Loading...
2023/04/13 Planning Commission Agenda Packet City of Rohnert Park Planning Commission NOTICE IS HEREBY GIVEN THAT A MEETING will be held on Thursday, April 13, 2023 6:00 P.M. CITY HALL - COUNCIL CHAMBER 130 Avram Avenue, Rohnert Park, California To any member of the audience desiring to address the Planning Commission: For public comment on items listed or not listed on the agenda, or on agenda items if unable to speak at the scheduled time, you may do so upon recognition from the Chairperson. Please fill out a speaker card prior to speaking. 1. CALL TO ORDER 2. PLEDGE OF ALLEGIANCE 3. ROLL CALL (Austin-Dillon_____ Epstein____ Lam____ Orloff____ Striplen____) 4. PUBLIC COMMENT – Persons who wish to speak to the Commission regarding an item that is not on the agenda may do so at this time. Please see above for details on how to submit public comments. 5. CONSENT CALENDAR - ADOPTION OF MINUTES 5.1 Approval of the Draft Minutes of the Planning Commission Meeting of February 9, 2023 Commissioner Motion/Roll Call Vote: (Austin-Dillon_____ Epstein ____ Lam ____ Orloff _____ Striplen _____) 6. AGENDA ITEMS 6.1 PUBLIC HEARING – TENTATIVE SUBDIVISION MAP AND DEVELOPMENT AREA PLAN EXTENSION - File No. PLSD23- 0001/PLDP20-0003 - Lisa Borba, UD LLC – Consideration of Resolution(s) 2023-06 and 2023-07 approving an extension of a Tentative Subdivision Map (TSM) and Development Area Plan (DAP) to allow the subdivision and development of property located on a 34.34-acre lot south of Rohnert Park Expressway, East of the Green Music Center and North of Copeland Creek within the University District Specific Plan (APN: 047-131-026 and -027). CEQA: The City prepared an Environmental Impact Report (EIR) to address the potentially significant adverse environmental impacts associated with the planning, construction, or operation of the UDSP and to identify appropriate and feasible mitigation measures and alternatives that may be adopted to significantly reduce or avoid the impacts identified in the EIR. The City certified the Final EIR for the University District Specific Plan project on April 26, 2006. An Addendum to the EIR was prepared to analyze the revised 2014 UDSP Project relative to the UDSP analyzed in the 2006 EIR. Updated traffic, noise and air quality analyses were prepared, and the water supply assessment was reviewed to support the Addendum. The Addendum concluded that the proposed changes in the Project would not result in a new or substantially more severe impact than disclosed in the 2006 EIR. The proposed DAP I is consistent with the analysis in the EIR and EIR Addendum and would not result in additional environmental effects. Therefore, no additional environmental review is necessary. Commissioner Motion/Roll Call Vote: (Austin-Dillon_____ Epstein ____ Lam ____ Orloff _____ Striplen _____) 6.2 Downtown Project Update 7. ITEMS FROM THE PLANNING COMMISSION 8. ITEMS FROM THE DEVELOPMENT SERVICES STAFF 9. ADJOURNMENT NOTE: If you challenge the nature of the proposed action in court, you may be limited to raising only those issues you or someone else raised at public hearing(s) described in this agenda, or in written correspondence delivered to the City of Rohnert Park at, or prior to the public hearing(s). AMERICAN DISABILITY ACT ACCOMMODATIONS: Any member of the public who needs accommodations should email the ADA Coordinator at jcannon@rpcity.org or by calling 707-588-2221. The ADA Coordinator will use their best efforts to provide reasonable accommodations to provide as much accessibility as possible while also maintaining public safety in accordance with the City procedure for resolving reasonable accommodation requests. Information about reasonable accommodations is available on the City website at https://www.rpcity.org/city_hall/departments/human_resources/a_d_a_and_accessibility_resources CERTIFICATION OF POSTING OF AGENDA I, Clotile Blanks, Community Development Technician, for the City of Rohnert Park, declare that the foregoing notice and agenda for April 13, 2023, Planning Commission Meeting of the City of Rohnert Park was posted and available for review on April 7, 2023, at Rohnert Park City Hall, 130 Avram Avenue, Rohnert Park, California 94928. The agenda is available on the City of Rohnert Park’s website at www.rpcity.org. Signed this 7th day of April 2023 at Rohnert Park, California. Clotile Blanks Appeals of any decisions made tonight must be received by the Planning Division within 10 days and no later than 5:00 p.m. on April 24, 2023. Minutes of the Planning Commission Meeting of the City of Rohnert Park Thursday, February 9, 2023 6:00 P.M. 130 Avram Avenue, Rohnert Park 1. CALL TO ORDER Chairperson Austin-Dillion called the regular meeting to order at 6:00 p.m. 2. PLEDGE OF ALLEGIANCE Led by Chairperson Austin-Dillion. 3. ROLL CALL Present: Tramaine Austin-Dillion, Chairperson Matt Epstein, Vice Chairperson Marc Orloff, Commissioner Charles Striplen. Commissioner Absent: Fanny Lam, Commissioner 4. ITEMS FROM THE DEVELOPMENT SERVICES STAFF (moved up from # 8 on the Agenda) ACTION: Moved/Seconded (Orloff/Striplen) to hear agenda item #8 (items from the Development Services Staff) at this time in the proceedings. Motion carried by the following (4-0-1) roll call vote: AYES: Austin-Dillion, Orloff, Striplen, Epstein and; NOES: None; ABSENT: Lam; ABSTAIN: None. Chairperson Austin-Dillon read and presented a proclamation honoring former Planning Commissioner Daniel Blanquie. 5. PUBLIC COMMENT None. 6. CONSENT CALENDAR - ADOPTION OF MINUTES 6.1 Approval of the Draft Minutes of the Planning Commission Meeting of January 26, 2023. ACTION: Moved/Seconded (Epstein/Striplen) to adopt the Minutes of the Planning Commission Meeting of January 26, 2023. Motion carried by the following (4-0-1) roll call vote: AYES: Austin-Dillion, Orloff, Striplen, Epstein and; NOES: None; ABSENT: Lam; ABSTAIN: None. 7. AGENDA ITEMS 7.1 SITE PLAN AND ARCHITECTURAL REVIEW - File No. PLSR22-0010 – Mike Fields/Boulder Associates – Consideration of Resolution No. 2023-04 approving Site Plan and Architectural Review for the addition of 800 square feet to the Rohnert Park Cancer Center located at 301 Professional Center Drive. (APN 143-490-012). Suzie Azevedo, Assistant Planner, provided a PowerPoint and highlighted the project in the following areas: project location, description, details, site plans, elevations, and parking analysis. Ms. Azevedo recommended approval of the Site Plan and Architectural Review (SPAR) for an 800sf addition to the Rohnert Park Cancer Center located at 301 Professional Center Drive, which would provide an increased level of cancer care at this facility. The Applicant, Jesse Van Zee, VP of Business Development for U.S. Cancer Management, previously director of Rohnert Park Cancer introduced himself to Commissioners. They aim to provide compassionate and university level care by providing leading edge technology. ACTION: Moved/Seconded (Epstein/Striplen) to approve Resolution No. 2023-04 approving Site Plan and Architectural Review for the addition of 800 square feet to the Rohnert Park Cancer Center located at 301 Professional Center Drive. (APN 143-490-012). Motion carried by the following (4-0-1) roll call vote: AYES: Austin-Dillion, Orloff, Striplen, Epstein and; NOES: None; ABSENT: Lam; ABSTAIN: None. 8. ITEMS FROM THE PLANNING COMMISSION 9. ADJOURNMENT Chairperson Austin-Dillion adjourned the regular meeting at 6:38 p.m. ________________________________ ___________________________________ Chairperson Recording Secretary – Clotile Blanks 1 CITY OF ROHNERT PARK PLANNING COMMISSION STAFF REPORT Meeting Date: April 13, 2023 Item No: 6.1 Prepared by: Suzie Azevedo, Planner I Agenda Title: PLSD23-0001/PLDP20-0003, UD LLC Tentative Subdivision Map and Development Area Plan Extension Location: 34.34-acre lot south of Rohnert Park Expressway, East of the Green Music Center and North of Copland Creek within the University District Specific Plan (APN: 047-131-026 and -027) GP/Zoning: P-I/Medium Density (SP-Specific Plan) Applicant/Owner: Lisa Borba, UD LLC RECOMMENDED ACTION: Staff recommends that the Planning Commission adopt Resolution(s) 2023-06 and 2023-07 approving an extension of a Tentative Subdivision Map (TSM) and Development Area Plan (DAP) to allow the subdivision and development of property located on a 34.34-acre lot south of Rohnert Park Expressway, East of the Green Music Center and North of Copeland Creek within the University District Specific Plan (APN: 047-131-026 and -027). Figure 1: Project Location Figure 1: Project Location 2 BACKGROUND: In 2006, the University District Specific Plan (UDSP) and a development agreement (DA) between the City, University District LLC, and Vast Oak Properties L.P. was approved and associated General Plan amendments were also adopted and implemented to allow development of 1,645 residential units and 175,000 square feet of commercial space on approximately 300 acres of land owned by five property owners (University District LLC, Vast Oak Properties, Cotati-Rohnert Park Unified School District, Signature Homes, and Linden). Subsequent amendments to the UDSP, DA, and General Plan were approved in 2014 and in 2019. An Environmental Impact Report (EIR) was prepared and adopted by the City in conjunction with this 2006 approval of the Specific Plan, General Plan amendments and DA and an addendum to the EIR was prepared in 2014. The 2006 UDSP allocates 203 small-lot single family and townhome units in the moderate- density category to the UD LLC area with a (P/I/MD) land use designation. The 203 medium- density residential units in the P/I/MD designation may consist of single family detached, clustered housing, and alley-loaded housing. Attached housing could also be developed under this designation. In 2020, UD LLC filed TSM and DAP applications for the creation of the 203 small-lot single- family home sites. The proposal includes a 0.66-acre stormwater detention basin in the northwest corner of the project site and relies on the construction of a permanent off-site stormwater detention facility. At the April 22, 2021 Planning Commission Meeting, the Commission recommended to the City Council approval of a TSM and DAP. On May 25, 2021, the City Council approved the TSM and DAP to allow the subdivision of the property located on a 34.34- acre lot south of Rohnert Park Expressway, East of the Green Music Center and North of Copeland Creek within the University District Specific Plan (APN: 047-131-026 and -027), consisting of the UDLLC 203 single family and townhome residential lots. Pursuant to the City of Rohnert Park Municipal Code Section 16.10.050, the TSM approval was conditioned to expire twenty-four (24) months after the date of approval unless prior to the expiration the applicant filed a request for an extension of time in accordance with Government Code Section 66452(a). Further, Chapter 17.06.420 - Development Schedule, of the Rohnert Park Municipal Code states that construction in each development area must begin within two years of final development area plan approval by the city council or the approval will expire and must be re-applied for. For good cause shown by the developer, the planning commission may, at a public hearing, grant extensions of time for up to two years for each extension. The applicant has filed the necessary requests pursuant to these provisions. ANALYSIS: As previously mentioned, the site is encumbered with a temporary stormwater detention basin on the western side of the site and as a condition of approval, the basin will be relocated prior to commencement of any development activity on the Project site. The applicant has indicated that progress has been made on the permanent Copeland Creek detention basin solution, but it is complicated and involves both state and federal agencies and additional time is needed. Pursuant to Government Code Section 66463.5 (c), ‘upon application of the subdivider, filed prior to the expiration of the approved or conditionally approved tentative map, the time at which the map expires may be extended by the legislative body or by an advisory agency authorized to approve or conditionally approve tentative maps for a period or periods not 3 exceeding a total of six years’. Additionally, Chapter 17.06.420 allows for an extension of up to two years for the DAP, subject to approval by the Planning Commission. As noted, the original two (2) year approvals were effected in May, 2021 and the application for an extension has appropriately been filed. After further discussion with the City’s Engineering Consultant and the Planning Manager, it has been determined that there is no foreseeable change within the Subdivision Map Act or city processing structure that would prohibit the Commission from extending the TSM and DAP. As such, staff will be recommending a two-year extension for each entitlement. The City has in the past allowed one to two-year extensions at which time upon expiration, the extension approval can be re-evaluated to ensure that no changes to state or local laws or policies have occurred. ENVIRONMENTAL DETERMINATION: Pursuant to the California Environmental Quality Act (CEQA), the City of Rohnert Park, as the lead agency, has conducted an environmental review of the University District Specific Plan Area, which includes the project site. The City prepared an Environmental Impact Report (EIR) to address the potentially significant adverse environmental impacts that may be associated with the planning, construction, or operation of the Project and to identify appropriate and feasible mitigation measures and alternatives that may be adopted to significantly reduce or avoid the impacts identified in the EIR. The City certified the Final EIR on May 23, 2006 and approved an Addendum to the Final EIR on April 8, 2014. An Environmental Consistency Analysis was prepared for this project, which concluded that the proposed Tentative Subdivision Map is consistent with the analysis in the EIR and Addendum and would not result in additional environmental effects. Therefore, no additional environmental review is necessary. PUBLIC NOTIFICATION: A public hearing notice was published in the Community Voice on March 31, 2023. Notice was sent to property owners within 300 feet, as required by the zoning ordinance. The February 24, 2022 Planning Commission Meeting Agenda was posted as required and the meeting materials have been posted to the web site and have been made available to the public. Planning Manager Approval Date: 4/7/2023 Attachments (list in packet assembly order): 1. Planning Commission Resolution 2023-06 • Resolution Exhibit A – UD LLC Tentative Subdivision Map • Resolution Exhibit B – Conditions of Approval 2. Planning Commission Resolution 2023-07 • Resolution Exhibit A – UD LLC Development Area Plan • Resolution Exhibit B – Conditions of Approval PLANNING COMMISSION RESOLUTION NO. 2023-06 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK APPROVING A TWO-YEAR EXTENSION OF A TENTATIVE SUBDIVISION MAP TO ALLOW THE SUBDIVISION OF PROPERTY (COMMONLY KNOWN AS UD LLC) LOCATED ON A 34.34-ACRE LOT SOUTH OF ROHNERT PARK EXPRESSWAY, EAST OF THE GREEN MUSIC CENTER AND NORTH OF COPELAND CREEK WITHIN THE UNIVERSITY DISTRICT SPECIFIC PLAN (APN: 047-131-026 AND - 027) CONSISTING OF 203-SINGLE AND TOWNHOME RESIDENTIAL LOTS WHEREAS, the applicant, Lisa Borba, on behalf of UD LLC, filed a Planning Application (PLSD23-0001) requesting an extension of the Tentative Subdivision Map to allow the subdivision and development of property (commonly known UD LLC)), a 34.34-acre lot south of Rohnert Park Expressway, east of the Green Music Center and north of Copeland Creek within the University District Specific Plan (APN: 047-131-026 AND 027), in accordance with the City of Rohnert Park Municipal Code (“RPMC”); and WHEREAS, on May 25, 2021, the Tentative Subdivision Map was approved pursuant to the City of Rohnert Park Municipal Code Section 16.10.050, and the approval date set to expire twenty-four (24) months after the date of approval unless prior to the expiration the applicant filed a request for an extension of time in accordance with Government Code Section 66463.5(c); and WHEREAS, on March 6, 2023, in accordance with Government Code Section 66463.5(c) as noted above, the applicant filed an application (PLSD23-0001) requesting an extension of the Tentative Subdivision Map approval; and WHEREAS, pursuant to California State Law and the RPMC, public hearing notices were mailed to all property owners within a three hundred foot radius of the subject property and a public hearing was published for a minimum of 10 days prior to the public hearing in the Community Voice; and WHEREAS, on April 13, 2023, the Planning Commission held a public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposed extension of the Tentative Subdivision Map; NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Rohnert Park makes the following findings, determinations and recommendations with respect to the proposed time extension of the Tentative Subdivision Map: Section 1. The above recitations are true and correct. Section 2. CEQA Finding. On May 23, 2006, the City of Rohnert Park certified the Final EIR for the UDSP project, including adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program. On April 8, 1 2 Reso 2023-06 2014, the City approved an Addendum to the Final EIR, as described in City Council Resolution No. 2014-032. An Environmental Consistency Analysis was prepared for this project, which concluded that the proposed Tentative Subdivision Map and Development Area Plan are consistent with the analysis in the EIR and Addendum and would not result in additional environmental effects. Therefore, no additional environmental review is necessary. Pursuant to CEQA Guidelines Sections 15162 and based on the entire record, the City Council finds that no new environmental effects could occur and no new mitigation measures are required as a result of the proposed Tentative Subdivision Map. Therefore, no additional environmental review is required. Section 3. Findings Regarding the Extension of the Tentative Subdivision Map. The Planning Commission, in consideration of Planning Application File Number PLSD23-0001, hereby makes the following findings concerning the time extension of the Tentative Subdivision Map pursuant to RPMC Section 16.10.090(E): 1. The proposed map, and its design and improvements, are consistent with the general plan and any applicable specific plan, any policy or guideline implementing the general plan (including the city’s design guidelines), or other applicable provisions of this code. Criteria Satisfied. The proposed Tentative Subdivision Map is consistent with the General Plan designations for the area, as well as the specific plan that applies to the property. The proposed Tentative Map will implement the General Plan in that it would increase the City’s existing housing stock. The Tentative Map complies with the goals and policies of the City’s Housing Element and the project’s affordable housing obligation has been satisfied by the construction of a 218 unit affordable housing complex within the University District. The time extension of the Tentative Map is consistent with the revised University District Specific Plan as it proposes to subdivide the property according to its requirements related to number of residential units, density, housing type, housing location, public improvements, open space and related amenities. The Tentative Map depicts the specific residential lots consistent with the Specific Plan. The time extension of the Tentative Map will remain consistent to meet City standards which provide satisfactory pedestrian and vehicular circulation, including emergency vehicle access and on site improvements, such as streets, utilities, and drainage facilities have been designed and are conditioned to be constructed in conformance with City standards. 2. The site is physically suitable for the type of development. Criteria Satisfied. The Tentative Map reflects the specific plan for this site, which is physically suitable for the proposed development. No major geologic hazards have been reported on the site or other limited conditions that would render it unsuitable for residential development. 3. The site is physically suitable for the proposed density of development. Criteria Satisfied. The site is of sufficient size and shape and appropriately shown in the Specific Plan to allow the proposed density of development. The subdivision has been designed to accommodate the development of 203 residential units, taking into consideration the shape and topography of the site. This development is consistent 3 Reso 2023-06 with the density ranges provided for in the Specific Plan. 4. The design of the subdivision or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat, absent a statement of overriding conditions. Criteria Satisfied. An Environmental Impact Report (EIR) for the University District Specific Plan Project (State Clearinghouse number 2003112011) and Addendum to this EIR has been prepared and approved which shows potential impacts related to the development of the site with the proposed uses. No significant unavoidable impacts related to existing habitats were identified. The Final EIR for this Project includes adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program. The contents of the Final EIR are incorporated herein by this reference. 5. The design of the subdivision or the type of improvements will not cause serious public health problems. Criteria Satisfied. The design of the project is not expected to have negative impacts on the health or well-being of project residents or occupants of the surrounding land uses. The design of the Tentative Map is in conformance with the City’s General Plan, Zoning Ordinance, and Subdivision Ordinance. The construction of all units on the site has been conditioned to comply with all applicable City ordinances, codes, and standards including, but not limited to, the California Uniform Building Code, the City’s Ordinances relating to stormwater runoff management and controls. In addition, the design and construction of all improvements for the subdivision has been conditioned to be in conformance with adopted City street and public works standards. The City’s ordinances, codes, and standards have been created based on currently accepted standards and practices for the preservation of the public health, safety and welfare. Finally, the proposed street system throughout the subdivision will provide adequate emergency vehicular access. 6. The design of the subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property with the proposed subdivision, absent alternative, equivalent easements. Criteria Satisfied. The project will respect all existing easements, and any new easements required by the project have been made conditions of the map approval. 7. Any proposed phases and their proposed sequence of construction are identified on the submitted map. Criteria Satisfied. The project is a 203-unit development proposal that will be constructed in a single phase. NOW THEREFORE BE IT FURTHER RESOLVED, that the Planning Commission does hereby approve a twenty-four (24) month extension of Planning Application No. PLSD23- 0001, Tentative Subdivision Map as set forth in Exhibit A, subject to the recommended conditions of approval as approved in their entirety in Exhibit B. 4 Reso 2023-06 DULY AND REGULARLY ADOPTED on this 13th day of April, 2023, by the City of Rohnert Park Planning Commission by the following vote: AYES: NOES: ABSENT: ABSTAIN: AUSTIN-DILLON _____ EPSTEIN _____ LAM _____ ORLOFF ____STRIPLEN____ ______________________________________________________ Tramaine Austin Dillon, Rohnert Park Planning Commission Attest: Clotile Blanks, Recording Secretary Attachment: Exhibit A, Tentative Subdivision Map Exhibit B, Conditions of Approval I-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETI-8 STREET I-9 STREET PARCEL B 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 113 114 118 147 121 146 109 110 122 PARCEL C 36 34 3 2 138 198 117 84 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 175 172 184 183 180 179 176 163 151 152 155 156 159 160 PARCEL G 143 19 6263104105140 2160 PARCEL E 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 ROHNERT PARK EXPRESSWAY SONOMA STATE UNIVERSITY COPELAND CREEK J-SECTION PARCEL D PARCEL F 39 144 145 PARCEL A I-10 STREET PARCEL H 37 UNIVERSITY DISTRICT UDLLC PROPERTY CITY OF ROHNERT PARK, CALIFORNIA DECEMBER 2020 TABLE OF CONTENTS LEGEND ABBREVIATIONS OWNER/DEVELOPER/CONSULTANTS:UTILITY COMPANIES: BASIS OF ELEVATIONS - BENCHMARK: BASIS OF BEARINGS: Know what's below. before you dig.CallR * GENERAL NOTES: 1.ASSESSOR'S PARCEL NUMBERS: 047-131-027 AND 047-131-026 2.PROPERTY ACREAGE: 34.34 ACRES 3.EXISTING LAND USES: REFER TO 2014 UNIVERSITY DISTRICT SPECIFIC PLAN (APPROVED). 4.INDIVIDUAL LOT AND PARCEL SIZES ARE SHOWN ON TENTATIVE MAP SHEET 4. THE APPLICANT RESERVES THE RIGHT TO ADJUST LOT WIDTHS UP TO 2 FEET (SO LONG AS THEY MEET THE REQUIRED SETBACKS) AND ARE STILL IN CONFORMANCE WITH THE APPROVED MAP. FOR REFERENCE THE SMALLEST AND LARGEST FOR SALE LOTS ARE: ·SMALLEST - 58' X 58' = 3,364 SF (MULTIPLE LOTS) ·LARGEST - 7,295 SF (LOT 184) 5.EXISTING PROPERTY USE: VACANT / TEMPORARY STORM WATER DETENTION. 6.AREAS SUBJECT TO INUNDATION: PER VAST OAK LOMAR PROCESSED BY ENGEO FOR COPELAND CREEK REFER TO EXISTING CONDITIONS MAP SHEET C2 FOR LIMITS OF FLOOD PLAIN. 7.PERMANENT AND CONSTRUCTION ACCESS FOR THIS PROJECT SHALL BE FROM ROHNERT PARK EXPRESSWAY. APPLICANT RESERVES THE RIGHT FOR FUTURE ACCESS TO THESE STREETS AND OTHER STREETS TO BE CONSTRUCTED. 8.UNLESS OTHERWISE SPECIFICALLY STATED IN THE CONDITIONS OF APPROVAL, LOCAL AGENCY APPROVAL OF THIS MAP SHALL CONSTITUTE AN EXPRESS FINDING THAT THE PROPOSED SUBDIVISION AND DEVELOPMENT OF THE SUBJECT PROPERTY WILL NOT UNREASONABLY INTERFERE WITH THE FREE AND COMPLETE EXERCISE OF RIGHTS DESCRIBED IN GOVERNMENT CODE SECTION 66436(a)(3)(A)(i). 9.LANDSCAPE AND FENCING DETAILS FOR THE RESIDENTIAL AND THE PRIVATE HOA PARCELS WILL BE CONCEPTUALLY DETAILED WITH THE DEVELOPMENT AREA PLANS (DAP). ADDITIONALLY, THE DAP WILL PROVIDE DETAIL ON UNIT MIX, SETBACKS AND PARKING REQUIREMENTS. 10.THE PROJECT SITE IS PART OF ASSESSMENT DISTRICT 05-01. 11.THE PRELIMINARY GRADES AND UTILITY ROUTING SHOWN ARE SUBJECT TO CHANGE BASED ON FINAL DESIGN. 12.DOMESTIC WATER SERVICE TO BE PROVIDED BY CITY OF ROHNERT PARK. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK AND SONOMA COUNTY WATER AGENCY (SCWA) STANDARDS. LOCATION OF FIRE HYDRANTS TO BE COORDINATED WITH CITY'S PUBLIC SAFETY DIVISION PRIOR TO FINAL DESIGN. 13.SEWAGE SERVICE TO BE PROVIDED BY CITY OF ROHNERT PARK. WHEN INSTALLED IT SHALL CONFORM WITH CITY OF ROHNERT PARK STANDARDS. 14.ELECTRIC AND GAS SERVICE TO BE PROVIDED BY PACIFIC GAS & ELECTRIC. WHEN INSTALLED IT SHALL BE IN CONFORM WITH CITY OF ROHNERT PARK AND PG&E STANDARDS. GENERAL NOTES CONTINUED: 15. TELEPHONE SERVICE TO BE PROVIDED BY AT&T (FORMERLY SBC) AND SHALL ADHERE TO THEIR STANDARDS WHEN INSTALLED. 16.SCHOOL DISTRICT: THE UDLLC PROPERTY IS LOCATED COMPLETELY WITHIN AND WILL BE SERVICED BY THE COTATI-ROHNERT PARK UNIFIED SCHOOL DISTRICT. 17.FOR ALL LOTS INCLUDING MOTORCOURT PRODUCTS, ON LOT DRAINAGE SHALL FLOW TO THE FRONT OF EACH LOT. THE DRAINAGE PATTERNS WILL BE BETTER REFINED WITH THE DAP PROCESS. 18.LIGHTING WITHIN THE PRIVATE ALLEY MOTORCOURTS SHALL BE PROVIDED BY HOUSE LIGHTS. 19.UPON APPROVAL OF THIS MAP, APPLICANT ACKNOWLEDGES THAT ADDITIONAL STUDIES MAY BE REQUIRED (SUCH AS ACOUSTICAL) WITH FINAL DESIGN TO IMPLEMENT CONCEPTS SHOWN ON THIS TENTATIVE MAP APPLICATION. ADDITIONAL EASEMENTS, DEED RESTRICTIONS AND OR MAINTENANCE AGREEMENTS MAY BE NEEDED AS DETERMINED DURING THE FINAL DESIGN. PLANS FOR ALL ONSITE/OFFSITE IMPROVEMENTS WILL BE PREPARED AND SUBMITTED TO THE APPROPRIATE AGENCIES FOR APPROVAL PRIOR TO COMMENCEMENT OF CONSTRUCTION. 20.REFER TO AMENDED AND RESTATED DEVELOPMENT AGREEMENT FOR REQUIREMENTS/TIMING OF AFFORDABLE HOUSING, PHASING/TIMING OF INFRASTRUCTURE AND ENERGY REQUIREMENT STANDARDS. VICINITY MAP Exhibit A to Resolution 2023-06 M MAPPED FLOOD PLAIN (ENGEO)118119120125125 120128 12513 0 135 140 14014 0 125130135130135 140145120 125 130 125 120128 ROHNERT PARK EXPRESSWAY APPROXIMATE CENTERLINE OF CREEK COPELAND CREEK EXISTING CANOPY LINE EXISTING WETLAND PARCEL G 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105 140 2160 PARCEL E EXISTING DETENTION BASIN KARRINGTON ROAD KERRY ROAD 145 144 37 PARCEL H PARCEL FPARCEL DPARCEL A LEGEND MAPPED FLOOD PLAIN (ENGEO) EXISTING WETLAND EXISTING CANOPY LINE APPROXIMATE CENTERLINE OF CREEK PLAN 2AACPLAN 4A ACPLAN 3A ACPLAN 2AACPLAN 1AACPLAN 4A ACACACW SS WW WSS 59' RIGHT OF WAY 36' CURB TO CURB 5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 8' TRAIL 8' PARKING 8' PARKING 10' DRIVE LANE 10' DRIVE LANE 59' R/W STREET C/L 1.5%2%2%2%2%1.5% 5"AC OVER 4" AB 18" LTSG FCFC NTS PAVEMENT DESIGN CHART: NOTE: PAVEMENT DESIGN SECTIONS ARE BASED THE PROJECT GEOTECHNICAL REPORT BY ENGEO DATED APRIL 03, 2006, REVISED DECEMBER 12, 2012, WHICH ASSUMES A PRELIMINARY 'R' VALUE OF 5. FINAL STRUCTURAL SECTION WILL BE DETERMINED AFTER 'R' VALUE TEST OF SUBGRADE MATERIAL IS COMPLETED FOLLOWING THE CALTRANS FLEXIBLE PAVEMENT DESIGN CRITERIA AND APPROVAL OF THE CITY ENGINEER. AB SHALL BE CLASS 2 (R=78) PER CALTRANS STANDARD SPECIFICATIONS. ASB SHALL BE CLASS 2 (R=50) PER CALTRANS STANDARD SPECIFICATIONS. PAVEMENT SECTIONS ABTIACSTREET NAME PRIVATE LANES/MOTORCOURT 10"5 3" LTSG 0" NEIGHBORHOOD STREETS 4"7 5"18"4"1.5'6"FALL 1.0' (TYP.) 1/2" R1"1"3"FL 1/2" R 6"4" MIN.CLASS II AB(TRC) TOP OF ROLLED CURB ELEV. 36.5' R/W 52' R/W 59' R/W I-9 I-1 THROUGH I-5 I-6 52' RIGHT OF WAY 32' CURB TO CURB 5'5' R/W RESIDENTIAL L/S 5' S/W R/W RESIDENTIAL L/S 5' S/W 6' PARKING 6' PARKING 10' DRIVE LANE 10' DRIVE LANE 52' R/W STREET NTS 28' CURB TO CURB 37.5' RIGHT OF WAY R/W 5'0.5' 4"PCC/4"AB 6' PARKING 12' DRIVE LANE 10' DRIVE LANE RESIDENTIAL 4' L/S S/W 37.5' R/W STREET NTS C/L C/L 2%2%2%1.5% 1.5%2%2%2%2%1.5% 4"PCC/4"AB4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG 18" LTSG 5"AC OVER 4" AB FCFC FCFC TCB 20' PRIVATE LANE 2% CONCRETE BAND (SEE DETAIL RIGHT) 3" AC/ 10" AB TRC 3.5' ROLLED CURB AND GUTTER (SEE DETAIL RIGHT) 10.0' C/L 20' WIDE PRIVATE LANE NTS 10.0' STREET SECTION LEGEND SWLK + + + + + 2% MIN TYP HP (TYP) AD (TYP) THROUGH CURB DRAIN OR SD STUB FC AD R/W HP BIO-RETENTION CELL (LOCATION VARIES)5%MIN12% MAX(LOW SIDE)1% MINR/W TC SIDEWALK LANDSCAPE STRIP ROLLED CURB DETAIL NTS TYPICAL LOT DRAINAGE NTS TYPICAL DRIVEWAY DETAIL NTS STANDARD CITY DETAILS 27' PRAE, PUE 3.5' 5' PUE 5' PUE 5' PUE FC R/W AND BW TYPICAL UTILITY/TREE LAYOUT (FACING STREET) NTS 4' MIN BETWEEN TREE AND D/W FLUSH CONCRETE BAND 6"6"SLOPE VARI E SDRIVEWAY A P R O N 8"4" MIN. CLASS II AB (TYP.) 1/2" R NTS(BEL) TOP OF CONC.BAND ELEV.ON-LOT BIORETENTION DETAIL NTS BACK OF CONCRETE BANDSD PER CITY STD 864 (TYP) TYPICAL 4-PACK MOTORCOURT DETAIL (WITH DUAL SS DOWN ALLEY) NTS BIO CELL (49 SF TYP) DUAL LOT BIO SWALE (98 SF TYP) JT SERVICE (TYP) TRC DUAL SSROHNERT PARK EXPRESSWAY SLOPE VARIES 1.5% MIN. - 3:1 MAX 4" PCC/ 4" AB4" PCC/4" AB 5' PUE 5' PUE 37.5' R/W I-7 THROUGH I-8 NOTE: BIOSWALE LOCATION TO BE DETERMINED WITH DEVELOPMENT AREA PLAN R/W 8' L/S 1.5% PAD P/L PAD TYPICAL REAR OR SIDEYARD DETAIL NTS KICKBOARD UNDER FENCE BNDY/ RPX R/W 36.5' RIGHT OF WAY 27' CURB TO CURB4' R/W RESIDENTIAL L/S 5' S/W R/W OPEN SPACE 9.5' TRAIL 6' PARKING 10' DRIVE LANE 11' DRIVE LANE 36.5' R/W STREET NTS C/L 1.5%2%2%2%1.5% 4"PCC/4"AB4"PCC/4"AB 5"AC OVER 4" AB 18" LTSG FCFC 5' PUE 1' P/L PARCEL E 0.5' BUUBLE-UP GRAVEL SHOULDER 42" HIGH BLACK TUBULAR STEEL FENCE 18" ACACACACACACN0°02'45"E 300.00' BNDYN89°23'45"E 95.00' BNDY N0°02'45"E80.00' BNDYN89°23'45"E 95.00' BNDY N0°02'45"E 342.98' BNDY1671'N0°02'01"W 871.58' BNDYM PRIVATE MOTORCOURT (TYP.) I-8 STREETI-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETI-9 STREET OPEN SPACE PUBLIC STORM DRAIN EASEMENT WATER QUALITY BASIN PUBLIC STORM DRAIN EASEMENT ** * LANDSCAPE 3816± SF 175 3816± SF 172 3816± SF 184 3816± SF 183 3816± SF 180 3816± SF 179 3816± SF 176 3816± SF 163 3816± SF 151 3816± SF 152 3816± SF 155 3816± SF 156 3816± SF 159 3816± SF 160 3596± SF 35 3596± SF 32 3596± SF 31 3596± SF 28 3596± SF 27 3596± SF 24 3596± SF 23 3596± SF 5 3596± SF 6 3596± SF 9 3596± SF 10 3596± SF 13 3596± SF 14 3596± SF 17 3596± SF 18 3596± SF 92 3596± SF 75 3596± SF 87 3596± SF 80 3596± SF 88 3596± SF 79 3596± SF 91 3596± SF 76 3596± SF 100 3596± SF 67 3596± SF 95 3596± SF 72 3596± SF 96 3596± SF 71 3596± SF 99 3596± SF 68 3596± SF 103 3596± SF 64 3744± SF 194 3710± SF 197 3811± SF 190 3777± SF 193 3844± SF 189 4984± SF 41 3596± SF 58 3596± SF 57 3596± SF 54 3596± SF 53 3596± SF 50 3596± SF 49 3596± SF 46 3596± SF 45 3596± SF 42 3816± SF 171 3816± SF 164 3364± SF 44 3364± SF 47 3364± SF 48 3364± SF 51 3364± SF 52 3364± SF 55 3364± SF 56 3364± SF 43 3364± SF 59 3906± SF 20 3906± SF 61 3364± SF 33 3364± SF 22 3364± SF 25 3364± SF 26 3364± SF 29 3364± SF 30 3364± SF 15 3364± SF 12 3364± SF 11 3364± SF 8 3364± SF 7 3364± SF 4 4318± SF 107 3364± SF 120 4793± SF 108 4708± SF 111 3568± SF 112 3364± SF 115 3364± SF 116 3364± SF 119 4793± SF 138 3714± SF 126 3741± SF 142 3714± SF 129 3714± SF 130 3714± SF 133 3948± SF 134 4793± SF 137 3364± SF 199 3364± SF 196 3364± SF 195 3364± SF 192 3364± SF 191 3527± SF 123 4126± SF 167 4126± SF 168 4747± SF 40 3570± SF 165 3570± SF 150 3570± SF 153 3570± SF 154 3570± SF 157 3570± SF 158 3570± SF 161 3570± SF 162 4126± SF 148 4126± SF 187 4295± SF 106 4024± SF 113 3784± SF 114 3784± SF 118 4382± SF 147 3784± SF 121 3741± SF 146 4793± SF 109 4793± SF 110 3758± SF 122 0.65±AC PARCEL C 7295± SF 39 3596± SF 36 3364± SF 34 3654± SF 3 3655± SF 2 4671± SF 1 6738± SF 38 3677± SF 198 3784± SF 117 3628± SF 84 3364± SF 89 3364± SF 90 3364± SF 93 3364± SF 94 3364± SF 97 3364± SF 98 3364± SF 101 3364± SF 86 3364± SF 102 3628± SF 83 3308± SF 85 3308± SF 82 3364± SF 70 3364± SF 73 3364± SF 74 3364± SF 77 3364± SF 78 3364± SF 65 3364± SF 81 3364± SF 66 3364± SF 69 0.11±AC PARCEL B 3923± SF 202 3654± SF 203 3331± SF 201 3074± SF 200 3484± SF 188 3570± SF 174 3570± SF 177 3570± SF 178 3570± SF 181 3570± SF 182 3570± SF 185 3570± SF 170 3570± SF 173 3774± SF 169 3774± SF 166 3774± SF 149 3774± SF 186 3513± SF 124 3364± SF 16 3687± SF 125 4793± SF 139 4708± SF 136 3568± SF 135 3364± SF 132 3364± SF 131 3364± SF 128 4063± SF 141 3364± SF 127 3868± SF 143 3502± SF 19 3568± SF 62 3906± SF 63 3906± SF 104 3568± SF 105 3980± SF 140 3568± SF 213644± SF 60 0.36±AC PARCEL E 3364± SF 37 0.15±AC PARCEL A 3741± SF 145 4123± SF 14431'38'67'58'47'67'62' 62'67'62' 62'31'47'58' 38'62'58'62'62'62'62'62'58'62'58'62'62'62'62'58'62'62'58'62'62' 62'62'62'62'58'62'62'58'62'62'62'62'62'62'58' 58'62'62'62'62'62'62'58'62'62'58'62'62'62'62'62'62'58'62'58'62'62'62'62'62'58'62'62'58'62'62'62'62'62'62'58'67'62'67'62'67'47'3 1'38'38'31'47'14' 56'58'58'20'31'58'66' 67'58'65'58'58'58'58'58'58'58'65'58'64'58'58'58'58'58'58'58'64'58'63'58'58'53'58'53'58'53'63'63'62'63'58'63'238'130'37'204'10' 561' 20' 58'72' 10' 49'15'186'14'4 8' 9'24'38'58'58'43'64'16'58'64'58'58'58'58'58'58'58'64'58'64'58'58'58' 58'58'58'58'64'43'3 1'44'63'38'31'43'65'43'16'60'58'73'39'22'58' 58'58'58'65'58'58'65'58'58'58' 58'58'58'65'58'58'65'58'58'58'43'3 1'38'63'45'31'43'54'64'74'44'31'74'64'74'64'64'11'63'64'28'47' 74'64'74'64'44'30'64'60'14' 74' 54'3 1 '44'72'60' 7'64'39'71'54'3 3'73'58' 58'65'58'65'69'58'22'65'58' 36'65'65'63'44'19'24'31' 38'59'58'39'31' 62' 62'59'59'62' 62'38'3 1 '39'58'58'58'58'62'58'62'58'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'62'58'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'63'38'31'43'63'62'63'62'43'3 1'38'63'36'33'45'58'63'52'10' 62'62'63'62'43'3 1'38' 58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58'58'58'58'58'62'58'62'58'58'58'58'58'62'58'58'62'58'58' 58'58'58'62'58'62'58'58'58'58'58'58'62'58'62'58'58'58'108'60'58'62'58'58'58'67'80'51'31'62'80'79'6'61'20'10' 53'14'188'14'4 6' 9' 20' 622' 28' 63'70'78'68'10'58'63'48'58'5' 58'58'58'58'58' 57'58'62'58'58'62'58'58'58'58'62'58'58'58'58'58'58'62'58'58'62'58'58'58'58'58'62'58'58'62'58'58'58' 56'15 '33'18'58'62'58'17'10' 55'1 8'304'38'195' 41'255'71'66'144'18'5 5' 11' 6 9'14'144'6 5'72'255'42' 195' 38'304'1 4'52'22'128'143'30'19'43'208'343'0.40±ACPARCEL D2.95±AC PARCEL G 143'20' 20' OPEN SPACE LANDSCAPE 98'107'62'N89°23'45"E 1692.78' BNDY N89°55'52"E 1691.47' BNDY ROHNERT PARK EXPRESSWAY EX MAINTENANCE EASEMENT OVER COPELAND CREEK I-10 STREET * 5.88±AC PARCEL F 0.16±AC PARCEL H ACACACACACAC*GANG MAILBOX LOCATIONS TO BE ADJUSTED, AS NEEDED, WITH FINAL DESIGN BASED ON APPROVAL OF POSTAL SERVICE TYPICAL 4-PACK MOTORCOURT DETAIL NTS FRONT DOOR ORIENTATION FC R/W AND BW HOUSES FACING STREET NTS TYPICAL 4-PACK MOTORCOURT DETAIL (LOTS FRONTING I-3 STREET) NTS 12 0 12 5 13 0 120120 120120120 120 120120120125125125 125125125125 125125130130 130130130130130 130135131131132133134 136136 137138139130 130 130 130 130130130 130 120 120125 125 125 130130 135135135 135 140140 140 140 140 140 1 4 0 14014014014 0 14 0 140140125 125 125125 120 120 125 125 12 5 M INV 114.6± 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5%0.5%0.5%0.5% 0 . 5 % 1.0%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%1.0%0.5%0.5%0.7%0.5%0.5%1.0%0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 0.5% 3.5:1 MAX 0.5%0.5%0.5%0.5%0.5%136.0 132.6 HP 133.6 GB 130.9 LP 128.9 129.7 128.8LP 128.2128.4HP 128.7LP 128.3HP 128.6 LP 127.9 HP 128.5 LP 128.0 HP 128.4 LP 126.8 HP 127.6 LP 127.1 HP 127.9 LP 127.2 HP 128.0 LP 127.3 128.9 LP 128.2 LP 129.3 LP 130.0 HP 130.4 LP 132.4 HP 132.6 LP 130.8 131.2 135.30.5%0.5%0.5%0.5% P135.3 P135.4 P135.2 P135.3 P134.7 P134.8 P134.6 P134.7 P134.2 P134.3 P134.1 P134.2 P133.6 P133.7 P133.5 P133.6 P135.8 P135.7 P135.2 P135.1 P135.1 P135.0 P134.7 P134.6 P134.6 P134.5 P134.2 P134.1 P134.1 P134.0 P133.2 P133.2 P130.9 P131.4 P130.5 P131.0 P131.5 P132.0 P131.0 P131.5 P132.0 P132.5 P131.6 P132.1 P132.1 P132.6 P131.9 P132.4 P132.9 P133.3 P132.2 P132.7 P135.1 P135.6 P135.0 P135.5 P134.5 P135.0 P134.4 P134.9 P134.0 P134.5 P133.9 P134.4 P133.4 P133.9 P133.3 P133.8 P132.8 P133.3 P132.7 P133.2 P134.2 P134.3 P133.7 P133.6 P133.6 P133.5 P133.4 P133.3 P133.5 P133.4 P133.0 P132.9 P132.9 P132.8 P132.4 P132.3 P132.3 P132.2 P131.8 P131.7 P131.7 P131.6P130.6 P131.1 P130.0 P130.3 P129.9 P129.9 P130.3 P130.2 P130.2 P130.1 P130.8 P130.7 P130.6 P130.5 P130.7 P130.6 P130.2 P130.1 P130.7 P130.6 P131.3 P131.2 P132.8P132.5 P135.8 P135.9 P136.3 P136.3 P128.5 P128.3 P128.3 P128.2 P128.2 P128.1 P128.4 P128.3 P128.5 P128.4 P128.5 P128.4 P128.6 P128.5 P128.5 P128.4 P128.6 P128.5 P129.6 P129.5 P128.9 P128.8 P129.0 P128.9 P129.2 P129.1 P129.3 P129.2 P129.0 P128.9 P128.9 P128.8 P128.9 P129.4 P129.0 P129.5 P129.2 P129.3 P129.1 P129.2 P128.9 P129.4 P128.6 P129.1 P128.8 P129.3 P129.1 P129.6 P128.7 P129.2 P128.5 P128.7 P128.2 P128.3 P128.1 P128.2 P128.8 P128.9 P128.7 P128.8 P129.0 P129.1 P128.9 P129.0 P129.1 P129.2 P129.2 P129.3 P129.5 P129.8 P129.0 P129.5 P136.4 P128.8 P128.7 P128.9 P128.8 2.5%2.0% 2.5%2.0% 2.5%2.0% 4.0%2.0% 4.0%2.0% 3.5%2.0% 3.5%2.0% 3.5%2.0% 0.5% 0.5% 0.5% 0.5% 0.5% 3.5%2.0%0.5%1.0%HP 129.7 0.5%4:1MAX0.5%129.8 GB1.0%0.5%0.5% P129.9 P129.8 P135.9 P135.8 2.0% 2.0% 2.0% 2.0% 2.0% EX TC 122.6 EX TC 129.3 EX TC 130.5 EX TC 136.1 EX TC 137.1 EX TC 139.5 FG 119.4 SD INV 116.19 GRT 123.1 COPELAND CREEK I-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETSD INV 127.4 SD INV 127.1 SD INV 126.8 SD INV 126.7 SD INV 126.4 SD INV 126.0 SD INV 125.6 SD INV 125.1 SD INV 125.0 SD INV 124.7 SD INV 125.3 SD INV 125.6 SD INV 126.2 SD INV 126.3 SD INV 126.3 SD INV 124.9 SD INV 124.5 SD INV 124.1 SD INV 123.9 SD INV 124.2 SD INV 124.4 SD INV 124.6 SD INV 125.3 SD INV 125.5 SD INV 125.9 SD INV 123.5 SD INV 123.3 SD INV 123.4 SD INV 123.0 SD INV 123.1 SD INV 122.4 SD INV 122.5 SD INV 122.0 SD INV 121.8SD INV 121.9 SD INV 122.9 SD INV 121.3 SD INV 120.3 SD INV 120.8 SD INV 120.3 SD INV 120.6 SD INV 121.1 SD INV 121.2 SD INV 121.4 SD INV 122.1 SD INV 121.9 SD INV 122.0 SD INV 122.4 SD INV 122.7 SD INV 122.8 SD INV 122.9 SS INV 114.96 SS INV 116.5 SS INV 119.1 SS INV 118.1 SS INV 116.9 SS INV 118.2 SS INV 121.5 SS INV 120.4 SS INV 119.2 SS INV 120.3 SS INV 121.5 SS INV 122.3 SS INV 122.5 SS INV 118.1 SS INV 119.2 SS INV 120.3 SS INV 119.1 SS INV 117.0 SS INV 118.2 HH I I EE I-8 STREET G G LIMIT OF GRADING ROHNERT PARK EXPRESSWAY PARCEL G 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105 140 2160 PARCEL E SD INV 120.1 B B CC D D SD INV 124.0 SS INV 119.1 SD INV 125.6 SD INV 125.4 SD INV 126.6 SS INV 119.5 SD INV 126.1 144 145 37 SS INV 121.2 SD INV 121.5 SD INV 122.9 SD INV 125.9 SD INV 124.7 SS INV 115.6 SD INV 125.8 I-9 STREET I-10 STREET PARCEL H PARCEL FPARCEL DLIMIT OF GRADING PARCEL A J J F F K K K K BIO-SWALE SD INV 117.0 FULL TRASH CAPTURE DEVICE (FROM STATE APPROVED LIST) COMPLIANT WITH STATE TRASH REDUCTION TO BE PROVIDED RECYCLED WATER TO BE EXTENDED INTO SITE TO IRRIGATE COMMON AREAS AND PLANTER STRIPS AA SUBDRAIN INV 116.2 SUBDRAIN INV 116.2 6" MINIMUM 18" APPROX. 10' CLASS 2 PERMEABLE MATERIAL OR EQUAL 8" PERFORATED SUBDRAIN PIPE (ASTM-3031) 4" PERMEABLE SOIL MATERIAL 14"± OR AS DETERMINED BY STORMWATER ENGINEER TO CAPTURE SUMMER DRY WEATHER FLOW 24" 4:14:1 18" MINIMUM SOIL MIX 5" INCHES/HOUR INFILTRATION NOTES: 1.MODIFY EXISTING SIGNALIZED INTERSECTIONS AT ROHNERT PARK EXPRESSWAY 2.MINIMUM STREET SLOPE IS 0.5% 3.TRASH CAPTURE DEVICE (FROM STATE APPROVED LIST) TO BE INSTALLED AT BASIN OUTLET SECTION A-A NTS3:1PL SECTION E-E NTS SECTION G-G NTS SECTION B-B NTS SECTION H-H NTS*3:1EXISTING GROUND CONFORM TO EXISTING P/LPARCEL E 9.5' TRAIL 1' R/W *2:1 MAX MAY BE ALLOWED AT CERTAIN LOCATIONS TO AVOID EXISTING CREEK CANOPY 2% 3 : 1 PAD P/L 2'8' 12' BENCH 2' PL 3:1CONFORM TO EXISTING 2' OVERBUILD PAD VARI E S 3.5: 1 M A X 2' OVERBUILD PLBNDY20' EX SD EASEMENT 20' EX SD EASEMENT BNDY EXISTING PARCEL C BASIN PAD3 : 1 2' 10' CONFORM TO EXISTING PARCEL C BASIN SECTION C-C NTS 3 : 1 3' OVERBUILD R/W PARCEL C BASIN I-1 STREET SECTION D-D NTS BNDY R/W EXISTING 1.5% 3 : 1 PARCEL C BASIN 8'3'10' L/S 6' S/W VARIE S 4:1 M A X EXISTING PARCEL B 5' S/W 5' L/S 1.5% EXISTING GROUND 8' COMPACTED AB BIO-SWALE, SEE DETAIL THIS SHEET COMPACTED AB SECTION J-J NTS BNDY R/W 1.5% PARCEL A VARIES 2% 6' L/S 6' S/W 8' L/S SECTION I-I NTS BNDY R/W 1.5% PARCEL A VARIES 2% 6' L/S 6' S/W 8' L/S ROHNERT PARK EXPRESSWAY ROHNERT PARK EXPRESSWAY TYPICAL BIO-SWALE DETAIL NTS LEGEND OVERLAND RELEASE COMPACTED AB SECTION F-F NTS * 3 : 1 2'OVERBUILD EXISTING GROUND CONFORM TO EXISTING P/LPARCEL E 8' TRAIL 2'*2:1 MAX MAY BE ALLOWED AT CERTAIN LOCATIONS TO AVOID EXISTING CREEK CANOPY 1.5% PAD P/L 2'5' L/S VARI E S 2'OVERBUILD BIO-SWALE, SEE DETAIL THIS SHEET 6' L/S 6' HIGH TUBULAR STEEL FENCE TUBULAR STEEL FENCE TUBULAR STEEL FENCE WOOD FENCE NEIGHBORHOOD WALL NEIGHBORHOOD WALL SECTION K-K NTS BNDY R/W 1.5% PARCEL A VARIES 2% MIN 6' L/S 6' S/W VARIES L/S ROHNERT PARK EXPRESSWAY NEIGHBORHOOD WALL HIGH PAD LOW PAD SDCB 22 GR 118.54 INV 113.81 7LF 18"SD S=0.003 M 118119120125125120128 12513 0 135 140 14014 0 125130135130135 140145120 125 130 125 120128ROHNERT PARK EXPRESSWAY COPELAND CREEKJASMINE CIRCLEI-8 STREETI-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETAPPROXIMATE CENTERLINE OF CREEK OPEN SPACE WATER QUALITY BASIN FUTURE J-SECTION BRIDGE (APPROXIMATE LOCATION) EXISTING BUS STOP 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 138 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105140 2160 PARCEL E SONOMA STATE CONNECT TO SIDEWALK ON ROHNERT PARK EXPRESSWAY (TYP) 144 145 PARCEL A PARCEL DPARCEL G FUTURE TRAIL CONNECTION I-10 STREET PARCEL H PARCEL F 37 I-9 STREET LEGEND EXISTING TRAILS PROPOSED TRAIL CONNECTIONS I-8 STREETI-7 STREET I-1 STREETI-2 STREETI-3 STREETI-4 STREETI-5 STREETI-6 STREETI-9 STREET ROHNERT PARK EXPRESSWAY 143 19 6263104105 140 2160 PARCEL E 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 PARCEL B 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 175 172 184 183 180 179 176 163 151 152 155 156 159 160 PARCEL G COPELAND CREEK (PUBLIC STORM DRAIN EASEMENT) 37 PARCEL A 145 144 PARCEL D PARCEL F I-10 STREET PARCEL H LEGEND PROPOSED LAND USE SUMMARY PARCEL LANDUSE OWNERSHIP AREA (NET) A LANDSCAPE/OPEN SPACE/HOA 0.11± AC ENTRY MONUMENT B LANDSCAPE/OPEN SPACE HOA 0.11± AC C WATER QUALITY BASIN HOA 0.66± AC D OPEN SPACE CITY 0.40± AC E TRAIL CITY 0.35± AC F OPEN SPACE HOA 5.88± AC G OPEN SPACE HOA 2.95± AC H LANDSCAPE/OPEN SPACE/HOA 0.16± AC ENTRY MONUMENT MOTORCOURTS 1.73± AC ROADWAYS 6.49± AC LOTS 15.50± AC TOTAL 34.34± AC MAINTENANCE RESPONSIBILITIES RESIDENTIAL LOTS S/W - OWNED & MAINTAINED BY CITY NTS S/W - OWNED & MAINTAINED BY CITY TERMINATE AT FENCE (TYP) ROHNERT PARK EXPRESSWAY JASMINE CIRCLEUNIVERSITY DISTRICT LLC DOC. 2001-110858 APN 047-131-026 APN 047-131-027 N0°02'01"W 871.58'N0°02'45"E 300.00'N0°02'45"E 342.98'N89°55'52"E 1691.47' N89°23'45"E 1692.78' N89°23'45"E 95.00' N89°23'45"E 95.00'N0°02'45"E80.00' Resolution 2023-06 1 EXHIBIT B CONDITIONS OF APPROVAL UNIVERSITY DISTRICT LLC TENTATIVE MAP (TM) The proposed map was reviewed and the following conditions of approval were developed using the reference documents listed below. • Tentative Map, dated December 2020, prepared by MacKay & Somps, Sheets 1-8 • City’s Subdivision Ordinance – Title 16 in affect at the time of tentative map review • City’s Grading & Erosion and Sediment Control Ordinances – Title 15, Chapters 15.50 & 15.52 in affect at the time of tentative map review • City’s Manual of Standards, Detail and Specifications, adopted as of this review date ON-GOING CONDITIONS The conditions below shall apply to the University District Tentative Map (herein “Project”). The Project shall be developed in accordance with the General Plan (GP), University District Specific Plan (UDSP), Mitigation Measures identified in the University District Specific Plan Environmental Impact Report (FEIR), Development Agreement (DA) between the City and University District LLC, the Rohnert Park Municipal Code (RPMC) and the Design and Construction Standards. The Conditions of Approval as stated herein are the obligation of the applicant/developer and place no obligation either express or implied on the City. These Conditions of Approval run with this TM as approved regardless of ownership at time of recording. General Requirements 1) The applicant shall comply with all documents approved by the City Council and adhere to all exhibits presented by the applicant at the Planning Commission and\or City Council meeting for approval of the University District Specific Plan project and this Project unless subsequently revised by the City. 2) In case of conflict between the various documents, the following order shall prevail: General Plan, University District Specific Plan (UDSP), Mitigation Measures for the Final Environmental Impact Report (FEIR), Rohnert Park Municipal Code (RPMC), Development Agreement (DA), , Tentative Map (TM) and its Conditions of Approval, , and Design and Construction Standards. 3) The applicant shall comply with the FEIR and Addendum. In addition, the applicant shall pay the cost to monitor the Mitigation Measures identified in the FEIR for the University District Specific Plan project (SCH # 2003122014) kept on file in the Development Services Department. The requirements contained in the Mitigation Monitoring Program (MMP) shall be incorporated into these conditions and constructed in accordance with the MMP. ( 2 ) 4) The applicant agrees to indemnify, hold harmless and defend the City, its officers, agents, elected and appointed officials, and employees, from any and all liability or claims that may be brought against the City arising out of its approval of this Tentative Map and associated entitlements pertaining to the University District Specific Plan. 5) By accepting the benefits conferred under this TM, the applicant acknowledges all the conditions imposed and accepts this TM subject to conditions, as may be amended from time to time, and the RPMC, as applicable. 6) The use of the property by the applicant/grantee for any activity authorized by this TM shall constitute acceptance of all conditions and obligations imposed by the City on this TM. The applicant/grantee by said acceptance waives any challenge as to the validity of these conditions. 7) Approval of the Tentative Map is conditioned upon completion of offsite improvements to the satisfaction of the City in the Copeland Creek and Hinebaugh Creek watersheds that will provide replacement floodwater detention for the detention currently provided by the temporary detention basin within the site, in a manner that allows the existing basin to be abandoned in its entirety without resulting flooding of the UDLLC property and without adverse impacts to adjoining properties above those conditions that existed prior to development of the Vast Oak and UDLLC properties. These offsite improvements shall be constructed and functional and approved by City prior to the existing basin being removed. The final design of the offsite improvements has not been completed; design work will be completed by the City and/or the applicant as determined at a later date. The final cost and source of funding for the offsite improvements has not been determined. The measures will likely require approval by multiple resource agencies; the timing, mitigation requirements and costs for obtaining permits has not been determined. 8) Phasing is not proposed or approved. The Subdivision is considered a single- phase development. All improvements shall be designed and guaranteed through an improvement agreement and surety with the Final Map, unless otherwise noted. 9) Submit a copy of the CCRs (or as an alternative, add the lots within UD LLC to the existing project CC&Rs) and/or maintenance declarations for private improvements (such as for maintenance of alleys and private utilities) to the Director of Development Services or designee and City Attorney for review and approval prior to recording of each final map. The applicant shall clarify if the UDLLC property will be annexed into the existing Homeowner’s Association, or if a new Association will be formed for the UDLLC property. Maintenance declaration(s) shall be required to be recorded concurrent with the recordation of the Final Map or prior to City Engineer approval of improvement plans for the respective design, whichever occurs first. The CC&R's will include provisions for maintenance of: a) All private storm drain systems. b) All private driveways c) All private alleys and motor courts, including lighting d) Privately-owned utilities within private easements, driveways, or alleys ( 3 ) e) Common area landscaping and irrigation f) Planter strip landscaping and irrigation within public right-of-ways. g) Private walkway and access easements. h) Gang mailboxes i) The Copeland Creek pedestrian bridge j) Front yard and side yard landscaping and irrigation outside of the fencing, as shown on the tentative map, including front yard water quality measures. k) The Copeland Creek pedestrian trail and landscaping. l) The Parcel C detention basin and any additional water quality improvement. m) The Copeland Creek parcels. The CC&R’s shall include a plan for a funding mechanism for the ongoing maintenance of these improvements. The plan shall include in a cash flow analysis, by year, showing both the ongoing maintenance costs and longer-term capital replacement costs, and expected revenues from the payment of the maintenance annuity with each certificate of occupancy. The analysis shall consider that certain improvements (e.g., the Parcel C detention basin and pedestrian bridge will be constructed with the map in advance of building permits being issued for the entire development.. Developer shall provide an initial funding deposit as needed to cover costs as well as maintain an adequate reserve and/or identification of a phasing program that would reduce the monthly assessment impact upon Association homeowners. The CC&R’s shall include language that upon reasonable notice by the City to the HOA (except in an emergency), the City shall have the right to perform maintenance and repair work as needed to ensure that the creeks and basins will function as designed and will have adequate flood protection capacity. The City will have the right to invoice the HOA for costs incurred and the HOA will reimburse the City for these costs. As an option, the HOA and City may enter into a contract whereby the City will perform specified work on a long-term basis and the HOA pays the City for the cost of this work. Developer may also agree to provide a maintenance annuity for the cost of specified work to be performed by the City (the annuity will be separate and above from the annuity required under Section 4.06). The CC&R’s shall include a description and an exhibit of improvements within the UDLLC Property clearly delineating those improvements to be maintained by the HOA and those to be maintained by the City. The City shall have no obligation to maintain or police the private maintenance of the alleys, motor courts, or private driveways. This provision shall be included in the CC&Rs. The CC&R’s shall inform subsequent property owners of the nature and extent of existing agricultural activities, operations, and facilities in the vicinity of the project site. The disclosure shall also provide notice of the potential conflicts or effects of typical agricultural activities outside of project including but not limited to noise, odors, dust, agricultural spraying, livestock and burning etc ( 4 ) 10) If the City is required to enforce any of the conditions of approval, the applicant shall pay all costs. At the City’s sole discretion, the City may require a cash deposit to cover enforcement costs as a condition of the approval of any final map. 11) If there is conflict between the CC&R’s and the City Code or these conditions, the City Code or these conditions shall prevail. 12) Prior to the issuance of Certificate of Occupancy, the applicant shall provide suitable escrow documentation reflecting City’s demand for payment of Regional Transportation Fee for each lot affected by this fee per the Development Agreement by and between University District LLC, and City of Rohnert Park. Building Services 13) Building code provisions shall apply to the construction, alteration, moving, demolition, repair, maintenance and use of any building or structure within the jurisdiction of the City, except work located primarily in a public way, public utility towers and poles, mechanical equipment not specifically regulated by building code provisions, and hydraulic flood control structures. All projects shall comply with the most current code recognized by the City at the time of their building permit application. All State and local ordinances shall be applicable to current projects. 14) Geotechnical investigation reports shall be submitted for all building permit projects unless waived by the Building Official. When required by the Building Official, the potential for soil liquefaction and soil strength loss during earthquakes shall be evaluated during geo- technical investigations. Compaction reports and pad certifications are required for each building pad site and all compaction reports shall be submitted prior to a foundation inspection and in compliance with the soils and geo-technical recommendations. 15) A completed and approved wet fire hydrant system, or other system approved by the Building Official and Department of Public Safety (DPS), and all weather roads shall be in place prior to any flammable or combustible material (such as wood) being brought onto the site. Prior to meter installation, the applicant may tie to the water system for fire flow only. Fire access road shall meet the DPS Fire Access Road Standard. These fire access roads shall continue to be accessible until acceptance of the public streets by the City. 16) The applicant shall submit a mailbox plan (locations and sizes) for all lots prior to approval of any final map. The plan shall be approved by the Rohnert Park Post Office and included with the first submittal of the improvement plans. The applicant shall submit to the City a written confirmation from the Rohnert Park Post Office that the mailbox locations are approved. The City will review and approve the location plan to ensure adequate site distance and traffic safety measures are incorporated. 17) All public utilities easements (PUE) and public access easements shall always be open and accessible within phases under construction or occupied. 18) Copies of the soils and geology reports prepared by a licensed soils engineer and geologist shall be reviewed and approved by the developer’s soils engineer and geologist prior to issuance of a grading permit. The developer’s soils engineer shall sign the plans stating that they conform to the soils report recommendations. ( 5 ) 19) The applicant shall submit plans and obtain separate building permits for retaining walls over four (4) feet in height and for all other walls, fences and signs over six (6) feet in height. 20) The applicant shall obtain a demolition permit for any structure to be demolished. All underground structures shall be abated, back-filled, inspected and approved by Sonoma County Environmental Health Services or the Building Official as applicable. 21) For any project requiring an on-site inspector to monitor grading, housing construction and/or development, the applicant shall deposit funds with the City to cover the full cost of an inspector prior to any land disturbance. The City Engineer, as appropriate, shall approve the amount and hire the inspector. 22) The developer shall implement a dust control program as part of the measures required by the FEIR for air quality control and the requirements of PM 10 and the Best Available Control Measures (BACM). The program shall ensure that, at the City Engineer’s discretion, a water vehicle for dust control operations is always kept readily available during construction. The developer shall provide the City Engineer and Building Official with the name and telephone number of the person directly responsible for dust control and operation of the water vehicle. Planning Services 23) A Tree Preservation and Removal Plan including a separate tree removal and sensitive area plan shall be submitted to the Development Services Department for review and approval in accordance with City ordinance. The plan shall show all sensitive areas and stands of trees that are to be protected during grading operations and include, in detail, the method proposed to protect these areas. 24) All areas to be graded and left undeveloped shall have a revegetation plan as part of the dust control program. The Development Services Director or designee shall review and approve the plan. The applicant shall guarantee through a grading bond the revegetation prior to issuance of grading permits. 25) Development Area Plans in conformance with Section 17.06.400 of the Rohnert Park Municipal Code shall be approved by the City Council for all development areas. 26) All material storage areas shall be fenced with at least a 6-foot high chain link fence with at least two 20-foot gates for emergency vehicle access. The fencing shall be shown on the construction fire and security protection site plan. 27) These conditions shall apply prior to recordation of each final map or large lot final map, unless otherwise specified herein. A “final map” shall mean a map that results in buildable parcels of an acre or less in area. A “large lot final map” shall mean a map that results in parcels larger than one acre in area. 28) The applicant shall pay all application fees, plan check and inspection fees, recordation fees, encroachment permit fees, segregation of assessment fees and other applicable miscellaneous fees in effect at the time the fee is paid as required in the Fee Schedule or RPMC (note that affordable housing and park dedication requirements have been satisfied within the larger UDSP and no additional dedication or in-lieu payments are ( 6 ) required). 29) The final map shall identify who is responsible to own and maintain all parcels to be created with the map. 30) The applicant shall make a good faith effort to acquire any required off-site property interest necessary to construct or provide improvements, including but not limited to temporary construction easements required by the City. If the applicant fails to do so, the applicant shall, at least 120 days prior to submittal of the final map for approval, enter into an agreement to complete the improvements, pursuant to Government Code Section 66462, at such time as the City acquires the property interests required for the improvements. The agreement shall provide for payment by applicant of all costs incurred by the City to acquire the off-site property interests. Security for a portion of these costs shall be in the form of a cash deposit in the amount specified in the appraisal report obtained by applicant, at applicant’s cost plus estimated legal and administration fees. The City Engineer shall approve or reject the appraiser prior to commencement of the appraisal report. 31) The improvement plans shall show water services to each building. All water meters shall be within the public right-of-way unless the Public Works Director specifically approves exceptions. The City shall not maintain water and sewer system lines beyond existing main line stub outs or on private property, unless otherwise agreed to by the City. Access easements shall be given to the City and recorded concurrently with the final map for any exceptions approved by the City Engineer that require access to private property. 32) If applicable, easements of record not shown on the tentative map shall be relinquished or relocated. Lots affected by proposed easements or easements of record, which cannot be relinquished or relocated, shall be redesigned. All easements for off-site grading and drainage shall be acquired prior to approval of construction on these properties. 33) The applicant shall provide cable or conduit for each residential lot for cable television and Internet access. The applicant shall provide cable or conduit for fiber optics or other smart technologies for each commercial lot for Internet access. The cable or conduit shall be shown on the joint trench improvement plans and constructed before the final lift of asphalt is placed on the adjacent street. 34) Prior to approval of the first final map that requires a homeowners’ association, the applicant shall incorporate a homeowners’ association consisting of all property owners of lands in the development at the time of incorporation (or as an alternative, add the lots within UD LLC to the existing Vast Oak homeowners association). The homeowners’ association shall be responsible for maintaining all common facilities pertaining to the Home Owners Association, including but not limited to, the association’s property, common drive aisles, alleys, lanes, private streets, parking facilities and all utilities contained therein, and landscaping plus landscaping in adjacent public rights-of-way (such as parkway strips or other similar areas), and for paying for security lighting, any common garbage collection services, any security patrol services, if provided, and any other functions of a homeowners’ association. The homeowners’ association shall comply with all NPDES permit Best Management Practices in effect at the time. 35) The CC&R’s shall prohibit the on-site parking of recreational vehicles, including ( 7 ) boats. Parking shall be prohibited along emergency vehicle access easements, private streets and alleys. The No Parking signs shall be approved by the DPS. A separate signing and striping plan shall be provided to address on-site stop signs and no parking areas prior to approval of any final map. 36) Private streets or alleys shall be private facilities and shall have private street maintenance, street sweeping and streetlights. Private streets shall have a visible demarcation between the public and private areas and identified with signage that which differentiates them from public streets. The City Engineer shall approve all signage for private facilities with the approval of individual improvement plans for the project. 37) The applicant shall provide adequate vehicle sight distance as specified by the State of California, Department of Transportation’s Highway Design Manual (latest edition) at all public and private street intersections. In addition, intersections and driveways shall comply with City requirements for sight triangles. The design of the streets shall incorporate public safety concerns, fire protection equipment movements, as well as the location and pickup of solid waste. 38) The applicant shall show the proposed structural sections for all private streets on the site improvement plans and pay the City’s plan check and inspection fee for the proposed private improvements, including the water, recycled water, sewer and storm drainage facilities in these areas, to assure that the improvements are designed and constructed to City standards, with exceptions as shown on the Tentative Map. 39) Safety lighting at the end and at any curve in any private street, alley, lane or place shall be provided for residential units that do not front on a public street. The lighting shall include individual lights on each residential unit and\or streetlights on streetlight poles. The City Engineer shall approve the lighting plans that include these facilities. 40) The applicant shall contact the solid waste franchised hauler and obtain their written approval of the proposed solid waste pickup locations on private streets, alleys, lanes or places. The pickup locations shall not be located in emergency vehicle access easements. A copy of the written approval from the solid waste franchised hauler shall be submitted with the street improvement plans for City review and approval. Provisions for paved areas for trash receptacles on certain parcels shall be identified in the improvement plans to service alley access residences; the trash receptacle cutouts shall be located on private parcels fronting public streets and accommodate the receptacles for the respective lots. 41) Where required, the landscaping for the detention and/or retention basins shall be reviewed and approved by the Development Services Director or designee. 42) The applicant will coordinate with the local bus system authority to facilitate local bus service in the project and to determine bus stop locations and shelter improvements. The bus shelter locations shall be shown on the improvement plans and reviewed and approved by the City Engineer. A copy of the written correspondence with the local bus system authority approving transit facilities shall be submitted with the first street improvement plans for each map. 43) Any above ground utility structures and appurtenances (e.g. cable TV boxes, phone splice boxes) shall be installed in a public utilities’ easement within the applicant’s property and within 10 feet behind street face of curbs. These structures and appurtenances ( 8 ) shall be screened with landscaping to the satisfaction of the Development Services Director or designee. The landscape screening shall be included in Development Area Plans and shall not interfere with the utility companies’ or DPS’s access. 44) The electrical and water services shall be provided to all parks, landscape medians, and other landscape areas in accordance with plans approved by the City. 45) Prior to the approval of this map, the applicant shall be responsible for costs of implementation of ensuring compliance with Mitigation Measures contained in Mitigation Monitoring Plan (MMP) for the FEIR. The applicant shall provide funding, in an amount determined by the Development Services Director or designee to hire consultants or staff to implement compliance monitoring. 46) Prior to approval of this map, the street name and a theme for all street name signage, including traffic signal signage, street corner signage, directional signs, and other permanent fixtures depicting street names shall be submitted to the Development Services Director or designee for review and approval. 47) Unless otherwise specified in these conditions, the conditions of approval shall apply to each building permit. 48) The applicant shall provide a master signage program for each residential subdivision, prior to issuance of building permits for this tentative map phase. The signing plan shall be submitted to the Development Service Director or designee for review and approval. 49) The declaration of covenants, conditions and restrictions (CC&R’s) filed for each development shall be prominently displayed in the project sales office at all times. The CC&R’s shall apply to both owners and renters. The CC&R’s shall be written to require renters to comply with the regulations of the CC&R’s, and a copy of the CC&R’s shall be given to each renter. 50) Design and placement of walls and fences for each neighborhood or land use district shall be in accordance with the standards in an approved Development Area Plan Walls and fences may be phased for each development area. Walls, fences and landscaping should not obstruct pedestrian travel to Rohnert Park Expressway, specifically at Parcel A and Parcel B (the I-7 and I-8 Street Segments) If a continuous wall or fence is used, a gate shall be provided. 51) All residential dwellings shall display illuminated street numbers in a prominent location in such a position that the numbers are easily visible to approaching emergency vehicles from both directions. The numbers shall be of a contrasting color to the background to which they are attached and four (4) inches minimum in height. Flag lots will have their address displayed in a prominent position at the driveway intersection with the street. 52) All buildings shall be connected to public water and sewer systems prior to occupancy. Water and sewer service accounts shall be set up with the City Finance Department for each structure with a building permit. 53) Prior to front yard landscaping installation by the applicant, plant species, location, container size, quality and quantity of all landscaping plants and materials shall be ( 9 ) reviewed and approved by the Development Services Director or designee for consistency with the approved improvement plans. All plant replacements shall be to an equal or better standard than originally approved. 54) Hours of construction shall be limited to the hours in accordance with the RPMC. 55) The applicant shall comply with all state federal and local laws. 56) Applicant shall submit the Buyer’s Disclosure document to City prior to commencement of sales, reservations, etc. to Director of Development Services or designee for review and approval. 57) Applicant shall adjust the size of Lot Nos. 38 and 39 to be no more than 5,500 square feet, consistent with the P/I/Medium Density SFD Land Use Designation of the UDSP. 58) When fencing is used between parcels and open space parcels (Parcels A through G), it shall be open view fencing that is no less than 50% visually open. The location and design of the fencing shall be approved by the City prior to final map. Engineering Services 59) The grading plan as shown on the Tentative Map is not approved. The grading plan places numerous lot pads below the Copeland Creek and Sonoma State University wetlands top of bank. These watercourses are source of current overland flow onto the site. Following completion of the upstream detention measures design, a hydraulic analysis shall be complete for Copeland Creek where it adjoins the development, showing the elevation and path of the 100-year flood. The grading shall be adjusted as needed to place lot pads a minimum of 18” above the 100-year flood and all streets above the 100-year flood, subject to approval by City. 60) The final map for the UDLLC property shall include a public drainage easement over the creek and basin properties. Developer and the HOA shall not contest the right of upstream 3rd parties to discharge existing runoff into the creeks. 61) Developer shall enter into an agreement with the City which outlines the responsibilities of the HOA to operate and maintain into perpetuity all water quality improvements within the UDLLC property. The agreement shall run with the property and shall provide for the HOA to succeed Developer upon transfer of these parcels from Developer to the HOA. The agreement shall be subject to the approval of the North Coast Water Quality Control Board and generally conform to the City of Santa Rosa long-term maintenance agreement for stormwater treatment measures. This condition shall be satisfied by an amendment to the current Master Maintenance Agreement between the City and the Developer, dated November 24, 2015, and subsequently amended on November 14, 2017 and October 23, 2018, as well as further amendments. Maintenance of the Copeland Creek flood control channel is also an obligation of the HOA, where located within the development. The Developer shall also cooperate in the execution of any agreements necessary to provide for the ongoing maintenance of Copeland Creek, which may include Sonoma County Water Agency as a participant in the agreement. The developer shall be responsible for obtaining a long-term maintenance permit from the resource agencies for the ( 10 ) maintenance work. 62) Infrastructure shall be constructed in conformance with the Tentative Map and in conformance with Exhibit “C”, Dedications, Improvements, and Facilities Schedule of the Development Agreement. 63) The requirements for the design and construction of public improvements as set forth in the Development Agreement between Owner(s) and City shall be adhered to. In the case of a conflict between the requirement set forth in the Development Agreement and these Conditions of Approval, the more stringent conditions shall apply as solely determined by the City Engineer. Prior to the Approval of Improvement Plans or Start of Construction 64) Improvement Plans prepared by a Registered Civil Engineer shall be submitted for the review and approval of the City Engineer showing grading, paving, utilities, drainage, structures to be built, lighting and trash collection. Improvements shall conform to the requirements of Chapter 16.16 of the Municipal Code. The improvements plans shall include parking lots, street and utility information including all concrete curb and gutter, sidewalk, striping and signing, paving, water lines, storm drain lines and sewer lines as necessary, erosion control and any necessary transitions. All improvements shall be in accordance with the City of Rohnert Park Standard Improvement Details. Improvement Plans shall include a Storm Water Pollution Prevention Plan including winterization and erosion protection. 65) Storm drainage improvements shall be designed in accordance with the Sonoma County Water Agency criteria. Hydrology calculations, pipe sizing and storm drain plans shall be submitted for the review and approval of the City Engineer. 66) No lot- to- lot drainage is allowed except where easements are provided for drainage are provided. No drainage may discharge across sidewalks. 67) The applicant shall demonstrate for each building pad to the satisfaction of the City of Rohnert Park as follows: a) Adequate protection from 100-year frequency storm; and b) Feasible access during a 10-year frequency storm. 68) Fire protection shall be in accord with the requirements of Rohnert Park Public Safety Department. With the submittal of the improvement plans, calculations shall be provided to the City and the Rohnert Park Public Safety Department to ensure that adequate water pressures are available to supply hydrant flows and sprinkler flows. 69) The improvement plans shall show a sewer lateral to each building in accord with City Standards. 70) The recycled water main shall be extended as needed to serve landscaping within landscape parcels and other parcels as needed. 71) The existing traffic signals at the intersections of Karrington Road and Kerry Road with Rohnert Park Expressway shall be modified to include signalization of the new southerly approaches. Improvements shall include revisions needed for pedestrian access and ( 11 ) decorative pavement similar to that on the north side of the intersection. The signals shall be operational prior to the occupancy of any homes. 72) The Parcel C detention/ water quality basin shall be constructed and operational prior to paving or start of home construction (with the exception of landscaping, which shall be completed prior to final acceptance of improvements and release of bonds OR occupancy of homes). The basin shall include a trash capture device at the outlet into the basin meeting State full-trash capture requirements (5-mm. screen, 1-year, 1-hour storm with high-flow bypass). 73) The improvement plans for the project shall include the Copeland Creek trail (including landscaping and other appurtenant improvements). 74) The improvement plans for the development shall include design for the pedestrian bridge across Copeland Creek, along with connections to the existing Copeland Creek trail and the “J” Section trail system, in general conformance with the Trail Exhibit on Sheet 6 of the Tentative Map. The bridge shall be designed and guaranteed with the Final Map. Construction shall begin prior to issuance of the 100th building permit and shall be constructed within 12 months of the start of construction. The development shall include the design and construction of utilities within existing or proposed public right-of-way for electric, gas, telephone, communication and cable TV shall be submitted to the City Engineer and Director of Development Services for review and approval. Any above-ground utility boxes, cabinets or structures shall be specifically approved by the City and screened from public view to the satisfaction of the Director of Development Services and City Engineer and meet utility company’s installation criteria. 75) A grading permit application shall accompany submittal of the Subdivision Improvement Plans. Said application shall include the requirements listed in Sections 15.48 & 15.50 of the Municipal Code. 76) The grading plans shall be in conformance with the Bay Area Air Quality Management District guidelines for reducing construction impacts and minimize dust emissions. 77) A geotechnical study acceptable to the City shall be conducted by an Engineer licensed in the State of California and qualified to perform soils work, or by a California Certified Geologist prior to site development. Recommendations shall be provided, as necessary, to prevent damage to Project facilities and compliance with these recommendations shall be required as a condition of development at the project site. The grading and improvement plans shall incorporate the recommendations of the approved geotechnical study. This geotechnical study shall at a minimum incorporate the following: a) The liquefaction potential of the Project site. b) The location and extent of expansive soils at the project site, including recommendations regarding the treatment and/or remedy of on-site soils, and the structural design of foundations and underground utilities. c) Seismic safety including recommendations regarding the structural design of foundations and underground utilities. ( 12 ) 78) Unless otherwise agreed to by the City, the development shall submit drainage plans subject to the review and approval of the Sonoma County Water Agency (“SCWA”), the City of Rohnert Park and these conditions of approval. Said plans shall meet or exceed SCWA standards and City standards, whichever is more restrictive. All proposed building pad , including garages, shall be a minimum of 18 inches above the post construction 100- year water surface elevations, as described and modeled in “Copeland Creek Regional Detention and Refugia Project, Technical Memorandum 3 – Existing Conditions Flood Plain Analysis”, prepared by GHD, Inc, dated February 15, 2019, as revised and updated, or as shown in other subsequent modeling and approved by the City, SCWA, and FEMA. 79) The development shall include the design by the project proponent for Erosion and Sediment control plans prepared by a professional such as a Civil Engineer or certified Erosion Control Specialist and shall meet the requirements listed in Section 15.52.030 of the Municipal Code. The plans shall provide measures to avoid the introduction or spread of noxious weeds into previously un-infested areas. These plansare subject to review and approval by the City. Erosion and Sediment control plans shall be in conformance with Chapter 15.52 of the Municipal Code except that the reference document for design criteria shall be the City of Santa Rosa Standard Urban Storm Water Management Plan (SUSMP) or most current City adopted SUSMP. 80) The development shall include design by the project proponent of lighting on public streets as well as private streets/alleys. All streetlights shall be LED, meeting the design criteria for the City of Los Angeles. The design shall be in accordance with City standards and P.G. & E. requirements. In addition, lighting for private streets and alleys shall be designed in accordance with the Zoning ordinance and to the Public Safety Department’s satisfaction, allowing for wall-mounted lighting. 81) All existing overhead utilities within the subdivision and all proposed utilities shall be placed underground. 82) The development shall include design by the project proponent for roadways. Street improvements not specifically called out in these conditions shall be completed in conjunction with each phase of development (final map). The City Engineer may require reasonable improvements outside of each phase if needed for the orderly and safe development of that phase. The design shall include slurry sealing specifications, subject to review and approval by the City. All streets shall be slurry sealed prior to issuance of the last certificate of occupancy or prior to acceptance of the public improvements, whichever occurs first within each phase of development. 83) The development shall include the design by the project proponent for installation of moisture barriers at the edges of all pavement sections for purposes of maintaining constant moisture content of pavement sections, subject to review and approval by the City. The design shall include moisture protection extending to 6 inches below the aggregate base layer. The moisture barrier shall be a minimum of 4 inches wide and consist of Controlled Low Strength Material (CLSM) in a 10 mil visqueen lined trench. Alternate designs may be proposed by the developer and considered by the City. 84) Soils beneath all roadways including alleys shall be lime treated based on site specific tests and as recommended by a geotechnical engineer. ( 13 ) 85) The development shall include design by the project proponent and all public improvements shall comply with the latest version of the Rohnert Park Manual of Standards, Details and Specifications. Reference to particular standards shall be made on the improvement plans. Standards details and specifications shall not physically be included on the plans but shall be referenced. 86) The project proponent shall design motor courts, with utilities and appurtenances. These shall be private. 87) No utilities (sewer, water or storm drains) shall flow from a private utility to a public utility and back to a private utility. No utilities (sewer, water or storm drains) shall flow from a public utility to a private utility and back to a public utility. 88) All utilities shall be located within dedicated and accepted public street rights-of- way. Any exception must receive prior approval from the City Engineer. 89) All existing wells and septic systems shall be abandoned in compliance with State and County codes, prior to issuance of an initial grading permit. 90) The development the project proponent shall design all utilities in compliance with City Manual of Standards and the State Water Resources Control Board Division of Drinking Water Standards including vertical and horizontal separation between utilities, curbs, gutters and monuments. Prior to Approval of Final Map 91) Submit each final map and improvement plans with a completed Land Development Review Submittal Sheet, Final-Parcel Map Completeness Checklist and Final- Parcel Map Submittal Checklist as available on the City web-site and all appropriate additional information. 92) The Final Map submittal shall include a title report (within last 30 days of initial submittal), supporting documents, and calculations for City Engineer review. All calculated points within the map shall be based on one common set of coordinates. All information shown on the map shall be directly verifiable by information shown on the closure calculation printout. The point (s) of beginning shall be clearly defined. All lot acreages shall be shown on the map and shall be verifiable from information shown on the closure calculation printout. 93) Prior to City Council approval of the Final Map; the developer shall satisfy Rohnert Park Municipal Code section 16.14.010 D. 2 regarding off-site dedication of rights- of- way and easements. The Final Map shall show offer of dedication of the necessary right- of-way in fee title, sidewalk easements, public utility easements and other easements for public water, sewer, and storm drain, as shown on the tentative map or as needed per the final improvement design. 94) The Final Map for the development shall have a note on the local agency page stating: All fences, sound walls and retaining walls shall be constructed on private property and maintained by the private property owner or Association, unless specifically dedicated to and accepted by the City. 95) All property corners of lots within the subdivision shall be monumented in ( 14 ) compliance with city standards, except as expressly permitted in writing by the City Engineer. 96) The developer/ property owner shall enter into a Public Improvement Agreement (PIA) with the City, post the requisite bonds, and pay all applicable fees. The SIA shall be required to be recorded concurrent with the recordation of the Final Map. 97) Street names will be subject to the approval of the City Council. Prior to the Issuance of Grading Permits 98) Pre-construction surveys shall be completed for western pond turtles, burrowing owls, and migratory birds, in accordance with Mitigation Measures BIO-12a, BIO-13a, and BIO-14a of the FEIR. This shall be noted on the grading plans. 99) Applicant must file a Notice of Intent to Comply with the Terms of General Permit to Discharge Storm Water Associated with Construction Activity (NOI) with the State of California Water Resources Control Board, and obtain a permit, prior to commencement of any construction activity. 100) No construction shall be initiated until the Grading Plans have been approved by the City, all applicable fees have been paid, an encroachment permit and/or grading permit has been issued and a project schedule has been submitted to the City Engineer and a pre- construction conference has been held with the City Engineer or his designee. 101) Resource agency permits shall be secured, with copies of the permits supplied to the City and with permit requirements incorporated into the plans. 102) Plans shall incorporate tree protection measures. Trees to be preserved shall be clearly noted on the plans. 103) All areas considered to be a sensitive biological resource shall have construction fencing installed around the sensitive resources to prevent damage during construction. 104) Developer shall secure an encroachment permit from the City prior to performing any work within the City right of way or constructing within a City easement. 105) Resource agency permits shall be secured, with copies of the permits supplied to the City and with permit requirements incorporated into the plans. Prior to the Issuance of Building Permits 106) Prior to issuance of building permits for a single family residential units, individual plot plans for each lot shall be prepared by the project proponent, submitted and reviewed and approved by the City. 107) Prior to the issuance of building permits within the current Copeland Creek FEMA floodplain, a Letter of Map Revision (LOMR) shall be obtained for the lots within the development. 108) Prior to issuance of the 100th building permit, the construction of the Copland Creek pedestrian bridge shall be commenced. The construction of the Copeland Creek pedestrian bridge shall be completed within 12 months of the start of construction, or issuance of further building permits will be withheld. . ( 15 ) Prior to the Building Occupancy 109) Prior to issuance of Certificated of Occupancy for any phase, the public improvements that are necessary for safe access to the site, all frontage improvements, hookup of utilities, energizing of street lights, and any specific improvements for that phase shall be complete. Department of Public Safety-Fire 110) Fire Hydrant spacing and placement should be consistent with the City of Rohnert Park Standards, comply with Appendix C of the 2007 California Fire code, and the amendments to table C105.1 by RPDPS ordinance #793. The specific location and spacing of Fire Hydrants shall be determined and approved on the final construction drawings. 111) All roadway, private lanes and drives shall comply with the City of Rohnert Park Standards. Specifically reference Standard #202 “Alley, in regards to: a) Alley lighting shall meet the City’s minor street requirements. b) 20 or more units will require a 24’ alley width c) Alleys are to be used as secondary access only, with parking provided on primary access roads. 112) Roadway widths should be consistent with the City of Rohnert Park Standards except as shown on the Tentative Map, comply with Appendix D of the 2007 California Fire code, and the amendments to RPDPS ordinance #793 Section 15.28.D103.2 – 15.28.D106.1. 113) Minimum interior and exterior turning radius for Fire Apparatus Access shall be all 20 feet and 40 feet. 114) Water main sizes and GPM flow capacity for Fire suppression shall be determined and approved on the final construction drawing. Hydraulic flow calculations shall be included and approved with construction documents. PLANNING COMMISSION RESOLUTION NO. 2023-07 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ROHNERT PARK APPROVING A TWO-YEAR EXTENSION OF A DEVELOPMENT AREA PLAN TO ALLOW THE DEVELOPMENT OF PROPERTY (COMMONLY KNOWN AS UD LLC) LOCATED ON A 34.34-ACRE LOT SOUTH OF ROHNERT PARK EXPRESSWAY, EAST OF THE GREEN MUSIC CENTER AND NORTH OF COPELAND CREEK WITHIN THE UNIVERSITY DISTRICT SPECIFIC PLAN (APN: 047-131-026 AND -027) CONSISTING OF 203-SINGLE AND TOWNHOME RESIDENTIAL LOTS WHEREAS, the applicant, Lisa Borba, on behalf of UD LLC, filed a Planning Application (PLDP20-0003) requesting an extension of the Development Area Plan to allow the development of property (commonly known UD LLC)), a 34.34-acre lot south of Rohnert Park Expressway, east of the Green Music Center and north of Copeland Creek within the University District Specific Plan (APN: 047-131-026 AND 027), in accordance with the City of Rohnert Park Municipal Code (“RPMC”); and WHEREAS, on May 25, 2021, the Development Area Plan was approved pursuant to the City of Rohnert Park Municipal Code Section 17.06.420, and the approval date set to expire twenty-four (24) months after the date of approval unless prior to the expiration the applicant filed a request for an extension of time in accordance with RPMC 17.06.420; and WHEREAS, on March 6, 2023, in accordance with RPMC Section 17.06.420, the applicant filed an application (PLDP20-0003) requesting an extension of the Development Area Plan approval; and WHEREAS, pursuant to California State Law and the RPMC, public hearing notice was published for a minimum of 10 days prior to the first public hearing in the Community Voice; and WHEREAS, the City Council of the City of Rohnert Park has certified the Final Environmental Impact Report (EIR) and Addendum prepared for the UDSP project and the City has otherwise carried out all requirements for the project pursuant to CEQA; and WHEREAS, on April 13, 2023, the Planning Commission held a duly noticed public hearing at which time interested persons had an opportunity to testify either in support or opposition to the proposed Development Area Plan; and WHEREAS, the Planning Commission has reviewed and considered the information contained in the Development Area Plan extension. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Rohnert Park make the following findings, determinations, and recommendations with respect to the proposed Development Area Plan extension: Section 1. The above recitations are true and correct. 2 Reso 2023-07 Section 2. Environmental Review: A. On May 23, 2006, the City Council of the City of Rohnert Park certified the Final EIR for this Project, including adoption of associated CEQA Findings, Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program, as described in City Council Resolution No. 2006-141. The City Council approved the Addendum to the Final EIR, as described in City Council Resolution No. 2014-032 approved on April 8, 2014. The proposed Development Area Plan is consistent with the analyses in the 2006 EIR and 2014 Addendum and will not result in additional environmental effects not previously evaluated in the EIR and Addendum. No additional environmental review is necessary. B. Further, CEQA Guidelines section 15162 provides that “no subsequent EIR shall be prepared” for a project unless the lead agency determines that (1) “substantial changes are proposed in the project which will require major revisions of the previous EIR”; or (2) “substantial changes occur with respect to the circumstances under which the project is undertaken”; or (3) “new information of substantial importance … shows” one or more significant effects not discussed in the original EIR, greater severity to previously-identified substantial effects, or newly- found feasible mitigation measures that would substantially reduce significant effects. The proposed Development Area Plan will not result in any changes to the proposed project not previously analyzed in the 2006 EIR and 2014 Addendum and no new information of substantial importance shows any significant effects or newly found feasible mitigation measures that would substantially reduce significant effects. Section 3. Findings for Approval of Development Area Plan. The Planning Commission in recommending approval to the City Council of Planning Application No. PLDP20- 0003, a two year extension of the Development Area Plan for University District Specific Plan hereby makes the following findings in accordance with Rohnert Park Municipal Code Section 17.06.400; to wit; 1. The proposed development conforms to the applicable specific plan Criteria Satisfied. The proposed UD LLC Development Area Plan I conforms to the amended Specific Plan and would implement development of the University Specific Plan project. The proposed Development Area Plan provides additional details on the project including lot types, preliminary front door placement, plus elements of the subdivision including the stormwater basin, mailbox enclosures, common area landscaping, subdivision fencing and walls, street trees, bike trail and subdivision entry features. The proposed development is consistent with the specific plan because it conforms to the requirements in the specific plan related to density, housing type, housing location, and related amenities. 2. Public infrastructure and services can be provided concurrently with the development Criteria Satisfied. The developer will be required to participate in the Public Facilities Financing Plan, which will provide for necessary off-site public facilities, and shall be responsible for on-site facilities to meet the project’s needs. The Development Agreement for the project sets forth the timing of the necessary 3 Reso 2023-07 facilities as they relate to the physical development of the site. Section 4. Based on the findings set forth in this Resolution and the evidence in the staff report, and the above-referenced Findings, the Planning Commission hereby recommends that the City Council approve Development Area Plan I for the University District LLC area within the University District Specific Plan, as set forth at Exhibit A, in its entirety, and subject to the recommended conditions of approval as provided in Exhibit B. DULY AND REGULARLY ADOPTED on this 13th day of April 2021 by the City of Rohnert Park Planning Commission by the following vote: AYES: _____ NOES:_____ ABSENT:_____ ABSTAIN:_____ AUSTIN-DILLON _____ EPSTEIN _____ LAM _____ ORLOFF ____STRIPLEN____ ___________________________________________________________ Tramaine Austin-Dillon, Chairperson, Rohnert Park Planning Commission Attest: ________________________________ Clotile Blanks, Recording Secretary Exhibit A: DAP I Exhibit B: Conditions of Approval UDLLC PROPERTYDEVELOPMENT AREA PLAN IforSINGLE FAMILY DETACHED LOTS, MAILBOXES, PARKWAY STRIPS,TUBULAR FENCING, WALLS, BASIN, PILASTERS, & BIKE TRAILatUNIVERSITY DISTRICTRohnert Park, CaliforniaDECEMBER 2020FUTURE DAP 2 WILL INCLUDE HOUSE ARCHITECTURE, UNENCLOSED FRONT YARD, LANDSCAPE,LOT FENCING & GATES, COLORS & MATERIALS, LOT FLATWORK, & DRIVEWAYSExhibit A to Resolution 2023-07 VAST OAK WESTVAST OAK EASTOPEN SPACE/WETLANDS(NOT A PART OF DAP)COPELAND CREEK(NOT A PART OF DAP)ROHNERT PARK EXPRESSWAY(NOT A PART OF DAP)KARRINGTON ROAD KERRY ROADWATER QUALITY &DETENTION BASINI-8 STREETI-7 STREETI-1 STREET I-2 STREET I- 1 STREET (KARRINGTON ROAD) I-4 STREET I-5 STREET I-6 STREET (KERRY ROAD)I-9 STREETI-9 STREETI-10 STREETLANDSCAPEPARCELVAST OAK NORTHVAST OAKWESTVAST OAK EASTUNIVERSITY DISTRICTLEGEND:203 SFD LOTSSINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020NEIGHBORHOOD PLANC.1CITY PARCELJ-SECTION BRIDGE LOCATION, TRAIL CONNECTION, AND DESIGNTO BE PROVIDED IN A SEPARATE FUTURE DAPPEDESTRIAN CONNECTION TO RPXPEDESTRIAN CONNECTION TO RPX4-PACK MOTORCOURT SFD: 180 LOTS2-PACK MOTORCOURT SFD: 4 LOTSCONVENTIONAL SFD: 19 LOTSPRIVATE DRIVE AISLE: 1 LOTPRIVATE DRIVE AISLE/TURNAROUND. ON-LOTDRIVE LOCATION TO BE DETERMINED WITHARCHITECTURE DAP APPROVALNOTES:1. RPX NOT A PART OF DAP I2. J-SECTION PEDESTRIAN BRIDGE & TRAIL NOT A PART OF DAP I I-8 STREETI-7 STREETI-1 STREETI-2 STREET I- 1 STREET (KARRINGTON ROAD) I-4 STREET I-5 STREET I-6 STREET (KERRY ROAD)I-9 STREETI-9 STREETI-10 STREETOPEN SPACE/WETLANDS(NOT A PART OFDAP)COPELAND CREEK(NOT A PART OF DAP)ROHNERT PARK EXPRESSWAY(NOT A PART OF DAP)WATER QUALITY &DETENTION BASINLANDSCAPEPARCEL175172184183180179176163151152155156159160171164167168165150153154157158161162148187174177178181182185170173169166149186194197190193189199196195192191198202203201200188107120108111112115116119138126142129130133134137123106113114118147121146109110122117124125139136135132131128141127143140145144353231282724235691013141718927587808879917610067957296719968103644158575453504946454244474851525556435920613322252629301512118744039363432138848990939497981018610283858270737477786581666916196263104105216037SINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020SITE PLANC.2LEGEND:PROPOSED FRONT DOOR LOCATION(C)NOTE:A.SEE SHEET C.3 FOR NEIGHBORHOOD MINIMUM LOT SETBACKSB.PROPOSED LAND USE: P/I/MEDIUM DENSITY RESIDENTIALC.FRONT DOOR LOCATIONS SHOWN ARE PRELIMINARY AND CAN BE FACING THE PUBLICSTREET OR MOTORCOURT. FINAL LOCATION TBD WITH DAP 2 APPROVALD.BIO-CELLS WILL BE LOCATED ON LOT. FINAL LOCATION TBD WITH DAP 2PRIVATE DRIVE AISLE/TURNAROUND LOT. ON-LOTDRIVE LOCATION TO BE DETERMINED WITHARCHITECTURE DAP APPROVAL 4'MIN4'MIN4'MIN18' MIN4' MIN4'MIN4'MIN4'MIN4'MIN18' MIN18' MIN4' MIN4'MIN5'MINROWSIDEWALKSTREETPARKWAYPAE20'COURT4'MIN4'MIN18' MIN5'MINSINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020TYPICAL PLOTTING EXHIBITC.3.14- PACK TYPICAL PLOTTINGMINIMUM LOT SIZE: 3364 SFMAX LOT COVERAGE: 75%MAX FLOOR AREA RATIO: 0.75LEGEND:BUILDING ENVELOPE(PER REQ. SETBACKS)RIGHT OF WAYPUBLIC ACCESS EASEMENTPOTENTIAL BIO-CELL LOCATION ON LOTROWNOTE:A. ARCHITECTURE DETAILS ARE CONCEPTUAL AND FURTHER DETAILS TO BE PROVIDEDIN SEPARATE DAPB.PROPOSED LAND USE: P/I/MEDIUM DENSITYC.SEE SECTION 1.4 OF SPECIFIC PLAN FOR CORNER SETBACKSD.FRONT DOORS MAY FACE PUBLIC STREET OR MOTORCOURTE.NO PARKING IN COURT DRIVE AISEL. SIGN TO BE PROVIDED BY BUILDERPAEBIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)BIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)BIO-CELL LOCATED ON LOT (FINAL LOCATION TBDWITH ARCHITECTURE DESIGN) 4'MIN4'MIN5'MIN5'MIN4'MIN4'MIN5'MIN5'MIN18'18'4'MIN4'MIN18'MIN18'MIN4'MIN4'MIN5'MIN8'MIN4'MIN4'MIN8'MINROWSIDEWALKSTREETPARKWAYSINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020C.3.2CONVENTIONAL SFD TYPICAL PLOTTINGMINIMUM LOT SIZE: 3364 SFMAX LOT COVERAGE: 75%MAX FLOOR AREA RATIO: 0.75LEGEND:BUILDING ENVELOPE(PER REQ. SETBACKS)RIGHT OF WAYPUBLIC ACCESS EASEMENTPOTENTIAL BIO-CELL LOCATION ON LOTROWPAENOTE:A. ARCHITECTURE DETAILS ARE CONCEPTUAL AND FURTHER DETAILS TO BE PROVIDEDIN SEPARATE DAPB.PROPOSED LAND USE: P/I/MEDIUM DENSITYC.SEE SECTION 1.4 OF SPECIFIC PLAN FOR CORNER SETBACKSD.FRONT DOORS MAY FACE PUBLIC STREET OR MOTORCOURTBIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)BIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)BIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)TYPICAL PLOTTING EXHIBIT 5' MIN 5' MIN 4' MIN 4' MIN 18' MIN4'MIN4'MIN18' MINROWSIDEWALKSTREETPARKWAYPAE20'COURTSINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020C.3.32-PACK MOTORCOURT SFD TYPICALPLOTTING MINIMUM LOT SIZE: 3364 SFMAX LOT COVERAGE: 75%MAX FLOOR AREA RATIO: 0.75LEGEND:BUILDING ENVELOPE(PER REQ. SETBACKS)RIGHT OF WAYPUBLIC ACCESS EASEMENTPOTENTIAL BIO-CELL LOCATION ON LOTROWPAENOTE:A. ARCHITECTURE DETAILS ARE CONCEPTUAL AND FURTHER DETAILS TO BE PROVIDEDIN SEPARATE DAPB.PROPOSED LAND USE: P/I/MEDIUM DENSITYC.SEE SECTION 1.4 OF SPECIFIC PLAN FOR CORNER SETBACKSD.FRONT DOORS MAY FACE PUBLIC STREET OR MOTORCOURTBIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)BIO-CELL LOCATED IN FRONT YARD(FINAL LOCATION TBDWITH ARCHITECTURE DESIGN)TYPICAL PLOTTING EXHIBIT 17517218418318017917616315115215515615916035323128272423569101314171892758780887991761006795729671996810364194197190193189415857545350494645421711644447485152555643592061332225262930151211874107120108111112115116119138126142129130133134137199196195192191123167168401651501531541571581611621481871061131141181471211461091101223634321381981178489909394979810186102838582707374777865816669202203201200188174177178181182185170173169166149186124161251391361351321311281411271431962631041051402160I-8 STREETI-7 STREETI-1 STREETI-2 STREET I- 1 STREET (KARRINGTON ROAD) I-4 STREET I-5 STREET I-6 STREET (KERRY ROAD)I-9 STREETI-9 STREET1451443937I-10 STREETOPEN SPACE/WETLANDS(NOT A PART OFDAP)COPELAND CREEK(NOT A PART OF DAP)ROHNERT PARK EXPRESSWAY(NOT A PART OF DAP)WATER QUALITY &DETENTION BASINLANDSCAPEPARCELLEGEND:ON-SITE STREET PARKING: 245 SPACESSINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020PARKING PLANC.4 I-8 STREETI-7 STREETI-1 STREETI-2 STREET I- 1 STREET (KARRINGTON ROAD) I-4 STREET I-5 STREET I-6 STREET (KERRY ROAD)I-9 STREETI-9 STREETI-10 STREETOPEN SPACE/WETLANDS(NOT A PART OFDAP)COPELAND CREEK(NOT A PART OF DAP)ROHNERT PARK EXPRESSWAY(NOT A PART OF DAP)WATER QUALITY &DETENTION BASINLANDSCAPEPARCELSINGLE FAMILY DETACHED LOTSat UDLLC PROPERTYRohnert Park, CaliforniaDECEMBER 2020GARBAGE PICKUP PLANC.5LEGENDTRASH AND RECYCLING BIN LOCATIONS WITHINPUBLIC STREETS FOR PICKUPNOTE: ON-LOT TRASH & RECYCLING BIN STORAGELOCATION TO BE LOCATED BEHIND SIDE YARD FENCE KERRY ROAD VAST OAKEASTVAST OAKWESTROHNERT PARK EXPRESSWAYCOPELAND CREEKTWINCREEKSPARKKARRINGTON ROAD TABLE OF CONTENTSNTSNTSCOVER SHEETLANDSCAPE MASTER PLANLANDSCAPE MASTER PLANDETENTION BASINCOPELAND CREEKROHNERT PARK EXPRESSWAYENTRYWAYS - KARRINGTON & KERRYLANDSCAPE DETAILSMAILBOX LOCATIONS & ROUTING PLANL-1.0L-2.0L-3.0L-4.0L-5.0L-6.0L-7.0L-8.0 TO L-10.0L-11.0SITE MAPVICINITY MAP4TH LAND DEVELOPMENT PHASE -UDLLC AT UNIVERSITY DISTRICTROHNERT PARK, CALIFORNIADECEMBER 10, 2020LANDSCAPE PLANS FOR:SINGLE FAMILY DETACHED LOTS ATUNIVERSITY DISTRICT PROPERTY DAP 1L-1.0Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Scale: See DetailDevelopment Area PlanNORTHCover SheetUDLLC FINAL MAPRohnert Park, CaliforniaUDLLC at University DistrictNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691PROJECTSITEUDLLCProject No. 04220DECEMBER 10, 2020NOTES:1.BUILDING PERMITS WILL NOT BE ISSUED UNTIL A COMBUSTIBLE CLEARANCE MEMO IS PROVIDED BYTHE FIRE DEPARTMENT. WATER SUPPLIES AND ACCESS MUST BE COMPLETE AND OPERATIONAL BEFOREBUILDING PERMITS WILL BE AUTHORIZED.2.ALL BUILDINGS SHALL BE EQUIPPED WITH FIRE SPRINKLERS AND ALARM SYSTEMS AS REQUIREDBY THE CALIFORNIA FIRE CODE AND LOCAL AMENDMENTS. SEPARATE FIRE DEPARTMENT PERMITS WILLBE REQUIRED FOR EACH BUILDING.3.ADDRESSES SHALL BE ILLUMINATED AND VISIBLE FROM THE STREET PER LOCAL ORDINANCE. KARRINGTON ROAD WATER QUALITY &DETENTION BASINLOT 203LOT 202LOT 200LOT 201LOT 199LOT 198LOT 196LOT 197LOT 195LOT 194LOT 192LOT 193LOT 191LOT 190LOT 188LOT 189LOT 187LOT 186LOT 149LOT 148LOT 184LOT 185LOT 150LOT 151LOT 183LOT 182LOT 153LOT 152LOT 180LOT 181LOT 154LOT 155LOT 179LOT 178LOT 157LOT 156LOT 176LOT 177LOT 158LOT 159LOT 175LOT 174LOT 161LOT 160LOT 172LOT 173LOT 162LOT 163LOT 171LOT 170LOT 165LOT 164LOT 168LOT 169LOT 166LOT 167LOT 143LOT 140LOT 142LOT 141LOT 138LOT 139LOT 137LOT 136LOT 134LOT 135LOT 133LOT 132LOT 130LOT 131LOT 129LOT 128LOT 126LOT 127LOT 125LOT 124LOT 123LOT 122LOT 120LOT 121LOT 119LOT 118LOT 116LOT 117LOT 115LOT 114LOT 112LOT 113LOT 111LOT 110LOT 108LOT 109LOT 107LOT 146LOT 106LOT 147STREET I-4 STREET I-2 STREET I-1 STREET I-9STREET I-7ROHNERT PARK EXPRESSWAYCOPELAND CREEK(NOT PART OF DAP 1)MATCHLINE REFER TO SHEET L-3.0LOT 144LOT 145LIMIT OF WORK @ P.L.LIMIT OF WORKSTREET I-10AAL-2.0Scale: 1" = 40'-0"0'20'40'80'160'Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Development Area PlanNORTHLandscape Master PlanRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691UDLLC at University DistrictUDLLC FINAL MAPProject No. 04220DECEMBER 10, 2020BOTANICAL NAMESYMBOLCOMMON NAMEPLANT PALETTESTREET TREESACER RUBRUMCERCIS OCCIDENTALSLIRIODENDRON TULIPIFERAOLEA EUROPAEA 'SWAN HILL'PISTACIA CHINENSIS'KEITH DAVEY'PLATANUS X ACERIFOLIA'COLUMBIA'PRUNUS CERASIFERA'KRAUTER VESUVIUS'QUERCUS AGRIFOLIAQUERCUS RUBRASEQUOIA SEMPERVIRENS'APTOS BLUE'RED MAPLEWESTERN REDBUDTULIP POPLARSWAN HILL OLIVEKEITH DAVEYCHINESE PISTACHELONDON PLANE TREEPURPLE LEAF PLUMCOAST LIVE OAKRED OAKCOAST REDWOODMODV. LOWMODLOWLOWMODLOWLOWMODHIGHWUCOLSSIZE24" BOX15 GAL24" BOX15 GAL24" BOX24" BOX15 GAL24" BOX24" BOX24" BOX1 GAL1 GALGROUNDCOVERSARCTOSTAPHYLOS SP.MYOPORUM PARVIFOLIUMMANZANITACREEPING MYOPORUMV. LOWLOWPLANTING NOTES1.THE LOCATION AND QUANTITY OF TREES IS SUBJECT TO CHANGE BY NO MORE THAN 5%BASED ON UTILITY COMPOSITION. PROVIDE 3' CLEAR AROUND ALL HYDRANTS PERCALIFORNIA FIRE CODE.2.THE PLANTING DESIGN FOR THE SITE IS DROUGHT TOLERANT AND UTILIZES NATIVE ANDADAPTED ORNAMENTAL PLANTING.3.ALL SHRUBS AND GROUNDCOVER MATERIAL SELECTED HAS A WUCOLS WATER USE RATINGOF LOW OR VERY LOW.4.PROPOSED TREE CANOPIES ARE SHOWN AT 85% MATURE GROWTH DIAMETER IN ORDER TOENSURE THERE IS SUFFICIENT ROOM FOR TREE GROWTH AND HEALTH.5.PROVIDE 3' CLEARANCE FROM TREES AROUND ALL HYDRANTS PER CALIFORNIA FIRE CODE.PLANT LIST CONSISTENT WITHAPPROVED VAST OAK PLANTING .IRRIGATION DESIGN1.PARKWAY STRIP LANDSCAPING SHALL UTILIZE RECYCLEDWATER FROM A COMMON HOA SYSTEM.6' HIGH TUBE STEELFENCE WITHPILASTER. SEEDETAIL E, SHEET L-8.0.SEE WATER QUALITY& DETENTION BASINENLARGEMENT,SHEET L-4.0.KARRINGTON ROADENTRANCE. SEESHEET L-7.0 FORENLARGEMENTS.SEE TYPICAL PLANTINGCONDITION ATRESIDENTIALINTERFACE SECTION,SHEET L-5.0.6' HIGH TUBE STEELFENCE AND GATE. SEEDETAIL E, SHEET L-8.0.6' PROJECT WALL WITHSTONE VENEEREDPILASTERS. SEEDETAIL D, SHEET L-8.0.FOR LANDSCAPE ANDSIDEWALKIMPROVEMENTS TOMEDIAN AND NORTHSIDE, REFER TOROHNERT PARKEXPRESSWAY DAPPREPARED BY VTA.PARCEL FPARCEL G KERRY ROAD HINEBAUGH CREEKVAST OAKEASTVAST OAKWESTROHNERT PARK EXPRESSWAYCOPELAND CREEKTWINCREEKSPARKKARRINGTON ROAD NTNORTH-SOUTH THEMEDSTREET TREE (TYP.)EAST-WEST THEMEDSTREET TREE, TYPICALREFER TO DAP 2 FORFENCING ATPROPERTY LINE.FENCES AT REAROF RESIDENTIALLOTS ALONGWEST AND EASTSIDES OF UD LLCPROPERTY WILLBE SHOWN ONDAP 2.42" HIGH TUBE STEELFENCE. SEEDETAIL D, SHEET L-9.0.(TO BE PLACED 18" BACKOF FACE OF CURB.) KERRY ROADCOPELAND CREEK(NOT PART OF DAP 1)LOT 104LOT 105LOT 62LOT 63LOT 103LOT 102LOT 65LOT 64LOT 100LOT 101LOT 66LOT 67LOT 99LOT 98LOT 69LOT 68LOT 96LOT 97LOT 70LOT 71LOT 95LOT 94LOT 73LOT 72LOT 92LOT 93LOT 74LOT 75LOT 91LOT 90LOT 77LOT 76LOT 88LOT 89LOT 78LOT 79LOT 87LOT 86LOT 81LOT 80LOT 84LOT 85LOT 82LOT 83LOT 61LOT 60LOT 21LOT 20LOT 58LOT 59LOT 22LOT 23LOT 25LOT 24LOT 57LOT 56LOT 54LOT 55LOT 26LOT 27LOT 29LOT 28LOT 53LOT 52LOT 50LOT 51LOT 30LOT 31LOT 33LOT 32LOT 49LOT 48LOT 46LOT 47LOT 34LOT 35LOT 45LOT 44LOT 42LOT 43LOT 41LOT 40LOT 18LOT 19LOT 17LOT 16LOT 14LOT 15LOT 13LOT 12LOT 10LOT 11LOT 9LOT 8LOT 6LOT 7LOT 5LOT 4LOT 36LOT 38LOT 1LOT 2LOT 3OPEN SPACE/WETLANDSSTREET --5STREET I-9STREET I-8ROHNERT PARK EXPRESSWAYMATCHLINEREFER TO SHEET L-2.0 STREET I-4 LOT 39LOT 37LIMIT OF WORKLIMIT OF WORK @ P.L.AAL-3.0Scale: 1" = 40'-0"0'20'40'80'160'Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Development Area PlanNORTHLandscape Master PlanRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691NORTH-SOUTH THEMEDSTREET TREE (TYP.)BOTANICAL NAMESYMBOLCOMMON NAMEPLANT PALETTESTREET TREESACER RUBRUMCERCIS OCCIDENTALSLIRIODENDRON TULIPIFERAOLEA EUROPAEA 'SWAN HILL'PISTACIA CHINENSIS'KEITH DAVEY'PLATANUS X ACERIFOLIA'COLUMBIA'PRUNUS CERASIFERA'KRAUTER VESUVIUS'QUERCUS AGRIFOLIAQUERCUS RUBRASEQUOIA SEMPERVIRENS'APTOS BLUE'RED MAPLEWESTERN REDBUDTULIP POPLARSWAN HILL OLIVEKEITH DAVEYCHINESE PISTACHELONDON PLANE TREEPURPLE LEAF PLUMCOAST LIVE OAKRED OAKCOAST REDWOODMODV. LOWMODLOWLOWMODLOWLOWMODHIGHWUCOLSSIZE24" BOX15 GAL24" BOX15 GAL24" BOX24" BOX15 GAL24" BOX24" BOX24" BOX1 GAL1 GALGROUNDCOVERSARCTOSTAPHYLOS SP.MYOPORUM PARVIFOLIUMMANZANITACREEPING MYOPORUMV. LOWLOWPLANTING NOTES1.THE LOCATION AND QUANTITY OF TREES IS SUBJECT TO CHANGE BY NO MORE THAN 5%BASED ON UTILITY COMPOSITION. PROVIDE 3' CLEAR AROUND ALL HYDRANTS PERCALIFORNIA FIRE CODE.2.THE PLANTING DESIGN FOR THE SITE IS DROUGHT TOLERANT AND UTILIZES NATIVE ANDADAPTED ORNAMENTAL PLANTING.3.ALL SHRUBS AND GROUNDCOVER MATERIAL SELECTED HAS A WUCOLS WATER USE RATINGOF LOW OR VERY LOW.4.PROPOSED TREE CANOPIES ARE SHOWN AT 85% MATURE GROWTH DIAMETER IN ORDER TOENSURE THERE IS SUFFICIENT ROOM FOR TREE GROWTH AND HEALTH.5.PROVIDE 3' CLEARANCE FROM TREES AROUND ALL HYDRANTS PER CALIFORNIA FIRE CODE.PLANT LIST CONSISTENT WITHAPPROVED VAST OAK PLANTING .IRRIGATION DESIGN1.PARKWAY STRIP LANDSCAPING SHALL UTILIZE RECYCLEDWATER FROM A COMMON HOA SYSTEM.UDLLC at University DistrictUDLLC FINAL MAPProject No. 04220DECEMBER 10, 2020EAST-WEST THEMEDSTREET TREE,TYPICAL6' HIGH TUBE STEELFENCE. SEE DETAIL B,SHEET L-8.0.6' HIGH TUBE STEELFENCE WITHPILASTER. SEEDETAIL E, SHEETL-8.0.KERRY ROADENTRANCE. SEESHEET L-7.0 FORENLARGEMENT.SEE TYPICAL TRAILCONDITION ATSTREETSCAPESECTION, SHEET L-5.0.6' PROJECT WALL WITHSTONE VENEEREDPILASTERS. SEEDETAIL D, SHEET L-8.0.6' PROJECT WALL WITHSTONE VENEEREDPILASTERS. SEEDETAIL D, SHEET L-8.0.FOR LANDSCAPE ANDSIDEWALKIMPROVEMENTS TOMEDIAN AND NORTHSIDE, REFER TOROHNERT PARKEXPRESSWAY DAPPREPARED BY VTA.PARCEL FPARCEL G KERRY ROAD HINEBAUGH CREEKVAST OAKEASTVAST OAKWESTROHNERT PARK EXPRESSWAYCOPELAND CREEKTWINCREEKSPARKKARRINGTON ROAD NTFENCES AT REAROF RESIDENTIALLOTS ALONGWEST AND EASTSIDES OF UD LLCPROPERTY WILLBE SHOWN ONDAP 2.42" HIGH TUBE STEELFENCE. SEEDETAIL D, SHEET L-9.0.(TO BE PLACED 18" BACKOF FACE OF CURB.) L-4.0Scale: 1" = 20'-0"0'10'20'40'80'Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Development Area PlanNORTHLandscape Plan & PerspectiveRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691UDLLC at University DistrictWATER QUALITY & DETENTION BASINProject No. 04220DECEMBER 10, 2020 AALOT 188LOT 189LOT 187LOT 186LOT 149LOT 148LOT 143LOT 140LOT 106LOT 147STREET I-9COPELAND CREEK(NOT PART OF DAP 1)REFER TO THIS SHEET MATCHLINE LOT 144LIMIT OF WORKAACOPELAND CREEK(NOT PART OF DAP 1)LOT 104LOT 105LOT 62LOT 63LOT 61LOT 60LOT 21LOT 20LOT 18LOT 19STREET I-9REFER TOTHIS SHEETMATCHLINE LIMIT OF WORKL-5.0Scale: 1" = 30'-0"0'15'30'60'120'Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Development Area PlanNORTHLandscape Plan & SectionsRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691BOTANICAL NAMESYMBOLCOMMON NAMEPLANT PALETTESTREET TREESACER RUBRUMCERCIS OCCIDENTALSLIRIODENDRON TULIPIFERAOLEA EUROPAEA 'SWAN HILL'PISTACIA CHINENSIS'KEITH DAVEY'PLATANUS X ACERIFOLIA'COLUMBIA'PRUNUS CERASIFERA'KRAUTER VESUVIUS'QUERCUS AGRIFOLIAQUERCUS RUBRASEQUOIA SEMPERVIRENS'APTOS BLUE'RED MAPLEWESTERN REDBUDTULIP POPLARSWAN HILL OLIVEKEITH DAVEYCHINESE PISTACHELONDON PLANE TREEPURPLE LEAF PLUMCOAST LIVE OAKRED OAKCOAST REDWOODMODV. LOWMODLOWLOWMODLOWLOWMODHIGHWUCOLSSIZE24" BOX15 GAL24" BOX15 GAL24" BOX24" BOX15 GAL24" BOX24" BOX24" BOX1 GAL1 GALGROUNDCOVERSARCTOSTAPHYLOS SP.MYOPORUM PARVIFOLIUMMANZANITACREEPING MYOPORUMV. LOWLOWPLANTING NOTES1.THE LOCATION AND QUANTITY OF TREES IS SUBJECT TO CHANGE BY NO MORE THAN 5%BASED ON UTILITY COMPOSITION. PROVIDE 3' CLEAR AROUND ALL HYDRANTS PERCALIFORNIA FIRE CODE.2.THE PLANTING DESIGN FOR THE SITE IS DROUGHT TOLERANT AND UTILIZES NATIVE ANDADAPTED ORNAMENTAL PLANTING.3.ALL SHRUBS AND GROUNDCOVER MATERIAL SELECTED HAS A WUCOLS WATER USE RATINGOF LOW OR VERY LOW.4.PROPOSED TREE CANOPIES ARE SHOWN AT 85% MATURE GROWTH DIAMETER IN ORDER TOENSURE THERE IS SUFFICIENT ROOM FOR TREE GROWTH AND HEALTH.5.PROVIDE 3' CLEARANCE FROM TREES AROUND ALL HYDRANTS PER CALIFORNIA FIRE CODE.PLANT LIST CONSISTENT WITHAPPROVED VAST OAK PLANTING .IRRIGATION DESIGN1.PARKWAY STRIP LANDSCAPING SHALL UTILIZE RECYCLEDWATER FROM A COMMON HOA SYSTEM.UDLLC at University DistrictCOPELAND CREEKProject No. 04220DECEMBER 10, 2020TYPICAL TRAIL CONDITIONAT STREETSCAPESECTIONPUBLIC ROADWAYCLASS I BIKE TRAIL PERCITY'S MANUAL OF STANDARDS1'18"9.5'CONCRETEBIKETRAILGRAVELSHOULDERDRAWING NOT TO SCALESECTIONTYPICAL PLANTING CONDITIONAT RESIDENTIAL INTERFACEDRAWING NOT TO SCALECLASS I BIKE TRAIL PERCITY'S MANUAL OF STANDARDS2'8'CONCRETEBIKETRAILGRAVELSHOULDERHOME PAD6' PROJECT WALL WITHSTONE VENEEREDPILASTERS. SEEDETAIL D, SHEET L-8.0.6' PROJECT WALL WITHSTONE VENEEREDPILASTERS. SEEDETAIL D, SHEET L-8.0.6' HIGH TUBE STEELFENCE. SEEDETAIL B, SHEET L-8.0.PROJECT WALLPLANTING BUFFERBY OTHERSPLANTING BUFFERBY OTHERSPARCEL FPARCEL G KERRY ROAD HINEBAUGH CREEKVAST OAKEASTVAST OAKWESTROHNERT PARK EXPRESSWAYCOPELAND CREEKTWINCREEKSPARKKARRINGTON ROAD NTSEE TYPICAL PLANTINGCONDITION ATRESIDENTIAL INTERFACESECTION, THIS SHEET.SEE TYPICAL TRAILCONDITION ATSTREETSCAPESECTION,THIS SHEET.42" HIGH TUBESTEEL FENCE. SEEDETAIL D, SHEETL-9.0.42" HIGH BLACKTUBULAR STEELFENCING AALOT 168LOT 169LOT 166LOT 167LOT 125LOT 124LOT 123LOT 122STREET I-7ROHNERT PARK EXPRESSWAYREFER TO THIS SHEET MATCHLINEAALOT 84LOT 85LOT 82LOT 83LOT 41LOT 40STREET I-8ROHNERT PARK EXPRESSWAYREFER TO THIS SHEETMATCHLINE LOT 39L-6.0Scale: 1" = 30'-0"0'15'30'60'120'Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Development Area PlanNORTHLandscape PlanRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691BOTANICAL NAMESYMBOLCOMMON NAMEPLANT PALETTESTREET TREESACER RUBRUMCERCIS OCCIDENTALSLIRIODENDRON TULIPIFERAOLEA EUROPAEA 'SWAN HILL'PISTACIA CHINENSIS'KEITH DAVEY'PLATANUS X ACERIFOLIA'COLUMBIA'PRUNUS CERASIFERA'KRAUTER VESUVIUS'QUERCUS AGRIFOLIAQUERCUS RUBRASEQUOIA SEMPERVIRENS'APTOS BLUE'RED MAPLEWESTERN REDBUDTULIP POPLARSWAN HILL OLIVEKEITH DAVEYCHINESE PISTACHELONDON PLANE TREEPURPLE LEAF PLUMCOAST LIVE OAKRED OAKCOAST REDWOODMODV. LOWMODLOWLOWMODLOWLOWMODHIGHWUCOLSSIZE24" BOX15 GAL24" BOX15 GAL24" BOX24" BOX15 GAL24" BOX24" BOX24" BOX1 GAL1 GALGROUNDCOVERSARCTOSTAPHYLOS SP.MYOPORUM PARVIFOLIUMMANZANITACREEPING MYOPORUMV. LOWLOWPLANTING NOTES1.THE LOCATION AND QUANTITY OF TREES IS SUBJECT TO CHANGE BY NO MORE THAN 5%BASED ON UTILITY COMPOSITION. PROVIDE 3' CLEAR AROUND ALL HYDRANTS PERCALIFORNIA FIRE CODE.2.THE PLANTING DESIGN FOR THE SITE IS DROUGHT TOLERANT AND UTILIZES NATIVE ANDADAPTED ORNAMENTAL PLANTING.3.ALL SHRUBS AND GROUNDCOVER MATERIAL SELECTED HAS A WUCOLS WATER USE RATINGOF LOW OR VERY LOW.4.PROPOSED TREE CANOPIES ARE SHOWN AT 85% MATURE GROWTH DIAMETER IN ORDER TOENSURE THERE IS SUFFICIENT ROOM FOR TREE GROWTH AND HEALTH.5.PROVIDE 3' CLEARANCE FROM TREES AROUND ALL HYDRANTS PER CALIFORNIA FIRE CODE.PLANT LIST CONSISTENT WITHAPPROVED VAST OAK PLANTING .IRRIGATION DESIGN1.PARKWAY STRIP LANDSCAPING SHALL UTILIZE RECYCLEDWATER FROM A COMMON HOA SYSTEM.UDLLC at University DistrictROHNERT PARK EXPRESSWAYProject No. 04220DECEMBER 10, 20206' PROJECT WALLWITH STONEVENEEREDPILASTERS. SEEDETAIL D,SHEET L-8.0.6' HIGH TUBE STEELFENCE WITHPILASTER. SEEDETAIL E, SHEET L-8.0.6' HIGH TUBE STEELFENCE. SEEDETAIL B, SHEET L-8.0.6' HIGH TUBE STEELFENCE WITHPILASTER. SEEDETAIL E,SHEET L-8.0.WATER QUALITY &DETENTION BASIN.SEE SHEET L-4.0 FORENLARGEMENT.ROHNERT PARKEXPRESSWAY ENTRYWAY.SEE SHEET L-7.0, FORENLARGEMENTS6' PROJECT WALL WITH STONEVENEERED PILASTERS. SEEDETAIL D, SHEET L-8.0.6' PROJECT WALL WITH STONEVENEERED PILASTERS. SEEDETAIL D, SHEET L-8.0.ROHNERT PARKEXPRESSWAYENTRYWAY. SEESHEET L-7.0 FORENLARGEMENTS.PARCEL FPARCEL G KERRY ROAD HINEBAUGH CREEKVAST OAKEASTVAST OAKWESTROHNERT PARK EXPRESSWAYCOPELAND CREEKTWINCREEKSPARKKARRINGTON ROAD NT L-7.0Scale: 1" = 20'-0"0'10'20'40'80'Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.Development Area PlanNORTHLandscape PlanRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691UDLLC at University DistrictENTRYWAYSProject No. 04220DECEMBER 10, 2020 Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.L-8.0Scale: See DetailDevelopment Area PlanNORTHLandscape DetailsRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691ACONCRETE PAVINGSCALE: 1-1/2" = 1'-0"1CONCRETE PAVING.4"234CLASS II AGGREGATE BASE,COMPACTION, & THICKNESS PER SOIL'SREPORT RECOMMENDATION.56REINFORCING PER SOIL'S REPORTRECOMMENDATION.1/2" TOOLED RADIUS.COMPACTED SUBGRADE ORENGINEERED FILL.1/4" WIDE X 3/4" DEEP TOOLED CONTROLJOINT (SEE PLANS).73/8" WIDE FIBER FILLED EXPANSIONJOINT W/ POLYSULFIDE SEALANT.SEALANT COLOR TO MATCH ADJACENTPAVING. SEE PLAN FOR LOCATION.8FINISH GRADE. 2" BELOW TOP OFPAVING FOR PLANTING AREA.9THICKENED EDGE AT PLANTING AREAWHERE REQUIRED OR UNDERPEDESTALS.1236"896745ACOUSTIC/PROJECT WALL W/ STONE VENEER PILASTERSSCALE: 1/2" = 1'-0"3746' AS VIEWED FROM PERIMETEROR EXTERIOR OF WALL5 566NOTE:1.SEE STRUCTURAL ENGINEER'SDRAWINGS @ BACK OF SET FORFOOTINGS & REINFORCEMENT.2.VINES TO BE PLANTED ON WALL W/MEDIAN SIZED SHRUB IN FRONT.3.WALL SHALL REQUIRE A SEPARATEBUILDING PERMIT.11'-0"2'-0"78972878792'-0"8"21WALL CAP. CLASSIC 10" BY STEPSTONE, COLOR 'ALMOND'.FINISH GRADE.PILASTERS AT CORNERS,ENDS AND EVERY PROPERTY LINE INTERSECTION WITHSTONE VENEER SEE STRUCTURAL ENGINEER'S DRAWINGS.PILASTER VENEER. NEW EURO CASTLE 'CHARDONNAY' BY CULTURED STONE.PILASTER CAP. 28" CLASSIC BY STEPSTONE, COLOR 'ALMOND'.DSM CONCRETE MASONRY UNITS. BASALITE SPLIT FACED BOTH SIDES, COLOR 505.REINFORCEMENT PER STRUCTURAL ENGINEER'S DRAWINGS.FOOTING PER STRUCTURAL ENGINEER'S DRAWINGS.COMPACTED SUBGRADE OR ENGINEERED FILL.34DETAIL B, C, D & E: ALL WALL, PILASTER &FENCE COLORS & MATERIALS MATCH CITYAPPROVED COLOR SCHEME FOR VAST OAK.UDLLC at University DistrictUDLLC FINAL MAPProject No. 04220DECEMBER 10, 20206' HIGH TUBE STEEL FENCE WITH PILASTERSCALE: 1/2" = 1'-0 "543211" x 1-1/2" SQUARE 16 GA TUBULAR STEELTOP AND BOTTOM RAILS.2" SQUARE 16 GA TUBULAR STEEL POSTS -SET IN CONCRETE FOOTING.5/8" SQUARE 18 GA TUBULAR STEEL PICKETS.PILASTER.CONCRETE FOOTING PER STRUCTURALENGINEER'S DRAWINGS OR SHOPDRAWINGS.FINISH GRADE.COMPACTED SUBGRADE OR ENGINEEREDFILL.REINFORCEMENT PER STRUCTURALENGINEER'S DRAWINGS.REINFORCEMENT PER STRUCTURALENGINEER'S DRAWINGS.FOOTING PER STRUCTURAL ENGINEER'SDRAWINGS.REINFORCEMENT PER STRUCTURALENGINEER'S DRAWINGS.68'-0"+/- O.C.6'-0"3"CLR.43157NOTE:1.REFER TO CITY'S MANUAL OF STANDARDS.2.PANELS AND POST ARE GALVANIZED STEEL W/"EPOXY" FINISH, COLOR SHALL BE 'BLACK'. SEEAPPROVED SHOP DRAWINGS.2'-0"3'-0" SQ.78910611891011DE6' HIGH TUBE STEEL FENCESCALE: 1/2" = 1'-0 "543211" x 1-1/2" TUBULAR STEELTOP,BOTTOM AND MID RAILS.1-1/2" SQUARE TUBULAR STEELPOSTS - SET IN CONCRETEFOOTING.5/8" TUBULAR STEEL PICKETS.CONCRETE FOOTING PERSTRUCTURAL ENGINEER.FINISH GRADECOMPACTED SUBGRADE68'-0" O.C.6'-0"3"CLR.2131546NOTE:1.FOR REFERENCE ONLY. REFERTO CIVIL ENGINEER'S PLANS FORSPECIFICATION AND DETAIL ORCITY'S MANUAL OF STANDARDS.TUBE STEEL VEHICULAR ACCESS GATESSCALE: 3/8" = 1'-0"1'-0"6'-0"1'-6"1'-0"3-7/8" MAX5/8" TUBE STEEL PICKETS5/8" TUBE STEEL CROSSMEMBERSPLATES TO BOTTOMOF POSTSCONCRETE FOOTINGEXTENDED FOOTINGAT FENCE CORNERS1234568912347256876'-0"6'-0"1" X 1½" TUBE STEEL TOP1½" SQ. TUBE STEEL POSTWELD 4" X 4" X 3/8" STEELCANE BOLT AND SLEEVE IN GROUND.NOTE:1.FOR REFERENCE ONLY. REFER TOCIVIL ENGINEER'S PLANS FORSPECIFICATION AND DETAIL OR CITY'SMANUAL OF STANDARDS.9DOUBLE PADLOCKFLANGES TO THE OUTSIDE.AND BOTTOM RAILSAT 6' O.C. MAXIMUMBC Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.L-9.0Scale: See DetailDevelopment Area PlanNORTHLandscape DetailsRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691UDLLC at University DistrictUDLLC FINAL MAPProject No. 04220DECEMBER 10, 2020SCALE: 1/2" = 1'-0"CMU CONSTRUCTION. GROUT CELLS SOLID.REINFORCEMENT PER STRUCTURAL ENGINEER.CONCRETE FOOTING & REINFORCEMENT PERSTRUCTURAL ENGINEER.TAPERED PILASTER. VENEER SPECIFICATIONREFER TO WALLS & FENCES PLANS PREPARED BYVTA.BRICK CAP. RUNNING BOND OVER END PROFILE.BRICK TO MATCH PREVIOUS PORTALS.BRICK BASE, 2 RUNNING BOND BANDS ABOVE ANDBELOW 45° ON EDGE. FOR BRICK SPECIFICATIONREFER TO CONSTRUCTION CALLOUT LEGEND,SHEETS L-9 THROUGH L-15.SIDEWALKBRONZE CARRIAGE LIGHT (2). FRANKLIN IRONWORKS LV 2254WL-OR-M, COLOR "186" AVAILABLETHROUGH LAMPS PLUS. ELECTRICAL CONTRACTORTO REMOVE 120V SOCKET AND WIRING ANDREPLACE W/ EMBER LED SHELTER VSH LED LIGHT#VSH-350-T5. PROVIDE FOR FIXTURES TO BEDIMABLE. RUN WIRING THROUGH PILASTERS PERALL APPLICABLE CODES.6745321NOTE:-ALL WOOD MEMBERS SHALL BE SELECTREDWOOD, STAINED AND SEALED WITH OLYMPICSEMI SOLID ELITE, COLOR 'TIMBERLINE'.-REFER TO STRUCTURAL ENGINEER'S DRAWINGSFOR FOOTINGS, REINFORCEMENT ANDCONSTRUCTION/ CONNECTIONS.887'-6"5467109112'-0"MIN. TYP.1312'-0"1'-3"12410119394'-0"14aFRONT ELEVATIONPLAN VIEW1414TWO POST ENTRANCE PORTAL8X8 BEAM. CONNECTIONS TO PILASTER ANDOTHERS PER STRUCTURAL ENGINEER.10X8 JOIST. CONNECTIONS TO PILASTER ANDOTHERS PER STRUCTURAL ENGINEER.4X4 LATTICE @ 12" O.C.COMPACTED SUBGRADE OR ENGINEERED FILL.ADJACENT PLANTER WALL. SEE DETAIL B, THISSHEET. TIE REINFORCEMENT TOGETHER.EMBER LED (201) 228-0880 STRUCTURE MOUNTEDSOLAR PANEL CENTERED ABOVE LATTICE, OVERBEAMS.NEMA 3 BATTERY ENCLOSURE AVAILABLETHROUGH EMBER LED (201) 228-0880. PAINT TOMATCH TRELLIS STRUCTURE. CONCEAL ALL WIRINGIN PAINTED CONDUIT. RUN CONDUIT OUT OF VIEW.MOUNT BOX AWAY FROM STREET VIEW.91011121314a14SCALE: 1/2" = 1'-0"BRONZE CARRIAGE LIGHT (2). FRANKLIN IRON WORKS LV2254WL-OR-M, COLOR "186" AVAILABLE THROUGH LAMPS PLUS.ELECTRICAL CONTRACTOR TO REMOVE 120V SOCKET AND WIRINGAND REPLACE W/ EMBER LED SHELTER VSH LED LIGHT #VSH-350-T5.PROVIDE FOR FIXTURES TO BE DIMABLE. RUN WIRING THROUGHPILASTERS PER ALL APPLICABLE CODES.8X8 BEAM. CONNECTIONS TO PILASTER AND OTHERS PERSTRUCTURAL ENGINEER.10X8 JOIST. CONNECTIONS TO PILASTER AND OTHERS PERSTRUCTURAL ENGINEER.4X4 LATTICE @ 12" O.C.COMPACTED SUBGRADE OR ENGINEERED FILL.ADJACENT PLANTER WALL. SEE DETAIL C, THIS SHEET. TIEREINFORCEMENT TOGETHER.EMBER LED (201) 228-0880 STRUCTURE MOUNTED SOLAR PANELCENTERED ABOVE LATTICE, OVER BEAMS.NEMA 3 BATTERY ENCLOSURE AVAILABLE THROUGH EMBER LED (201)228-0880. PAINT TO MATCH TRELLIS STRUCTURE. CONCEAL ALLWIRING IN PAINTED CONDUIT. RUN CONDUIT OUT OF VIEW. MOUNTBOX AWAY FROM STREET VIEW.67887'-6"5467109112'-0"MIN. TYP.131293910'-0"16'-0"12"101149PLAN VIEWSCALE: 1/4" = 1'-0"1'-4"6NOTE:-ALL WOOD MEMBERS SHALL BE SELECTREDWOOD, STAINED AND SEALED WITH OLYMPICSEMI SOLID ELITE, COLOR 'TIMBERLINE'.-REFER TO STRUCTURAL ENGINEER'S DRAWINGSFOR FOOTINGS, REINFORCEMENT ANDCONSTRUCTION/ CONNECTIONS.N4321CMU CONSTRUCTION. GROUT CELLS SOLID.REINFORCEMENT PER STRUCTURAL ENGINEER.CONCRETE FOOTING & REINFORCEMENT PER STRUCTURAL ENGINEER.TAPERED PILASTER. FOR VENEER SPECIFICATION REFER TO CONSTRUCTIONCALLOUT LEGEND, SHEETS L-9 THROUGH L-15.BRICK CAP. RUNNING BOND OVER END PROFILE. FOR BRICK SPECIFICATIONREFER TO CONSTRUCTION CALLOUT LEGEND, SHEETS L-9 THROUGH L-15.BRICK BASE, 2 RUNNING BOND BANDS ABOVE AND BELOW 45° ON EDGE. FORBRICK SPECIFICATION REFER TO CONSTRUCTION CALLOUT LEGEND, SHEETSL-9 THROUGH L-15.SIDEWALK514101112131414a14a14FOUR POST ENTRANCE PORTALABCSCALE: 1" = 1' - 0"AT BACK OF SIDEWALK6"174431WALL CAP. SEE SHEETS L-7 THROUGH L-11 FORSPECIFICATION.8x8x16 BB CMU PER STRUCTURAL ENGINEER'SDRAWINGS. REFER TO CONSTRUCTION CALLOUTLEGEND, SHEETS L-7 THROUGH L-11.COMPACTED SUBGRADE OR ENGINEERED FILLFINISH GRADE.3/4" DRAIN ROCKHORIZONTAL REBAR PER STRUCTURAL ENGINEER.VERTICAL REBAR PER STRUCTURAL ENGINEER.CONCRETE FOOTING - SIZE PER STRUCTURALENGINEER.PERFORATED 4" PIPE. CONNECT TO CIVILENGINEER'S DRAINLINE OR DAYLIGHT.FILTER FABRIC234565PER STRUCTURAL ENGINEER 628789NOTE:·FOOTINGS AND REINFORCEMENT SHALLBE PER A STRUCTURAL ENGINEER.10910VARIES SEE PLANS - WALL SHALL NOT EXCEED 3'-0" IN HEIGHT 2:1 MAXSPLIT FACED RETAINING WALLDETAIL A, B, C & D: ALL FENCE, WALL, PILASTER& TRELLIS COLORS & MATERIALS MATCH CITYAPPROVED COLOR SCHEME FOR VAST OAK.42" HIGH TUBULAR STEEL FENCESCALE: 3/4" = 1'-0"42"6'-0"4"TYP.1'1'-6" 2"3521674123456721 1/2" SQ. TUBE STEEL POSTS.SET POSTS IN FOOTING ORATTACH TO CONCRETE AT 6'O.C. MAX.1 1/2" SQ. TUBE STEEL TOPAND BOTTOM RAILS.5/8 " TUBE STEEL PICKETSWELD 4" x 4" x 3/8" STEELPLATE TO POST BOTTOM.EACH CORNER TOACCOMODATE 1/4" DIA. x 3"MASONARY BOLT W/EXPANSION SHIELD. AFFIXPOST TO PAVING WHEREOCCURS3-4" x 4" x 3/8" STEEL PLATESCONCRETE FOOTINGCOMPACTED SUBGRADENOTES: - ALL CONNECTIONS TO BE FILLET WELD ANDGROUND SMOOTH - ALL STEEL SHALL RECEIVE ONE PRIMER COATAND TWO COATS SEMI-GLOSS BLACK PAINT.- INSTALL IN PLANTING AREAS WHERE POSSIBLE.D Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates.L-10.0Scale: See DetailDevelopment Area PlanNORTHLandscape DetailsRohnert Park, CaliforniaNapa855 Bordeaux Way, Suite 240Napa, CA94558tel: 707.224.2299fax: 707.224.6821www.vanderToolen.comtel: 925.274.1305Walnut Creek700 Ygnacio ValleyRd. Suite 100Walnut Creek, CA94596tel: 916.244.3000West Sacramento2101 Stone Blvd.Suite 115W.Sacramento,CA 95691ATREE STAKING N.T.S.234567811234856TREE.2" DIAMETER LODGE POLEPINE STAKE SET 30" INTOGRADE OR UNDISTURBEDSUBGRADE A MINIMUM OF12" BELOW BOTTOM OFROOTBALL. PLACE STAKESPERPENDICULAR TOPREVAILING WINDS.RECYCLED RUBBER TWISTTIES - KNOT AND ATTACH TOSTAKE W/ ROOFING TACK.TREE ROOTBALLSET ON LIGHTLYTAMPED SOIL. DONOT PENETRATEROOTBALL WITHSTAKES.3" DEEP WATERINGBASIN W/ 2" DEPTHBARK MULCHFINISH GRADE.AMENDED BACKFILL.(4) PLANT TABLETSRUBBER TWISTTIES WRAPPED INA FIGURE "8"AROUND TRUNKTWICE ROOTBALLDIAMETER6"12"1/2 1/2 4"TO FIRST BRANCHPREVAILINGWINDPLANELEVATION752NOTE:-SCARIFY SIDES OF PLANTING PIT.-FERTILIZER TABS ARE NOT TO BEUSED WITH CALIFORNIA NATIVEPLANTS.-DO NOT USE AMENDED SOIL FORCALIFORNIA NATIVE TREES.-SET CROWN OF ROOTBALL 1"ABOVE GRADE.SHRUB N.T.S.SHRUB - SET CROWN OF ROOTBALL 2" ABOVEFINISH GRADE.3" HIGH WATERING BASIN.FINISH GRADE.AMENDED BACKFILL.SET ROOTBALL ON LIGHTLYTAMPED SUPPORT.(2) 21 GRAM PLANT TABLETS.3" DEPTH MULCH.COMPACTED SUBGRADE OR ENGINEERED FILL.1. FERTILIZER TABS ARE NOT TO BE USED WITH CALIFORNIANATIVE SHRUBS.2. DO NOT USE AMENDED SOIL FOR CALIFORNIA NATIVE SHRUBS.TWICE ROOTBALLDIAMETER6"1" NOTE:1123456788643257CBCN.T.S.GROUND COVER SPACING CHARTAAPLANTING GRID:A = TRIANGULAR SPACINGB= ROW SPACING*C=PERIMETER SET-BACKPLANT SPACING SCHEDULE:6"12"18"24"36"31"±21"±16"±10 1/2"±5"±* 0.866 X A4"10"12"18"24"CBUDLLC at University DistrictUDLLC FINAL MAPProject No. 04220DECEMBER 10, 2020SHRUB - ON SLOPEN.T.S.1234567SET SHRUB CROWN 1" ABOVEFINISH GRADE.2" DEEP BASIN WITH BARKMULCH (2" DEPTH).FINISHED GRADE.AMMENDED BACKFILL.SET ROOTBALL ONUNDISTURBED SOIL.PLANT TABLETS.NATURAL OR GRADED SLOPENOT EXCEEDING 2:1 OR PERSOILS REPORT.1245637NOTE:-SCARIFY SIDES OF PLANTING PIT.-FERLTILIZED TABS ARE NOT TO BE USE WITH CALIFORNIA NATIVE PLANTS.-DO NOT USE AMENDED SOIL FOR CALIFORNIA NATIVE SHRUBS.ROOTBALL DEPTH 4"TWICE ROOTBALLDIAMETERD PARCEL G 175 172 184 183 180 179 176 163 151 152 155 156 159 160 35 32 31 28 27 24 23 5 6 9 10 13 14 17 18 92 75 87 80 88 79 91 76 100 67 95 72 96 71 99 68 103 64 194 197 190 193 189 41 58 57 54 53 50 49 46 45 42 171 164 44 47 48 51 52 55 56 43 59 2061 33 22 25 26 29 30 15 12 11 8 7 4 107 120 108 111 112 115 116 119 138 126 142 129 130 133 134 137 199 196 195 192 191 123 167168 40 165 150 153 154 157 158 161 162 148187 106 113 114 118 147 121 146 109 110 122 PARCEL C 39 36 34 3 2 1 38 198 117 84 89 90 93 94 97 98 101 86 102 8385 82 70 73 74 77 78 65 81 66 69 PARCEL B 202 203 201 200 188 174 177 178 181 182 185 170 173 169 166 149186 124 16 125 139 136 135 132 131 128 141 127 143 19 6263104105 140 2160 204 PARCEL E 145 144 37 PARCEL A PARCEL D PARCEL H KARRINGTON PLACE ROHNERT PARK EXPRESSWAY VAST OAK EAST VAST OAK WEST ROHNERT PARK EXPRESSWAY L-11.0 Project No. 04220Scale: 1" = 100'-0"NORTHDECEMBER 10, 2020 Landscape Master Plan 0'50'100'200'400' MAILBOX LOCATIONS Rohnert Park, California Copyright 2020 vanderToolen Associates. The drawings or written materials contained herein constitute the original and unpublished work of the landscape architect. Reproduction, use or alteration in any form is strictly prohibited without the written consent of vanderToolen Associates. POTENTIAL ROUTING UDLLC FROM VAST OAK WEST NTS Napa 855 Bordeaux Way, Suite 240 Napa, CA 94558 tel: 707.224.2299 fax: 707.224.6821 www.vanderToolen.com tel: 925.274.1305 Walnut Creek 700 Ygnacio Valley Rd. Suite 100 Walnut Creek, CA 94596 tel: 916.244.3000 West Sacramento 2101 Stone Blvd. Suite 115 W.Sacramento, CA 95691 MAILBOX DISTRIBUTION MAILBOX ENCLOSURE Q - 53 LOTS (3) 20-UNIT CLUSTER MAILBOXES (2) 3-UNIT PARCEL BOXES MAILBOX ENCLOSURE R - 54 LOTS (3) 20-UNIT CLUSTER MAILBOXES (2) 3-UNIT PARCEL BOXES MAILBOX ENCLOSURE S - 42 LOTS (3) 20-UNIT CLUSTER MAILBOXES (2) 3-UNIT PARCEL BOXES MAILBOX ENCLOSURE T - 54 LOTS (3) 20-UNIT CLUSTER MAILBOXES (2) 3-UNIT PARCEL BOXES MAILBOX ENCLOSURE TYPICAL SCALE: 1/4" = 1'-0" ELEVATION 1 2 3 4 5 6 7 8 1P 2P 18 17 16 15 14 13 12 9 10 20 19 STANDING SEAM METAL ROOF WITH SCUPPER DRAINAGE THROUGH PILASTERS AND FACE OF CURB. ROOF SHALL BE 'COOL DARK' DURATECH 5000 AEP SPAN TO MATCH PARK STRUCTURES. STEEL TRELLIS. COLOR SHALL BE 'RAL 7047 GREY' TO MATCH PARK STRUCTURE. SEE STRUCTURAL ENGINEER'S DRAWINGS AND CALCULATIONS FOR MATERIALS, CONSTRUCTION AND REINFORCEMENT. (3) 20 UNIT CBU MAILBOXES AND (2) 3 PARCEL ONLY BOXES*, FRONT LOADING. REFER TO MAILBOX LEGEND, THIS SHEET, FOR SPECIFICATIONS AND LOCATIONS. 2' X 3' PILASTERS WITH STONE VENEER TO MATCH PROJECT WALL. FOR CONSTRUCTION AND FOOTING REFER TO STRUCTURAL ENGINEER'S DRAWINGS. MANUFACTURER'S PEDESTAL. EMBER LED "ESHINE" SHELTER SYSTEM (201) 228-0880. SOLAR PANEL AND LED LIGHTING PER ELECTRICAL CONTRACTOR. 2 LIGHTS PER BAY. SUBMIT SHOP DRAWINGS TO DEVELOPER AND LANDSCAPE ARCHITECT FOR APPROVAL. NOTES: - SHOP DRAWINGS FOR STEEL OVERHEAD, ROOF PANELS, GUTTER AND DOWNSPOUTS SHALL BE PREPARED AND SUBMITTED TO DEVELOPER AND LANDSCAPE ARCHITECT FOR APPROVAL. - STRUCTURES SHALL BE SUBMITTED TO BUILDING DEPARTMENT FOR BUILDING PERMIT. SECTION VIEW 2 12'-0" +/- 6'-0" 1'-6"10'-0" +/-EQ.EQ. 2'-0"1'-5"1'-2"1'-8" TYP.2'-0" 3 4 5 8 9 10 8 12 9 11 4 3 GOOD NEIGHBOR FENCE OR PROJECT WALL AT PROPERTY LINE WHERE IT OCCURS. SEE UDLLC WALLS AND FENCES PLANS PREPARED BY VTA. CONCRETE SIDEWALK PER CIVIL ENGINEER. PARKWAY. REFER TO UDLLC PRODUCTION PLANS FOR PLANTING AND IRRIGATION. STREET AND CURB. CITY APPROVED TRASH/RECEPTACLE CONTAINER. TRASH RECEPTACLES SHALL BE CITY APPROVED DOUBLE CASSIDY 08CL1708, BLACK. EXPANSION BOLT TO CONCRETE PER MANUFACTURER'S SPECIFICATIONS. AVAILABLE THROUGH BARCO PRODUCTS. BOLT TO CONCRETE PER MANUFACTURER'S SPECIFICATIONS. LOCATION PER PLAN. CONCRETE PAVING. 4" PVC DRAIN THROUGH FACE OF CURB. PROJECT PILASTER AT PROPERTY LINE CORNERS. DOG PICK-UP STATION. 1 2 3 4 5 6 7 8 9 10 11 2 7 6 1 2 PLAN VIEW 7 12 61 2'-6"2'-6"10 12 13 12 4 13 3P 2P 1P 2P 1P LP LC 14 14 1215 15 11 1 2 3 4 5 6 7 8 1P 2P 18 17 16 15 14 13 12 9 10 20 19 11 1 2 3 4 5 6 7 8 1P 2P 18 17 16 15 14 13 12 9 10 20 19 11 3P A Q R S T 4-Pack Motorcourt Lots at University District UDLLC T S R Q *MAILBOX LOCATIONS ARE SUBJECT TO FINAL APPROVAL BY USPS. Resolution 2023-07 1 EXHIBIT B UNIVERSITY DISTRICT LLC DEVELOPMENT AREA PLAN I (DAP I) CONDITIONS OF APPROVAL ON-GOING CONDITIONS The conditions below shall apply to UDLLC Development Area Plan I (DAP I) within the University District Specific Plan. The University District shall be developed in accordance with the General Plan (GP), University District Specific Plan (UDSP) including Design Guidelines, Mitigation Measures (MMs) identified in the UDSP Final Environmental Impact Report (FEIR), Development Agreement (DA) between the City and University District LLC, the Rohnert Park Municipal Code (RPMC), and the Design and Construction Standards. General Requirements 1) The applicant shall comply with all documents approved by the City Council and adhere to all verbal representations and exhibits presented by the applicant at the Planning Commission and\or City Council meeting for approval of the University District Specific Plan project and this Project unless subsequently revised by the City. 2) In case of conflict between the various documents, the following order shall prevail: General Plan, UDSP, Mitigation Measures for the FEIR, RPMC, DA, Tentative Map and its Conditions of Approval, UDLLC DAP I and conditions of approval, and Design and Construction Standards. 3) The applicant shall comply with the FEIR. In addition, the applicant shall pay the cost to monitor the mitigation measures identified in the FEIR for the UDSP Project (SCH # 2003122014) kept on file in the Development Services Department. The requirements contained in the Mitigation Monitoring Program (MMP) shall be incorporated into these conditions and constructed in accordance with the MMP. 4) The applicant agrees to indemnify, hold harmless and defend the City, its officers, agents, elected and appointed officials, and employees, from any and all liability or claims that may be brought against the City arising out of its approval of UDLLC DAP I. 5) By accepting the benefits conferred under UDLLC DAP I, the applicant acknowledges all the conditions imposed and accepts the DAP subject to those conditions with full awareness of the provisions of the Specific Plan, as may be amended from time to time, and the RPMC, as applicable. 6) The use of the property by the applicant/grantee for any activity authorized by UDLLC DAP I shall constitute acceptance of all of the conditions and obligations imposed by the City on the DAP. The applicant/grantee by said acceptance waives any challenge as to the validity of these conditions. ( 2 ) 7) All improvements shall comply with all applicable sections of the City of Rohnert Park Municipal Code and any other applicable relevant plans of affected agencies, unless superseded by the Specific Plan for this property. 8) The development of this phase shall be consistent with all other approvals associated with this project (e.g. UDSP/Design Guidelines, Tentative Map, DA). 9) The applicant shall obtain all necessary permits and clearances from the Rohnert Park Building and Public Safety Departments prior to occupancy of the project. 10) Any covenants, conditions, and restrictions (CC&R’s) applicable to the project property shall be consistent with the terms of these conditions and the City Code. If there is conflict between the CC&R’s and the City Code or these conditions, the City Code or these conditions shall prevail. Site Plan, Landscaping and Signs 11) All improvements shall be in conformance with the submitted Site Plans, Parkway and Streetscape Plans, and Landscape Plans, except as modified herein. 12) All plant materials proposed for use within the DAP areas of UDLLC shall be in conformance with the University District Plant Material Matrix contained in Appendix B of the Specific Plan. 13) The design of all entrances to the site shall be subject to Department of Public Safety approval. 14) The designs and locations of decorative paving treatments shall be subject to staff review and approval. 15) The Planning Manager shall have the authority to administratively approve minor variations to the DAP that may be subsequently proposed following DAP approval. 16) Design and placement of walls and fences, including acoustic walls, fences, and gates, for each neighborhood or land use district shall be in accordance with the standards included in UDLLC DAP I and shall be approved by planning staff. Open view fencing (at least 50% open) shall be used adjacent to open space parcels to ensure visibility. 17) All exterior lighting shall be designed so as to prevent any spillover lighting onto adjacent properties and rights-of-way. Lighting elements will be required to be recessed within their fixtures to prevent glare. New lighting levels provided shall be compatible with general illumination levels in existing areas to avoid a noticeable contrast in light emissions, consistent with the need to provide for safety and security. Exterior project lighting shall be reviewed and approved by Development Services Director. 18) The design of any entry monument signage shall be submitted to the Planning Division for review and approval prior to installation. ( 3 ) 19) The project applicant shall design and construct all project facilities in accordance with the most recent seismic standards of the California Building Standards Code. 20) The applicant shall design and construct the foundations for all project structures using standard engineering practices that account for, and minimize damage resulting from, expansive soil conditions. Specific design and constructed methods shall be as directed by Mitigation Measure GE0-8a of the FEIR for this project. 21) All trees within five feet of the public right-of-way shall have root barriers that are approved by the Engineering Division. 22) A permanent automatic sprinkler shall be installed to maintain all landscape materials and areas. 23) The applicant's engineer shall coordinate with the City Engineer to ensure that recycled water is used for irrigation of the project's landscaping, if available. 24) The final location for mailbox enclosures, enclosure sizes, and total number of mailboxes and parcel boxes per enclosure shall be subject to review and approval by the Planning Division and United States Post Office. Site Improvements 25) All double-check valves provided for domestic water and fire sprinkler systems shall be concealed from any public streets with decorative walls and landscaping. Plans shall be submitted to the Development Services Department and City Engineer for review and approval. 26) Any existing overhead utilities within the subdivision and all proposed utilities shall be placed underground. 27) Any changes in sidewalk configuration due to site grades and transformer locations shall be subject to review and approval by the Planning Manager and City Engineer. Construction Mitigation 28) For any project requiring an on-site inspector to monitor grading and/or development, the applicant shall deposit funds with the City to cover the full cost of an inspector prior to any land disturbance. The City Engineer, as appropriate, shall approve the amount and hire the inspector. 29) The developer shall comply with construction hours pursuant to Rohnert Park Municipal Code Section 9.44.120. 30) All construction material waste and other debris shall be recycled to the extent feasible. The applicant shall present a “clean site everyday” program to City building staff for approval. The program shall include on-site signage in English and Spanish to be posted ( 4 ) at construction entrances. No animals shall be brought on site by construction personnel during work hours. 31) All material storage areas shall be fenced with at least a 6-foot high chain link fence with at least two separate points of access with sufficient width for emergency vehicles. The access points shall be shown on the construction fire and security protection site plan. Page 1 City of Rohnert Park Planning Commission Report Meeting Date: April 13, 2023 Item No: 6.2 Prepared by: Jeffrey Beiswenger, Planning Manager Paul Carey, Senior Analyst Agenda Title: Downtown Project Update Location: 6400 State Farm Drive Applicant/Owner: City of Rohnert Park RECOMMENDED ACTION: None. Presentation Only. BACKGROUND: In March 2016, the City adopted the Central Rohnert Park Priority Development Area Plan and Program EIR. This grant-funded planning effort that covers 300 acres generally bounded by Highway 101 to the west, the SMART right-of-way to the east, Commerce Boulevard to the north and Avram Avenue/Santa Alicia Drive to the south, has at its heart the concept of developing a downtown district for Rohnert Park, centered on the area around Rohnert Park Expressway and State Farm Drive. The common theme of a downtown Rohnert Park is a walkable, mixed use district comprised of food, art, and beverage destinations; with a rich and interesting public realm consisting of walkable streets, pockets parks, and a central green space, all while providing downtown residential unit living, supporting a diversity of incomes and lifestyle options. In April 2022, after several unsuccessful development attempts by private interests, the City purchased the 30-acre property at the southeast corner of Rohnert Park Expressway and State Farm Drive (6400 State Farm Drive) to make greater progress on developing a “downtown” district in Rohnert Park. Since the City purchase of the property, we have had multiple inquiries from the development community. We have maintained an open-door policy and have been willing to meet with development interests on various site development ideas. We have made it clear that the ultimate development of the property would have to follow a public and transparent process. Through these meetings have learned that: • Residential development remains the most profitable development type in the region • Retail development is difficult to build due to construction costs and follow on lease rates • A mixed -use project would work, since the new residential could support the retail development. • Providing a unique downtown environment could be attractive to both residential and retail devel- opers. While staff is committed to leading the City’s efforts in developing a downtown district, staff also recognizes that working with a private partner(s) will likely be necessary and will require compliance with state’s Surplus Land Act, including provisions for affordable housing. ANALYSIS: Existing Entitlements: In late 2018, City adopted a series of entitlements for the “Station Avenue Project” located on this site. Staff is recommending that these entitlements be rescinded in order to Page 2 provide a “clean slate” for future work on the downtown. A brief summary of these entitlements and the rationale for recision is presented below. • Planned Development Zoning Designation (PD). This zoning district, sets up a two-step design review process for Planning Commission and City Council. With the adoption of the form-based code, the PD designation is duplicative and removing the designation will streamline the design approval process and reduce the cost of development. • Station Avenue, Final Development Plan, Conditional Use Permit and Tentative Map. These doc- uments establishes the detailed design and development standards for the project proposed by Laulima Development. This is not the project the City intends to have built and rescinding these entitlements will clear the way for future work. • Project Development Agreement (DA). This Development Agreement outlines the “business deal” between the City and the former developer and contains a range of provisions are specific to the Station Avenue developer. Because the DA is recorded against the title of the property, it is binding on future owners (including potentially the City). In order to ensure clear title to the downtown property, the DA should be terminated. Downtown Form Based Code: In 2018, the City adopted a Form-Based Code. A Form-Based Code (FBC) differs from a standard zoning code in that urban design elements (street locations and widths, sidewalk locations and widths, building setbacks etc.) are included in the code in a prescriptive manner so that the City has more certainty about the final look of any development project built within the downtown area. The FBC provides certainty that the future downtown will contain the following components: 1. Strong commercial focus in the Downtown Core. Ground floor commercial uses are required in the Downtown Core district, with optional housing or office the second floor and above. 2. Walkable blocks and streets. Downtown areas tend to have smaller blocks and do not have park- ing lots between public sidewalks and building front doors. The FBC limits the size of blocks and requires the buildings have entrances directly from public sidewalks (or plazas). 3. Building height and “enclosure”. In downtown areas, streets and plazas become “outdoor rooms” and the buildings along the sidewalk form the “walls” to these outdoor rooms. A certain amount of building height is desired to create “enclosure” along public streets to help create inviting out- door sidewalks and plaza environments. The FBC also include regulations related to the design of buildings to avoid long blank wall and to minimize private parking lots along the sidewalk edge. 4. Residential development with a “downtown feel”. The FBC has development standards related to residential development that will prevent “walled off” or internally focused apartments. Residen- tial units will have a direct relationship to the public sidewalk through porches, stoops, balconies and other features. 5. Street standards. The FBC includes street cross-section and design standards, which include de- tails and dimensions for vehicle lanes, medians (if any), bicycle lanes widths, parking, and side- walks. The street standards are intended to create safe environments for pedestrians with an em- phasis of street crossings and streets designed for low speed automobile travel. 6. Urban Parks. The FBC specifically requires parks and plazas that create spaces for informal gath- erings, small scale music performance and other activities. The code includes detail design stand- ards to ensure that the parks and plazas will complement the urban, pedestrian oriented downtown environment. Since the adoption of the Central Rohnert Park Priority Development Plan, the City has seen many examples of how that plan and the FBC work to create the block pattern, building designs, civic space and other elements of a downtown environment. A series of urban design schemes have been developed for the downtown, demonstrating that the FBC consistently produces design solutions that incorporate a downtown retail core, urban plazas, walkable block lengths and opportunities for multi-modal Page 3 transportation. The consistent themes of these various plans provides strong assurance that the City’s vision for downtown can be developed, particularly in light of the City’s willingness to invest in the infrastructure and affordable housing components that have proven to be barriers to previous project proposals. Surplus Land Act Compliance Strategy: The FBC gives the City strong control of its downtown site and the City’s investments provides the catalyst for the development of a fully realized downtown district. However, in order to accomplish complete development of the downtown, the City will need private partners to assist in the development of the residential and commercial components. In addition, sale of land to these private partners helps support the City’s ongoing investments in the downtown district. Any public agency seeking to sell its property must comply with the California Surplus Land Act (SLA). In its most simplified form, the SLA, which is found in Government Code sections 54220-54234, requires local agencies disposing of their surplus land to prioritize affordable housing development. The SLA distinguishes between “surplus land” and “exempt surplus land”, based on the amount of affordable housing the local agency is committed to developing: (1) City’s committed to 15% affordable housing must go through the full surplus land act disposal process; or (2) City’s committed to 25% affordable housing can access a streamlined process. The City has successful accomplished the “exempt surplus” designation from HCD. Under the category 2 exemption of the SLA (Government Code section 54221(f)(1)(F)(ii)), the State Farm site would be “exempt surplus” so long as: • the planned development is larger than one acre • the planned development is zoned for mixed use • the planned development will include at least 300 residential units • at least 25% of the residential units will be affordable The category 2 exemption of the SLA works well with City goals, as the affordable housing exemption prioritizes affordable housing, which meets the intent of California’s affordable housing goals, as well as meeting the intent of the City’s strategic goals of ensuring the effective delivery or public services and developing a vibrant community. Additionally, the SLA category 2 exemption gives the City more development flexibility to create the desired walkable mixed-use downtown environment. The first step in downtown development was to clear the SLA, which the City has accomplished. The City intends to build more than 300 units of which at least 25 percent are affordable to low income households; this qualifies the site for an exemption to the SLA. The City sent a draft resolution to HCD to confirm that the 30-acre project site would be exempt; HCD response was the “resolution sufficiently demonstrates that the Property is ‘exempt surplus land’ under the Surplus Land Act because the City intends to dispose of the property, which is more than one acre in area, for a mixed-used development project pursuant to the requirements found in Government Code section 54221(f)(1)(F)(ii)”. The Council approved the resolution on March 14, 2023 declaring the 30-acre parcel “exempt surplus land”. The next step in preparing the site for development is to rescind the existing entitlements that were adopted by the City to facilitate the Station Avenue project. Staff is in the process of preparing the resolutions necessary to rescind the entitlements and will return to the Planning Commission for a recommendation at a future meeting. Staff is also in the process of preparing an RFQ/RFP for development partners to develop the downtown site, including appropriate affordable housing and ensuring that City and resident land needs are paramount. Land needs include increased acreage for the Public Works site, open spaces and parks usage, and the affordable housing footprint. Planning Manager Approval Date: 3/29/2023