2024/04/23 City Council Resolution 2024-027 RESOLUTION NO. 2024-027 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROHNERT PARK FINDING THE SOUTHWEST BOULEVARD COMPLETE STREETS PROJECT, PROJECT NO. CIP2023, EXEMPT FROM THE CALIFORNIA ENVIRONMENAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15301, APPROVING THE PLANS AND SPECIFICATIONS, AWARDING THE CONSTRUCTION CONTRACT TO TEAM GHILOTTI, INC. FOR $2,852,349, AUTHORIZING THE CITY MANAGER TO APPROVE UP TO $427,852.35 (15%) IN CHANGE ORDERS, AND AUTHORIZING TASK ORDER 2023-01 WITH GHD, INC FOR CONSTRUCTION MANAGEMENT SERVICES FOR$259,988 WHEREAS, the Southwest Boulevard Complete Streets Project is a roadway reconstruction project along Southwest Boulevard between the roundabout at Commerce Boulevard and east of Adrian Drive; and WHEREAS, the Project will improve safety and convenience for pedestrians, bicyclists, and motorists traveling within and to the area; and WHEREAS,the plans and specifications for the Project were prepared by BKF Engineers and approved by the City Engineer; and WHEREAS, consistent with Public Contract Code, an invitation for bids was posted and published on February 16th, 2024 and February 23`d, 2024; and WHEREAS,five(5) sealed bids were received at the bid opening on February 28th , 2024, and were publicly opened; and WHEREAS, staff reviewed bids and determined that Team Ghilotti. Inc submitted the lowest responsive and responsible bid in an amount of$2,852,349.00; and WHEREAS, staff solicited a request for proposals and determined that GHD, Inc. is the most qualified consultant for Construction Management and Inspection services and recommends procuring their services through Task Order No 2024-02 for $259,988.00. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Rohnert Park that it does hereby authorize and approve as follows: 1. The above recitals are true and correct and material to this Resolution. 2. The City Manager is hereby authorized to approve up to 15% ($427,852.35) in Construction Change Orders. 3. The City Council determines that the Project is categorically exempt from CEQA pursuant to CEQA Guidelines Sections 15301 c due to work on an existing street and directs staff to file a Notice of Exemption with the Clerk-Recorder's Office for the County of Sonoma. 4. The plans and specifications for the Project, on file with the City Clerk, are hereby approved and adopted. 5. In making its findings, the City Council relied upon and hereby incorporates by reference all of the bid materials, correspondence, staff reports and all other related materials. 6. In accordance with California Public Contract Code Section and any other applicable laws, the City Council of the City of Rohnert Park hereby finds the bid from Team Ghilotti, Inc 4877-7102-3749 v2 for $2,852,349.00 to be the lowest, responsive and responsible bid and waives any irregularities in such bid in accordance with applicable law. 7. The City Manager is hereby authorized and directed to execute the contract with Team Ghilotti Inc., Exhibit A, for the sum of two million eight hundred and fifty two thousand three hundred and forty nine dollars ($2,852,349) for construction of the Project in accordance with the bid documents and applicable law upon submission by Team Ghilotti, Inc. of all documents required pursuant to the Project bid documents. 8. City staff is hereby directed to issue a Notice of Award to Team Ghilotti, Inc. for the Project. 9. The City Manager is hereby authorized to execute Task Order 2024-02 with GHD, Inc. for$259,988 for Construction Management and Inspection Services, as shown in Exhibit B. BE IT FURTHER RESOLVED that the City Manager is hereby authorized and directed to execute documents pertaining to the same for and on behalf of the City of Rohnert Park,and the City Attorney's office is authorized to make minor edits to the documents. DULY AND REGULARLY ADOPTED this 23rd days :pril, 2024. C ►, RI NE :TPARK Sus n H. Adams, Ma or ATTEST: Elizabe h Machado, Assistant City Clerk APPROVED AS TO FORM: Newtat.... Lee Burdick, Assistant City Attorney Attachments: Exhibit A and Exhibit B ELWARD: pUe RODRIGUEZ: ALe SANBORN: e GIUDICE: Pkie.ADAMS: G W AES: (5 ) NOES: ( ) ABSENT: ( 0 � ) ABSTAIN: ( ) Resolution 2023-027 Page 2 of 2 Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-18 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 C O N T R A C T SOUTHWEST BOULEVARD COMPLETE STREETS PROJECT NO. 2020-23 CALTRANS PROJECT NO. CRASL-5379(026) THIS AGREEMENT, made and entered into this _____ day of______________, 2024, by and between Team Ghilotti, Inc., hereinafter called "Contractor", and the City of Rohnert Park, hereinafter called "City". WHEREAS, the City Council of said City has awarded a contract to Contractor for performing the work hereinafter mentioned in accordance with the sealed proposal of said Contractor. NOW, THEREFORE, IT IS AGREED, as follows: 1. Scope of Work: The Contractor must perform all the work and furnish all the labor, materials, equipment and all utility and transportation services required to complete all of the work of construction and installation of the improvements more particularly described in the Resolution adopted by the City Council of said City on April 23, 2024 the items and quantities of which are more particularly set forth in the Contractor's bid therefor on file in the office of the City Clerk, except work to be performed by subcontractors as set forth in the Contractor’s bid and for which the Contractor retains responsibility. 2. Time of Performance and Liquidated Damages: The Contractor must begin work within fifteen (15) calendar days after official notice by the City Engineer to proceed with the work and must diligently prosecute the same to completion within 180 calendar days of that Notice. The Contractor acknowledges and agrees that time is of the essence with respect to Contractor’s work and that Contractor shall diligently pursue performance of the work. In the event the Contractor does not complete the work within the time limit so specified or within such further time as said City Council must have authorized, the Contractor must pay to the City liquidated damages in the amount of Five Thousand Two Hundred Dollars ($5,200) per day for each and every day's delay in finishing the work beyond the completion date so specified. Additional provisions with regard to said time of completion and liquidated damages are set forth in the specifications, which provisions are hereby referred to and incorporated herein by reference. 3. Payments: Payments will be made by City to the Contractor for said work performed at the times and in the manner provided in the specifications and at the unit prices stated in Contractor's bid. The award of the contract is for a total amount of Two Million, Eight Hundred Fifty-two Thousand, Three Hundred Forty-nine Dollars ($2,852,349.00). 4. Component Parts and Interpretation: This contract must consist of the following documents, each of which is on file in the office of the City Clerk and all of which are incorporated herein and made a part hereof by reference thereto: a) This Agreement b) Notice Inviting Sealed Proposals c) Instruction and Information to Bidders Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-19 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 d) Accepted Proposal, with all attachments and certifications e) Performance Bond f) Payment Bond g) Special Provisions h) Standard Specifications i) Technical specifications j) Design Standards k) Plans, Profiles and Detailed Drawings In the event of conflict between these documents, the following order of precedence will govern: this contract; change orders; supplemental agreements and approved revisions to plans and specifications; special conditions; standard specifications; detail plans; general plans; standard plans; reference specifications. In the absence of a controlling or contrary provision in the foregoing, the Standard Specifications (2022 edition) of the California Department of Transportation shall apply to this project. 5. Independent Contractor. Contractor is and will at all times remain as to City a wholly independent contractor. Neither City nor any of its officers, employees, or agents will have control over the conduct of Contractor or any of Contractor’s officers, employees, agents or subcontractors, except as expressly set forth in the Contract Documents. Contractor may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of City. 6. Prevailing Wages: Copies of the determination of the Director of the Department of Industrial Relations of the prevailing rate of per diem wages for each craft, classification or type of worker needed to execute this Contract will be on file in, and available at, the office of the Director at 601 Carmen Drive, Camarillo, California 93010. Contractor must post at the work site, or if there is no regular work site then at its principal office, for the duration of the Contract, a copy of the determination by the Director of the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code § 1773.2.) Contractor, and any subcontractor engaged by Contractor, may pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records. Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor may forfeit as a penalty to City up to $200.00 for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate. Nothing in this Contract prevents Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-20 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under § 1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations. With each application for payment, Contractor shall also deliver certified payrolls to Owner as set forth above in these General Conditions, and concurrently therewith (but in no event less frequently than monthly) directly to the Labor Commissioner in the format prescribed by the Labor Commissioner. If federal funds are used to pay for the Work, Contractor and any subcontractor agree to comply, as applicable, with the labor and reporting requirements of the Davis-Bacon Act (40 USC § 276a-7), the Copeland Act (40 USC § 276c and 18 USC § 874), and the Contract Work Hours and Safety Standards Act (40 USC § 327 and following). 7. Hours of Labor: Contractor acknowledges that under California Labor Code sections 1810 and following, eight hours of labor constitutes a legal day’s work. Contractor will forfeit as a penalty to City the sum of $25.00 for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code section 1810. 8. Apprentices: Attention is directed to the provisions in Sections 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the Labor Code concerning the employment of apprentices by the Contractor or any Subcontractor under him. Section 1777.5, as amended, requires the Contractor or Subcontractor employing tradesmen in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will be used in the performance of the Contract. The ratio of apprentices to journeymen in such cases must not be less than one to five except: A. When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days prior to the request for certificate, or B. When the number of apprentices in training in that area exceeds a ratio of one to five, or C. When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis statewide or locally, or D. When the assignment of an apprentice to any work performed under a public works Contract would create a condition which would jeopardize his life or the life, safety, or property of fellow employees or the public at large, or if the specified task to which the apprentice is to be assigned is of such a nature that training cannot be provided by a journeyman, or Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-21 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 E. When the Contractor provides evidence that he employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to eight journeymen. The Contractor is required to make contributions to funds established for the administration of apprenticeship program if he employs registered apprentices or journeymen in any apprenticeable trade on such Contracts and if other Contractors on the public works site are making such contributions. The Contractor and any Subcontractor under him must comply with the requirements of Section 1777.5 and 1777.6 in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. 9. Labor Discrimination: Attention is directed to Section 1735 of the Labor Code, which reads as follows: "A contractor must not discriminate in the employment of persons upon public works on any basis listed in subdivision (a) of Section 12940 of the Government Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code, except as otherwise provided in Section 12940 of the Government Code. Every contractor for public works who violates this section is subject to all the penalties imposed for a violation of this chapter. " 10. CARB In-Use Off-Road Diesel-Fueled Fleets A. Contractor shall complete and return the “In-Use Off-Road Diesel-Fueled Fleets Certification” attached hereto as Exhibit A to City within fifteen (15) calendar days after this Agreement is fully executed. If Contractor fails to timely do so, City shall have the same rights as if Contractor had breached this Agreement. B. Contractor warrants that it is knowledgeable of and will comply with California Code of Regulations Title 13, Sections 2449, 2449.1, and 2449.2, relating to In-Use Off- Road Diesel-Fueled Fleets (the “Regulations”), issued by the California Air Resources Board (“CARB”) effective October 1, 2023. C. If Contractor or its listed subcontractors intend to use vehicles subject to the Regulations in its performance under this Agreement, Contractor must obtain copies of the valid Certificates of Reported Compliance, as described in Regulation Section 2449(n), for the fleet, if applicable, prior to entering into a new or renewed contract with that fleet. Contractor shall not enter into a contract with a fleet for which it does not have a valid Certificate of Reported Compliance for the fleet and Contractor’s listed subcontractors, if applicable, prior to entering into a new or renewed contract with that fleet. Contractor shall only allow fleets with valid Certificates of Reported Compliance on Contractor’s job sites. D. The Certificates of Reported Compliance received by the Contractor for this Project must be retained for three (3) years after the Project’s completion. Upon request by CARB, these records must be provided to CARB within five (5) business days of the request. E. Between March 1 and June 1 of each year, Contractor must collect new valid Certificates of Reported Compliance for the current compliance year, as defined in Regulation Section Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-22 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 2449(n), from all fleets that have an ongoing contract with the Contractor as of March 1 of that year. Contractor must not write contracts to evade this requirement. F. If Contractor discovers that any fleet intending to operate vehicles subject to the Regulation for Contractor does not have a valid Certificate of Reported Compliance, as defined in Regulation section 2449(n), or if Contractor observes any noncompliant vehicles subject to the Regulation on Contractor’s job site, then Contractor must report the required information to CARB within the time period contained in in the Regulations. G. Upon request by CARB, Contractor must immediately disclose to CARB the name and contact information of each responsible party for all vehicles subject to the Regulation operating at the job site or for Contractor. H. If applicable, Contractor shall prominently display signage for any project where vehicles subject to the Regulation as provided and within the time period contained in in the Regulation. 10. Workmen's Compensation Insurance: In accordance with the provisions of Article 5, Chapter 1, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part 1, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, the Contractor is required to secure the payment of compensation to his employees and must for that purpose obtain and keep in effect adequate Workmen's Compensation Insurance. The undersigned Contractor is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workmen's compensation or to undertake self-insurance in accordance with the provisions of that Code, and will comply with such provisions before commencing the performance of the work of this contract. 11. Indemnity and Insurance: To the fullest extent permitted by law (including without limitation California Civil Code Section 2782), Contractor must indemnify, hold harmless, release and defend City, its officers, elected officials, employees, agents, volunteers, and consultants from and against any and all actions, claims, demands, damages, disability, losses, expenses including, but not limited to, attorney's fees and other defense costs and liabilities of any nature that may be asserted by any person or entity including Contractor, in whole or in part, arising out of Contractor’s activities hereunder, including the activities of other persons employed or utilized by Contractor including subcontractors hired by the Contractor in the performance of this Agreement excepting liabilities due to the sole negligence, intentional misconduct or active negligence of the City. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable by or for Contractor under Worker's Compensation, disability or other employee benefit acts or the terms, applicability or limitations of any insurance held or provided by Contractor and must continue to bind the parties after termination/completion of this Agreement. Contractor shall procure and maintain throughout the time for performance of the work under this Contract the insurance required by the Special Provisions. The requirement that Contractor procure and maintain insurance shall in no way be construed to limit the Contractor’s duty to indemnify City as provided in the paragraph above. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. 12. City Right of Termination and Right to Complete the Work. The City may terminate the Contract when conditions encountered during the work make it impossible or Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-23 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 impracticable to proceed, or when the City is prevented from proceeding with the Contract by act of God, by law, or by official action of a public authority. In addition, the occurrence of any of the following is a default by Contractor under this Contract: A. Contractor refuses or fails to prosecute the Work or any part thereof with such diligence as will insure its completion within the time specified or any permitted extension. B. Contractor fails to complete the Work on time. C. Contractor is adjudged bankrupt, or makes a general assignment for the benefit of creditors, or a receiver is appointed on account of Contractor’s insolvency. D. Contractor fails to supply enough properly skilled workers or proper materials to complete the Work in the time specified. E. Contractor fails to make prompt payment to any subcontractor or for material or labor. F. Contractor fails to abide by any applicable laws, ordinances or instructions of City in performing the Work. G. Contractor breaches or fails to perform any obligation or duty under the Contract. Upon the occurrence of a default by Contractor, the Director will serve a written notice of default on Contractor specifying the nature of the default and the steps needed to correct the default. Unless Contractor cures the default within 10 days after the service of such notice, or satisfactory arrangements acceptable to City for the correction or elimination of such default are made, as determined by City, City may thereafter terminate this Contract by serving written notice on Contractor. In such case, Contractor will not be entitled to receive any further payment, except for Work actually completed prior to such termination in accordance with the provisions of the Contract Documents. In event of any such termination, City will also immediately serve written notice of the termination upon Contractor’s surety. The surety will have the right to take over and perform pursuant to this Contract; provided, however, that if the surety does not give City written notice of its intention to take over and perform this Contract within five days after service of the notice of termination or does not commence performance within 10 days from the date of such notice, City may take over the Work and prosecute the same to completion by contract or by any other method it may deem advisable for the account and at the expense of Contractor. Contractor and the surety will be liable to City for any and all excess costs or other damages incurred by City in completing the Work. If City takes over the Work as provided in this Section, City may, without liability for so doing, take possession of, and utilize in completing the Work, such materials, appliances, plant, and other property belonging to Contractor as may be on the site of the Work and necessary for the completion of the Work. Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-24 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 13. Substitution of Securities for Withheld Amounts: Pursuant to California Public Contracts Code Section 22300, securities may be substituted for any moneys withheld by a public agency to ensure performance under a contract. At the request and sole expense of the Contractor, securities equivalent to the amount withheld must be deposited with the public agency, or with a state or federally chartered bank as the escrow agent, who must pay such moneys to the Contractor upon satisfactory completion of the contract. Securities eligible for substitution under this section must include those listed in the California Public Contracts Code Section 22300 or bank or savings and loan certificates of deposit. The Contractor must be the beneficial owner of any securities substituted for moneys withheld and must receive any interest thereon. Alternatively, the Contractor may request and the City shall make payment of retentions earned directly to the escrow agent at the expense of the Contractor. At the expense of the Contractor, the Contractor may direct the investment of the payments into securities and the Contractor shall receive the interest earned on the investments upon the same terms provided for in Section 22300 for securities deposited by the Contractor. Upon satisfactory completion of the Contract, the Contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the City, pursuant to the terms of this section. Any escrow agreement entered into pursuant to this section must contain as a minimum the following provisions: a. The amount of securities to be deposited; b. The terms and conditions of conversion to cash in case of the default of the Contractor; and c. The termination of the escrow upon completion of the contract. 14. General Provisions A. Authority to Execute. Each Party represents and warrants that all necessary action has been taken by such Party to authorize the undersigned to execute this Contract and to bind it to the performance of its obligations. B. Assignment. Contractor may not assign this Contract without the prior written consent of City, which consent may be withheld in City’s sole discretion since the experience and qualifications of Contractor were material considerations for this Contract. C. Binding Effect. This Agreement is binding upon the heirs, executors, administrators, successors and permitted assigns of the Parties. D. Integrated Contract. This Contract, including the Contract Documents, is the entire, complete, final and exclusive expression of the Parties with respect to the Work to be performed under this Contract and supersedes all other agreements or understandings, whether oral or written, between Contractor and City prior to the execution of this Contract. E. Modification of Contract. No amendment to or modification of this Contract will be valid unless made in writing and approved by Contractor and by the City Council, City Manager or Assistant City Manager, as applicable. The Parties agree that this requirement for written modifications cannot be waived and that any attempted waiver will be void. F. Counterparts, Facsimile or other Electronic Signatures. This Contract may be executed in several counterparts, each of which will be deemed an original, and all of which, Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-25 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 when taken together, constitute one and the same instrument. Amendments to this Contract will be considered executed when the signature of a party is delivered by facsimile or other electronic transmission. Such facsimile or other electronic signature will have the same effect as an original signature. G. Waiver. Waiver by any Party of any term, condition, or covenant of this Contract will not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Contract will not constitute a waiver of any other provision, or a waiver of any subsequent breach or violation of any provision of this Contract. Acceptance by City of any Work performed by Contractor will not constitute a waiver of any of the provisions of this Contract. H. Interpretation. This Contract will be interpreted, construed and governed according to the laws of the State of California. Each party has had the opportunity to review this Contract with legal counsel. The Contract will be construed simply, as a whole, and in accordance with its fair meaning. It will not be interpreted strictly for or against either party. I. Severability. If any term, condition or covenant of this Contract is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Contract will not be affected and the Contract will be read and construed without the invalid, void or unenforceable provision. J. Venue. In the event of litigation between the parties, venue in state trial courts will be in the County of Sonoma. In the event of litigation in a U.S. District Court, venue will be in the Northern District of California. IN WITNESS WHEREOF, the City of Rohnert Park has caused these presents to be executed by its officers, thereunto duly authorized, and Contractor has subscribed same, all on the day and year first above written. CITY OF ROHNERT PARK TEAM GHILOTTI, INC. ____________________________________ Marcela Piedra, City Manager Date Name:_______________________ Date Per Resolution No. ___________adopted by the Rohnert Park City Council at its meeting of April 23, 2024 Title: ________________________ ATTEST: APPROVED AS TO FORM: ____________________________________ City Clerk City Attorney Consultant Executed Contract on file with Clerks Office Attachment 2 – Resolution Exhibit A Southwest Boulevard Complete Streets Page 1-26 Rohnert Park City Proj. No. 2020-23 OAK #4888-9091-9966 v1 EXHIBIT A IN-USE OFF-ROAD DIESEL-FUELED FLEETS CERTIFICATION The undersigned Contractor certifies to the City of Rohnert Park (“Owner” or “City”) as set forth in sections 1 through 2, below: 1. Certification of Compliance. I hereby certify that I and all of my subcontractors will conform to the California Air Resource Board (“CARB”) In-Use Off -Road Diesel-Fueled Fleets requirements for all work involving the use of vehicles subject to the regulations, including, without limitation, as applicable, the Contracting Requirements in Title 13 CCR section 2449, subdivision (i), subparts (1) – (4), and the Prime Contractor Requirements in Title 13 CCR section 2449, subdivision (j), subparts (1) – (5). 2. Instructions. Check one (1) box below. ☐ Contractor’s current CARB issued Certificate of Reported Compliance accompanies this Certification. (If this box is checked, the Certificate must be provided.) ☐ Contractor certifies that its work on the Project (including work of its Subcontractors) does not involve the use of vehicles subject to the CARB In-Use Off-Road Diesel-Fueled Fleets requirements. CONTRACTOR: (Name of Contractor) Date: ___________________, 2024 By: (Signature) Name: (Print Name) Its: (Title) END OF CERTIFICATION OAK #4855-1901-8891 (Rev 10-23) GHD INC. TASK ORDER NO. 2024-02 CITY OF ROHNERT PARK AND GHD INC. AUTHORIZATION TO PROVIDE CONSTRUCTION MANAGEMENT SERVICES FOR THE SOUTHWEST BOULEVARD COMPLETE STREETS PROJECT, PROJECT 2020-23. SECTION 1 – PURPOSE The purpose of this Task Order is to authorize and direct GHD Inc. to proceed with the work specified in Section 2 below in accordance with the provisions of the MASTER AGREEMENT between the City of Rohnert Park (“City”) and GHD Inc. (“Consultant”) hereto dated November 10, 2020. SECTION 2 – SCOPE OF WORK The items authorized by this Task Order are presented in Exhibit A - Scope of Services. SECTION 3 – COMPENSATION AND PAYMENT Compensation shall be as provided in the MASTER AGREEMENT between the parties referenced in SECTION 1 above. The total cost for services as set forth in SECTION 2 shall be based on Consultants’ standard labor charges in accordance with the provisions of the MASTER AGREEMENT and as shown in Exhibit B subject to a not-to-exceed amount of Two Hundred Fifty Nine Thousand Nine Hundred Eighty-Eight Dollars ($259,988.00), which amount shall constitute a guaranteed maximum price for Consultant’s full performance of the entire scope of work under this Task Order. SECTION 4 – TIME OF PERFORMANCE The work described in SECTION 2 shall be completed by December 31, 2024, or as extended by the City Manager, the Director of Public Works, or his/her designee. SECTION 5 – ITEMS AND CONDITIONS All items and conditions contained in the MASTER AGREEMENT for Consulting Services between City and Consultant are incorporated herein by reference. Approved this _____ day of April, 2024. CITY OF ROHNERT PARK GHD INC. ____________________________ Name, Title (Date) Name, Title (Date) GHD INC. Per Resolution No. 2024-___ adopted by the Rohnert Park City Council at its meeting of April 23, 2024 ATTEST: ____________________________ City Clerk Name, Title (Date) APPROVED AS TO FORM: By: _____________________________________ City Attorney Attachment 3 - Resolution Exhibit B Consultant Executed Contract on file with Clerks Office 027 GHD | City of Rohnert Park | 12636789 | City of Rohnert Park CM Services for Southwest Blvd Complete Streets Project 10 3.Work Plan - Construction Management and Inspection Services Scope of Services 3.1 Project Management GHD project management will include preparation and maintenance of budgets and schedules for GHD services, instructions to the GHD Team, preparation of field safety instructions, and routine progress reporting. 3.2 Conduct Kick Off Meeting with City GHD will schedule and attend a kick-off meeting with the City and other parties. 3.3 Conduct Job Walk A job walk will be conducted to review the construction requirements, constraints, sequence of operations, public notifications, methods of traffic control, and related project activities/events. 3.4 Pre-Construction Photo and Video Take video and photos of site prior to construction. 3.5 Pre-Construction Meeting We will prepare an agenda and minutes of the meeting. Special attention will be given to those items that may impact the schedule and/or project funding. 3.6 Construction Progress Meetings Conduct weekly or bi-weekly progress meetings with the Contractor, the City Project Manager, and other involved parties to discuss the progress of the project, review 3-week look ahead schedule, discuss status of submittals, RFIs and other significant issues relating to the Project. Consultant to prepare notes from the meetings, follow up on the issues raised at these meetings to expedite resolution and closure to issues and circulate meeting minutes. 3.7 Submittal and RFI Tracking GHD will utilize web based CMIS construction management software to maintain Requests for Information and track Submittals to confirm that correspondence requiring responses, requests, and submittals are answered in a timely manner, not to exceed five business days from the design engineer. The contractor’s submittal schedule will list all significant submittals required by the specifications and those that are critical to the project’s success. The schedule will identify the expected date that the item is due. The City will review the schedule to confirm that all submittals are listed and that the planned dates allow sufficient time before the item is required on the job site. We will identify those submittals that can be reviewed by the CM Team and those that require review by the design engineer. 3.8 Record Drawings We will monitor contractor’s record drawings throughout the life of the project. Exhibit A GHD | City of Rohnert Park | 12636789 | City of Rohnert Park CM Services for Southwest Blvd Complete Streets Project 11 3.9 Project Files We will maintain project files, which shall be provided to the City at the completion of the Project. The files will contain the following: • Reproductions of original contract documents, including addenda • Notice to Proceed • Correspondence • Meeting minutes • Submittals • Contract change orders and supporting documentation • Clarifications for the contract documents (RFI) • Material delivery tickets and compliance certification • Weekly and monthly progress reports • Meeting minutes • Daily inspection reports • Progress photos • Lab and field test reports • Progress payments supporting documentation • Other project documentation • Required Caltrans exhibits and paperwork 3.10 Inspection & Materials Testing GHD will provide field observation during construction. We will conduct detailed daily site observations of the general progress of the work to determine if the work is proceeding in accordance with the contract documents. The inspector will attend all meetings, coordinate sampling and testing of construction materials in accordance with bid documents, record up-to-date construction changes to use in preparation of the record drawings, and report any violations to any applicable regulations or mitigation measures as well as maintain a copy of the contract documents and construction-related documents at the site, coordinate all construction activities with the utility companies and other agencies within the project area and as required by the City and photograph, log and pre-video prior, during and after construction. GHD will partner with RGH for Materials Testing, anticipating concrete cylinders, subgrade and ABII densities, and HMA compaction with related lab testing of materials, in accordance with the City QAP and LAPM frequency of testing tables. Inspector will prepare daily Construction Inspection Reports, which are included in CMIS construction management software. These reports include, at minimum, hours, personnel, equipment, (separated by contractor/subcontractor) weather, narrative section including observations, visitors to site, photographs, and daily quantities completed during the shift. Top Ten Keys to Effective, Efficient Quality Assurance 1 Dedication to Project Success 2 Apply practical knowledge from related experience 3 Know contract documents 4 Recognize potential issues inherent in work 5 Understand construction crew skills, limitations & challenges 6 Understand site conditions 7 Prioritize based on risk and timing 8 Proactive contingency plan 9 Make use of resources - personnel & technology 10 Clear & timely communication GHD | City of Rohnert Park | 12636789 | City of Rohnert Park CM Services for Southwest Blvd Complete Streets Project 12 3.11 Weekly Status Reports Weekly status reports will be prepared and will include a description of work performed, WSWD, 3 week look ahead schedule review, summary of PCOs and CCOs, photos, and any issues with the project. 3.12 Payment Applications GHD will review Contractor’s schedule of values versus the payment application. The Construction Manager will provide a recommendation of the monthly progress payment applications submitted by the contractor and provide recommendation to the City for payment. Construction Manager will also organize field meetings between inspector, Contractor, and City to verify quantities when necessary. It will be noted that as a condition of payment approval, the contractor must be current with as-built recording and scheduling efforts. 3.13 Schedules GHD will review the contractor’s initial and updated schedules for compliance with the contract documents and verify that the schedules accurately represent the scope of work. We will verify that all work for interim milestones is included on the schedule, logic ties of activities, check the reasonability of task durations, review the critical path, and check for critical activities. Important scheduling elements, such as partial shutdowns, street and lane closures, detours, public notifications, material delivery, material storage, and contractor material hauling will be a part of the schedule review process. 3.14 Change Orders Construction Manager will determine the necessity of the change, check for propriety, consider other methods of accomplishing the work, method of compensation, effect on contract time, estimate of cost, the Contractor’s reaction to the proposed change, and the probability of final approval. If the Construction Manager determines that a proposed change is warranted, a proposed change order file will be established. Documents prepared by the Construction Manger describing the work, will be transmitted to the Contractor for pricing. Concurrently, independent estimate of cost and time impact will be prepared by the City and Construction Manager. Upon receipt of the contractor’s quotation, the Construction Inspector or Construction Manager will review and compare it to the independent estimate. Based on the review, the Construction Manager will either recommend approval to the City or recommend rejection. If negotiation is authorized, the Construction Manager will conduct the negotiations with the Contractor. For work approved by the City where a unit cost is not determined prior to performing the work, the Inspector will meet with contractor to review DEWRs and material sheets at the end of each day and sign off on them. 3.15 Conflict Resolution An allowance will be included for resolution of issues which may arise during the project. 3.16 Public Relations Ensure proper public notification by the contractor (information about the project, door hangers, no-parking signs, etc) and proper timing of notifications occur. GHD will also perform the following: • Maintain a log of all phone calls and emails received • Listen to citizen’s concerns and work to address them • Work with the Contractor for prompt resolution of issues • Make sure contractor is prepared to circulate fliers, newspaper notifications as appropriate, and as approved by the City about noise restrictions, period of construction, and suggested alternate routes • Verify that changeable message signs are placed alerting traffic of the period of potential delays during lane closures if applicable • Communicate with emergency services about any events that may raise emergency calls from the public GHD | City of Rohnert Park | 12636789 | City of Rohnert Park CM Services for Southwest Blvd Complete Streets Project 13 •Coordinate with public transit agencies regarding potential conflicts with existing bus stops •Provide updated project-related information to the City for email or website updates 3.17 Final Inspection and Punch List At the completion of the project, GHD will perform inspections of the work to determine if any work is incomplete. Consultant will coordinate a walk through with the City and Contractor , prepare a punch list of the incomplete work, and provide it to the Contractor. We will perform subsequent inspections to confirm that incomplete work has been completed satisfactorily and inform the City when work is complete for one final inspection . As much as practical, punchlist items will be identified and communicated to the Contractor in advance so that they can be addressed prior to close-out if the Contractor is motivated to complete the project efficiently. 3.18 Documentation The Contractor’s record drawings will be reviewed for completeness and accuracy. We will coordinate the completion of final As-Built drawings through the design engineer. A final project report will be prepared summarizing the project and performance of the contractor. 3.19 Verification GHD will confirm tests and inspections were performed and results provided according to the Drawings and Specifications. 3.20 Submittal of Project Files At the completion of the project, GHD will turn over all documents (digitally), including documents maintained in CMIS and other documentation. Assumptions 1.GHD does not supervise or direct Contractor’s Work. Contractor will be solely responsible for and have control over construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the Work under the Contract. 2.Contractor is responsible for job site safety. 3.Contractor will not be relieved of obligations to perform Work in accordance with the Contract Documents either by activities or duties of Construction Management staff, or by tests, inspections, or approvals required or performed by persons other than Contractor. PROJECT FEE ESTIMATING SHEET SHT #1 of 1 PROJECT NAME:Southwest Blvd Complete Streets Project PROJECT #On-Site Inspector TBD Date 3/27/2024 Construction Manager Dillenburg PREPARED BY:Tim Dillenburg CLIENT: City of Rohnert Park Project Director Rozga FEE COMPUTATION Final Opinion of Probable Construction Cost LABOR CATEGORY> Project Director PM RE Proj Coord Inspector TOTAL Subconsultant Other Direct Costs TOTAL 90 Working Days 2,000,000$ RATE>$360 $301.50 $301.50 $144 $211.50 HOURS/ Services $8/hr office FEE 5 month Construction period /HR /HR /HR /HR /HR GHD fee $20/hr field 18 week Inspection period Project Oversight $8$8 Task 1.0 6 6 12 6 months, including final Monthly Progress 1,980$ 1,809$ -$ -$ -$ 3,789$ 92$ 3,881$ 1 Hr for PD Sub-Total 66 12 1,980$ 1,809$ -$ -$ -$ 3,789$ -$ 92$ 3,881$ Pre Construction & Contract Phase $8$6 Task 2.1 4 72 18 94 18 weekly Provide Project Coordination 1,440$ -$ 21,708$ 2,592$ -$ 25,740$ 752$ 26,492$ 4 hrs CM, 25% PC Task 2.2 2 8 8 4 22 1 pre-construction meeting Prepare and Conduct Preconstruction Meeting -$ 603$ 2,412$ 1,152$ 846$ 5,013$ 176$ 5,189$ 8 hrs CM, 25% PM Task 2.3 4 18 18 40 18 weekly contractor & other meetings Conduct and Document Project Meetings -$ 1,206$ 5,427$ 2,592$ -$ 9,225$ 320$ 9,545$ 1 hrs each Task 2.4 5 5 4.5 monthly update Review Contractors Construction Schedule -$ -$ 1,357$ -$ -$ 1,357$ 36$ 1,393$ 1 hrs each Task 2.5 36 36 72 18 weekly Maintain Project Records -$ -$ 10,854$ 5,184$ -$ 16,038$ 576$ 16,614$ 2 hrs Task 2.6 26 26 7 pay requests, including final Prepare Monthly Progress Payments -$ -$ 7,839$ -$ -$ 7,839$ 208$ 8,047$ 4 hrs each Task 2.7 6 6 11 6 months including final Prepare Weekly Progress Reports -$ 1,658$ -$ 792$ -$ 2,450$ 88$ 2,538$ 1 hrs for writing each PM & PC Task 2.8 5 2.5 8 5 Assumed Number of RFI's/RFC's Respond to RFI's -$ -$ 1,508$ 360$ -$ 1,868$ 60$ 1,928$ 1 hrs each CM, 50% PC Task 2.9 15 4 19 5 Assumed Number of PCO's Prepare PCO's and Change Orders -$ -$ 4,523$ 540$ -$ 5,063$ 150$ 5,213$ 3 hrs CM, 25% PC Task 2.10 10 5 15 20 Assumed Number of shop drawings/submittals Coordinate Submittal and Shop Drawing Review -$ -$ 3,015$ 720$ -$ 3,735$ 120$ 3,855$ 0.5 hrs CM, 50% PC Task 2.11 Included in Task 3.1 Monitor Permit Compliance -$ -$ -$ -$ -$ -$ -$ -$ Task 2.12 Included in Task 3.1 Monitor Construction Record Drawings -$ -$ -$ -$ -$ -$ -$ -$ Task 2.13 410 14 Perform Claims Management/Conflict Resolution -$ 1,206$ 3,015$ -$ -$ 4,221$ 112$ 4,333$ Sub-Total 4 16 205 97 4 325 1,440$ 4,673$ 61,657$ 13,932$ 846$ 82,548$ -$ 2,598$ 85,146$ Inspection & Materials Testing 12.00 Task 3.1 520 520 8.0 avg hrs per day inspection Provide Field Inspection/Observation -$ -$ -$ -$ 109,980$ 109,980$ 10,400$ 120,380$ 65 working days not overlapping Task 3.2 8 8 Prior to Pre-construction Prepare Photograph and Video Documentation -$ -$ -$ -$ 1,692$ 1,692$ 96$ 1,788$ Task 3.3 Included in Task 3.1 Field Changes -$ -$ -$ -$ -$ -$ -$ -$ Task 3.4 Included in Task 3.1 Prepare Daily Observation Reports -$ -$ -$ -$ -$ -$ -$ -$ Task 3.5 Materials Testing Materials Testing -$ -$ -$ -$ -$ -$ $25,000 3,750$ 28,750$ Coord time included in Task 3.1 Post Construction Phase Task 3.6 42 410 Develop Punchlists -$ -$ 1,206$ 288$ 846$ 2,340$ 128$ 2,468$ Task 3.7 18 8 4 30 Compile & Submit Final Documents -$ -$ 5,427$ 1,152$ 846$ 7,425$ 288$ 7,713$ Task 3.8 8 2 2 12 Final pay request, coordinate retention release Prepare Final Pay Estimate -$ -$ 2,412$ 288$ 423$ 3,123$ 120$ 3,243$ Notice of Completion Sub-Total 30 12 538 580 -$ -$ 9,045$ 1,728$ 113,787$ 124,560$ 25,000$ 14,782$ 164,342$ Public Outreach $8$6 Task 4.1 244 10 Public Outreach Plan -$ 603$ 1,206$ 576$ -$ 2,385$ 80$ 2,465$ Task 4.2 9 9 18 18 Public Information and Contact Points -$ -$ 2,714$ 1,296$ -$ 4,010$ 144$ 4,154$ 0.5 hrs each Sub-Total 21313 28 -$ 603$ 3,920$ 1,872$ -$ 6,395$ -$ 224$ 6,619$ Contingency $6 $6 -$ Project Totals 10 24 248 122 542 944 3,420$ 7,085$ 74,621$ 17,532$ 114,633$ 217,292$ 25,000$ 17,702$ 259,988$ Assumes no formal claims. Time is for meetings & communication to resolve field issues wks coordination * OTHER DIRECT COSTS Include: Telephone, Vehicles, Fuel, Lodging, Printing, Photo-copies paint, and other misc. direct expenses. Exhibit B