense 221.46 600006800 02/20/2024 FASTENAL Water Utility Fund Other Expense 221.46 600006801 02/20/2024 FIRST ALARM SECURITIES SERVICES General Fund Repair & Maintenance 289.26 600006801 02/20/2024 FIRST ALARM SECURITIES SERVICES General Fund Repair & Maintenance 1,949.64 600006801 02/20/2024 FIRST ALARM SECURITIES SERVICES General Fund Repair & Maintenance 83.40 600006802 02/20/2024 FRIEDMAN'S HOME IMPROVEMENT General Fund Repair & Maintenance 143.04 600006802 02/20/2024 FRIEDMAN'S HOME IMPROVEMENT General Fund Other Expense 108.49 600006802 02/20/2024 FRIEDMAN'S HOME IMPROVEMENT Water Utility Fund Equipment, Small Office & Tool 77.06 600006803 02/20/2024 FRIZELLE-ENDS COMPANY General Fund Othr Accrued Liab.-Sales Tax (3.76) 600006803 02/20/2024 FRIZELLE-ENDS COMPANY General Fund Community Outreach 1.88 600006803 02/20/2024 FRIZELLE-ENOS COMPANY General Fund Community Outreach 81.17 600006803 02/20/2024 FRIZELLE-ENDS COMPANY General Fund Other Expense 1.88 600006803 02/20/2024 FRIZELLE-ENOS COMPANY General Fund Other Expense 506.47 600006804 02/20/2024 GHD INC CIP - Government Capital Projects 578.93 600006804 02/20/2024 GHD INC CIP Water Capital Projects 1,652,25 600006805 02/20/2024 GRAINGER INC General Fund Travel and Training 930.11 600006805 02/20/2024 GRAINGER INC General Fund Repair & Maintenance (1.58) 600006805 02/20/2024 GRAINGER INC General Fund Repair & Maintenance 169.32 600006805 02/20/2024 GRAINGER INC General Fund Repair & Maintenance 415.63 60000680E 02/20/2024 GRAINGER INC General Fund Repair & Maintenance 58.76 600006805 02/20/2024 GRAINGER INC General Fund Repair & Maintenance 499.37 600006805 02/20/2024 GRAINGER INC General Fund Other Expense 19.53 600006805 02/20/2024 GRAINGER INC General Fund Other Expense 3&14 600006805 02/20/2024 GRAINGER INC General Fund Other Expense 30.88 600006805 02/20/2024 GRAINGER INC Facilities Internal Service Fd Equipment, Small Office & Tool 870.92 600006805 02/20/2024 GRAINGER INC Facilities Internal Service Fd Equipment, Small Office & Tool 1,069.25 600006805 02/20/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 483.48 600006805 02/20/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 50.86 Page 11 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006806 02/20/2024 GREEN VALLEY CONSULTING ENGINEERS General Fund Deposit Payable 17,530.00 600006806 02/20/2024 GREEN VALLEY CONSULTING ENGINEERS General Fund Other Rev -Developer Deposit (17,530.00) 600006806 02/20/2024 GREEN VALLEY CONSULTING ENGINEERS General Fund Developer Deposit Expense 17,530.00 600006807 02/20/2024 MARK PIPPIN General Fund Ohter Exp-Special Events 924.32 600006807 02/20/2024 MARK PIPPIN Water Utility Fund Uniform - Purchase 65.40 600006808 02/20/2024 ISABELLE JANE MCLOONE General Fund Reimbursements 595.00 600006809 02/20/2024 JOHNS CARL BROWNING General Fund Reimbursements 595.00 600006810 02/20/2024 JOHN DEERE FINANCIAL Fleet Services ISF Fleet Veh Repairs for WTR 78.57 600006811 02/20/2024 KEITH BAKER General Fund Reimbursements 595.00 600006812 02/20/2024 KIDDE SAFETY General Fund Othr Accrued Liab.-Sales Tax (234,82) 600006812 02/20/2024 KIDDE SAFETY General Fund Other Expense 234.82 600006812 02/20/2024 KIDDE SAFETY General Fund Other Expense 2,751.63 600006813 02/20/2024 KONE INC General Fund Contract -Outside Services 139.26 600006814 02/20/2024 LIFE ASSIST INC General Fund Other Exp-First Aid Supplies 99.08 600006815 02/20/2024 MADISON SCARBROUGH General Fund Reimbursements 1,000,00 600006816 02/20/2024 MATTHEW CADIGAN General Fund Reimbursements 595.00 600006817 02/20/2024 MCCROMETER INC Water Utility Fund Meter & Supplies Existing 46.22 600006818 02/20/2024 METER VALVE & CONTROL INC Water Utility Fund Meter & Supplies Existing 12,875.62 600006819 02/20/2024 MILLER PACIFIC ENGINEERING GROUP INC CIP - Government Capital Projects 2,145.40 600006820 02/20/2024 MINTIER HARNISH CIP - Government Non -Capital Projects 30,601.01 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Safes Tax 0.03 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Sales Tax 0.03 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Sales Tax 0.05 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Sales Tax 0.02 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Sales Tax 0.34 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Sales Tax 0.32 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Othr Accrued Liab.-Sales Tax 0.14 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Fuel (0.03) 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Fuel 14.19 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Fuel (0.03) 600006821 02/20/2024 SANTA ROSA AUTO PARTS General Fund Fuel 14.19 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Fleet Veh Repairs for DS (0.34) 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Fleet Veh Repairs for DS 230.29 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Fleet Veh Repairs for Parks (0.05) 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Fleet Veh Repairs for Parks 23.63 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Fleet Veh Repairs for Parks (0.02) 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Fleet Veh Repairs for Parks 9.07 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Other Expense 7.18 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Other Expense (0.32) 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Other Expense 139.23 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Other Expense (0.14) 600006821 02/20/2024 SANTA ROSA AUTO PARTS Fleet Services ISF Other Expense 62.05 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 561.47 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 249.61 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 755.54 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 941.53 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,462.89 Page 12 of 17 CHECK NUMBER CHECK RATE VENDOR NAME FUND 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund 500006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund 600006822 02/20/2024 NICK BAR8IERI TRUCKING LLC General Fund 600006822 02/20/2024 NICK BARBIERI TRUCKING LLC General Fund 600006823 02/20/2024 OCCUPATIONAL HEALTH CENTERS OF CAUFORNIA General Fund 600006824 02/20/2024 OFFICE DEPOT General Fund 600006824 02/20/2024 OFFICE DEPOT General Fund 600006824 02/20/2024 OFFICE DEPOT General Fund 600006824 02/20/2024 OFFICE DEPOT General Fund 600006825 02/20/2024 Addle Lowe General Fund 600006826 02/20/2024 Alexander Witney Delzei General Fund 600006827 02/20/2024 Austin Aquino -Harrison General Fund 600006828 02/20/2024 Cecilia Brenner General Fund 600006829 02/20/2024 Karissa Gross General Fund 600006830 02/20/2024 Katie Haas General Fund 600006831 02/20/2024 Mercedes Murphy General Fund 600006832 02/20/2024 Noah Vondralee-Sternhill General Fund 600006833 02/20/2024 Phi Tran General Fund 600006834 02/20/2024 Thomas Clark Miller General Fund 600006835 02/20/2024 Alejandra Carolina Ramirez Garcia General Fund 600006836 02/20/2024 Andres Mendez General Fund 600006837 02/20/2024 Ashley Fairchild General Fund 600006838 02/20/2024 Irma Ramirez General Fund 600006839 02/20/2024 Marcos Lopez Herrera General Fund 600006840 02/20/2024 Maria Gonzalez General Fund 600006841 02/20/2024 Marin-Sonoma Mosquito and Vector Control General Fund 600006842 02/20/2024 Nelly Damian General Fund 600006843 02/20/2024 OWEN EQUIPMENT Water Utility Fund 600006843 02/20/2024 OWEN EQUIPMENT Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006844 02/20/2024 PACE SUPPLY Water Utility Fund 600006845 02/20/2024 PACIFIC DOOR PRODUCTS INC General Fund 600006846 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006846 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006846 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006846 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006846 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006846 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006847 02/20/2024 PACIFIC GAS & ELECTRIC General Fund 600006848 02/20/2024 PACIFIC GAS & ELECTRIC General Fund ACCOUNT AMOUNT Inventories 1,074.92 Inventories 730.27 Inventories 801.53 Fuel 1,192.72 Contract -Outside Services 108.00 Office Expense 198.06 Office Expense 24.41 Other Expense 51.40 Other Expense 38.44 Reimbursements 400.00 Reimbursements 595.00 Reimbursements 595.00 Reimbursements 400,00 Reimbursements 400.00 Reimbursements 400.00 Reimbursements 595.00 Reimbursements 595.00 Reimbursements 400.00 Reimbursements 400.00 Othr Accrued Liab.-PrkRec Rfnd 800.00 Othr Accrued Liab.-PrkRec Rfnd 400.00 Othr Accrued Liab.-PrkRec Rfnd 100.00 Othr Accrued Liab.-PrkRec Rfnd 800.00 Othr Accrued Liab.-PrkRec Rfnd 800.00 Othr Accrued Liab.-PrkRec Rfnd 100.00 Otter Accrued Liab.-PrkRec Rfnd 100.00 Othr Accrued Liab.-PrkRec Rfnd 800.00 Repair & Maintenance 332.94 Repair & Maintenance 434.59 Other Expense (7.80) Other Expense 389.97 Other Expense (48.29) Other Expense 2,414.35 Other Expense (47.85) Other Expense 2,392.60 Other Expense (27.58) Other Expense 1,378,95 Other Expense 245.81 Repair & Maintenance 2,018.85 Utility -Electric 2,989.53 Utility -Electric 13,802.65 Debt -Principal 3,505.36 Utility -Electric 1,351.59 Utility -Electric 487.64 Utility -Electric 3,546.91 Utility -Electric 9,098.99 Utility -Electric 391.38 Page 13 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006848 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 918.31 600006848 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 2,578,60 600006848 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 3,707,17 600006849 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Non -Capital Projects 27.10 600006850 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 5,583,77 600006851 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 73,63 600006852 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 62.68 600006853 02/20/2024 PACIFIC GAS & ELECTRIC Graton JEPA Wilfred Utility -Electric 1,546.98 600006854 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Utility -Electric 7,301.38 600006854 02/20/2024 PACIFIC GAS & ELECTRIC General Fund Debt -Principal 3,817.28 600006855 02/20/2024 PAT NELSON CONSTRUCTION INC CIP - Government Capital Projects 23,600.00 600006856 02/20/2024 BOTTLING GROUP LLC General Fund Other Exp-Concessions 437.43 600006857 02/20/2024 PETALUMA HEALTH CENTER Graton-Gambling Trtmnt- CLOSE Contract -Outside Services 2,753.93 600006858 02/20/2024 R&B A CORE & MAIN COMPANY Sewer Utility Fund Repair & Maintenance 167.87 600006859 02/20/2024 REDWOOD EMPIRE MUNICIPAL INSURANCE FUND General Fund Workers' Compensation Premium 14,982.00 600006860 02/20/2024 REDWOOD LOCK INC General Fund Repair & Maintenance 22.89 600006861 02/20/2024 REFRIGERATION SUPPLIES DISTRIBUTOR General Fund Repair & Maintenance 321.16 600006862 02/20/2024 ROBERT HALF INTERNATIONAL INC General Fund Contract -Outside Services 1,987.20 600006862 02/20/2024 ROBERT HALF INTERNATIONAL INC General Fund Contract -Outside Services 1,465.20 600006862 02/20/2024 ROBERT HALF INTERNATIONAL INC General Fund Contract -Outside Services 1,987,20 600006862 02/20/2024 ROBERT HALF INTERNATIONAL INC General Fund Contract -Outside Services 1,465.20 600006863 02/20/2024 RP EXPRESS LLC General Fund Repair & Maintenance 21.00 600006863 02/20/2024 RP EXPRESS LLC General Fund Repair & Maintenance 70,00 600006863 02/20/2024 RP EXPRESS LLC General Fund Repair & Maintenance 14.00 600006863 02/20/2024 RP EXPRESS LLC General Fund Repair & Maintenance 7.00 600006864 02/20/2024 RSG INC CIP - Government Capital Projects 5,018.75 600006865 02/20/2024 SAMUELJ GLEASON General Fund Reimbursements 595.00 600006866 02/20/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 900.00 600006866 02/20/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 172.29 600006866 02/20/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 368.88 600006866 02/20/2024 SANTA ROSA UNIFORM & CAREER APPAREL General Fund Uniform - Purchase 196.60 600006867 02/20/2024 SERENA ELIZE FLORES General Fund Reimbursements 59S.00 600006868 02/20/2024 SERVPRO OF PETALUMA/ROHNERT PARK General Fund Contract -Outside Services 2,484.95 600006869 02/20/2024 SOILAND CO INC Water Utility Fund Other Expense 90.00 600006870 02/20/2024 SONOMA COUNTY DEPT OF HEALTH SERVICES General Fund Contract -Outside Services 4,800.00 600006871 02/20/2024 STEVEN GROVER AND ASSOCIATES CIP - Government Non -Capital Projects 4,647.50 600006872 02/20/2024 STROUPE PETROLEUM General Fund Repair & Maintenance 509.80 600006873 02/20/2024 TAYLOR M. FALLER- DIEFENDERFER General Fund Reimbursements 595.00 600006874 02/20/2024 TERRY SIMPSON General Fund Recruitment 2,229.99 600006875 02/20/2024 THE PUN GROUP General Fund Contract -Outside Services 25,000,00 600006876 02/20/2024 TIM SETZER General Fund Reimbursements 595.00 600006877 02/20/2024 TRI CITY FENCE CO INC CIP - Government Capital Projects 1,848.00 600006878 02/20/2024 TROPE GROUP INC General Fund Other Expense 2,258,60 600006878 02/20/2024 TROPE GROUP INC General Fund Other Expense 26,954.49 600006878 02/20/2024 TROPE GROUP INC General Fund Other Expense 96.00 600006879 02/20/2024 ULINE General Fund Othr Accrued Liab.-Sales Tax 0.14 600006879 02/20/2024 ULINE General Fund Other Exp-PS-ID (0.14) Page 14 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006879 02/20/2024 ULINE General Fund Other Exp-PS-iD 111.63 600006880 02/20/2024 UNITED RENTALS NORTH AMERICAN INC Water Utility Fund Equipment, Small Office & Tool 289.43 600006881 02/20/2024 VERIZON COMMUNICATIONS INC. General Fund Contract -Outside Services 50.00 600006882 02/20/2024 WEDGEWOOD VILLAGE PHARMACY LLC General Fund Othr Accrued Liab.-Sales Tax (1,31) 600006882 02/20/2024 WEDGEWOOD VILLAGE PHARMACY LLC General Fund Other Exp-Animal Clinic NonElg 1.31 600006882 02/20/2024 WEDGEWOOD VILLAGE PHARMACY LLC General Fund Other Exp-Animal Clinic NonElg 142.74 600006882 02/20/2024 WEDGEWOOD VILLAGE PHARMACY LLC General Fund Other Exp-Animal Clinic NonElg 61.59 600006883 02/20/2024 WERLE ENTERPRISE LLC NATIONAL PRINT & PROMO General Fund Office Expense 595.74 600006883 02/20/2024 WERLE ENTERPRISE LLC NATIONAL PRINT & PROMO General Fund Printing 55.03 600006884 02/20/2024 WITMER PUBLIC SAFTEY GROUP INC General Fund Equipment, Small Office & Tool 92.63 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 1,139,62 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 40.81 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 2,414.00 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 262.39 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 1,994.35 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 493.05 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006885 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 1,139.62 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 40.81 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 2,414.00 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 262.39 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 1,994.35 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 493.05 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006886 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 1,139.62 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 40.81 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 2,414.00 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 262.39 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 1,994.35 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006887 02/23/2024 KSA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 493.05 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006887 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 397.20 600006888 02/23/2024 KBA DOCUMENT SOLUTIONS INC General Fund Lease -Equipment 752.10 600006889 02/23/2024 AMERICAN MEDICAL RESPONSE WEST General Fund Contract -Outside Services 30.00 600006890 02/23/2024 AMERICAN STORAGE LLC General Fund Other Expense 150.00 600006891 02/23/2024 REDACTED RETIREE General Fund Retiree -Benefit Medical Reimb 502.10 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 225.35 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 1,417.65 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 90.14 Page 15 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 160.80 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 135.21 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 4,643.97 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 45.07 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 157.31 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 676,05 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 270.42 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 45.07 600006992 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 170.62 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 341.24 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 45.07 600006892 02/23/2024 AT&T MOBILITY General Fund Communication -Phone 135.21 600006892 02/23/2024 AT&T MOBILITY Information Technology ISF Communication -Phone 45.07 600006892 02/23/2024 AT&T MOBILITY Sewer Utility Fund Communication -Phone 22.54 600006892 02/23/2024 AT&T MOBILITY Sewer Utility Fund Communication -Phone 90.14 600006892 02/23/2024 AT&T MOBILITY Water Utility Fund Communication -Phone 22.53 600006892 02/23/2024 AT&T MOBILITY Water Utility Fund Communication -Phone 215.69 600006893 02/23/2024 REDACTED RETIREE General Fund Retiree -Benefit Medical Reimb 470.20 600006894 02/23/2024 CDW GOVERNMENT Information Technology ISF Software 3,190.38 600006895 02/23/2024 CINTAS General Fund Repair & Maintenance 19.48 600006896 02/23/2024 CIRA General Fund General Liab Self Insur'd Loss 11,112.50 600006896 02/23/2024 CIRA General Fund Workers' Compensation Premium 107,603.24 600006897 02/23/2024 CITY OF CLOVERDALE General Fund City Council D2Exp 55.00 600006897 02/23/2024 CITY OF CLOVERDALE General Fund City Council D3Exp 55.00 600006897 02/23/2024 CITY OF CLOVERDALE General Fund City Council D5Exp 55.00 600006898 02/23/2024 CITY OF SANTA ROSA Sewer Utility Fund Laguna Plant & SubRegional Exp 1,007,260.14 600006898 02/23/2024 CITY OF SANTA ROSA Public Facility Finance DevFee Laguna Plant & SubRegional Exp 71,175.48 600006899 02/23/2024 COMPLETE WELDERS SUPPLY General Fund Other Exp-First Aid Supplies 114.78 600006899 02/23/2024 COMPLETE WELDERS SUPPLY General Fund Other Exp-First Aid Supplies 76.52 600006900 02/23/2024 DC ELECTRIC GROUP INC General Fund Retention Payable 44.50 600006900 02/23/2024 DC ELECTRIC GROUP INC General Fund Retention Payable 296.75 600006901 02/23/2024 FASTENAL General Fund Maintenance -Janitorial 1,595.01 600006901 02/23/2024 FASTENAL Water Utility Fund Other Expense 84.19 600006902 02/23/2024 FEDERAL EXPRESS CORPORATION General Fund Postage & Shipping 85.46 600006903 02/23/2024 FRIEDMAN'S HOME IMPROVEMENT Sewer Utility Fund Repair & Maintenance 54.23 600006904 02/23/2024 GRAINGER INC General Fund Repair & Maintenance 44.15 600006904 02/23/2024 GRAINGER INC General Fund Other Expense 140.22 600006904 02/23/2024 GRAINGER INC General Fund Repair & Maintenance 24.30 600006904 02/23/2024 GRAINGER INC Sewer Utility Fund Repair & Maintenance 61.69 600006904 02/23/2024 GRAINGER INC Water Utility Fund Equipment, Small Office & Tool 51.7.43 600006904 02/23/2024 GRAINGER INC Water Utility Fund Repair & Maintenance 142.20 600006904 02/23/2024 GRAINGER INC Water Utility Fund Repair & Maintenance 21.51 600006904 02/23/2024 GRAINGER INC Water Utility Fund Repair & Maintenance 62.29 600006905 02/23/2024 REDACTED RETIREE General Fund Retiree -Benefit Medical Reimb 679.83 600006906 02/23/2024 NEON ONE General Fund Bank & Merchant Fees 1,963,50 600006907 02/23/2024 NICK BARBIERI TRUCKING LLC General Fund Inventories 1,122.06 600006908 02/23/2024 ADAM STRONGMAN General Fund Travel and Training 80.00 Page 16 of 17 CHECK NUMBER CHECK DATE VENDOR NAME FUND ACCOUNT AMOUNT 600006909 02/23/2024 REBECCA SOTELO General Fund Travel and Training 80.00 600006910 02/23/2024 GARRET ANDERSEN Sewer Utility Fund Conservation Measures 225.00 600006910 02/23/2024 GARRET ANDERSEN Water Utility Fund Conservation Measures 225.00 600006911 02/23/2024 PETER MARTIN Sewer Utility Fund Contract -Outside Services 1,840.00 600006912 02/23/2024 OWEN EQUIPMENT Water Utility Fund Repair & Maintenance 639.72 600006913 02/23/2024 PACE SUPPLY Water Utility Fund Repair & Maintenance 42.83 600006914 02/23/2024 UBEO MIDCO, LLC Information Technology ISF Contract -Outside Services 755.84 600006914 02/23/2024 UBEO MIDCO, LLC Information Technology ISF Contract -Outside Services 755.84 600006915 02/23/2024 REDWOOD LOCK INC General Fund Repair & Maintenance 160.00 600006915 02/23/2024 REDWOOD LOCK INC Sewer Utility Fund Repair & Maintenance 118.27 600006915 02/23/2024 REDWOOD LOCK INC Water Utility Fund Equipment, Small Office & Tool 49.05 600006915 02/23/2024 REDWOOD LOCK INC Water Utility Fund Repair & Maintenance '78.89 600006915 02/23/2024 REDWOOD LOCK INC Water Utility Fund Repair & Maintenance 39.02 600006916 02/23/2024 RELIABLE HARDWARE & STEEL CO Sewer Utility Fund Repair & Maintenance 40.90 600006916 02/23/2024 RELIABLE HARDWARE & STEEL CO Sewer Utility Fund Other Expense 300.44 600006917 02/23/2024 ROBERT HALF INTERNATIONAL INC General Fund Contract -Outside Services 1,589.76 600006918 02/23/2024 SOILAND CO INC General Fund Othr Accrued Lia6.-Sales Tax (11.48) 600006918 02/23/2024 SOILAND CO INC Water Utility Fund Other Expense 11.48 600006918 02/23/2024 SOILAND CO INC Water Utility Fund Other Expense 127.50 600006919 02/23/2024 SONY MUSIC PUBLISHING (US) LLC General Fund Other Exp-PAC Production 1,080.00 600006920 02/23/2024 SUPERIOR SUPPLIES INC Water Utility Fund Other Expense 170.43 600006920 02/23/2024 SUPERIOR SUPPLIES INC Water Utility Fund Other Expense 209.21 600006921 02/23/2024 THYSSENKRUPP ELEVATOR CORPORATION General Fund Contract -Outside Services 767.00 600006922 02/23/2024 HD SUPPLY INC General Fund Repair & Maintenance 200.45 600006923 02/23/2024 REDACTED RETIREE General Fund Retiree -Benefit Medical Reimh 679.70 600006924 02/23/2024 NORTH BAY BOHEMIAN General Fund Communication Advertising 291.60 600006925 02/23/2024 WERLE ENTERPRISE LLC NATIONAL PRINT & PROMO General Fund Other Expense 95.98 600006926 02/23/2024 WESTERN EXTERMINATOR General Fund Repair & Maintenance 73.25 600006927 02/23/2024 GCP WW HOLDCO LLC General Fund Uniform - Purchase 300.00 600006928 02/23/2024 WYATT IRRIGATION CO Water Utility Fund Repair & Maintenance 183.79 2,608,610.29 Page 17 of 17 Item 8.13. MINUTES OF THE SPECIAL CITY COUNCIL MEETING AND JOINT REGULAR MEETING OF THE CITY OF ROHNERT PARK City Council Rohnert Park Financing Authority Successor Agency to the Community Development Commission Tuesday, February 27, 2024 1. CITY COUNCIL/RPFA/SUCCESSOR AGENCY TO THE CDC JOINT REGULAR MEETING/CITY COUNCIL SPECIAL MEETING - CALL TO ORDER/ROLL CALL Mayor Adams called the meeting to order at 3:00 p.m., which was legally noticed on February 23, 2024. Council Present: Susan H. Adams, Mayor Gerard Giudice, Vice Mayor Jackie Elward, Councilmember (arrived at 3:15 p.m.) Samantha Rodriguez, Councilmember Emily Sanborn, Councilmember (arrived at 3:05 p.m.) Staff present: City Manager Piedra, City Attorney Kenyon, Public Safety Director Mattos, Human Resources Director Cannon, Deputy Chief Johnson, Director of Development Services Giudice, Director of Public Works Garrett, Animal Shelter Coordinator Zeldes, Housing Manager Garcia, Information Systems Technician Azevedo, Information Systems Operations Manager Cotter, and Assistant City Clerk Machado. 2. TIME CERTAIN 3:00 P.M.: RECESS TO CLOSED SESSION IN CONFERENCE ROOM 2A TO CONSIDER: Mayor Adams made the closed session announcement pursuant to Government Code 54957.7 and Council recessed to closed session in Conference Room 2A at 3:00 p.m. to consider: A. Personnel Matters (Government Code § 54957): Public Employee Annual Performance Evaluation - Title: City Manager B. Mayor Adams reconvened the Joint Meeting Open Session at 5:00 p.m. and all Councilmembers were present. Mayor Adams reported the Council will return to Close Session after the Open Session Items are completed. 3. READING OF THE LAND ACKNOWLEDGMENT Read by Mayor Adams. City of Rohnert Park Joint Regular Meeting Minutes for City Council February 27, 2024 RPFA/CDC Successor Agency and City Council Special Meeting Page 2 of 4 4. PLEDGE OF ALLEGIANCE Led by Vice Mayor Giudice. 5. PRESENTATIONS A. Presentation from Kelly Bass Seibel, Community Engagement Vice President, Sonoma County Tourism Regarding Sonoma County Industry/Tourism Status Kelly Bass Seibel, Community Engagement Vice President, was joined by Brian Marchi, Board of Directors Chair, and Claudia Vecchio, President and CEO. Claudia Vecchio provided an overview of the current industry performance, non -visitor study conducted by Sonoma County Tourism, and Sonoma County Tourism's marketing approach and business development initiatives. B. Presentation from Jack Anderson and Mitch Marshall, Co -Owners of Illuminate Sober Living, Regarding the New Men's Sober Living Home in Rohnert Park Jack Anderson and Mitch Marshall provided an overview of Illuminate Sober Living's purpose, services, and structure. 6. SSU STUDENT REPORT A. By Taylor Frickman, Senator of External Affairs, Sonoma State University Associated Students, Inc. (SSU ASI) Taylor Frickman was unable to attend the meeting. 7. DEPARTMENT HEAD BRIEFING None. 8. PUBLIC COMMENTS Steve Keith spoke about the importance of accessibility for in person meetings. 9. CONSENT CALENDAR 9.A Approval of Minutes for City Council/RPFA/Successor Agency Joint Regular Meeting, February 13, 2024 9.B Acceptance of Reports from Finance Department: City Bills/Demands for Payment dated January 30, 2024 through February 8, 2024 9.0 Adopt Resolution 2024-010 Approving and Authorizing an Amendment to the City's Classification Plan 9.D Adopt Resolution 2024-011 Authorizing an Application for and Receipt of Prohousing Incentive Pilot Program (PIP) Funds (CEQA Status: Not a Project Under CEQA, per CEQA Guidelines 15378(b)(4)) 9.E. Adopt Resolution 2024-012 Authorizing City Manager to Execute a Memorandum of Understanding (MOU) with the City of Cotati for Animal Licensing Services through Docupet 9.17 Adopt Resolution 2024-013 Authorizing the City Manager to Execute an Agreement with the UC Davis, Koret Shelter Medicine to Accept $16,000 in State Grant Funding for Animal Behavior Training; and Authorize the Finance Director to Appropriate the Funds in the Animal Services Budget for FY 2023/24 City of Rohnert Park Joint Regular Meeting Minutes for City Council February 27, 2024 RPFA/CDC Successor Agency and City Council Special Meeting Page 3 of 4 9.G Adopt Resolution 2024-014 Finding the Southwest Boulevard Waterline Replacement Project (Project 2020-23W) Exempt from CEQA Pursuant to CEQA Guidelines Section 15301, Approving the Plans and Specifications, Awarding the Construction Contract to Team Ghilotti, Inc. for $1,787,141, Authorizing the City Manager to Approve up to $268,071.15 (15%) in Change Orders, and Authorizing Task Order 2024-01 with GHD, Inc. for Construction Management Services for a Total Amount of 310,050.00 ACTION: Moved/seconded (Giudice/Rodriguez) to approve the consent calendar. Motion carried by the following unanimous 5-0-0-0 voice vote: AYES: Elward, Rodriguez, Sanborn, Giudice, and Adams, NOES: None, ABSENT: None, ABSTAINS: None. 10. REGULAR ITEMS None. 11. COMMITTEE / LIAISON/ OTHER REPORTS A. Standing Committees: 1. Education Committee Special Meeting (2/15) Councilmember Rodriguez reported the meetings had been a fusion of two committees: the Education Committee and Cotati-Rohnert Park Unified School District 2x2x2 Committee. Councilmember Rodriguez will be meeting with the Superintendent to see if they are able to take on calling for the meetings for this year, and if they are not, the City of Rohnert Park, City of Cotati, and Sonoma State University will share the responsibility for the meetings so they can continue to speak about working together for the benefit our students. B. Liaison Reports: 1. Rohnert Park Chamber of Commerce Board of Directors Meetiniz (2/20 Councilmember Rodriguez reported on this meeting. 2. Rohnert Park-Cotati Regional Library Advisory Board Meeting((2/20) Mayor Adams reported on this meeting. C. Outside Agency Reports and Mayors & Councilmembers/City Selection Committee Appointments: 1. Zero Waste Sonoma Board of Directors (2/15) Councilmember Sanborn reported on this meeting. 2. Mayors' and Councilmembers' Legislative Committee Meeting (2/16) Mayor Adams reported on this meeting. 3. Golden Gate Bridge. Hiahwav & Transoortation District Board of Directors Meeting 2/23 Vice Mayor Giudice reported on this meeting. D. Reports Under Government Code Section 53232.3(b): City of Rohnert Park Joint Regular Meeting Minutes for City Council February 27, 2024 RPFA/CDC Successor Agency and City Council Special Meeting Page 4 of 4 1. League of California Cities North Bay General Membership Division Meeting/BAHFA Board/MTC Commission and ABAG Executive Board (2/15) Mayor Adams reported on this meeting. 2. Rohnert Park Chamber of Commerce "Noon Times Breakfast" (2/21) Councilmember Rodriguez reported on this meeting during Item 11.B.1. 12. COMMUNICATIONS Vice Mayor Giudice announced the Rotary Club will do a peace garden cleanup on March 9, 2024, at 9 a.m. and invited members of the public to attend. Councilmember Rodriguez announced the Sonoma County Historical Society is having a luncheon on March 10, 2024, on Thursday, February 29, 2024 the North Bay Business Journal will host an Economic Summit, tonight, February 27, 2024 there is a dine and donate at all of the Mary's Pizza Shack in Sonoma County to raise money for the homeless and at -risk jobs resource fair, and on March 15, 2024 there will be a Women in Street Art session at Sonoma State University. Mayor Adams stated she received a letter saying congratulations on the removal of the homeless encampment at Robert's Lake. 13. ADDING AGENDA ITEMS TO A FUTURE CITY COUNCIL MEETING AGENDA None. 14. PUBLIC COMMENT None. 2. RECESS TO CLOSED SESSION IN CONFERENCE ROOM 2A TO CONSIDER: Mayor Adams made the closed session announcement pursuant to Government Code 54957.7 and Council recessed to closed session in Conference Room 2A at 6:02 p.m. to consider: A. Personnel Matters (Government Code § 54957): Public Employee Annual Performance Evaluation - Title: City Manager B. Mayor Adams announced that the Council will report on closed session at its next regular council meeting (Government Code §54957.1) 15. ADJOURNMENT Mayor Adams adjourned the meeting at 6:02 p.m. Elizabeth Machado, Assistant City Clerk City of Rohnert Park Susan H. Adams, Mayor City of Rohnert Park ITEM NO. 8.C. Mission Statement "We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Administration Submitted By: Marcela Piedra, City Manager Prepared By: Sylvia Lopez Cuevas, City Clerk Agenda Title: Cancellation of City Council Joint Regular Meeting on March 26, 2024 RECOMMENDED ACTION: By Minute Order, cancel the Rohnert Park City Council Joint Regular Meeting scheduled for March 26, 2024, due to the Council Priority Workshop and Goal Session scheduled for the same day. BACKGROUND: The City Council has the authority to establish meeting dates and times as well as reschedule or cancel such meetings with proper and timely notice. Chapter I, Section F of the City Council Protocols indicate that "any meeting of the Council may be canceled in advance by a majority vote of the Council." On March 26, 2024, the Rohnert Park City Council will hold a Special Meeting ("workshop") at the Community Center from 8:00 a.m. to 4:00 p.m. to allow the City Council to discuss its current priorities and accomplishments with Department Heads, and select its strategic priorities for 2024/2025. Jan Perkins, Vice President of ICMA-CM, will facilitate this workshop. The Rohnert Park City Council Regular Meeting is scheduled on March 26, 2024, at 5:00 p.m. in Council Chambers. Due to the length of the workshop, both meetings being held in different locations, and other logistics, staff is requesting the City Council to cancel the City Council regular meeting on March 26, 2024. The City Clerk will handle the required posting and noticing. OPTIONS CONSIDERED: Recommended Option: Staff recommends canceling the Rohnert Park City Council Regular Meeting on March 26, 2024. 2. Alternative: The City Council can maintain the current meeting schedule and hold the workshop from 8:00 a.m. to 4:00 p.m. at the Community Center and relocate staff to Council Chambers to begin the joint regular Meeting on at 5:00 p.m. on the same day. This option is not recommended because the length of the morning session might affect the engagement of all participants. ITEM NO. 8.C. FISCAL IMPACT/FUNDING SOURCE: None. City Manager Approval Date: 03/04/2024 Attachments: 1. City Council Protocols - Chapter I, Section F "Cancelation of Meetings." staff. During study/work sessions, Councilmembers may ask questions of staff. For those questions that staff cannot immediately answer, responses will be provided for the Council in writing or at a future Council meeting. E. Closed Sessions Consistent with the Ralph M. Brown Act (Government Code sections 54950, et seq.), the Council may hold closed sessions during any regular or special meeting, or any time otherwise authorized by law to consider or hear any matter which is authorized by State law to be heard or considered in closed session. 1. The City Council may exclude from any such closed session any person or persons which it is authorized by State law to exclude from such closed sessions. 2. The general subject matter for consideration will be expressed in an open meeting before such session is held. 3. Councilmembers may not reveal the nature of discussion or the decision from a closed session unless required by law or unless a majority of the Council agrees in closed session to disclose confidential closed session information, except that the Council must unanimously agree to divulge any confidential closed session information that is attorney/client privileged communications. F. Cancellation of Regular Meetings Any meeting of the Council may be canceled in advance by a majority vote of the Council. G. Quorum A majority of the Council will constitute a quorum, but a lesser number may adjourn a meeting. If all Councilmembers are absent the clerk may declare the meeting adjourned to a stated time and place and shall post a notice of adjournment within 24 hours. H. Presiding Officer The Mayor will preside over all Council meetings. The Mayor will have authority to preserve order at all Council meetings, to remove any person from any meeting of the Council for disorderly conduct, to enforce the rules of the Council and to determine the order of business under the rules of the Council. 1. Absence of Mayor The Vice Mayor will act as Mayor in the absence or disability of the Mayor. 2. Mayor and Vice Mayor Absence When the Mayor and the Vice Mayor are absent from any meeting of the Council, the members present may choose another member to act as Mayor pro tem, and that person will, for the time being, have the powers of the Mayor. City Council Protocols Page 2 of 27 Amended 612712023 by Reso. No. 2023-047 ITEM NO. 8.D. Mission Statement "We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. " CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Public Works Submitted By: Vanessa Garrett, Director of Public Works Prepared By: Vanessa Garrett, Director of Public Works Agenda Title: Receive and File the Complete Streets Annual Report for 2023 Pursuant to Resolution 2012-111 (City's Complete Streets Policy) RECOMMENDED ACTION: Receive and File the Complete Streets Annual Report for 2023 in accordance with City's Complete Streets Policy Adopted by Resolution 2012-111 BACKGROUND: On September 25, 2014, the Rohnert Park City Council adopted Resolution 2012-111, the City's Complete Streets Policy. This policy commits the City to continuing to develop an "integrated transportation network with infrastructure and design that allows safe and convenient travel along and across streets for all users including pedestrians, bicyclists, persons with disabilities, motorists, movers of commercial goods, users and operators of public transportation, seniors, children, youth and families". The complete streets policy includes four major elements: 00 commitment to complete -streets concepts; oo implementation through review and evaluation of improvement plans including consultation with the bicycle and pedestrian committee; oo exemptions only for good cause; and oo annual reporting The annual report is required to include information on the miles of new bike -lanes, miles of new sidewalk, number of new curb ramps, number of new signs and number of new crossings. Attachment 1 is the 2023 annual report, which summarizes the work completed, by calendar year. This report documents that since the adoption of the Complete Streets Policy in 2012 the City has completed: oo 59,852 linear feet of new bike -lanes oo 89,325 square feet of enhanced bike -lanes and 135 new bicycle lane markers oo 103,562 linear feet of new sidewalk oo 425 new or improved curb ramps oo 570 new guidance signs oo 197 improved pedestrian crossings ITEM NO. STRATEGIC PLAN AND COUNCIL PRIORITIES ALIGNMENT: The recommended action is consistent with Strategic Plan Goal C — Ensure the Effective Delivery of Public Services. OPTIONS CONSIDERED: None. Receiving the Annual Complete Streets Report is required by the City's Complete Streets Resolution. FISCAL IMPACT/FUNDING SOURCE: None Department Head Approval Date: 3/4/2024 City Manager Approval Date: 3/4/2024 City Attorney Approval Date: NA Attachments: 1. City of Rohnert Park Complete Streets Annual Report —Updated March 2024 2 City of Rohnert Park Complete Streets Report - Required by City Council Resolution 2012-111 Updated: March 2024 2022 2017-07 Southwest Boulevard & Commerce Roundabout 690 15 538 460 4 36 2 2017-22 Sidewalk Replacement Project _ 300 2019-28 101 Enterprise Crosswalk Improvement 3 1 Total Improvements Under Complete Streets Policy 59,852 130 89,325 103,562 227 198 570 197 1,740 Data is based on projects that were completed (notice of completion filed) in each calendar year. Projects that were begun in one calendar year and completed in the following year are counted in the year of completion. Bicycle Lane Markers includes "sharrows" and other lane markings alerting motorists to bicycle traffic W:\City Council Items\2024\03-12-24\Complete Streets\SOl_Complete Streets Report Attachment_ tracking matrix ITEM NO. 8.E. gOtINERT PAgK Mission Statement "We Care for Our Residents by Working Together to Build a 6z Better Communitr for Todav and Tomorrow." CITY OF ROHNERT PARK �a ciFo aNi� CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Development Services Submitted By: Alicia Giudice, Director of Development Services Prepared By: Elliott Pickett, Associate Planner Agenda Title: Receive and File the Annual Review of the Growth Management Program per Municipal Code Section 17.19.030 RECOMMENDED ACTION: Receive and file the Annual Review of the Growth Management Program per Municipal Code Section 17.19.030. BACKGROUND: Chapter 17.19 of the Rohnert Park Municipal Code (RPMC) contains the City's Growth Management Program (GMP). The purpose of the GMP is to ensure that the rate of population growth does not exceed an average annual growth rate of one percent per year, which translates to an annual average growth rate of 225 market -rate housing permits per year. The City conducts an annual review under the GMP to monitor residential development. The GMP requires that the annual review include: • The number of units included in final discretionary approvals granted for each of the five previous calendar years, within the July 2000 City Limits and each Specific Plan Area; • The number of units included in final map filings within the July 2000 City Limits and within each Specific Plan Area; • The number of building permits approved within the July 2000 City Limits and within each Specific Plan Area; • Projected housing units by year per approved and pending development agreements; and • Applications pending for new residential units or mixed -use developments with a residential component. The annual report also documents when building permits are "implemented", which the Growth Management Ordinance defines as one year after issuance, regardless of when a certificate of occupancy is actually secured. Exhibit A (Growth Management Program Annual Housing Permits Implemented and Trigger Cap Projections Table) reports on the implemented building permits. If the annual report demonstrates that both the combined number of residential building permits implemented in any two prior calendar years exceeds five hundred sixty (560) housing units, and the development pace for the preceding three-year period has exceeded an average of two hundred twenty-five (225) units per year, then the City may place a cap on new residential development in the following calendar year to manage the average annual growth rate. ITEM NO. 8.E. The GMP allows "carry over" of building permits from year to year, which means that the City can build up a bank of unit credits during years where less than 225 building permits are "implemented" and use that bank during periods where a cap could otherwise be imposed. The GMP defines a building permit as "implemented" one year after it was issued (roughly the time it takes to build and occupy a unit of housing). There is no requirement to check this against the issuance of occupancy certificates. The GMP exempts certain types of housing units from counting toward the trigger cap. These types of housing units are required to be reported separately and include: • Single-family dwellings on legal lots of record within the July 2000 City Limits that are not within an approved subdivision; • Housing that is affordable to low- and very low-income households and affordable to moderate -income households under the City's inclusionary housing requirements; • Second dwelling units (accessory dwelling units); • Conversions of mobile homes or apartments to condominium ownership; • Rehabilitation, remodel, or replacement of existing housing; • Model homes (until they receive an occupancy permit); and • Residential infill projects where there is adequate infrastructure and no general plan amendment was required. ANALYSIS: During the period from 2000 to 2014, very few new residential building permits, subject to growth management ordinance, were issued. This allowed the City to build up a significant "bank" of unit credits under the GMP. For the period between 2015 and 2023, building permits have been "implemented" for 1,957 new housing units subject to the growth management ordinance (this number excludes most affordable and infill housing units). This is an average of 217 residential units per year. In 2024, 76 building permits will be implemented (based on 2023 data). This will not trigger the cap since the two-year total is 469 units (below the 560 value) and the three-year average is 215 (below the 225 value). In most years, the number of units implemented is less than the yearly allotment of 225 units. In these years, the surplus units are added to a "bank" for future use. In years where the 225 unit number is exceeded, the units in the bank are reduced. The bank of unit credits currently stands at 2,727 in 2024. Given the significant housing shortage in the region, staff believes this was and continues to be an appropriate method for implementing the GMP. Exhibit A presents the number of non-exempt residential building permits implemented or projected to be implemented from 2011 through 2026, based on approved and pending development plans and compares these to the GMP "triggers" (560 implemented permits in 2 years and a 3-year annual average of 225 implemented permits) and the "bank" of building permit credits. Exhibit A illustrates that the City implemented more than 225 building permits in 2015, 2019, 2020, 2022, and 2023. In the remaining years, the City's "bank" of credits has increased modestly. The City will implement fewer than 225 building permits in 2024, based on 2023 permitting numbers. 2 ITEM NO. 8.E. Exhibit A also illustrates that the City has exceeded both the 2-year and 3-year triggers only in 2019 and 2020, but has otherwise not exceeded both triggers. Finally Exhibit A illustrates that planned growth projections for SOMO Village and the Downtown area, added to ongoing construction in University District and Willowglen could result in both triggers being exceeded in 2026. However, because the City continues to have a significant bank of building permit credits, these projected events would not require imposing a cap on building permits. Assuming that non-exempt residential development continues at an average rate of 200-300 dwelling units per year, it is unlikely that Rohnert Park would have to begin limiting residential construction within the next decade. As required by the Growth Management Ordinance, Exhibit B presents additional detail on the total number of residential units that received final discretionary approvals and that were included on approved final maps as well as the total number of building permits issued within the 2000 City Limits and within each Specific Plan Area that are subject to the GMP. Exhibit C presents details on the building permits that were exempt from the GMP, as required by the Growth Management Ordinance. STRATEGIC PLAN and COUNCIL PRIORITY ALIGNMENT: Preparation of the Annual Review of the Growth Management Program is consistent with Strategic Plan Goal D — Continue to Develop a Vibrant Community. The Growth Management Program is designed to ensure growth is paced to minimize environmental, social, and fiscal impacts, and ensure concurrency between growth, infrastructure, and service, and therefore supports the City Council Strategic Priorities "Infrastructure, Maintenance, and Beautification," and "Provide Equitable Services to All." Additionally, this annual review is required by the City's Municipal Code. OPTIONS CONSIDERED: None. Preparation of the Annual Review of the Growth Management Program is required by the City's Municipal Code. FISCAL IMPACT/FUNDING SOURCE: There is no fiscal impact associated with this report. Department Head Approval Date: 02/21/2024 Code Compliance Approval Date: N/A Finance Director Approval Date: N/A City Attorney Approval Date: N/A City Manager Approval Date: 03/03/2024 Attachments: 1. Exhibit A — Growth Management Program Annual Housing Permits Implemented and Trigger Cap Projections Table 2. Exhibit B —Annual Review of Housing Units per Section 17.19.030.B.1-3 3 ITEM NO. 8.E. 3. Exhibit C — Housing Units Not Subject to Growth Management Ordinance's Trigger Cap (Building Permits Issues) ITEM NO. 8.E. Exhibit A — Growth Management Program Annual Housing Permits Implemented and Trigger Cap Projections Table Number of Non -Exempt Building Permits Implemented' 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 1 2025 2026 Current Projection 2000 City Limits 0 0 0 0 244 84 0 0 150 114 0 0 74 8 255 200 Stadium Lands PD2 0 0 0 0 244 84 0 0 135 0 0 0 74 0 0 0 SOMO Village PD 0 0 0 0 0 0 0 0 0 0 0 0 0 8 100 100 Central Rohnert Park PDA 0 0 0 0 0 0 0 0 0 83 0 0 0 0 50 100 Other 0 0 0 0 0 0 0 0 15 31 0 0 0 0 105 0 Northwest SPA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Northeast SPA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 University District SPA 0 0 0 0 0 0 115 140 184 128 124 181 113 67 103 68 Vast Oak 0 0 0 0 0 0 115 140 184 128 121 142 113 67 35 0 Bristol 0 0 0 0 0 0 0 0 0 0 3 39 0 0 0 0 Creath 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 18 UD LLC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 50 Southeast SPA 0 1 0 1 0 1 0 1 0 L 0 L 0 23 66 1 64 1 52 1 50 51 1 50 50 Trigger Ca Calculations 0 0 244 84 115 163 400 306 176 231 238 76 408 318 TWO-YEAR Trigger TOTAL (4) = 560 0 0 0 0 244 199 278 563 706 482 407 469 _)14 484 726 THREE-YEAR Trigger AVERAGE (5) = 225 0 1 0 0 1 0 81 109 1 148 121 1 226 290 294 238 215 1 182 241 267 Residual Development Cap as of 2010=1,7593 1,984 2,209 2,434 2,659 2,640 2,781 2,891 2,953 2,778 2,697 2,746 2,740 2,727 2,876 2,693 2,600 CAP CAP CAP Exhibit A ITEM NO. 8.E. Applications Pending / Infill Projects / Notes 2000 City Limits Stadium Lands PD Additional 74 Units Approved for SAMP in 2020 SOMO Village PD General Plan amendments originally approved in 2010 with additional entitlements approved in 2021. Tentative Map application pending for future phase 47 Units Central Rohnert Park PDA 7 affordable units within the Bella Creek apartments exempt from GMP Application for Downtown Development expected 2024; 25% affordable Northwest SPA None Northeast SPA None University District SPA 218-unit affordable housing complex is exempt from GMP. Tentative Map application pending for 36 Units (Snyder Lane Townhomes Southeast SPA Affordable units are exempt from GMP. (1) "Residential building permit implementation" means completion of the dwelling unit that a permit pertains to and is deemed to take place one year after the permit is issued (RPMC 17.19.020.D). (2) Stadium Lands PD includes Fiori Estates, Reserve at Dowdell, and Residences at Five Creek (3) 10 yrs x 225 (2001-2010), less 491 units permitted during that time frame (2002-14 units, 2003-66 units, 2004-214 units, 2005-197 units) (4)(5) Formula for Applying the Trigger Cap (RPMC 17.19.050) - 'Beginning in the calendar year 2005, if the annual report demonstrates both that the combined number of residential permits implemented in any two successive (i.e. prior) calendar years exceeds five hundred sixty housing units (five hundred sixty represents one hundred twenty-five percent of the two-year average growth of four hundred fifty housing units), and the development pace for the preceding three-year period has exceeded an average of two hundred twenty-five units per year, then a cap on residential development in the following calendar year shall be established." Exhibit A ITEM NO. 8.E. Exhibit B — Annual Review of Housing Units per Section 17.19.030.B.1-3 2016 2017 2018 2019 2020 2021 2022 2023 Final Discretionary Approvals Stadium Lands PD 0 135 0 0 74 0 0 0 SOMO Village PD 0 0 0 0 0 1,750 0 0 2000 City Limits Central Rohnert Park PDA 0 550 0 0 0 0 0 0 Other Redwood Crossings) 0 0 0 0 0 0 105 0 Northwest SPA 0 0 0 0 0 0 0 0 Northeast SPA 0 0 0 0 0 0 0 0 University District SPA Vast Oak, UDLLC & Bristol 0 0 42 0 0 0 0 0 Southeast SPA 0 0 0 2 0 0 0 22 Total 0 685 42 2 74 1,750 105 22 Number of Units on Final Map I Stadium Lands PD 0 135 0 0 0 74 0 0 SOMO Village PD 0 0 0 0 0 0 148 0 2000 City Limits Central Rohnert Park PDA 0 0 0 0 0 0 0 0 Northwest SPA 0 0 0 0 0 0 0 0 Northeast SPA 0 0 0 0 0 0 0 0 University District SPA Vast Oak, Bristol 0 278 105 0 128 120 0 0 Southeast SPA 182 0 129 0 2 106 0 0 Total 182 413 234 0 1 130 1 226 1 148 0 Number of Non -Exempt Building Permits Issued* Stadium Lands PD 0 0 135 0 0 0 74 0 SOMO Village PD 0 0 0 0 0 0 0 8 2000 City Limits Central Rohnert Park PDA 0 0 0 83 0 0 0 0 Other 0 0 15 0 0 0 0 0 Northwest SPA 0 0 0 0 0 0 0 0 Northeast SPA 0 0 0 0 0 0 0 0 University District SPA Vast Oak, Bristol 115 140 184 128 124 181 113 67 Southeast SPA 0 24 66 64 52 50 51 1 Total 115 1 164 400 1 275 1 176 1 231 1 238 1 76 * excludes affordable units — See Exhibit C Exhibit B ITEM NO. 8.E. Exhibit C — Housing Units Not Subject to Growth Management Ordinance's Trigger Cap (Building Permits Issued) 2016 2017 2018 2019 2020 2021 2022 2023 Single -Family Dwelling Lots not in a Subdivision 0 0 0 0 0 0 0 0 Affordable Housing Units* 0 3 220 7 52 2 62 4 Accessory Dwelling Units 1 2 0 0 3 5 4 5 Conversion of Mobile Homes Parks to Condos 0 0 0 0 0 0 0 0 Model Homes** 9 6 7 2 3 4 1 2 Exempted Infill Units (Edgeway) 0 0 0 31 0 0 0 0 Total 10 11 227 40 58 11 67 * Housing units affordable to lower -income households and affordable to moderate -income households under the City's inclusionary housing requirements ** Model homes included in non-exempt totals for accuracy since they are subject to GMP when occupied. Note: Pursuant to Municipal Code 17.19.030.B.6, these projects are not included in the housing counts in Exhibit A for the calculation of the trigger cap. Exhibit C N F eT LI) �M1LIFARpti� ITEM NO. 8.F. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Development Services Submitted By: Alicia Giudice, Development Services Director Prepared By: Jenna Garcia, Housing Manager Elliott Pickett, Associate Planner Agenda Title: Receive the Annual Report on the Status of the General Plan and Housing Element for Calendar Year 2023, and Direct Staff to forward the Annual Report to the State Office of Planning and Research and the Department of Housing and Community Development RECOMMENDED ACTION: Receive the Annual Report on the Status of the General Plan and Housing Element for Calendar Year 2023, and direct staff to forward the Annual Report to the State Office of Planning and Research and the Department of Housing and Community Development. BACKGROUND: Government Code Section 65400 requires local jurisdictions to submit an Annual Progress Report on the status of policies and programs of the jurisdiction's adopted General Plan and Housing Element and on the progress made toward reaching the jurisdiction's Regional Housing Needs Allocation (RHNA) targets. This report must be provided to the jurisdiction's legislative bodies and subsequently submitted to the Governor's Office of Planning and Research (OPR) and the Department of Housing and Community Development (HCD) by April I" of each year. The intent of this requirement is to ensure that the General Plan directs all land use decisions and remains an effective guide for future development. The outcomes of the annual reports are also considered by many state grant programs. This report provides the City of Rohnert Park's progress in implementing the City's General Plan 2020 and its progress toward meeting the City's RHNA during the 2023 calendar year. ANALYSIS: All cities and counties are required to adopt a General Plan to guide future development within their jurisdiction. The City of Rohnert Park's current General Plan 2020 was adopted in 2000, and was amended a number of times since General Plan 2020 includes the following mandatory components: oo Land Use oo Transportation oo Open Space (Parks and Recreation) oo Environmental Conservation oo Health and Safety ITEM NO. 8.F. oo Noise oo Housing In 2023, the City adopted a comprehensive update of the Housing Element as required by state law. A comprehensive update to the General Plan (General Plan 2040) is expected to be completed and ready for adoption in 2024. General Plan Progress: In 2023, the City continued implementing policies and working toward goals in the currently adopted General Plan (General Plan 2020), while continuing work on the General Plan update (General Plan 2040). Through these policies, the City has continued operational practices and implemented new programs for safety, fiscal responsibility, sustainability, cohesive community development, and worked toward best meeting the needs of the residents and priorities of the City Council. The City's 2023 accomplishments, guided by the General Plan, include implementing a safety improvement project, replacing infrastructure at over 40 signalized intersections, establishing a Community Facilities District (CFD) for development in SOMO Village, and extending recycled water into new subdivisions. Progress in meeting specific goals is outlined in Attachment 1. Housing Element Progress: The Housing Element is one of the mandated elements of the General Plan and must be updated on a set schedule, consistent with the eight -year cycle of the Regional Housing Needs Allocation (RHNA) process. The City is currently reporting under its 2023 Housing Element, which covers the period between 2023 and 2031. The Housing Element Annual Progress Report (Attachment 2) will be the first progress report submitted on the 2023 Housing Element. The Housing Element Annual Progress Report (APR) generally includes data for the previous calendar year. However, in transitional years between RHNA cycles, jurisdictions may choose to count units permitted during the six months prior to the Housing Element due date towards the new RHNA cycle. The City of Rohnert Park has opted to do this. For this reason, units entitled, permitted, and occupied after June 30, 2022 are shown on the Housing Element APR for Calendar Year 2023. The Housing Element APR reports units by affordability. Housing affordability is measured as a percentage of area median income (AMI), which is calculated and updated regularly by HCD. The base income is defined by a household of four and adjustments are made by HCD for other household sizes. The most current data for Sonoma County, which became effective on June 6, 2023, is summarized in Figure 1 below. 2 ITEM NO. 8.F. Figure 1: 2023 Area Median Income (A I) Levels Qualifying incarnes by Household Size a nor uWooa 1400Da 1200M ioatiav 600W 6aaao a 11111 Ill UtFefnely LOW very Low 15C1 I Law J ] Median � i X %) ModeFate 3 ! 20%1 f3^ FarttN Vze 51 rz 83 Sa 05 For the Housing Element 2023-2031 cycle, Rohnert Park's total RHNA is 1,580 units, with the affordability profile presented in Table 1. Table 1: RHNA Allocations for 2023-2031 Cycle, By Income Level Income Level RHNA Allocation Very Low (<_50%AMI) 399 units Low (<_80%AMI) 230 units Moderate (<_120%AMI) 265 units Above Moderate (Over 120%AMI) 686 units TOTAL 1,580 units The Housing Element Annual Progress Report (Attachment 2) shows the total number of housing units permitted in the City from July 1, 2022 through December 1, 2023, compared with the RHNA allocation by income level for this cycle. With 140 market rate units permitted since July 1, 2022, the City is on track to meet its goal of 686 units for the "above moderate -income" level. In the first of its 8-year RHNA cycle, the City has issued permits for 20% of the overall units in this income category. Figure 2 below illustrates the City's RHNA allocation for above moderate -income (blue) compared to units permitted July 1, 2022 through December 31, 2023 for above moderate -income units (orange.) 3 ITEM NO. 8.F. Figure 2: RHNA Above Moderate-Jncome Allocations Compared to Permitted Units through Dec 2023 Ffowwng F Ieeffwat Ode 7023,-2031 The City is also on track to meet its RHNA for housing affordable to very low-income earners. However, it is falling short on RHNA targets for housing affordable to low-income and moderate - income earners. This is primarily due to the timing of planned affordable housing developments, including Downtown and SOMO Village. As some of these projects start pulling permits, and the City continues to implement the programs in its Housing Element, the number of units permitted in these income categories will increase. Figure 3 below illustrates the City's RHNA allocations (blue) compared to units permitted through June 30, 2022 (orange) for each of the below -market -rate income levels. Figure 3= RHNA Below Market Rate Allocations Compared to PermItked Units through Dec 2023 Housing Clenlerd Cyde 2013•2031 ■ FIRM ■ FmmRlOd unlcp "ry I ow The City's 2023 Housing Element includes several programs and policies intended to support the construction of housing available to all income ranges. The City has already begun implementing many of these programs and will continue to do so over the next seven years. Included in Attachment 2 is a detailed report on the status of Housing Element program implementation. Some program .19 ITEM NO. 8.F. implementation requires City Council to take actions, including considering amendments to the City's Municipal Code. Staff will bring some of these items to City Council later this year for consideration. STRATEGIC PLAN AND COUNCIL PRIORITIES ALIGNMENT: The Annual Report on the General Plan and Housing Element is required by state law. It also assists Council in understanding progress towards Strategic Plan Goal D — Continue to Develop a Vibrant Community and City Council Strategic Priority "Housing for All." OPTIONS CONSIDERED: None. This annual review is required by state law. FISCAL IMPACT/FUNDING SOURCE: There is no fiscal impact to the City. Code Compliance Approval Date: N/A Department Head Approval Date: 02/21/2024 Finance Approval Date: N/A Human Resources Approval Date: N/A City Attorney Approval Date: N/A City Manager Approval Date: 03/04/2024 Attachments: 1. Annual Report on the Status of the Rohnert Park General Plan (Calendar Year 2023) 2. Housing Element Annual Progress Report (July 2022 — December 2023) 5 Attachment I Annual Report on the Status of the Rohnert Park General Plan Calendar Year 2023 Government Code Section 65400 mandates that the planning agencies of cities submit an annual report on the status of the General Plan and progress on the implementation to their legislative bodies, the Governor's Office of Planning and Research (OPR), and the Department of Housing and Community Development (HCD) each year. The report must address each City's progress in its General Plan implementation, including the progress in meeting its share of regional housing needs. The intent of this requirement is to ensure that the General Plan directs all land use decisions and remains an effective guide for future development. The information that follows complies with the Government Code requirements related to the provision of an annual report on the status of the Rohnert Park General Plan. Status of the Rohnert Park General Plan The Rohnert Park General Plan was adopted in July 2000 and has been amended a number of times to stay current. The General Plan includes the following mandatory components: oo Land Use oo Transportation/Circulation oo Housing oo Open Space (Parks and Recreation) oo Noise oo Health and Safety oo Environmental Conservation During 2023, the following amendments to the General Plan were approved: oo Resolution No. 2023-004: The previous Housing Element was rescinded and replaced with the updated 2023 Housing Element. The General Plan Diagram was updated to change the land use designation for three sites identified in the Housing Element to High Density Residential. oo Resolution No. 2023-063: The General Plan Diagram was updated to change the land use designation within a portion of Willowglen Phase 4 from Rural Estate Residential to Low Density Residential and updated related tables and figures to reflect that change. General Plan Progress in Implementation The City made progress in 2023 toward achieving General Plan Goals and Policies as listed in the subsequent tables in this report. Notably, the City has continued to increase the supply of new housing and approve projects to supply housing into the next decade. The City also continues to complete infrastructure projects to serve new development, as well as existing neighborhoods. Page 1 The following series of tables represents the progress the City has made toward implementing its general plan goals during the 2023 calendar year. As is to be expected, the City did not work on all goals in this calendar year and the list covers only activities that took place in 2023. Table 2 —Implementation of Land Use Goals and Policies in 2023 Goal or Policy Progress in 2023 Goal LU-B Provide soft urban edges and ensure On -going The University District and Southeast Specific Plan provide that designated intensities provide low densities of housing and an open space buffer as they gradual transition to open space at city transition towards Petaluma Hill Road. The SOMO Village edges. Final Development Plan provides its high density housing near the commercial core, with lower density housing at its edges, and provides open space on the southern and eastern sides of the property. Goal LU-F Create a new mixed -use University On -going Construction of housing in the University District Specific District north of Sonoma State Plan (UDSP) continued. Staff and applicant team continue University that would draw visitors, coordinating development of the remaining parcels. serve as destination point for the City, offer a wide mix of residential employment opportunities and foster close physical and visual relationship between the campus and the City. Goal LU-I Provide a range of housing variety in On -going Construction and permitting continues on a wide variety of type and price, including large -lot housing types, including large -lot homes in the UDSP and homes and housing oriented to Southeast Specific Plan (SESP, Willowglen), multifamily students. housing (Adega II, Redwood Crossing), ADUs, and interim housing. Goal LU-K Promote a diverse range of jobs within On -going There are 8,947 active businesses licenses. the city. In 2023, unemployment ended at 4016, up from 2.9% in the end 2022, though within a normal range. Hospitality and retail make up over one-third of all jobs (34.9%) in the city, though manufacturing, healthcare, and construction combine Page 2 for the next 22% of employment. The labor is 70.8%, about 8 over the national average. Currently and for the foreseeable future, the city spotlights select, diverse businesses, with retail, restaurant, market, and entertainment included by the end of 2023 Table 3 —Implementation of Growth Management Goals in 2023 Goal or Policy Progress in 2023 Goal GM-B Undertake efforts to facilitate provision of housing affordable to low and very On -going The City's growth management ordinance continues to exempt affordable housing units from trigger caps. low income household by exemption affordable housing form any numerical "trigger cap" restrictions. Goal GM-C Ensure that growth is paced to achieve General Plan buildout over a 20-year On -going Housing construction rates are averaging less than one percent per year in Rohnert Park. period, representing an annual average population growth rate of one percent. Goal GM-F Ensure all new development provides necessary public facilities to support On -going The City's Development Agreements continue to support the provision of and funding for public facilities to support development. development. The Improvement Plans at the intersection of Keiser Avenue and Petaluma Hill Road were approved by the County of Sonoma and work is expected to start this year. Goal GM-H Minimize impacts — physical, visual and fiscal — of growth and annexation on On -going The City continued collecting maintenance annuity fund deposits from builders in the University District and special existing homes and businesses. taxes for services in Willowglen, established a community facility district for upcoming development in SOMO Village, and continues to monitor project -specific mitigation measures to minimize impacts of growth. Page 3 Table 4 —Implementation of Urban Form Goals in 2023 Goal or Policy Progress in 2023 Goal CD-B Establish strong connections between adjacent neighborhoods and between On -going City is implementing a Bike and Ped master plan to better understand the connections needed on a regional basis. In 2023, neighborhoods and activity centers in the City continued to work towards plans for the extension of the order to encourage walking and Hinebaugh Creek and Copeland Creek bikeways within the biking. University District providing a safe way to walk and bike between existing neighborhoods and new development. Goal CD-C Establish an open space network that links residential neighborhoods, parks On -going In 2023, the City continued developing plans for the extension of the Hinebaugh Creek bikeway and Griffin 's Grove Park within and open space areas. the University District. Construction continued on a new trail leading to Crane Creek Regional Park, and the City worked on dedicating 75 acres of open space to the east of the city limits to Sonoma County Regional Park in order to preserve that space in perpetuity. Goal CD-D Preserve and enhance views of the eastern ridgeline. On -going When reviewing development proposals and specific plans for areas along the east of the city, view corridors and view impact analyses are used to protect the view of the ridgeline. In 2023, this included approvals for Phase 4 of Willowglen. Goal CD-F Maintain a distinct urban edge, while creating a gradual transition between On -Going Specific Plans along City borders have gradual transitions to open space and maintain scenic corridors. The City continues to urban uses and open space. maintain an Urban Growth Boundary. Table 5 —Implementation of Street System Goals in 2023 Goal or Policy Progress in 2023 Goal Maintain high levels of mobility along all On -going The City is almost complete with safety improvement project that TR-B major street segments and at major replaces all of the infrastructure at our 40+ signalized intersections. intersections. Page 4 Goal Build new roads and improve existing On -going In 2023, Public Works has worked on several preventative TR-C roadways, where necessary, in maintenance projects to keep our existing roads in good shape conjunction with new development. and installing a new traffic signal to meet the new traffic flow needs of the UDSP. New roads have been developed in the UDSP, SESP, and SOMO Village, in conjunction with new development. The City accepted improvements to Keiser Avenue, Kerry Road, Oak Circle, and portions of roads in Phase 2 of Willowglen. Table 6 —Implementation of Transportation Demand Goal in 2023 Goal or Policy Progress in 2023 Goal TR- Establish LOS C as the minimum standard for all arterial and collector roadway segments and On -going Mitigation of traffic impacts is required of new developments to maintain a minimum level of 1 and TR-2 intersections. Require mitigation measures, as service. needed, for new development that increases traffic such that LOS levels fall below the established minimum standard. Goal TR- Provide continuous sidewalks along all existing and future streets. On -going Installation of sidewalks on existing streets is required for any new development. All new street 37 construction requires the installation of sidewalks. Goal TR- Establish requirements for bicycle parking as part of the Zoning Ordinance update. Ensure that secure On -going All new commercial and industrial development requires the installation of bicycle parking facilities. 43 bicycle parking is provided in conjunction with new New project entitlements include conditions of development. approval to require the installation. Goal TR- Promote safe, efficient, and comfortable circulation for cyclists and pedestrians throughout Rohnert On -going Public Works has engaged in a regional bicycle and pedestrian planning exercise to connect routes N Park. within our city and beyond, and are integrating more progressive bike protection when restriping/ modifying roadways. Page 5 Table 7 —Implementation of Open Space Goals in 2023 Goal or Policy Progress in 2023 Goal Maintain and enhance the Petaluma On -going Development along the east side of Petaluma Hill Road will be OS-D Hill Road Scenic corridor. designed to protect the view of the hills to the east from the roadway. SOMO Village, Southeast Specific Plan, and University District Specific Plan are also designed to create view corridors of the hills to the east. California Environmental Quality Act (CEQA) documents for development projects require consideration of the visual impact of a development. Goal Maintain publicly owned open space On -going Public Works is performing a tree assessment survey to better OS-E areas in their natural state; provide understand the health and best options for our natural canopy. public access in a manner that is compatible with the conservation of habitat. Goal Develop additional parkland in the On -going During 2023, work continued on Griffin's Grove Park within OS-G City to meet the standards of University District, the city entered into a Public Improvement required park acreage for new Agreement for the first park in SOMO Village, and collected a fee for residents. park purposes associated with changes to Willowglen Phase 4. Table 8 —Implementation of Wastewater Goals in 2023 Goal or Policy Progress in 2023 Goal Continue participation in the planning, financing and On -going The City participated in regional coordination PF-7 construction of wastewater treatment capacity meetings. Recycled water has been extended into new expansions of the Subregional Wastewater Disposal developments at the University District, Southeast System. Explore opportunities for increasing Specific Plan, and Stadium Lands. SOMO Village reclaimed water use and decreasing potable water will be utilizing recycled water within the public demand. right-of-way Page 6 Goal Require developers to install or pay for new sewer On -going New developments are required to provide and pay PF-P lines and other sewer improvements needed to for the necessary infrastructure including upgrading accommodate new development. existing sewer and wastewater systems or the installation of new systems. Table 9 —Implementation of Water Supply and Conservation Goals in 2023 Goal or Policy Progress in 2023 Goal Continue to encourage water conservation On -going New technology is being installed on all meters throughout the PF-G through the use of reclaimed water and city for more accurate readings/ better user interface/ more reduction of water consumption and information to better manage inefficient water use. All new discharge, for both existing and new development requires water conserving devices and where development. feasible, connecting irrigation systems to recycled water. SOMO Village will be utilizing recycled water within the public right-of-way Goal Ensure that groundwater withdrawal does not On -going The City monitors and manages its groundwater use and PF-H exceed safe yield. groundwater levels are rising under Rohnert Park. The City participates in the Joint Powers Authority for the Santa Rosa Plain Groundwater Sustainability Agency. Public Works maintains an operational philosophy to let our groundwater wells rest during normal (mild) weather patterns that allow it. Table 10 —Implementation of Historic and Archaeological Resources Goals in 2023 Goal or Policy Progress in 2023 Goal Conserve historic and archaeological resources for the On -going New development approval must conform to the EC -A aesthetic, educational, economic and scientific CEQA. Under CEQA, archaeological resources contribution they make to Rohnert Park's identity and must be mitigated if found in the development site. quality of life. Page 7 Table 11—Implementation of Habitat and Biological Resources Goals in 2023 Goal or Policy Progress in 2023 Goal Protect special status species and On -going The City regularly implements protection of endangered, threatened, EC-C supporting habitats within Rohnert or rare species through California Environmental Quality Act review Park, including species that are State for any project. or federally listed as Endangered, Threatened, or Rare. Goal Protect sensitive habitat areas and On -going The City regularly implements these policies through the California EC-C wetlands in the following order of Environmental Quality Act review for any project. protection preference: 1) avoidance, 2) on -site mitigation, 3) off -site mitigation. Goal Maintain existing native vegetation On -going The Tree Preservation Ordinance requires staff approval for most EC-D and encourage planting of native tree removals located not on single-family residences. Native plants plants and trees. are required to be included in new landscape plans for private development projects and for public improvements. In 2023, the city monitored projects and reviewed plans for consistency with these requirements. Enforcing the Water Efficient Landscaping Ordinance for new developments and CIP projects creates a palette of drought tolerant and native vegetation. Table 12 —Implementation of Water Quality Goals in 2023 Goal or Policy Progress in 2023 Goal EC- Enhance the quality of surface and groundwater resources and prevent their On -going The City participates in a regular working group hosted by the water board to coordinate activities on maintaining and F contamination. improving water quality. City staff are active members of the water advisory committee technical advisory committee. Goal EC- Undertake steps to minimize the depletion of groundwater resources. On -going The City has an adopted ground policy resolution that limits groundwater pumping to 2, 577 acre-feet per year. The City G manages its pumping to this level and monitors groundwater levels(levels have been rising since 2006). The City participates Page 8 in the Joint Powers Authority that is the Santa Rosa Plain Groundwater Sustainability Agency. Public Works maintains an operational philosophy to let our groundwater wells rest during normal (mild) weather patterns that allow it. Goal EC- Ensure that the City's drinking water continues to meet or exceed water On -going The City has had 100% compliance with testing requirements for drinking water during 2023 and reports out every year about I quality standards. our results in the Consumer Confidence Report. Goal EC- Discourage use of insecticides, herbicides, or toxic chemical substances On -going In 2021, the City Council revised the Integrated Pest Management (IPM) program to eliminate the use of Ranger Pro J within the city and encourage Glyphosate and the City continues to implement this program. development and use of pesticide and fertilizer management plans for landscaped areas. Table 13 —Implementation of Air Quality Goals in 2023 Goal or Policy Progress in 2023 Goal EC-K Continue to work toward improving air quality and meeting all federal and state ambient air On -going New projects are required to implement mitigation measures to reduce air quality impacts of new quality standards by reducing the generation of development. air pollutant from both stationary and mobile sources, where feasible. Table 14 —Implementation of Seismic and Geological Hazards Goals in 2023 Goal or Policy Progress in 2023 Goal HS-A Minimize the risk to life and property from seismic and geologic hazards in Rohnert Park. On -going The City enforces the Uniform Building Code and requires soils reports for new development. Page 9 Table 15 —Implementation of Drainage, Erosion, Stormwater and Flooding Goals in 2023 Goal or Policy Progress in 2023 Goal HS-B Minimize the risk to life and property from On -going The City reviews proposals for new development in flooding. areas of flooding in accordance with Federal Emergency Management Agency (FEMA) requirements and requires drainage study and review during the development review process. The City has a Local Hazard Mitigation Plan which was certified by FEMA and California OES. Goal HS-C Control erosion and sedimentation to provide On -going The City maintain water quality control plans for flood protection and water quality. construction sites to protect the quality of our storm drains and streams. The City has adopted and enforces a grading ordinance and requires all development be designed to the Sonoma County low -impact development standards. All construction projects of any size are required to secure coverage under the State Water Board's General Construction Permit. Table 16 —Implementation of Solid Waste Management and Recycling Goals in 2023 Goal or Policy Progress in 2023 Goal HS-D Reduce the generation of solid waste and recycle On -going The City works with Zero Waste Sonoma and those material that are used to slow the filling of Recology to present educational materials to all local and regional landfills, in accord with the refuse customers within the city limits, perform audits California Integrated Waste Management Act of of residential and commercial cans, etc, and 1989. enforcing strict diversion requirements through our Franchise Agreement with Recology. Page 10 Table 17 —Implementation of Hazardous Materials Goals in 2023 Goal or Policy Progress in 2023 Goal HS-G Protect groundwater and soil from On -going The City coordinates with the Sonoma County Waste contamination by hazardous materials. Management Agency, the Santa Rosa Subregional System and other local agencies on hazardous waste collection events and the dissemination of information regarding hazardous material management. Signs at storm drains are maintained on an ongoing basis throughout the City. City public works, public safety and code enforcement staff respond to and abate hazardous material spills. Table 18 —Implementation of Emergency Management Goals and Policies in 2023 Goal or Policy Progress in 2023 Goal HS-H Use the Standardized Emergency On -going The City continued to utilize the National Incident Management Plan as a guide for Management System to ensure a standard emergency emergency management in Rohnert Park. response and continued to monitor potential emergencies and hazards to determine the appropriate response. The City has a Local Hazard Mitigation Plan which was certified by FEMA and California OES. Policy HS-23 Prepare and disseminate information to help households prepare for emergency On -going Frequent communication with the public was accomplished through press releases, social media tools, and other situations. emergency notification methods and services. Public Safety personnel assisted in an "Emergency Help Prep "program, providing presentations to local citizens. Policy HS-24 Require adequate access for emergency vehicles, including adequate street width On -going For all projects, including new developments, and infrastructure improvements, plans are reviewed and and vertical clearances, on new streets. approved by Public Safety personnel. Page 11 Table 19 —Implementation of Noise Goals in 2023 Goal or Policy Progress in 2023 Goal NS-A Protect public health and welfare by eliminating or minimizing excessive noise levels. On -going Noise is evaluated as new projects are proposed in compliance with the city noise ordinance. Goal NS-B Minimize the exposure of noise -sensitive uses — including residences, schools, churches, hospitals and other public uses — to excessive noise levels. On -going In 2023, the City used its approval authority to review the noise impacts of projects and impose conditions of approval to minimize noise impacts. Page 12 Jurisdiction Rohnert Park Reporting Year 2023 (Jan. 1 - Dec. 31) Planning Period 6th Cycle 01/3112023 - 01/31/2031 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Table B Regional Housing Needs Allocation Progress Permitted Units Issued by Affordability 1 2 3 4 Projection Income Level RHNA Allocation Period - 2023 2024 2027 2028 2029 2030 2031 Total Units to Total Remaining RHNA by Income b Income Level Y O6/30/2022- Date all ears ( Y ) Level 01 /30/2023 Deed Restricted 60 - - - - - - - - - 399 65 334 Very Low Non -Deed Restricted Deed Restricted 2 - - - - - - - - - 230 8 222 Non -Deed Low Restricted 4 2 - - - - - - - - Deed Restricted 2 265 8 257 Non -Deed Moderate Restricted 6 - - - - - - - - - Wove Moderate 686 69 71 - - - - - - - - 140 546 Total RHNA 1,580 Total Units 1461 751 1 1 1 1 1 1 1 1 221 1 1,359 Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1). 5 6 7 Extremely low- Total Units to Total Units *Extremelyow-Income Income Need 2023 .11116 2024 2025 2026 2027 2028 2029 2030 2031 Date Remaining Units` 200 1 60 _ 601 140 *Extremely low-income houisng need determined pursuant to Government Code 65583(a)(1). Value in Section 5 is default value, assumed to be half of the very low-income RHNA. May be Note: units serving extremely low-income households are included in the very low-income RHNA progress and must be reported as very low-income units in section 7 of Table A2. They For the first year of the 6th cycle, Table B will only include units that were permitted since the start of the planning period. Projection Period units are in a separate column. Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at apr@hcd.ca.gov. ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation Jurisdiction Rohnert Park Reporting Year 2023 (Jan. 1 - Dec. 31) Table D Program Implementation Status pursuant to GC Section 65583 Housing Programs Progress Report 1 2 3 4 Name of Program Objective Timeframe in H.E Status of Program Implementation (a) To ensure sufficient residential capacity is maintained to accommodate the RHNA for Active. Procedure developed, staff to update regularly. Identified next steps for each income category, staff will develop and implement a formal, ongoing (project -by- software integration for more streamlined tracking. Staff to revisit in 2024 and make project) administrative evaluation procedure Within six months of adoption adjustments where necessary. HO-1.A No Net Loss of Residential Capacity to (b) No project approval or other action that reduces the density or development Accommodate RHNA capacity of a site shall be undertaken unless sufficient remaining sites are available or additional adequate sites are identified to meet the City's RHNA obligation prior to approval of the development and made available within 180 days of approval of the development, as required by Senate Bill 166. Ongoing Active. Procedure developed and being implemented on a project -by -project basis. The City shall create and maintain a list of additional sites with appropriate zoning that HO-1.6 Administrative List could be added to the City's Sites Inventory if and when an analysis provided through of Additional Sites the Annual Progress Report indicates that sufficient sites may not exist to accommodate Create list by December 2023, consider adding sites from Active. Administrative List of Additional Sites has been developed. Sites will be added the City's remaining RHNA, by income level, for the planning period. list to inventory on an annual basis to inventory if/when needed as per no net loss procedure. (a) As part of the General Plan update, the City shall rezone sufficient sites in order to demonstrate an adequate inventory of sites to meet its Regional Housing Needs HO-1.0 Rezone to meet Allocation (RHNA). Within one year of adoption In progress. Rezoning to be complete along with adoption of General Plan in 2024. (b) The City will amend the code as required to allow non -vacant sites included in one RHNA previous Housing Element inventory and vacant sites included in two previous Housing In progress. Code updates are drafted and expected to go to Council for consideration Elements to address by -right approval requirements in Government Code § 65583. By 2023 and adoption in 2024. (a) Develop a written SB 35 application process, including the pre -application and the procedure that would be used if the City becomes subject to 513 35 provisions. This HO-1.D Streamline process would provide a streamlined ministerial approval process to qualified Development Process residential and mixed -use development projects. The written procedures and checklists would be developed and made available on the City's website. By 2024 Not started, will be completed in 2024. (b) Develop Objective Design and Development Standards for multi -family and mixed - use projects. Replace factors 1, 2, and 3 in the City's Site Plan and Architectural Review procedures with objective findings. By 2024 Not started, will be completed in 2024. The City will require replacement housing units subject to the requirements of HO-1.E Replacement Government Code Section 65915(c)(3) when any new development occurs on a site in Housing Program the Sites Inventory or on a site within the Downtown District Amenity Zone (DDAZ) if that site meets any of the conditions listed in the Housing Element. Ongoing Active, being implementd on a project -by -project basis. (a) Post all required information about development standards and fees to an easily In progress. City has this information posted on the Development Services webpage. accessed location on the City's website. By Jan 2024 Staff plan to continue work to make it easier for developers to access and navigate. (b) When making findings for Government Code Section 66001(d)(1) every five years, ensure compliance with AB 602 requirements for new development impact fee studies HO-2.A Accessible and and resulting fees. By 2025 Not started, will be completed by 2025. Transparent Information In progress. This information is posted online in the City's certified Housing Element, (c) Create and publish a summary that identifies the sites on the City's Sites Inventory and staff regularly directs interested developers to the appropriate sections. Staff are and make the summary available online in map format. Provide site -specific in the process of creating a dedicated housing developer webpage with a map, development information and support whenever possible in order to reduce up -front Create summary by 2023; Update annually or as sites are housing site summaries and other tools to help promote housing development. This is costs for interested housing developers. developed lexpected to go live in 2024. (a) Conduct outreach annually for the housing fair, including contacting developers, In progress. City staff participated in a regional housing fair hosted by the Napa - lenders, fair housing organizations, providers of affordable housing, homeless service Sonoma Collaborative in December 2023, and plans to host its first City annual HO-2.B Outreach to providers, regional organizations that provide ADU TA. Annual housing fair mid-2024. Developers (b) Facilitate opportunities for collaboration between market -rate and affordable housing developers through the annual housing fair. Annual Not started. The City plans to host its first annual housing fair mid-2024. (c) Maintain contacts with nonprofit housing and refer potential developers of such Active. The City maintains contacts with nonprofit housing organizations and refers housing to these organizations for assistance. Review annually and update if needed developers to these organizations. (a) City staff will bring forward Municipal Code amendments to address recent changes In progress. Code updates are drafted and expected to go to Council for consideration HO-2.0 zoning for a variety to State law (see HE program for list of codes that require updating). Amend code by June 2024 and adoption in 2024. (b) The City will review all other plans regulating land use and complete any legally of Housing Types permissible amendments to Specific Plans to ensure compliance with State laws related to transitional housing, supportive housing, group homes, Low Barrier Navigation Not started. Code updates are expected to go to Council for consideration and Centers, and Accessory Dwelling Units. Amend remaining plans regulating land use by 2024 adoption in 2024. Incentivize and promote the development of accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs) by providing technical assistance and resources for their development and rental through the following actions: (a) Maintain ADU webpage with accessible information, simple application, and contact Active. The ADU webpages are live on the City's web site. Staff is in the process of information for questions about and assistance with accessory dwelling units. Review annually and update if needed conducting the annual review and will be making updates by mid-2024. (b) Partner with and/or fund regional organizations that provide technical assistance, including site evaluations, for the development of ADUs and JADUs, and landlord/tenant support, such as the Napa Sonoma ADU Center and Homes for Sonoma. Active. Staff met with Napa -Sonoma ADU Center to discuss opportunities to Share resources provided by these organizations, including webinars and technical Contact at least one regional organization by the end of collaborate. The Napa -Sonoma ADU Center is currently promoted on the City's ADU assistance programs, through the City webpage, newsletter, and social media. 2023 to establish a partnership webpages. (c) Facilitate the development of JADUs by developing promotional materials specific to In progress. Staff will include promotional materials about JADUs on the City's ADU JADUs and their funding and making these available on the City's ADU webpage. By December 2023 webpages when they make updates in 2024. Active. The Napa -Sonoma ADU Center is currently promoted on the City's ADU HO-2.D Incentivize and Promote ADU and JADU webpages. The Napa -Sonoma ADU Center and City were working on a collaborative Development effort to promote the CaIHFA ADU grant program in Fall 2023, however, the program (d) In partnership with regional organizations, promote and publicize new allowances ran out of funds before the promotion effort got off the ground. City staff look for ADUs and JADUs to the public, including place -based promotion for locations with forward to additional grant funds becoming available in the future and will work with higher income eligibility limits for the CaIHFA ADU grant program. By December 2024 the Napa -Sonoma ADU Center to promote to Rohnert Park residents. (e) Help legalize existing unpermitted units. Promote and publicize program through City website and social media to encourage people with unpermitted units to bring up to code. By December 2024 Not started, will be completed in 2024. In progress. As demonstrated in Table A2, the City permitted 19 ADUs in the first year of the 6th RHNA cycle. In its Housing Element, the City had projected permitting 40 (f) Annually report out on the City's successes in the production of ADUs and JADUs ADUs over the course of the 8-year RHNA cycle - an average of 5 per year. In its first with the City's APR. Annually year alone, the City has nearly quadrupled its annual target. (g) The City will monitor the affordability and production of ADUs every two to three years (three times in the planning period) as part of the annual report. If production and affordability does not meet assumptions in the sites inventory then, based on the Review in 2025, 2027, and 2029, and if necessary, Not started. Although staff are monitoring ADU production on an annual basis, staff results, the City will take appropriate action within 6 months. implement cost -reducing measures within one year. plan to conduct a more formal monitoring in 2025. (a)The City will prepare a Workforce Housing Overlay (WFHO) that further provides for the City's identified housing needs. The City will determine locational factors for the HO-2.E Workforce Housing implementation of WFHO. Findings and recommendations will be presented to the Overlay Planning Commission and City Council. If directed, WFHO will be adopted into the Code within 6 months IPresent by Jan 2026 lNot started, due in 2026. (b) The City will conduct necessary outreach to property owners and residents in proposed overlay areas. By Dec 2026 Not started, due in 2026. Once the CDC resumes participation in the MCC Program, the program will be HO-3.A Mortgage Credit implemented through private lenders so that homebuyers in Rohnert Park can continue Certificate Program to benefit from the federal Program. The City will invite local lenders to the annual Not started. This program is operated through the County Community Development housing fair (See Program HO-2.13) , provide information on the MCC Program, and Commission (CDC). City staff met with CDC staff who indicated that they plan to report out on these efforts in the Annual Planning Report. Outreach annually, beginning in 2024 implement this program once they identify a consultant who can run it for them. The City will study the feasibility of providing a supplemental density bonus program that further incentivizes the provision of units to meet the City's identified housing needs. The study will include review of the provisions for which the supplemental (City) density bonus program may be used which could include, but are not limited to, the following: HO-3.B City Density Bonus -9 deeper level of affordability Program •Uigher proportion of affordable units -Units available to persons exiting homelessness -Universal Design The City will complete a study by July 2026 to determine the appropriate additional densities and incentives to development projects, and will present their findings and recommendations to the Planning Commission and City Council by the end of 2026. If Complete study by July 2026; Present recommendations directed, the City Density Bonus will be adopted into the Code within 6 months. by end of 2026. Not started, due in 2026. (a) In partnership with a Joint Powers Authority (JPA) and non-profit asset manager, utilize tax-exempt governmental purpose bonds to fund: (1) the acquisition of existing market -rate apartment complexes and restrict future rents to be affordable to households that earn very low to moderate incomes, and (2) the construction of new In progress. In 2023, City staff met with a rep of the Joint Powers Authority "CA development of deed -restricted affordable housing. In order for asset managers to Statewide Communities Development Authority" (CSCDA), which operates the HO-3.0 Essential Housing access these types of bonds, Cities mustjoin a Joint Powers Authority (JPA) and "Workforce Housing Program" through which they issue tax-exempt governmental Bond Financing Program authorize the JPA to issue these bonds on behalf of the City. The JPA, in partnership purpose bonds to acquire existing market -rate housing and restrict the rent to lower with the non-profit asset manager, then purchases the apartment complex, using only Establish JPA structure orjoin existing JPA by July 2023 to moderate -income households. The City confirmed that it is already an active money from the bond financing, and sets the rents to be affordable to low -to moderate Implement construction or acquisition projects through member of CSCDA and can implement this program in Rohnert Park if and when an income households. 2031 eligible market -rate apartment complex is put up for -sale. (b) Review production of units provided by the Essential Bonds Housing Financing Program four years into the planning period, compare with Housing Element Report progress to the City Council in 2027, and to HCD requirements and targets, and report progress to City Council. within 30 days of City Council report. Not started, will review production in 2027. In partnership with Housing Land Trust of Sonoma County, the City shall continue to set aside funds to buy down the affordability on new and existing market -rate homes for HO-3.D Homes for the sale in Rohnert Park and make the homes affordable to low- to moderate -income Essential Workforce families. Housing Land Trust adds the homes to their inventory, provides ongoing stewardship and compliance monitoring of the units, and ensures the ongoing affordability of the homes if/when they resell. Ongoing Active. This program is currently operating, although the current housing market Between 2023 and 2033, Rohnert Park has 68 units at high risk and up to 20 affordable units at lower risk of converting to market rents. The City will work to preserve the units within these 2 projects as affordable by undertaking the following specific actions: (a) Maintain an inventory of units at -risk of conversion to market -rate in the next 10 years. Annually update this list during the City's APR process. Annual Active. City staff maintain an inventory of units at -risk of conversion. Active. Staff reached out to the property manager at Edgewood Apartments (whose (b) Ensure nonprofit developers and property owners of at -risk housing are aware of affordability covenant is set to expire in October 2026) to notify them about State and existing State and Federal noticing requirements. Provide education to tenants about Federal noticing requirements. Staff will be meeting with property management in upcoming expiration of affordability and their rights under the law. Provide this early 2024 to talk about their plan to support tenants in these units when the information at the annual housing fair. (See Program HO-2.6) JAnnual 1covenant expires, and to provide education to their tenants. Active. As noted above, staff are already in contact with property management at Edgewood Apartments about noticing requirements and tenant education. The City also has a loan with a non -profit -owned affordable housing project called Santa Alicia HO-3.E At -Risk Units (c) Proactively outreach to owners at least three years before expiration of affordability Apartments, which was set to expire in September 2023. The City extended the terms covenants to inform them of state preservation notice law requirements and to ensure of the loan until September 2024. The owner has indicated that they intend to tenants receive the required notices at three years, twelve months, and six months maintain this property as affordable in perpetuity. At the request of the owner, staff prior to the scheduled expiration of rent restrictions, as described in Government Code Review annually. Contact at least three years before plan to renegotiate the terms of the loan and take to Council for a longer -term Proactively outreach to at least two qualified entities per year to make diligent )rts to maintain affordability levels. Meet with owners of at -risk units who intend to opt out of a Section 8 contract or ordable Housing Agreement to examine potential strategies to preserve or replace units (e.g., transferring the units to a nonprofit developer). Commit to extending the terms of City loans with affordable projects, thereby also :ending the affordability period. Commit funding, as available, from the City's housi Support grant applications to provide funds for preservation of affordable projects. itinue coordinating with County Housing Authority to connect people living in units h expiring affordability covenants with Housing Choice Vouchers. City shall support the development of affordable housing on underutilized City- ned sites by taking the following actions: Outreach to property owners, businesses, and residents of adjacent parcels of City- ned inventory sites. Provide annual status updates on stakeholders and co -facilitate nmunity meeting(s) with potential developer of site if site is being actively isidered for housing oroiect. (b) Explore land donation or long-term ground lease of City -owned sites included in inventory for development into affordable housing projects. Ensure consistency with the Surplus Land Act through development of a comprehensive and competitive program to solicit requests for proposals (RFPs), with an application publicly available HO-3.F Affordable Housing on the City's website. on Underutilized City Sites (c) Research and implement appropriate environmental mitigation measures for housine development of Citv-owned sites. Pursue funding for appropriate proiects on Citv-owned sites in Review production of units on City -owned land four years into the planning period I compare with Housing Element projections. If actual production is below the jected level, and the City is not meeting its RHNA targets proportional to the 'ation of the planning period, implement an alternative action program aimed at eting RHNA targets. This action may include implementation of the Workforce 'dinate with Cotati-Rohnert Park Unified School District to identify housing inities on underutilized District -owned lands for educator workforce housing other residential development, including but not limited to 133 units on the )-owned site in University District. Annual Active. Active. This is a strategy the City has successfully utilized in the past, and hopes to do Ongoing so again for Edgewood Apartments. Ongoing Active. See notes under HO-3.E(c) above. Ongoing Active. See notes under HO-3.E(e) above. Active. The City held a meeting to discuss the future downtown site (which includes 100+ units of affordable housing) in April 2023 with residents of Valley Village Mobile Home Park, which is located next to the site. Will continue outreach efforts to Ongoing, begin prior to RFP for each project, consistent neighbors and stakeholders of this and other city -owned inventory sites in the coming with schedule in HO 3.H Timeline tab years. Active. The City entered into long-term ground lease in 2022 for a Homekey-funded interim housing project on City -owned land, "Labath Landing." (This project pulled permits in the 6th RHNA cycle.) In 2023, the City declared its downtown site Exempt Surplus Land and set aside at least 25%of the overall housing units as affordable to lower -income households. The RFQfor the downtown site was released in November 2023, and staff hope to have a developer selected by Summer 2024. Staff plan to explore a land donation or long-term ground lease for the affordable housing project Ongoing, consistent with schedule of actions in HO 3.H site. Staff also plan to begin analysis work for an affordable housing project at the City - Timeline tab owned Roberts Lake Park & Ride site in 2024. Ongoing as sites are developed Active. Ongoing as sites are developed. Active. The City was awarded $14.6 million in Homekey funds to build the 60-unit non - congregate interim housing project on City -owned land in 2021. This project received final certificates of occupancy in 2023. In 2024, the City plans to apply for Prohousing Ongoing, consistent with schedule of actions in HO 3.H Incentive Program funds to provide gap financing for the affordable housing project at Timeline tab the future downtown site. By 2028 JNot started, will review production in 2028. In progress. City staff had initial meeting with Cotati-Rohnert Park Unified School Meet with CRPUSD staff and provide information on District staff in 2022 to discuss housing opportunities on district -owned lands. Staff development options by 2026 plan to follow up again within the next few years. In collaboration with the Napa Sonoma Collaborative and local nonprofit organizations, such as Generation Housing, the City will analyze policies and programs needed to meet HO-3.G Prohousing the threshold for the Prohousing Designation program. The City will complete a study Designation by July 2023 to determine which policies and programs may be required for the program and will present their findings and recommendations to the Planning Complete study by July 2023; Present recommendations Completed. The City submitted Prohousing Designation Program application in March Commission and City Council by the end of 2023. by end of 2023 2023. Application was approved and designation awarded in August 2023. a) Funding: The City will work with affordable housing developers to identify, leverage, and pursue local, state, and federal funding programs to maximize the number of affordable units available to low-, very low-, and extremely low-income households, whenever possible. Additionally, the City will continue to analyze the benefit ofjoining a Joint Powers Agreement (1PA), to allow the issuance of bonds in Rohnert Park for the Identify, leverage, and pursue funding opportunities as development of affordable housing and provide funding to the Homes for the Essential they arise, beginning in 2023, and at least annually Active. The City does this on an on -going basis. See description of some recent efforts Workforce Program (Program HO-3.D) throughout the planning period above under HO-3.F(d). b) Development Opportunities: The City currently actively participates in subregional housing planning efforts through the Napa Sonoma Collaborative and will continue this participation. This includes a regional mapping project that provides relevant development information and TCAC Opportunity Index Scores for available housing sites on the City's Sites Inventory. The City will continue their participation and will provide updated site information annually to allow developers easy identification of Active. The City participates in regular meetings and efforts led by the Napa Sonoma development opportunities, including opportunities for development of affordable Beginning in 2023, updated annually during preparation Collaborative, and will continue to provide updated site information annually to the housing, farmworker housing, and special needs housing. of the Annual Progress Report Collaborative to include in their regional mapping project. c) Small Lot Consolidation: To expand opportunities for affordable housing development By October 2023, the City will develop a list of sites HO-3.H Assist in the and enhance the financial viability of smaller sites, the City will encourage the where lot consolidation is feasible based on ownership, Development of Affordable consolidation of small parcels to accommodate larger -scale and higher density sales, and existing uses. Provide list to interested Housing developments that are compatible with existing neighborhoods. The City will also developers when requested, and review annually for facilitate lot consolidation for mixed -use developments by providing appropriate accuracy. Develop incentives for lot consolidation by In progress. Staff has identified sites that would benefit from small lot consolidation, assistance to developers to encourage negotiations between property owners. October 2024. and plans to finalize the list in 2024 and consider incentives for lot consolidation. (d) Farmworker Housing: The City will identify housing opportunities and support housing development for farmworkers identifying development opportunities (subprogram (b)), providing priority processing and incentives to farmworker housing projects coordinating with farmworker advocacy groups (Program HO-4.C: Culturally By October 2024, the City will develop and provide Appropriate Outreach and Marketing), developers of farmworker housing (Program HO- developers information about incentives for farmworker 2.6: Outreach to Developers). housing Not started, will be completed in 2024. (e)Special Needs & Extremely Low -Income Housing: The City will expand on its strong track record of supporting the development of housing affordable to extremely low- income households including permanent supportive housing, transitional housing, and low -barrier navigation centers through continued pursuit of Project Homekey and other funds as they are available. Additional programs supporting the development of extremely low-income housing include: Programs HO-2.8: Outreach to Developers, HO- 2.C: Zoning for a Variety of Housing Types, HO-3.F: Affordable Housing on Underutilized City Sites, HO-4.C: Culturally Appropriate Outreach and Marketing, and HO-4.D: Actions to Address Homelessness. As included in individual programs In progress. See status described within each program referenced. The City shall take measures to reduce the risk of displacement throughout the City, especially in areas of increased investment and development, through the following actions: Present information and data regarding Condominium Conversions and policy options to the Planning (a) Consider a Condominium Conversion ordinance to limit the loss of rental housing Commission and City Council in 2028. If directed, adopt stock. ordinance by December 2028 Not started, due in 2028. (b) Continue to promote programs for housing stability and eviction prevention. Active. City shares housing resources and programs for housing stability and eviction Prepare a directory of trusted community partners willing to promote these programs. prevention on the City's website and in City Hall. During COVID shut -down, the City Utilize these partnerships to share resources in a culturally sensitive manner and promoted a COVID-related rental assistance program through its website and social HO-4.A Anti -Displacement incorporate place -based outreach. Prepare list by 2023 media channels. Actions (c) When implementing Essential Housing Bond Financing Program, prioritize areas In progress. As it considers potential sites for this program, the City will prioritize sites identified as susceptible to displacement, as identified by the Assessment of Fair that are susceptible to displacement. (See also status described in Program HO-3.0 Housing. Present recommendation by July 2023 above.) (d) Study the need for and implications of enacting additional anti -displacement strategies, present findings and recommendations to the Planning Commission and City Council in 2024, and implement recommendations in 2025, which may result in an update to the City's existing rental housing ordinance. Topics to be considered may include but are not limited to anti -displacement strategies that address unfair evictions, excessive rent increases, substandard rental housing conditions, rental inspections, Present study of additional strategies in September harassment, or other strategies that reflect conditions unique to the City. 2024; Implement recommendation in September 2025 Not started, staff to present study to Council in 2024. The City shall take measures to provide and publicize information regarding fair housing programs, housing rights, and complaint procedures, including the following actions: (a) Post information regarding local, State, and Federal fair housing programs in public places, including City Hall, the Community Center, and the Senior Center, and on the City's Affordable Housing webpage. Include information about Fair Housing of Sonoma HO- Fair Housing County to ensure residents with housing complaints can connect to the appropriate Review posted information annually and update Information agencies and services. postings and website if needed Active. (b) Invite fair housing organizations, such as Sonoma County Legal Aid, to the annual housing fair (See Program HO-2.B) to share information and resources. Annual Not started, will begin in 2024. (c) Continue to maintain an inventory of existing affordable rental housing and Review inventory annually and update postings and affordable ownership opportunities and programs on the City website. website if needed Active. HO-4.0 Culturally Develop a program and process for affordable housing providers to conduct outreach to Appropriate Outreach and historically underrepresented populations, including people of color and farmworkers, Marketing when affordable housing programs are being marketed. By July 2023 Active. Staff developed and began implementing this program in 2023. Continue current City actions to address homelessness, including the following actions: Active. In fiscal year 2023/2024, the City is investing over $4 million in homeless (a) Invest funding in outreach services and housing programs, such as interim housing, services, including outreach, interim housing, and permanent supportive housing. City rapid rehousing, and permanent supportive housing. Utilize metrics -driven approach to staff closely monitor to ensure that all programs are performing according to their ensure programs are performing according to their agreement with the City. Ongoing, at least annually, beginning in 2023 agreements with the City. (b) Continue facilitation of the Rohnert Park Homelessness Roundtable on a regular basis. Monthly or as needed, beginning in January 2023 Active. City staff continue to faciliate the Homelessness Roundtable as needed. Active. In 2023, the City issued final certificates of occupancy for its 60-unit Homekey- HO-4.D Actions to Address (c) Support the construction, occupancy, and operation of local interim housing. Ongoing, at least annually, beginning in 2023 funded interim housing project, Labath Landing. Homelessness (d) Retain homeless services coordinator to manage and oversee City's homeless services program. Ongoing, at least annually, beginning in 2023 Active. (e) Support regional cooperation efforts to address homelessness, including providing technical assistance and support to City representatives serving on the Sonoma County Continuum of Care (CoC) Board and regularly attending and/or participating in CoC Active. The City maintains representation on the Sonoma County CoC Board and Board and subcommittee meetings. Quarterly, beginning Spring 2023 participates in subcommittee meetings. Present findings and/or make program (f) Explore additional innovative strategies and programs to better address and end recommendations to City Council annually, beginning in Active. Staff present findings and make recommendations regarding homeless service homelessness. 2024 programs to City Council at least annually. The City shall review its Inclusionary Housing Ordinance requirements for rental residential developments with the provisions of Government Code 65850.01 as HO-4.E Inclusionary Housing amended by AB 1505. If necessary, the City shall amend its Inclusionary Housing Ordinance Ordinance to promote fair housing opportunity and meet housing needs. The City will Review ordinance by December 2028; Recommend any consider a variety of provisions for its Inclusionary Housing Ordinance, including necessary amendments to Planning Commission and City allowances for alternative equivalents and units that are affordable by design. Council by December 2028 Not started, will review in 2028. The City shall continue to partner with the Sonoma County Community Development Commission (CDC) on housing rehabilitation programs for low -and moderate -income households, including the following actions: (a) Update and distribute information about the CDC's rehabilitation programs to individuals with disabilities, seniors and the elderly, and advocacy groups that represent HO-5.A Housing these special needs groups. Ongoing at least annually, beginning by December 2025 Not started, will review in 2025. (b) Provide and maintain information on rehabilitation programs, including the CDC Rehabilitation for Low -and Moderate -Income rehabilitation program, on the City's website. Ongoing, beginning in 2023 Active, this information is on the City's website. Households (c) Pursue grant opportunities to create a residential rehabilitation program for lower income residents. Work with the Community Development Commission to apply for HOME, CalHome, and CDBG funds, as well as promote Section 504 Home Repair In progress. City staff are in regular contact with staff at the Sonoma County Program loans and grants to provide housing rehabilitation loans and weatherization Review of grant funding opportunities annually, Community Development Commission about opportunities to apply to grant programs services for income -eligible households to improve living conditions beginning in 2023 to provide housing rehabilitation loans to income -eligible households. The City will continue to provide protections for mobile home parks and residents within them by implementing its existing Chapters 17.23 and 9.70 of its City Code: HO-5.13 Continuing Protections for Mobile • Its voter -approved Mobile Home Ordinance (Chapter 9.70; includes rent stabilization Home Parks tied to CPI, vacancy decontrol, and creation of a rent appeals board); and Ongoing, with any activity reporting in the APR Active. • Its Mobile Home Park Conversion Ordinance (Chapter 17.23), which prohibits the conversion of a mobile home park to another use unless certain findings are made Ongoing, with any activity reporting in the APR Active. The City will develop a mixed -use downtown with housing, retail and commercial space on a 30-acre City -owned parcel in the central Rohnert Park area, adjacent to the Sonoma-Marin Area Rail Transit (SMART) train station. This area, located at 6400 State Farm Dr, is known as "Station Center." Additionally, the City will continue its investment in bicycle and walking paths as well as a pedestrian/bicycle overcrossing of Highway 101, to connect the east to the west side of the city. This will increase the walkable amenities and resources in areas in the City with higher concentration of lower -income households including the Copeland Creek Corridor, Central and West Rohnert Park, as well as A and B Sections. Between 2023 and 2031, the City will undertake the following specific actions: Present findings and recommendations to Council by (a) Explore options to accelerate construction of major backbone infrastructure to July 2023, and begin to implement recommendations in In progress. Staff presented recommendations to City Council to accelerate facilitate development of a walkable mixed -use downtown area. the 2023-2024 Capital Improvement Program construction of major backbone infrastructure in 2023. (b) Consistent with the Exempt Surplus Land Act resolution adopted by the City Council on March 14, 2023, implement land donation or long-term ground lease in the Station Center area for development of housing, of which 25% shall be targeted as deed- In progress. Surplus Land Act resolution was adopted by the City Council on March 14, HO-5.0 Community restricted as affordable to lower -income households, through development of a 2023 and the RFQ was released on November 1, 2023. Of the total housing units built Revitalization comprehensive and competitive program to solicit request for proposals (RFPs), with an Adopt resolution in March 2023. Release RFP by January at the site, at least 25% will be deed -restricted as affordable to lower -income application publicly available on the City's website. 2025. households. In progress. City submitted letter of interest for IIG Catalytic grant in early 2023, nominated its downtown site for the ABAG Priority Sites Program in mid-2023 and (c) Pursue funding for infrastructure and affordable housing to support development of plans to apply for funds through the Prohousing Incentive Program to help promote project, including Infill Infrastructure Grant (IIG) funding. Ongoing, starting in 2023 the development of the 100+ unit affordable housing project in downtown. (d) Uphold equitable transit -oriented development (eTOD) best practices for the Station Center site, including but not limited to the pursuit of local match for affordable In progress. Staff included eTOD best practices in the RFQ for this site, which was housing subsidy, removal of barriers to development, and infrastructural improvements By January 2025, incorporated into the Station Center posted on November 1, 2023. Staff will continue to consider this as they pursue Ito serve transit and pedestrian access. JRFP loutside funding opportunities. The City's capital improvement plan was adopted in June 2023 along with the annual budget. The plan continues to prioritize investments in infrastructure in N F eT LI) �M1LIFARpti� ITEM NO. 8.G. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Developer Services Submitted By: Alicia Giudice, Director of Development Services Prepared By: Justin Brandt, Deputy City Engineer Agenda Title: Receive and Accept the Annual Development Agreement Review Report for Southeast Specific Plan, University District Specific Plan, Five Creek Planned Development, Station Avenue Planned Development and Redwood Crossing as required by California Government Code Section 65865.1 & Rohnert Park Municipal Code Section 17.21.050 RECOMMENDED ACTION: Receive and Accept the Annual Development Agreement Review Report for Southeast Specific Plan, University District Specific Plan, Five Creek Planned Development, and Redwood Crossing. BACKGROUND: California Government Code Section 65865.1 and Rohnert Park Municipal Code Section 17.21.050 require annual review of Development Agreements. This requirement is mirrored in Section 9.05 of the Development Agreements (DAs) for the Sonoma Mountain Village Planned Development, the Southeast Specific Plan, and the University District Specific Plan and Section 8.5 of the DA for the Five Creek Planned Development and Redwood Crossing. The annual review provisions require the developers to provide evidence of good faith compliance with the terms and conditions of their DA. This evidence is then evaluated by the City to confirm the developers' compliance with the terms of their DA. If, after its review, the City finds the developer has complied in good faith with the DA, the City may issue a Certificate of Compliance. If, after an annual review, the City finds that the developer has not complied with the DA, then various remedies may be considered up to and including termination of the DA. The Municipal Code and the various DAs differ slightly in their requirements for the annual review. Some designate the review responsibility to the City Manager and some designate it to the Director of Development Services. Some require the annual review report to be delivered to the Planning Commission and some require that it be delivered to the City Council. This annual review report is intended to be a comprehensive review — it has been prepared by the Development Services Department and reviewed by the City Manager. It will be delivered to the City Council with a copy to Planning Commission for its reference. ANALYSIS: Staff has conducted an independent review of each developer's compliance with its DA. At this time, the developers at the Southeast Specific Plan Area, University District, Five Creek, Redwood ITEM NO. 8.G. Crossing, and SOMO Village are actively pursuing their projects and are currently in compliance with their DAs. Southeast Specific Plan: The Southeast developer is currently in compliance with the terms of its DA as discussed below. The Southeast Specific Plan is located north of Valley House Drive, east of Bodway Parkway and west of Petaluma Hill Road. It has become known as the Willowglen neighborhood or W section. The Specific Plan Area includes 80 acres zoned for 477 dwelling units including rural estate and low, medium and high -density product, as outlined in Table 1. The development also includes 10,000 square feet of commercial space and a six -acre park. The DA originally became effective on January 13, 2010 and had a ten-year term. The term has been extended twice and the DA will expire on January 13, 2034. A summary of development to date is included in Table 1 below. Table 1— Residential Product Summary for Property Subject to the Southeast Specific Plan DA Phase Market Rate Affordable Total Status 1 103 4 107 Complete 2 113 16 129 Complete 3 98 8 106 under construction 4 76 0 76 in plan review Apartment Complex 0 36 36 Complete Townhomes 33 12 45 in plan review Total for Project 423 76 499 The developer (Penn Grove Mountain LLC) is completing its third phase of development, which consist of 378 housing units including 64 affordable units. The developer has completed the required Maurice Fredricks Park. The developer has paid fees totaling to $1,765,837.19 through December 31, 2023, including the regional traffic fee, the Valley House Drive mitigation fee and the additional services personnel fee as required by the DA. The developer established the required Community Facilities District to cover maintenance costs in 2015 and these special taxes are currently budgeted to cover services in this subdivision. On August 22, 2024, City Council authorized Ordinance 981, Amendment No.6, by and between the City of Rohnert Park and Penn Grove Mountain LLC and recorded on August 25, 2023, as Instrument No. 2023039521 in the Official Records of the County of Sonoma. Amendment No. 6 extended the Development Agreement for an additional ten years, and increased the number of units to 499 by adding 22 lots to Phase 4. The Amendment also increased the number of townhome units to be affordable by 4 units, and set a timeline for construction of the affordable units to ensure the affordable townhome units are constructed along with the end of Phase 4, added to require a park payment, and increased the affordability term of affordable units from 45 to 99 years. On October 19, 2023, improvement plans only for sewer and storm drain utilities were approved for construction. On 2 ITEM NO. 8.G. November 14, 2023, City Council authorized an Assignment and Assumption Agreement between Penn Grove Mountain LLC and South Fen Inc., transferring Phase 4 property to South Fen Inc., and recorded on November 21, 203, as Instrument No. 2023057395 in the Official Records of the County of Sonoma. No building permits have been issued for the fourth phase of this development. The commercial component of the project has not yet begun. Attachment la includes additional information provided by the developer. University District Specific Plan: The University District developer is in technical compliance with the terms of its DA. Staff is monitoring progress on required intersection improvements at the corner of Petaluma Hill Road and Rohner Park Expressweay and at the corner of Petaluma Hill Road and Keiser Avenue. Monitoring will continue to ensure continued compliance with the requirements for timing of construction. The University District Specific Plan is located south of Keiser Avenue, west of Petaluma Hill Road and east of Snyder Lane. The Specific Plan includes property north and south of Rohnert Park Expressway. It has become known as K and O sections. The property subject to the DA includes most but not all of the University District Specific Plan Area (notably the 42-unit Bristol Subdivision is not subject to the University District DA). The property subject to the DA includes 258.75 acres programed for 1,454 dwelling units including 218 affordable units, as outlined in Table 2. The development described in the DA also includes a maximum of 100,000 square feet of commercial space and 74 acres of parks and open space. The DA became effective on May 22, 2014 and will expire on May 22, 2024, unless the term is extended. The developer has submitted a request to extend the Development Agreement. This request is under review by City staff, and may be coming to City Council in the coming months. Table 2 — Residential Product Summary for Property Subject to the University District DA Phase Market Affordable Total Status Rate Vast Oak West 399 0 399 complete north of RPX and south of Hinebau h Creek Vast Oak East 428 0 428 fully permitted and (north of RPX and south of Hinebaugh Creek) completing construction Vast Oak North 206 0 206 under construction north of Hinebau h Creek and south of Keiser UDLLC 203 0 203 entitlements approved south of RPX Apartment Complex 0 218 218 complete Total for Project 1,236 218 1,454 The master developer in the University District (University District LLC) has been constructing the major infrastructure and then transferring approved lots to merchant builders for construction. Currently, Vast Oak West subdivision (399 single family homes) is complete and merchant builders are completing the Vast Oak East subdivision (428 single family homes). The required 218-unit affordable housing complex was completed in 2021 and is fully occupied. There is currently no active development activity on the UDLLC property or on the commercial phase of the project. ITEM NO. 8.G. Analysis of DA Compliance for Vast Oak (north of Rohnert Park Expressway). The master developer has made significant progress in satisfying the DA provisions associated with Vast Oak. The master developer has completed Twin Creeks Park and a second park, Griffin's Grove Park is near acceptance. The required pedestrian bridge over Hinebaugh Creek that links Vast Oak East to Vast Oak North is complete and warranty period ends onJune 23, 2024. The master developer has completed major offsite infrastructure including improvements to both Rohnert Park Expressway and Keiser Avenue, from Snyder Lane to Petaluma Hill Road. These improvements has been accepted by City Council. The master developer has also completed its obligation to fund the construction of a portion of the Eastside Trunk Sewer and Water Tank 8, both of which are complete. The master developer has completed its obligation to fund a monument sign and a regional traffic fee study. The master developer has dedicated property to allow a connection to and expansion of Crane Creek Regional Park. The master developer and merchant builders are current on all fee payments including regional traffic fees and maintenance annuity fees. The outstanding offsite infrastructure necessary to support the full development of Vast Oak includes completion of improvements to the intersections of Rohnert Park Expressway at Petaluma Hill Road and Keiser Avenue at Petaluma Hill Road. Both of these intersections are under the jurisdiction of the County of Sonoma. The master developer has completed the installation of traffic lights, road markings, and most of the traffic loops at the intersection of Rohnert Park Expressway and Petaluma Hill Road. The remaining work includes the installation of traffic loops in the eastbound direction on Rohnert Park Expressway. These traffic loops will serve as traffic counts. The master developer has obtained the necessary right of way at the intersection of Keiser Avenue and Petaluma Hill Road and has approved plans from the County of Sonoma. Construction of this intersection is expected mid- year. In March of 2022, the City Council approved the form of Improvement Agreements for both of these intersections and the master developer posted bonds to guarantee completion. These actions were taken to secure the developer's commitment to complete the work as required under the Development Agreement. Analysis ofDA Compliance for UDLLC (south of Rohnert Park Expressway). The University District DA also covers the property south of Rohnert Park Expressway, which is currently being used as a temporary detention basin, but is entitled for 203 units. There is an option for the detention basin to be relocated to the east side of Petaluma Hill Road within the Development Agreement, if feasible. Otherwise, the basin is required to stay for flood mitigation on the UD LLC property. Attachment lb includes additional information provided by the University District developer. Five Creek Planned Development: The developer of the Five Creek Planned Development Area is in compliance with the terms of its DA and staff anticipates that all obligations of the DA will be completed by the end of 2024. The Five Creek Planned Development Area includes approximately 15 acres located east of Labath Avenue, west of Dowdell Avenue, south of Carlson Avenue and north of Hinebaugh Creek. The project covered by the DA includes a hotel, a small park and 209 dwelling units with the affordability profile outlined in Table 3. The DA originally became effective on February 24, 2017, was amended in 2020, and expired in 2023. .19 ITEM NO. 8.G. Table 3 — Summary of Residential Property Approved Under the Five Creek DA Phase Market Rate Affordable Total Status Adega Apartments Phase 1 135 0 135 complete Adega Apartments Phase 2 66 8 74 under construction Total for Project 201 8 209 The original developer. Stadium RP Development Partners LLC purchased greenhouse gas emission credits and made reimbursements, and affordable housing contributions as required by the DA. The original developer assigned the obligations related to the construction of a hotel to Pacific Hospitality (developer of the Cambria hotel). These obligations, including the construction of Martin Avenue, installation of offsite utilities and development of the hotel are complete. The original developer assigned the obligations related to the construction of the first phase of the Adega apartments to Rohnert Park 668. These obligations including the formation of a Community Facilities District to fund services and the construction of Carlson Avenue, Martin Avenue and the public park are complete. The original developer assigned the obligations of the first amendment to the DA to USA Properties Fund Inc. in 2021. The $200,000 valuation adjustment payment required by the first amendment to the DA was made in 2021. USA Properties Fund Inc. has executed an affordable housing agreement with the City ensuring that 8 units will be restricted to residents earning no more than 120% of area median income. USA Properties Fund, Inc. has paid the required park contribution. Staff is working with USA Properties Fund, Inc. to finalize the annexation to the Westside CFD. This is the remaining obligation under the DA, and remains enforceable as a condition of approval of the site plan and architectural review and conditional use permit for this project. Construction of Phase 2 should be completed this year. Attachment 1 c includes additional information provided by the developer. Redwood Crossing: The developer of the Redwood Crossing Project is in compliance with the terms of its DA. The Redwood Crossing project was initially approved as rezoning to allow up to 135 multifamily units on a 6.5-acre parcel located at the southeast corner of Business Park Drive and Dowdell Avenue. On November 27, 2018, the City approved a Development Agreement with Redwood Crossings RP, LLC, and Sonoma Media Investments, LLC covering this project. The DA became effective on December 27, 2018, has a 10-year term and will expire in 2028. The Redwood Crossing developer submitted a planning application for a site plan and architectural review for a 105-unit townhome style project, which was approved by the Planning Commission on May 26, 2022. Staff will be working with the applicant through the building permit process to implement the terms of the DA which include, restricting 10% of the units for housing affordable to residents making up to 120% of area median income, making a park contribution and annexing to the 5 ITEM NO. 8.G. Westside Community Services District. Currently, the developer is in the process of addressing environmental compliance. Attachment 1 d includes additional information provided by the developer. SOMO Planned Development: The developer of SOMO Village is in compliance with the terms of its DA. The SOMO Planned Development (SOMO) is located in southeast Rohnert Park, south of Camino Colegio, west of Bodway Parkway and east of the SMART tracks. The planned development area includes 175 acres. It was originally approved in 2010 and in 2021, the City Council approved revised entitlements for the project to include up to 823,000 square feet of commercial, office, retail and industrial use, over 38 acres of parks and open space and 1,750 dwelling units with the affordability mix and expected phasing outlined in Table 4. The re -entitlements included an Amended and Restated Development Agreement which became effective May 28, 2021. The DA has a term of 15 years and will expire in 2036. Table 4 — Residential Product Summary for Property Subject to the SOMO DA Phase Market Rate Affordable Total Status Phase 1 North 269 20 289 Phase 1 N-A consists of 116 single-family homes (under construction) and 32 townhome units (in plan check) Phase 2 North 129 84 213 Phase 1 South 279 100 379 Phase 2 South 179 16 195 Phase 3 South 239 16 255 Phase 3 North 401 18 419 Total for Project 1,496 254 1,750 The developer, SOMO Village LLC, has initiated its first phase of development, which is a portion of its approved Phase 1 North, located generally east of Mitchell Drive and north of Waterside Lane. The sewer, water and storm drain systems were constructed and accepted by City Council on January 9, 2024. The development includes 116 single family lots and 32 townhomes, which have been approved by the SOMO Village Design Review Board. SOMO Village LLC assigned all 116 single family lots to Century Communities. SOMO Village LLC plans to begin construction of the 32 townhomes in 2024. As required by the DA, the developer has dedicated a fire station site and a public access easement over SOMO Green (adjacent to Credo High School) to City and has acquired the Bodway Parkway right-of-way from the City. On December 13, 2022, City Council authorized the formation of the required Community Facilities District per the DA agreement and approved the Phase IN -A final map includes the dedication of a 0.4-acre park to serve the first phase of development. Attachment le includes additional information about the SOMO Village project provided by the developer. 2 ITEM NO. 8.G. STRATEGIC PLAN AND COUNCIL PRIORITY ALIGNMENT: This action is consistent with Strategic Plan Goal D — Continue to Develop a Vibrant Community. It is also consistent with the Council's priority of housing for all. The Annual Report on the Development Agreements is an important part of implementing the terms of these agreements. OPTIONS CONSIDERED: None. Receiving this report is required by the Municipal Code and the various Development Agreements. FISCAL IMPACT/FUNDING SOURCE: There is no fiscal impact associated with receiving this Annual Report. Costs associated with implementing the various Development Agreements, including the cost of reporting, are covered by the Reimbursement Agreements that the City has with each developer. Code Compliance Approval Date: NA Department Head Approval Date: 2/27/24 Finance Approval Date: NA Human Resources Approval Date: NA City Attorney Approval Date: NA City Manager Approval Date: 3/4/2024 Attachments: 1. Additional information provided by the various developers a. Southeast Specific Plan Information b. University District Information c. Five Creek PD Information d. Redwood Crossings Information e. SOMO Village Information 7 WC WILLOWGLEN February 9th, 2024 To: Justin Brandt. P.E. City of Rohnert Park Community Development Services 130 Avram Avenue, Rohnert Park, CA 94928 Re: 2024 Annual Review of Southeast Specific Plan Mr. Brandt, This report is being submitted per the request of the City of Rohnert Park by Penn Grove Mountain LLC. This report is in reference to the Development Agreement for the Southeast Specific Plan. dated December 7, 2010 between the City of Rohnert Park and Penn Grove Mountain LLC. We are pleased to report continued progress on the Southeast Rohnert Park project over the past year. Willowglen has completed construction of all homes in Phase3 with the exception of Lot 19 which is 80% complete. Only 2 homes remain available for purchase in the community. In 2023, $869,350.45 was paid in pulling the last 17 permits for Phase 3 housing. The final Phase 3 home construction permit was pulled in June of 2023. Housing Land Trust sold the remaining affordable owner -occupied single-family homes in Phase 3 in July of 2023 Penngrove Mountain LLC, in working with the City staff was able to gain approval of the Phase 4 tentative map. Phase 4, assigned to South Fen Inc. site improvements began in late September, 2023 but progress has been delayed by weather conditions. The master plan submittal for the single-family homes in Phase 4 has been submitted and is in the plan review process. All plans have been designed as all electric homes. Respeg&JO Fantasia Stensland Willowglen Homes (707) 473-8620 office / P.O. Box 2357, Healdsburg CA 95448 / www.willowglenhomes.us Brookfield besidential February 12, 2024 12657 Alcosta Boulevard, Suite 250 Tel: 925.743.8000 San Ramon, CA 94583 Fax: 925.743.8050 www.brookfieldhomes.com Ms. Alicia Giudice, Development Services Manager Mr. Justin Brandt, PE, Deputy City Engineer City of Rohnert Park 130 Avram Avenue Rohnert Park, CA 94928 - 2486 RE: Amended and Restated Development Agreement including the First and Second Amendments ("DA" ), between City of Rohnert Park ("City"), University District LLC ("UD LLC"), and Vast Oak Properties, L.P. ("VOP") DA Annual Review Compliance Update Dear Ms. Giudice and Mr. Brandt, Attached please find the UD LLC 2023 DA Annual Review Compliance, which includes the Entitlement, Land Development, and Housing Construction / Sales / Closings status. The University District Project remains in compliance with the requirements of the subject Development Agreement and has recently requested Extension of the Agreement in compliance with the applicable terms. Please let me know if you have any questions or comments regarding this submittal. Thank you. Sincerely, Lisa M. Borba AICP University District LLC DA 2023 ANNUAL REVIEW COMPLIANCE I. Entitlement, DA, Agency Processing and Mapping, Permits, Security, and Agreements a. Affordable Apartments: i. Project complete. All units completed and received Certificates of Occupancy in 2021. b. Project Improvement Agreements ("PIA"), Surety Bonds and UD LLC Funding: Executed and posted (including grading, wet, dry, surface and landscape): i. VO West FM 1 — A through 1 — D. 399 lots, Basin, Trail, and Park. Grading, Wet / Dry Utilities and Park bonds released, PIA released, and improvements accepted by City in 2020-21. Complete, all Bonds released by City. ii. VO East FM 2 — A through 2 — F. 428 lots, Trail and Mixed — Use Site. Grading, Wet / Dry Utilities and Trail PIA completion. Wet Utility Bond release complete. Dry Utility, Surface and Trail improvements acceptance by City in process (stalled with weather). PIA Release and Transition to Warranty anticipated in Q2 2024. iii. VO North FM 3-A. 86 lots and Bike Path. Grading, Wet / Dry Utilities / Surface and Trail PIA completed. Bike Path landscaping installed in 2022 in conjunction with Pedestrian Bridge. Wet Utilities Accepted/PIA released and transitioned to Warranty in 2022. Warranty Release scheduled March 2024. Surface and Trail transition to Warranty anticipated Q4 2024. iv. VO North FM 3-B. 120 lots and Bike Path. Grading, Wet / Dry Utilities / Surface and Trail PIA completed. Bike Path landscaping installed in 2022 in conjunction with Pedestrian Bridge. Wet Utilities Accepted/PIA released and transitioned to Warranty in 2022. Warranty Release scheduled March 2024. Surface and Trail transition to Warranty anticipated Q42024. v. Griffin's Grove Park. 1. Grading / Electrical / Concrete PIA completed. Construction completed in 2022. Punchlist items stalled by weather. PIA Release and Transition to Warranty anticipated Q22024. 2. Gazebo installed and Building Permit completed in 2022. vi. Water Tank and Dedication and Petaluma Hill Road ("PHR"): 1. Dedication conveyed, funding provided, and PHR utility improvements completed. 2. Bonds and PIA released, and Water Tank completed in 2020. vii. North Kerry Road Vehicular Bridge. Construction per PIA completed, bonds released and City accepted in 2020. viii. North Kerry Road. Construction completed, PIA Released and transition to Warranty February 2023. Warranty Release scheduled forMarch 7, 2024. ix. Keiser Avenue: 1. East of Kerry Road. Construction completed by UD LLC. PIA Released, transitioned to Warranty March 2023. Warranty Release scheduled for March 7, 2024 2. West of Kerry Road. Construction completed by UD LLC. PIA Released, transitioned to Warranty March 2023. Warranty Release scheduled for March 7, 2024 x. Rohnert Park Expressway 1. RPX Phase 1— North Snyder to Petaluma Hills Road construction completed by UD LLC. PIA completed, City Accepted and Bond Released in 2020. 2. RPX Phase 2 — South Snyder to Petaluma Hills Road construction completed by UD LLC. PIA completed, City Accepted and Bond Released in 2020. xi. Hinebaugh Creek Pedestrian Bridge. 1. Grading and Abutment Construction complete in 2022. Transition ownership/maintenance to HOA March 1st 2023. PIA Released and transitioned to Warranty July 2023. Warranty Release scheduled for Q3 2024. 2. Bridge installed and building permit completed in 2022. xii. Petaluma Hill Road / Rohnert Park Expressway. a. Phase 1 completed. City Accepted and Bond Released. b. Phase 2 signal relocation and intersection work complete August 2023, with only count loops remaining. City PIA Release and transition to County Warranty anticipated Q2 2024. xiii. Petaluma Hill Road / Keiser Avenue Intersection. a. County approved Intersection and Signal Improvements plans November 2023. Signal components in fabrication with anticipated onsite delivery Spring 2024. PIA Bond posted with City March 2022, and construction anticipated Spring 2024. c. SUMMARY: Civil Improvement Plans (Grading, Wet Utilities and Surface), Dry Utilities, and Final Map (FM") Processing: i. APPROVED: 1. VO West — Imp. Plans and FM 1— A through 1— D. 2. VO East — Imp. Plans and FM 2 — A through 2 — F. 3. Kerry Road, Keiser (East) and Hinebaugh Creek V. Bridge. 4. VO North — Imp. Plans and FM 3 — A and Backbone. 5. VO North — 3 - B Imp. Plans and FM. 6. Hinebaugh Creek Pedestrian Bridge. 7. PHR intersection at RPX Phase 1 & 2 8. PHR intersection at Keiser Avenue. ii. In design / plan check process or pending: 1. None. d. APPROVED Landscape and Bike Trail Improvement Processing: i. Approved: 1. VO West and VO East Backbone, Parkways, Residential, Basin, Twin Creeks Park, Trails, and Rohnert Park Expressway — Phases 1 & 2. 2. Griffin's Grove Park DAP, Grading and Electrical Plans. 3. VO North — Phase 3A Parkway Improvement Plans. 4. VO North — Phase 3B Parkway Improvement Plans 5. Hinebaugh Creek Pedestrian Bridge 6. Griffin's Grove Park Gazebo ii. In design / plan check process or pending: 1. None II. Land Development: a. SUMMARY Improvements completed and accepted by City / Association: i. Twin Creeks Park, RPX, and VO West Wet / Dry Utilities and Basin. ii. Kerry Road Bridge and Road from Hinebaugh Creek to Keiser Avenue. iii. VO West Hinebaugh Creek Bike Trail. iv. VO East Hinebaugh Creek Bike Trail. v. VO East Backbone and FM 2 — A through 2 — F - Wet / Dry Utilities. vi. VO North Grading, Wet Utilities vii. Keiser Avenue (Kerry Road to Petaluma Hill Road) — Wet / Dry Utilities. viii. Keiser Avenue (West of Kerry Road) — improvements by City — complete 2021. b. Improvements completed and in process of City / Association acceptance: i. VO North 3 — A - Dry Utilities and Surface improvements. ii. VO North 3-B — Dry Utilities and Surface improvements iii. VO North 3A & B — Bike Trail Landscaping iv. VO East Trail Berm v. Hinebaugh Creek Pedestrian Bridge vi. Griffin's Grove Park. vii. Petaluma Hill Road intersection at RPX Phase 2. 4 Improvements in process with future installation: viii. Petaluma Hill Road intersection at Keiser Avenue. ix. UD LLC - 203 residential lots and Copeland Creek Pedestrian Bridge pending Regional Detention Basin development. III. Housing Construction / Sales / Closings / Association: a. VO West has 399 lots within three residential neighborhoods. i. Builders purchased all 399 lots and completed all housing construction. ii. 399 homes sold to date and 399 closed to date. b. VO East has 428 lots within four residential neighborhoods. i. Builders purchased all 428 lots and completed all housing construction. ii. 428 homes sold to date and 425 closed to date. c. VO North has 206 lots within three residential neighborhoods. i. Builders own 206 lots. Housing construction commenced in 2021. ii. 178 homes sold to date and 140 closed to date d. Total VO has 1,033 lots. i. Builders own 1,033 lots out of 1,033 lots. ii. 1,005 homes sold to date and 967 closed to date. e. UD LLC Property has 203 lots within one residential neighborhood. i. Land Development will commence upon completion of Regional Detention Basin. No lots sold to date. ii. 0 homes sold to date and 0 closed to date. f. University District Detached Homes Association ("UD Association") operational. IV. Mixed - Use Site: a. Status Update approved by March 23, 2021 City Council. i. No active PSA on property at present time. Anticipate Proposed Use would ultimately process own entitlements and DAP 1 through City. DA EXHIBIT C - 1 Pedestrian Bridges (Section 4.08 C): Pedestrian Bridge at Hinebaueh Creek (Connectine Vast Oak ("VO") East & VO North). Bond prior to VO North Final Map with 100th market — rate ("MR") unit. Commence construction prior to 100th VO North MR Building Permit (`BP"). Complete construction prior to 150th VO North MRBP or 12 months after. Status: Construction completed, and acceptance in progress. DA satisfied. Pedestrian Bridge at Copeland Creek (Connecting UD LLC & RC High School). Bond prior to 1"t UD LLC Final Map. Commence construction prior to 100th MR UD LLC BP. Complete construction within 12 months of construction commencement. Bond and Offer of Dedication with 1"t UD LLC Final Map. Status: Design and permit not required to be commenced yet. Roadway Improvements (Section 4.09): Rohnert Park Expressway ("RP)C") (Section 4.09A): Phase 1, North (Snyder Lane to Petaluma Hill Road ("PHR")). Bond prior with the Final Map that creates the 800th MRBP. Commence construction prior to 25th MRBP. Complete construction within 12 months after commencement or 18 months if commenced during rain, and provide connections to interior streets prior to CO. Status: Construction and acceptance completed. DA satisfied. Phase 2, South (Snyder Lane to PHR). Bond prior to Final Map that creates 800th MRBP. Commence construction prior to 800th MRBP. Complete construction within 12 months after commencement of construction or 18 months if commenced during rainy season. Status: Construction and acceptance completed. DA satisfied. Section 4.09 B: Keiser Avenue: Phase 1 (Snyder to West Side of Griffin's Grove Park). Bond prior to 1st VO North Final Map. Commence construction prior to 1st VO North MRBP. Complete construction within 12 months after commencement of construction or prior to occupancy of any MR unit in VO North. Status: ROW funding and construction completed. Construction east of Kerry Road completed. DA satisfied. Phase 2 (West Side of Grifiin's Grove Park to PHR). Bond prior to Final Map that creates 100th VO North MRBP. Commence construction prior to 100th VO North MRBP or upon completion of Keiser Phase 1. Complete construction within 12 months of commencement of construction. Status: In Compliance. ROW funding and construction completed. Construction east of Kerry Road completed. PIA and Bonding for intersection improvements secured March 2022. County approval of Improvement Plans was severely delayed byprocessing, but ultimately secured November2023, Signal in fabrication and construction anticipated in Spring2024. In conformance with DA. C.1 Section 4.09 C: Vehicular Bridge / Public Roadway Vehicle Bridge at Hinebaugh Creek (Amend to Kerry Road from Twin Creeks Drive). Bond prior to 1st VO North Final Map. Commence construction prior to 1st VO North MRBP. Complete construction within 12 months after commencement of construction or prior to occupancy of any MR unit in VO North. Status: Construction completed. City acceptance in 2020. DA satisfied. Kerry Road Extension from Hinebaugh Creek to Keiser Avenue. Bond prior to 1st VO North Final Map. Commence construction prior to 1st VO North MRBP. Complete construction within 12 months after commencement or prior to any MR VO North CO. Status: Construction completed. City acceptance in 2020. DA satisfied. Section 4.10: Potable Water Tank ("Tank") and 128 Acre Land Dedication: Water Tank 128 acre Property Land Dedication, Bonding and Construction. Dedication and Close Escrow by December 31, 2016. Bond with Final Map that creates 2001h MR single — family lot. Status: Dedicated, Closed, and Funding completed. DA satisfied. Section 4.11: Parks: Twin Creeks Park: Dedication. On 1st Final Map Sheet Graded and Stubbed Utilities: Bond on 1st Final Map. Commence construction prior to 50th MRBP. Complete construction prior to 100th MRBP. Improvement: Bond on Final Map that creates 100th MRBP. Commence construction prior to 100th MRBP. Complete construction within 12 months of construction commencement. Status: Dedicated, Improved and City accepted. DA satisfied. Griffin's Grove Park: Dedication. On 1st VO North Final Map Perimeter Road: Bond on 1st VO North Final Map. Commence construction prior to 50th VO North MRBP. Complete construction prior to 100th VO North MRBP. Improvement: 7 Bond on Final Map that creates 1001h VO North MRBP. Commence construction prior to 100th VO North MRBP. Complete construction prior to 150th VO North MRBP. Status: Dedicated, Improved in 2022. City Acceptance in Progress. In conformance with DA. EXHIBIT D — 1 II. AFFORDABLE APARTMENT COMPLEX: A. Obligation to Construct:(1) through (5): In compliance. B. Affordability: In compliance. C. Affordable Housing Agreement: (1) through (8): In compliance. D. Quality / Standards: In compliance. E. Marketing / Implementation: (1) through (3): In compliance. III. In — Lieu Fees: In compliance. IV. Compliance Monitoring: In compliance. V. Developer's Obligation: In compliance. VI. Priority: In compliance. VII. Adjustment: A. General: In compliance. B. Potential Reduction in Affordable Units: Subject to UD LLC Property units. E PROPERTIES FUND February 06, 2024 Alicia Guidice Director of Development Services City of Rohnert Park 130 Avram Avenue Rohnert Park, CA 94928 Re: Annual Review of Development Agreement for Stadium RP Development Agreement Dear Ms.Guidices, April 21, 2021, USA Properties Fund Inc. took a partial assignment and assumption of the Stadium RP Development Agreement. Prior to this assignment, Stadium Development Partners, LLC assigned certain rights and obligations under the Development Agreement separately to Pacific Hospitality Sonoma. LLC (Hotel Assignment) and Rohnert Park 668, L.P. (Phase 1 Residential Assignment). The Development Agreement obligations pertinent to those two assignments have been satisfied. The remaining obligations are those outlined for the Residential Phase 2 Project in the Stadium RP First Amendment to Development Agreement entered as of March 16, 2020, and recorded June 22, 2020. The status of those obligations is as follows: Section 6.5 (a) — Public Service Payments — the contemplated public service payments shall begin upon completing construction of the units. Section 6.7 — Residential Phase Two Park Contribution — The Residential Phase Two Park Contribution of $77,774.70 (after Park Fee Credit was applied) was paid at the time of building permit issuance in March 2022. Section 6.8 — Residential Phase Two Affordable Housing — An Affordable Housing Agreement codifying the affordable housing obligations in the Stadium RP First Amendment to Development Agreement was executed with City of Rohnert Park March 14, 2022, and recorded April 1, 2022. Section 6.9 — Valuation Adjustment Payment — this payment has been made. Rounding out this summary, we are pleased to report that construction of the Residential Phase Two Project continues and is scheduled for completion and final certificate of occupancy by Q2 2024. Very truly yours, USA Properties Fund Milo Terzich, P.E. Vice President ]�edvvooc� Crossings RP, lL�.0 February 1, 2024 City of Rohnert Park Community Development Department 130 Avram Ave, 2nd Floor Rohnert Park, CA 94928 RE: Development Agreement — Annual Review — Redwood Crossings To Mr. Brandt, This letter is to provide the city of Rohnert Park with an update on our development Redwood Crossings per the Development Agreement, Section 8.5 — Periodic Review. We are currently in the Building Permit Stage of the approvals with the City of Rohnert Park. We just submitted our fifth submittal to comments for the building permit. We are still dealing with CTS and state agencies on finalizing permits and requirements. The state has come back with new items we are disputing. We can't proceed with construction until these are resolved. Please let us know what else you need if anything for the DA Periodic Annual Review letter. Thank you. Chris Scerri Manager Redwood Crossings RP, LLC 855 Lakeville Street, Suite 200 Petaluma, CA 94952 Office — 707.206.4041 Cell — 415.994.3118 Email — chris@absconstruct.com s Corporate Office 0 85S Lakeville St. Suite 200 a Petaluma, CA 94952 Main (707) 206-4044 e Fax (707) 206-4051 L�J � February 2, 2024 City of Rohnert Park Community Development Services 130 Avram Avenue Rohnert Park, CA 94928 RE: 2024 Periodic Review of the SOMO Village Development Agreement Dear City Staff, Please accept this report as sufficient evidence that Developer ("SOMO") has demonstrated good faith compliance with the provisions of its Development Agreement ("DA") Public Improvements In connection with Phase 1 NA, SOMO completed underground public improvements and all of the surface improvements except for the landscaping in the public right-of-way, which will be completed as the adjacent homes are constructed. Land Development SOMO completed its Phase 1 NA residential land development in 2023. New Home Construction SOMO's sold 116 lots to Century Communities ("CC") and the public builder began building homes in January 2024. In connection with the sale to CC, SOMO made a partial assignment of the DA to CC specific to the lots transferred. SOMO plans to begin construction of 32 townhomes in Phase 1 NA in the Spring of 2024. Other Related Matters CC&Rs — SOMO submitted its latest and expected final submittal to the Department of Real Estate on January 22, 2024. CFD — SOMO has been working with the City's team on the Phase 1 NA CFD and expects to issue bonds in March 2024. In conclusion, SOMO looks forward to seeing homes being built and residences moving in, in 2024. Respectfully, Eric Reid, CFO PO BOX 7087. COTATI. CA 94931 P. 707 795 3550 N F eT LI) �M1LIFARpti� ITEM NO. 8.H. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Development Services Submitted By: Alicia Guidice, Director of Development Prepared By: Justin Brandt, Deputy City Engineer Agenda Title: Adopt a Resolution Authorizing and Approving an Impact Fee Credit Agreement with SOMO Village, LLC for the Camino Colegio Impact Fee Required by the Amended and Restated Development Agreement (CEQA Status: Consistent with the Supplemental EIR Adopted on March 9, 2021) RECOMMENDED ACTION: Adopt a Resolution authorizing and approving an Impact Fee Credit Agreement with SOMO Village, LLC for the Camino Colegio Impact Fee Required by the Amended and Restated Development Agreement (CEQA Status: Consistent with the Supplemental EIR adopted on March 9, 2021) BACKGROUND: SOMO Village is a large planned development area, which includes over 1,750 new residential dwelling units. SOMO Village is located east of the SMART railroads, south of Camino Colegio, west of Petaluma Hill Road, and north of Railroad Avenue (Attachment 1). Development of this area was originally approved in 2010 and modified and amended in 2021. On March 23, 2021, City Council authorized Ordinance 953, Amended and Restated Development Agreement (Development Agreement) by and between the City of Rohnert Park (City) and SOMO Village, LLC (Developer) and recorded on June 15, 2021. Section 4.08(D) of the Development Agreement requires the developer to pay an impact fee in the amount of One Million Seven Hundred and Eleven Thousand Three Hundred Sixty -One Dollars ($1,711,361), with increases based on CPI, to be paid in two installments ("Camino Colegio Impact Fee") for the purpose of funding public improvements for Camino Colegio. The first installment is due at the issuance of the building permit that includes the 1,000th residential unit. The second installment is due at the issuance of the building permits that includes the 1,327th residential unit. Since recordation of the Development Agreement, the applicant has made and paid for $129,019.14 worth of unanticipated improvements along Camino Colegio. Therefore, staff requests a fee credit against the Camino Colegio Impact Fee in the amount of $129,019.14, prior to fee escalation in April 2024. The Camino Colegio Impact Fee can be paid at any time during the course of the project. ANALYSIS: On July 8, 2022, the City Engineer approved SOMO Village Phase IN -A, SOMO Village Planned Development, Rohnert Park, California, June 2022, WDID #149C393412, prepared by Civil Design Consultants Inc., 66 sheets. On January 26, 2023, a Public Improvement Agreement by and between the City of Rohnert Park and SOMO Village, LLC for Phase IN -A in -Tract Surface and Dry Utilities 4856-6451-3960 v1 ITEM NO. 8.1-1. Improvements was recorded as Instrument No. 2023003409 in the Official Records of the County of Sonoma. In the summer of 2023, the Developer began repairing Camino Colegio according to the approved plans. During the course of demolition, there were unforeseen conditions. These unforeseen conditions included deficiencies in the subsurface road structure. These unforeseen road conditions resulted in additional work and additional unexpected cost to the developer of $129,019.14 to repair the road to the necessary road condition. The costs included additional asphalt removal and replacement, irrigation lines, and striping. These improvements were necessary to return the road to the necessary condition and maintain City infrastructure. City staff has reviewed the documentation provided by the developer to ensure all costs were included and paid appropriately per Public Contract Code, which includes verification of prevailing wage and time & materials. City staff has verified the developer has paid the additional unexpected cost $129,019.14 for the completed improvements and therefore is entitled to a credit in that amount against the Camino Colegio Impact Fee. In order to formalize this impact fee credit, the City and the developer must enter into an Impact Fee Credit Agreement (Attachment 2). Staff is recommending that the City Council authorize the City Manager to execute this agreement with the developer. ENVIRONMENTAL ANALYSIS: On August 20, 2010, City Council approved the Environmental Impact Report for the Sonoma Mountain Planned Development by Resolution 2010-101. On March 9, 2021, City Council approved the Supplemental Environmental Impact Report by Resolution 2021-028. The mitigation measures adopted with the original and supplemental Environmental Impact Reports are being monitored by City staff and included in construction conditions as appropriate. Execution of an Impact Fee Credit Agreement does not trigger the need for additional environmental analysis. STRATEGIC PLAN AND COUNCIL PRIORITIES ALIGNMENT: The recommended action is consistent Strategic Plan Goal D — Continue to Develop a Vibrant Community. OPTIONS CONSIDERED: None. The recommended action is consistent with the Development Agreement and necessary to complete the project. FISCAL IMPACT/FUNDING SOURCE: The proposed action will have no direct fiscal impact on the City. The first installment of the Camino Colegio Impact Fee will be reduced by $129,019.14, prior to fee escalation in April 2024. The Developer will be making the remainder of the Impact Fee payments at later dates. Department Head Approval Date: 2/13/2024 Finance Approval Date: 2/22/2024 City Attorney Approval Date: 2/23/2024 City Manager Approval Date: 3/4/2024 Attachments: 1. Vicinity Map 4856-6451-3960 v1 2 ITEM NO. 8.1-1. 2. Resolution Authorizing and Approving an Impact Fee Credit Agreement with SOMO Village, LLC for the Camino Colegio Impact Fee Required by the Amended and Restated Development Agreement a. Exhibit A: Impact Fee Credit Agreement by and between the City of Rohnert Park and SOMO Village, LLC 4856-6451-3960 v1 Figure 1— Phase 1N-A Location Map � a Limits of Phase 1N-A x.. w, —I - ?tm" V. ■ �vgrlM� +WxHdA + Liam IN ?how 7ft Am" + wrSk*in Aw" Ak P4+RkI•M 157 + Pp,�CP'Y FtKvwf 3S. • 24k "Mpg X ■ RESOLUTION NO.2024-015 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING AND APPROVING AN IMPACT FEE CREDIT AGREEMENT WITH SOMO VILLAGE, LLC FOR THE CAMINO COLEGIO IMPACT FEE REQUIRED BY THE AMENDED AND RESTATED DEVELOPMENT AGREEMENT WHEREAS, on August 10, 2010, the City Council of the City of Rohnert Park adopted Resolution No. 2010-101 approving the Final Environmental Impact Report for the Sonoma Mountain Planned Development; and WHEREAS, on March 9, 2021, the City Council of the City of Rohnert Park adopted Resolution No. 2021-028 approving the Supplemental Environmental Impact Report for the Sonoma Mountain Planned Development; and WHEREAS, on March 23, 2021, the City Council of the City of Rohnert Park adopted Ordinance 953 approving the Amended and Restated Development Agreement (Development Agreement) between the City of Rohnert Park (City) and SOMO Village, LLC (Developer); and WHEREAS, Section 4.08(B) of the Development Agreement requires the Developer to pay impact fees throughout the course of the project, including an impact fee in the amount of One Million Seven Hundred and Eleven Thousand Three Hundred Sixty -One Dollars ($1,711,361), with CPI adjustment, towards Camino Colegio to be paid in two installments ("Camino Colegio Impact Fee"); and WHERAS, on July 8, 2022, the City Engineer approved SOMO Village Phase IN -A, SOMO Village Planned Development, Rohnert Park, California, June 202Z WDID #149C393412, prepared by Civil Design Consultants Inc., 66 sheets; and WHEREAS, On January 26, 2023, a Public Improvement Agreement by and between the City of Rohnert Park and SOMO Village, LLC for Phase IN -A in -Tract Surface and Dry Utilities Improvements was recorder as Instrument No. 2023003409 in the Official Records of the County of Sonoma; and WHEREAS, during the course of improvements there were unforeseen conditions and the Developer utilized their own resources to rehabilitate Camino Colegio beyond the requirements of the Development Agreement and project approvals; and WHEREAS, the City desires to reimburse Developer for the costs of this additional work by providing a credit against the first installment of the Camino Colegio Impact Fee; and WHEREAS, Developer has provided documentation complying with Public Contract Code that documents its costs for the work in a not -to -exceed a value of One -Hundred Twenty - Nine Thousand Nineteen Dollars and Fourteen cents ($129,019.14); and WHEREAS, the City and Developer desire to enter into an Impact Fee Credit Agreement allocating the $129,019.14 to the first installment of the Camino Colegio Impact Fee. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve the Impact Fee Credit Agreement towards the first installment of the Camino Colegio Impact Fee included as Exhibit A to this Resolution. BE IT FUTHER RESOLVED that based on the evidence presented at the duly noticed public meeting of March 12, 2024, the City Council of the City of Rohnert Park finds that the public improvements and activities were adequately described and mitigated in the Final Environmental Impact Report and Supplemental Environmental Impact Report for the Sonoma Mountain Planned Development, and that no other CEQA analysis is warranted. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute the Impact Fee Credit Agreement for the first installment of the Camino Colegio Impact Fees in substantially similar form to the agreement attached hereto and incorporated by this reference as Exhibit A subject to minor modification by the City Manager or City Attorney. DULY AND REGULARLY ADOPTED this 12th day of March, 2024. ATTEST: Sylvia Lopez Cuevas, City Clerk APPROVED AS TO FORM: Michelle M. Kenyon, City Attorney Attachments: Exhibit A CITY OF ROHNERT PARK Susan H. Adams, Mayor ELWARD: RODRIGUEZ: SANBORN: GIUDICE: ADAMS: AYES: ( ) NOES: ( ) ABSENT:( ) ABSTAIN: ( ) Resolution 2024-015 Page 2 of 2 RECORDING REQUESTED BY ) AND WHEN RECORDED MAIL TO: ) ) ) City of Rohnert Park ) 130 Avram Avenue ) Rohnert Park, California 94928-2486 ) Attention: City Clerk ) (Space Above This Line for Recorder's Use Only) Exempt from recording fee per Gov. Code § 27383. IMPACT FEE CREDIT AGREEMENT BY AND BETWEEN THE CITY OF ROHNERT PARK AND SOMO VILLAGE, LLC THIS IMPACT FEE CREDIT AGREEMENT (the "Agreement") is made and entered into on this day of 2024 (the "Effective Date") by and between SOMO VILLAGE, LLC, a Delaware limited liability corporation ("Developer"), and the CITY OF ROHNERT PARK, a California municipal corporation ("City"), with reference to the following facts and intentions. RECITALS A. On March 23, 2021, the City Council of the City of Rohnert Park adopted its Ordinance No. 953 approving an Amended and Restated Development Agreement with the Developer recorded in the Official Records of Sonoma County as Document No. 2021070368 (the "Development Agreement"). B. The Development Agreement requires that the Developer construct certain roadway improvements and pay certain impact Fees. Section 4.08(B) of the Development Agreement provides that Developer shall pay "a fee equal to One Million Seven Hundred and Eleven Thousand Three Hundred Sixty -One Dollars ($1,711,361), subject to CPI Adjustment, for the purpose of mitigating roadway impacts on existing Camino Colegio caused by the Project ("Camino Colegio Impact Fee")" in two installments of. (1) Eight Hundred Fifty -Five Thousand Six Hundred Eighty -One Dollars ($855,681) with CPI adjustment prior to the issuance of the one thousandth (1,000th) residential building permit for the Project; and (2) Eight Hundred Fifty -Five Thousand Six Hundred Eighty Dollars ($855,680) with CPI adjustment prior to the issuance of the one thousand three hundred and twenty- seventh (1,327th) residential building permit for the Project." 4872-9921-5271 v1 C. During the course of construction of required improvements at Camino Colegio, the Developer encountered unforeseen conditions and utilized their own resources to rehabilitate Camino Colegio beyond the requirements of the Development Agreement and project approvals. D. The City desires to reimburse Developer for the costs of this additional work by providing a credit against the first installment of the Camino Colegio Impact Fee. AGREEMENT NOW, THEREFORE, in consideration of the faithful performance of the terms and conditions set forth in this Agreement, the parties hereto agree as follows: 1. Incorporation of Recitals. The foregoing Recitals are true and correct and are hereby incorporated into and form a material part of this Agreement. 2. Property Subject to Agreement. The property which is the subject of this Agreement ("Property") is located in the City of Rohnert Park, Sonoma County, California, and is described in Exhibit 1, attached hereto and incorporated by this reference. The Property is only a portion of the real property subject to the Development Agreement. The City has approved the development of residential subdivision on the Property (the "Project"). Impact Fee Credit_ 3.1. Source and Method of Credit. Subject to the limitations set forth in this Section 3, Developer, or any subsequent developer of the Property, shall receive a credit in an amount not to exceed $129,019.14, based on unforeseen costs and supporting documentation of the work ("Impact Fee Credit"). 3.2 Implementation of Impact Fee Credit. The Impact Fee Credit shall be applied in an amount not to exceed $129,019.14 against the first installment of the Camino Colegio Impact Fee as adjusted based on CPI as of the Effective Date. The City shall keep an accounting of the balance of the Impact Fee Credit. 4. Miscellaneous. 4.1 Compliance with Laws. Developer shall fully comply with all federal, state and local laws, ordinances and regulations in the performance of this Agreement. Developer shall, at its own cost and expense, obtain all necessary permits and licenses for the work, give all necessary notices, pay all fees and taxes required by law that will serve the development on the Property. Copies and/or proof of payment of said permits, licenses, notices, fee and tax payments and deposits shall be furnished to the City Engineer upon request. 4.2. Notices. Formal written notices, demands, correspondence and communications between City and Developer shall be sufficiently given if. (a) personally delivered; or (b) dispatched by next day delivery by a reputable carrier such as FedEx to the offices of City and Developer indicated below, provided that a receipt for delivery is provided; or (c) if dispatched by 4872-9921-5271 v1 first class mail, postage prepaid, to the offices of City and Developer indicated below. Such written notices, demands, correspondence and communications may be sent in the same manner to such persons and addresses as either party may from time -to -time designate by next day delivery or by mail as provided in this section. Cam: City of Rohnert Park 130 Avram Avenue Rohnert Park, CA 94928 Attn: City Manager with a copy to: City of Rohnert Park 130 Avram Avenue Rohnert Park, CA 94928 Attn: City Attorney Developer: SOMO Village LLC PO Box 7087 Cotati, CA 94931 Attn: Brad Baker Notices delivered by deposit in the United States mail as provided above shall be deemed to have been served two (2) business days after the date of deposit if addressed to an address within the State of California, and three (3) business days if addressed to an address within the United States but outside the State of California. 4.3 Entire Agreement. The terms and conditions of this Agreement constitute the entire agreement between City and Developer with respect to the matters addressed in this Agreement. This Agreement may not be altered, amended or modified without the written consent of both parties hereto. 4.4 Runs with the Land; Recordation. This Agreement pertains to and shall run with the Property. Upon execution, this Agreement shall be recorded in the Official Records of Sonoma County. 4.5 Waiver or Modification. Any waiver or modification of the provisions of this Agreement must be in writing and signed by the authorized representative(s) of each Party. 4.6 Relationship of the Parties. Neither Developer nor Developer's contractors, subcontractors, agents, officers, or employees are agents, partners, joint venturers or employees of City and the Developer's relationship to the City, if any, arising herefrom is strictly that of an independent contractor. Developer's contractors and subcontractors are exclusively and solely under the control and dominion of Developer. Further, there are no intended third party beneficiaries of any right or obligation assumed by the Parties. 4872-9921-5271 v1 4.7 Binding Upon Heirs, Successors and Assigns. The terms, covenants and conditions of this Agreement shall be binding upon all heirs, successors and assigns of the parties hereto; provided, however, that this Agreement shall not be binding upon a purchaser or transferee of any portion of the Property except as assigned pursuant to the terms of the Development Agreement. 4.8 Governing Law; Venue. This Agreement shall be construed and enforced in accordance with the laws of the State of California, without reference to choice of law provisions. Any legal actions under this Agreement shall be brought only in the Superior Court of the County of Sonoma, State of California. 4.9 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be deemed to be an original. 4.10 Interpretation. This Agreement shall be construed according to its fair meaning, and not strictly for or against any party. No presumptions or rules of interpretation based upon the identity of the party preparing or drafting the Agreement, or any part thereof, shall apply to the interpretation of this Agreement. 4.11 Headings. Section headings in this Agreement are for convenience only and are not intended to be used in interpreting or construing the terms, covenants or conditions contained in this Agreement. 4.12 Authority. Each party executing this Agreement on behalf of a party represents and warrants that such person is duly and validly authorized to do so on behalf of the entity it purports to bind and if such party is a partnership, corporation or trustee, that such partnership, corporation or trustee has full right and authority to enter into this Agreement and perform all of its obligations hereunder. IN WITNESS WHEREOF, City and Developer have executed this Agreement as of the Effective Date. (signatures on following page) 4872-9921-5271 v1 Dated: ATTEST: City Clerk APPROVED AS TO FORM: City Attorney 4872-9921-5271 v1 "CITY" CITY OF ROHNERT PARK, a California municipal corporation M. City Manager Per Resolution No. 2024- adopted by the Rohnert Park City Council at its meeting of, 2024. "DEVELOPER" SOMO Village, LLC, Dated: Im 4872-9921-5271 v1 Brad Baker Manager ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA ) ss. COUNTY OF SONOMA On before me, , (here insert name and title of the officer) personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) 4872-9921-5271 v1 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA ) ss. COUNTY OF CONTRA COSTA On before me, , (here insert name and title of the officer) personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) 4872-9921-5271 v1 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA ) ss. COUNTY OF SONOMA On before me, , (here insert name and title of the officer) personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) 4872-9921-5271 v1 N F eT LI) �M1LIFARpti� Meeting Date: Department ITEM NO. 8.I. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT March 12t', 2024 Public Works Submitted By: Vanessa Garrett, Director of Public Works Prepared By: Dustin DeMatteo, Sustainability Manager Agenda Title: Adopt a Resolution Authorizing a Budget Amendment for the Appropriation of $76,440 in the Vehicle Replacement Fund for the Purchase of an Electric Vehicle to be Reimbursed by the Department of Energy's "Energy Efficiency and Conservation Block Grant" RECOMMENDED ACTION: To adopt a resolution authorizing the City Manager to execute a budget amendment for the appropriation of $76,440 in the Vehicle Replacement Fund (VRF) for the purchase of an electric vehicle to be reimbursed in full by the Department of Energy's EECBG Equipment Rebate Voucher Program. BACKGROUND: The City of Rohnert Park Draft 2040 General Plan was released on July 20, 2022, for public review. The draft General Plan outlines the city's goals, policies, and programs for the year 2040, covering various topics, including Climate Change. Within the Climate Change Element, there is a recognition of the need to initiate a "Municipal Fleet Electrification Program." ANALYSIS: Transitioning the City -owned fleet to zero -emission vehicles over time is identified as a strategy with significant environmental and air quality benefits, leading to reduced greenhouse gas emissions. The City of Rohnert Park, as a duly recognized municipality within the State of California, was allocated a pre -determined amount of block grant funding totaling $76,440, which needed to be utilized for energy efficiency and/or energy conservation purposes. The purchase of an electric vehicle to support its climate goals was determined by staff as an effective utilization of the block grant funding and the vehicle would be allocated to the Public Works Department and General Services Division. STRATEGIC PLAN AND COUNCIL PRIORITY ALIGNMENT: This item is consistent with the city council's strategic priority of integrating the climate change element. OPTIONS CONSIDERED: 1. Recommended Option: Staff recommends accepting the grant amount of $76,440 grant from the Department of Energy's EECBG Equipment Rebate Voucher Program and authorize staff to execute the purchase of an electric vehicle with the Vehicle Replacement Fund. ITEM NO. 8.I. 2. Alternative: The City Council could consider not accepting the grant, however, this decision would conflict with the direction that Climate Change Element prescribes. Staff does not recommend this option. FISCAL IMPACT/FUNDING SOURCE: The City plans to allocate $76,440 from the City's Vehicle Replacement Fund (VRF), a fund specifically designated for replacing and upgrading the City's fleet of vehicles. It is noted that this fund allocation is within the City's legal authority. Additionally, the resolution mentions that the transferred funds from the VRF are expected to be fully reimbursed within 45 days, as per the Department of Energy's Energy Efficiency and Conservation Block Grant (EECBG) Equipment Rebate Voucher Program terms and conditions. Department Head Approval Date: 01/26/2024 Finance Approval Date: 03/04/2024 City Attorney Approval Date: 03/04/2024 City Manager Approval Date: 03/04/2024 Attachments: 1. 2 Year Vehicle Replacement Plan 2. Resolution 2 VRF Fund FY 2023/24 Recommendations 23124 FISCAL YEAR REPLACE Paid into VRF? DEPT VEH# (Y/n) YEAR MILEAGE MAKE/MODEL Cost for vehicle Reason for purchasing either gas or electric vehicle PARKS P022 N 2006 82,598 CHEVROLET 2500 HD $ 80,000.00 Purchasing regular vehicle for towing PARKS P011 N 2000 132,710 GMC 2500 $ 80,000.00 Purchasing regular vehicle for towing PARKS P016 N 2000 96,521 GMC 2500 $ 80,000.00 Purchasing regular vehicle for towing PARKS TR06 N 2004 6,324 JD BACKHOE 310 SG $ 200,000.00 Equipment can't be electric- Will use biodiesel PARKS MW01 Y 2015 5037 HOURS JACOBSON WIDE AREA MOWER $ 185,000.00 Equipment can't be electric- Will use biodiesel PS 0037 2015 53,923 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid PS 0044 2013 37,932 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid PS 0045 2013 65,108 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid PS 0046 2013 61,491 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid PS 0047 2013 71,769 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid PS 0048 2013 66,852 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid PS 0005 2013 66,697 (no pursuit vehicles are all electric yet), Purchasing Y FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid ADD -City Hall vehicle N All electric 6 person vehicle $ 80,000.00 All electric, include $55k for charging station ADD- Upfitting of fire Request to upfit an existing fire engine N truck $ 100,000.00 Fire engine upfitting request- diesel PS 0007 2007 89,124 Replaced with Hybrid. Replaced this fiscal year with remaining funding through PS. Only need charging N CHEVROLET IMPALA $ - station. All electric, include $55k for charging station PS (no pursuit vehicles are all electric yet), Purchasing 0052 Y 2013 48,601 FORD POLICE INTERCEPTOR $ 80,000.00 Hybrid GEN SERVICES C030 N 2007 106,750 CHEVROLET IMPALA $ 45,000.00 All electric, include $55k for charging station Utilities New vehicle for additional position added during $ 65,000.00 budget (Pump mechanic) Utilities New vehicle for additional position added during $ 65,000.00 budget (Water distribution operator) IDS (pads for fire incident scene purposes (9 total) $ 12,600.00 Charging stations $ 165,000.00 Consider Replacement Total to budget for VRF: $ 1,797,600.00 RESOLUTION NO.2024-016 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK ADOPT A RESOLUTION AUTHORIZING THE CITY MANAGER TO TRANSFER FUNDS FOR PURCHASE OF AN ELECTRIC VEHICLE TO BE REIMBURSED THROUGH THE DEPARTMENT OF ENERGY'S "ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT PROGRAM" WHEREAS, the City of Rohnert Park Draft 2040 General Plan was released on July 20, 2022 for public review; and WHEREAS, the draft General Plan outlines the goals, policies, and programs the city will pursue looking forward to 2040 on a wide range of topics, such as Climate Change; and WHEREAS, within the Climate Change Element, it identifies a need to initiate a "Municipal Fleet Electrification Program"; and WHEREAS, transitioning City -owned fleet to zero -emission vehicles over time will result in immense environmental and air quality benefits with reduced greenhouse gas emissions; and WHEREAS, the City of Rohnert Park is a duly recognized municipality within the State of California and is vested with the legal authority to administer the awarded grant fund allocation of $76,440 for the purchase of an electric vehicle to support its climate goals; and WHEREAS, the City would allocate the $76,440 from the City's Vehicle Replacement Fund (VRF), which is a fund set up by the City to budget the necessary resources for the purpose of replacing and upgrading the City's fleet of vehicles; and WHEREAS, the City can expect the transferred $76,440 from the Vehicle Replacement Fund to be reimbursed, in full, back into the VRF within 45 days, per the Department of Energy's Energy Efficiency and Conservation Block Grant Program (EECBG) Equipment Rebate Voucher terms and conditions; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve a resolution authorizing the City Manager to transfer funds for purchase of an electric vehicle to be reimbursed. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 12t' day of March 2024. CITY OF ROHNERT PARK Susan H. Adams, Mayor ATTEST: Sylvia Lopez Cuevas, City Clerk APPROVED AS TO FORM: Michelle M. Kenyon, City Attorney ELWARD: RODRIGUEZ: SANBORN: GIUDICE: ADAMS: AYES:( ) NOES: ( ) ABSENT:( ) ABSTAIN: ( ) Resolution 2024-016 Page 2 of 2 N F eT LI) �M1LIFARpti� ITEM NO. 8.J. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Public Safety Submitted By: Tim Mattos, Director of Public Safety Prepared By: Aaron Johnson, Deputy Chief Agenda Title: Adopt a Resolution to Accept a Grant in the Amount of $21,171 from the Department of Justice (DOJ) Edward Byrne Memorial Justice Assistance Grant (JAG) Program for Purchase of Portable Radios and Authorizing the Finance Director to Increase FY 2023/24 Budget Appropriations by $21,171 RECOMMENDED ACTION: Staff recommends City Council adopt a resolution accepting a $21,171 grant from the Department of Justice (DOJ) Edward Byrne Memorial Justice Assistance Grant (JAG) Program for purchase of portable radios and authorize the Finance Director to increase appropriations in the FY 2023/24 budget by $21,171. BACKGROUND: The U.S. Department of Justice (DOJ), Office of Justice Programs (OJP), Bureau of Justice Assistance (BJA) invited applications for funding through the Edward Byrne Memorial Justice Assistance Grant (JAG) Program. The JAG Program assists local governments to purchase equipment for law enforcement; the Rohnert Park Department of Public Safety submitted a request for funding to purchase six portable radios for use by Public Safety Officers. ANALYSIS: Our current operating budget does not provide for all field personnel to be assigned one of these radios, resulting in a mix of old and new technologies that interferes with operational efficiency. In addition to more fully equipping our agency, this purchase will also increase effectiveness during natural disasters, mass casualty incidents, and other significant law enforcement events requiring mutual aid with other Sonoma County and regional emergency response agencies. These radios will enable fast, effective, and reliable communication between RPDPS and a variety of first responders throughout the Bay Area. This enhanced ability to communicate with multiple jurisdictions during large-scale events will significantly improve our response and recovery abilities. These radios will maintain their capability even if radio infrastructure and power supplies are damaged during a natural disaster or terrorist attack. ITEM NO. 8.J. ENVIRONMENTAL ANALYSIS: No environmental impact is anticipated. STRATEGIC PLAN AND COUNCIL PRIORITIES ALIGNMENT: Strategic plan Goal C: Ensure the effective delivery of public services. The grant will enable the Department of Public Safety to reduce the threat to Public Safety Officers engaged in high -risk situations in the community. OPTIONS CONSIDERED: 1. RECOMMENDED — Approve the attached resolution accepting the $21,171 grant from the Department of Justice (DOJ) Edward Byrne Memorial Justice Assistance Grant (JAG) Program for purchase of portable radios and authorize the Finance Director to increase appropriations in the FY 2023/24 budget by $21,171. 2. NOT RECOMMENDED — Decline the grant and not fund the purchase of approximately six portable radios to better equip Public Safety Officers. FISCAL IMPACT/FUNDING SOURCE: Acceptance of this grant will not require any additional budget appropriations to the adopted General Fund. Code Compliance Approval Date: N/A Department Head Approval Date: 2/22/2024 Finance Approval Date: 2/23/2024 Human Resources Approval Date: N/A City Attorney Approval Date: N/A City Manager Approval Date: 3/3/2024 Attachments: 1. A Resolution of the City Council of the City of Rohnert Park Accepting a $21,171 Grant from the Department of Justice (DOJ) Edward Byrne Memorial Justice Assistance Grant (JAG) Program for Purchase of Portable Radios and Authorizing the Finance Director to Increase FY 2023/24 Budget Appropriations by $21,171 2. JAG Program grant award letter 3. JAG Program certification requiring signature of the Mayor 2 RESOLUTION NO. 2024-017 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK ACCEPTING A $21,171 GRANT FROM THE DEPARTMENT OF JUSTICE (DOJ) EDWARD BYRNE MEMORIAL JUSTICE ASSISTANCE GRANT (JAG) PROGRAM FOR PURCHASE OF PORTABLE RADIOIS AND AUTHORIZING THE FINANCE DIRECTOR TO INCREASE FY 2023/24 BUDGET APPROPRIATIONS BY $21,171 WHEREAS; the U.S. Department of Justice (DOJ), Office of Justice Programs (OJP), Bureau of Justice Assistance (BJA) invited applications for criminal justice funding through the Edward Byrne Memorial Justice Assistance Grant (JAG) Program; and WHEREAS, the City of Rohnert Park Public Safety Department submitted a request for JAG Program funds to purchase additional portable radios with interoperable multi -band technology, to improve emergency response and interagency communications; and WHEREAS, the City of Rohnert Park was granted funding and desires to accept the JAG grant from the US Department of Justice; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and accept a $21,171 grant from the Department of Justice (DOJ) Edward Byrne Memorial Justice Assistance Grant (JAG) Program, attached hereto as Exhibit A, for purchase of portable radios. BE IT FURTHER RESOLVED that the Mayor is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park, and the Director of Finance or their designee is authorized to increase appropriations in the FY 2023/24 budget by the amount of $21,171 and to make any other accounting adjustments necessary to execute the JAG Program grant in accordance with applicable laws. DULY AND REGULARLY ADOPTED this 12th day of March, 2024. ATTEST: Sylvia Lopez Cuevas, City Clerk APPROVED AS TO FORM: Michelle M. Kenyon, City Attorney Attachments: Exhibit A CITY OF ROHNERT PARK Susan H. Adams, Mayor ELWARD: RODRIGUEZ: SANBORN: GIUDICE: ADAMS: AYES: ( ) NOES: ( ) ABSENT:( ) ABSTAIN: ( ) =� Department of Justice (DOJ) Office of Justice Programs Bureau of Justice Assistance Name and Address of Recipient City, State and Zip: Recipient UEI: CITY OF ROHNERT PARK 130 AVRAM AVE ROHNERT PARK, CA 94928 CQSKJBN54Y54 Washington, D.C. 20531 Project Title: To purchase portable radios with multi -band technology to enable improved emergency response and to Award Number: 15PBJA-23-GG-03126-JAGX enhance interagency operability and cooperation between jurisdictions. Solicitation Title: BJA FY 23 Edward Byrne Memorial Justice Assistance Grant (JAG) Program - Local Solicitation (Federal Award Amount: $21,171.00 (Federal Award Date: 9/25/23 1 Awarding Agency: Office of Justice Programs Bureau of Justice Assistance Funding Instrument Type: Grant Opportunity Category: D Assistance Listing: 16.738 - Edward Byrne Memorial Justice Assistance Grant Program (Project Period Start Date: 10/1/22 (Project Period End Date: 9/30/24 Budget Period Start Date: 10/1/22 IBudget Period End Date: 9/30/24 Project Description: The City of Rohnert Park will use JAG funds to purchase portable radios with interoperable multi -band technology to equip officers of the Rohnert Park Department of Public Safety. Page: 1 Award Letter September 25, 2023 Dear Marcela Piedra, On behalf of Attorney General Merrick B. Garland, it is my pleasure to inform you the Office of Justice Programs (OJP) has approved the application submitted by CITY OF ROHNERT PARK for an award under the funding opportunity entitled 2023 BJA FY 23 Edward Byrne Memorial Justice Assistance Grant (JAG) Program - Local Solicitation. The approved award amount is $21,171. Review the Award Instrument below carefully and familiarize yourself with all conditions and requirements before accepting your award. The Award Instrument includes the Award Offer (Award Information, Project Information, Financial Information, and Award Conditions) and Award Acceptance. For COPS Office and OVW funding the Award Offer also includes any Other Award Documents. Please note that award requirements include not only the conditions and limitations set forth in the Award Offer, but also compliance with assurances and certifications that relate to conduct during the period of performance for the award. These requirements encompass financial, administrative, and programmatic matters, as well as other important matters (e.g., specific restrictions on use of funds). Therefore, all key staff should receive the award conditions, the assurances and certifications, and the application as approved by OJP, so that they understand the award requirements. Information on all pertinent award requirements also must be provided to any subrecipient of the award. Should you accept the award and then fail to comply with an award requirement, DOJ will pursue appropriate remedies for non-compliance, which may include termination of the award and/or a requirement to repay award funds. Prior to accepting the award, your Entity Administrator must assign a Financial Manager, Grant Award Administrator, and Authorized Representative(s) in the Justice Grants System (JustGrants). The Entity Administrator will need to ensure the assigned Authorized Representative(s) is current and has the legal authority to accept awards and bind the entity to the award terms and conditions. To accept the award, the Authorized Representative(s) must accept all parts of the Award Offer in the Justice Grants System (JustGrants), including by executing the required declaration and certification, within 45 days from the award date. To access your funds, you will need to enroll in the Automated Standard Application for Payments (ASAP) system, if you haven't already completed the enrollment process in ASAP. The Entity Administrator should have already received an email from ASAP to initiate this process. Congratulations, and we look forward to working with you. Maureen Henneberg Deputy Assistant Attorney General Office for Civil Rights Notice for All Recipients The Office for Civil Rights (OCR), Office of Justice Programs (OJP), U.S. Department of Justice (DOJ) has been delegated the responsibility for ensuring that recipients of federal financial assistance from the OJP, the Office of Community Oriented Policing Services (COPS), and the Office on Violence Against Women (OVW) are not engaged in discrimination prohibited by law. Several federal civil rights laws, such as Title VI of the Civil Rights Act of 1964 and Section 504 of the Rehabilitation Act of 1973, require recipients of federal financial assistance to give assurances that they will comply with those laws. Taken together, these civil rights laws prohibit recipients of federal financial assistance from DOJ from discriminating in services and employment because of race, color, national origin, religion, disability, sex, and, for grants authorized under the Violence Against Women Act, sexual orientation and gender identity. Recipients are also prohibited from discriminating in services because of age. For a complete review of these civil rights laws and nondiscrimination requirements, in connection with DOJ awards, see https://ojp.gov/funding/ Explore/LegalOverview/CivilRightsRequirements.htm. Under the delegation of authority, the OCR investigates allegations of discrimination against recipients from individuals, entities, or groups. In addition, the OCR conducts limited compliance reviews and audits based on regulatory criteria. Page: 2 These reviews and audits permit the OCR to evaluate whether recipients of financial assistance from the Department are providing services in a nondiscriminatory manner to their service population or have employment practices that meet equal -opportunity standards. If you are a recipient of grant awards under the Omnibus Crime Control and Safe Streets Act or the Juvenile Justice and Delinquency Prevention Act and your agency is part of a criminal justice system, there are two additional obligations that may apply in connection with the awards: (1) complying with the regulation relating to Equal Employment Opportunity Programs (EEOPs); and (2) submitting findings of discrimination to OCR. For additional information regarding the EEOP requirement, see 28 CFR Part 42, subpart E, and for additional information regarding requirements when there is an adverse finding, see 28 C.F.R. §§ 42.204(c), .205(c)(5). The OCR is available to help you and your organization meet the civil rights requirements that are associated with DOJ grant funding. If you would like the OCR to assist you in fulfilling your organization's civil rights or nondiscrimination responsibilities as a recipient of federal financial assistance, please do not hesitate to contact the OCR at askOCR@ojp.usdoj.gov. Memorandum Regarding NEPA NEPA Letter Type OJP - Ongoing NEPA Compliance Incorporated into Further Developmental Stages NEPA Letter he Edward Byrne Memorial Justice Assistance Grant Program (JAG) allows states and local governments to support a broad range of activities to prevent and control crime and to improve the criminal justice system, some of which could have environmental impacts. All recipients of JAG funding must assist BJA in complying with NEPA and other related federal environmental impact analyses requirements in the use of grant funds, whether the funds are used directly by the grantee or by a subgrantee or third party.? Accordingly,?prior to obligating?funds for any of the specified activities, the grantee must first determine if any of the specified activities will be?funded by the grant. The specified activities requiring environmental analysis are: a. New construction; b. Any renovation or remodeling of a property located in an environmentally or historically sensitive area, including properties located within a 100-year flood plain, a wetland, or habitat for endangered species, or a property listed on or eligible for listing on the National Register of Historic Places; c.? A renovation, lease, or any proposed use of a building or facility that will either (a) result in a change in its basic prior use or (b) significantly change its size; d.? Implementation of a new program involving the use of chemicals other than chemicals that are (a) purchased as an incidental component of a funded activity and (b) traditionally used, for example, in office, household, recreational, or education environments; and e. Implementation of a program relating to clandestine methamphetamine laboratory operations, including the identification, seizure, or closure of clandestine methamphetamine laboratories. Complying with NEPA may require the preparation of an Environmental Assessment and/or an Environmental Impact Statement, as directed by BJA. Further, for programs relating to methamphetamine laboratory operations, the preparation of a detailed Mitigation Plan will be required. For more information about Mitigation Plan requirements, please see https://www.bja.gov/Funding/nepa.html. NEPA Coordinator Page: 3 First Name Last Name Orbin Middle Name Terry Award Information This award is offered subject to the conditions or limitations set forth in the Award Information, Project Information, Financial Information, and Award Conditions. Recipient Information Recipient Name CITY OF ROHNERT PARK UEI CQSKJBN54Y54 Street 1 130 AVRAM AVE Street 2 City ROHNERT PARK Zip/Postal Code 94928 County/Parish Award Details Federal Award Date 9/25/23 Award Number 15PBJA-23-GG-03126-JAGX Federal Award Amount $21,171.00 State/U.S. Territory California Country United States Province Award Type Initial Supplement Number 00 Funding Instrument Type Grant Assistance Listing Number Assistance Listings Program Title 16.738 Edward Byrne Memorial Justice Assistance Grant Program Statutory Authority Title I of Public Law 90-351 (generally codified at 34 U.S.C. 10101-10726), including subpart 1 of part E (codified at 34 U.S.C. 10151-10158); see also 28 U.S.C. 530C(a) Page: 4 U.S. DEPARTMENT OF JUSTICE OFFICE OF JUSTICE PROGRAMS Edward Byrne Memorial Justice Assistance Grant Program FY 2023 Local Solicitation Certifications and Assurances by the Chief Executive of the Applicant Government On behalf of the applicant unit of local government named below, in support of that locality's application for an award under the FY 2023 Edward Byrne Memorial Justice Assistance Grant ("JAG") Program, and further to 34 U.S.C. § 10153(a), I certify to the Office of Justice Programs ("OJP"), U.S. Department of Justice ("USDOX), that all of the following are true and correct: 1. 1 am the chief executive of the applicant unit of local government named below, and I have the authority to make the following representations on my own behalf as chief executive and on behalf of the applicant unit of local government. I understand that these representations will be relied upon as material in any OJP decision to make an award, under the application described above, to the applicant unit of local government. 2. 1 certify that no federal funds made available by the award (if any) that OJP makes based on the application described above will be used to supplant local funds, but will be used to increase the amounts of such funds that would, in the absence of federal funds, be made available for law enforcement activities. 3. 1 assure that the application described above (and any amendment to that application) was submitted for review to the governing body of the unit of local government (e.g., city council or county commission), or to an organization designated by that governing body, not less than 30 days before the date of this certification. 4. 1 assure that, before the date of this certification— (a) the application described above (and any amendment to that application) was made public; and (b) an opportunity to comment on that application (or amendment) was provided to citizens and to neighborhood or community -based organizations, to the extent applicable law or established procedure made such an opportunity available. 5. 1 assure that, for each fiscal year of the award (if any) that OJP makes based on the application described above, the applicant unit of local government will maintain and report such data, records, and information (programmatic and financial), as OJP may reasonably require. 6. 1 have carefully reviewed 34 U.S.C. § 10153(a)(5), and, with respect to the programs to be funded by the award (if any), I hereby make the certification required by section 10153(a)(5), as to each of the items specified therein. Signature of Chief Executive of the Applicant Unit of Date of Certification Local Government Printed Name of Chief Executive Name of Applicant Unit of Local Government Title of Chief Executive Rev. April 21, 2023 ITEM NO. 8.K. (00 Mission Statement "We Carefor Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow. CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Public Works Submitted By: Vanessa Garrett, Director of Public Works Prepared By: Amanda Bunte, Project Manager Agenda Title: Adopt a Resolution Authorizing the City Manager to Execute a Consultant Services Agreement with Saudis Inc. for Design of the Water Tank and Well System Seismic Retrofit Project No. 2020-17 in the amount of $592,776 and to Increase Appropriations in Project No. 2020-17 by $290,190.75 from the Federal Emergency Management Act (FEMA) Hazard Mitigation Grant Program RECOMMENDED ACTION: Adopt a Resolution authorizing the City Manager to execute a Consultant Services Agreement with Sandis Inc. for Design of the Water Tank and Well System Seismic Retrofit Project No. 2020- 17 (Seismic Retrofit Project) in the amount of $592,776 and to Increase Appropriations in Project No. 2020-17 by $290,190.75 from the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program. BACKGROUND: The City of Rohnert Park revised and adopted its current Local Hazard Mitigation Plan on September 10, 2019. Due to the age of the infrastructure and the potential for regional hazards related to earthquakes, the City is seeking to perform seismic retrofits and infrastructure upgrades related to seven city water tank sites and six groundwater well sites. The groundwater well sites identified in this project are the most active and highest producing in our groundwater supply system, providing about 40% of the City's normal potable water daily use at 4.2 million gallons per day and maintaining water service pressure to the system. The seven water tanks identified in this project were constructed between 1970 and 1999 and provide a total of 4.4 million gallons of additional water storage supply during peak daily use and during possible emergencies. The Seismic Retrofit Project will include the assessment and design for new building upgrades to seven well sites and two tank sites, seismic retrofits to these site, new telemetry and pumps, connectivity to portable generators, security improvements, and control upgrades. 4895-3538-4453 v1 ITEM NO. 8. K. The project is partially funded through the FEMA Hazard Mitigation Grant Program, administered through the California Governor's Office of Emergency Services (Cal OES). The consultant is required to follow the grant guidelines (Cal OES Project No. DR4569-PA0210). ANALYSIS: Pursuant to the City's Purchasing Policy for professional services, staff prepared a Request for Proposals (RFP) for professional design services to assist City staff with the preliminary design/coordination, entitlement review process, final design, City permitting process, construction bid documents (PS&E) and construction phase services for the Water Tank and Well System Seismic Retrofit Project. The RFP was advertised on October 12, 2023 and two proposals were received on November 10, 2023. Staff formed a review committee and evaluated the proposals. The review committee found both consultants qualified for the project, but upon further investigation it was discovered that GHD Inc. may have a conflict for this project because they assisted the city in compiling materials for the FEMA Grant. Staff reached out to the Grant Administrator at CalOES, who confirmed GHD Inc. is disqualified from proposing on the design contract. Therefore, staff recommends that the City Council award the design consultant services agreement with Sandis, Inc. for $592,776. ENVIRONMENTAL ANALYSIS: As part of the scope of services, GHD, Inc. will undertake the necessary review under the California Environmental Quality Act (CEQA) for the project. In addition, the City received federal funding for the project through the FEMA Hazard Mitigation Grant Program which provides a federal nexus to the National Environmental Policy Act (NEPA). FEMA is the lead agency and will perform their environmental review of the project during this design phase. STRATEGIC PLAN AND COUNCIL PRIORITIES ALIGNMENT: The recommended action is consistent with Council Priority 3 (Infrastructure, Maintenance, and Beautification) and Goal C of the Strategic Plan (ensure the effective delivery of public services). Retrofitting and renovating the water tanks and well system will make the City's water supply more dependable and resilient so the City can continue to provide clean and reliable drinking water to residents. OPTIONS CONSIDERED: 1. Staff recommends adopting a resolution authorizing the City Manager to execute a Consultant Services Agreement with Sandis, Inc. in the amount of $592,776 and accept the HMGP funds of $290,190.75 to go towards the design costs. This action will provide design for these important water facility upgrades. 2. The City Council could decide not to authorize the City Manager to execute the Consultant Services Agreement, however this would delay the much needed and critical improvements to the City's water system. FISCAL IMPACT/FUNDING SOURCE: The Water Tank and Well System Seismic Retrofit Project (Project No. 2020-17) is funded through water enterprise funds with a total budget of $1,399,389.85. With the City Council approval of the attached Resolution, the FEMA Hazard Mitigation Grant Program of $290,190.75 would be 4895-3538-4453 v1 ITEM NO. 8. K. added to the project budget, bringing the total budget to $1,608,580.60. The Consultant Services Agreement with Sandis, Inc is $592,776. There is sufficient funding in the project to award the Consultant Services Agreement to Sandis, Inc. for $592,776. See Table 1 for a breakdown of the Project budget and proposed expenditures: Table 1— Water Tank and Well System Seismic Retrofit Project No. CIP2017 Budget Item Amount $ Project Budget Project Budget 1,399,389 Cal OES Grant 290,190 Total Budget 1,608,580 Project Expenditures/Contracts/Soft Costs (Est) GHD Task Order 2020-18 15,062 Brelje & Race Task Order 2021-03 306,170 Soft Costs Budget (staff labor, legal, permitting) Estimated 64,803 Consultant Services Agreement: Sandis, Inc 59Z 776 Total Expenditures/Contract/Soft Costs 978,811 Department Head Approval Date: 2/45/2024 City Attorney Approval Date: 2/23/2024 Finance Director Approval Date: 2/26/2024 City Manager Approval Date: 3/03/2024 Attachments: 1. Resolution authorizing the City Manager to execute a Consultant Services Agreement with Sandis Inc. for Design of the Water Tank and Well System Seismic Retrofit Project No. 2020-17 (Seismic Retrofit Project) in the amount of $592,776 and to Increase Appropriations in Project No. 2020-17 by $290,190.75 from the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program a. Resolution Exhibit A - Hazard Mitigation Grant Program — Approval of Funds $290,190.75. b. Resolution Exhibit B - Consultant Services Agreement with Sandis, Inc. for Design of Water Tanks and Well System Seismic Retrofit Project No. 2020-17 in the amount of $592,776 4895-3538-4453 v1 RESOLUTION NO.2024-018 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK AUTHORIZING THE GRANT ACCEPTANCE AND EXECUTION OF THE GRANT FUNDS FROM CALOES FOR THE FEMA GRANT AND DESIGNATING THE CITY MANAGER ORDESIGNEE AS AUTHORIZED REPRESENTATIVE TO EXECUTE CONSULTANT SERVICES AGREEMENT WITH SANDIS, INC. FOR $592,776 WHEREAS; City Council approved the Local Hazard Mitigation plan in Resolution 2019-116 and authorized the submission to Federal Emergency Management Agency (FEMA); and WHEREAS, in an effort to become more resilient to seismic events the City applied for funds to better protect the water distribution system; and WHEREAS, the City received approval for Hazard Mitigation Grant Program (HMGP) funds in the amount of $290,190.75 for the Water Tank and Well Seismic Retrofit project on November 4, 2022 from the Federal Emergency Management Agency (FEMA) for water system improvements; and WHEREAS, the grant is administered through the California Governor's Office of Emergency Services (Cal OES Project No. DR4569-PA0210), and the City needs to accept the grant funds of $290,190.75 for design from the FEMA Hazard Mitigation Grant Program per Resolution 2022-099 and add those funds to the Project No. 2020-17 budget; and WHEREAS, on October 12, 2023 the City of Rohnert Park advertised a Request for Proposals (RFP) for design of the Water Tank and Well Seismic Retrofit Project No. 2020-17; and WHEREAS, two proposals were received by November 10, 2023; and WHEREAS, staff formed a review committee and recommends Sandis, Inc. for the project for a total fee of $592,776. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve as follows: 1. The City Manager is hereby authorized to accept the $290.190.75 Hazard Mitigation Grant Program funds for the Water Tank and Well Seismic Retrofit project, operated by CalOES, as shown in Exhibit A. 2. The City Manager is hereby authorized to execute the Consultant Services Agreement with Sandis, Inc. for $592,776 for design and consultant service work for the Water Tank and Well Seismic Retrofit Project, as shown in Exhibit B 3. This resolution shall become effective immediately. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park. ULY AND REGULARLY ADOPTED this 12th day of March, 2024. ATTEST: Sylvia Lopez Cuevas, City Clerk APPROVED AS TO FORM: Michelle M. Kenyon, City Attorney Attachments: Exhibit A and B CITY OF ROHNERT PARK Susan H. Adams, Mayor ELWARD: RODRIGUEZ: SANBORN: GIUDICE: ADAMS: AYES: ( ) NOES: ( ) ABSENT:( ) ABSTAIN: ( ) Resolution 2024-018 Page 2 of 2 U.S. Department of Homeland Security Region 9 1111 Broadway, Suite 1200 F otierrti Oakland, California 94607 T FEMA t9ND 5 November 4, 2022 Mark S. Ghilarducci, Director Governor's Authorized Representative California Governor's Office of Emergency Services 3650 Schriever Avenue Mather, CA 95655 Reference: Application Approval, HMGP DR-4569-210-011 R City of Rohnert Park, California City of Rohnert Park Water Tank System Seismic Retrofit, Phase 1 FIPS Code: 097-62546, Supplement 17 Dear Mark Ghilarducci: We approve and issue Hazard Mitigation Grant Program (HMGP) funds for the City of Rohnert Park, HMGP DR-4569-210-011R, City of Rohnert Park Water Tank System Seismic Retrofit. The total project cost for Phase One is $386,921. As shown in the enclosed Obligation Report — Supplement 17, we are obligating $290,190.75 for the 75 percent Federal share; the 25 percent non -Federal share is $96,730.25. These funds are available in SmartLink for immediate and eligible disbursements. The following is a summary of the approved funding: Total Project Cost: Federal Share (75%): Non -Federal Share (25%): $386,921 $290,190.75 $96,730.25 This HMGP project approval and obligation of funds are subject to the following conditions: 1. Scope of Work (SOW) — The City of Rohnert Park will seismically retrofit 7 of the City's 8 water tanks, as well as 6 well sites. A total of 13 city structures, as identified in the project inventory, will be updated. The inadequate foundations for tanks 1 and 2, as identified by a Seismic Evaluation, will be replaced as well as set up generator connections, automatic transfer switches (ATS), and associated electrical upgrades needed to power the 7 water tanks with booster pumps through generator connections. The following Phase 1 activities and deliverables are expected: Phase 1 Activity Estimated Timeline 60% Design & Permitting 10 Months CEQA 3 Months 2. Project Completion Date — The work schedule included with the project application indicates that the project will take 17 months to complete. Please inform the sub -recipient that work completed after this date is not eligible for federal funding, and that federal Mark Ghilarducci November 4, 2022 Page 2 of 2 funds may be de -obligated for work completed outside the completion date when there is no approved time extension 3. Project Closeout — Within 120 days of project completion, all project funds must be liquidated and final closeout documentation for the project must be submitted to FEMA. Please note the project must comply with Code of Federal Regulations Title 2, Part 200 reporting requirements at the time of closeout. 4. Record of Environmental Considerations (REC) — This project has been determined to be Categorically Excluded from the need to prepare either an Environmental Impact Statement or Environmental Assessment in accordance with FEMA Instruction 108-1-1 and FEMA Directive 108-1-1 as authorized by DHS Instruction Manual 023-01-001-01, Revision 1. Categorical Exclusions A4 (information gathering, data analysis and processing, information dissemination, review, interpretation, and development of documents) and A7 (the commitment of resources, personnel, and funding to conduct audits, surveys, and data collection of a minimally intrusive nature) have been applied. Particular attention should be given to the project conditions before and during project implementation. Failure to comply with these conditions may jeopardize federal assistance, including funding. 5. Standard Conditions — This project approval is subject to the enclosed Standard Mitigation Grant Program (HMGP) Conditions, amended August 2018. Please note that federal funds may be de -obligated for work that does not comply with these conditions. If you have any questions or need further assistance please contact Jocelyn Madison -Kelly, Grants Management Specialist, by email jocelyn.madisonkellygfema.dhs.gov, or phone (202) 717- 0135. Sincerely, Digitally signed by ROBERT P MCCORD LJ for Date: 2022.11.04 13:24:46-07'00' Kathryn Lipiecki Director, Mitigation Division FEMA Region 9 Enclosures (3): Obligation Report - Supplement 17 Project Management Report Record of Environmental Clearance (REC) Standard Mitigation Grant (HMGP) Conditions cc: Jennifer Hogan, State Hazard Mitigation Officer, California Governor's Office of Emergency Services Jacy Hyde Ph.D., Branch Chief, California Governor's Office of Emergency Services Jared Peri, Hazard Mitigation Grants Specialist, California Governor's Office of Emergency Services 9/30/2022 FEDERAL EMERGENCY MANAGEMENT AGENCY HMGP-OB-01 11:13 AM HAZARD MITIGATION GRANT PROGRAM Obligation Disaster FEMA Amendment State Action Supplemental No Project No No Application ID No No State Recipient 4569 11 •R 0 210 1 17 CA Statewide Subrecipient: Rohnert Park Project Title : City of Rohnert Park Water Tank System Seismic Retrofit Subrecipient FIPS Code: 097-62546 Total Amount Previously Allocated $290,190.75 Total Amount Previously Obligated $290,190.75 Subrecipient Management ProjectAmount CostAmount Total Amount Total Amount Available Pending Obligation for New Obligation $0.00 $0.00 Total Obligation IFMIS Date IFMIS Status FY $290,190.75 $0.00 $290,190.75 09/21/2022 Accept 2022 Comments Date: 09/21/2022 User Id: SSCOTT39 Comment: Approved funding for 4569-210-11 R-Sonoma County -City of Rohnert Park Water Tank System Seismic Retrofit-$290,190.75 Authorization Preparer Name: STEVEN SCOTT Preparation Date: 09/21/2022 HMO Authorization Name: THOMAS BERRY HMO Authorization Date: 09/21/2022 Page 1 of 1 09/30/2022 11:17 AM Disaster FEMA Amendment Number Project Number Number 4569 11 - R 0 Subrecipient: Rohnert Park FIPS Code: 097-62546 FEDERAL EMERGENCY MANAGEMENT AGENCY HAZARD MITIGATION GRANT PROGRAM Project Management Report App ID State 210 CA Recipient Statewide Project Title : City of Rohnert Park Water Tank System Seismic Retrofit Mitigation Project Description Amendment Status: Approved Approval Status: Approved Project Title : City of Rohnert Park Water Tank System Seismic Retrofit Recipient : Statewide Subrecipient : Rohnert Park Recipient County Name : Sonoma Recipient County Code: 97 Recipient Place Name: Rohnert Park Recipient Place Code : 0 Project Closeout Date : 00/00/0000 Work Schedule Status Amend # Description 0 Phase 1: Design and Concurrent Permitting 0 Phase 1: California Environmental QualiryAct (CEQA 0 Phase 1: NEPA Review 0 Phase 2: Construction Management RFQ 0 Phase 2: Construction Bidding & Award 0 Phase 2: Construction 0 Phase 2: Project & Grant Closeout Subrecipient County Name : Sonoma Subrecipient County Code : 97 Subrecipient Place Name : Rohnert Park Subrecipient Place Code : 62546 HMGP-AP-01 Time Frame Due Date Revised Date Completion Date 10M 00/00/0000 00/00/0000 00/00/0000 3M 00/00/0000 00/00/0000 00/00/0000 6M 00/00/0000 00/00/0000 00/00/0000 3M 00/00/0000 00/00/0000 00/00/0000 3M 00/00/0000 00/00/0000 00/00/0000 9M 00/00/0000 00/00/0000 00/00/0000 6M 00/00/0000 00/00/0000 00/00/0000 Approved Amounts Total Approved Federal Total Approved Non -Federal Net Eligible Share Percent Federal Share Amount Share Percent $386,921.00 75.000000000 $290,190.75 25.00000000 Allocations Allocation IFMIS IFMIS Submission ES/DFSC ES/DFSC Proj Alloc Amount Subrecipient Number Status Date Date FY Support Req Amend Nr Fed Share Management Cost $290,190.75 $0.0 10 A 09/21/2022 09/20/2022 2022 7829388 0 Obligations Action IFMIS IFMIS Submission Nr Status Date Date Total $290,190.75 SFS SFS Suppl Project Obligated FY Support Amend Nr Amt - Fed Share Page 1 of 1 $0. Subrecipient Management Cost Total Approved Non -Fed Share Amount $96,730.25 Total Alloc Amount $318,190.75 $318,190.75 Total Obligated Amount 09�30/202X 09/21/202 09/21/2022 2022 78302F03DERAL6MERGEWC MANAGgM CY $0.00 $290k1Im P-01 11:17 AM HAZARD MITIGATION RANT wont_ Total $290,190.75 $0.00 $290,190.75 Page 1 of 1 09/19/2022 FEDERAL EMERGENCY MANAGEMENT AGENCY 04:42:19 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) Project HMGP-4569-0011-CA (4569-210-011) (1) Title: City of Rohnert Park Water Tank System Seismic Retrofit NEPA DETERMINATION Non Compliant Flag: No EA Public Notice Date: EIS Notice of Intent CATEX CATEGORIES EA Draft Date: EA Final Date: EA Fonsi Level: CATEX ��y:U]�l�Fii71 REC-01 Comment The project would involve the seismic retrofit or replacement of two potable water tank foundations (Tanks 1 and 2) with larger, deeper foundations and the tanks would be secured to newly drilled foundation piers with structural anchor bolts. A generator connection to the electrical panel that runs the booster pump, automatic transfer switch (ATS), and electrical infrastructure also would be installed at seven tanks (Tanks 1-7) to provide emergency backup power. Hard water and electrical connections would be replaced at Tanks 1-7 with flexible connections. The project would also add a generator connection for each of six well pumps (Wells, 7, 11, 13, 16, 27, and 39), an ATS, a properly anchored variable frequency drive to replace existing pneumatic tanks, and new control panels for regular and emergency operation along with other electrical modifications necessary to complete upgrades. Phase 1 of the project would include up to eight geotechnical bores at Tank 1 (38.33037,-122.69567) and Tank 2 (38.33037,-122.69567) in previously graded, disturbed areas in downtown Rohnert Park. No additional ground disturbance or structural activities are permitted during Phase 1 without prior notice to FEMA. This review does not cover construction actions, which would be conducted during Phase 2 and will require separate review. This project has been determined to be Categorically Excluded from the need to prepare either an Environmental Impact Statement or Environmental Assessment in accordance with FEMA Instruction 108-1-1 and FEMA Directive 108-1-1 as authorized by DHS Instruction Manual 023-01-001-01, Revision 1. Categorical Exclusions A4 (information gathering, data analysis and processing, information dissemination, review, interpretation, and development of documents) and A7 (the commitment of resources, personnel, and funding to conduct audits, surveys, and data collection of a minimally intrusive nature) have been applied . Particular attention should be given to the project conditions before and during project implementation. Failure to comply with these conditions may jeopardize federal assistance including funding. - Iholm2 - 09/09/2022 01:21:40 GMT Note correction in coordinates as follows: Tank 1 (38.331366,-122.696067) and Tank 2( 38.341343, - 122.697620); original coordinates (38.33037,-122.69567) provided by Subapplicant for Tank 1 nearest cross -street. - Iholm2 - 09/19/2022 02:02:07 GMT Catex Category Code Description a4 (a4) Information gathering, data analysis and processing, information dissemination, review, interpretation, and development of documents. If any of these activities result in proposals for further action, those proposals must be covered by an appropriate CATEX. Examples include but are not limited to: (a) Document mailings, publication and distribution, training and information programs, historical and cultural demonstrations, and public affairs actions. (b) Studies, reports, proposals, analyses, literature reviews; computer modeling; and non -intrusive intelligence gathering activities. a7 (a7) The commitment of resources, personnel, and funding to conduct audits, surveys, and data collection of a minimally intrusive nature. If any of these commitments result in proposals for further action, those proposals must be covered by an appropriate CATEX. Examples include, but are not limited to: (a) Activities designed to support the improvement or upgrade management of natural resources, such as surveys for threatened and endangered species, wildlife and wildlife habitat, historic properties, and archeological sites; wetland delineations; timber stand examination; minimal water, air, waste, material and soil sampling; audits, photography, and interpretation. (b) Minimally -intrusive geological, geophysical, and geo-technical activities, including mapping and engineering surveys. (c) Conducting Facility Audits, Environmental Site Assessments and Environmental Baseline Surveys, and (d) Vulnerability, risk, and structural integrity assessments of infrastructure. Selected Yes Yes NOTE: All times are GMT using a 24-hour clock. Page 1 of 5 09/19/2022 FEDERAL EMERGENCY MANAGEMENT AGENCY 04:42:19 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) Project HMGP-4569-001 1 -CA (4569-210-011) (1) Title: City of Rohnert Park Water Tank System Seismic Retrofit EXTRAORDINARY Extraordinary Circumstance Code ENVIRONMENTAL LAW / EXECUTIVE ORDER Description No Extraordinary Circumstances were selected Environmental Law/ Executive Order Status Description Clean Air Act (CAA) Completed Project is located in a non -attainment area Completed Coordination required with applicable state administering agency - Review concluded Comment REC-01 Selected ? The project is located in Sonoma County. The county is within a non -attainment area for 8 hr Ozone (2008, 2015) and PM-2.5 (2006) according to the U.S. Environmental Protection Agency (USEPA): https://www3.epa.gov/airquality/greenbook/anay o_ca.html updated, August 31, 2022 . Based on the scope of work, the potential emissions from project activities are clearly below de minimis thresholds for the General Conformity rule. Thus, the project is exempt from a conformity determination. - Iholm2 - 09/09/2022 01:01:06 GMT Coastal Barrier Resources Act Completed Project is not on or connected to CBRA Unit (CBRA) or otherwise protected area - Review concluded Clean Water Act (CWA) Completed Project would not affect any water of the U.S. - Review concluded Coastal Zone Management Act Completed Project is not located in a coastal zone area (CZMA) and does not affect a coastal zone area - Review concluded Executive Order 11988 - Completed No effect on floodplain/flood levels and Per Flood Rate Insurance Map (FIRM) panel Floodplains project outside floodplain - Review concluded 06097C0879E, dated December 2, 2008, the project is located outside the Special Flood Hazard Area and the project is outside the floodplain. See attached maps. - Iholm2 - 09/19/2022 01:36:33 GMT Executive Order 11990 - Completed No effects on wetlands and project outside Per the U.S. Fish and Wildlife Service Wetland Wetlands wetlands - Review concluded Mapper viewed on September 5, 2022, the project is located outside of wetlands and not likely to result in any potential direct impacts that will adversely affect wetlands. See attached maps. - NOTE: All times are GMT using a 24-hour clock. Page 2 of 5 09/19/2022 FEDERAL EMERGENCY MANAGEMENT AGENCY REC-01 04:42:19 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) Project HMGP-4569-001 1 -CA (4569-210-011) (1) Title: City of Rohnert Park Water Tank System Seismic Retrofit Environmental Law/ Executive Order Status Description Comment Iholm2 - 09/19/2022 01:36:56 GMTPer the U.S. Fish and Wildlife Service Wetland Mapper viewed on September 5, 2022, the project is located outside of wetlands and not likely to result in any potential direct impacts that will adversely affect wetlands. See attached maps. - Iholm2 - 09/19/2022 01:41:03 GMTPer the U.S. Fish and Wildlife Service Wetland Mapper viewed on September 5, 2022, the project is located outside of wetlands and not likely to result in any potential direct impacts that will adversely affect wetlands. See attached maps. - Iholm2 - 09/19/2022 01:42:10 GMT Executive Order 12898 - Completed Low income or minority population in or near According to the Environmental Protection Environmental Justice for Low project area Agency's Environmental Justice Screening and Income and Minority Populations Mapping Tool (Version 2020), there are minority (40-48%) and low-income (29-31%) populations within 1 mile of the Tank 1 and Tank 2 project areas. This project would not result in disproportionately high and adverse impacts on low income or minority populations. - Iholm2 - 09/09/2022 01:04:27 GMT Completed No disproportionately high and adverse impact on low income or minority population - Review concluded Endangered Species Act (ESA) Completed Listed species and/or designated critical The proposed action is to provide funding to the habitat present in areas affected directly or subrecipient for design development and indirectly by the federal action geotechnical boring. These actions would result in no impacts to endangered species. Endangered Species Act (ESA) review will need to be completed prior to implementing any subsequent phases of the project. The proposed Phase 1 scope of work will not destroy or adversely modify suitable habitat and will not affect any other listed or proposed species under the jurisdiction of the U.S. Fish and Wildlife Service (USFWS). It is therefore determined the proposed action would have "No Effect" on listed species and consultation with the USFWS under Section 7 of the ESA is not required. See attached No Effect Determination. - Iholm2 - 09/09/2022 00:59:54 GMT Completed No effect to species or designated critical habitat (See comments for justification) - Review concluded Farmland Protection Policy Act Completed Project does not affect designated prime or (FPPA) unique farmland - Review concluded NOTE: All times are GMT using a 24-hour clock. Page 3 of 5 09/19/2022 FEDERAL EMERGENCY MANAGEMENT AGENCY 04:42:19 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) Project HMGP-4569-001 1 -CA (4569-210-011) (1) Title: City of Rohnert Park Water Tank System Seismic Retrofit Environmental Law/ Executive Order Status Description Fish and Wildlife Coordination Completed Project does not affect, control, or modify a Act (FWCA) waterway/body of water - Review concluded Migratory Bird Treaty Act (MBTA) Completed Project located within a flyway zone Completed Magnuson -Stevens Fishery Completed Conservation and Management Act (MSA) Project does not have potential to take migratory birds - Review concluded Project not located in or near Essential Fish Habitat - Review concluded National Historic Preservation Act Completed Applicable executed Programmatic (NHPA) Agreement. Activity meets Programmatic Allowance (enter date and # in comments) - Review concluded Wild and Scenic Rivers Act (WSR) CONDITIONS Standard Conditions: Completed Project is not along and does not affect Wild and Scenic River - Review concluded Comment REC-01 The project is in the Flyway, however, based on the project scope of work there is likely no potential for take of migratory birds. - Iholm2 - 09/09/2022 01:01:42 GMT The Phase I Undertaking was reviewed by Lisa Holm, who meets the applicable Secretary of the Interior Professional Qualifications Standards in accordance with Stipulation 1.B.1.a. of the Programmatic Agreement among the Federal Emergency Management Agency (FEMA), State Historic Preservation Office (SHPO) and California Office of Emergency Services (Cal OES) signed October 30, 2019. The Undertaking complies with Second Tier Programmatic Allowance II.A.5.b (geotechnical coring within previously disturbed soils) (Appendix B) of the Agreement. Thus, the Undertaking does not require SHPO review or notification per Stipulation II.A.1 of the Agreement. - Iholm2 - 09/09/2022 00:57:07 GMT Any change to the approved scope of work will require re-evaluation for compliance with NEPA and other Laws and Executive Orders. This review does not address all federal, state and local requirements. Acceptance of federal funding requires recipient to comply with all federal, state and local laws. Failure to obtain all appropriate federal, state and local environmental permits and clearances may jeopardize federal funding. NOTE: All times are GMT using a 24-hour clock. Page 4 of 5 09/19/2022 FEDERAL EMERGENCY MANAGEMENT AGENCY REC-01 04:42:19 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) Project HMGP-4569-001 1 -CA (4569-210-011) (1) Title: City of Rohnert Park Water Tank System Seismic Retrofit If ground disturbing activities occur during construction, applicant will monitor ground disturbance and if any potential archeological resources are discovered, will immediately cease construction in that area and notify the State and FEMA. NOTE: All times are GMT using a 24-hour clock. Page 5 of 5 Standard Mitigation Grant Program (HMGP) Conditions FEMA Region IX, August, 2018 The following list applies to Recipients and Subrecipients accepting HMGP funds from the Federal Emergency Management Agency (FEMA) of the Department of Homeland Security (DHS): Applicable Federal, State, and Local Laws and Regulations. The Recipient/Subrecipient must comply with all applicable Federal, State, and Local laws and regulations, regardless of whether they are on this list or other project documents. DHS financial assistance Recipients and Subrecipients are required to follow the provisions of the State HMGP` Administrative Plan, applicable Hazard Mitigation Assistance Uniform Guidance, and Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards located in Title 2 of the Code of Federal Regulations (CFR) Part 200, adopted by DHS in 2 CFR 3002. 2. Financial Management Systems. The Recipient and Subrecipient must maintain financial management systems to account for and track funds, as referenced in 2 CFR 200.302. 3. Match or Cost Share. Non-federal match or cost share must comply with 2 CFR 200.306, the scope of work (SOW), and any agreements among the Subrecipient, the Recipient, and FEMA. 4. Budget Changes. Unanticipated adjustments are permitted within the approved total cost. However, if costs exceed the federal share, the Subrecipient must notify the Governor's Authorized Representative (GAR) of overruns before implementation. The GAR shall submit a written request for approval to FEMA Region IX. The subaward must continue to meet HMGP requirements, including cost effectiveness and cost share. Refer to 2 CFR 200.308 for additional information. 5. Real Property and Land. The acquisition, use, and disposition must comply with 2 CFR 200.311. 6. Equipment. The acquisition, use, and disposition must comply with 2 CFR 200.313. 7. Supplies. Upon project completion, FEMA must be compensated for unused supplies, exceeding $5,000 (fair market value), and not needed for other federal programs. Refer to 2 CFR 200.314. 8. Procurement. Procurement procedures must be in conformance with 2 CFR 200.318-320. 9. Monitoring and Reporting Program Performance. The Recipient and Subrecipient must submit quarterly progress reports, as referenced in the 2 CFR 200.328 and State HMGP Administrative Plan. 10. Records Retention. In accordance with 2 CFR 200.333, financial/ programmatic records related to expenditures must be maintained at least 3 years after the date of Recipient's final expenditure report. 11. Enforcement and Termination. If the Recipient or Subrecipient fails to comply with the award or subaward terms, whether stated in a Federal statute or regulation, the State HMGP Administrative Plan, subpplication, a notice of award, an assurance, or elsewhere, FEMA may take one or more of the actions outlined in 2 CFR 200.338, including termination or partial termination of the award or subaward outlined in 2 CFR 200.339. 12. Allowable Costs. Funds are to be used for allowable costs in compliance with 2 CFR 200.403, the approved SOW, and any agreements among the Subrecipient, Recipient, and FEMA. 13. Non -Federal Audit. The Recipient and Subrecipient are responsible for obtaining audits in accordance with the Single Audit Act of 1984, in compliance with 2 CFR 200.501. 14. Debarred and Suspended Parties. Recipients and Subrecipients are subject to the non -procurement debarment and suspension regulations implementing Executive Orders 12549 and 12689, and 2 CFR 180. These regulations restrict federal financial assistance awards, subawards, and contracts with parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in the federal assistance programs or activities. 15. Equipment Rates. Rates claimed for use of Subrecipient-owned equipment in excess of the FEMA- approved rates must be approved under State guidelines issued by the State Comptroller's Office or must be certified by the Recipient to include only those costs attributable to equipment usage less any fixed overhead and/or profit. 16. Duplication of Funding between Public Assistance (PA) and HMGP. Funding for PA Section 406 and HMGP Section 404 are permitted on the same facility/location, but the activities identified under each program must be distinct with separately accounted funds. At closeout, FEMA may adjust the funding to ensure the Subrecipient was reimbursed for eligible work from only one funding source. 17. Historic Properties and Cultural Resources. In compliance with 2 CFR 800, if a potential historic property or cultural resource is discovered during construction, the Subrecipient must cease work in the area and take all reasonable measures to avoid or minimize harm to the discovered property/resource. During construction, the Subrecipient will monitor ground disturbance activity, and if any potential archeological resources are discovered, will immediately cease work in that area, and notify the Recipient and FEMA. Construction in the area may resume with FEMA's written approval after FEMA's consultation, if applicable, with the State Historic Preservation Officer (SHPO). 18. NEPA and Changes to the Scope of Work (SOW). To comply with the National Environmental Policy Act (NEPA), and other Laws and Executive Orders, any change to the approved SOW shall be re-evaluated before implementation. Construction associated with a SOW change, prior to FEMA approval, may be ineligible for funding. Acceptance of federal funding requires environmental permits and clearances in compliance with all appropriate federal, state and local laws, and failure to comply may jeopardize funding. Within their authority, the Recipient and Subrecipient must use of all practicable means, consistent with other essential policies, to create and maintain productive harmony for people and nature, and fulfill the social, economic, and other needs of present and future generations of Americans. 2 CONSULTANT SERVICES AGREEMENT RE: WATER TANK AND WELL SYSTEM SEISMIC RETROFIT DESIGN PROJECT NO.2020-17 This AGREEMENT FOR CONSULTANT SERVICES ("Agreement") is entered into as of the day of 2024, by and between the City of Rohnert Park ("City"), a California municipal corporation, and SANDIS, Inc. ("Consultant"), a California corporation, with reference to the following facts, understandings and intentions. Recitals WHEREAS, City desires to obtain engineering design services for the Water Tanks and Wells Seismic Retrofit Project No. 2020-17; and WHEREAS, Consultant hereby warrants to City that Consultant is skilled and able to provide such services described in Section 3 of this Agreement; and WHEREAS, City desires to retain Consultant pursuant to this Agreement to provide the services described in Section 3, subject to the terms and conditions of this Agreement. Agreement NOW, THEREFORE, in consideration of their mutual covenants, the parties hereto agree as follows: 1. Incorporation of Recitals. The recitals and all defined terms set forth above are hereby incorporated into this Agreement as if set forth herein in full. 2. Project Coordination. Authorized representatives shall represent City and Consultant in all matters pertaining to this Agreement. A. Cam. The City Manager or his/her designee shall represent City for all purposes under this Agreement, except where approval for the City is specifically required by the City Council. The CIP Project Manager, Amanda Bunte, is hereby designated as the project manager ("Project Manager"). The Project Manager shall supervise the progress and execution of this Agreement. B. Consultant. Consultant shall assign Tom Frisher to have overall responsibility for the progress and execution of this Agreement for Consultant. 3. Scope and Performance of Services A. Scope of Services. Subject to such policy direction and approvals as the City through its staff may determine from time to time, Consultant shall perform the services set out in the "Scope of Work" attached hereto as Exhibit A and incorporated herein by reference. Page 1 of 16 OAK #4858-0652-4811 (Rev.10/23) B. Time of Performance. Consultant's services are to commence upon receipt of a written notice to proceed from City, but in no event prior to receiving a fully executed agreement from City and obtaining and delivering the required insurance coverage, and satisfactory evidence thereof, to City. Consultant's services are to be completed not later than December 31, 2024. Consultant shall perform its services in accordance with the schedule attached hereto as Exhibit A. Any changes to these dates in either this Section 3 or Exhibit A must be approved in writing by the City. C. Standard of Quality. City relies upon the professional ability of Consultant as a material inducement to entering into this Agreement. All work performed by Consultant under this Agreement shall be performed: (1) with due diligence, using its best efforts to perform and coordinate all activities in a timely manner; (2) in accordance with all applicable legal requirements; and (3) with the standard of quality ordinarily expected of competent professionals in Consultant's field of expertise. Consultant shall correct, at its own expense, all errors made in the provision of services under this Agreement. In the event that Consultant fails to make such correction in a timely manner, City may make the correction and charge the cost thereof to Consultant. 4. Compensation and Method of Payment. A. Compensation. The compensation to be paid to Consultant, including both payment for professional services and reimbursable expenses, shall be at the rate and schedules attached hereto as Exhibit B, and incorporated herein by reference. However, notwithstanding the foregoing, Consultant shall be required to complete all work identified in Exhibit A in an amount not to exceed the total cost identified in Exhibit B, and in no event shall the amount City pays Consultant exceed five -hundred ninety-two thousand, seven -hundred and seventy-six Dollars ($592,776). The City's payment under this Agreement shall not be deemed a waiver of unsatisfactory work, even if such defects were known to the City at the time of payment. B. Timing of P"ment. (1) Consultant shall submit itemized monthly statements for work performed. All statements shall include adequate documentation demonstrating work performed during the billing period and shall conform to Federal Funding invoicing requirements, if applicable. Except as otherwise provided herein, City shall make payment, in full, within thirty (30) days after City's approval of the invoice. (2) Payments due and payable to Consultant for current services must be within the current budget and within an available, unexhausted and unencumbered appropriation of the City. In the event the City has not appropriated sufficient funds for payment of Consultant services beyond the current fiscal year, this Agreement shall cover only those costs incurred up to the conclusion of the current fiscal year; payment for additional work is conditional upon future City appropriation. C. Changes in Compensation. Consultant will not undertake any work that will incur costs in excess of the amount set forth in Section 4(A) of this Agreement without prior written amendment to this Agreement. City shall have the right to amend the Scope of Work Page 2 of 16 OAK #4858-0652-4811 (Rev.10/23) within the Agreement by written notification to Consultant. In such event, the compensation and time of performance shall be subject to renegotiation upon written demand of either party to the Agreement. Consultant shall not commence any work exceeding the Scope of Work without prior written authorization from the City. Failure of Consultant to secure City's written authorization for extra or changed work shall constitute a waiver of any and all right to adjustment in the contract price or time due, whether by way of compensation, restitution, quantum meruit, etc. for work done without the appropriate City authorization. D. Taxes. Consultant shall pay all taxes, assessments and premiums under the federal Social Security Act, any applicable unemployment insurance contributions, Workers Compensation insurance premiums, sales taxes, use taxes, personal property taxes, or other taxes or assessments now or hereafter in effect and payable by reason of or in connection with the services to be performed by Consultant. E. No Overtime or Premium Pay. Consultant shall receive no premium or enhanced pay for work normally understood as overtime, i.e., hours that exceed forty (40) hours per work week, or work performed during non-standard business hours, such as in the evenings or on weekends. Consultant shall not receive a premium or enhanced pay for work performed on a recognized holiday. Consultant shall not receive paid time off for days not worked, whether it be in the form of sick leave, administrative leave, or for any other form of absence. F. Litigation Support. Consultant agrees to testify at City's request if litigation is brought against City in connection with Consultant's work product. Unless the action is brought by Consultant or is based upon Consultant's negligence, City will compensate Consultant for the preparation and the testimony at Consultant's standard hourly rates, if requested by City and not part of the litigation brought by City against Consultant. 5. Term. This Agreement shall commence upon its execution by both parties and shall continue in full force and effect until completed, amended pursuant to Section 19, or otherwise terminated as provided herein. 6. Inspection. Consultant shall furnish City with every reasonable opportunity for City to ascertain that the services of Consultant are being performed in accordance with the requirements and intentions of this Agreement. All work done and all materials furnished, if any, shall be subject to the Project Manager's inspection and approval. The inspection of such work shall not relieve Consultant of any of its obligations to fulfill the Agreement as prescribed. 7. Ownership of Documents. Title, including the copyright and all intellectual property rights, to all plans, specifications, maps, estimates, reports, manuscripts, drawings, descriptions, designs, data, photographs, reports and any other final work products compiled, prepared or obtained by Consultant under the Agreement shall be vested in City, none of which shall be used in any manner whatsoever by any person, firm, corporation, or agency without the expressed written consent of the City. Consultant shall assume no responsibility for the unintended use by others of such final work products which are not related to the scope of the services described under this Agreement. Basic survey notes and sketches, charts, computations, and other data prepared or obtained under the Agreement shall be made available, upon request, to City without restriction or limitations on their use. Consultant may retain copies of the above - Page 3 of 16 OAK #4858-0652-4811 (Rev.10/23) described information but agrees not to disclose or discuss any information gathered, discussed or generated in any way through this Agreement without the written permission of City during the term of this Agreement, unless required by law. 8. Employment of Other Consultants, Specialists or Experts. Consultant will not employ or otherwise incur an obligation to pay other consultants, specialists or experts for services in connection with this Agreement without the prior written approval of the City. 9. Conflict of Interest Requirements. A. Consultant covenants and represents that neither it, nor any officer or principal of its firm, has, or shall acquire any investment, income, business entity, interest in real property, or other interest, directly or indirectly, which would conflict in any manner with the interests of City, hinder Consultant's performance of services under this Agreement, or be affected in any manner or degree by performance of Consultant's services hereunder. Consultant further covenants that in the performance of the Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the City. Consultant agrees at all times to avoid conflicts of interest, or the appearance of any conflicts of interest, with the interests of the City in the performance of the Agreement. B. Consultant is not a designated employee within the meaning of the Political Reform Act because Consultant: (1) will not have the power to make any governmental decision, including whether to: approve any rates, rules, regulations, policies, standards, or guidelines of the City or any of its subdivisions; adopt or enforce any laws; issue, deny, suspend, or revoke any permit, license, application, certificate, order, or any similar authorization or entitlement; authorize, modify, or renew any form of City contract; grant approval to any City contract specifications on behalf of the City; or grant City approval for any plans, designs, reports, or similar; and (2) will not participate in the making of any governmental decision in the equivalent of a staff capacity. For the purposes of this provision, "participating in a governmental decision" includes providing information, an opinion, or a recommendation directly to any person at the City empowered to make a decision on behalf of the City without significant intervening substantive review; and (3) will not perform the same duties for the City that would otherwise be performed by a staff member required to report under the City's conflict of interest code. (2 Cal. Code Regs. § 18700.3.) 10. Liability of Members and Employees of City. No member of the City and no other officer, elected official, employee or agent of the City shall be personally liable to Consultant or otherwise in the event of any default or breach of the City, or for any amount which may become due to Consultant or any successor in interest, or for any obligations directly or indirectly incurred under the terms of this Agreement. To the maximum extent permitted by Page 4 of 16 OAK #4858-0652-4811 (Rev.10/23) law, the City shall have no liability or responsibility for any accident, loss, or damage to any work performed under this Agreement whether prior to its completion or acceptance or otherwise. 11. Indemnity. A. Indemnification. To the fullest extent permitted by law, Consultant shall, at its own expense, indemnify, protect, defend (by counsel reasonably satisfactory to the City) and hold harmless City and any and all of its officers, officials, employees, agents and volunteers ("Indemnified Parties") from and against any and all liability (including liability for claims, demands, damages, obligations, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including attorneys' fees and costs, court costs, interest, defense costs and expert witness fees) of any nature ("Liability"), whether actual, alleged or threatened, which arise out of, pertain to, or relate to the performance or failure to comply with this Agreement, regardless of any fault or alleged fault of the Indemnified Parties. I. For design professionals (as that term is defined by statute) acting within the scope of their professional capacity, to the fullest extent permitted by law, Consultant shall, at its own expense, indemnify, protect, defend (by counsel reasonably satisfactory to the City) and hold harmless any Indemnified Parties from and against any and all Liability, whether actual, alleged or threatened, which arise out of, pertain to, or relate to Consultant's negligence, recklessness, or willful misconduct, or as may be provided by statute in Civil Code § 2782.8, as may be amended from time to time. 2. The only exception to Consultant's responsibility to indemnify, protect, defend, and hold harmless the Indemnified Parties from Liability is due to the active negligence or willful misconduct of City or its elective or appointive boards, officers, agents and employees. B. Scope of Obli ag tion. Consultant's duty to indemnify, protect, defend and hold harmless as set forth in this Section II shall include the duty to defend (by counsel reasonably satisfactory to the City) as set forth in California Civil Code § 2778. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable by or for Consultant under worker's compensation, disability or other employee benefit acts or the terms, applicability or limitations of any insurance held or provided by Consultant and shall continue to bind the parties after termination/completion of this Agreement. This indemnification shall be regardless of and not in any way limited by the insurance requirements of this contract. This indemnification is for the full period of time allowed by law and shall survive the termination of this agreement. Consultant waives any and all rights to express or implied indemnity against the Indemnified Parties concerning any Liability of Consultant arising out of or in connection with the Agreement or Consultant's failure to comply with any of the terms of this Agreement. C. Consultant's duty to indemnify, protect, defend and hold harmless as set forth in this Section II shall not be excused because of Consultant's inability to evaluate Liability, or because Consultant evaluates Liability and determines that Consultant is not or may not be Page 5 of 16 OAK #4858-0652-4811 (Rev.10/23) liable. Consultant must respond within thirty (30) calendar days to any tender by the City, unless the time for responding has been extended by an authorized representative of the City in writing. If Consultant fails to timely accept such tender, in addition to any other remedies authorized by law, as much of the money due or that may become due to Consultant under this Agreement as shall reasonably be considered necessary by the City may be retained by the City until disposition has been made of the matter subject to tender, or until Consultant accepts the tender, whichever occurs first. Consultant agrees to fully reimburse all costs, including but not limited to attorney's fees and costs and fees of litigation incurred by the City in responding to matters prior to Consultant's acceptance of the tender. 12. Independent Contractor. It is expressly agreed that Consultant, in the performance of the work and services agreed to be performed by Consultant, shall act as and be an independent contractor and not an agent or employee of City and shall have responsibility for and control over the details and means of providing its services under this Agreement. Consultant shall furnish, at its own expense, all labor, materials, equipment, tools, transportation and services necessary for the successful completion of the services under this Agreement. As an independent contractor, Consultant shall obtain no rights to retirement benefits or other benefits which accrue to City's employees, and Consultant hereby expressly waives any claim it may have to any such rights. Consultant, its officers, employees and agents shall not have any power to bind or commit the City to any decision. 13. Compliance with Laws. A. General. Consultant shall use the standard of care in its profession to comply with all applicable federal, state, and local laws, codes, ordinances, and regulations. Consultant represents and warrants to City that it has and shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits, insurance and approvals which are legally required for Consultant to practice its profession. City is not responsible or liable for Consultant's failure to comply with any or all of the requirements contained in this paragraph or in this Agreement. B. Workers' Compensation. Consultant certifies that it is aware of the provisions of the California Labor Code which require every employee to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and Consultant certifies that it will comply with such provisions before commencing performance of the Agreement and at all times in the performance of the Agreement. C. Prevailing Wage. Consultant and Consultant's subcontractors (if any) shall, to the extent required by the California Labor Code, pay not less than the latest prevailing wage rates to workers and professionals as determined by the Director of Industrial Relations of the State of California pursuant to California Labor Code, Part 7, Chapter 1, Article 2. Copies of the applicable wage determination are on file at the City's office of the City Clerk. D. Injury and Illness Prevention Program. Consultant certifies that it is aware of and has complied with the provisions of California Labor Code § 6401.7, which requires every employer to adopt a written injury and illness prevention program. Page 6 of 16 OAK #4858-0652-4811 (Rev.10/23) E. Business Licenses. Unless exempt by law, Consultant and all subcontractors shall have acquired, at Consultant's expense, a business license from the City in accordance with Chapter 5.04 of the Rohnert Park Municipal Code, prior to City's issuance of an authorization to proceed with the Services. Such license(s) shall be kept valid throughout the term of this Agreement. City may withhold compensation from Consultant until such time as Consultant complies with this section. 14. Confidential Information. All data, documents, discussions or other information developed or received by or for Consultant in performance of this Agreement are confidential and not to be disclosed to any person except as authorized by City or as required by law. 15. Assignment; Subcontractors; Employ A. Assignment. Consultant shall not assign, delegate, transfer, or convey its duties, responsibilities, or interests in this Agreement or any right, title, obligation, or interest in or to the same or any part thereof without the City's prior written consent, which shall be in the City's sole discretion. Any assignment without such approval shall be void and, at the City's option, shall immediately cause this Agreement to terminate. B. Subcontractors; Employees. Consultant shall be responsible for employing or engaging all persons necessary to perform the services of Consultant hereunder. No subcontractor of Consultant shall be recognized by the City as such; rather, all subcontractors are deemed to be employees of Consultant, and Consultant agrees to be responsible for their performance. Consultant shall give its personal attention to the fulfillment of the provisions of this Agreement by all of its employees and subcontractors, if any, and shall keep the work under its control. If any employee or subcontractor of Consultant fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, it shall be discharged immediately from the work under this Agreement on demand of the Project Manager. 16. Insurance. Without limiting Consultant's indemnification provided herein, Consultant shall, at its own expense, procure and maintain insurance that complies with the requirements set forth in Exhibit C to this Agreement, which is attached hereto and incorporated by reference. Consultant shall upon thirty (30) days' notice comply with any changes in the amounts and terms of insurance as may be required from time -to -time by City's risk manager. 17. Termination of Agreement; Default. A. This Agreement and all obligations hereunder may be terminated at any time, with or without cause, by the City upon five (5) days' written notice to Consultant. B. If Consultant fails to perform any of its obligations under this Agreement within the time and in the manner herein provided or otherwise violates any of the terms of this Agreement, in addition to all other remedies provided by law, City may terminate this Agreement immediately upon written notice. In such event, Consultant shall be entitled to receive as full payment for all services satisfactorily rendered and expenses incurred hereunder, an amount which bears the same ratio to the total fees specified in the Agreement as the services Page 7 of 16 OAK #4858-0652-4811 (Rev.10/23) satisfactorily rendered by Consultant bear to the total services otherwise required to be performed for such total fee; provided, however, that the City shall deduct from such amount the amount of damages, if any, sustained by City by virtue of Consultant's breach of the Agreement. C. In the event City terminates this Agreement without cause, Consultant shall be entitled to any compensation owed to it up to the time of such termination, it being understood that any payments are full compensation for services rendered prior to the time of payment. D. Upon termination of this Agreement with or without cause, Consultant shall turn over to the City Manager immediately any and all copies of studies, sketches, drawings, computations, and other data, whether or not completed, prepared by Consultant or its subcontractors, if any, or given to Consultant or its subcontractors, if any, in connection with this Agreement. Such materials shall become the permanent property of the City. Consultant, however, shall not be liable for City's use of incomplete materials nor for the City's use of complete documents if used for other than the project contemplated by this Agreement. 18. Suspension. City shall have the authority to suspend this Agreement and the services contemplated herein, wholly or in part, for such period as it deems necessary due to unfavorable conditions or to the failure on the part of Consultant to perform any provision of this Agreement. Consultant will be paid for satisfactory services performed prior to the date of suspension. During the period of suspension, Consultant shall not receive any payment for services or expenses incurred by reason of such suspension. 19. Merger; Amendment. This Agreement constitutes the complete and exclusive statement of the agreement between City and Consultant and shall supersede all prior negotiations, representations, or agreements, either written or oral. This document may be amended only by written instrument, signed by both the City and Consultant. All provisions of this Agreement are expressly made conditions. 20. Interpretation. This Agreement shall be interpreted as though it was a product of a joint drafting effort, and no provisions shall be interpreted against a party on the ground that said party was solely or primarily responsible for drafting the language to be interpreted. 21. Litigation Costs. If either party becomes involved in litigation arising out of this Agreement or the performance thereof, the court in such litigation shall award reasonable costs and expenses, including attorneys' fees, to the prevailing party. In awarding attorneys' fees, the court will not be bound by any court fee schedule, but shall, if it is in the interest of justice to do so, award the full amount of costs, expenses, and attorneys' fees paid or incurred in good faith. 22. Time Is of the Essence. Time is of the essence in this Agreement. Upon receipt of a written notice from City to proceed with work required by this Agreement, Consultant shall immediately commence work to perform the services required in accordance with the schedule of work. In the event that the Agreement does not include a fixed schedule for completion of work, Consultant shall diligently prosecute all work until completion. Page 8 of 16 OAK #4858-0652-4811 (Rev.10/23) 23. Written Notification. Any notice, demand, request, consent, approval or communication that either party desires or is required to give to the other party shall be in writing and either served personally or sent by prepaid, first-class mail. Any such notice, demand, etc. shall be addressed to the other party at the address set forth below. Either party may change its address by notifying the other party in writing of the change of address. Notice shall be deemed communicated within seventy-two (72) hours from the time of mailing if mailed as provided in this section. If to City: City Clerk City of Rohnert Park - City Hall 130 Avram Avenue Rohnert Park, CA 94928 If to Consultant: SANDIS, Inc. 636 91h Street Oakland, CA 94607 24. Consultant's Books and Records. A. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services, or expenditures and disbursements charged to City and all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement. B. Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City Attorney, City Auditor, City Manager, or a designated representative of any of these officers. Copies of such documents shall be provided to City for inspection when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Consultant's address indicated for receipt of notices in this Agreement. C. City may, by written request by any of the above -named officers, require that custody of the records be given to the City and that the records and documents be maintained in the City Manager's office. 25. Agreement Is Binding. The terms, covenants, and conditions of this Agreement shall apply to, and shall bind, the heirs, successors, executors, administrators, assigns, and subcontractors of both parties. 26. Equal Employment Opportunity. Consultant is an equal opportunity employer and agrees to comply with all applicable state and federal regulations governing equal employment opportunity. Consultant will not discriminate against any employee or applicant for employment because of race, religion, age, sex, creed, color, sexual orientation, marital status or national origin. Consultant will take affirmative action to ensure that applicants are treated Page 9 of 16 OAK #4858-0652-4811 (Rev.10/23) during such employment without regard to race, religion, age, sex, creed, color, sexual orientation, marital status, or national origin. Such action shall include, but shall not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; lay-offs or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. Consultant further agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause. 27. Non -Exclusive Agreement. This is a non-exclusive agreement. City reserves the right to provide, and to retain other consultants to provide, services that are the same or similar to the services described in this Agreement. 28. City Not Obligated to Third Parties. The City shall not be obligated to or liable for payment hereunder to any parry other than Consultant. 29. Remedies/Waiver. No failure on the part of either party to exercise any term, covenant, condition, right or remedy hereunder shall operate as a waiver of any other term, covenant, condition, right or remedy that such parry may have hereunder. All remedies permitted or available under this Agreement, or at law or in equity, are cumulative and alternative. As a condition precedent to commencing legal action involving a claim or dispute against City arising from this Agreement, Consultant shall comply with the claims -presentation requirements under the Government Tort Claims Act, California Government Code Sections 900, et seq. and the Rohnert Park Municipal Code. 30. Severability. If any one or more of the provisions contained herein shall for any reason be held to be invalid, illegal or unenforceable in any respect, then such provision or provisions shall be deemed severable from the remaining provisions hereof, and such invalidity, illegality, or unenforceability shall not affect any other provision hereof, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had not been contained herein. 31. Exhibits. The following exhibits are attached to this Agreement and incorporated herein by this reference: A. Exhibit A: Scope of Work and Schedule of Performance B. Exhibit B: Compensation C. Exhibit C: Insurance Requirements 32. Execution. This Agreement may be executed in several counterparts, each of which shall constitute one and the same instrument and shall become binding upon the parties when at least one copy hereof shall have been signed by both parties. In approving this Agreement, it shall not be necessary to produce or account for more than one such counterpart. The parties hereby expressly agree to the use of electronic signatures, which shall be deemed to have the same effect as an original - gnature. Page 10 of 16 OAK #4858-0652-4811 (Rev.10/23) 33. News Releases/Interviews. All Consultant and subcontractor news releases, media interviews, testimony at hearings and public comment shall be prohibited unless expressly authorized by City. 34. Applicable Law; Venue. This Agreement shall be construed and interpreted according to California law. In the event that suit shall be brought by either party hereunder, the parties agree that a trial of such action shall be held exclusively in a state court in the County of Sonoma, California. 35. Authorijy. Each individual executing this Agreement on behalf of one of the parties represents that he or she is duly authorized to sign and deliver the Agreement on behalf of such party and that this Agreement is binding on such party in accordance with its terms. IN WITNESS WHEREOF, City and Consultant have executed this Agreement as of the date first above written. CITY OF ROHNERT PARK By: Marcela Piedra, City Manager Date: Per Resolution No. 2024- adopted by the Rohnert Park City Council at its meeting of March , 2024 ATTEST: By: City Clerk APPROVED AS TO FORM: By: City Attorney SANDIS INC. Agreement signed by Consultant ' on File with Clerk's Office By: Jeff Setera, PE Title: President Date: SANDIS, INC By: Tony Brubaker Title: CFO & Associate Principal Date: Page 11 of 16 OAK #4858-0652-4811 (Rev.10/23) EXHIBIT A Scope of Work and Schedule of Performance [to be inserted] Exhibit A OAK #4858-0652-4811 (Rev.10/23) SCOPE OF SERVICES A. PROJECT ASSESSMENT As part of the initial Project Assessment, The Sandis Team (Sandis) will perform the following tasks: 1. Visit all Project groundwater well and tank sites to become familiar with the Project. 2. Review existing available record drawings of the facilities and assess the current condition of the well and tank sites as it applies to Current Seismic Building Code requirements. This will include confirmation of accuracy of record drawings wherever feasible. 3. Review all attachments included in the RFP. 4. Review plans and supporting documents previously prepared by Brelje and Race Consulting Engineers (BRCE). Sandis will reuse as much of the existing design as feasible to generate overall Project design documents. 5. Review the following existing assessment reports as a basis to finalize the design: A. Well Assessment Technical Memo by BRCE dated 7-7-2022 (RFP Attachment B). B. Preliminary Seismic Evaluation Report by ZFA Structural Engineers dated 12-3-2020 for Water Tanks No.1 and No.2 (RFP Attachment C). 6. Review any additional existing project files provided to the consultant by the City. 7. Meet with City staff in person to discuss project details and discuss findings of Project Assessment. B. DESIGN Following the completion of the Project Assessment phase, Sandis will begin the Design Phase for the Project. This will include the following: 1. Prior to starting design, Sandis will prepare an engineering technical memorandum addressed to City Staff, for review and approval, summarizing the proposed design for this project. Sandis will engage City staff to answer any questions and feedback required to finalize the engineering technical memorandum. 2. Prepare existing conditions survey for each Project site. This will include the following items: A. Sandis will request utility as-builts from the City and all other utility providers in Project areas and include information on Project surveys. B. Collect topographic survey data at each of the well and tank sites. C. Perform mechanical utility locating at each of the well and tank sites. D. Perform potholing at sites as determined necessary to verify existing conditions. Our fee includes a $50,000 allowance for potholing. E. Produce a topographic survey for each site at a scale of 1" = 20'. This survey will show the location of existing trees, structures, walkways, fences, adjacent roadways, and utility information within the project areas. 3. Prepare a Geotechnical Study for the project sites to be used during the Design phase. This study will include the following: A. Review available geologic and geotechnical data. B. Perform field investigation. Subsurface exploration will be performed using soil borings and cone penetration testing (CPT). This effort will be focused at the Tank 1 and 2 sites, given the most significant structural improvements will be at these sites. C. Perform laboratory testing on soil samples. D. Prepare a geotechnical report summarizing the results of the data review and field investigation. Provide recommendations to be used during design. 4. Prepare construction documents including full size drawings, technical specifications, engineer's construction cost estimate, and estimated construction time schedule. The Project plan set will include the following sheets: A. Cover Sheet and Typical Notes B. Demolition Plans C. Site Piping & Paving Improvements Plans D. Site Function & Process Diagram E. Erosion and Sediment Control Plans F. Horizontal Control and Layout Plans G. Construction Details H. Electrical Plans and Diagrams I. Structural Plans and Details Submittal will include: A. 60% PS&E and Construction Schedule B.100% PS&E and Construction Schedule 5. Lead and attend two (2) working meetings with Public Works staff to review design documents and discuss the Project. 6. Update Project Schedule. Schedule will meet Cal-OES project required deadlines, as detailed in Attachment D of the project RFP. 7. Update Bid Schedule. Schedule will match the grant application for grant -funded items. C. BUILDING PERMIT SUBMITTALS Following the completion of Design Development and PS&E submittals to Public Works, Sandis will perform the following services related to Building Permits: 1. Prepare, generate and submit all documents and six (6) hard copies to the Building Department, as required by the Building Permit Application. Sandis will coordinate with Public Works staff and keep them informed on progress. 2. Include all required/requested Building Department information on the Drawings as noted in the Building Permit Application and any other applicable checklists. 3. Make document and drawings revisions and resubmittals as required by the Building Permit plan check process in order to obtain City Building Permit for Construction. We assume revisions at this stage will be minor and not significantly modify or expand on the Project Design. EXHIBIT B Compensation [to be inserted] Exhibit B OAK #4858-0652-4811 (Rev.10/23) SANDIS / MILLER PACIFIC / ATEEM / RINNE & PETERSON Rinne & Rinne & Sandis Sandis Sandis MillerPacf/c M/llerPacf/c ATEEM Rinne& Peterson Peterson Rinne& Task Hours Total Task Fee R 0 H N E R T PARK DES 1 G N OF WATER TANK AND WELL Sandis Engineering Project Design Sandis Sandis Sandis Sandis Sandis Sandis Miller Pacfic Project Project A TEEM Project A TEEM Peterson Project Project Peterson CAD Fee / SYSTEM SEISMIC RETROFIT PROJECT PlC/QAQC PM Engineer Engineer CAD Tech Survey PM Proj Surveyor Survey Crew UL Manager Uti/Locator Principal Manager Engineer Principal Manager Engineer Principal Manager Engineer Technician Allowance � , ��-• �- 11 1 1 1 A. Project Assessment E 228 $48,330 B. Design 2427 $487,146 1. Prepare Engineering Technical Memo 0 1 2. Perform Site Surveys and Investigations . 111 . ' •1 C. Building Permits and Construction Documents 356 $57,300 1. Submit PS&E and applicable docs for Building Permit(s) 2. Address and respond to agency comments 3. Resubmit plans for agency approvals D. (OPTIONAL) Project Bidding 248 $49,742 1. Assist with project bidding 2. Attend pre -bid job walk 3. Assist with technical questions/clarifications during bidding 4. Assist with issuance of Addenda 5. Prepare and Issue Conformed Set of Drawings oil E. (OPTIONAL) Consultant Services During Construction 1118 $197,749 1. Conduct/assist client with pre -construction meeting 27 $6,900 2. Assist with responses to all RFIs during construction $67,283 3. Assist review and approval of project submittals Ulm 4. Assist with construction change orders 4 5. Assist with completion of punch list items 6. Prepare Record drawings/final digital copies 1. Prepare Boundary Survey for each Site 32 1 160 1 104 TotalsF 0 0 0 0 0 32 Notes: 1. Hours and staff assignments may be adjusted by the consultant as needed to implement the tasks described during the course of the project. 184 1 208 1 26 1 104 1 6 1 28 1 79 1 24 1 266 1 128 1 96 1 241 1 217 1 163 1 64400 1 3307 2961 $66,480 747 EXHIBIT C INSURANCE REQUIREMENTS for Consultant Services Agreement Consultant shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by Consultant, its agents, representatives, or employees. MINIMUM SCOPE AND LIMIT OF INSURANCE Coverage shall be at least as broad as: 1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $1,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Consultant has no owned autos, Code 8 (hired) and 9 (non -owned), with a limit no less than $1,000,000 per accident for bodily injury and property damage. 3. Workers' Compensation insurance as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. (Not required if consultant provides written verification it has no employees) 4. Professional Liability (Errors and Omissions) Insurance appropriates to Consultant's profession, with a limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions: Additional Insured Status The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of Consultant including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to Consultant's insurance (at least as broad as ISO Form CG 20 10 11 85, or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms, if later revisions used). Primary Coverage For any claims related to this contract, Consultant's insurance coverage shall be primary insurance primary coverage at least as broad as ISO CG 20 01 04 13 with respect to the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Exhibit C OAK #4858-0652-4811 (Rev.10/23) City, its officers, officials, employees, or volunteers shall be in excess of Consultant's insurance and shall not contribute with it. Notice of Cancellation Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City. Waiver of Subrogation Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether the City has received a waiver of subrogation endorsement from the insurer. Self -Insured Retentions Self -insured retentions must be declared to and approved by the City. The City may require Consultant to provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self -insured retention may be satisfied by either the named insured or City. Acceptability of Insurers Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best's rating of no less than A:VII, unless otherwise acceptable to the City. Claims Made Policies If any of the required policies provide coverage on a claims -made basis: I. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work; 2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work; and 3. If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a Retroactive Date prior to the contract effective date, Consultant must purchase "extended reporting" coverage for a minimum of five (5) years after completion of contract work. Verification of Coverage Consultant shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive Consultant's obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. Exhibit C OAK #4858-0652-4811 (Rev.10/23) CERTIFICATE OF CONSULTANT I HEREBY CERTIFY that I am the President , and a duly authorized representative of the firm of Sandis Inc. whose address is 636 91h Street, Oakland, CA 94607 , and that neither I nor the above firm I here represent has: a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above consultant) to solicit to secure this Agreement. b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out the Agreement; or c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above consultant) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out the Agreement; Except as here expressly stated (if any); I acknowledge that this certificate is subject to applicable State and Federal laws, both criminal and civil. Date Jeff Setera PE Signature OAK #4858-0652-4811 (Rev.10/23) ITEM NO. 8.L. (00 Mission Statement "We Carefor Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow. CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Public Works Submitted By: Vanessa Garrett, Director of Public Works Prepared By: Jason Sampietro, Associate Engineer Agenda Title: Adopt a Resolution Finding the Pathway Replacement Project (Phase 1), Project No. CIP1722 Exempt from CEQA Pursuant to CEQA Guidelines Section 15301(c), Awarding the Construction Contract to SkyView Tree Experts, Inc. for $46,000, and Authorizing the City Manager to Approve up to 15% ($6,900) in Change Orders RECOMMENDED ACTION: Adopt a resolution finding the Pathway Replacement Project (Phase 1), Project No. CIP1722 exempt from CEQA pursuant to CEQA Guidelines Section 15301, awarding the construction contract to SkyView Tree Experts, Inc. for $46,000, and authorizing the City Manager to approve up to 15% ($6,900) in change orders. BACKGROUND: In April 2018, Fugro Roadware, Inc. prepared an Off Street Bike Path Report that analyzed 43 pathway sections in the City of Rohnert Park and found that 30 sections are in need of replacement. The City is selecting pathways for replacement based on Pavement Condition Index, usage, and pathway continuity. The current set of pathways in design for replacement are: - Hinebaugh Creek Path, Donna Court to Country Club Drive - Hinebaugh Creek Path, San Mateo Court to Snyder Lane - Hinebaugh Creek Path, Snyder Lane to University District Caltrans has current standards for pathways include a 10 foot width with a 3 foot shoulder (16 foot total width) and to have a 10 foot vertical clearance for branches and trees. To achieve the 16-foot wide pathway along the above sections of Hinebaugh Creek Path, approximately 150 trees would be required to be removed. Although Caltrans' recommended standards for pathway total width is 16-feet, there are also minimum standards, which match the city's standard pathway width of 8 foot wide paved pathway with 2 foot shoulders. ANALYSIS: To proceed the above pathway replacement project, the City decided to design the minimum width pathway. The reduced width pathway would result in needing to remove 38 trees, as opposed to 150 trees. These trees were assessed by the City arborist and were found to be either dead or dying, 4895-3538-4453 v1 ITEM NO. 8. L. maintenance hazards, drastically affect pathway width, or appear to have large root systems under the existing pathway and would likely suffer damage during construction. Public Outreach: On February 1, 2024, Staff hand delivered informational flyers to residents adjacent to the creek pathway where the affected trees are located, and posted on social media prior to the meeting. The flyer provided information of a public meeting being held on February 20, 2024 to discuss the pathway project and the potential for tree removal. On February 7, 2024, information regarding the pathway project and the upcoming public meeting was posted across the City's social media pages. On February 20, 2024 at 5pm the City hosted a community meeting regarding proposed tree removal and pathway construction and 5 people attended the meeting. Construction: The City's bidding procedures for public works projects operate under the California Uniform Public Construction Cost Accounting Act (CUPCCAA), Public Contract Code sections 22000-22050. In accordance with the City's bidding requirements, the engineers estimate for the project was $250,000, therefore the project was formally bid. Staff posted and published an Invitation to Bidders on January 51h, 2024 and January 12th, 2024 for the Pathway Tree Removal Project, Project No. 2017-22. On February 1st, 2024, the sealed bids were publicly opened. The City received thirteen (13) bids listed below: Contractor Bid Amount SkyView Tree Experts, Inc. $46,000 West Coast Arborists, Inc. $47,775 The Professional Tree Care Co. $65,835 Richard Smith DBA Bay Area Tree Specialists $71,998 Arbor Pros, LLC $77,920 Anvil Builders, Inc. DBA Atlas Sonoma Tree Surgery $81,918 Mountain F Enterprises $83,950 Atlas Tree Service, Inc. $98,600 Julian Tree Care, Inc. $106,200 Nate's Tree Service, Inc. $114,596.47 J. Allen Schneider Corp DBA Pacific Tree Care $143,714.43 Land Revision $215,000 Steve Taylor Excavation, Inc. $312,675 The average bidding price was $112,787.80. Staff has determined that SkyView Tree Experts, Inc. was the lowest apparent bidder, with a total bid of $46,000. Staff reviewed the bid for responsiveness and contractor responsibility. SkyView Tree Experts is found to be the lowest 4895-3538-4453 v1 ITEM NO. 8. L. responsive and responsible bidder with the license and bonding capacity to complete the work. To account for any unforeseen conditions during the construction, staff recommends that the City Council authorize the City Manager to execute change orders in an amount up to 15% ($6,900) of the project award amount for contingencies. ENVIRONMENTAL ANALYSIS: The scope of work involves tree removal for pathway improvements. Based on the scope of work, staff has determined that this project is categorically exempt from the California Environmental Quality Act (CEQA) under CEQA Guidelines section 15301c due to these minor improvements for pathways. STRATEGIC PLAN AND COUNCIL PRIORITIES ALIGNMENT: The recommended action is consistent with Strategic Plan Goal D (continue to develop a vibrant community) by providing pathway improvements for pedestrians and cyclists. Council Priority 4 (Provide Equitable Services to All) is met because this project serves residents of D and E Neighborhood Sections. Metropolitan Transportation Commission (MTC) identified D and E Neighborhood Sections as Equity Priority Communities in 2022. OPTIONS CONSIDERED: 1. Staff recommends adopting a resolution awarding the construction contract to SkyView Tree Experts, Inc. for $46,000 and authorizing the City Manager to execute change orders in an amount of up to 15% ($6,900) of the project award amount. 2. The City Council could decide to not award the construction contract and rebid the project. This option is not recommended as it will result in delaying needed improvements. If this option is selected, rebidding the project may not yield competitive bids. FISCAL IMPACT/FUNDING SOURCE: The fiscal impact of approving the proposed Resolution is $52,900. The Pathway Repaving Project currently has $979,848.15 unencumbered funds for the tree removal and future construction of the pathway replacement project. Upon approving the proposed Resolution, the total available project budget would be $926,948.15, which would provide sufficient funds to complete the pathway replacement portion of the project. Department Head Approval Date: 2-26-2024 City Attorney Approval Date: 2-23-2024 Finance Director Approval Date: 2-21-2024 City Manager Approval Date: 3-4-2024 Attachments: 1. Resolution 2. Resolution Exhibit A- Construction Contract with SkyView Tree Experts, Inc. for $46,000. 4895-3538-4453 v1 RESOLUTION NO.2024-019 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK FINDING THE PATHWAY REPLACEMENT (PHASE 1) PROJECT NO.2017-22 EXEMPT FROM CEQA PURSUANT TO CEQA GUIDELINES SECTION 15301C, AWARDING THE CONSTRUCTION CONTRACT TO SKYVIEW TREE EXPERTS, INC. FOR $46,000, AND AUTHORIZING THE CITY MANAGER TO APPROVE UP TO 15% (6,900) IN CHANGE ORDERS WHEREAS; in April 2018, Fugro Roadware, Inc. prepared an Off Street Bike Path Report that analyzed 43 pathway sections in the City of Rohnert Park and found that 30 sections are in need of replacement; and WHEREAS, the City determined the following Hinebaugh Creek Paths are in need of replacement next: Donna Court to Country Club Drive, San Mateo Court to Snyder Lane, and Snyder Lane to University District; and WHEREAS, the 2023 Sidewalk and Pathway Project consists of the replacement of the select creek pathways along Hinebaugh Creek with the recommendation to be widened to 8 feet paved and 2 foot shoulders and the vertical clearance raised per the City's manual of standards; and WHEREAS, The City Arborist identified 38 trees to be removed to construct the 2023 Sidewalk and Pathway Improvement Project; and WHEREAS, the City hosted a community meeting on February 20, 2024 regarding proposed tree removal and pathway construction; and WHEREAS, consistent with the Public Contract Code, an invitation for bids was posted and published on January 5, 2024 and January 12, 2024, for the Pathway Tree Removal Project; and WHEREAS, 13 sealed bids were received on the bid opening date of February 1, 2024 and were publicly opened; and WHEREAS, staff reviewed the bids and determined that SkyView Tree Experts, Inc. submitted the lowest responsive and responsible bid with an amount of $46,000; and WHEREAS, staff recommends that the City Council authorize the City Manager to Execute contract change orders in an amount up to 15% ($6,900) of the project award amount; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve as follows: 1. The above recitals are true and correct and material to this Resolution. 2. The City Manager is hereby authorized to approve up to 15% ($6,900) in Change Orders 3. The City Council determines that the Project is categorically exempt from CEQA pursuant to CEQA Guidelines Sections 15301C due to minor improvements for pathways, and directs staff to file a notice of exemption with the Clerk -Recorder's Office Resolution 2024-XXX 1 for the County of Sonoma. 4. In making its findings, the City Council relied upon and hereby incorporates by reference all of the bid materials, correspondence, staff reports and all other related materials. 5. In accordance with California Public Contract Code Section and any other applicable laws, the City Council of the City of Rohnert Park hereby finds the SkyView Tree Experts bid of $46,000.00 for the Project to be the lowest, responsive and responsible bid and waives any irregularities in such bid in accordance with applicable law. 6. The City Manager is hereby authorized and directed to execute the contract with SkyView Tree Experts, Inc. in substantially similar form to Exhibit A, which is attached hereto and incorporated by this reference, for the sum of Forty -Six Thousand Dollars and zero cents ($46,000.00) for construction of the Project in accordance with the bid documents and applicable law upon submission by SkyView Tree Experts, Inc. of all documents required pursuant to the Project bid documents. 7. City staff is hereby directed to issue a Notice of Award to SkyView Tree Experts, Inc. for the Project. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute documents pertaining to same for and on behalf of the City of Rohnert Park. DULY AND REGULARLY ADOPTED this 12th day of March, 2024. ATTEST: Sylvia Lopez Cuevas, City Clerk APPROVED AS TO FORM: Michelle M. Kenyon, City Attorney Attachments: Exhibit A CITY OF ROHNERT PARK Susan H. Adams, Mayor ELWARD: RODRIGUEZ: SANBORN: GIUDICE: ADAMS: AYES: ( ) NOES: ( ) ABSENT:( ) ABSTAIN: ( ) Resolution 2024-019 Page 2 of 2 CONTRACT PATHWAY TREE REMOVAL PROJECT NO. 2017-22 THIS AGREEMENT, made and entered into this 2024, by and between Skyview Tree Experts, hereinafter called "Contractor", and the City of Rohnert Park, hereinafter called "City". WHEREAS, the City Council of said City has awarded a contract to Contractor for performing the work hereinafter mentioned in accordance with the sealed proposal of said Contractor. NOW, THEREFORE, IT IS AGREED, as follows: 1. Scope of Work: The Contractor must perform all the work and furnish all the labor, materials, equipment and all utility and transportation services required to complete all of the work of construction and installation of the improvements more particularly described in the Resolution adopted by the City Council of said City on , 2024 the items and quantities of which are more particularly set forth in the Contractor's bid therefor on file in the office of the City Clerk, except work to be performed by subcontractors as set forth in the Contractor's bid and for which the Contractor retains responsibility. 2. Time of Performance and Liquidated Damages: The Contractor must begin work within fifteen (15) calendar days after official notice by the City Engineer to proceed with the work and must diligently prosecute the same to completion within 30 calendar days of that Notice. The Contractor acknowledges and agrees that time is of the essence with respect to Contractor's work and that Contractor shall diligently pursue performance of the work. In the event the Contractor does not complete the work within the time limit so specified or within such further time as said City Council must have authorized, the Contractor must pay to the City liquidated damages in the amount of Two Thousand Eight Hundred Dollars ($2,800) per day for each and every day's delay in finishing the work beyond the completion date so specified. Additional provisions with regard to said time of completion and liquidated damages are set forth in the specifications, which provisions are hereby referred to and incorporated herein by reference. 3. Payments: Payments will be made by City to the Contractor for said work performed at the times and in the manner provided in the specifications and at the unit prices stated in Contractor's bid. The award of the contract is for a total amount of Forty Six Thousand Dollars ($46,000.00) 4. Component Parts and Interpretation: This contract must consist of the following documents, each of which is on file in the office of the City Clerk and all of which are incorporated herein and made a part hereof by reference thereto: a) This Agreement b) Notice Inviting Sealed Proposals c) Instruction and Information to Bidders d) Accepted Proposal, with all attachments and certifications e) Performance Bond f) Payment Bond Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 g) Special Provisions h) Standard Specifications i) Technical specifications j) Design Standards k) Plans, Profiles and Detailed Drawings In the event of conflict between these documents, the following order of precedence will govern: this contract; change orders; supplemental agreements and approved revisions to plans and specifications; special conditions; standard specifications; detail plans; general plans; standard plans; reference specifications. In the absence of a controlling or contrary provision in the foregoing, the Standard Specifications (2022 edition) of the California Department of Transportation shall apply to this project. 5. Independent Contractor. Contractor is and will at all times remain as to City a wholly independent contractor. Neither City nor any of its officers, employees, or agents will have control over the conduct of Contractor or any of Contractor's officers, employees, agents or subcontractors, except as expressly set forth in the Contract Documents. Contractor may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of City. 6. Prevailing Wages: Copies of the determination of the Director of the Department of Industrial Relations of the prevailing rate of per diem wages for each craft, classification or type of worker needed to execute this Contract will be on file in, and available at, the office of the Director at 601 Carmen Drive, Camarillo, California 93010. Contractor must post at the work site, or if there is no regular work site then at its principal office, for the duration of the Contract, a copy of the determination by the Director of the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code § 1773.2.) Contractor, and any subcontractor engaged by Contractor, may pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records. Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor may forfeit as a penalty to City up to $200.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate. Nothing in this Contract prevents Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice's work for every five hours of labor performed by a journeyman (unless an exception is granted under § 1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations. With each application for payment, Contractor shall also deliver certified payrolls to Owner as set forth above in these General Conditions, and concurrently therewith (but in no event less frequently than monthly) directly to the Labor Commissioner in the format prescribed by the Labor Commissioner. If federal funds are used to pay for the Work, Contractor and any subcontractor agree to comply, as applicable, with the labor and reporting requirements of the Davis -Bacon Act (40 USC § 276a-7), the Copeland Act (40 USC § 276c and 18 USC § 874), and the Contract Work Hours and Safety Standards Act (40 USC § 327 and following). 7. Hours of Labor: Contractor acknowledges that under California Labor Code sections 1810 and following, eight hours of labor constitutes a legal day's work. Contractor will forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. 8. Apprentices: Attention is directed to the provisions in Sections 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any Subcontractor under him. Section 1777.5, as amended, requires the Contractor or Subcontractor employing tradesmen in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the Contract. The ratio of apprentices to journeymen in such cases must not be less than one to five except: A. When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days prior to the request for certificate, or B. When the number of apprentices in training in that area exceeds a ratio of one to five, or C. When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis statewide or locally, or D. When the assignment of an apprentice to any work performed under a public works Contract would create a condition which would jeopardize his life or the life, safety, or property of fellow employees or the public at large, or if the specified task to which the apprentice is to be assigned is of such a nature that training cannot be provided by a j oumeyman, or E. When the Contractor provides evidence that he employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to eight journeymen. The Contractor is required to make contributions to funds established for the administration of apprenticeship program if he employs registered apprentices or j ourneymen in any apprenticeable 3 Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 trade on such Contracts and if other Contractors on the public works site are making such contributions. The Contractor and any Subcontractor under him must comply with the requirements of Section 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. . 9. Labor Discrimination: Attention is directed to Section 1735 of the Labor Code, which reads as follows: "A contractor must not discriminate in the employment of persons upon public works on any basis listed in subdivision (a) of Section 12940 of the Government Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code, except as otherwise provided in Section 12940 of the Government Code. Every contractor for public works who violates this section is subject to all the penalties imposed for a violation of this chapter. " 10. Workmen's Compensation Insurance: In accordance with the provisions of Article 5, Chapter 1, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part 1, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, the Contractor is required to secure the payment of compensation to his employees and must for that purpose obtain and keep in effect adequate Workmen's Compensation Insurance. The undersigned Contractor is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of that Code, and will comply with such provisions before commencing the performance of the work of this contract. 11. Indemnity and Insurance: To the fullest extent permitted by law (including without limitation California Civil Code Section 2782), Contractor must indemnify, hold harmless, release and defend City, its officers, elected officials, employees, agents, volunteers, and consultants from and against any and all actions, claims, demands, damages, disability, losses, expenses including, but not limited to, attorney's fees and other defense costs and liabilities of any nature that may be asserted by any person or entity including Contractor, in whole or in part, arising out of Contractor's activities hereunder, including the activities of other persons employed or utilized by Contractor including subcontractors hired by the Contractor in the performance of this Agreement excepting liabilities due to the sole negligence, intentional misconduct or active negligence of the City. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable by or for Contractor under Worker's Compensation, disability or other employee benefit acts or the terms, applicability or limitations of any insurance held or provided by Contractor and must continue to bind the parties after termination/completion of this Agreement. Contractor shall procure and maintain throughout the time for performance of the work under this Contract the insurance required by the Special Provisions. The requirement that Contractor procure and maintain insurance shall in no way be construed to limit the Contractor's duty to indemnify City as provided in the paragraph above. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. E Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 12. City Right of Termination and Right to Complete the Work. The City may terminate the Contract when conditions encountered during the work make it impossible or impracticable to proceed, or when the City is prevented from proceeding with the Contract by act of God, by law, or by official action of a public authority. In addition, the occurrence of any of the following is a default by Contractor under this Contract: A. Contractor refuses or fails to prosecute the Work or any part thereof with such diligence as will insure its completion within the time specified or any permitted extension. B. Contractor fails to complete the Work on time. C. Contractor is adjudged bankrupt, or makes a general assignment for the benefit of creditors, or a receiver is appointed on account of Contractor's insolvency. D. Contractor fails to supply enough properly skilled workers or proper materials to complete the Work in the time specified. E. Contractor fails to make prompt payment to any subcontractor or for material or labor. F. Contractor fails to abide by any applicable laws, ordinances or instructions of City in performing the Work. G. Contractor breaches or fails to perform any obligation or duty under the Contract. Upon the occurrence of a default by Contractor, the Director will serve a written notice of default on Contractor specifying the nature of the default and the steps needed to correct the default. Unless Contractor cures the default within 10 days after the service of such notice, or satisfactory arrangements acceptable to City for the correction or elimination of such default are made, as determined by City, City may thereafter terminate this Contract by serving written notice on Contractor. In such case, Contractor will not be entitled to receive any further payment, except for Work actually completed prior to such termination in accordance with the provisions of the Contract Documents. In event of any such termination, City will also immediately serve written notice of the termination upon Contractor's surety. The surety will have the right to take over and perform pursuant to this Contract; provided, however, that if the surety does not give City written notice of its intention to take over and perform this Contract within five days after service of the notice of termination or does not commence performance within 10 days from the date of such notice, City may take over the Work and prosecute the same to completion by contract or by any other method it may deem advisable for the account and at the expense of Contractor. Contractor and the surety will be liable to City for any and all excess costs or other damages incurred by City in completing the Work. If City takes over the Work as provided in this Section, City may, without liability for so doing, take possession of, and utilize in completing the Work, such materials, appliances, plant, and other property belonging to Contractor as may be on the site of the Work and necessary for the completion of the Work. 13. Substitution of Securities for Withheld Amounts: Pursuant to California Public Contracts Code Section 22300, securities may be substituted for any moneys withheld by a public agency to ensure performance under a contract. At the request and sole expense of the Contractor, securities equivalent to the amount withheld must be deposited with the public agency, or with a state or federally chartered bank as the escrow agent, who must pay such moneys to the Contractor upon 5 Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 satisfactory completion of the contract. Securities eligible for substitution under this section must include those listed in the California Public Contracts Code Section 22300 or bank or savings and loan certificates of deposit. The Contractor must be the beneficial owner of any securities substituted for moneys withheld and must receive any interest thereon. Alternatively, the Contractor may request and the City shall make payment of retentions earned directly to the escrow agent at the expense of the Contractor. At the expense of the Contractor, the Contractor may direct the investment of the payments into securities and the Contractor shall receive the interest earned on the investments upon the same terms provided for in Section 22300 for securities deposited by the Contractor. Upon satisfactory completion of the Contract, the Contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the City, pursuant to the terms of this section. Any escrow agreement entered into pursuant to this section must contain as a minimum the following provisions: a. The amount of securities to be deposited; b. The terms and conditions of conversion to cash in case of the default of the Contractor; and C. The termination of the escrow upon completion of the contract. 14. General Provisions A. Authority to Execute. Each Party represents and warrants that all necessary action has been taken by such Party to authorize the undersigned to execute this Contract and to bind it to the performance of its obligations. B. Assignment. Contractor may not assign this Contract without the prior written consent of City, which consent may be withheld in City's sole discretion since the experience and qualifications of Contractor were material considerations for this Contract. C. Binding Effect. This Agreement is binding upon the heirs, executors, administrators, successors and permitted assigns of the Parties. D. Integrated Contract. This Contract, including the Contract Documents, is the entire, complete, final and exclusive expression of the Parties with respect to the Work to be performed under this Contract and supersedes all other agreements or understandings, whether oral or written, between Contractor and City prior to the execution of this Contract. E. Modification of Contract. No amendment to or modification of this Contract will be valid unless made in writing and approved by Contractor and by the City Council, City Manager or Assistant City Manager, as applicable. The Parties agree that this requirement for written modifications cannot be waived and that any attempted waiver will be void. F. Counterparts, Facsimile or other Electronic Signatures. This Contract may be executed in several counterparts, each of which will be deemed an original, and all of which, when taken together, constitute one and the same instrument. Amendments to this Contract will be considered executed when the signature of a party is delivered by facsimile or other electronic transmission. Such facsimile or other electronic signature will have the same effect as an original signature. G. Waiver. Waiver by any Party of any term, condition, or covenant of this Contract will not constitute a waiver of any other term, condition, or covenant. Waiver by any Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 Parry of any breach of the provisions of this Contract will not constitute a waiver of any other provision, or a waiver of any subsequent breach or violation of any provision of this Contract. Acceptance by City of any Work performed by Contractor will not constitute a waiver of any of the provisions of this Contract. H. Interpretation. This Contract will be interpreted, construed and governed according to the laws of the State of California. Each party has had the opportunity to review this Contract with legal counsel. The Contract will be construed simply, as a whole, and in accordance with its fair meaning. It will not be interpreted strictly for or against either party. I. Severability. If any term, condition or covenant of this Contract is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Contract will not be affected and the Contract will be read and construed without the invalid, void or unenforceable provision. J. Venue. In the event of litigation between the parties, venue in state trial courts will be in the County of Sonoma. In the event of litigation in a U.S. District Court, venue will be in the Northern District of California. IN WITNESS WHEREOF, the City of Rohnert Park has caused these presents to be executed by its officers, thereunto duly authorized, and Contractor has subscribed same, all on the day and year first above written. CITY OF ROHNERT PARK Marcela Piedra, City Manager Date Per Resolution No. adopted by the Rohnert Park City Council at its meeting of 2024 ATTEST: City Clerk 7 Pathway Tree Removal Rohnert Park City Proj. No. 2017-22 SkyView Tree Experts U 16/02/2024 Dan Dunn (Feb 16, 202407:53 PST) Name: Daniel Dunn Date Title: President APPROVED AS TO FORM: City Attorney Skyview Contract —Tree Removal_CI P 1722 Final Audit Report 2024-02-16 Created: 2024-02-16 By: Ashley Cotter (acotter@rpcity.org) Status: Signed Transaction ID: CBJCHBCAABAAPPCzaINaUYgIPB56fYRv9fYAoT8xuJ11 "Skyview Contract —Tree Removal_CIP 1722" History Document created by Ashley Cotter (acotter@rpcity.org) 2024-02-16 - 0:10:01 AM GMT Document emailed to Dan Dunn (dan@skyview-tree.com) for signature 2024-02-16 - 0:10:06 AM GMT Email viewed by Dan Dunn (dan@skyview-tree.com) 2024-02-16 - 3:50:15 PM GMT p Document e-signed by Dan Dunn (dan@skyview-tree.com) Signature Date: 2024-02-16 - 3:53:07 PM GMT - Time Source: server Agreement completed. 2024-02-16 - 3:53:07 PM GMT a Adobe Acrobat Sign go ITEM NO. 8.M. Mission StatementWe Carefor Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow. CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Public Works Submitted By: Vanessa Garrett, Director of Public Works Prepared By: Eydie Tacata, Senior Public Works Analyst Agenda Title: Adopt a Resolution Accepting State Transportation Grant Funds, Authorizing City Manager to Execute Caltrans Program Supplement No. A00000422 for the Southwest Boulevard Complete Streets Project (State Project No. CRASL-5379(026) / City Project No. CIP2023), and Appropriating $2,285,000 in State Funds RECOMMENDED ACTION: Adopt a resolution accepting State transportation grant funds, authorizing City Manager to execute Program Supplement No. A422 for the Southwest Boulevard Complete Streets Project (State Project No. CRASL-5379(026) / City Project No. CIP2023), and appropriating $2,285,000 in State funds. BACKGROUND: In 2020, as part of the Five -Year Capital Improvements Program, the City developed the Southwest Boulevard Complete Streets Project ("Project") to rehabilitate the segment of Southwest Boulevard between the roundabout and 300' east of Adrian Drive, and also install new sidewalk and landscaped medians, repair aging soundwalls, and provide protected bike lanes. The project was developed to be highly competitive for State and Federal transportation funding for locations adjacent to transit -oriented communities or disadvantaged neighborhoods. In March 2022, the California Transportation Commission (CTC) adopted the 2022 State Transportation Improvement Program (2022 STIP), which programmed $2,285,000 in Federal COVID Relief funds for the Project. However, in Spring 2023, the U.S. Congress' debt ceiling discussions threatened a rescission of Federal COVID funds from transportation programs across the country, including funds programmed for the Project. With the funding of several Bay Area projects also at risk, the Metropolitan Transportation Commission, Sonoma County Transportation Authority, and the California Department of Transportation (Caltrans) worked diligently to find State funds to supplant the Federal COVID funds. In December 2023, the CTC approved a 2022 STIP amendment to allocate $2,285,000 in Caltrans' own State funds for the Project. DISCUSSION: Caltrans administers Federal and State funds and assists local agencies in following Federal and State laws pertaining to the use of the funds. Caltrans and the City are parties to Administering Agency -State Agreement for State Funded Projects No. 04-5379S21 ("Master Agreement"), which stipulates how the City may use State funds. For each project that receives State funds, ITEM NO. 8.M. Caltrans provides a "Program Supplement" to the Master Agreement that describes the funding program, grant amount, project phase being funded, and City's and Caltrans' roles and responsibilities. Caltrans has provided the attached Program Supplement No. 0000OA422 (Exhibit A to Resolution) for $2,285,000 in State funds for the Project's construction phase. Caltrans requires a certified resolution identifying the representative authorized to execute the agreement. The authorizing resolution and executed Program Supplement No. 0000OA422 will allow Caltrans to encumber the funds so that reimbursement payments can be made to the City. The City's approved CIP budget provides a total project budget of $4,364,488, including the Caltrans-administered State funds allocated by the California Transportation Commission. (See Table 1: Project Funding and Activities below.) Table 1. Project Funding and Activities Project Activities Environmental, Construction Contract, Funding Sources Preliminary Construction Total Funding Each Engineering and Management & Source Design Inspection Local Gas Tax RMRA Fund $100,000 $0 $100,000 Local Casino Supplemental Fund $0 $648,492 $648,492 Local Infrastructure Reserve Fund $538,009 $780,991 $1,319,000 Local Traffic Signalization Fee Fund $0 $11,996 $11,996 "State -Only" (Caltrans) funds approved State by California Transportation $0 $2,285,000 $2,285,000 Commission Resolution FP-23-52 Total Funding $638,009 $3,726,479 $4,364,488 The preliminary engineering, environmental and design phases are complete. The project is currently out to bid for construction. Aside from returning a signed Program Supplement Agreement to Caltrans, all State requirements are fulfilled thus far to ensure reimbursement with State funds. Staff recommends that the City Council adopt the attached resolution to authorizing the City Manager to approve and execute Program Supplemental Agreement No. A422, and that the City Clerk is directed to certify the resolution. OPTIONS CONSIDERED: No other options are considered. Without executing the Program Supplement Agreement and providing a certified resolution, the City cannot receive State funds for the Project. STRATEGIC PLAN ALIGNMENT: This action is consistent with Strategic Plan Goal D - Continue to Develop a Vibrant Community. 2 ITEM NO. 8.M. FISCAL IMPACT/FUNDING SOURCE: The fiscal impact of this proposed Council action is $2,285,000 in State funds which are received by the City on a reimbursement basis. This action provides the City with $2,285,000 for eligible project construction and construction engineering costs, such as construction management and inspection. Department Head Approval Date: 02/19/2024 Finance Approval Date: 02/06/2024 City Attorney Approval Date: 02/05/2024 City Manager Approval Date: 03/04/2024 Attachments: 1. Resolution 2. Exhibit A to Resolution: Program Supplement Agreement No. A422 RESOLUTION NO.2024 -020 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK ACCEPTING STATE TRANSPORTATION GRANT FUNDS, AUTHORIZING CITY MANAGER TO EXECUTE CALTRANS PROGRAM SUPPLEMENT NO.0000OA422 FOR THE SOUTHWEST BOULEVARD COMPLETE STREETS PROJECT (STATE PROJECT NO. CRASL-5379(026) / CITY PROJECT NO. CIP2023), AND APPROPRIATING $2,285,000 IN STATE FUNDS WHEREAS, the California Transportation Commission (CTC) as the governing body responsible for programming State transportation funds allocated $2,285,000 in State transportation grant funds for the construction phase of the Southwest Boulevard Complete Streets Project (State Project No. CRASL-5379(026) / City Project No. CIP2023); and WHEREAS, the California Department of Transportation (Caltrans) has requested a certified enabling resolution identifying the project receiving funding through Program Supplement No. 0000OA422 and the official authorized to execute the Program Supplement. NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rohnert Park that the State transportation grant funds are accepted and the City Manager is hereby authorized and directed to take all actions for and on behalf of the City of Rohnert Park, including execution of the Program Supplement No. 0000OA422, in substantially similar form to the agreement attached hereto as "Exhibit A" and incorporated by this reference, which authorizes State funds for the Southwest Boulevard Complete Streets Project (State Project No. CRASL-5379(026) / City Project No. CIP2023) in accordance with Administering Agency —State Agreement for Federal Funding No. 04-5379S21. DULY AND REGULARLY ADOPTED this 12t' day of March, 2024. ATTEST: Sylvia Lopez Cuevas, City Clerk APPROVED AS TO FORM: Michelle M. Kenyon, City Attorney Attachments: Exhibit A CITY OF ROHNERT PARK Susan H. Adams, Mayor ELWARD: RODRIGUEZ: SANBORN: GIUDICE: ADAMS: AYES:( ) NOES: ( ) ABSENT:( ) ABSTAIN: ( ) EXHIBIT A TO RESOLUTION PROGRAM SUPPLEMENT NO. OOOOOA422 Adv. Project ID Date: December 28, 2023 to 0423000150 Location: 04-SON-0-RNPK ADMINISTERING AGENCY -STATE AGREEMENT Project Number: CRASL-5379(026) FOR STATE FUNDED PROJECTS NO 04-5379521 E.A. Number: Locode: 5379 This Program Supplement, effective 12/07/2023, hereby adopts and incorporates into the Administering Agency -State Agreement No. 04-5379521 for State Funded Projects which was entered into between the ADMINISTERING AGENCY and the STATE with an effective date of 10/20/2021 and is subject to all the terms and conditions thereof. This PROGRAM SUPPLEMENT is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No. approved by the ADMINISTERING AGENCY on (See copy attached). The ADMINISTERING AGENCY further stipulates that as a condition to the payment by the State of any funds derived from sources noted below encumbered to this project, Administering Agency accepts and will comply with the Special Covenants and remarks set forth on the following pages. PROJECT LOCATION: In Rohnert Park on Southwest Boulevard between Commerce Boulevard and 300' east of Adrian Drive: TYPE OF WORK: Pavement rehabilitation; road diet; install bike lane LENGTH: 0.0(MILES) Estimated Cost State Funds Matching Funds $2,513,500.00 STATE $2,285,000.00 LOCAL $228,500.00 OTHER $0.00 CITY OF ROHNERT PARK By Title Date Attest STATE OF CALIFORNIA Department of Transportation By Chief, Office of Project Implementation Division of Local Assistance Date I hereby certify upon my personal knowledge that budgeted funds are available for this encumbrance: Accounting Officer Date 01/04/2024 $2,285,000.00 Program Supplement 04--537-A422- SERIAL Page 1 of 4 EXHIBIT A TO RESOLUTION 04-SON-0-RNPK CRASL-5379(026) SPECIAL COVENANTS OR REMARKS 1. Any State and Federal funds that may have been encumbered for this project are available for disbursement for limited periods of time. For each fund encumbrance the limited period is from the start of the fiscal year that the specific fund was appropriated within the State Budget Act to the applicable fund Reversion Date shown on the State approved project finance letter. Per Government Code Section 16304, all project funds not liquidated within these periods will revert unless an executed Cooperative Work Agreement extending these dates is requested by the ADMINISTERING AGENCY and approved by the California Department of Finance. ADMINISTERING AGENCY should ensure that invoices are submitted to the District Local Assistance Engineer at least 75 days prior to the applicable fund Reversion Date to avoid the lapse of applicable funds. Pursuant to a directive from the State Controller's Office and the Department of Finance; in order for payment to be made, the last date the District Local Assistance Engineer can forward an invoice for payment to the Department's Local Programs Accounting Office for reimbursable work for funds that are going to revert at the end of a particular fiscal year is May 15th of the particular fiscal year. Notwithstanding the unliquidated sums of project specific State and Federal funding remaining and available to fund project work, any invoice for reimbursement involving applicable funds that is not received by the Department's Local Programs Accounting Office at least 45 days prior to the applicable fixed fund Reversion Date will not be paid. These unexpended funds will be irrevocably reverted by the Department's Division of Accounting on the applicable fund Reversion Date. 2. ADMINISTERING AGENCY agrees to comply with the requirements in 2 CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (applicable to Federal and State Funded Projects). 3. The ADMINISTERING AGENCY shall construct the PROJECT in accordance with the scope of work presented in the application and approved by the California Transportation Commission. Any changes to the approved PROJECT scope without the prior expressed approval of the California Transportation Commission are ineligible for reimbursement and may result in the entire PROJECT becoming ineligible for reimbursement. 4. A. This PROJECT is programmed to receive funding from the State Transportation Improvement Program (STIP). Funding may be provided under one or more components. A component(s) specific fund allocation is required, in addition to other requirements, before reimbursable work can occur for the component(s) identified. Each allocation will be assigned an effective date and identify the amount of funds allocated per component(s). This PROGRAM SUPPLEMENT has been prepared to allow reimbursement of eligible PROJECT expenditures for the component(s) allocated. The start of reimbursable expenditures is restricted to the later of either 1) the effective date of the Master Program Supplement 04--537-A422- SERIAL Page 2 of 4 EXHIBIT A TO RESOLUTION 04-SON-0-RNPK CRASL-5379(026) SPECIAL COVENANTS OR REMARKS Agreement, 2) the effective date of the PROGRAM SUPPLEMENT, or 3) the effective date of the component specific allocation. B. STATE and ADMINISTERING AGENCY agree that additional funds made available by future allocations will be encumbered on this PROJECT by use of a STATE approved Allocation Letter and Finance Letter. ADMINISTERING AGENCY agrees that STATE funds available for reimbursement will be limited to the amount allocated by the California Transportation Commission (CTC) and/or the STATE. C. Upon ADMINISTERING AGENCY request, the CTC and/or STATE may approve supplementary allocations, time extensions, and fund transfers between components. An approved time extension will revise the timely use of funds criteria, outlined above, for the component(s) and allocation(s) requested. Approved supplementary allocations, time extensions, and fund transfers between components made after the execution of this PROGRAM SUPPLEMENT will be documented and considered subject to the terms and conditions thereof. Documentation for approved supplementary allocations, time extensions, and fund transfers between components will be a STATE approved Allocation Letter, Fund Transfer Letter, Time Extension Letter, and Finance Letter, as appropriate. D. This PROJECT will be administered in accordance with the CTC STIP guidelines, as adopted or amended, and the STATE Procedures for Administering Local Grant Projects in the State Transportation Improvement Program (STIP), the Local Assistance Program Guidelines, and the Local Assistance Procedures Manual. The submittal of invoices for project costs shall be in accordance with the above referenced publications and the following. E. The ADMINISTERING AGENCY shall invoice STATE for environmental & permits, plans specifications & estimate, and right-of-way costs no later than 180 days after the end of last eligible fiscal year of expenditure. For construction costs, the ADMINISTERING AGENCY has 180 days after project completion to make the final payment to the contractor and prepare the final Report of Expenditures and final invoice, and submit to STATE for verification and payment. F. All obligations of STATE under the terms of this Agreement are subject to the appropriation of resources by the Legislature and the encumbrance of funds under this Agreement. Funding and reimbursement are available only upon the passage of the State Budget Act containing these STATE funds. G. Award information shall be submitted by the ADMINISTERING AGENCY to the District Local Assistance Engineer immediately after the award. Failure to do so will cause delay in processing the invoices for the construction component. As a minimum, the award information should have the following: Project number, Program Supplement 04--537-A422- SERIAL Page 3 of 4 EXHIBIT A TO RESOLUTION 04-SON-0-RNPK CRASL-5379(026) SPECIAL COVENANTS OR REMARKS project description, PPNO, date the project was advertised, award amount, bid opening date, award date and estimated completion date. H. This PROJECT is subject to the timely use of funds provisions enacted by Senate Bill 45 (SB 45), approved in 1997, and subsequent CTC guidelines and State procedures approved by the CTC and STATE, as outlined below: Funds allocated for the environmental & permits, plan specifications & estimate, and right-of- way components are available for expenditure until the end of the second fiscal year following the year in which the funds were allocated. Funds allocated for the construction component are subject to an award deadline and contract completion deadline. ADMINISTERING AGENCY agrees to award the contract within 6 months of the construction fund allocation and complete the construction or vehicle purchase contract within 36 months of award. I. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices at least once every six months commencing after the funds are encumbered for each phase by the execution of this Project Program Supplement Agreement, or by STATE's approval of an applicable Finance Letter. STATE reserves the right to suspend future authorizations/obligations for Federal aid projects, or encumberances for State funded projects, as well as to suspend invoice payments for any on -going or future project by ADMINISTERING AGENCY if PROJECT costs have not been invoiced by ADMINISTERING AGENCY for a six-month period. If no costs have been invoiced for a six-month period, ADMINISTERING AGENCY agrees to submit for each phase a written explanation of the absence of PROJECT activity along with target billing date and target billing amount. ADMINISTERING AGENCY agrees to submit the final report documents that collectively constitute a "Report of Expenditures" within one hundred eighty (180) days of PROJECT completion. Failure of ADMINISTERING AGENCY to submit a "Final Report of Expenditures" within 180 days of PROJECT completion will result in STATE imposing sanctions upon ADMINISTERING AGENCY in accordance with the current Local Assistance Procedures Manual. Program Supplement 04--537-A422- SERIAL Page 4 of 4 Meeting Date: Department: Submitted By: Prepared By: Agenda Title: ITEM NO. 9.A. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow. " CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT March 12, 2024 Public Works Vanessa Garrett, Public Works Director Vanessa Garrett, Public Works Director Receive a Presentation from Sonoma Water and Authorize the City's Representative to the Water Advisory Committee to Recommend Approval of the Proposed Fiscal Year 2024-25 Budget for Sonoma Water RECOMMENDED ACTION: Receive a presentation from Sonoma Water and Authorize the City's representative to the Water Advisory Committee to recommend approval of the Sonoma Water's Proposed Fiscal Year 2024-25 Budget. BACKGROUND: Sonoma Water provides wholesale water supply to the City of Rohnert Park and eight other "water contractors" in Sonoma and Marin Counties. The Water Advisory Committee (WAC) is composed of an elected official from each of the water contractors. The City appoints both a primary representative and an alternate, either of which can act as the City's "representative" when the WAC meets. The purpose of the WAC is to advise Sonoma Water's Board of Directors on policy matters. Each year, typically in April, the WAC reviews and provides a recommendation on Sonoma Water's proposed annual budget. This year the WAC will be meeting on April 1 st and will be asked to recommend approval of a budget that includes a between 9% and 15% rate increase for the City's wholesale water purchases. While Sonoma Water's Board of Directors has historically endeavored to respect recommendations from the WAC, it is not obligated to make budget decisions based on WAC recommendations. Prior to last year, the rate increases have been limited to around 6%. Last year the rate increase was nearly 10%. The increase reflects the compounding effects of reduced water sales due to drought, and the need to fund capital improvement activity that has been deferred in an effort to reduce water rate increases in prior years. The proposed budget and attendant wholesale water rate increase were carefully negotiated by staff from Sonoma Water and the contractors. Initial rate increase projections were higher and staff worked together to identify opportunities for savings. The City of Rohnert Park's 5-year water rate study, enacted in March 2022, projected a 6% increase each year for the purposes of setting new residential and commercial water rates. ITEM NO. 9.A. ANALYSIS: The business relationship between Sonoma Water and its prime contractors, including the City, is described in the Restructured Agreement for Water Supply (Restructured Agreement). The Restructured Agreement requires that Sonoma Water adopt its annual budget by the end of April and sets a formula for calculating the wholesale rate, which is presented below. Sonoma Water's Rate Formula Annual Budget/Water Sold in Acre Feet = Cost of Water per Acre Foot The Restructured Agreement defines "Water Sold in Acre Feet" as (i) the average of water sales in the past 3 years or (ii) the water sold in the previous year, whichever is less. The proposed increase this year is based on the last 3 year's average sales. The budget proposal was presented to Sonoma Water's Technical Advisory Committee (TAC) and Water Advisory Committee (WAC), composed of staff from the contractors, on February 5, 2024 and the WAC supported the proposal. The rate increase proposed is 9.98% for the City of Rohnert Park. The Council's action will provide voting direction to the City's representative to the WAC ahead of the scheduled April 8t' WAC meeting where the budget will be presented for approval. While City staff understands the need for the rate increase and is recommending support because of the shared efforts to reduce Sonoma Water's cost, the City's water rates are premised on wholesale water rate increases averaging 6% per year. Staff estimates that the proposed wholesale water rate increase will result in an unexpected impact of between $150,000 and $200,000 in the City's water utility budget for water purchases. This unanticipated expense this year will impact the City's ability to budget for certain capital expenditures. The City is bound by Proposition 218, which requires a public process prior to increasing water rates. This also means that although Sonoma Water is increasing rates to the City, residents and businesses will not have the rate increase immediately passed on to them. Long term, the consistently higher rates proposed by Sonoma Water will mean higher rates for City water users when a new water rate study is completed in the next year. Other long-term impacts of the proposed rate include less budget for the City's capital expenditures each year (i.e. replacing older water lines, rehabilitating city water wells, etc.). While Sonoma Water's Fiscal Year 24-25 budget is unlikely to change at this point, staff from Sonoma Water and the various water contractors are continuing a dialogue on strategies for managing funding needs in future years in order to provide for more certainty in long-term budgeting and rate setting. STRATEGIC PLAN and CITY COUNCIL PRIORITY ALIGNMENT: The recommended action is consistent with Strategic Plan Goal C — Ensure the Effective Delivery of Public Services. Water supply is a necessary and critical public service. While not reflective of the City Council's strategic priorities, the Water Advisory Committee is tasked with making a budget recommendation under the terms of the City's wholesale water agreement with Sonoma Water. 2 ITEM NO. 9.A. OPTIONS CONSIDERED: None. Sonoma Water supply is an integral part of the City's supply strategy. While the proposed rate increase is higher than Sonoma Water's long term financial plan projects, the increase supports necessary capital projects and was carefully negotiated by technical staff to provide for necessary investments in Sonoma Water's system in the face of the impending rate reductions being required by the State. FISCAL IMPACT/FUNDING SOURCE: This action will result in a 9.98% increase in the wholesale rate that the City pays for its Sonoma Water supply, beginning on July 1, 2024. The funding source is the water enterprise fund. Water fund operations expense roughly $9.3 million to run the City's distribution system and wells, purchase water, and pay for rising utilities such as electricity per fiscal year. Department Head Approval Date: 02/27/24 Code Compliance Review: NA Finance Director Approval Date: NA City Attorney Approval Date: NA City Manager Approval Date: 03/03/24 Attachments: Sonoma Water Budget Presentation ti r 7 Sonoma 1 Water Clean. Reliable. Essential. Every day. FY 2024-2025 Proposed Budget and Rates Water Transmission System Lynne Rosselli ADMINISTRATIVE SERVICES DIVISION MANAGER Lynne. Rosselli@scwa.ca.gov Jake Spaulding FINANCE MANAGER Jake.Spaulding@scwa.ca.gov Q © Q (D sonomawater.org i 0 r� r' 4 f r '— — or— -• 1 ti,T r V%ANDSOR 4 y4 i ' , _ • r rti �;i� .y � �' Legend Production Well r ■ Russian River Collector Tank �— — Russian River Watershed ...{ SANTAROSA_ ' SANTA ROSA PLAIN f � r SEBASTOPOL I ti 1 — l t L r 1 r ROHNERT + PARK # OTATI ! PETALJMA peel le kwd Ohl Yf�r is SONOMA rji Q G Transparent and collaborative process to bring rates to Board of Directors by end of April Technical Advisory Committee (Jan -March) Water Contractor Boards & Councils (March) y pP TyF IS � ' z NORTH MARIN WATER DISTRICT Water Advisory Committee (April) TOWN OF WINDSOR Sonoma Water Board of Directors (April) City of Santa Rosa �,vr���CG` R11 CITY Of COTATI 1963. Budget includes multiple water transmission system activities and funds Operations and Maintenance Four Subfunds Five Capital Funds Debt Service Funds 6 Challenges Fully Volumetric Rate Low Water Deliveries Aging Infrastructure Maintenance Needs Increased Repairs Natural Hazard Vulnerabilities t4' �tii"� yipab;., qt i '�4�.•�.'••♦ S' �Y',+ + O �� SNS ,..`e+S+ob 7y�P i�•F'PP�i%�°r��s�` aR1it EP��� •' F� ���•��t°t��.•4�,�Et�;��t�����q�•,��.L'�'L�'s..�o���'+��tiP'��e'r�P�PPP������tf ��°rr Sq'S q S6 SS Lt�:a�++i•� •'•.Y"•�'L.4°♦L�'LL♦LO AO_0 L 4.@�w 41� LLLQ LQHee P f �P P�`,, t� .P b s'etSStS q q Ss . 9i.... a ry tt itt at$° z' +�ssa vso2P�4� £PL ft IF, Py'• ♦ E, $8.46 million budgeted for hazard mitigation projects to reduce risks Bennett Valley Fault Crossing Ely Booster Pump Station Flood Mitigation Collector 3 and 5 Liquefaction Mitigation RDS Pump and Motor Control Center Replacement Seismic Retrofit of Storage Tanks Wilfred Booster Station $7.20 million budgeted for other capital projects to increase resiliency Kawana-Ralphine SBS Pipeline Mirabel/Wohler Storage Building Mirabel Fiber Resiliency Occidental Road and Sebastopol Road Wells Ralphine Tanks Flow Thru Conversion Warm Springs Dam Hydroturbine Retrofit Water System Treatment Upgrades k I Wohler Bridge Fiber Optic Cable Total FY23-24 Capital Budget _ including Hazard Mitigation Projects: $15.66M 7 $45.41 million budgeted for operations and maintenance to protect, improve and maintain system reliability Projects Aqueduct Cathodic Protection Collector Well, Vault, Pump, Pipeline, Valve Rehabilitations/Replacements Emergency Inventory Procurement SCADA Improvements Tank Recoats & Tank Maintenance Program Studies Arc Flash Studies DeMuth Property Hydrogeologic Investigation Groundwater Banking Feasibility Study Regional Water Supply Resiliency Study Transmission System Master Plan, Modeling & Condition Assessments Programs $7.53 million for Biological Opinion, Water Supply Planning and Water Conservation Visit us online to enter your toilet test results and be entered to win a $25 gift card. REQUEST FREE DYE TABS- -:-_ 0 iSAVINGWATER SaVingWaterPartners ip.org c alleng, QVE�s� A Expenditures compared to FY 23-24 Operations and Maintenance Capital Projects BO Compliance, Water Supply Planning, Water Conservation Debt Service Tota I s Grants, Use of Fund Balance, and Bond Proceeds $40.41 $45.41 $5.00 $12.28 $15.66 $3.39 $9.78 $7.53 ($2.25) $5.83 $5.83 $0.00 $68.30 $74.43 $6.14 $18.15 $18.13 ($0.02) FY 24-25 Budgeted Expenditures Debt Service $5.83 Million, 8% BO Compliance, Water Supply Planning, Water Conservation $7.53 Million, 10% Operations Jbr and r � Maintenance $45.41 Million, 61% Capital Projects $15.66 Million, 21% Example of how rates are calculated mount. Due to the drought, Sonoma Water recommended and WAC approved using 3-year annual average for FY24/25. Deliveries and Rates Due to the prescribed fully volumetric rate, budgeted deliveries have a significant impact on rate increases. 12-Month Actuals 40,844 -11982 14.74% 3-Year Annual Ave 42 826 0 9.98% (FY24/25 Budget) ' 44,500 AF 44,500 1,674 5.83% Steps taken to reduce budget and rate Deferred non - routine maintenance projects = $8.9 million Budgeted off the 3-year annual average rather than the 12-month actuals Use of grants, bond proceeds, and fund balance = $18.13 million Result: Rate increase dropped from 14.71 % to Total cost per gallon is $0.004 Budgeted use of $2.25M in Prudent Reserve Proposed Rates for FY 24-25 Ain.. Zi• Deliveries (Acre -Feet) 42,826 O&M $1,015.39 $1,015.39 $1,015.39 Water Management Planning $0.35 $0.35 $0.35 Watershed Planning & Restoration $40.04 $40.04 $40.04 Recycled Water and Local Supply $0.00 $0.00 $0.00 Water Conservation $59.55 $59.55 $59.55 Total O&M $1,115.33 $1,115.33 $1,115.33 Storage & Common Bond/Loan Charges $162.69 $162.69 $162.69 Sonoma Aqueduct Bond/Loan Charge $145.49 Prime Contractors $1,278.02 $1,278.02 $1,423,51 Discretionary Charges Capital Charges - to build fund balance $11.00 $0.00 $34.90 for future projects J p Prime Contractors $11.00 $0.00 $34.90 Total Prime Contractors $1,289.02 $1,278.02 $1,458.41 Total Overall Increase: 9.88% 9.98% 8.14% 2024 wholesale water rates per Acre -Foot $2,400 $2,200 $2,000 $1, 800 $1, 600 $1,400 $1,200 $1, 000 $800 $600 $400 $200 Sonoma County Water Agency Zone 7 Water Agency (Pleasanton, Livermore) Santa Clara Valley Contra Costa Water District Water District San Francisco Public Utilities Commission Next steps • Presentations upon Request to City and Town Councils,, and Water District Boards in March • Water Advisory Committee Vote — April 8 • Adoption by Sonoma Water's Board — April 16 Sonoma Water Videos Investing in our infrastructure Avaiable in English and Spanish at www.youtube.com/@sonomawater/videos Value of water: A brief video on the value of our water su We are Sonoma Water: Where vour water comes from Water storage tank maintenance: A brief video on how we are workiniz to kee our water storage facilities upgraded, reliable for today and future generations Maintaining the Sonoma booster station: Keeping the drinking water flowing to Sonoma. Vallev of the Moon Water District one booster station at a time! Aqueduct corrosion protection program: A brief video on work to combat corrosion in our aqueduct Russian River Aqueduct Crossing: Ensuring safe delivery of drinking water ri Dry Creek habitat restoration: Protecting our natural pipeline, habitat Sonoma � Water Lynne Rosselli Administrative Services Division Manager Lynne. Rosselli@scwa.ca.gov Jake Spaulding Finance Manager Jake.Spaulding@scwa.ca.gov 0 Q Q® sonomawater.org N F eT LI) �M1LIFARpti� ITEM NO. 9.B. Mission Statement "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow." CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department Public Safety Submitted By: Aaron Johnson, Deputy Chief Prepared By: Adam Strongman, Lieutenant Agenda Title: Consider Approving the Installation of 10 Fixed Location Automated Flock License Plate Reader (ALPR) Cameras in the City of Rohnert Park. RECOMMENDED ACTION: Approve the installation of 10 fixed location Flock® ALPR cameras in the City of Rohnert Park. BACKGROUND: The Sonoma County Auto Theft Task Force (SONCATT) is a collaborative group that works within Sonoma County to identify stolen vehicles and crimes associated with thefts. The team is comprised of officers from the Sonoma County Sheriff's Office, Santa Rosa Police Department, and the California Highway Patrol. These officers look for innovative ways to combat stolen vehicles as well as other crimes in Sonoma County. The team has used data to support enforcement activities and to identify high crime areas within the county. SONCATT received funding to install and use fixed location automated license plate readers (ALPR) as a tool to identify vehicles associated with crime as they enter, traverse, or remain in Sonoma County. Flock Safety® is the vendor identified to provide this service. Currently, Rohnert Park DPS is one of the only agencies on the Hwy 101 corridor not utilizing this fixed camera technology. SONCATT believes the strategic integration of this technology in Sonoma County will increase the apprehension of dangerous persons and make the surrounding communities safer. ANALYSIS: Statistical analysis from SONCATT shows Rohnert Park is the third highest municipality for stolen vehicles in the county. This is based on victims reporting the crime and the associated data being shared with SONCATT. Additionally, we know there are instances of human trafficking in Rohnert Park and many of those suspects utilize rental vehicles or vehicles that do not belong to them. ALPR technology can capture the metadata of the vehicle to assist officers when the associated vehicles pass one of the fixed-point cameras. Ten cameras have been allocated to the City of Rohnert Park. The locations for installation were determined by SONCATT based on intersections with high traffic volume as well as points of ingress and egress to the city and feeder arterial streets. Staff from Flock will work with the City on securing permits and doing a location analysis; however, these cameras are "infrastructure" free meaning they are powered solely by solar energy and utilize a cellular connection for encrypted data transmission. All installation will be done by Flock represented contractors. ITEM NO. 9.13. This ALPR installation project was presented to the Chiefs Community roundtable for discussion. Respondents of the roundtable were in support of using this technology to enhance community safety. Comments received were "I think it is a great idea", "Sounds like a helpful tool for Public Safety." The data captured by the cameras will be stored in a cloud server and retained for 30 days. After 30 days, the data is purged from the system leaving no record of capture. ENVIRONMENTAL ANALYSIS: There is no environmental impact with this project. OPTIONS CONSIDERED: 1. Recommended Option: Staff recommend authorizing the installation of the Flock ALPR camera technology because our current mobile ALPR technology has been beneficial in locating crime vehicles in our city. 2. Alternative: Staff also considered not allowing the installation of this technology; however, we do not recommend this option because we know there is a high percentage of stolen vehicles in Sonoma County that originate from The City of Rohnert Park. FISCAL IMPACT/FUNDING SOURCE: There is no fiscal impact on this project for the first two years. The funding and subscriptions are paid for by SONCATT and all installations and data access are a part of the funded program. After the two- year SONCATT funding agreement the city has the following options: 1. SONCATT secures funding for additional years to maintain the sponsored program at no cost to the City. 2. City absorbs subscription cost of $3000 per camera per year ($30,000/yr.). 3. City terminates subscription and Flock removes all cameras at no cost to the City. Code Compliance Approval Date: N/A Department Head Approval Date: January 31, 2024 Finance Approval Date: N/A Human Resources Approval Date: N/A City Attorney Approval Date: N/A City Manager Approval Date: 03/04/2024 Attachments: 1. ALPR recommended distribution 2. ALPR Policy 2 Flock Camera Proposed Locations #54 WB Golf Course Dr @ Redwood Hwy Off Ramp #55 NB Redwood Dr @ Golf Course Dr #56 SB Redwood Dr @ Golf Course Dr W #57 WB Golf Course Dr @ Commerce Blvd #58 SB Redwood Dr @ Rohnert Park Expy #59 NB Redwood Dr @ Rohnert Park Expy #60 EB Rohnert Park Expy @ Commerce Blvd #61 EB Rohnert Park Expy @ Rancho Verde Cir #62 WB Rohnert Park Expy @ Snyder Ln #63 SB Labath Ave @ Rohnert Park Expy Rohnert Park Department of Public Safety Rohnert Park Department of Public Safety Policy Manual Automated License Plate Readers (ALPRs) 428.1 PURPOSE AND SCOPE The purpose of this policy is to provide guidance for the capture, storage and use of digital data obtained through the use of Automated License Plate Reader (ALPR) technology. 428.2 ADMINISTRATION The ALPR technology, also known as License Plate Recognition (LPR), allows for the automated detection of license plates. It is used by the Rohnert Park Department of Public Safety to convert data associated with vehicle license plates for official law enforcement purposes, including identifying stolen or wanted vehicles, stolen license plates and missing persons. It may also be used to gather information related to active warrants, homeland security, electronic surveillance, suspect interdiction and stolen property recovery. ALPR data collection, access, and retention shall be managed by the Support Services Manager. 428.2.1 ALPR ADMINISTRATOR The Support Services Manager shall be responsible for developing guidelines and procedures to comply with the requirements of Civil Code§ 1798.90.50 et seq. This includes, but is not limited to (Civil Code§ 1798.90.51; Civil Code§ 1798.90.53): (a) A description of the job title or other designation of the members and independent contractors who are authorized to use or access the ALPR system or to collect ALPR information. (b) Training requirements for authorized users. (c) A description of how the ALPR system will be monitored to ensure the security of the information and compliance with applicable privacy laws. (d) Procedures for system operators to maintain records of access in compliance with Civil Code § 1798.90.52. (e) The title and name of the current designee in overseeing the ALPR operation. (f) Working with the Custodian of Records on the retention and destruction of ALPR data. (g) Ensuring this policy and related procedures are conspicuously posted on the department's website. 428.3 OPERATIONS Use of an ALPR is restricted to the purposes outlined below. Department members shall not use, or allow others to use the equipment or database records for any unauthorized purpose (Civil Code§ 1798.90.51; Civil Code§ 1798.90.53). (a) An ALPR shall only be used for official law enforcement business. (b) An ALPR may be used in conjunction with any routine patrol operation or criminal investigation. Reasonable suspicion or probable cause is not required before using an ALPR. Copyright Lexipol, LLc 2024/02/06, All Rights Reserved. Automated License Plate Readers (ALPRs) - 1 Published with permission by Rohnert Park Department of Public Safety Rohnert Park Department of Public Safety Rohnert Park Department of Public Safety Policy Manual Automated License Plate Readers (ALPRs) (c) While an ALPR may be used to canvass license plates around any crime scene, particular consideration should be given to using ALPR-equipped cars to canvass areas around homicides, shootings and other major incidents. Partial license plates reported during major crimes should be entered into the ALPR system in an attempt to identify suspect vehicles. (d) No member of this department shall operate ALPR equipment or access ALPR data without first completing department -approved training. (e) No ALPR operator may access department, state or federal data unless otherwise authorized to do so. (f) If practicable, the officer should verify an ALPR response through the California Law Enforcement Telecommunications System (CLETS) before taking enforcement action that is based solely on an ALPR alert. 428.4 DATA COLLECTION AND RETENTION The Support Services Manager is responsible for ensuring systems and processes are in place for the proper collection and retention of ALPR data. Data will be transferred from cameras to the designated storage in accordance with department/vendor procedures. All ALPR data downloaded to the server should be stored for a minimum of one year (Government Code § 34090.6) and in accordance with the established records retention schedule. Thereafter, ALPR data should be purged unless it has become, or it is reasonable to believe it will become, evidence in a criminal or civil action or is subject to a discovery request or other lawful action to produce records. In those circumstances the applicable data should be downloaded from the server onto portable media and booked into evidence. 428.5 ACCOUNTABILITY All data will be closely safeguarded and protected by both procedural and technological means. The Rohnert Park Department of Public Safety will observe the following safeguards regarding access to and use of stored data (Civil Code § 1798.90.51; Civil Code§ 1798.90.53): (a) All ALPR data downloaded to the mobile workstation and in storage shall be accessible only through a login/password-protected system capable of documenting all access of information by name, date and time (Civil Code§ 1798.90.52). (b) Members approved to access ALPR data under these guidelines are permitted to access the data for legitimate law enforcement purposes only, such as when the data relate to a specific criminal investigation or department -related civil or administrative action. (c) ALPR system audits should be conducted on a regular basis (quarterly). For security or data breaches, see the Records Release and Maintenance Policy. Copyright Lexipol, LLc 2024/02/06, All Rights Reserved. Automated License Plate Readers (ALPRs) - 2 Published with permission by Rohnert Park Department of Public Safety Rohnert Park Department of Public Safety Rohnert Park Department of Public Safety Policy Manual Automated License Plate Readers (ALPRs) 428.6 POLICY The policy of the Rohnert Park Department of Public Safety is to utilize ALPR technology to capture and store digital license plate data and images while recognizing the established privacy rights of the public. All data and images gathered by the ALPR are for the official use of this department. Because such data may contain confidential information, it is not open to public review. 428.7 RELEASING ALPR DATA The ALPR data may be shared only with other law enforcement or prosecutorial agencies for official law enforcement purposes or as otherwise permitted by law, using the following procedures: (a) The agency makes a written request for the ALPR data that includes: (a) The name of the agency. (b) The name of the person requesting. (c) The intended purpose of obtaining the information. (b) The request is reviewed by the Records Supervisor or the authorized designee and approved before the request is fulfilled. (c) The approved request is retained on file. Requests for ALPR data by non -law enforcement or non -prosecutorial agencies will be processed as provided in the Records Maintenance and Release Policy (Civil Code § 1798.90.55). 428.8 TRAINING The Training Coordinator should ensure that members receive department -approved training for those authorized to use or access the ALPR system (Civil Code § 1798.90.51; Civil Code §1798.90.53). Copyright Lexipol, LLc 2024/02/06, All Rights Reserved. Automated License Plate Readers (ALPRs) - 3 Published with permission by Rohnert Park Department of Public Safety f i"ock safety Chief Tim Mattos ;,ac kg ro u n1l The Sonoma County Auto Theft Taskforce (SONCATT) received a grant to install Flock cameras throughout Sonoma County. Rohnert Park has the third highest rate for stolen vehicles. SONCATT allocated funding for 10 cameras in Rohnert Park. Statistics JURISDICTION 2021 YTD 2022 YTD 2023 YTD 202212023+i- COMPARISION Santa Rosa P.D. 527 426 339 -87 CHP 181 161 148 -13 Rohnert Park P.D. 129 103 70 -33 Petaluma P.D. 115 89 71 -18 Sonoma Co. S.O.* 62 63 47 -16 Cloverdale 12 5 6 +1 Cotati 4 15 10 -5 Healdsburg 16 13 11 -2 Sebastopol 12 7 8 +1 Sonoma State Univ. 0 1 0 -1 Santa Rosa J.C. 0 0 0 - TOTAL 1,058 883 710 -173 3 What is Flock" License Plate Recognition Gathers evidence about vehicles NOT people Alerts police of wanted vehicles Used to solve crime M What this is NOT NOT facial recognition NOT tied to personal identifiable information NOT used for traffic enforcement Data NOT stored for more than 30 days 5 Cast Flocks is a subscription service to the user. The hardware is the property of Flocks and the user (Rohnert Park DPS) will have access to the data warehoused in the system. $3000 per camera per year. Cost covered by SONCATT for two years. Proposed Locations DoubleTree by Hilton d) St Elizabeth Seton GregaryCt The Home Depot y Sonoma Wine Country Marguerite Hahn Catholic Church ■� GecrgiaCt Fiber Care Carpet Elementary 19 Moura rn 4 Cleaning -Sonoma �¢ Lifevio !d Ave Wilfred Ave Amy Drive Thru Chick- A v 9 Heartwood or \ Mountain Shadows ��1I�1�■ Apartments Walmart In-N-Out Burger W XloralWay Neighborhood Marketq Graton Resort and CasinoO 1 Foxtall Golf Club Golf Course Dr e, Fry �°nneAiP to o<P ry K Scandia Family Fun Center ni cascadect ov o o Cogir of Rohnert ParkQ' et peg n_ Business Park or °or Evergreen Park Ct d OLD CAz BEER© a�D^ Elementary School n 6 The Church of� Jesus Christ of Latter... g. y Eagle Park, Fiori EstatesRohnert Park Communil Q o o Dorotea Park -01en st Organic Garde w oa w o ,v Keiser Ave 19 o`r ?�6 Costco Wholesalem� oc oroa oakcir P �Chila-killer cafe' QBuehananFood Services Cambria Hotel a a` Lawrence E. Jones Sonoma Wine Count 4 Q SantaboroteaGv Fmilya�a Middle School �m Country 9by Fairfield Inn &Suites \\ by Marriott Santa Rosa... terde(P ¢- --Hooters'¢o Concentra Urgent Care a �no� - Rancnoy� Rohnert Park - Cotat r' AIM101 "\,_ • Regional Library 1 Olive Garden It ian RohnPv ert Park Ex 1 v \\ ,t` way® Sahouria Pediatric \ Ross Dress for Less Rohnert Park - Dentistry & Orthodontics Rebounderz Rohnert Park Valley Village Sunrise © v IndoorTrampoilne... v � I $' Crossbrook Apartments Callinan Sports R0[in Park Estte44aor ���p �i P \ &Fitness Center 'T Community Center o Enterprise Dr Rancho Feliz 1 A Rustic Ln Mobile NomeParkq Madngalst tnt m Park AAvram Ave venue Catering q w wC John Reed ° Jasmine Cir 3 Camino -Creek O GaminoCoronado Apartments _ Rancho Cotate 7 High School Case Study: Serial Burglar San Ramon PD - San Ramon, CA Officers received a Flock alert on a vehicle believed to be associated with burglaries in the area When the vehicle was located, officers found 1.5 ounces of meth, stolen property and burglary tools in the vehicle Before Flock 6 Stolen Vehicle Recoveries in 8 Mo. After Flock 21 Stolen Vehicle Recoveries in S Mo. Police make seven arrests overbusyfourdays - danviAesanramon.com 0 Questions? ITEM NO. 9.C. swk,l k` „ k Mission Statement A.`#U "We Care for Our Residents by Working Together to Build a Better Communityfor Today and Tomorrow. " CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 12, 2024 Department: Public Works Submitted By: Vanessa Garrett, Public Works Director Prepared By: Vanessa Garrett, Public Works Director Agenda Title: Receive an Informational Presentation on the Results of the Capital Improvement Program Project 2022-10 Holly Fauna Emergency Access Bridge Feasibility Study. RECOMMENDED ACTION: Informational presentation on the results of the Capital Improvement Program Project 2022-10 Holly Fauna Emergency Access Bridge Feasibility Study BACKGROUND: A connection between Holly Avenue and Fauna Avenue has been considered by the City since the neighborhoods were developed in the late 1970s. Early drawings proposed a culvert, and a wooden footbridge was proposed in 1989. Since the late 1990s, a connection over the Wilfred Extension has been included in the City's Bicycle and Pedestrian Master Plan to connect the bike routes on Holly and Fauna Avenues. In 2021, the City Council approved funding to study a bridge connecting Holly and Fauna, which could be used only in the event of emergencies but closed to regular vehicles. It would also have a bicycle/ pedestrian opening for recreational use. The location of the study area is shown below: Faretnarn ; f0 C _ r f F19 - ti Fescue li w ., t9 • 3 � � • 3l Fain L = _ �� m Proposed bride -. k x lacation +i '. Fi�iMiY iI 14 ITEM NO. 9.C. In 2023, the City retained Steven Grover & Associates (SGA), which completed the City's Highway 101 Bicycle and Pedestrian Crossings Study in February 2022, to study a potential bridge over the Wilfred Extension that would serve as a single -lane access route for emergency vehicles, while also allowing use by cyclists and pedestrians. ANALYSIS: Site Assessment Environmental: This project would likely require review by three jurisdiction agencies: 1) the U.S. Army Corps of Engineers (Corps) 2) the California Regional Water Quality Control Board for the North Coast Region (Regional Water Board) 3) the California Department of Fish and Wildlife (CDFW) Since the Wilfred Extension eventually connects to the Bellevue -Wilfred Creek and the Laguna de Santa Rosa, it is expected that all three agencies will assert jurisdiction. Therefore, any work within and immediately adjacent to the channel will trigger the need for environmental permits from one or all of these agencies. It is likely that the CDFW and Regional Water Board will regard a new bridge over the Wilfred Extension as having permanent shading impacts to the channel and vegetation, so mitigation would be required. Furthermore, the CDFW, and often the Regional Water Board, will require tree replacement at a minimum 3:1 ratio, for the removal of any trees regarded as riparian. Right of Wad According to Sonoma County Assessor data, the Wilfred Extension is composed of two City -owned parcels, divided along the center line of the channel. The City owns the appropriate amount of Right of Way to span both sides of the channel. Utilities and Hydraulics: There are several utilities that cross the creek at the same location of the proposed bridge, including a sewer line, water line, and gas and electric. The project area also has a low risk for natural floods, but consideration needs to be given for a design that maintains flow capacity for the waterway. Design Options There are three types of bridges that could serve the intended purpose of emergency vehicle access as well as pedestrian and bicycle access: 2 ITEM NO. 9.C. 1. A steel prefabricated truss bridge (As shown in figure 1 below): The cost for this type of bridge at this location is between $2.16 million and $2.47 million. There would also be a recurring annual maintenance and 30 year replacement fund that should be considered of approximately $90,000 per year. 2. A Concrete three span bridge (As shown in figure 2 below): The cost for this type of bridge at this location is between $1.92 million and $2.03 million. There would also be a recurring annual maintenance and 30 year replacement fund that should be considered of approximately $67,000 per year. ITEM NO. 9.C. 3. The concrete double box culvert (As shown in figure 3 below): The cost for this type of bridge at this location is between $2.45 million and $2.47 million. There would also be a recurring annual maintenance and 30 year replacement fund that should be considered of approximately $90,000 per year. Timeline For all of the bridge options, a list of required next steps would need to take place prior to actual construction of the bridge, including: oo Further biological assessments: These likely take at least one year so that studies can be completed during every season as needed. oo Applications with environmental regulatory agencies: Applications and negotiating mitigation is expected. This can take up to 2 years to complete. oo Determining funding: There are currently no funds allocated for this bridge. The bridge could utilize some of the following funding sources: o Measure M transportation o General fund o TDA Article 3 Using these funds would be a trade off with other important projects, including the city's pavement maintenance, trail projects, and building projects. STRATEGIC PLAN and CITY COUNCIL PRIORITY ALIGNMENT: Not applicable OPTIONS CONSIDERED: None. This is an informational presentation. FISCAL IMPACT/FUNDING SOURCE: Presentation of the findings does not have a fiscal impact. .19 ITEM NO. 9.C. Department Head Approval Date: 03/04/2024 Code Compliance Review: NA Finance Director Approval Date: NA City Attorney Approval Date: NA City Manager Approval Date: 3/5/2022 Attachments: 1. Holly Fauna Feasibility Study 3L4t `n Tot i T ' Ix Ilk s, j e v► Eli STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study Table of Contents EXECUTIVE SUMMARY 3 Abbreviations 5 STUDY PURPOSE & SCOPE 6 Community Context and Project Background 6 Relationship to Existing Plans and Documents 9 DETAILED SITE ASSESSMENT 13 Environmental 13 Right of Way 15 Utilities 15 Geometrics 16 Hydraulics 17 DESIGN CONSTRAINTS, CODES, & GUIDELINES 18 Geometric Constraints 18 Codes, Guidelines, and Design Criteria 19 Bicycle and Pedestrian Use, Accessibility, and Safety 19 Access Control 19 Structure 20 Substructure 20 ALTERNATIVES & ASSESSMENT 21 1. Steel Prefabricated Truss Bridge 22 1.a. 100-foot Span 22 1.b. 80-foot Span 23 2. Concrete Three -Span Bridge 23 2.a. Cast -in -Place Reinforced 23 2.b. Cast -in -Place Prestressed 24 3. Concrete Double -Box Culvert 25 3.a. Cast -in -Place Reinforced 25 3.b. Precast 26 Alternatives Summary 26 Assessment 27 CONCEPTUAL COST ESTIMATE SUMMARY 28 NEXT STEPS 29 APPENDICES 29 Rohnert Park Project # 22-10 2 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G EXECUTIVE SUMMARY Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study This Study assesses the feasibility of conceptual designs for a crossing between Holly Avenue and Fauna Avenue that could be regularly used by cyclists and pedestrians, while also serving as a single -lane access route for emergency vehicles. In northwest Rohnert Park, the Wilfred Creek Extension Channel (Wilfred Extension) separates Holly Avenue in Section H and Fauna Avenue in Section F. The channel creates a gap in the City's roadway and active transportation networks, limiting access routes for emergency vehicles and making it harder for cyclists and pedestrians to reach transit and trails. A connection between Holly Avenue and Fauna Avenue has been considered by the City since the neighborhoods were developed in the late 1970s. Early drawings proposed a culvert, and a wooden footbridge was proposed in 1989. Since the late 1990s, a connection over the Wilfred Extension has been included in the City's Bicycle and Pedestrian Master Plan to connect the bike routes on Holly and Fauna Avenues. In 2021, the City Council approved funding to study a bridge connecting Holly and Fauna, which could be used only in the event of emergencies, but closed to regular vehicles. This Study, completed by Steven Grover & Associates, with support from Biggs Cardosa Associates, BKF Engineers, and WRA Environmental Consultants, finds three structure types that are feasible for the crossing (i.e., steel single -span truss bridge, concrete three -span bridge, and concrete double -box culvert). Through a preliminary analysis of site conditions, utilities, channel hydraulics and environment, and maintenance and access requirements for Sonoma Water and the City, we developed and assessed two conceptual design alternatives for each crossing type: 1. Steel Prefabricated Truss Bridge Alternative a. 100-foot span b. 80-foot span 2. Concrete Three -Span Bridge Alternative a. Cast -in -Place Reinforced b. Cast -in -Place Prestressed 3. Concrete Double -Box Culvert Alternative a. Cast -in -Place Reinforced b. Precast The steel prefabricated truss bridge alternative has the highest overall cost and greatest visual impact. It also has the smallest disturbed soil area, which minimizes impacts to the channel's hydraulic capacity and areas below the high water line. Construction challenges pertaining to staging and maneuverability would likely be greatest with a 100-foot prefabricated bridge. The concrete three -span bridge alternative has the lowest cost. It would be custom-built and require foundations and permanent supports to be placed within the channel, resulting in some Rohnert Park Project # 22-10 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study hydraulic and environmental impacts. However, the cast -in -place prestressed alternative would have the thinnest deck and use the least amount of material. The concrete double -box culvert alternative would be similar to existing culvert crossings in the City and have the largest footprint and disturbed soil area due to work related to excavation, compaction, and the construction of cutoff walls and wingwalls. Since all six crossing alternatives are feasible, we recommend that the City coordinate with the bicycle, pedestrian, and residential communities to identify preferred crossing alternative for further study. Outside the scope of this Study, more data on the crossing site, such as subsurface conditions, the likelihood of the presence of special -status species, and the channel's stormwater capacity through hydraulic modeling, would further clarify the costs associated with the preferred alternatives. Rohnert Park Project # 22-10 4 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Abbreviations AASHTO BPMP CDFW CIP Corps CTS CWA DIH EV3 FMDM HMA HGL LRFD MUTCD OHWL PROWAG RCB Regional Water Board SCT Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study American Association of State Highway and Transportation Officials Bicycle and Pedestrian Master Plan California Department of Fish and Wildlife Capital Improvements Program U.S. Army Corps of Engineers California Tiger Salamander Clean Water Act Cast -in -Drilled -Hole Emergency Vehicle Type 3 Flood Management Design Manual Hot Mix Asphalt Hydraulic Grade Line Load and Resistance Factor Design Manual on Uniform Traffic Control Devices Ordinary High -Water Line Public Rights of Way Accessibility Guidelines Reinforced Concrete Box California Regional Water Quality Control Board, North Coast Region Sonoma County Transit SCTA Sonoma County Transportation Authority SGA Steven Grover & Associates SMPM Stream Maintenance Program Manual Sonoma Water Sonoma County Water Agency SS Sanitary Sewer Rohnert Park Project # 22-10 5 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G STUDY PURPOSE & SCOPE Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study This Study assesses the feasibility of conceptual designs for a crossing between Holly Avenue and Fauna Avenue that could be regularly used by cyclists and pedestrians, while also serving as a single -lane access route for emergency vehicles. The Project would close a gap in Rohnert Park's active transportation network and provide emergency response with a secondary point of access to homes in the City's H and F Sections. Community Context and Project Background Incorporated in 1962, Rohnert Park was one of the earliest communities to be master -planned using the concept of the "neighborhood unit." Each neighborhood, known as "sections," consisted of approximately 250 homes within a third of a mile to a school or open space. On the east side of US 101, H and F Sections adjacent to the City's northern edge were developed in the late 1970s around the North Course of the Foxtail Golf Club, formerly known as the Mountain Shadows Golf Resort. Running southeast to northwest between H and F Sections, is an engineered waterway or channel that separates Holly Avenue and Fauna Avenue. In record drawings and previous City and County planning documents, this channel has been variously named "Bellevue Creek," "Five Creeks Channel," "Five Creek Diversion," and the "Wilfred Extension." For the purposes of this Feasibility Study, the channel will be referred to as the 'Wilfred Extension," to be consistent with the Sonoma County Water Agency's (Sonoma Water) 2020 Stream Maintenance Program Manual (SMPM). A detailed description of the Wilfred Extension is provided in the Detailed Site Assessment chapter of this Study. Excerpt from Sonoma Water Stream Maintenance Program Manual, Figure C-68. (Sonoma Water, 2020. See Appendix E for full exhibit.) Rohnert Park Project # 22-10 STEVEN GROVER & A S S O C I A T E S ARCNITE C TU RE E .. I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study Due to the Wilfred Extension, 179 single-family homes in F Section on the west side of the channel have only one route for ingress and egress into their neighborhood through the intersection of Fauna Avenue and Flores Avenue. Similarly, in H Section on the east side of the channel, 79 single-family homes have only one neighborhood entrance and exit route through the intersection of Holly Avenue and Fairway Drive. With no connection between Holly Avenue and Fauna Avenue the Wilfred Extension limits access between H and F sections and also creates a gap in the City's active transportation network. Drawings from 1977 for the Coleman Valley Subdivision, in H Section, proposed a through street, then named Wiggins Avenue, that crosses the Wilfred Extension via a future reinforced concrete box (RCB) culvert. The drawings also show a similar double -box culvert on Fairway Drive, 0.3 miles away. However, drawings from the following year for the Mountain Shadows Subdivision in F Section, show that Wiggins Avenue was bisected, renamed Fauna Avenue and Holly Avenue, and terminated with cul-de-sacs on either side of the channel. Nevertheless, the 1978 drawings still included callouts for a future proposed RCB culvert between Fauna Avenue and Holly Avenue, as well as a future bridge at the location. Plan drawing from the Coleman Valley Subdivision Improvement Plans depicting a proposal for a RCB culvert: (M. Hudis & Associates, 1977) In 1989, drawings were prepared for the City that proposed a six -foot -wide "Five Creeks Pedestrian/Bike Bridge" with wooden decking to connect Fauna Avenue and Holly Avenue, with a proposed resolution to request sealed proposals for the development of the bridge. However, this coincided with the City's General Plan update, and the City ceased its pursuit of the footbridge following community opposition to the connection proposed in the General Plan's Circulation Element, with City Council directing staff to delete the proposed bridge between Holly and Fauna Avenues from the General Plan. Rohnert Park Project # 22-10 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study . _ _ ffiApST d 3l. Section drawing from the proposal for the Five Creeks Pedestrian/Bike Bridge. (M. Hudis & Associates, 1989) In 1995, the City's Bicycle Committee adopted the Bicycle Master Plan, which designated a bridge at the Holly -Fauna location to complete the Class III bike route circulation plan for H and F Sections. In December 1999, the City again sought to receive sealed proposals for a bridge connecting Holly and Fauna Avenues, and a public hearing was conducted for the "Five Creek Pedestrian Bridge" during a City Council meeting. Following a mix of public comments that both supported and opposed the project, Council voted to create a working group comprised of community members, a bike committee liaison, and a council liaison to propose and report a course of action. However, no record of outcomes from the working group are recorded in the minutes from subsequent City Council meetings. For the next 14 years, there did not appear to be any significant development of the Holly - Fauna Bridge. With the exception of the five-year Capital Improvements Program (CIP) adopted by the City in 2008, the CIPs adopted between 2000 and 2014 included the Holly -Fauna Bridge (no. TR-67) an "unfunded" project. In 2008, the City's adopted CIP included the Holly -Fauna Bridge as a "funded" project, following the request of a community member. Furthermore, the City's Bicycle and Pedestrian Master Plan, approved by the City in the same year as part of the Sonoma County Transportation Authority's (SCTA) countywide plan, also identified a proposed pedestrian connection between Holly and Fauna Avenues. According to the CIP project description: The City's Bike Master Plan and General Plan show a Class III route through Holly and Fauna Avenues, crossing over the Wilfred Channel Extension, but there is no "official" crossing here. Pedestrians and cyclists who want to get to the other side must either wade through the creek or travel south along the creek about 300' to the golf course, where the channel goes underground. A bike/ped bridge would enable a safe crossing of the creek and properly connect the two Class III routes on Holly and Fauna Avenues. Beginning in 2015, the City's adopted five-year CIP project lists did not include unfunded projects as in previous years, and the Holly -Fauna Bridge project no longer appeared. In February 2019, during a meeting of the City's Bicycle and Pedestrian Advisory Committee (BPAC), the Committee received a public comment that spoke of the need for a connection between Holly Avenue and Fauna Avenue. According to meeting minutes, the community Rohnert Park Project # 22-10 8 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study member, who lived in H Section, displayed a photo of the Wilfred Extension full of water from a recent storm and provided several reasons to build a bridge at the location, such as protecting the environment by mitigating the debris people place in the channel to use as an informal crossing; creating an emergency access route; and proving accessible pathways for different users. Adding that there was considerable support for a bridge among neighbors, the community member asked that the BPAC study the issue and need for the project and advocated putting the project back on the City's CIP. Photo (looking east towards Holly Ave) of the existing conditions of the Wilfred Extension following a heavy rain event. (Jason Sampietro, 2024) During a review in 2021 of the five-year CIP by the City Council, the Vice Mayor motioned to add to the CIP, the study of a bridge connecting Holly and Fauna, which could be used only in the event of emergencies, but closed to regular vehicles. The motion was unanimously supported by other councilmembers as a safety issue, and the Holly -Fauna Bridge Feasibility Study was added to the CIP as a new and funded project (no. TR-147). In 2023, the City retained Steven Grover & Associates (SGA), which completed the City's Highway 101 Bicycle and Pedestrian Crossings Study in February 2022, to study a potential bridge over the Wilfred Extension that would serve as a single -lane access route for emergency vehicles, while also allowing use by cyclists and pedestrians. Relationship to Existing Plans and Documents The 1977 drawings for the Coleman Valley Subdivision, the 1978 drawings for the Mountain Shadows Subdivision, and the 1989 drawings for the Five Creek Pedestrian/Bike Bridge all demonstrate that a connection between Holly Avenue and Fauna Avenue has been intended by the City since the start of the H and F Sections. Rohnert Park Project # 22-10 STEVEN GROVER & A S S O C I A T E S ARCNITE C TU RE E .. I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study According to meeting minutes, the Bicycle Master Plan that was prepared and adopted by the City in 1995 identified a bridge between Holly and Fauna Avenues to complete the Class III bike routes in the area. Adopted in 2000, the City's 2020 General Plan, 8th Edition, refers to the 1995 Bicycle Master Plan and also includes a map of the bicycle system that depicts a proposed Class I path along the Wilfred Extension that connects to the existing Class III bike routes in H and F Sections. Hi M M 1*It ...a+f...' xL 1 y -.r W WW=Na r19 4 �+ q Excerpt from Figure 4.4-1, Bicycle System. (Rohnert Park General Plan, 8th Edition. See Appendix A for full map.) ►ab .� ...... AVI 8 DR dC . In 2014, SCTA updated the 2008 Countywide Bicycle and Pedestrian Master Plan (BPMP) by coordinating with local jurisdictions, assessing additional census and collision data, discussing the progress in implementing bike/ped improvements and programs, and providing an updated list of proposed bike/ped projects. For Rohnert Park, the 2014 BPMP includes a Holly -Fauna bike/ped bridge as a "medium" priority project (#159), which is also identified in SCTA's Bike Route Map. Rohnert Park Project # 22-10 10 STEVEN GROVER & A S S O C I A T E S ARCHITECTURE E .. I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study BELLEVUE ',REEK TRAIL .... ■ ... . • ....... ■ ■ . ■ . ■ ■ ■ . ■ ■ ■ ■ ■ ■ ■ ■ ■ . ■ . . ■ . 'PO p.tJuuuuuuuuuuuuuuuur.ro.r 000uuu■ • P O Y���mp • ■v ti SLY AV HOLLYAVE COLEMAN I GOLIS ■uuuuuuuuum ua.P p S �p\1Np0t ell* f Etmrntery 4- ♦. s MO P • JuOyB <R Q� ; School Rohnert �P ♦ Rohnert Park _- . • S6,T Rot n's1Lake • SNYDER LANE Rd/Golf Course Or GOLF COURSE OR ELEANOR AV CHRISTIAN SCHOOL N � • IC ♦ O 'P ■ • ��� ■ p0 EASTER ♦ R V j 2 SEALS • ■ Ervr9— 4r BUSINESS' W DAYCARE ♦ ■ Ekm eary ,A Lu PARK tr.ryr��I��R�... ■ ■ C . • Op ■� O a i at • R,- ■r C Excerpt from Sonoma County Bicycle and Pedestrian Master Plan for Rohnert Park' existing and proposed bike/ped facilities. (SCTA Bicycle and Pedestrian Master Plan, 2014. See Appendix A for full map.) � on EndRoute Holly Junsdictwn City of Rohnert Park Label Holly -Fauna Bike/Ped Bridge LengthFeet 270.48 LengthMiles O.OS StartRoute Fauna Status Proposed Q Zoom to P iin 0 r rIpsrto. Excerpt from SCTA Bike Route Map Tool. (SCTA Bicycle and Pedestrian Master Plan, 2014) The Draft 2040 General Plan Policy Document, released in July 2022 for public review, includes a map of the Bicycle and Pedestrian System that specifically identifies a proposed bridge that would close a gap in the existing Class III bike routes along Holly Avenue and Fauna Avenue. Rohnert Park Project # 22-10 11 :/ west FD > OF k STEVEN GROVER & A S S O C I A T E S ARCNITE C TU RE E .. I N E E R I N G 101 �0.0. O- Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study ....... ................ I............. .............. ■.- Excerpt from Figure 7-2 Blcycle and Pedestrian System. (Rohnert Park Draft 2040 General Plan Po/icy Document, 2022. See Appendix A for full map.) The development of the Holly -Fauna Bridge would help the City achieve many goals in the 2022 General Plan Public Review Draft Policy Document, such as the following: CD-8.5 Continuous Streets: The Project would provide a connection between neighborhoods. CD-8.6 Fine -Grained Street Patterns: This Project would be human -scaled, enhance integrated street patterns, and provide continuity between neighborhoods. CD-8.7 Limit Cul-de-Sac Use: The Project would provide pedestrian and bicycle connections at cul-de-sac ends. C-3.5 Encourage Last Mile Solutions: By improving active transportation routes, the Project would contribute to "last mile" solutions for transit users. C-5.1 Multimodal Network Strategy and Prioritization: The Project would increase continuity between pedestrian routes, bicycle routes, and public transit. C-6.8 Bicycle and Pedestrian Improvements Through Capital Improvements Program: This CIP project would make improvements shown in the Bicycle and Pedestrian Circulation Diagram. C-8.1 Transit Access: As a pedestrian and bicycle path connection, the Project would support last -mile solutions for transit riders and enhance access for F Section residents to the Sonoma County Transit's (SCT) Route 14 bus, which passes through H Section and stops at the intersection of Holly Avenue and Fairway Drive. Rohnert Park Project # 22-10 12 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study PFS-6.6 Dumping Prohibition: The Project would protect waterways and minimize the likelihood that debris will be placed into the channel to be used as an informal crossing. PFS-9.5 Emergency Response Preparation and Coordination: The Project would enhance emergency response, access, and evacuation routes. HS-1.4 Emergency Vehicle Access: The Project would provide H and F sections with a new access route for emergency vehicles. HS-2.3 Maintain Fire Access: The Project would have an emergency vehicle load rating suitable for EV3 fire trucks with a tandem rear axle. RC-4.5 Special Status Species Protection: By minimizing the likelihood that debris will be placed into the channel to be used as an informal crossing, the Project would reduce impacts to waterways upstream of California Tiger Salamander habitat areas. DETAILED SITE ASSESSMENT Environmental The project study area is centered between Holly Avenue and Fauna Avenue, at the intersection with the Wilfred Extension channel. This area is bounded by an environmental mitigation bank to the north, low -density single-family homes to the east and west, and the north course of the Fox Tail Golf Club to the south. According to Sonoma Water's 2020 SMPM, the Wilfred Extension is an engineered channel that conveys runoff from Coleman Creek and the Foxtail Golf Club, northwest to the Wilfred Channel. Within the golf course, sediment detention basins reduce turbidity and improve the quality of water discharged to the Wilfred Extension. The northern (lower) portion of the Wilfred Extension borders a vernal pool and wetland, where sensitive habitat is protected. For this Study, we conducted a preliminary biological and environmental permitting assessment (Appendix B). Based on aerial imagery, trees that currently grow along the Wilfred Extension include coast redwood, coast live oak, eucalyptus, and willows. Although the willows are likely a product of natural recruitment, the other species appear to be planted sometime between 1982-1993 for aesthetic purposes and to create a visual barrier along the edges of the channel and adjacent golf course. A mixture of native, and predominantly non-native, grasses and forbs grow under and between the planted riparian trees. Within the area, habitat is not present for the endangered Sonoma sunshine, Sebastopol meadowfoam, and Burke's goldfields. However, the intermittent Wilfred Extension, and the planted urban mixed -riparian zones on either side of the channel, constitute two potentially sensitive biological communities present. Special -status plants that may occur in the area are Rohnert Park Project # 22-10 13 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study the pappose tarplant, hayfield tarplant, marsh microseris, two -fork clover, and saline clover. With the exception of the two -fork clover, whose occurrence is extremely unlikely, occurrences for the other plants are also unlikely, since only marginal suitable habitat exists in the area's highly -altered and developed urban setting. The primary special -status wildlife of concern that may occur in the area are the California Tiger Salamander (CTS) and Western Pond Turtle. Although CTS habitat is not present in the study area, the mitigation bank to the north along Horn Avenue is managed specifically for its conservation and the project area is within its average 1.25-mile dispersal range. Western Pond Turtle may also be present in the golf course ponds and could potentially use the channel for migration when water is present, or may occur if channel waters are perennial or have deep perennial pools. Additional special -status wildlife that may occur are the Western red bat and Hoary bat, whose occurrences would be dependent on the types of trees present onsite and when a maternity roost is present. Furthermore, the California red -legged frog and Coastal Rainbow Trout (steelhead) are special wildlife that have been documented within five miles of the area but are unlikely to occur onsite, due to the intermittent nature of the Wilfred Extension and because the channel does not hydrologically connect to any sites and headwaters that could act as populations sources. A site visit is recommended to confirm the likelihood that special -status species may occur or be present and to evaluate whether the trees have suitable characteristics to support bat roosting, and what types of roost may be present. This project would likely require review by three jurisdiction agencies: 1) the U.S. Army Corps of Engineers (Corps), 2) the California Regional Water Quality Control Board for the North Coast Region (Regional Water Board), and 3) the California Department of Fish and Wildlife (CDFW). Since the Wilfred Extension eventually connects to the Bellevue -Wilfred Creek and the Laguna de Santa Rosa, it is expected that all three agencies will assert jurisdiction. Therefore, any work within and immediately adjacent to the channel will trigger the need for environmental permits from one or all of these agencies. Section 404 of the Clean Water Act (CWA) establishes a program to regulate the discharge of dredged or fill material into Waters of the U.S., including tributaries and wetlands. Per Section 404, any disturbance below the ordinary high-water line (OHWL) of one-half acre or less, requires authorization from the Corps through a Nationwide Permit. If the disturbance is greater than one-half acre, an Individual Permit is required. The Regional Water Board must also certify federal permits under Section 401 of the CWA through a Water Quality Certification. However, if there is no disturbance below the OHWL, the Regional Water Board still regulates any activity within aquatic habitats through the Waste Discharge Requirements Program. Rohnert Park Project # 22-10 14 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study Lastly, the CDFW regulates activities that may alter or have the potential to alter creek beds and banks under Section 1600 of the California Fish and Game Code, especially since their jurisdiction encompasses the channel up to the edge of the top of bank, or to the outer edge of the riparian drip line. It is likely that the CDFW and Regional Water Board will regard a new bridge over the Wilfred Extension as having permanent shading impacts to the channel and vegetation, so mitigation would be required. Furthermore, the CDFW, and often the Regional Water Board, will require tree replacement at a minimum 3:1 ratio, for the removal of any trees regarded as riparian. Right of Way According to Sonoma County Assessor data, the Wilfred Extension is composed of two City - owned parcels, divided along the center line of the channel. Parcel no. 160-010-007 on the west side is identified as a "Miscellaneous City Property," and parcel no. 143-280-009 on the east side is identified as a "Municipal Utility Property." Based on Sonoma Water's 2020 SMPM, Sonoma Water has an easement to maintain the channel to a level generally defined by the local jurisdiction. Specifically, Sonoma Water is authorized to maintain the channels it does not own through permissive easement agreements with local jurisdictions. According to the SMPM, the agreements do not require or obligate Sonoma Water to maintain any specific level of hydraulic capacity or conduct any maintenance. For the easement engineered channels, Sonoma Water also works only within the channel banks and does not maintain roads, ditches, fences, or other structures outside the channel. Utilities Drawings for the Coleman Valley Subdivision from 1977 show a six-inch sanitary sewer (SS) pipe that runs east -west, five feet south of the centerline of Holly and Fauna Avenues, at a depth of approximately ten feet below street level. Where it crosses under the centerline of the Wilfred Extension, 30 linear feet of this pipe is encased in concrete. A SS manhole was shown to be located adjacent to the back of sidewalk on Fauna Avenue, although drawings for the City's 2014 sewer lining project noted the manhole as buried. Drawings for the Mountain Shadows Subdivision from 1978 show an eight -inch water main ten feet north of the centerline of Holly and Fauna Avenues, parallel to the SS pipe. The drawings state that the main is to be depressed under the channel with a minimum two feet of cover. In 1988, the City's Aqueduct North Pipeline Project added a 12-inch pipeline on the western side of the Wilfred Extension, four feet under the access road along the top of bank. Near the end of Fauna Avenue, valves, pressure reducer, and vault were added under the access road to connect the pipeline to the eight -inch water main. Data from Sonoma County GIS also show that a 21-inch storm drain on Holly Avenue empties into the channel. Rohnert Park Project # 22-10 15 STEVEN GROVER & A S S O C I A T E S ARCNITE C TU RE E .. I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study Coordination with Comcast, AT&T, and Pacific Gas & Electric (PG&E) in December 2023 showed that these companies do have underground lines in or near the crossing location. An underground Comcast cable crosses the channel between the two houses on the south side of the crossing location, and an underground AT&T line terminates at the house on the southwest corner of the project area. According to PG&E maps, an underground primary voltage conductor and high-pressure gas line crosses the channel in a joint trench along south side of Holly and Fauna Avenues. Although PG&E's maps also identify structures that support overhead utilities (e.g., poles and towers) around the Holly and Fauna Avenue cul-de-sacs, none appear to be present in the project area. Based on Google Earth measurements, the closest City street lights are located approximately 80-90 feet from the channel at the roadway intersections. Utility locations should be verified in the field prior to final design. FAUNA AVE Geometrics Isr&.78L. --7' r � t Ij 2. Plan graphic depicting existing utilities and parcels (SGA, 2024) f HOLLY AVE - r Record drawings show that the public rights of way on Holly and Fauna Avenues are 56 feet wide, encompassing roadways 33 feet in width, 6-inch curbs and gutters, and 5-foot sidewalks. The radii of the cul-de-sacs at the ends of Holly Avenue and Fauna Avenue are approximately 28 feet. At the cul-de-sacs of Holly and Fauna Avenues, chain link fences, with gates, restrict vehicular access into the channel, but permanent openings within the gates allow for access by pedestrians and cyclists. The distance between Holly Avenue and Fauna Avenue is approximately 142.5 feet between the backs of sidewalk. The Wilfred Extension channel is approximately 100 feet wide between tops of bank, and approximately eight feet deep, with sloped embankments of 1:2 on either side. Rohnert Park Project # 22-10 16 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study On the west side of the channel, the strip of land between private properties and the top of bank has been flattened, and early drawings show a 13-foot-wide asphalt access road that runs parallel to the channel. However, satellite imagery appears to show that the road had become overgrown by the late 2000s. This unpaved trail connects to the North Rohnert Park Trail along Wilfred Creek, approximately a third of a mile to the north. On the east side of the channel, there is no flattened area, and an informal unpaved trail along the sloped embankment leads into the north course of the Fox Tail Golf Club, approximately 400 feet to the south, where pedestrian connections are undefined. Hydraulics The project area has a low risk for natural floods. It is categorized as Zone X in the FEMA Flood Insurance Rate Map, which places it outside the 0.2% annual chance floodplain and outside the potential for a 500-year flood (see Appendix Q. The area is also excluded from the areas with flood risk identified in the 2022 General Plan Public Review Draft Policy Document. However, a major storm event in 2005/2006 caused substantial localized flooding in areas throughout Rohnert Park, including along Holly Avenue and within the golf course, which may have been the result of drainage blocked by debris. For this Study, we conducted a preliminary hydraulic assessment of the Wilfred Channel (Appendix D). Based on communications with Sonoma Water and drainage records received, the design interval for the channel is advised to be the 25-year flow, or approximately 817 cubic feet per second, as shown in the hydrology map provided by the agency. Information about the Hydraulic Grade Line (HGL) of the channel is also provided in the 1989 drawings for the City's proposed pedestrian bridge, which show a 10-year HGL elevation of 98.80' and a 100-year HGL elevation of 100.16 feet. In 2013, the County conducted an aerial LiDAR survey for the greater Sonoma County. The survey data suggested that the elevation of the channel bed increased, likely due to an accumulation of sediment over time. Based on a comparison of the cross section of the channel included in the 1989 drawings, to a cross section of the project site produced using LiDAR data, the elevation of the channel bed appeared to have risen by approximately 3.7 feet. However, Sonoma Water's 2020 SMPM recorded that the Wilfred Extension was maintained and dredged in 2017, and sediment removal record drawings received from Sonoma Water indicate that the elevation of the channel bed was returned to near -design levels (Appendix Q. Regular channel and creek maintenance should be conducted in accordance with the Sonoma Water 2020 Flood Management Design Manual (FMDM), which states, All conveyance systems must be maintained to preserve the design flow capacity. Monitoring and maintenance requirements, including access, monitoring methods, and regulatory requirements, should be considered in the channel design process. The party (or parties) responsible for maintenance and the associated documentation (e.g., Rohnert Park Project # 22-10 17 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study irrevocable license, maintenance agreement) must be identified for any project. Responsible parties may include Sonoma Water (for Sonoma Water facilities), other jurisdictions (including cities and Sonoma County for facilities within their rights -of -way), or private parties (sec. 4.2.1.5, Monitoring and Maintenance Needs, p. 4-5). The City's 2022 General Plan Public Review Draft Policy Document also includes the following goals: PFS-5.2 Drainage Facility Maintenance: The City shall require the maintenance of all drainage facilities, including detention basins and both natural and manmade channels, to ensure that their full carrying capacity is not impaired. HS-4.2 Drainage Maintenance: In cooperation with the Sonoma Water, maintain flood plain areas, drainage channels, and other drainage structures and improve drainage channel capacity in ways that will preserve the natural character of habitat areas, riparian corridors, and waterways to the maximum extent feasible. Before final design of a Holly -Fauna Bridge, consultation with Sonoma Water is recommended to obtain the most recent hydraulic data. DESIGN CONSTRAINTS, CODES, & GUIDELINES Geometric Constraints The City desires that a potential bridge over the Wilfred Extension could be regularly used by cyclists and pedestrians, while also serving as a single -lane access route for emergency vehicles, such as a Type EV3 or rear tandem axle fire truck. Per California Code of Regulations, Title 21, Division 2, Chapter 7, Article 1411.7(f), the maximum width of a fire truck is 120 inches. To allow easy passage by a Type EV3 emergency vehicle, and to provide ample width for cyclists and pedestrians, the clear with of the crossing should be a minimum of 12 feet. According to the hydraulic assessment, a minimum clearance of one foot must be provided between the low chord of a bridge structure and the 100-year water surface to preserve the required minimum freeboard in the upstream channel. Since the channel must be regularly maintained and dredged to retain its hydraulic capacity, as well as the capacity of storm drains that lead to the channel, it would be appropriate to use the HGL record information in the 1989 drawings for the Five Creeks Pedestrian/Bike Bridge. The 1989 elevations need to be maintained to prevent flooding throughout the city, and Sonoma Water's maintenance would be in accordance with the recommendations in its Flood Management Design Manual. Based on the 100-year HGL information included in the 1989 drawings (i.e., 100.16 feet), the preliminary design of a new bridge crossing should have a bottom chord elevation of 101.16 feet or higher. Rohnert Park Project # 22-10 18 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study In the portion of the Wilfred Extension owned by the City, Sonoma Water's maintenance activities include channel maintenance for flood control, fire fuel reduction, public safety, etc. The City also accesses the channel area for weed abatement, which is primarily conducted manually using string trimmers. According to Sonoma Water, access to the west bank's maintenance road from Fauna Avenue would be minimally required, where trucks would likely enter head -first and then back out. Therefore, a key dimension is the minimum width between private ROW and proposed bridge entrance. To provide adequate space for access on the west side, the centerline of the crossing alternatives may need to be shifted slightly east of the centerline of the channel. Maintenance vehicles and equipment that would be used in the channel area include trucks, bulldozers and skid -steers to remove vegetation, debris, and silt. Sonoma Water's largest vehicles that would need to access the channel area are Ford F-550 trucks towing wood chippers, 10-wheel dump trucks, and Ford F-150 trucks with long beds. Based on this data, 18 feet minimum horizontal clearance should be provided on both sides of the bridge entrances for access by maintenance vehicles. Codes, Guidelines, and Design Criteria Bicycle and Pedestrian Use, Accessibility, and Safety The design of the crossing for bicycle and pedestrian use, accessibility, and safety should be in accordance with the AASHTO Guide for the Development of Bicycle Facilities, 4th Edition (2012), with February 2017 errata; and the current Public Rights of Way Accessibility Guidelines (PROWAG) published by the U.S. Access Board, which adapts ADA standards into guidelines for physical access for elements located within the public right of way. When PROWAG is adopted by the Department of Justice, the guidelines will become enforceable standards under title II of the ADA. In general, surfaces for the traveled way should be firm, stable, and slip resistant; grades should be less than 5%; cross slopes must be less than 2%; a smooth transition should be provided between paths and the deck of the crossing; guards must have a minimum design height of 42 inches, measured from the top of the traveled way surface; and openings between horizontal or vertical members on guards must be small enough that a six-inch sphere cannot pass through the guard in the lower 27 inches, and an eight -inch sphere cannot pass through the guard in portions higher than 27 inches. Access Control In accordance with AASHTO, signage should be used as a first attempt restrict unauthorized motor vehicles from accessing a bicycle and pedestrian facility, such as the MUTCD's R5-3, "No Motor Vehicles" sign; or R5-11, "Authorized Vehicles Only" sign (see figures below). Other shared use path and regulatory signs could be used to restrict vehicles that are already prohibited on the facilities. To further restrict unauthorized vehicles, removable bollards could be placed at the entrances to the crossing, consistent with vehicular access control devices at Rohnert Park Project # 22-10 19 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study other Class I paths within the City, such as at the Golf Course Commerce Path at State Farm Drive, Copeland Creek Trail at Rohnert Park Expressway, and Laguna de Santa Rosa Trail at Commerce Boulevard. If used, the removable bollards be should painted, coated, or manufactured of material in a bright color to enhance daytime visibility; reflectorized for nighttime visibility, and leave a flush surface when removed. As an obstruction within the pathway, the bollard should be delineated as shown in California MUTCD Figure 9C-2. NO MOTOR VEHICLES AUTHORIZED VEHICLES ONLY R5-3 and R5-11 Signage (California MUTCD 2014, Rev 7) Structure The structural design of the crossing should be in accordance with the procedures outlined in the following codes and specifications, listed in the general order of precedence: 1. AASHTO Guide Specifications for the Design of Pedestrian Bridges, December 2009 with 2015 Interim Revisions; 2. Caltrans Seismic Design Criteria (SDC), Version 2.0, April 2019 with October 2019 Interim Revisions; and, 3. AASHTO LRFD Bridge Design Specifications, 8th Edition (2017), and California Amendments with preface dated April 2019 (AASHTO-CA BDS-8). The structure should be designed for a pedestrian loading of 90 pounds per square foot and checked for an H10 maintenance vehicle. A single vehicle should be placed to produce the maximum load effects and should not be placed in combinations with the pedestrian load, in accordance with the current edition of the AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges. The structure should also be analyzed for the load effects resulting from a Type EV3 emergency vehicle configuration, consisting of a front single axle load of 24,000 pounds and a rear tandem axle weight of 62,000 pounds (two 31,000-pound axles spaced at four feet). A well-defined earthquake resisting system (ERS) should also be incorporated into the design to prevent collapse of the structure when subjected to the design earthquake. Substructure The available information about the project site does not provide adequate data to complete the foundation design recommendations for the proposed improvements; therefore, a site - specific boring program will be required prior to final design. Rohnert Park Project # 22-10 20 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study To meet both seismic and hydraulics requirements, design of the crossing should use the following bent types, in the order listed: 1. Single column bents supported on shafts (3'-0" Diameter, Min). 2. Widely spaced multi -column bents supported on shafts, with clear spacing equal or greater than five times the diameter of the column (2x 2'-0" Diameter at 10'. Min). 3. Widely spaced multiple pile extensions supporting slab bridges, with clear spacing equal or greater than five times the diameter of the pile (2x 2'-0" Diameter at 10', Min). ALTERNATIVES & ASSESSMENT A total of six crossing alternatives were studied and determined to be feasible for meeting the Project's purpose and need. The six alternatives comprise three structure types with two conceptual design alternatives for each type: 1. Steel Prefabricated Truss Bridge Alternative a. 100-foot span b. 80-foot span 2. Concrete Three -Span Bridge Alternative a. Cast -in -Place Reinforced b. Cast -in -Place Prestressed 3. Concrete Double -Box Culvert Alternative a. Cast -in -Place Reinforced b. Precast The following are applicable to all alternatives: • The clear width of all crossing alternatives are 12 feet. • The centerlines of all channel crossing concepts have been aligned with Sonoma Water's centerline of the channel invert. This provides space for access to and maneuverability along the maintenance path on the west side of the Wilfred Extension. Note that Sonoma Water's centerline is approximately six feet east of the line between the two parcels that encompass the channel (parcels 160-010-007 and 143-280-009). • Similar to existing conditions, standard chain link fencing would be installed adjacent to the entrances of the crossing, with lockable gates for maintenance vehicles and an open passage for pedestrians to access to the informal trails adjacent to the channel. • Since the crossing would be used exclusively by cyclists, pedestrians, and emergency vehicles, we determined that standard Caltrans crash barriers are not required for the approaches or main span. Therefore, architectural guards in accordance with AASHTO should be added to both sides of the crossing and approaches for fall protection. To Rohnert Park Project # 22-10 21 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study minimize long-term maintenance costs, the guards should be stainless or weathering steel. • A finish layer, such as asphalt concrete, would form the riding and walking surface on the approaches and main span for all alternatives. • Adequate illumination should be provided for all alternatives for night time use, and AASHTO recommends average maintained horizontal illumination levels of 0.5 to 2-foot candies (5 to 22 lux). If required, higher lighting levels should be provided for personal safety and fixtures should include appropriate cutoffs and asymmetrical lighting distribution to minimize spillover of light into adjacent homes and the channel environment. • Due to proposed abutments and wingwalls, all alternatives would impact the buried six- inch sanitary sewer pipe. The culvert alternatives would additionally impact the eight - inch water main and electrical and gas joint trench. • All alternatives would also have similar impacts to existing trees. • Routine dredging of the Wilfred Channel is required for all alternatives. The alternative crossing concepts are discussed in detail below, and plans and profiles are included in Appendix F. 1. Steel Prefabricated Truss Bridge I.a. 100-foot Span This alternative is the most visually prominent and consists of a 100-foot single -span prefabricated bowstring truss bridge. We coordinated with two manufacturers of prefabricated bridges and learned that although aluminum is less expensive and used for various pedestrian bridges, an aluminum truss bridge is not recommended for this Project because the beams would have to be very large to meet the specific structural loading requirements. Therefore, steel is recommended, which could be galvanized or painted. To minimize long-term maintenance needs, we recommend that weathering steel be used for the bridge. The maximum height of the structure would be approximately 12.5 feet over the traveled way at the center of the main span. The bridge would supported by cast -in -place abutments on spread footings or cast -in -drilled -hole (CIDH) concrete piles. Small wingwalls would be added at the abutments to resist scour, and narrow berms would be excavated or added immediately under the bridge to provide access and clearance for maintenance and inspection of bridge anchorages. This alternative has the smallest disturbed soil area, which minimizes impacts to the channel's hydraulic capacity and areas below the high water line. The Project's location poses construction challenges for delivery and staging, which must navigate homes and driveways, as well as the erection of the bridge, which must thread through existing trees. This alternative could be galvanized or painted, but weathering steel is recommended to minimize long term maintenance needs. Rohnert Park Project # 22-10 22 W_ STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study Conceptual rendering of 100'soan steel truss bridge. (SGA, 2024) Built prefabricated truss bridge over a creek (Contech, n.d.) 1. b. 80-foot Span This alternative is nearly identical to the 100-foot prefabricated steel bowstring truss bridge, except that the span of the bridge is 80 feet. Impacts to the channel and construction processes between the two alternatives would be similar. 2. Concrete Three -Span Bridge 2. a. Cast -in -Place Reinforced This alternative consists of a three -span cast -in -place reinforced concrete slab. Ideal span lengths would be 40 feet over the center of the channel, and 30 feet over the embankments, and the slab would be approximately two feet thick (see Caltrans Bridge Design Aids 4-10). The Rohnert Park Project # 22-10 23 STEVEN GROVER & A S S O C I A T E S ARCNITE C TU RE E .. I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study slab would be supported by cast -in -place abutments on spread footings or CIDH concrete piles, with small wingwalls. Bridge bents would consist of concrete columns approximately three feet in diameter and Type 1 or Type 2 pile shafts. This structure type requires foundations and permanent supports to be placed within the channel. 2. b. Cast -in -Place Prestressed This alternative is nearly identical to the cast -in -place reinforced alternative, except that the continuous concrete slab is prestressed or post -tensioned. This would allow for a thinner deck depth of approximately one foot instead of two feet. Due to additional activities involved in constructing and tensioning the prestressing steel, construction is more difficult than non - prestressed cast -in -place reinforced concrete slabs. However, the overall structure is thinner, lighter, and uses less material. e k - Conceptual rendering of cast -In -place prestressed concrete bridge. (SGA, 2024) Built concrete three span bridge, Celina, TX (PermaTrak, 2017) Rohnert Park Project # 22-10 24 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G 3. Concrete Double -Box Culvert 3. a. Cast -in -Place Reinforced Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study This alternative consists of a cast -in -place double -box culvert, with opening dimensions of 12- foot wide by eight -foot tall, per Caltrans Standard Plan D81. Around the culvert's inlet and outlet, cutoff walls approximately four feet deep would be installed at the base, and Type C wingwalls on spread footings would be installed on either side (see Caltrans Standard Plans D84). This alternative has largest footprint and disturbed soil area, so impacts to the channel would be significant, due to work related to excavation and compaction, and the construction of the cutoff walls and wingwalls. OWN- ------------ Conceptual rendering of cast -In -place double -box culvert. (SGA, 2024) Built concrete double -box culvert, Rock Hill, SC (Campco Engineering, n. d.) Rohnert Park Project # 22-10 25 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study 3. b. Precast This alternative is nearly identical to the cast -in -place reinforced culvert alternative, except that the culvert is precast, per Caltrans Standard Plan D83A. A precast alternative would reduce labor costs and construction duration associated with concrete work and curing. However, construction of cast -in -place elements such as cutoff walls and wingwalls would still require formwork and curing time. Impacts to the channel would be the same as the cast -in -place culvert alternative. Alternatives Summary No. Alternative Span Structure Depth Formwork in Channel Impacts to Disturbed Soil Area (acre) Channel I.a. Prefab Steel Truss 100' 10'-0" No Low 0.03 1.b. Prefab Steel Truss 80' 8'-0" No Low 0.03 2.a. Reinf Concrete Slab 30' - 40' - 30' 1'-10" Yes Medium 0.03 2.b. Prestressed Concrete Slab 30' - 40' - 30' 1'-3" Yes Medium 0.03 3.a. Reinf Concrete Culvert 12' - 12' 10'-1.5" Yes High 0.1 3.b. Precast Conc Culvert 12' - 12' 10'-1" Yes High 0.1 Rohnert Park Project # 22-10 26 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Assessment Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study All six conceptual design alternatives are feasible. Therefore, the City should coordinate with the bicycle, pedestrian, and residential communities to identify a preferred crossing alternative. To help facilitate the assessment for this process, we have provided comments for a few key considerations for each crossing type in the table below. No. — Crossing Visual Impact Cost Maintenance Environmental ImRa- Type 1. Prefab Steel • The truss structure • Potential volatility • The large quantity • No construction, Truss above the banks of of steel costs. of surface area formwork, or the creek will • Challenges with would need to be columns in the present a larger delivery, staging, maintained, but if creek. visual mass than and erection. weathering steel is • Truss is lifted into other alternatives. used, maintenance place so would be minimal. construction • Less prone to timeline is short. debris accumulation than other alternatives. 2. Three -Span • The thin deck • Lower cost of • Concrete structures • Two columns Concrete presents a minimal concrete compared require less within the creek. Slab visual mass. to steel. maintenance than • Formwork required • Requires column steel. within the creek. foundations in the • Debris may • Longer creek. accumulate at construction columns. timeline. 3. Concrete • The culvert • Lower cost of • Concrete structures • Extensive work Culvert structure and new concrete compared require less within the creek. grading create a to steel. maintenance than visual mass within steel. and below the • Debris may banks of the creek. accumulate at culvert face. For all alternatives, the permitting needs would largely be the same, and the list below provides information about the approximate permitting costs for each agency, including application preparation and agency consultation time. • Army Corps (assumes nationwide permit and not individual): $15,000 • Regional Water Quality Control Board: $15,000 • California Dept. of Fish and Wildlife, Lake and Streambed Alteration Agreement: $20,000 • United States Fish and Wildlife Service (if needed): $20,000 • California Dept. of Fish and Wildlife, Incidental Take Permit (if needed): $25,000 However, since each crossing type impacts the creek at varying levels, the differences in environmental costs will depend on how much mitigation would be required. It is appropriate to assume that with higher levels of environmental impact, more mitigation would be required and Rohnert Park Project # 22-10 27 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study therefore, greater environmental costs. However, it is not possible to identify the exact mitigation approach and requirements at this preliminary stage, such as on -site restoration, mitigation credits, or off -site mitigation. These approaches would depend on the species impacted by the project, which would be assessed through a site visit. The costs for species mitigation could be $600,000 or more per acre, whereas on -site enhancements could cost approximately $150,000 per acre. CONCEPTUAL COST ESTIMATE SUMMARY The table below summarizes conservative conceptual -level cost estimates for each alternative, in 2023 dollars. Based on Caltrans contingency recommendations of 30-50% for cost estimating at the feasibility stage, we included contingencies of 40% in the total construction estimates. The estimates include assumptions such as 12-inch hot mix asphalt (HMA) for pavement on fill, and a temporary creek diversion system. Trenchless utility relocation (i.e., bore/jack or directional drilling) was also assumed for the estimate, but an open trench approach, or integrating utilities into the crossing structure, could be explored in final design. Using Alameda County Transportation Commission and Caltrans cost estimating recommendations, we also estimated conceptual -level total project costs to account for project delivery/soft costs. Detailed cost breakdowns are provided in Appendix G. No. Alternative Civil ($1,000s) Structure Contingency Soft Costs Proiect Total ($1,000s) ($1,000s) ($1,000s) ($1,000s) La. Prefab Steel Truss (100' span) 496 850 539 584 2,469 1.b. Prefab Steel Truss (80' span) 497 680 471 511 2,159 2.a. Reinforced Concrete Slab 496 612 443 481 2,032 2.b. Prestressed Concrete Slab 496 552 419 454 1,921 3.a. Reinforced Concrete Culvert 934 400 534 578 2,446 3.b. Precast Concrete Culvert 934 410 538 583 2,465 Rohnert Park Project # 22-10 28 STEVEN GROVER & A S S O C I A T E S A R C H I T E C T U R E E N G I N E E R I N G Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study NEXT STEPS Prior to final design of the preferred alternative, we recommend the following: 1. Conduct a biological assessment site visit to confirm the likelihood that special -status species may occur or be present and evaluate whether the trees have suitable characteristics to support bat roosting, and what types of roost may be present. 2. Perform a site survey to verify utility locations in the field and obtain the most recent topographic data. 3. This Study is based on Sonoma Water's records of channel topography following their latest channel maintenance performed in 2017. Prior to final design, Sonoma Water should be consulted to obtain the most recent channel maintenance reports and hydraulic information for the Wilfred Extension. 4. Perform hydraulic modeling that accounts for debris allowance to confirm the design flow of the culvert. 5. Develop a site -specific boring program to collect data to complete foundation design recommendations. 6. Reassess the alternatives and select one to be carried forward into final design. APPENDICES A. Bicycle and Pedestrian Network Maps B. Biological Assessment Memorandum C. FEMA FIRMette D. Hydraulic Assessment Memorandum E. Sonoma Water Post -Maintenance Records F. Plans and Profiles of Conceptual Alternatives G. Conceptual Cost Estimates Rohnert Park Project # 22-10 29 Holly -Fauna Emergency Vehicle Access Bridge Feasibility Study Vanessa Garrett, Director of Public Works 1r F' -• - - -- _ _ — — ! r a S LL �' y } J F � 1p\ F: �ry y F` 100 Lqe�y 1 •y .lb ip AL k Scope of Study Bridge to fully span creek Designed for emergency access only Not for regular traffic use Accommodates bicycle and pedestrian traffic 744TTOO History Connection between Holly Ave and Fauna Ave contemplated since I 970s Shown in several bicycle/ pedestrian master plans Feasibility study funded in 2021 BELLEVUE i-,REIEK TRAIL - ■I■lil■dMIMENMENONEA M1 l 1 4 Feasibly Option #1 Truss Bridge $2.16 - $2.47 million 5 Feasible Option #2 _ ` Joe J Concrete Three Span Bridge $1.92 - $2.03 million wimp--_ r T L 1• �� J --easible Option #3 - J Concrete Double Box Culvert $2.45 - $2.47 million 16 . Other considerations Environmental Right of Way Utilities and Hydraulics Timeline for implementation is multiple years Design and environmental Funding Questions?